Water-rich sand layer shield tunnel transverse deformation treatment device and working method

By combining grouting and soil decompression and pressure relief in a water-rich sand-layer shield tunnel, using a trolley mobile device to grout on both sides of the tunnel and soil decompression on the top, the problem of lateral deformation management of the tunnel is solved, and rapid , stable construction efficiency and safety.

CN118933888APending Publication Date: 2024-11-12NANCHANG RAIL TRANSIT GRP ENG CONSTR CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411207069.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the operation of the water-rich sand-layer shield tunnel, such as lateral deformation, pipe sheet staggered and water leakage, threatening the safety of subway shield tunnels, and it is difficult to effectively manage the existing technology.

Method used

Provide a water-rich sand layer shield tunnel lateral deformation control device, combining grouting and soil decompression and pressure relief functions, forming a closed area by performing micro-perturbing on the ground, using a trolley moving device to grout on both sides of the tunnel and The top is drained and the pressure is relieved, and vertical force is applied to restore transverse deformation to achieve controllable soil and water discharge.

Benefits of technology

It realizes rapid construction during the skylight period, improves work efficiency, and devices with multiple functions can effectively control the lateral deformation of the tunnel and ensures construction stability and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933888A_ABST
    Figure CN118933888A_ABST
Patent Text Reader

Abstract

The invention provides a water-rich sand layer shield tunnel transverse deformation treatment device and a working method, and the device is in a trolley form, can quickly move through a track, and simultaneously has grouting and soil digging functions. A grouting unit is arranged at the lower part of the trolley and is provided with a slurrying barrel, a slurry storage barrel and a grouting pump, so that grouting in the tunnel can be conveniently realized; a soil digging unit is arranged on the upper portion of the trolley, a drilling machine capable of freely moving is installed on a working platform on the trolley, a tunnel top duct piece reserved grouting hole is drilled through the drilling machine, soil digging and drainage are started under the soil water pressure behind a duct piece, and a connector matched with the duct piece reserved grouting hole is installed on the drilling machine. And the lifting control interface of the drilling machine is tightly attached to or separated from the grouting hole, so that the controllability of soil digging and pressure relief is realized. By means of the device and the working method, treatment of the transverse deformation of the shield tunnel in the water-rich sand layer is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel engineering, and in particular to a device and a working method for controlling lateral deformation of a shield tunnel in a water-rich sand layer. Background Art

[0002] After the shield tunnel is built, in the long-term operation process, due to various factors such as surrounding rock pressure variation and train vibration, the shield tunnel will produce lateral deformation, segment misalignment, water leakage and other diseases. As a typical disease, the lateral deformation of the tunnel is especially common in water-rich sand layers. The subway shield tunnel passing through the water-rich sand layer is prone to lateral deformation under the action of soil and water pressure due to the low bearing capacity and high rheological properties of the stratum, which in turn threatens the safety of the subway shield tunnel.

[0003] Therefore, developing a device and method for controlling lateral deformation of a shield tunnel in a water-rich sand layer is a technical problem that needs to be solved by those skilled in the art. Summary of the invention

[0004] In view of the lateral deformation of shield tunnels in water-rich sand layers, the present invention provides a device and a working method for the treatment of lateral deformation of shield tunnels in water-rich sand layers. The device has the functions of grouting correction and excavation to relieve pressure. The treatment idea is to perform grouting on both sides of the tunnel, and to generate pressure by grouting into the soil to squeeze the soil and push the pipe segments to restore the lateral deformation of the tunnel. At the same time, the soil is excavated at the top of the tunnel to relieve pressure, and the soil and water behind the tunnel are discharged to achieve the purpose of pressure relief. The purpose of excavation to relieve pressure is to make it easier to perform grouting on both sides of the tunnel to restore the lateral deformation, and the device can provide a vertical force at the top of the tunnel to help the lateral deformation recovery. Before starting to treat the lateral deformation of the tunnel, micro-disturbance grouting is performed on the ground in advance in the treatment area, and a closed area is formed between the grouting reinforcement body formed by grouting and the tunnel, so that it is safer and more stable to perform excavation to relieve pressure at the top of the tunnel. In order to achieve rapid construction during the skylight period, the present invention proposes a device in the form of a trolley, which can be quickly moved by track and has the functions of grouting and excavation. The lower part of the trolley is a grouting unit, which is equipped with a slurry barrel, a slurry storage barrel, and a grouting pump, which can conveniently realize grouting in the tunnel; the upper part of the trolley is an earth-digging unit. A freely movable drilling rig is installed on the working platform of the trolley. The reserved grouting holes of the tunnel top segment are drilled by the drilling rig, and the earth-digging and drainage are started under the soil and water pressure behind the segment. The drilling rig is equipped with an interface matching the reserved grouting holes of the segment. The lifting and lowering control interface of the drilling rig is tightly fitted or separated with the grouting hole to realize the controllable earth-digging and pressure relief. The above-mentioned device and method are used to achieve the control of lateral deformation of shield tunnels in water-rich sand layers.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A device for treating lateral deformation of a shield tunnel in a water-rich sand layer, comprising a slurry making bucket, a slurry storage bucket, a grouting pump, a first telescopic hydraulic cylinder, a second telescopic hydraulic cylinder, a working platform, a slide rail, a lifting device, a drilling rig, a soil and water collecting device, a drainage pipe, and a guardrail;

[0007] The slurry making barrel, slurry storage barrel and grouting pump are installed on the main body of the trolley and fixedly connected to the bottom plate of the trolley. The slurry making barrel is provided with a valve, and the prepared slurry is discharged into the slurry storage barrel for storage by controlling the valve. A pipeline is provided between the slurry storage barrel and the grouting pump to transport the slurry. When grouting in the tunnel, the grouting pipe is drilled in the reserved grouting hole of the pipe segment and connected to the grouting pump to carry out grouting;

[0008] The working platform is fixedly installed on the trolley through the first telescopic hydraulic cylinder, and the working platform can be freely raised and lowered by the first telescopic hydraulic cylinder. The working platform is also provided with a second telescopic hydraulic cylinder, the bottom end of which is fixedly connected to the working platform, and an annular steel plate is welded to the top of the second telescopic hydraulic cylinder. The second telescopic hydraulic cylinder on the working platform can apply force to the top of the tunnel to form a vertical support to help restore the lateral deformation. The outer surface of the annular steel plate is provided with flexible rubber, which is bonded to the annular steel plate to ensure that the contact with the tunnel top segment when forming the vertical support will not cause damage to the segment;

[0009] The slide rails are fixedly installed on the working platform. The slide rails are divided into longitudinal horizontal slide rails and transverse arc-shaped slide rails. The position of the drilling rig can be adjusted through the slide rails to align with the reserved grouting holes of the tunnel top segment. The lifting device is installed on the arc-shaped slide rails through steel plates. The upper part is connected to the drilling rig. The free lifting and lowering of the drilling rig can be controlled through the lifting device.

[0010] The drilling rig is fixedly installed on the lifting device. The drilling rig is provided with an interface of the same size as the reserved grouting hole of the pipe segment. A layer of rubber sponge is provided on the surface of the interface. The drill rod adopts a spiral drill rod. When drilling into the soil behind the pipe segment through the reserved grouting hole of the pipe segment, due to the soil and water pressure behind the pipe segment, the soil and water will be discharged along the spiral drill rod. The lifting and lowering of the drilling rig is controlled by the lifting device to make the interface of the drilling rig and the reserved grouting hole of the pipe segment fit tightly and separate, so that the soil excavation and pressure relief can be controlled.

[0011] The above-mentioned device for controlling lateral deformation of a shield tunnel in a water-rich sand layer, wherein the soil and water collecting device is an annular barrel with a hollow center portion, the bottom of the barrel is fixedly connected to the steel plate on the slide rail by three vertical rods, and a drainage pipe is connected to the bottom of the soil and water collecting device to discharge the collected soil and water into the drainage ditch at the bottom of the tunnel.

[0012] A working method for lateral deformation control of a shield tunnel in a water-rich sand layer, applied to the above-mentioned device, the working method comprises the following steps:

[0013] S1. First, the tunnel defects are detected by using a total station or 3D laser scanning to detect the lateral convergence deformation of the shield tunnel. The original tunnel diameter is l cd , the diameter after transverse deformation is l ab , when the tunnel convergence value is between 9‰ and 12‰D, that is When the value is between 9‰ and 12‰, it is a serious disease and will affect the safety of tunnel operation. The disease should be treated. D is the diameter of the tunnel, Δ D Indicates the tunnel convergence value;

[0014] S2. Conduct ground micro-disturbance grouting. Through ground grouting, a closed area is formed between the grouting reinforcement formed by grouting and the tunnel. After determining the area that needs to be treated for lateral convergence and deformation, measure and stake out, determine each hole position and grouting depth, drill holes and drive grouting pipes for micro-disturbance grouting. The grouting material uses cement-water glass slurry. The cement slurry: water glass slurry is 4 to 5:1, of which the water-cement ratio of cement slurry is 0.8 to 1:1, and 42.5 ordinary Portland cement is used. The water glass liquid uses 35°Be′ neutral water glass with a modulus of 2.85;

[0015] S3. One day after the ground grouting is completed, the lateral deformation of the tunnel is treated. When the ground micro-disturbance grouting is performed, the cement-water glass double liquid slurry can complete the final setting in 10 to 30 minutes. After one day, the strength can reach 50 to 60% of the 28-day strength. With a certain strength, the lateral deformation of the tunnel is treated. The trolley is moved to the construction site by the track, and grouting is performed in the reserved grouting holes on both sides of the tunnel. Grouting is injected into the soil behind the tunnel to squeeze the soil to generate pressure to push the segments to restore the lateral deformation of the tunnel;

[0016] S4, while carrying out the grouting step in S3, the tunnel top is excavated to relieve pressure. By drilling holes at the reserved grouting holes at the top of the tunnel, the soil and water are discharged under the soil and water pressure behind the segments, making it easier to carry out grouting on both sides of the tunnel in S3 to restore the lateral deformation of the tunnel;

[0017] S5. When the soil excavation and pressure relief process in S4 is performed, the soil and water discharged from the grouting hole are collected by a soil and water collecting device. A drainage pipe is connected to the bottom of the collecting device to discharge the soil and water directly to the drainage ditch at the bottom of the tunnel;

[0018] S6. When the grouting and excavation processes in S3 and S4 are being carried out simultaneously, the convergence deformation and ground settlement of the tunnel shall be monitored. When the change value of the tunnel convergence on one side reaches 3mm, you should be alert, pay close attention to the tunnel convergence change and grouting situation, and prepare to stop the grouting and excavation process in advance. When it reaches 5mm, immediately stop the grouting on both sides of the tunnel and the excavation on the top of the tunnel to relieve pressure. When the ground settlement is monitored to be greater than 3mm, you should be alert, pay attention to the settlement changes at all times, and be ready to stop the excavation process at any time. When the settlement value is greater than 5mm, you must stop excavation to relieve pressure and only carry out grouting on both sides of the tunnel;

[0019] S7. After the grouting on both sides of the tunnel is stopped, the grouting pipes are stagnant for about 5 minutes. After the slurry is initially solidified, all the grouting pipes are pulled out using special pipe pulling equipment, and the ball valves are closed in time. After the excavation of the top of the tunnel is stopped, the drilling rig is moved away through the slide rail and lifting device, and the ball valve is installed in the reserved grouting hole of the tunnel top segment to connect the grouting pipeline to grout the excavation pressure relief part;

[0020] S8. After completing the above work, the support is retracted by the second telescopic hydraulic cylinder, and the cement, grouting pipe, total station, level and other equipment and materials are placed in the trolley, and the trolley is moved to the next construction site;

[0021] S9. For the segment ring with large convergence deformation, the tunnel convergence value Δ D Still greater than 12‰D, that is, Δ D = l ab -l cd >12‰D, the final control purpose cannot be achieved, and multi-stage construction is required. The interval between each stage of construction is 2 to 3 months. Through multi-stage construction, the tunnel convergence value can be made less than 9‰~12‰D.

[0022] In the above working method, step S2 specifically includes:

[0023] S2-1. When performing ground micro-disturbance grouting, arrange the holes. Each construction ring has 3 rings on both sides, and the depth of the holes on both sides of the tunnel is 50cm from the outer surface of the segment. The depth of the holes in the middle of the tunnel is 2.5m from the outer side of the segment, and the depth of the holes in the middle of the two ends is 50cm from the outer side of the segment.

[0024] S2-2. After the hole position is determined, start drilling the pilot hole. Use Atlas equipment to drill the grouting pilot hole to a depth of 4m to facilitate the installation of the grouting pipe. Insert the grouting core pipe and install the grouting pipe to the specified depth. The grouting core pipe adopts a φ28 seamless steel pipe connected by a threaded mouth. The end of the core pipe has 2 rows of 4 holes with a hole diameter of 4mm. The hole protection device is at least 10cm long and slightly thicker than the grouting pipe. During construction, the end of the core pipe is wrapped with enameled cloth to prevent it from falling off and blocking the grouting hole. Use special equipment to install each root into the soil layer according to the grouting depth of each hole.

[0025] S2-3, start grouting operation, connect grouting equipment, start micro-disturbance grouting, use special tube pulling equipment to pull tubes while grouting, slowly, continuously and evenly, the pulling speed matches the grouting flow rate, grouting single section height and grouting amount, about 30s to pull 5cm, 10cm to inject 200-300 liters of slurry, grouting pressure 0.2-0.4MPa;

[0026] S2-4. When the above-mentioned pipe pulling and grouting are being carried out, the grouting is stopped when the pipe is pulled to a vertical distance of 4m from the outside of the middle segment of the tunnel. When grouting is stopped in all holes, the ground grouting operation is terminated.

[0027] In the above working method, step S3 specifically includes:

[0028] S3-1. Carry out the grouting process, install check valves and ball valves at the grouting holes on both sides of the tunnel, and check the quality of the grouting pipe joints and whether the grouting pump can be used normally;

[0029] S3-2. After checking and confirming that the grouting pipeline and equipment can work normally, start to prepare the slurry. The slurry uses cement slurry, 42.5 ordinary Portland cement, and the water-cement ratio is 0.8-1:1; the cement slurry is stirred in the slurry barrel. After the slurry is prepared, the control valve is used to make the cement slurry flow into the slurry storage barrel for storage;

[0030] S3-3. Start drilling through the reserved grouting holes in the segments, drive in the grouting pipes to a depth of 1.5m to 2m, connect the grouting pipelines, and start grouting. The grouting pressure is controlled at 0.8 to 1.0 MPa. During grouting, pay close attention to the working status of the grouting pumps.

[0031] S3-4. During the above grouting process, each ring of segments is symmetrically and synchronously grouted using double pumps, and grouting is performed synchronously by two grouting pumps installed on a trolley.

[0032] In the above working method, step S4 specifically includes:

[0033] S4-1. During the soil excavation and pressure relief process, the working platform is adjusted to a suitable height by the first telescopic hydraulic cylinder on the trolley, and then the annular steel plate is pushed to the top of the tunnel by the second telescopic hydraulic cylinder on the working platform to form a vertical support to help the tunnel recover from lateral deformation. A flexible rubber layer is provided on the outer surface of the annular steel plate to ensure that the support will not cause damage to the pipe segment;

[0034] S4-2, adjust the position of the drill rig through the slide rail on the working platform, align the drill rig with the reserved grouting hole on the top of the tunnel, start the drill rig after determining the position, and raise the drill rig through the lifting device on the working platform to drill. After drilling, due to the high pressure of soil and water behind the segment, the soil and water behind the segment are discharged from the hole along the drill rod;

[0035] S4-3, the drilling rod is pushed into the back of the segment through the lifting device so that the interface on the drilling rig is closely fitted with the reserved grouting hole. At this time, the soil and water behind the segment are stopped from being discharged, that is, the soil excavation and pressure relief are stopped. The drilling rig is lowered through the lifting device, and the interface is separated from the reserved grouting hole. At this time, soil and water are discharged and soil excavation and pressure relief are started again. The soil excavation and pressure relief are controllable by controlling the fitting or separation of the interface on the drilling rig and the reserved grouting hole;

[0036] S4-4. The drainage of soil and water behind the pipe segment is controlled by controlling the interface to fit with the reserved grouting hole through the lifting device. The drainage of soil and water starts when the interface is separated from the reserved grouting hole, and stops when they fit together. The drainage time of soil and water needs to be controlled when excavating the soil to relieve pressure. Each drainage time is 30 seconds, with an interval of 1 minute.

[0037] In the above working method, step S7 specifically includes:

[0038] S7-1. When grouting the top of the tunnel as described in S7, the grouting is started by installing a ball valve and a check valve at the reserved grouting hole to directly connect the grouting pipeline. The grouting material is cement slurry with a water-cement ratio of 0.8 to 1:1, 42.5 ordinary Portland cement is used, and the grouting pressure is 0.4 to 0.6 MPa;

[0039] S7-2. Pay close attention to the working status of the grouting pump during grouting. When the grouting pressure remains unchanged for 5 minutes without a significant decrease, the grouting can be ended. After the grouting is completed, close the ball valve in time.

[0040] The present invention has the following effects:

[0041] 1. The device for controlling the lateral deformation of a water-rich sand layer shield tunnel proposed in the present invention is in the form of a trolley, which can be moved through a track in the tunnel, is convenient and fast, can realize rapid and continuous construction during the window period, and can transport materials and equipment, thereby improving work efficiency.

[0042] 2. The device for managing the lateral deformation of a water-rich sand layer shield tunnel proposed in the present invention has multiple functions. The first function is to relieve pressure by excavating the soil, and the excavation and pressure relief can be controlled. The second function is to inject grouting, which has matching grouting equipment and can achieve synchronous grouting on both sides of the tunnel. The third function is to support the tunnel by laying vertical supports and applying a force to the tunnel vertically to help restore the lateral deformation of the tunnel.

[0043] 3. The principle of the method of grouting on both sides of the tunnel and excavating the soil on the top of the tunnel to relieve pressure proposed by the present invention is simple and clear. By grouting on the ground in advance, a closed area is formed between the grouting reinforcement body formed by the grouting and the tunnel, which ensures the stability of the excavation pressure relief. The three are combined to achieve the purpose of controlling the lateral deformation of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 is a flow chart of the working method of the present invention;

[0045] Figure 2 This is a schematic diagram of the lateral convergence deformation of the tunnel;

[0046] Figure 3 This is the layout diagram of the ground grouting holes;

[0047] Figure 4 for Figure 3 Schematic diagram of the middle AA section;

[0048] Figure 5 for Figure 3 Schematic diagram of the middle BB section;

[0049] Figure 6 A three-dimensional diagram of a device for controlling lateral deformation of a shield tunnel in a water-rich sand layer;

[0050] Figure 7 It is a front view of a device for controlling the lateral deformation of a shield tunnel in a water-rich sand layer;

[0051] Figure 8 This is the left view of the device for controlling the lateral deformation of a shield tunnel in a water-rich sand layer;

[0052] Fig. 9 A top view of a device for controlling lateral deformation of a shield tunnel in a water-rich sand layer;

[0053] In the figure: 1. original tunnel; 2. tunnel after lateral deformation; 3-1. holes on both sides of the tunnel; 3-2. holes in the middle of the tunnel; 3-3. holes in the middle of both ends; 4. pipe segments; 5. soil layer; 6. grouting equipment; 7. grouting pipe; 8. grouting pump; 9. slurry storage barrel; 10. valve; 11. slurry barrel; 12-1. first telescopic hydraulic cylinder; 12-2. second telescopic hydraulic cylinder; 13. working platform; 14. slide rail; 15. annular steel plate; 16. flexible rubber; 17. lifting device; 18. drilling rig; 19. interface; 20. soil and water collection device; 21. drainage pipe; 22. guardrail; 23. grouting areas on both sides of the tunnel; 24. ground grouting area; 25. track; 26. drainage ditch. DETAILED DESCRIPTION

[0054] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] See also Figures 1 to 9 A device for controlling the lateral deformation of a shield tunnel in a water-rich sand layer includes a slurry making barrel 11, a slurry storage barrel 9, a grouting pump 8, a first telescopic hydraulic cylinder 12-1, a second telescopic hydraulic cylinder 12-2, a working platform 13, a slide rail 14, a lifting device 17, a drilling rig 18, a soil and water collecting device 20, a drainage pipe 21, and a guardrail 22.

[0056] The slurry barrel 11, the slurry storage barrel 9, and the grouting pump 8 are installed on the trolley body and fixedly connected to the bottom plate of the trolley. The slurry barrel 11 is provided with a valve 10, and the prepared slurry is discharged into the slurry storage barrel 9 for storage by controlling the valve 10. A pipeline is provided between the slurry storage barrel 9 and the grouting pump 8 to transport the slurry. When grouting in the tunnel, the grouting pipe is set in the reserved grouting hole of the pipe segment and the grouting pump is connected to carry out grouting.

[0057] The working platform 13 is fixedly mounted on the trolley by a first telescopic hydraulic cylinder 12-1, and the working platform 13 can be freely raised and lowered by the first telescopic hydraulic cylinder 12-1. A second telescopic hydraulic cylinder 12-2 is also provided on the working platform, the bottom end of which is fixedly connected to the working platform 13, and an annular steel plate 15 is welded to the top. The second telescopic hydraulic cylinder 12-2 on the working platform 13 can apply force to the top of the tunnel to form a vertical support to help restore lateral deformation. A flexible rubber 16 is provided on the outer surface of the annular steel plate 15, which is bonded to the annular steel plate to ensure that when the vertical support is formed, it contacts the tunnel top segment and does not cause damage to the segment 4.

[0058] The slide rail 14 is fixedly mounted on the working platform 13, and is divided into a longitudinal horizontal slide rail and a transverse arc-shaped slide rail, through which the position of the drilling rig 18 can be adjusted to align with the reserved grouting holes of the tunnel top segment. The lifting device 17 is mounted on the arc-shaped slide rail through a steel plate, and the upper part is connected to the drilling rig 18, and the free lifting of the drilling rig can be controlled by the lifting device.

[0059] The drilling rig 18 is fixedly installed on the lifting device 17. The drilling rig is provided with an interface 19 of the same size as the reserved grouting hole of the pipe segment. A layer of rubber sponge is provided on the surface of the interface. The drill rod adopts a spiral drill rod. When drilling into the soil behind the pipe segment through the reserved grouting hole of the pipe segment, due to the high soil and water pressure behind the pipe segment 4, the soil and water will be discharged along the spiral drill rod. The lifting and lowering of the drilling rig 18 is controlled by the lifting device 17 to make the interface 19 of the drilling rig and the reserved grouting hole of the pipe segment tightly fit and separate, so that the soil excavation and pressure relief can be controlled.

[0060] The soil and water collecting device 20 is an annular drum with a hollow center, and the bottom of the drum is fixedly connected to the steel plate on the slide rail through three vertical rods. The drainage pipe 21 is connected to the bottom of the soil and water collecting device to drain the collected soil and water into the drainage ditch 26 at the bottom of the tunnel.

[0061] The present invention also provides a working method for controlling the lateral deformation of a shield tunnel in a water-rich sand layer, which is applied to the above-mentioned device, and the method comprises the following steps:

[0062] S1. First, the tunnel defects are detected by using total station or 3D laser scanning to detect the lateral convergence deformation of the shield tunnel. The original tunnel (1) becomes an elliptical tunnel after lateral deformation. The diameter of the original tunnel (1) is l cd , the diameter of the tunnel (2) after lateral deformation is l ab , when the tunnel convergence value is between 9‰ and 12‰D, that is When the value is between 9‰ and 12‰, it is considered a serious defect and will affect the safety of tunnel operation. The defect should be treated. Taking a shield tunnel with a diameter of 6m as an example, when the lateral convergence value is between 54 and 72mm, measures should be taken to treat the defect. Statistical analysis is performed on the tunnel lateral convergence deformation detection data to determine the area that needs lateral convergence deformation treatment.

[0063] S2. Perform ground micro-disturbance grouting. Through ground grouting, a closed area is formed between the grouting reinforcement formed by grouting the ground grouting area (24) and the tunnel. After determining the area that needs to be treated for lateral convergence deformation, measurement and layout are carried out to determine each hole position and grouting depth, and a hole is drilled and a grouting pipe is inserted for micro-disturbance grouting. The grouting material uses cement-water glass slurry, and the cement slurry: water glass slurry is 4 to 5:1, wherein the cement slurry has a water-cement ratio of 0.8 to 1:1, and uses 42.5 ordinary silicate cement. The water glass liquid uses 35°Be′ neutral water glass with a modulus of 2.85.

[0064] Wherein, step S2 specifically includes:

[0065] S2-1. When performing the ground micro-disturbance grouting described in S2, the hole positions are arranged as follows: Figure 3 to Figure 5 As shown, each construction ring has 3 outer rings on both sides, the depth of the hole position 3-1 on both sides of the tunnel is 50 cm from the outer surface of the segment 4, the depth of the hole position 3-2 in the middle of the tunnel is 2.5 m from the outside of the segment 4, and the depth of the middle hole position 3-3 at both ends is 50 cm from the outside of the segment 4.

[0066] S2-2. After the hole position is determined, start drilling the pilot hole. Use Atlas equipment to drill the grouting pilot hole to a depth of 4m to facilitate the installation of the grouting pipe 7. Insert the grouting core pipe and install the grouting pipe 7 to the specified depth. The grouting core pipe uses a φ28 seamless steel pipe connected by a threaded mouth. The end of the core pipe has 2 rows of 4 holes with a hole diameter of 4mm. The hole protection device is at least 10cm long and slightly thicker than the grouting pipe. During construction, the end of the core pipe is wrapped with enameled cloth to prevent it from falling off and blocking the grouting hole. Use special equipment to install the grouting pipes one by one into the soil layer 5 according to the grouting depth of each hole.

[0067] S2-3. Start grouting operation, connect grouting equipment 6, start micro-disturbance grouting, use special tube pulling equipment to pull tubes while grouting, slowly, continuously and evenly, the pulling speed matches the grouting flow rate, grouting single section height and grouting amount, about 30 seconds to pull 5cm, 10cm to inject 200-300 liters of slurry, grouting pressure 0.2-0.4MPa.

[0068] S2-4. When the pipe is pulled out and grouting is performed, the grouting is stopped when the pipe is pulled out to a vertical distance of 4 m from the outside of the middle segment 4 of the tunnel. When grouting is stopped at all holes, the ground grouting operation is terminated.

[0069] S3. After the ground grouting described in S2 is completed for 1 day, the lateral deformation of the tunnel is treated. When the ground micro-disturbance grouting is performed, the cement-water glass double liquid slurry can complete the final setting in 10 to 30 minutes, and the strength can reach 50 to 60% of the 28-day strength after 1 day. With a certain strength, the lateral deformation of the tunnel is treated. The trolley is moved to the construction site through the track 25, and grouting is performed through the reserved grouting holes of the pipe segment in the grouting area 23 on both sides of the tunnel. Grouting is performed to squeeze the soil behind the tunnel to generate pressure to push the pipe segment to restore the lateral deformation of the tunnel.

[0070] Wherein, step S3 specifically includes:

[0071] S3-1, carry out the grouting process described in S3, install check valves and ball valves at the holes on both sides of the tunnel, and check the quality of the grouting pipe joints and whether the grouting pump 8 can be used normally.

[0072] S3-2. After checking and confirming that the grouting pipeline and equipment can work normally, start to prepare the slurry. The slurry uses cement slurry, using 42.5 ordinary Portland cement, and the water-cement ratio is 0.8-1:1; the cement slurry is stirred in the slurry barrel 11. After the slurry is prepared, the cement slurry is controlled by the valve 10 to flow into the slurry storage barrel 9 for storage.

[0073] S3-3. Start drilling through the reserved grouting holes in the pipe segment, drive the grouting pipe to a depth of 1.5m to 2m, connect the grouting pipeline, and start grouting. The grouting pressure is controlled at 0.8 to 1.0 MPa. During grouting, pay close attention to the working status of the grouting pump 8.

[0074] S3-4. During the above grouting process, each ring of segments is symmetrically and synchronously grouted using two pumps, and grouting is performed synchronously by two grouting pumps 8 installed on a trolley.

[0075] S4. While carrying out the grouting step described in S3, the construction process of excavating and unloading the soil on the top of the tunnel is carried out. By drilling holes at the reserved grouting holes on the top of the tunnel, the soil and water are discharged under the soil and water pressure behind the pipe segment 4, making it easier to carry out the grouting on both sides of the tunnel described in S3 to restore the lateral deformation of the tunnel.

[0076] Wherein, step S4 specifically includes:

[0077] S4-1. When performing the soil excavation and pressure relief process described in S4, the working platform 13 is adjusted to a suitable height by the first telescopic hydraulic cylinder 12-1 on the trolley, and then the annular steel plate 15 is pushed to the top of the tunnel by the second telescopic hydraulic cylinder 12-2 on the working platform 13 to form a vertical support to help the tunnel recover from lateral deformation. A flexible rubber layer 16 is provided on the outer surface of the annular steel plate 15 to ensure that the support will not cause damage to the pipe segment.

[0078] S4-2. Adjust the position of the drill rig 18 through the slide rail 14 on the working platform 13 so that the drill rig 18 is aligned with the reserved grouting hole on the top of the tunnel. After determining the position, start the drill rig 18 and raise the drill rig 18 through the lifting device 17 on the working platform 13 to drill. After drilling, due to the high pressure of soil and water behind the segment 4, the soil and water behind the segment 4 are discharged from the hole along the drill rod.

[0079] S4-3, the lifting device 17 is raised to push all the drill rods into the back of the pipe segment 4 so that the interface 19 on the drilling rig 18 is tightly fitted with the reserved grouting hole. At this time, the drainage of soil and water behind the pipe segment 4 is stopped, that is, the excavation and pressure relief are stopped. The drilling rig 18 is lowered by the lifting device 17, and the interface 19 is separated from the reserved grouting hole. At this time, soil and water discharge and excavation and pressure relief are started. The excavation and pressure relief are controllable by controlling the fitting or separation of the interface 19 on the drilling rig 18 and the reserved grouting hole.

[0080] S4-4. The lifting device 17 is used to control the interface 19 to fit with the reserved grouting hole to control the discharge of soil and water behind the pipe segment 4. The interface 19 separates from the reserved grouting hole to start soil and water discharge, and fits to stop soil and water discharge. The soil and water discharge time needs to be controlled when digging the soil to relieve pressure. Each discharge time is 30 seconds, and the interval time is 1 minute.

[0081] S5. When the soil excavation and pressure relief process described in S4 is carried out, the soil and water discharged from the grouting hole are collected by a soil and water collecting device 20. A drainage pipe 21 is connected to the bottom of the collecting device to discharge the soil and water directly to a drainage ditch 26 at the bottom of the tunnel.

[0082] S6. When the grouting and excavation processes described in S3 and S4 are being carried out simultaneously, the convergence deformation and ground settlement of the tunnel shall be monitored. When the change value of the tunnel convergence on one side reaches 3mm, you should be alert, pay close attention to the tunnel convergence change and grouting situation, and prepare to stop the grouting and excavation processes in advance. When it reaches 5mm, immediately stop the grouting on both sides of the tunnel and the excavation on the top of the tunnel to relieve pressure. When the ground settlement is monitored to be greater than 3mm, you should be alert, pay attention to the settlement changes at all times, and be ready to stop the excavation process at any time. When the settlement value is greater than 5mm, you must stop excavation to relieve pressure and only carry out grouting on both sides of the tunnel.

[0083] S7. After the grouting on both sides of the tunnel is stopped, the grouting pipes are stagnant for about 5 minutes. After the slurry is initially solidified, all the grouting pipes are pulled out using a special pipe pulling device, and the ball valve is closed in time. After the excavation of the tunnel top is stopped, the drilling rig is moved away through the slide rail 14 and the lifting device 17, and a ball valve is installed in the reserved grouting hole of the tunnel top segment to connect the grouting pipeline to grout the excavation pressure relief part.

[0084] Wherein, step S7 specifically includes:

[0085] S7-1. When grouting the tunnel top as described in S7, start grouting by installing a ball valve and a check valve at the reserved grouting hole to directly connect the grouting pipeline. The grouting material is cement slurry with a water-cement ratio of 0.8 to 1:1, using 42.5 ordinary Portland cement, and the grouting pressure is 0.4 to 0.6 MPa.

[0086] S7-2. Pay close attention to the working status of the grouting pump during grouting. When the grouting pressure remains unchanged for 5 minutes without a significant decrease, the grouting can be ended. After the grouting is completed, close the ball valve in time.

[0087] S8. After completing the above work, the support is retracted by the second telescopic hydraulic cylinder 12-2, and equipment and materials such as cement, grouting pipe, total station, level, etc. are placed in the trolley, and the trolley is moved to the next construction site.

[0088] S9. For the segment ring with large convergence deformation, its tunnel convergence value may still be greater than 12‰D after one construction treatment, that is, Δ D = l ab -l cd >12‰D, the final control purpose cannot be achieved, and multi-stage construction is required. The interval between each stage of construction is 2 to 3 months. Through multi-stage construction, the tunnel convergence value can be made less than 9‰~12‰D.

[0089] In summary, the device and working method for controlling lateral deformation of a shield tunnel in a water-rich sand layer provided by the present invention have the following effects:

[0090] 1. The device for controlling the lateral deformation of a water-rich sand layer shield tunnel proposed in the present invention is in the form of a trolley, which can be moved through a track in the tunnel, is convenient and fast, can realize rapid and continuous construction during the window period, and can transport materials and equipment, thereby improving work efficiency.

[0091] 2. The device for managing the lateral deformation of a water-rich sand layer shield tunnel proposed in the present invention has multiple functions. The first function is to relieve pressure by excavating the soil, and the excavation and pressure relief can be controlled. The second function is to inject grouting, which has matching grouting equipment and can achieve synchronous grouting on both sides of the tunnel. The third function is to support the tunnel by laying vertical supports and applying a force to the tunnel vertically to help restore the lateral deformation of the tunnel.

[0092] 3. The principle of the method of grouting on both sides of the tunnel and excavating the soil on the top of the tunnel to relieve pressure proposed by the present invention is simple and clear. By grouting on the ground in advance, a closed area is formed between the grouting reinforcement body formed by the grouting and the tunnel, which ensures the stability of the excavation pressure relief. The three are combined to achieve the purpose of controlling the lateral deformation of the tunnel.

[0093] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0094] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A device for controlling lateral deformation of shield tunnels in water-rich sand layers. It is characterized in that It comprises a slurry making barrel (11), a slurry storage barrel (9), a grouting pump (8), a first telescopic hydraulic cylinder (12-1), a second telescopic hydraulic cylinder (12-2), a working platform (13), a slide rail (14), a lifting device (17), a drilling machine (18), a soil and water collecting device (20), a drainage pipe (21), and a guardrail (22); A slurry making barrel (11), a slurry storage barrel (9), and a grouting pump (8) are installed on the trolley body and fixedly connected to the bottom plate of the trolley. A valve (10) is provided on the slurry making barrel (11). The valve (10) is controlled to discharge the prepared slurry into the slurry storage barrel (9) for storage. A pipeline is provided between the slurry storage barrel (9) and the grouting pump (8) for conveying the slurry. When grouting is performed in the tunnel, the grouting pipe is drilled in the grouting hole reserved in the pipe segment and then connected to the grouting pump (8) to perform grouting. The working platform (13) is fixedly mounted on the trolley via a first telescopic hydraulic cylinder (12-1), and the working platform (13) can be freely raised and lowered via the first telescopic hydraulic cylinder (12-1). A second telescopic hydraulic cylinder (12-2) is also provided on the working platform, and the bottom end of the second telescopic hydraulic cylinder (12-2) is fixedly connected to the working platform (13). An annular steel plate (15) is welded to the top end of the second telescopic hydraulic cylinder (12-2). The second telescopic hydraulic cylinder (12-2) on the working platform (13) can apply a force to the top of the tunnel to form a vertical support, thereby helping to restore the lateral deformation. A flexible rubber (16) is provided on the outer surface of the annular steel plate (15), which is bonded to the annular steel plate (15) to ensure that when the vertical support is formed, the contact with the tunnel top pipe segment will not cause damage to the pipe segment (4); The slide rail (14) is fixedly installed on the working platform (13). The slide rail (14) is divided into a longitudinal horizontal slide rail and a transverse arc-shaped slide rail. The position of the drilling rig (18) can be adjusted through the slide rail (14) to align with the reserved grouting hole of the tunnel top segment. The lifting device (17) is installed on the arc-shaped slide rail through a steel plate, and the upper part is connected to the drilling rig (18). The free lifting and lowering of the drilling rig (18) can be controlled by the lifting device (17); The drilling machine (18) is fixedly mounted on the lifting device (17). The drilling machine (18) is provided with an interface (19) having a size equivalent to the reserved grouting hole of the pipe segment. A layer of rubber sponge is provided on the surface of the interface (19). The drill rod is a spiral drill rod. When drilling a hole into the soil behind the pipe segment through the reserved grouting hole of the pipe segment, due to the soil and water pressure behind the pipe segment (4), the soil and water will be discharged along the spiral drill rod. The lifting device (17) controls the lifting of the drilling machine (18) so that the interface (19) of the drilling machine (18) and the reserved grouting hole of the pipe segment are closely attached to and separated from each other, so that the soil excavation and pressure relief can be controlled.

2. The device for controlling lateral deformation of a shield tunnel in a water-rich sand layer according to claim 1, It is characterized in that The soil and water collecting device (20) is an annular cylinder with a hollow center. The bottom of the cylinder is fixedly connected to the steel plate on the slide rail through three vertical rods. The drainage pipe (21) is connected to the bottom of the soil and water collecting device (20) to drain the collected soil and water into the drainage ditch (26) at the bottom of the tunnel.

3. A working method for the treatment of lateral deformation of a shield tunnel in a water-rich sand layer. It is characterized in that Applied to the device of claim 1 or 2, the working method comprises the following steps: S1. First, the tunnel defects are detected by using a total station or 3D laser scanning to detect the lateral convergence deformation of the shield tunnel. The original tunnel diameter is l cd , the diameter after transverse deformation is l ab , when the tunnel convergence value is between 9‰ and 12‰D, that is When the value is between 9‰ and 12‰, it is a serious disease and will affect the safety of tunnel operation. The disease should be treated. D represents the tunnel diameter, Δ D Indicates the tunnel convergence value; S2. Conduct ground micro-disturbance grouting. Through ground grouting, a closed area is formed between the grouting reinforcement formed by grouting and the tunnel. After determining the area that needs to be treated for lateral convergence and deformation, measure and stake out, determine each hole position and grouting depth, drill holes and drive grouting pipes for micro-disturbance grouting. The grouting material uses cement-water glass slurry. The cement slurry: water glass slurry is 4 to 5:1, of which the water-cement ratio of cement slurry is 0.8 to 1:1, and 42.5 ordinary Portland cement is used. The water glass liquid uses 35°Be′ neutral water glass with a modulus of 2.85; S3. After grouting is completed on the ground for 1 day, the lateral deformation of the tunnel is treated. When the ground micro-disturbance grouting is performed, the cement-water glass double liquid slurry can complete final setting in 10 to 30 minutes, and the strength can reach 50 to 60% of the 28-day strength after 1 day. With a certain strength, the lateral deformation of the tunnel is treated. The trolley is moved to the construction site via the track (25), and grouting is performed in the reserved grouting holes on the segments on both sides of the tunnel. Grouting is performed to squeeze the soil behind the tunnel to generate pressure to push the segments to restore the lateral deformation of the tunnel. S4, while carrying out the grouting step in S3, the tunnel top is excavated to relieve pressure, by drilling holes at the reserved grouting holes at the tunnel top, draining the soil and water under the soil and water pressure behind the pipe segment (4), making it easier to carry out grouting on both sides of the tunnel in S3 to restore the lateral deformation of the tunnel; S5, when the soil excavation and pressure relief process in S4 is performed, the soil and water discharged from the grouting hole are collected by a soil and water collecting device (20), and a drainage pipe (21) is connected to the bottom of the collecting device to discharge the soil and water directly to the drainage ditch (26) at the bottom of the tunnel; S6. When the grouting and excavation processes in S3 and S4 are being carried out simultaneously, the convergence deformation and ground settlement of the tunnel shall be monitored. When the change value of the tunnel convergence on one side reaches 3mm, you should be alert, pay close attention to the tunnel convergence change and grouting situation, and prepare to stop the grouting and excavation process in advance. When it reaches 5mm, immediately stop the grouting on both sides of the tunnel and the excavation on the top of the tunnel to relieve pressure. When the ground settlement is monitored to be greater than 3mm, you should be alert, pay attention to the settlement changes at all times, and be ready to stop the excavation process at any time. When the settlement value is greater than 5mm, you must stop excavation to relieve pressure and only carry out grouting on both sides of the tunnel; S7, after the grouting on both sides of the tunnel is stopped, the grouting pipe is stopped for a preset time, and after the slurry is initially solidified, all the grouting pipes are pulled out using a special pipe pulling device, and the ball valve is closed in time; after the excavation of the tunnel top is stopped, the drilling rig is moved away by means of a slide rail (14) and a lifting device (17), and a ball valve is installed in the grouting hole reserved in the tunnel top segment to connect the grouting pipe to perform grouting on the excavation pressure relief part; S8. After completing the above work, the support is retracted by the second telescopic hydraulic cylinder (12-2), cement, grouting pipe, total station and level are placed in the trolley, and the trolley is moved to the next construction site; S9. For the segment ring with large convergence deformation, the tunnel convergence value Δ D Still greater than 12‰D, that is, Δ D = l ab -l cd >12‰D, the final control purpose cannot be achieved, and multi-stage construction is required. The interval between each stage of construction is 2 to 3 months. Through multi-stage construction, the tunnel convergence value can be made less than 9‰~12‰D.

4. The working method for controlling lateral deformation of a shield tunnel in a water-rich sand layer according to claim 3, It is characterized in that Step S2 specifically includes: S2-1. Arrange the holes for ground micro-disturbance grouting. Each construction ring has three outer rings on both sides. The depth of the holes (3-1) on both sides of the tunnel is 50 cm from the outer surface of the segment (4). The depth of the holes (3-2) in the middle of the tunnel is 2.5 m from the outer side of the segment (4). The depth of the holes (3-3) in the middle of both ends is 50 cm from the outer side of the segment (4). S2-2, after the hole position is determined, start drilling the pilot hole, use the Atlas equipment to drill the grouting pilot hole to a depth of 4m, so as to facilitate the installation of the grouting pipe (7), insert the grouting core pipe, and install the grouting pipe (7) to the specified depth. The grouting core pipe adopts a φ28 seamless steel pipe connected with a threaded mouth, and the end of the core pipe is cross-cut with 2 rows of 4 holes, with a hole diameter of 4mm. The hole protection device is at least 10cm long and slightly thicker than the grouting pipe. During construction, the end of the core pipe is wrapped with enameled cloth to prevent it from falling off and blocking the grouting hole; special equipment is used to install each root into the soil layer according to the grouting depth of each hole; S2-3, start grouting operation, connect grouting equipment (6), start micro-disturbance grouting, use special tube pulling equipment to pull tubes while grouting, slowly, continuously and evenly, the pulling speed matches the grouting flow rate, grouting single section height and grouting amount, about 30 seconds to pull 5cm, 10cm to inject 200-300 liters of slurry, grouting pressure 0.2-0.4MPa; S2-4. When the pipe is pulled out and grouting is performed, the grouting is stopped when the pipe is pulled out to a vertical distance of 4 m from the outside of the middle segment (4) of the tunnel. When the grouting is stopped at all the holes, the ground grouting operation is terminated.

5. The working method for controlling lateral deformation of a shield tunnel in a water-rich sand layer according to claim 3, It is characterized in that Step S3 specifically includes: S3-1, perform grouting process, install check valves and ball valves at the holes on both sides of the tunnel, check the quality of the grouting pipe joints and whether the grouting pump (8) can be used normally; S3-2. After checking and confirming that the grouting pipeline and equipment can work normally, start preparing the slurry. The slurry uses cement slurry, 42.5 ordinary Portland cement is used, and the water-cement ratio is 0.8-1:

1. The cement slurry is stirred in the slurry making barrel (11). After the slurry is prepared, the cement slurry is controlled by the valve (10) to flow into the slurry storage barrel (9) for storage; S3-3. Drill holes through the reserved grouting holes in the segments, drive in grouting pipes to a depth of 1.5 m to 2 m, connect the grouting pipelines, and start grouting. The grouting pressure is controlled at 0.8 to 1.0 MPa. During grouting, pay close attention to the working status of the grouting pump (8); S3-4. During the above grouting process, each ring of pipe segments is symmetrically and synchronously grouted using two pumps, and grouting is performed synchronously by two grouting pumps (8) installed on a trolley.

6. The working method for controlling lateral deformation of a shield tunnel in a water-rich sand layer according to claim 3, It is characterized in that Step S4 specifically includes: S4-1, when performing the soil excavation and pressure relief process, the working platform (13) is adjusted to a suitable height by the first telescopic hydraulic cylinder (12-1) on the trolley, and then the annular steel plate (15) is pushed to the top of the tunnel by the second telescopic hydraulic cylinder (12-2) on the working platform (13) to form a vertical support to help the tunnel recover from lateral deformation. A flexible rubber layer (16) is provided on the outer surface of the annular steel plate (15) to ensure that the support will not cause damage to the pipe segment; S4-2, adjusting the position of the drilling machine (18) by means of the slide rail (14) on the working platform (13), so that the drilling machine (18) is aligned with the reserved grouting hole on the top of the tunnel, and after the position is determined, starting the drilling machine (18), and raising the drilling machine (18) by means of the lifting device (17) on the working platform (13) to drill a hole. After the hole is drilled, due to the great pressure of soil and water behind the pipe segment (4), the soil and water behind the pipe segment (4) are discharged from the hole along the drill rod; S4-3, the lifting device (17) is raised to push the drill rod completely into the back of the pipe segment (4) so ​​that the interface (19) on the drilling machine (18) is closely fitted with the reserved grouting hole. At this time, the drainage of soil and water behind the pipe segment (4) is stopped, that is, the soil excavation and pressure relief are stopped. The drilling machine (18) is lowered by the lifting device (17), and the interface (19) is separated from the reserved grouting hole. At this time, soil and water discharge begins, and soil excavation and pressure relief begins again. The soil excavation and pressure relief are controllable by controlling the fitting or separation of the interface (19) on the drilling machine (18) and the reserved grouting hole; S4-4, the discharge of soil and water behind the pipe segment (4) is controlled by controlling the interface (19) to fit with the reserved grouting hole through the lifting device (17). The discharge of soil and water starts when the interface (19) is separated from the reserved grouting hole, and stops when the interface (19) fits with the reserved grouting hole. The discharge time of soil and water needs to be controlled when the soil is excavated to relieve pressure. Each discharge time is 30 seconds, and the interval time is 1 minute.

7. The working method for controlling lateral deformation of a shield tunnel in a water-rich sand layer according to claim 3, It is characterized in that Step S7 specifically includes: S7-1. When grouting the top of the tunnel as described in S7, the grouting is started by installing a ball valve and a check valve at the reserved grouting hole to directly connect the grouting pipeline. The grouting material is cement slurry with a water-cement ratio of 0.8 to 1:1, 42.5 ordinary Portland cement is used, and the grouting pressure is 0.4 to 0.6 MPa; S7-2. Pay close attention to the working status of the grouting pump during grouting. When the grouting pressure remains unchanged for 5 minutes without a significant decrease, the grouting can be ended. After the grouting is completed, close the ball valve in time.

Citation Information

Cited By

  • Shield tunnel segment structure deformation adjusting and supporting device and method

    CN119572270A

  • Disease treatment integrated comprehensive bearing operation platform for subway tunnel structure

    CN121451977A