Water-rich fault fracture zone tunnel grouting reinforcement method and mud burst and water burst treatment method
Through the combination of replacement grouting reinforcement method and deep drainage pressure, the problems of weak rock mass and large water pressure in water sludge in water-rich faults are solved, the grouting effect and management efficiency are improved, and the secondary disasters are reduced risk.
Patent Information
- Application Number
- CN202411149995.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-12
AI Technical Summary
In the current technology, when dealing with water-rich faults, the rock mass is weak, the water pressure is large, and the crushed slurry content is high, resulting in poor irrigation and poor slurry diffusion. High-pressure grouting may destroy the existing support system, and there is implementation. The problem of long cycles and high costs.
The replacement grouting reinforcement method is adopted, and the forward segmented replacement grouting reinforcement is carried out through forward segmented replacement and radiator tube segmented replacement grouting reinforcement, combining deep drainage pressure and shallow grouting water blocking, and grouting injection and return spray tube. Replace high-pressure grouting liquid to reduce water pressure and improve grouting effect.
It effectively solved the problem of poor grouting effect caused by high fine powder content in surrounding rocks in the fault zone, reduced the difficulty and safety risks of advanced grouting, improved the water blocking and consolidation effect, and enhanced the standardization and feasibility of governance. , reducing the risk of secondary sudden disasters.
Smart Images

Figure CN118933877A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering, and in particular to a grouting reinforcement method for a water-rich fault fracture zone tunnel and a method for controlling sudden mud and water gushing. Background Art
[0002] Due to the constraints of route selection, deep buried long water diversion tunnels inevitably pass through water-rich fault fracture zones, and mud and water gushing geological disasters occur from time to time. Mud and water gushing in water-rich fault fracture zones are characterized by suddenness, high flow rate, high water pressure, and strong destructiveness. They are often accompanied by secondary disasters such as tunnel collapse, surface collapse, and water source depletion. During the construction process, they often cause casualties, property losses, and construction delays.
[0003] How to effectively control the sudden mudslide and water gushing disaster when the tunnel passes through the water-rich fault is a prominent technical problem that troubles the academic and engineering communities. For sudden mudslide and water gushing geological disasters, tunnel winding, pilot tunnel drainage, surface directional grouting or in-tunnel advance grouting are usually used for control, among which in-tunnel advance grouting is the most widely used. Tunnel winding, pilot tunnel drainage, and surface directional grouting all have the problems of long implementation period and high cost, and are generally suitable for the control of super-large sudden mudslide and water gushing geological disasters.
[0004] The existing methods of in-tunnel advance grouting are used to treat sudden mud and water inrush disasters in water-rich faults. The main shortcomings of these methods are as follows: the rock mass of water-rich faults is weak and broken, the water pressure is large, the groutability is poor when the content of crushed rock is high, and the bonding strength with cement slurry is low; in order to allow the slurry to diffuse, the grouting pressure is usually increased, but excessive pressure may cause damage to the initial support system of the supported tunnel section. Summary of the invention
[0005] The purpose of the present invention is to address the defects of the prior art and provide a method for grouting reinforcement of tunnels in a water-rich fault fracture zone and a method for controlling sudden mud and water gushing. By adopting a replacement grouting reinforcement method, it is beneficial to the discharge of rock powder and the diffusion of slurry, thereby improving the effect of advance grouting reinforcement.
[0006] In order to solve the above technical problems, the present invention provides a method for grouting reinforcement of a water-rich fault fracture zone tunnel, comprising the following steps:
[0007] According to the advanced grouting orifice pipe and pressure gauge test, the measured value P of the external water pressure in the grouting hole;
[0008] Full-section drilling and grouting are carried out in front of the face. The grouting method of each grouting hole is determined according to the measured value P of the external water pressure in the grouting hole. If P≤P0, the forward segmented replacement grouting reinforcement method is adopted. If P>P0, the tube segmented replacement grouting reinforcement method is adopted, where P0 is the boundary value of the external water pressure in the grouting hole.
[0009] The forward segmented replacement grouting reinforcement method includes: using two adjacent grouting holes as a grouting channel and a return grouting channel respectively, injecting grout into one of the grouting holes, and the cement slurry flows back from the other grouting hole and replaces the rock powder in the fault fracture zone;
[0010] The tube segmented replacement grouting reinforcement method includes: using a grouting tube and a return grouting tube as a grouting channel and a return grouting channel of a grouting hole respectively, injecting high-pressure grouting through the grouting tube, and returning grouting through the return grouting tube to return grouting and replace rock powder in the fault fracture zone.
[0011] Furthermore, the forward segmented replacement grouting reinforcement method comprises:
[0012] Drill holes in sections in front of the face to form two adjacent grouting holes, including hole A and hole B. Displacement grouting is performed in two holes every time a certain distance is drilled.
[0013] The two-hole replacement grouting includes: grouting into hole A, the slurry flushes the rock powder in the fault fracture zone around the two adjacent grouting holes from hole B, closing hole B, and grouting into hole A so that the slurry fills the fault fracture zone between the two grouting holes, completing the grouting reinforcement of this section.
[0014] Furthermore, in the two-hole replacement grouting, hole A is located below hole B.
[0015] Furthermore, the segmented replacement grouting reinforcement method for the shooting tube includes:
[0016] A grouting hole is formed by drilling in sections in front of the face, and a tube replacement grouting is performed every time a certain distance is drilled;
[0017] The tube replacement grouting includes: arranging a grouting tube and a return grouting tube in a grouting hole, closing the grouting hole, injecting grout into the grouting hole through the grouting tube, flushing rock powder in the fault fracture zone around the grouting hole through the return grouting tube, closing the return grouting tube, and injecting grout into the grouting tube again to complete the grouting reinforcement of the section.
[0018] In a second aspect, the present invention provides a method for treating mud and water inrush in a tunnel in a water-rich fault zone, comprising:
[0019] S1. Construct a slag retaining wall to support the lower half of the mud outburst, and seal and consolidate the mud outburst;
[0020] S2. Advance detection and analysis of the distribution of geological defects ahead;
[0021] S3. Construct slurry-stopping walls and cover plates on the protruding mud body;
[0022] S4. Construct advance drainage and pressure relief holes on the fault seepage channel for deep drainage;
[0023] S5. Backfill the surge cavity; use the forward segmented replacement grouting reinforcement method and / or the tube segmented replacement grouting reinforcement method to perform advance grouting in front of the tunnel face.
[0024] Further, step S1 includes:
[0025] S11, piling up the protruding mud body, casting a slag retaining wall to support the lower half section of the protruding mud body, pre-buried drainage pipes in the slag retaining wall, and setting an anti-filter layer between the slag retaining wall and the protruding mud body;
[0026] S12. Lay steel mesh on the surface of the protruding mud body and spray concrete to seal the surface of the protruding mud body, and perform consolidation grouting on the protruding mud body.
[0027] Further, step S3 includes:
[0028] The upper half section of the grouting wall is constructed on the mud body. The grouting wall is inclined, anchor rods are implanted between the grouting wall and the tunnel side wall, and the bottom of the grouting wall is reinforced with a pipe shed. The pipe shed passes through the mud body and penetrates into the bedrock. A flower hole is opened in the part where the pipe shed penetrates into the bedrock and grouting is performed. A seamless steel pipe is embedded in the grouting wall as an advanced grouting orifice pipe.
[0029] While pouring the stop wall, pour the cover plate behind the stop wall.
[0030] Furthermore, step S4 includes: determining the position of the main seepage channel of the water-rich fault according to the distribution of the geological defects ahead obtained in step S2, and constructing advance drainage and pressure relief holes, the advance drainage and pressure relief holes are constructed from the area where the surrounding rock is relatively stable behind the slurry stop wall of the upper half section, and holes are drilled to the main seepage channel of the water-rich fault ahead for deep drainage.
[0031] Further, step S5 includes:
[0032] S51, according to the distribution of the geological defects ahead obtained in step S2, determine the distribution of the surge cavity, backfill the cavity with concrete, and determine the layout parameters of the grouting holes;
[0033] S52, drilling and grouting are performed on the entire section in front of the face of the grout-stopping wall of the upper half section. The drilling and grouting sequence is from outside to inside, from bottom to top, and in a skipped manner. The grouting method of each grouting hole is determined according to the measured value P of the external water pressure in the grouting hole. If P≤P0, the forward segmented replacement grouting reinforcement method is adopted. If P>P0, the tube segmented replacement grouting reinforcement method is adopted, wherein P0 is the boundary value of the external water pressure in the grouting hole;
[0034] The forward segmented replacement grouting reinforcement method includes: using two adjacent grouting holes as a grouting channel and a return grouting channel respectively, injecting grout into one of the grouting holes, and the cement slurry flows back from the other grouting hole and replaces the rock powder in the fault fracture zone;
[0035] The tube segmented replacement grouting reinforcement method includes: using a grouting tube and a return grouting tube as a grouting channel and a return grouting channel of a grouting hole respectively, injecting high-pressure grouting through the grouting tube, and returning grouting through the return grouting tube to return grouting and replace rock powder in the fault fracture zone.
[0036] Further, step S5 includes:
[0037] S53, remove the slag retaining wall and the concrete on the surface of the mud protrusion, excavate the mud protrusion to the cover plate, clean the foundation surface, and cast the grouting wall of the lower half section, wherein the foundation of the grouting wall is embedded in the bedrock in the groove, anchor rods are implanted in the grouting wall and the tunnel side wall, drainage holes are reserved on the grouting wall, anti-filtration measures are set in the holes, and seamless steel pipes are embedded in the grouting wall as the orifice pipes for advanced grouting;
[0038] S54. Supplementary grouting is performed on the lower section of the tunnel through the grout-stopping wall of the lower section by adopting the forward segmented displacement grouting reinforcement method and / or the tube segmented displacement grouting reinforcement method.
[0039] The beneficial effects of the present invention are:
[0040] 1. The present invention replaces the loose slag and rock powder in the surrounding rock cracks through the forward segmented replacement grouting reinforcement method and the tube segmented replacement grouting reinforcement method, thereby solving the problem of high fine powder content in the surrounding rock of the fault zone, which prevents the diffusion of slurry and leads to poor grouting effect.
[0041] 2. The present invention adopts a method that combines "deep drainage to relieve pressure and shallow grouting to block water", that is, deep drainage is carried out on the seepage channel of the water-rich fault through advance drainage and pressure relief holes, which reduces the water pressure of the grouting wall and the surrounding rock in front, and reduces the difficulty of advance grouting and the safety risks during implementation.
[0042] 3. The slurry stop wall of the present invention adopts an upward inclined slurry stop wall and a large pipe shed is arranged at the bottom of the slurry stop wall to "take root" deeply in the bedrock to ensure its stability.
[0043] 4. The present invention solves the problem that conventional anti-filtration drainage pipes are difficult to construct due to hole collapse and anti-filtration geotextiles are prone to clogging and failure through double-layer casing drainage holes.
[0044] 5. The method for controlling mud and water gushing in tunnels in water-rich fault fracture zones proposed in the present invention can improve the standardization and feasibility of controlling mud and water gushing in water-rich faults, enhance the treatment efficiency, enhance the water blocking and consolidation effects of advance grouting, effectively reduce the risk of secondary sudden gushing disasters, and have considerable economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a flow chart of the method for treating mud and water inrush in a tunnel in a water-rich fault fracture zone of the present invention;
[0046] Figure 2 This is a construction schematic diagram after the present invention completes step S3;
[0047] Figure 3 It is a schematic diagram of the structure of the slurry stop wall and the cover plate of the present invention;
[0048] Figure 4 It is a schematic diagram of deep drainage and pressure relief and full-section advance grouting of the present invention;
[0049] Figure 5 This is a cross-sectional hole arrangement diagram of the full-section advanced grouting opening of the present invention;
[0050] Figure 6 This is a longitudinal section diagram of the full-section advanced grouting of the present invention;
[0051] Figure 7 This is a cross-sectional hole arrangement diagram of the full-section advance grouting final hole of the present invention;
[0052] Figure 8 It is a longitudinal section view of the segmented replacement grouting reinforcement method of the shooting tube of the present invention;
[0053] Fig. 9 It is a cross-sectional view of the segmented replacement grouting reinforcement method of the shooting tube of the present invention;
[0054] Fig.10 It is a longitudinal section view of the forward segmented replacement grouting reinforcement method of the present invention;
[0055] Fig.11 This is a cross-sectional hole arrangement diagram of the lower half section advance grouting opening of the present invention;
[0056] Fig.12 This is a longitudinal section diagram of the advance grouting of the lower half section of the present invention.
[0057] Figure numerals: mud body 1; slag retaining wall 2; graded crushed stone filter 3; drainage steel pipe 4; mortar anchor 5; first grouting wall 6; self-propelled large pipe shed 7; cover plate 8; advance grouting orifice pipe 9; advance drainage pressure relief hole 10; shooting pipe 11; grouting shooting pipe 12; back-grouting shooting pipe 13; grouting flange 14; A hole 15; B hole 16; second grouting wall 17. DETAILED DESCRIPTION
[0058] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0059] like Figure 1 As shown, this embodiment provides a method for treating mud and water inrush in a tunnel in a water-rich fault zone, comprising:
[0060] S1, constructing a slag retaining wall 2 to support the lower half section of the mud protrusion body 1, and sealing and consolidating the mud protrusion body 1; step S1 specifically includes:
[0061] S11, the protruding mud body 1 (i.e. Figure 2 The mud accumulation body in the slope is pushed a certain distance from the foot of the slope to the face for elevation, the foundation is cleaned and the slag retaining wall 2 is poured. The slag retaining wall 2 is used to stabilize the mud body 1 in the lower half section. The slag retaining wall 2 is poured with C25 concrete. The thickness of the slag retaining wall 2 is 2m, and the height exceeds the mud body by 10.5m. The bedrock at the bottom of the slag retaining wall 2 is grooved with a groove depth of 0.5m, so that the foundation of the slag retaining wall 2 is located on the bedrock in the excavated groove to prevent slurry from bubbling when the mud body 1 is consolidated. Two rows of mortar anchor rods 5 are implanted in the foundation and in the contact range with the surrounding surrounding rock to enhance the integrity. The distance between the slag retaining wall 2 and the mud body 1 is 1.0m. A graded crushed stone filter 3 is set between the slag retaining wall 2 and the mud body 1. When the slag retaining wall 2 is poured, two drainage steel pipes 4 are installed on both sides of the lower part. The drainage steel pipes 4 pass through the slag retaining wall 2 and are connected to the graded crushed stone filter 3 to ensure smooth drainage in the early stage;
[0062] S12, laying steel mesh on the surface of the protruding mud body 1 from the slag retaining wall 2 to the tunnel face section and spraying C25 concrete to seal it; after the sealing layer is formed, consolidation grouting is performed on the protruding mud body 1 between the slag retaining wall 2 and the tunnel face.
[0063] S2. Advance detection, analyze the distribution of geological defects ahead; combine the engineering geological and hydrogeological data revealed by previous surveys and construction to analyze the causes of mud and water gushing, and the development of water-rich faults; after the mud body 1 is consolidated, further explore the spatial distribution of geological defects such as water-rich faults ahead and collapse areas caused by mud through "geophysical exploration + advance drilling"; draw a contour map of the spatial relationship between the collapse area, faults and tunnels, and determine the scale, direction and positional relationship of the collapse area and faults ahead with the tunnel.
[0064] S3, constructing a slurry stop wall and a cover plate 8 of the upper half section on the protruding mud body 1;
[0065] Step S3 specifically includes:
[0066] After the mud outburst 1 is solidified, the foundation is partially cleared at a distance of 5.0 to 10.0 m from the mud outburst face, and a mortar stop wall of the upper section is constructed, namely the first mortar stop wall 6. The first mortar stop wall 6 is inclined and cast with C30 concrete. The bottom thickness of the first mortar stop wall 6 is 2.0 m and the top thickness is 3.0 m, so as to reduce the risk of the first mortar stop wall 6 toppling under the action of the mud outburst 1. Figure 3As shown, two rows of Φ25 mortar anchor rods 5 are implanted in the first mortar stop wall 6 and the tunnel side wall, with an anchor rod length of 3.0m, 1.5m into the rock, a row spacing of 1.0m, and a circumferential spacing of 1.0m, arranged in a plum blossom shape; the bottom of the first mortar stop wall 6 falls on the consolidated protruding mud body 1. In order to ensure its stability, two rows of Φ108 self-propelled large pipe sheds 7 are used, and the row spacing is 1.0m. The self-propelled large pipe shed 7 passes through the protruding mud body 1, and the short pipe is drilled in and lengthened by the threaded connecting rod to penetrate 1.5m into the bedrock. The rock entry section of the self-propelled large pipe shed 7 is provided with flower holes and grouting is carried out. The self-propelled large pipe shed 7 is exposed 1.5m to be poured into the first mortar stop wall 6; a single layer of Φ16 steel mesh is set near the free surface of the first mortar stop wall 6, and the row spacing is 15×15cm. A Φ127×4mm seamless steel pipe is pre-buried in the first grouting wall 6 as an advanced grouting orifice pipe 9, the orifice pipe is 3.5m long, and 0.2-0.3m is exposed outside the orifice.
[0067] While pouring the first slurry-stopping wall 6, a cover plate 8 is poured 10m behind the first slurry-stopping wall 6. The cover plate 8 is poured with C30 concrete with a thickness of 0.5m to prevent leakage from the bottom and ensure the effect of advanced grouting.
[0068] S4, constructing advance drainage and pressure relief holes 10 on the fault seepage channel for deep drainage;
[0069] Step S4 specifically includes: according to the distribution of the geological defects ahead obtained in step S2, determining the location of the main seepage channel of the water-rich fault, and constructing the advance drainage and pressure relief holes 10, such as Figure 4 As shown, the advance drainage pressure relief hole 10 is constructed from the area with relatively stable surrounding rock behind the first mortar stop wall 6, generally 2 to 5m behind the first mortar stop wall 6, upslope 20° to 40°, and drilled to the main seepage channel of the front water-rich fault for deep drainage. The advance drainage hole has a diameter of 110mm and a depth of 30m to 50m. One is arranged on the arch and the two side spans, and the hole is drilled and the orifice pipe is installed; the orifice pipe adopts a double-layer casing structure, and its specific structure is shown in the Chinese utility model patent with authorization announcement number CN219888062U. After the orifice pipe is blocked and silted during the drainage process, the inner casing can be pulled out to clean the hole and then inserted again, so that the drainage hole can restore the function of reverse filtration and drainage. An orifice valve is installed on the orifice pipe, and the water resistance pressure of the orifice valve must be greater than the measured external water pressure.
[0070] S5. Backfill the surge cavity; use the forward segmented replacement grouting reinforcement method and / or the tube segmented replacement grouting reinforcement method to perform advance grouting in front of the tunnel face.
[0071] Step S5 specifically includes:
[0072] S51, after the concrete strength of the first grout-stopping wall 6 and the cover plate 8 reaches 75% of the design strength, the distribution of the surge cavity (i.e., the collapsed cavity area) is determined according to the distribution of the geological defects in front obtained in step S2, and the cavity concrete is backfilled; the arrangement parameters of the grouting holes are determined, such as Figures 5 to 7 As shown, in this embodiment, the advance grouting range is 9m outside the excavation contour line, the length is 25m, and the effective diffusion radius of the final hole slurry is 2.5m; each cycle of excavation is 20m, and a 5m grouting rock plate is retained; 5m of grouting is injected into the bottom of the hole within the excavation contour line, and the entire section outside the excavation contour line is grouting. No grouting is injected into the excavation line, and the measured value P of the external water pressure in each grouting hole is measured. The testing method of the measured value P of the external water pressure in the grouting hole belongs to the prior art;
[0073] S52, perform full-section drilling and grouting in front of the face of the first stop wall 6, the grouting liquid adopts cement-water glass double liquid grout or pure cement grout, the drilling and grouting sequence is from outside to inside, from bottom to top, and the interval jump hole method is carried out, the grouting method of each grouting hole is determined according to the measured value P of the external water pressure in the grouting hole, if P≤P0, the forward staged displacement grouting reinforcement method is adopted, if P>P0, the tube staged displacement grouting reinforcement method is adopted, wherein P0 is the boundary value of the external water pressure in the grouting hole, in this embodiment, P0=1MP a (the external water pressure in the hole must be offset by the grouting pressure; when the external water pressure in the hole is 1MPa, the grouting pressure of the full-hole grouting grouting pump must reach more than 3MP to achieve a balanced grouting effect). If the measured value P of the external water pressure in the grouting hole is large, that is, greater than 1MPa, the external water pressure in the hole will offset part of the grouting pressure and affect the rock powder replacement. Therefore, it is necessary to use a shooting tube 11 with a small inner diameter to reduce the water pressure resistance of the slurry when it moves forward. The grouting slurry can directly reach the section to be reinforced, and the high-pressure slurry is used to replace the rock powder.
[0074] The forward segmented replacement grouting reinforcement method includes: using two adjacent grouting holes as grouting channels and return grouting channels respectively, injecting grout into one of the grouting holes, and the cement slurry returns from the other grouting hole and replaces the rock powder in the fault fracture zone; the specific operation method is as follows: Fig.10As shown, two adjacent grouting holes are formed by drilling in sections in front of the face. The two adjacent grouting holes include hole A 15 and hole B 16. The depths of hole A 15 and hole B 16 are the same and the spacing is about 1.5 m. Hole A 15 corresponds to the lower grouting channel, and hole B 16 corresponds to the upper grouting channel. Two-hole replacement grouting is performed every time a certain distance is drilled. The two-hole replacement grouting includes: grouting into hole A 15, the slurry flushes the rock powder in the fault fracture zone around the two adjacent grouting holes from hole B 16, closing hole B 16, grouting into hole A 15, so that the slurry fills the fault fracture zone between the two grouting holes, completing the grouting reinforcement of this section, and then hole A 15 and hole B 16 continue to drill deeper to perform grouting reinforcement of the next section.
[0075] It should be noted that the grouting channel is preferably located below the return grouting channel. After grouting in the grouting channel, the slurry pressure flowing to the return grouting channel is relatively large, which can improve the effect of flushing out the rock powder, thereby achieving slurry replacement and improving the effect of grouting reinforcement. The return grouting channel can be a small-angle upward hole to facilitate the outflow of replaced rock powder.
[0076] The segmented replacement grouting reinforcement method includes: the grouting tube 11 includes a grouting tube 12 and a return grouting tube 13, the grouting tube 12 and the return grouting tube 13 are used as a grouting channel and a return grouting channel of a grouting hole respectively, high-pressure grout is injected through the grouting tube 12, and the return grouting tube 13 returns grouting and replaces the rock powder in the fault fracture zone. The specific operation method is as follows: Figure 8 , 9 As shown, a grouting hole is formed by drilling in sections in front of the face, and a displacement grouting by a shot tube 11 is performed every time a certain distance is drilled; the displacement grouting by the shot tube 11 includes: arranging a grouting shot tube 12 and a return grouting shot tube 13 in the grouting hole. In this embodiment, two grouting shot tubes 12 and two return grouting shot tubes 13 are provided, and the grouting hole is closed by a grouting flange 14. Grouting is injected into the grouting hole through the two grouting shot tubes 12, and the slurry flushes the rock powder in the fault fracture zone around the grouting hole from the two return grouting shot tubes 13. When the flushed rock powder is less, the two return grouting shot tubes 13 are closed, and grouting is injected into the grouting shot tube 12 again to complete the grouting reinforcement of this section, and then drilling continues to the depth to carry out grouting reinforcement of the next section.
[0077] It can be understood that if the grouting holes are upward holes or horizontal holes, the rock powder can be easily discharged from the grouting holes, which is beneficial to the diffusion of the slurry. However, full-section grouting is adopted in step S52, and the grouting holes in the lower half of the tunnel section are all downward holes. The rock powder is not easy to be discharged, which prevents the diffusion of the slurry and easily leads to poor grouting effect. Therefore, the lower half of the tunnel section can be supplemented with grouting, as shown in step S53 for details.
[0078] S53, remove the concrete on the surface of the slag retaining wall 2 and the mud body 1, excavate the mud body 1 to the cover plate 8, clean the foundation surface, and pour the mortar stop wall of the lower half section, that is, the second mortar stop wall 17, wherein the bedrock at the bottom of the second mortar stop wall 17 is grooved with a depth of 0.5m, and the foundation of the second mortar stop wall 17 is embedded in the bedrock in the groove to prevent grouting during supplementary grouting; two rows of Φ25 mortar anchor rods 5 are implanted in the second mortar stop wall 17 and the tunnel side wall, with an anchor rod length of 3.0m, 1.5m into the rock, a row spacing of 1.0m, and a circumferential spacing of 1.0m, arranged in a plum blossom shape; the excavation of the mud body 1 and the construction of the second mortar stop wall 17 should be carried out in sections and parts. Three φ110mm drainage holes are reserved on the second mortar stop wall 17, with a distance of 1m from the foundation surface and a spacing of 1m. Anti-filtration measures are set in the holes to ensure smooth drainage during excavation.
[0079] S54, such as Fig.11 and Fig.12 As shown, after the second grouting wall 17 is poured, advance grouting is carried out on the area 37m in front of the second grouting wall 17 and 9m outside the excavation contour line. The spacing between the grouting holes is 40×(50~120)cm, arranged in a plum blossom shape. The forward segmented displacement grouting reinforcement method and / or the tube-shooting segmented displacement grouting reinforcement method are also used to carry out supplementary grouting on the lower half section of the tunnel.
[0080] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for grouting reinforcement of a tunnel in a water-rich fault zone. Features: The following steps are involved: According to the advanced grouting orifice pipe and pressure gauge test, the measured value P of the external water pressure in the grouting hole; The whole section of the tunnel face is drilled and grouting is carried out. The grouting method of each grouting hole is determined according to the measured value P of the external water pressure in the grouting hole. If P≤P 0 , then the forward segmented replacement grouting reinforcement method is adopted. If P>P 0 , the segmented replacement grouting reinforcement method is adopted, in which P 0 is the demarcation value of the external water pressure in the grouting hole; The forward segmented replacement grouting reinforcement method includes: using two adjacent grouting holes as a grouting channel and a return grouting channel respectively, injecting grout into one of the grouting holes, and the cement slurry flows back from the other grouting hole and replaces the rock powder in the fault fracture zone; The tube segmented replacement grouting reinforcement method includes: using a grouting tube and a return grouting tube as a grouting channel and a return grouting channel of a grouting hole respectively, injecting high-pressure grouting through the grouting tube, and returning grouting through the return grouting tube to return grouting and replace rock powder in the fault fracture zone.
2. The grouting reinforcement method for a water-rich fault zone tunnel according to claim 1, Features: The progressive segmented replacement grouting reinforcement method comprises: Drill holes in sections in front of the face to form two adjacent grouting holes, including hole A and hole B. Displacement grouting is performed in two holes every time a certain distance is drilled. The two-hole replacement grouting includes: grouting into hole A, the slurry flushes the rock powder in the fault fracture zone around the two adjacent grouting holes from hole B, closing hole B, and grouting into hole A so that the slurry fills the fault fracture zone between the two grouting holes, completing the grouting reinforcement of this section.
3. The method for grouting reinforcement of a water-rich fault zone tunnel according to claim 2, Features: In the two-hole replacement grouting, hole A is located below hole B.
4. The method for grouting reinforcement of a water-rich fault zone tunnel according to claim 1, Features: The segmented replacement grouting reinforcement method for the shooting tube comprises: A grouting hole is formed by drilling in sections in front of the face, and a tube replacement grouting is performed every time a certain distance is drilled; The tube replacement grouting includes: arranging a grouting tube and a return grouting tube in a grouting hole, closing the grouting hole, injecting grout into the grouting hole through the grouting tube, flushing rock powder in the fault fracture zone around the grouting hole through the return grouting tube, closing the return grouting tube, and injecting grout into the grouting tube again to complete the grouting reinforcement of the section.
5. A method for treating mud and water inrush in tunnels in water-rich fault zones. Features: include: S1. Construct a slag retaining wall to support the lower half of the mud outburst, and seal and consolidate the mud outburst; S2. Advance detection and analysis of the distribution of geological defects ahead; S3. Construct slurry-stopping walls and cover plates on the protruding mud body; S4. Construct advance drainage and pressure relief holes on the fault seepage channel for deep drainage; S5. Backfill the surge cavity; use the forward segmented replacement grouting reinforcement method and / or the tube segmented replacement grouting reinforcement method to carry out advance grouting in front of the tunnel face.
6. The method for treating mud and water inrush in a tunnel in a water-rich fault zone according to claim 5, Features: Step S1 includes: S11, piling up the protruding mud body, casting a slag retaining wall to support the lower half section of the protruding mud body, pre-buried drainage pipes in the slag retaining wall, and setting an anti-filter layer between the slag retaining wall and the protruding mud body; S12. Lay steel mesh on the surface of the protruding mud body and spray concrete to seal the surface of the protruding mud body, and perform consolidation grouting on the protruding mud body.
7. The method for treating mud and water inrush in a tunnel in a water-rich fault zone according to claim 5, Features: Step S3 includes: The upper half section of the grouting wall is constructed on the mud body. The grouting wall is inclined, anchor rods are implanted between the grouting wall and the tunnel side wall, and the bottom of the grouting wall is reinforced with a pipe shed. The pipe shed passes through the mud body and penetrates into the bedrock. A flower hole is opened in the part where the pipe shed penetrates into the bedrock and grouting is performed. A seamless steel pipe is embedded in the grouting wall as an advanced grouting orifice pipe. While pouring the stop wall, pour the cover plate behind the stop wall.
8. The method for treating mud and water inrush in a tunnel in a water-rich fault zone according to claim 5, Features: Step S4 includes: determining the location of the main seepage channel of the water-rich fault according to the distribution of the geological defects ahead obtained in step S2, and constructing advance drainage and pressure relief holes. The advance drainage and pressure relief holes are constructed from the relatively stable surrounding rock area behind the slurry stop wall of the upper half section, and holes are drilled to the main seepage channel of the water-rich fault ahead for deep drainage.
9. The method for treating mud and water inrush in a tunnel in a water-rich fault zone according to claim 5, Features: Step S5 includes: S51, according to the distribution of the geological defects ahead obtained in step S2, determine the distribution of the surge cavity, backfill the cavity with concrete, and determine the layout parameters of the grouting holes; S52. Drill holes and grout the entire section in front of the face of the grout-stopping wall of the upper section. The drilling and grouting sequence is from outside to inside, from bottom to top, and in a skipped manner. The grouting method of each grouting hole is determined according to the measured value P of the external water pressure in the grouting hole. If P≤P 0 , then the forward segmented replacement grouting reinforcement method is adopted. If P>P 0 , the segmented replacement grouting reinforcement method is adopted, in which P 0 is the demarcation value of the external water pressure in the grouting hole; The forward segmented replacement grouting reinforcement method includes: using two adjacent grouting holes as a grouting channel and a return grouting channel respectively, injecting grout into one of the grouting holes, and the cement slurry flows back from the other grouting hole and replaces the rock powder in the fault fracture zone; The tube segmented replacement grouting reinforcement method includes: using a grouting tube and a return grouting tube as a grouting channel and a return grouting channel of a grouting hole respectively, injecting high-pressure grouting through the grouting tube, and returning grouting through the return grouting tube to return grouting and replace rock powder in the fault fracture zone.
10. The method for treating mud and water inrush in a tunnel in a water-rich fault zone according to claim 9, Features: Step S5 includes: S53, remove the slag retaining wall and the concrete on the surface of the mud protrusion, excavate the mud protrusion to the cover plate, clean the foundation surface, and cast the grouting wall of the lower half section, wherein the foundation of the grouting wall is embedded in the bedrock in the groove, anchor rods are implanted in the grouting wall and the tunnel side wall, drainage holes are reserved on the grouting wall, anti-filtration measures are set in the holes, and seamless steel pipes are embedded in the grouting wall as the orifice pipes for advanced grouting; S54. Supplementary grouting is performed on the lower section of the tunnel through the grout-stopping wall of the lower section by adopting the forward segmented displacement grouting reinforcement method and / or the tube-shooting segmented displacement grouting reinforcement method.
Citation Information
Cited By
Guiding, draining, grouting and plugging method for sudden gushing water of underground engineering
CN121251365A
Multi-layer three-dimensional space grouting reinforcement method for tunnel face
CN121952635A