Segment tensioning system and construction method thereof
By designing a pipe sheet tensioning system, the steel strands are quickly connected by clip assembly and elastic parts, and the controllable load force is achieved by unlocking the assembly, the problems of the steel strands are difficult to load and poor pressure holding effect in the prior art. Improve the stability and construction efficiency between tunnel pipes and reduce the risk of water seepage.
Patent Information
- Application Number
- CN202411167245.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-12
AI Technical Summary
The existing tunnel pipe strip tensioning device is difficult to load steel strands during construction, the loading force adjustment is complex and the pressure holding effect is poor, resulting in unstable tunnel pipe strip gaps, which may lead to water seepage and rework needs.
A pipe sheet tensioning system is designed, including a loading device and a tensioning device, which can quickly connect and lock the steel strands through clip assembly and elastic parts, and controllable load force application and release using unlocking components to ensure that Stable connection between tunnel pipes.
It achieves high connection strength and self-locking effect, ensures stability between tunnel pipes, reduces seepage risks and repair costs, and improves construction efficiency and safety.
Smart Images

Figure CN118933855A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnels, and in particular to a segment tensioning system and a construction method thereof. Background Art
[0002] During tunneling construction, as the tunneling equipment gradually advances, tunnel segments are laid and connected in sequence to form the tunnel support structure. These tunnel segments are locked together by bolt assemblies. Due to various reasons, including the free space between the tunnel segments and the tunneling channel, the uneven soil pressure under different soil environment conditions, etc., the spacing between tunnel segments or between multiple rings of tunnel segments may become unstable. This instability may cause the waterproofing measures to fail, especially when the gap is sealed with a water-swelling water stop ring. Once the tunnel segments are offset, it may cause water seepage, which requires repair work, which is not only difficult but also costly.
[0003] China's public document CN210460682U discloses a tensioning device for shield tunnel segments, which effectively tightens the segment rings at the entrance and exit of the working shaft of the shield tunnel, ensures the sealing and waterproof effect of the segment rings, and avoids the segment rings from loosening. China's public document CN116357339A discloses a tensioning device for connecting channel segments and a construction method thereof, which can achieve better construction effects by setting retractable clips and tensioning devices, making the connecting channel segments more tightly combined, reducing the impact of penetration on the project, and can achieve the tensioning of the segments in the connecting channel in a humid environment.
[0004] However, it is difficult to load the steel strands with the tensioning device during construction, the loading force is complicated to adjust and the loading state needs to be maintained at all times, and the pressure-maintaining effect is poor, so it needs to be improved. Summary of the invention
[0005] In order to overcome the problems existing in the related art, an embodiment of the present invention provides a segment tensioning system and a construction method thereof.
[0006] According to a first aspect of an embodiment of the present invention, there is provided a segment tensioning system, comprising a loading device, two or more tensioning devices and steel strands, each of the steel strands being connected to at least two of the tensioning devices, the loading device being connected to the tensioning device constituting a loading end, another tensioning device connected to the steel strand constituting a load end, the tensioning devices being fixed to tunnel segments at intervals, and a plurality of tunnel segments being spaced between the loading end and the load end; The tensioning device comprises a fixed base frame and at least one clip assembly mounted on the fixed base frame, the clip assembly comprises a working anchor cup and at least two working clips assembled in the working anchor cup, the mating surfaces of the working clip and the working anchor cup are conical surfaces, the at least two working clips are closed to form a locking hole for clamping the steel strand, and the conical small ends of the two clip assemblies connected to the steel strand are arranged opposite to each other; wherein, When the loading device is loaded, it clamps and pulls the steel strand at the loading end, and the working clamp at the load end locks the steel strand; When the loading device is unloaded, the loading end keeps locking the steel strand through the clip assembly.
[0007] In one embodiment, the clip assembly includes an elastic member elastically abutting against the working clip and an anchor cup end cover connected to the working anchor cup, the elastic member is used to apply an elastic preload force to the working clip to move toward the conical surface, and one end of the elastic member elastically abuts against the anchor cup end cover.
[0008] In one embodiment, the tensioning device further comprises an unlocking component, which is configured to flexibly push at least a portion of the working clip to disengage from the conical surface of the working anchor cup, so as to release the locking of the working clip on the steel strand.
[0009] In one embodiment, the unlocking assembly includes a top block and an adjusting bolt, the top block is slidably connected to the fixed base frame, the adjusting bolt is spirally connected to the fixed base frame and pushes the top block, and the working clamp is located in the sliding direction of the top block.
[0010] In one embodiment, the locking hole has a hole wall with intermittently protruding biting convexities, and the biting convexities are used to increase the biting force on the steel strand.
[0011] In one embodiment, the tensioning device is provided with a through hole, the locking hole and the through hole are coaxial, the steel strands are connected to a plurality of tensioning devices along the through hole, and the plurality of tensioning devices are in the same straight line.
[0012] In one embodiment, the loading device includes a loading seat detachably mounted on the tensioning device and a loading mechanism mounted on the loading seat, wherein the loading mechanism is provided with a plurality of tool clips, and the loading mechanism clamps and pulls the steel strands through the tool clips.
[0013] The second invention of the present invention discloses a construction method of a segment tensioning system. Using the segment tensioning system as described above, the construction method comprises the following steps: S101, determining a plurality of tunnel segments to be subjected to a pretension load and determining loading points, wherein at least two tunnel segments are spaced apart from each other; S102, installing at least two tensioning devices at intervals to corresponding loading points; S103, inserting the steel strands into the two tensioning devices, wherein the tensioning devices clamp and fix the steel strands through a clip assembly; S104, assembling a loading device to a tensioning device, wherein the loading device clamps one end of a fixed steel strand, and the loading device pulls the steel strand and applies a preload force between multi-ring tunnel segments; Steps S101-S104 are repeated until the tunnel excavation is completed.
[0014] In one embodiment, the step of determining the multi-ring tunnel segments to which the pre-tension load is to be applied and determining the loading points comprises the following steps: In the tunnel excavation direction, tunnel segments are laid ring by ring as the excavation equipment advances; When the number of rings of the newly laid tunnel segments reaches the preset number of rings, the corresponding tunnel segment is determined as the loading point; Assemble the new tensioning device to the loading point and connect it to the previous tensioning device via steel strands.
[0015] In one embodiment, the loading device pulling the steel strand comprises the following steps: The loading device clamps the steel strand through the tool clamp, and releases the locking of the steel strand by the working clamp in the tensioning device connected to the loading device; The loading device performs a telescopic movement to apply a controllable load force to the strand; After the loading device completes loading, the working clamp locks the steel strand, and the loading device releases pressure and releases the steel strand.
[0016] The technical solution provided by the embodiment of the present invention may include the following beneficial effects: each tensioning device is independently installed on the tunnel segment, and two adjacent tensioning devices are connected by steel strands and loads are applied to pull and tension multiple tunnel segments, and the connection strength is high. The clip assembly quickly connects or locks the steel strands, and the locking is convenient and efficient. The working clip and the working anchor cup achieve locking through the matching conical surface, and can autonomously maintain the stability of the steel strand load, and the self-locking effect is good.
[0017] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0019] Figure 1The present invention is a flowchart showing a construction method of a segment tensioning system according to an exemplary embodiment.
[0020] Figure 2 It is a construction schematic diagram showing a segment tensioning system according to an exemplary embodiment.
[0021] Figure 3 It is a partial cross-sectional schematic diagram showing a loading device connected to a tensioning device according to an exemplary embodiment.
[0022] Figure 4 yes Figure 3 Enlarged schematic diagram at point A in the middle.
[0023] Figure 5 The figure is a schematic cross-sectional structure diagram showing a tensioning device provided with an extension frame according to an exemplary embodiment.
[0024] In the figure, the base frame 10 is fixed; the locking seat 11; the unlocking hole 111; the docking plate 12; the bottom plate 13; the reinforcing plate 14; the clip assembly 20; the working anchor cup 21; the load hole 211; the working clip 22; the bite convex pattern 221; the conical surface 222; the elastic member 23; the anchor cup end cover 24; the unlocking assembly 30; the adjustment bolt 31; the top block 32; the unlocking boss 321; the steel strand 40; the locking bolt 50; the stopper 51; the rotating part 52; the bolt part 53; the loading device 60; the loading mechanism 61; the loading seat 62; the tool clip 63; the presser 64; and the extension frame 70. DETAILED DESCRIPTION
[0025] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on this patent; in order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0026] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as a limitation on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0027] In the description of the present invention, unless otherwise clearly specified and limited, if the term "connection" or the like appears to indicate the connection relationship between components, the term should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two components or the interaction relationship between two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0028] like Figures 1 to 4 As shown, the present invention provides a segment tensioning system, which is used to load and connect multiple tunnel segments. The segment tensioning system includes a loading device 60, two or more tensioning devices and steel strands 40, each of which is connected to at least two tensioning devices. The loading device 60 is connected to the tensioning device to form a loading end, and another tensioning device connected to the steel strand 40 forms a load end. The tensioning device is fixed to the tunnel segment at intervals, and multiple tunnel segments are spaced between the loading end and the load end. The two ends of the steel strand 40 are respectively fixed to the loading end and the load end, and the steel strand 40 connected to the loading end is loaded by the loading device 60, so that a pre-compression load force is formed between the load end and the loading end, thereby avoiding the change of the tunnel segment gap between the load end and the loading end. Among them, the segment tensioning system is applied to the tunnel excavation construction process, and the tunnel segment is laid along with the tunnel excavation construction, and the segment tensioning system limits the laid tunnel segment.
[0029] The tensioning device includes a fixed base frame 10 and at least one clip assembly 20 mounted on the fixed base frame 10. The fixed base frame 10 is a rigid structural member for detachably mounting to a tunnel segment. The clip assembly 20 is mounted on the fixed base frame 10 and is used to lock the outer peripheral wall of the steel strand 40 to transfer the load force of the steel strand 40 to the tunnel segment through the clip assembly 20 and the fixed base frame 10.
[0030] The clip assembly 20 includes a working anchor cup 21 and at least two working clips 22 assembled in the working anchor cup 21, and the mating surface of the working clip 22 and the working anchor cup 21 is a conical surface 222. At least two working clips 22 are closed to form a locking hole for clamping the steel strand 40, and the small ends of the conical surfaces 222 of the two clip assemblies 20 connected to the steel strand 40 are arranged opposite to each other. At least two working clips 22 are closed to form a locking hole for clamping the steel strand 40, and the tension of the steel strand 40 drives the conical surface 222 of the working clip 22 to press against the conical surface of the working anchor cup 21. The number of working clips 22 can be set to 2-6 pieces, and specifically, the number of working clips 22 can be set to two, three, four or six pieces. The side of the working clip 22 inserted into the working anchor cup 21 is set as an outer conical surface, and the working anchor cup 21 is provided with a through-hole-shaped load hole 211, and the load hole 211 is partially set as an inner conical surface to match the outer conical surface of the working clip 22. Preferably, the taper angle of the load hole 211 is greater than or equal to the taper angle of the working clip 22, so as to form a partial connection and a good combination effect.
[0031] When the loading device 60 is loaded, it clamps and pulls the steel strand 40 at the loading end, and the working clamp 22 at the load end locks the steel strand 40. The small ends of the conical surfaces 222 of the two clamp assemblies 20 connected to the steel strand 40 are arranged opposite to each other. When the loading device 60 is unloaded, the loading end keeps locking the steel strand 40 through the clamp assembly 20.
[0032] Multiple working clips 22 are closed to clamp the steel strand 40, and there is a gap between two adjacent working clips 22, so that they abut against the inner conical surface of the working anchor cup 21 under the tension of the steel strand 40, forming an automatic clamping and pressurizing structure. The clip assembly 20 locks the steel strand 40, so that it can be clamped quickly and has a good locking effect. The working clip 22 and the working anchor cup 21 cooperate through the conical surface 222, and the working clip 22 can automatically press against the working anchor cup 21 through the tension exerted on the steel strand 40, forming a self-locking effect.
[0033] Each tensioning device is independently installed on the tunnel segment. Two adjacent tensioning devices are connected by steel strands 40 and load is applied to pull multiple tunnel segments together and tighten them, with high connection strength. The clip assembly 20 quickly connects or locks the steel strands 40, which is convenient and efficient. The working clip 22 and the working anchor cup 21 are locked by the matching conical surface 222, and can autonomously keep the load of the steel strand 40 stable, with good self-locking effect.
[0034] Furthermore, the locking hole has an intermittently protruding engagement convex pattern 221 on the hole wall, and the engagement convex pattern 221 is used to improve the engagement effect and anti-dropping effect of the clip assembly 20 on the steel strand 40. The engagement convex pattern 221 is a convex point or convex rib structure, such as the engagement convex pattern 221 can be set as a pattern-like convex tooth structure; or the engagement convex pattern 221 is set as a convex tooth structure or a thread structure or a parallel convex rib structure formed between adjacent grooves. Preferably, the engagement convex pattern 221 is set as a thread structure to improve processing convenience and engagement ability.
[0035] In one embodiment, the clip assembly 20 further includes an elastic member 23 elastically abutting against the working clip 22 and an anchor cup end cover 24 connected to the working anchor cup 21, the elastic member 23 is inserted from the load hole 211 and abuts against the large end of the working clip 22, and the other end of the elastic member 23 elastically pushes against the anchor cup end cover 24. The anchor cup end cover 24 is fixed to the working anchor cup 21 and blocks the load hole 211 to confine the elastic member 23 in the working anchor cup 21. The elastic member 23 is used to apply an elastic preload force to the working clip 22 to move in the direction of the conical surface 222, wherein the elastic member 23 applies an elastic preload force to the large end of the working clip 22 to push the working clip 22 to always keep moving toward the small end.
[0036] Optionally, the elastic member 23 is configured as a preloaded spring to elastically abut against the large ends of the plurality of working clips 22. Optionally, the elastic member 23 is configured as a disc spring or an elastic sleeve to elastically abut against the large ends of the plurality of working clips 22. Under the elastic force of the elastic member 23, the working clip 22 can be prevented from loosening, causing the steel strand 40 to move. Furthermore, when the loading device 60 pulls the steel strand 40 for tensile loading, the steel strand 40 drives the working clip 22 to overcome the elastic force of the elastic member 23 and move. At the same time, the elastic preload of the elastic member 23 pushes the working clip 22 to move toward the inner conical surface 222 of the working anchor cup 21 to achieve automatic clamping, which can prevent the steel strand 40 from being pulled out in the reverse direction and avoid loading failure.
[0037] The anchor cup end cover 24 is provided with a through hole for the steel strand 40 to pass through. The steel strand 40 passes through the through hole and the elastic member 23 and is clamped by multiple working clips 22 at the same time. Moreover, the working clips 22 can prevent loosening and maintain the locking force under the push of the elastic member 23. The anchor cup end cover 24 is detachably connected to the working anchor cup 21 to facilitate the disassembly and adjustment of the elastic member 23. For example, the anchor cup end cover 24 is spirally connected to the working anchor cup 21 to form a spiral connection. Alternatively, the anchor cup end cover 24 is locked and connected to the working anchor cup 21 by a fastener to form a detachable connection.
[0038] Among them, during the loading process at the loading end, the anchor cup end cover 24 and the elastic member 23 can be loosened before loading to reduce the influence and resistance of the pre-tightening force of the elastic member 23 on the loading process and improve the loading efficiency. When the loading reaches the corresponding load requirement, the elastic member 23 is reset and the anchor cup end cover 24 is buckled, so that the elastic member 23 pushes the working clip 22 to automatically lock the steel strand 40, thereby achieving a locked connection with a good locking effect and no reversal.
[0039] Since the elastic member 23 always maintains an elastic preload on the working clip 22, in addition to removing the elastic member 23 and the anchor cup end cover 24 to release the elastic preload on the working clip 22, the unlocking assembly 30 can also be used to overcome the elastic preload of the elastic member 23 to release the locking of the working clip 22 on the steel strand 40.
[0040] The tensioning device further includes an unlocking assembly 30 mounted on the fixed base frame 10, and the unlocking assembly 30 movably pushes at least part of the working clip 22 to disengage from the conical surface 222 of the working anchor cup 21, so as to release the locking of the working clip 22 to the steel strand 40. The unlocking assembly 30 is arranged opposite to the working clip 22, so as to movably push the working clip 22 to move, so as to release the locking of the working clip 22 to the steel strand 40.
[0041] Specifically, when the clip assembly 20 is not provided with the elastic member 23, the unlocking assembly 30 pushes the working clip 22 to move along the axial direction of the load hole 211 to push the working clip 22 to separate from the conical surface 222 of the working anchor cup 21, thereby gradually increasing the gap between the working clips 22, releasing the locking of the working clip 22 on the steel strand 40, and thus enabling the loosening movement of the steel strand 40. When the clip assembly 20 is provided with the elastic member 23, the unlocking assembly 30 overcomes the elastic preload force of the elastic member 23 and moves to push the working clip 22 to release the locking of the steel strand 40.
[0042] The unlocking assembly 30 is provided with a threading hole for the steel strand 40 to pass through, and the hole diameter of the threading hole is larger than the maximum outer diameter of the steel strand 40. The steel strand 40 passes through the threading hole, and the working clamp 22 clamps the steel strand 40, with high coaxiality and good clamping effect.
[0043] Preferably, the unlocking assembly 30 includes a top block 32 and an adjusting bolt 31. The top block 32 is slidably connected to the locking seat 11, and the locking seat 11 is an upright plate on the fixed base frame 10. The adjusting bolt 31 is spirally connected to the locking seat 11 and pushes the top block 32. The working clamp 22 is located in the sliding direction of the top block 32. The fixed base frame 10 is provided with an unlocking hole 111, and the unlocking hole 111 is coaxially arranged with the load hole 211. In addition, the aperture of the unlocking hole 111 is larger than the aperture of the small hole of the load hole 211, and the aperture of the unlocking hole 111 is larger than the axis of the steel strand 40. The unlocking hole 111 provides a sliding guide for the top block 32 to directionally slide and unlock the working pipe segment.
[0044] The top block 32 slides in the unlocking hole 111, and an unlocking boss 321 is provided at the end of the top block 32. The unlocking boss 321 can move axially under the push of the locking seat 11, and push the working clamp 22 to move after being inserted into the load hole 211 to release the lock of the working clamp 22 on the steel strand 40.
[0045] In one embodiment, the unlocking assembly 30 is mounted on the locking seat 11 and is arranged opposite to the clip assembly 20, and the steel strand 40 shuttles along the central hole of the unlocking assembly 30. The unlocking assembly 30 and the clip assembly 20 are arranged in pairs, so that the working clip 22 of the corresponding clip assembly 20 can be correspondingly unlocked, and the corresponding unlocking effect is good. The unlocking assembly 30 is fixed to the locking seat 11, which can shorten the overall structural size and reduce the amount of activity required for unlocking.
[0046] In one embodiment, when two tensioning devices with loading loads are removed, the loading device 60 is required to load the steel strand 40, and then push the working clip 22 out of the working anchor cup 21, so as to contact the clamping of the steel strand 40. After the loading device 60 is unloaded, the steel strand 40 can be pulled out of the clip assembly 20 to complete the removal.
[0047] The tensioning device includes a fixed base frame 10, a clip assembly 20 and a locking bolt 50. The locking bolt 50 is used to lock the fixed base frame 10 to the tunnel segment. The tunnel segment is provided with a bolt hole, which is a hoisting hole, a grouting hole, a connection hole, etc. provided on the tunnel segment. The locking bolt 50 passes through the fixed base frame 10 and is connected to the bolt hole to achieve a locking connection of the fixed base frame 10. The fixed base frame 10 is locked to the tunnel segment by the locking bolt 50 to achieve flexible disassembly and assembly.
[0048] In one embodiment, the locking bolt 50 includes a stopper 51, a bolt portion 53 protruding from the stopper 51 at both ends opposite to each other, and a rotating portion 52. The bolt portion 53 is used to be spirally connected to the tunnel segment until the stopper 51. The rotating portion 52 is provided with a wire hole, and the steel strand 40 shuttles along the wire hole. The stopper 51 and the bolt portion 53 constitute a spiral locking structure to lock the fixed base frame 10 to the tunnel segment. The rotating portion 52 protrudes from the stopper 51 to facilitate the locking bolt 50 to rotate and bear force, and does not affect the shuttle of the steel strand 40.
[0049] The fixed base frame 10 is provided with a locking seat 11, and the fixed base frame 10 is provided with a threading channel for inserting the steel strand 40. The locking seat 11 is located on the threading channel and has a corresponding through hole. Preferably, the fixed base frame 10 is symmetrically arranged so that the clip assembly 20 can be installed at both ends to realize the locking structure of the steel strand 40.
[0050] The segment tensioning system is provided with a plurality of tensioning devices, for example, two, three, four, five, six, or eight tensioning devices are provided. The tensioning device is provided with through holes, and the through holes are connected by steel strands 40 to form a connection structure. Among them, each steel strand 40 is connected with two to form an integrated connection structure. In one embodiment, the tensioning device is provided with a through hole that penetrates, and the locking hole and the through hole are coaxial. The steel strands 40 connect a plurality of tensioning devices along the through hole, and the plurality of tensioning devices are in the same straight line. The plurality of tensioning devices are in the same straight line to form an integrated connection structure, and the plurality of tensioning devices are distributed in the same straight line, which is parallel to the axial direction of the tunnel excavation, thereby forming a parallel force-bearing structure with a good force-bearing effect.
[0051] In one embodiment, the segment tensioning system is distributed on the tunnel segment on the upward side of the tunnel. Specifically, the segment tensioning system is distributed on the upper half of the tunnel to reduce the impact of construction and avoid interference with equipment movement and personnel activities.
[0052] The fixed base frame 10 is provided with a single-side fixing structure; or, the fixed base frame 10 is provided with a double-side fixing structure. In one embodiment, the fixed base frame 10 includes a bottom plate 13, two docking plates 12 and at least two reinforcing plates 14, and the two docking plates 12 are relatively fixed to the two ends of the bottom plate 13. The three sides of the reinforcing plate 14 are respectively fixedly connected to the reinforcing plate 14 and the bottom plate 13, and the three sides of the locking seat 11 are respectively fixedly connected to the two reinforcing plates 14 and the bottom plate 13, and the locking seat 11 and the docking plates 12 are arranged at intervals.
[0053] The bottom plate 13 is used to fit to the tunnel segment, the butt plate 12 is distributed and fixed at both ends of the bottom plate 13, and the two reinforcing plates 14 are arranged in parallel and located between the two butt plates 12. The butt plate 12 and the reinforcing plate 14 form a rectangular structure or a II-shaped structure, the reinforcing plate 14 is located in the enclosed space and intersects with the bottom plate 13, and the fixed bottom frame 10 forms a frame-shaped structure, and the overall structure has high stability and high structural strength. Preferably, the fixed bottom is a symmetrical structure, so that it can be installed from both ends, and the structure is stable.
[0054] Furthermore, the tensioning device also includes an extension frame 70 detachably connected to the fixed base frame 10, and the extension frame 70 is used to extend the connection position and connection length of the fixed base frame 10, so as to adapt to different connection requirements of the steel strands 40. For example, the extension frame 70 can be extended to the bolt hole of another pipe segment so that the tensioning device crosses and connects two bolt holes to improve the installation structure strength and connection stability. Alternatively, the extension frame 70 can extend the connection mode of the extension clip assembly 20 to achieve different fixing directions of the steel strands 40.
[0055] In a preferred embodiment, the extension frame 70 is equipped with a clip assembly 20, and the clip assembly 20 is used to lock the steel strand 40. The extension frame 70 is equipped with the clip assembly 20, and accordingly, the end of the fixed base frame 10 connected to the extension frame 70 does not need to be equipped with the clip assembly 20, thereby simplifying the structure and achieving the uniformity of the fixed base frame 10.
[0056] The extension frame 70 is fixed to the docking plate 12 , and the two are locked and connected by a bolt assembly, and the connection effect is good. Preferably, an assembly plate is provided at one end of the extension frame 70 , and the clip assembly 20 abuts against the assembly plate through the steel strand 40 .
[0057] In one embodiment, the loading device 60 includes a loading seat 62 detachably mounted on the tensioning device and a loading mechanism 61 mounted on the loading seat 62. The loading mechanism 61 is provided with a plurality of tool clamps 63. The loading mechanism 61 clamps and pulls the steel strand 40 through the tool clamps 63. The loading mechanism 61 is provided as a hydraulic cylinder mechanism, which drives the tool clamps 63 to reciprocate linearly to perform loading movement on the steel strand 40. The tool clamps 63 are provided as two, three or four pieces to facilitate the clamping and fixing of the steel strand 40.
[0058] The output end of the loading mechanism 61 is provided with a presser 64, which is fixed against the working anchor cup 21 to locate the relative position of the loading assembly and the working anchor cup 21. Furthermore, a positioning groove is provided at the end of the presser 64, and the working anchor cup 21 is inserted and embedded in the positioning groove to form a coaxial positioning structure. The presser 64 is provided with a wire outlet hole, and the tool clamp 63 is located inside the presser 64 to clamp and locate the steel strand 40.
[0059] During the tensioning process of the tunnel segments, two or more tensioning devices are arranged at intervals along the length direction of the tunnel excavation at the support points of different tunnel segments. The tensioning device installed at each support point is locked to the corresponding tunnel segment by a locking bolt 50 to form a positioning support. The steel strand 40 is inserted into the clip assembly 20 connecting the two adjacent tensioning devices to form a connection at both ends of the steel strand 40. The loading device 60 is connected to the tensioning device located at the end, and the loading device 60 pushes against the working anchor cup 21 and pulls the steel strand 40 to move and load. During the loading process, the working clip 22 is driven by the steel strand 40 to break away from the inner conical surface 222 of the working anchor cup 21. After the loading is completed, the working clip 22 closes and presses against the inner conical surface 222 of the working anchor cup 21 to perform abutment locking. Preferably, the elastic member 23 provides a locking force to the working clip 22 to prevent the working clip 22 from loosening.
[0060] The segment tensioning system of the above embodiment is applied to tunnel construction, wherein a construction method of the segment tensioning system is provided, and the construction method comprises the following steps: Step S101, determine the multi-ring tunnel segments to which pre-tensioning loads need to be applied and determine the loading points, with at least two rings of tunnel segments between two adjacent loading points. During the tunnel excavation construction process, multiple tunnel segments near one end of the excavation device need to be tightened and loaded after laying to avoid changes in the fitting gaps between the tunnel segments as the excavation of the excavation equipment and the changes in the surrounding soil body are completed. The loading point is the location where the load is applied in the segment tensioning system. The tensioning device is fixed to the corresponding tunnel segment to achieve the specified load loading amount of the loading point. The steel strand 40 is a rope that can be loaded with elastic loads. The multi-ring tunnel segments maintain a suitable closing force under the tension of the steel strand 40.
[0061] Step S102, at least two tensioning devices are installed at intervals to corresponding loading points. The tensioning device is provided with a fixed base frame 10, a mounting hole is opened in the middle of the fixed base frame 10, and a locking bolt 50 passes through the mounting hole and is locked to the bolt hole of the tunnel segment to form an assembly connection.
[0062] Step S103, the steel strand 40 is inserted and connected to at least two tensioning devices, and the tensioning devices clamp and fix the steel strand 40 through the clamp assembly 20. The steel strand 40 passes through the working anchor cup 21, and the multiple working clamps 22 separate during the steel strand 40 process, and close and clamp after the steel strand 40 is inserted into place, so as to lock the steel strand 40 and prevent it from being pulled out in the reverse direction.
[0063] Step S104, assemble the loading device 60 to a tensioning device, the loading device 60 clamps one end of the fixed steel strand 40, and the loading device 60 pulls the steel strand 40 and loads the preload force between the multi-ring tunnel segments. After the two ends of the steel strand 40 are fixed, the loading device 60 is connected to one end of the steel strand 40 to drive the steel strand 40 to pull and load through axial telescopic movement or winding function, and the load loading effect is good and the load amount is controllable.
[0064] Steps S101-S104 are repeated until the tunnel excavation is completed.
[0065] At least one tensioning device is connected to both sides with steel strands 40, and two steel strands 40 are respectively loaded with preload forces in opposite force directions. Optionally, the tensioning devices are grouped into three, and the tensioning device in the middle is connected to steel strands 40 on both sides, so that the tensioning device in the middle is evenly stressed on both sides, which can expand the force range of the tunnel segment. At the same time, the segment tensioning system can expand the loading range without eccentric load through the tensioning device in the middle, and the overall loading consistency is high. It is worth mentioning that three or more tensioning devices can be connected continuously, and the tunnel segment can be continuously loaded to avoid looseness, which can improve the consistency of the force direction of the tunnel segment and avoid distortion and eccentric load.
[0066] In step S101, determining the multi-ring tunnel segments to be subjected to pre-tension load and determining the loading points includes the following steps: In the tunnel excavation direction, the tunnel segments are laid ring by ring as the excavation equipment excavates. In this embodiment, the segment tensioning system is tensioning to maintain the stability of the tunnel segments during the tunnel construction process, wherein the excavation equipment is installed to excavate along a preset trajectory, and the tunnel segments are laid ring by ring as the excavation equipment excavates.
[0067] When the number of newly laid tunnel segments reaches the preset number of rings, the corresponding tunnel segment is determined as the loading point. As the excavation equipment advances, the number of newly laid tunnel segments gradually increases, such as the number of tunnel segments reaching three rings, four rings, five rings, six rings, and eight rings. One of the tunnel segments is determined as the loading point, and the interval between the loading point and the nearest tensioning device is the tunnel segment of the designed number of rings. For example, the interval number of tunnel segments is three rings, four rings, five rings, and six rings, which can be flexibly adjusted according to design requirements and construction requirements. In addition, the segment tensioning system is implemented synchronously with the tunnel excavation construction to avoid water-stop failure caused by changes in the gap between two adjacent tunnel segments.
[0068] The new tensioning device is assembled to the loading point and connected to the previous tensioning device through the steel strand. The tensioning device is fixed to the newly determined loading point in time, and the loading device is assembled to the new tensioning device and pulls the steel strand, so that the tunnel segment can be tightened in time. The segment tensioning system disclosed in this application can realize continuous loading, and realize multi-point positioning and support through modular tensioning devices, which is flexible in loading and convenient in installation.
[0069] In step S104, the loading device 60 draws the steel strand 40, including the following steps: The loading device 60 clamps the steel strand 40 through the tool clamp 63, and releases the lock of the steel strand 40 by the working clamp 22 in the tensioning device connected to the loading device 60. The loading device 60 locks the steel strand 40 to form a preliminary position clamping lock to prevent the steel strand 40 from expanding and contracting after the working clamp 22 is loosened. Afterwards, the working clamp 22 can release the lock on the steel strand 40 under the unlocking push, so that there is no corresponding clamping force between the working clamp 22 and the steel strand 40, so that the steel strand 40 can be accurately loaded with load force.
[0070] The loading device 60 performs telescopic movement to apply a controllable load force to the steel strand 40. The loading device 60 is a hydraulic cylinder mechanism with controllable output pressure, which can clamp and fix the steel strand 40, and the center line of the steel strand 40 and the center line of the loading mechanism 61 are coaxially arranged. The steel strand 40 can fully apply the load force, and the load loading accuracy is high.
[0071] After the loading device 60 completes loading, the working clamp 22 locks the steel strand 40, and the loading device 60 releases pressure and releases the steel strand 40. The loading device 60 increases the load force step by step, and after the steel strand 40 reaches the preset load force, it is released and unlocked, so that the working clamp 22 resets and clamps the steel strand 40 under the elastic preload force of the elastic member 23, thereby achieving automatic clamping. Even after the loading device 60 releases pressure, the steel strand 40 can still maintain the corresponding loading force. Alternatively, after the steel strand 40 reaches the preset load force, the elastic member 23 is installed in the working anchor cup 21, the anchor cup end cover 24 closes the opening of the working anchor cup 21, and the working clamp 22 resets and clamps the steel strand 40 under the elastic preload force of the elastic member 23, thereby achieving automatic clamping of the steel strand 40.
[0072] Those skilled in the art will readily appreciate other embodiments of the present invention after considering the specification and practicing the disclosure disclosed herein. This application is intended to cover any variations, uses or adaptations of the present invention that follow the general principles of the present invention and include common knowledge or customary techniques in the art that are not disclosed by the present invention. The description and examples are to be considered exemplary only, and the true scope and spirit of the present invention are indicated by the following claims.
[0073] It should be understood that the present invention is not limited to the exact construction that has been described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.
Claims
1. A segment tensioning system, characterized in that: It comprises a loading device, two or more tensioning devices and steel strands, each of the steel strands is connected to at least two of the tensioning devices, the loading device connected to the tensioning device constitutes a loading end, the other tensioning device connected to the steel strand constitutes a load end, the tensioning devices are fixed to the tunnel segments at intervals, and a plurality of tunnel segments are spaced between the loading end and the load end; The tensioning device comprises a fixed base frame and at least one clip assembly mounted on the fixed base frame, the clip assembly comprises a working anchor cup and at least two working clips assembled in the working anchor cup, the mating surfaces of the working clip and the working anchor cup are conical surfaces, the at least two working clips are closed to form a locking hole for clamping the steel strand, and the conical small ends of the two clip assemblies connected to the steel strand are arranged opposite to each other; wherein, When the loading device is loaded, it clamps and pulls the steel strand at the loading end, and the working clamp at the load end locks the steel strand; When the loading device is unloaded, the loading end keeps locking the steel strand through the clip assembly.
2. The segment tensioning system according to claim 1, characterized in that: The clip assembly includes an elastic member elastically abutting against the working clip and an anchor cup end cover connected to the working anchor cup, the elastic member is used to apply an elastic preload force to the working clip to move toward the conical surface, and one end of the elastic member elastically pushes against the anchor cup end cover.
3. The segment tensioning system according to claim 2, characterized in that: The tensioning device also includes an unlocking component, which is used to flexibly push at least a portion of the working clip to separate from the conical surface of the working anchor cup so as to release the locking of the working clip on the steel strand.
4. The segment tensioning system according to claim 3, characterized in that: The unlocking assembly includes a top block and an adjusting bolt, the top block is slidably connected to the fixed base frame, the adjusting bolt is spirally connected to the fixed base frame and pushes the top block, and the working clamp is located in the sliding direction of the top block.
5. The segment tensioning system according to claim 1, characterized in that: The locking hole has bite convex patterns at intervals on its wall, and the bite convex patterns are used to increase the bite force on the steel strand.
6. The segment tensioning system according to claim 1, characterized in that: The tensioning device is provided with a through hole, the locking hole is coaxial with the through hole, the steel strand is connected to a plurality of tensioning devices along the through hole, and the plurality of tensioning devices are in the same straight line.
7. The segment tensioning system according to claim 1, characterized in that: The loading device comprises a loading seat detachably mounted on the tensioning device and a loading mechanism mounted on the loading seat. The loading mechanism is provided with a plurality of tool clamps, and the loading mechanism clamps and pulls the steel strands through the tool clamps.
8. A construction method of a segment tensioning system, using the segment tensioning system according to any one of claims 1 to 7, characterized in that: The construction method includes the following steps: S101, determining a multi-ring tunnel segment to be subjected to a pre-tension load and determining a loading point, wherein at least two rings of tunnel segments are spaced between two adjacent loading points; S102, installing at least two tensioning devices at intervals to corresponding loading points; S103, inserting the steel strands into two adjacent tensioning devices, wherein the tensioning devices clamp and fix the steel strands through a clip assembly; S104, assembling a loading device to a tensioning device, wherein the loading device clamps one end of a fixed steel strand, and the loading device pulls the steel strand and applies a preload force between multi-ring tunnel segments; Steps S101-S104 are repeated until the tunnel excavation is completed.
9. The construction method according to claim 8, characterized in that: The method of determining the multi-ring tunnel segments to be subjected to pre-tension load and determining the loading points comprises the following steps: In the tunnel excavation direction, tunnel segments are laid ring by ring as the excavation equipment advances; When the number of rings of the newly laid tunnel segments reaches the preset number of rings, the corresponding tunnel segment is determined as the loading point; Assemble the new tensioning device to the loading point and connect it to the previous tensioning device via steel strands.
10. The construction method according to claim 8, characterized in that: The loading device pulling the steel strand comprises the following steps: The loading device clamps the steel strand through the tool clamp, and releases the locking of the steel strand by the working clamp in the tensioning device connected to the loading device; The loading device performs a telescopic movement to apply a controllable load force to the strand; After the loading device completes loading, the working clamp locks the steel strand, and the loading device releases pressure and releases the steel strand.