Rapid cross-cut coal uncovering method based on alternating high-concentration gas power
Through the alternating high-concentration gas power method, using drilling cooperation at different levels and gas extraction technology, the problem of insufficient crack expansion in traditional Shimen coal is solved, and the rapid extraction and safe coal gas removal of coal body gas is achieved. Improves gas extraction efficiency and safety.
Patent Information
- Application Number
- CN202411218296.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-09-02
AI Technical Summary
The traditional Shimen coal-exposed technology does not expand sufficiently in the cracks in the coal seam, resulting in high ground stress and high gas pressure on the coal body, which in turn increases the risk of coal-exposed and long construction period, affecting the safety of mine production.
The alternating high-concentration gas dynamic method is adopted, and through drilling cooperation at different levels, high-concentration gas is extracted and combined with cracking and alternating stress, rapid extraction of coal gas is achieved, ground stress is reduced and gas extraction efficiency is improved.
It significantly improves the efficiency and safety of gas extraction, shortens the coal removal time, reduces the ground stress of the coal body, and achieves a fast and safe coal removal.
Smart Images

Figure CN118933994A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for quickly uncovering coal through a stone gate based on alternating high-concentration gas power, and belongs to the technical field of coal seam pressure relief and mining. Background Art
[0002] In coal and gas outburst mines, when the rock tunnel is used to uncover the coal seam, the outburst hazard is the greatest and the coal uncovering time is the longest. This is the difficulty of mine safety production and the bottleneck project of mining deployment. Due to the complexity of outbursts and the seriousness of their harm to mine safety production, people in the industry around the world attach great importance to this. At present, the industry has developed hydraulic punching, discharge drilling, pre-gas extraction, metal skeleton, straight-eye deep hole full-section blasting, direct vibration blasting and other stone gate coal uncovering anti-outburst technical measures for coal fields with different geological conditions, different coal seams, and different outburst hazards, which have played a certain role in preventing outbursts. However, the safety of these measures needs to be improved and the construction period required for coal uncovering is too long, which seriously affects mine safety production and normal mining and excavation. This is mainly because the coal seam cracks are not fully expanded before the traditional stone gate coal uncovering technology, and the regional fracture networking is not achieved; moreover, after the implementation of the traditional hydraulic cutting stone gate coal uncovering technology, the clay minerals and organic matter in the coal seam are very easy to swell when exposed to water, which often makes it difficult for water to be discharged after entering the coal body, blocking the gas flow channel, and inhibiting gas desorption, diffusion and penetration. As a result, the coal seam before stone gate coal uncovering has not achieved sufficient pressure relief and permeability enhancement, which ultimately leads to high ground stress and gas pressure in the coal body and high gas content. At this time, it is very dangerous to carry out stone gate coal uncovering.
[0003] Therefore, how to provide a new method to effectively reduce the ground stress of the coal body before stone gate coal uncovering, and improve the gas extraction efficiency by increasing permeability, so as to achieve fast and safe stone gate coal uncovering, is the research direction required by this application. Summary of the invention
[0004] In view of the problems existing in the above-mentioned prior art, the present invention provides a method for rapid rock-cut coal uncovering based on alternating high-concentration gas power. Through the cooperation of drilling holes at different levels, the extracted high-concentration gas is injected into other boreholes. By changing the pressure and extraction state of the boreholes, high-pressure and high-concentration gas fracturing, alternating stress fracturing and gas-driven gas are combined, so that the coal body gas that needs to be rock-cut coal uncovering can be rapidly extracted at a high concentration, thereby realizing rapid and safe rock-cut coal uncovering.
[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a method for rapid stone gate coal uncovering based on alternating high-concentration gas power, the specific steps are: Step 1: When the minimum normal distance between the stone gate coal uncovering working face and the coal seam is K, a conventional drilling method is used to penetrate the protective rock pillar to construct a group of boreholes toward the coal seam. The specific layout of the borehole group is as follows: first, a center hole is constructed toward the center of the coal seam. After completion, multiple boreholes are evenly arranged on a circle with a radius of J with the end hole position of the center hole as the center to form a first circle of boreholes; then, multiple boreholes are evenly arranged on a circle with a radius of L with the end hole position of the center hole as the center to form a second circle of boreholes; and J<L; after completion, a capsule sealer is used to seal the center hole, the first circle of boreholes, and the second circle of boreholes; Step 2: First, connect the inlet of the first circle of boreholes and the second circle of boreholes to the inlet of the booster pump through pipelines respectively, connect the outlet of the booster pump to the center hole through pipelines, start the booster pump, and inject the high-concentration gas extracted from the first circle of boreholes and the second circle of boreholes into the center hole through the boosting effect of the booster pump. After the set gas injection time is reached, stop the booster pump, and connect the center hole to the gas extraction pipeline network to extract gas; Step 3, group the boreholes in the second circle into M groups with N adjacent boreholes as a group; after the gas extracted from all the boreholes in each group is merged and pressurized by the booster pump, it is injected into one of the boreholes in the first circle, and the M groups correspond one by one to make the M boreholes in the first circle of boreholes be injected with high-pressure and high-concentration gas, and the booster pump is stopped after the set gas injection time is reached; the M groups correspond one by one to the other M boreholes in the first circle of boreholes that have not been injected with high-concentration gas, and the injection process of this step is adopted, and this is repeated until all the boreholes in the first circle have completed the process of injecting high-pressure and high-concentration gas; Step 4: first disconnect the central hole from the gas extraction pipeline network, and connect the first circle of boreholes processed in step 3 to the inlet of the booster pump through pipelines, and connect the outlet of the booster pump to the central hole through pipelines, start the booster pump, and inject the high-concentration gas extracted from the first circle of boreholes into the central hole through the boosting effect of the booster pump, and stop the booster pump after the set gas injection time is reached; Step 5: Divide the boreholes in the second circle into M groups in the same manner as in step 3, and inject the gas extracted from the adjacent N-1 boreholes in each group into the remaining boreholes in the group after being pressurized by a booster pump; stop the booster pump after the set gas injection time is reached; Step 6: regroup the boreholes in the second circle of boreholes in the same manner as in step 3, and repeat step 5 until all the boreholes in the second circle of boreholes have completed the high-pressure and high-concentration gas injection; Step 7: After repeating steps 2 to 6 for several times, connect all the boreholes in the borehole group to the gas extraction network for continuous gas extraction; when the gas content of the coal seam is less than 8m 3 / t, stop gas extraction and uncover the coal seam using conventional coal uncovering methods.
[0006] Furthermore, the number of holes drilled in the first circle is 8, and the number of holes drilled in the second circle is 16.
[0007] Furthermore, the values of N and M are both 4.
[0008] Furthermore, in the step 2, the gas injection pressure is 5 to 8 MPa, and the gas injection time is 8 to 10 hours.
[0009] Furthermore, in steps three, four and five, the gas injection pressure is 3-5 MPa, and the gas injection time is 2-3 hours.
[0010] Furthermore, the value of K is 8 to 10 m, the value of J is 2 to 3 m, and the value of L is 5 to 7 m.
[0011] Compared with the prior art, the method of the present invention first constructs a specific arrangement of borehole groups to form three different levels of boreholes, namely, a central hole, a first circle of boreholes, and a second circle of boreholes. The boreholes at different levels are grouped and coordinated, and the high-concentration gas extracted from each group of boreholes is pressurized and injected into other boreholes. In combination with gas extraction, the compressed air flow and the extracted air flow are alternately generated in each borehole, and the coal body around the boreholes is repeatedly subjected to the effects of expansion and contraction. Through a specific extraction, pressurization, and injection sequence, the coal body around the central hole, the first circle of boreholes, and the second circle of boreholes is respectively expanded and contracted. The high-pressure and high-concentration gas fracturing, positive and negative pressure alternating stress fatigue fracturing (i.e., it is affected by negative pressure during extraction and by positive pressure during injection, and the positive and negative pressure alternating stress effects are realized alternately), and the process of gas displacing gas are carried out in sequence, thereby significantly improving the gas extraction efficiency and gas extraction concentration; wherein, under the action of alternating high-concentration gas stress, the coal body is prone to reach the fatigue limit and rupture, thereby causing the cracks to continue to expand and gradually develop toward the deep, increasing the gas extraction radius of the borehole, and then increasing the total amount of gas extracted from the borehole, and improving the gas extraction effect. In summary, the present invention integrates the mutually coordinated processes of gas fracturing, alternating stress fatigue fracturing, and gas displacing gas, realizes efficient gas extraction and rapid stone gate coal uncovering, and has wide practicability; in addition, it also has the advantages of simple process, convenient operation, and low cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the construction layout of the present invention; Figure 2 yes Figure 1 Cross-section view along the AA direction.
[0013] In the figure: 1. Rock layer; 2. Coal seam; 3. Tunnel section; 4. Second circle of drill holes; 5. First circle of drill holes; 6. Center hole; 7. Booster pump. DETAILED DESCRIPTION
[0014] The present invention will be further described below.
[0015] like Figure 1As shown, the specific steps of the present invention are: Step 1: When the minimum normal distance between the coal mining working face and the coal seam 2 is 8 to 10 m, a conventional drilling method is used to penetrate the protective rock pillar to construct a group of boreholes toward the coal seam 2. The specific layout of the group of boreholes is as follows: first, a center hole 6 is constructed toward the center of the coal seam 2. After completion, 8 boreholes are evenly arranged on a circle with a radius of 2 to 3 m with the final hole position of the center hole 6 as the center of the circle to form a first circle of boreholes 5; then, 16 boreholes are evenly arranged on a circle with a radius of 5 to 7 m with the final hole position of the center hole 6 as the center of the circle to form a second circle of boreholes 4. Figure 2 As shown; after the construction is completed, the center hole 6, the first circle of drilled holes 5, and the second circle of drilled holes 4 are sealed with a capsule sealer; Step 2: First, connect the first circle of boreholes 5 and the second circle of boreholes 4 to the inlet of the booster pump 7 through pipelines respectively, connect the outlet of the booster pump 7 to the center hole through pipelines, start the booster pump 7, and inject the high-concentration gas extracted from the first circle of boreholes 5 and the second circle of boreholes 4 into the center hole 6 through the boosting effect of the booster pump 7. The gas injection pressure is 5-8MPa, and the gas injection time is 8-10h. After the set gas injection time is reached, stop the booster pump, and connect the center hole 6 to the gas extraction pipeline network to perform gas extraction; Step 3, the boreholes in the second circle of boreholes 4 are grouped into 4 groups with 4 adjacent ones; the gas extracted from all the boreholes in each group is merged and then pressurized by the booster pump 7 and injected into one of the boreholes in the first circle 5, so that the 4 groups correspond one by one to make the 4 boreholes in the first circle of boreholes 5 be injected with high-pressure and high-concentration gas, the injection pressure is 3-5MPa, the injection time is 2-3h, and the booster pump 7 is stopped after the set injection time is reached; the 4 groups correspond one by one to the other 4 boreholes in the first circle of boreholes 5 that have not been injected with high-concentration gas, and the injection process of this step is adopted, and this is repeated until all the first circle of boreholes 4 complete the process of injecting high-pressure and high-concentration gas; Step 4: First, disconnect the central hole 6 from the gas extraction pipeline network, and connect the first circle of boreholes 5 after the treatment in step 3 to the inlet of the booster pump 7 through pipelines, and connect the outlet of the booster pump 7 to the central hole 6 through pipelines. The gas injection pressure is 3-5 MPa, and the gas injection time is 2-3 hours. Start the booster pump to inject the high-concentration gas extracted from the first circle of boreholes 5 into the central hole 6 through the boosting effect of the booster pump 7. Stop the booster pump after the set gas injection time is reached; Step 5: Divide the boreholes in the second circle of boreholes 4 into M groups in the same manner as in step 3, and inject the gas extracted from the adjacent N-1 boreholes in each group into the remaining boreholes in the group after being pressurized by the booster pump 7; the gas injection pressure is 3-5MPa, the gas injection time is 2-3h, and the booster pump 7 is stopped after the set gas injection time is reached; Step 6: regroup the boreholes in the second circle of boreholes 4 in the manner of step 3, and repeat step 5 until all the boreholes in the second circle of boreholes 4 have completed the high-pressure and high-concentration gas injection; Step 7: After repeating steps 2 to 6 for several times, connect all the boreholes in the borehole group to the gas extraction network for continuous gas extraction; when the gas content of the coal seam is less than 8m 3 / t, stop gas extraction and uncover the coal seam using conventional coal uncovering methods.
[0016] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for rapid coal mining based on alternating high-concentration gas power, characterized in that: The specific steps are: Step 1: When the minimum normal distance between the stone gate coal uncovering working face and the coal seam is K, a conventional drilling method is used to penetrate the protective rock pillar to construct a group of boreholes toward the coal seam. The specific layout of the borehole group is as follows: first, a center hole is constructed toward the center of the coal seam. After completion, multiple boreholes are evenly arranged on a circle with a radius of J with the end hole position of the center hole as the center to form a first circle of boreholes; then, multiple boreholes are evenly arranged on a circle with a radius of L with the end hole position of the center hole as the center to form a second circle of boreholes; and J<L; after completion, a capsule sealer is used to seal the center hole, the first circle of boreholes, and the second circle of boreholes; Step 2: First, connect the inlet of the first circle of boreholes and the second circle of boreholes to the inlet of the booster pump through pipelines respectively, connect the outlet of the booster pump to the center hole through pipelines, start the booster pump, and inject the high-concentration gas extracted from the first circle of boreholes and the second circle of boreholes into the center hole through the boosting effect of the booster pump. After the set gas injection time is reached, stop the booster pump, and connect the center hole to the gas extraction pipeline network to extract gas; Step 3, group the boreholes in the second circle into M groups with N adjacent boreholes as a group; after the gas extracted from all the boreholes in each group is merged and pressurized by the booster pump, it is injected into one of the boreholes in the first circle, and the M groups correspond one by one to make the M boreholes in the first circle of boreholes be injected with high-pressure and high-concentration gas, and the booster pump is stopped after the set gas injection time is reached; the M groups correspond one by one to the other M boreholes in the first circle of boreholes that have not been injected with high-concentration gas, and the injection process of this step is adopted, and this is repeated until all the boreholes in the first circle have completed the process of injecting high-pressure and high-concentration gas; Step 4: first disconnect the central hole from the gas extraction pipeline network, and connect the first circle of boreholes processed in step 3 to the inlet of the booster pump through pipelines, and connect the outlet of the booster pump to the central hole through pipelines, start the booster pump, and inject the high-concentration gas extracted from the first circle of boreholes into the central hole through the boosting effect of the booster pump, and stop the booster pump after the set gas injection time is reached; Step 5: Divide the boreholes in the second circle into M groups in the same manner as in step 3, and inject the gas extracted from the adjacent N-1 boreholes in each group into the remaining boreholes in the group after being pressurized by a booster pump; stop the booster pump after the set gas injection time is reached; Step 6: regroup the boreholes in the second circle of boreholes in the same manner as in step 3, and repeat step 5 until all the boreholes in the second circle of boreholes have completed the high-pressure and high-concentration gas injection; Step 7: After repeating steps 2 to 6 for several times, connect all the boreholes in the borehole group to the gas extraction network for continuous gas extraction; when the gas content of the coal seam is less than 8m 3 / t, stop gas extraction and uncover the coal seam using conventional coal uncovering methods.
2. The method for rapid coal mining based on alternating high-concentration gas power according to claim 1 is characterized in that: The number of holes drilled in the first circle is 8, and the number of holes drilled in the second circle is 16.
3. The method for rapid rock-cutting coal uncovering based on alternating high-concentration gas power according to claim 2, characterized in that: The values of N and M are both 4.
4. The method for rapid rock-cutting coal uncovering based on alternating high-concentration gas power according to claim 1 is characterized in that: In the step 2, the gas injection pressure is 5-8 MPa, and the gas injection time is 8-10 hours.
5. The method for rapid rock-cutting coal uncovering based on alternating high-concentration gas power according to claim 1 is characterized in that: In the steps three, four and five, the gas injection pressure is 3-5 MPa, and the gas injection time is 2-3 hours.
6. The method for rapid rock-cutting coal uncovering based on alternating high-concentration gas power according to claim 1 is characterized in that: The value of K is 8 to 10 m, the value of J is 2 to 3 m, and the value of L is 5 to 7 m.
Citation Information
Patent Citations
Microwave-assisted supercritical carbon dioxide cyclic fracturing system and microwave-assisted supercritical carbon dioxide cyclic fracturing method
CN106285604A
Self-circulation injection enhanced coalbed methane recovery method for coal seam gas
CN111472832A
Hydraulic slotting and hot-cold circulation impact linkage cross-cut coal uncovering method
CN113153296A
Method and system for cracking coal body and displacing gas by using extracted gas
CN114233259A
Method and system for improving gas extraction effect through ground well drilling group linkage
CN114320259A