Long-distance directional arc-shaped multi-angle layer-penetrating goaf ponding exploration and drainage technology

Through the long-distance directional arc-shaped multi-angle layer-through water accumulation technology of goaf, combined with geological exploration and hydrological testing, the drilling layout and directional drilling are optimized, which solves the problems of drilling deviation and mud performance, and realizes the impact of drilling. More efficient and safer coal mine water discharge.

CN118934023APending Publication Date: 2024-11-12GANSU LINGTAI SHAOZHAI COAL IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411280493.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During coal mining, the existing technology under the conditions of large inclination angle of coal seam and fault development, drilling is prone to deviating from the design path, affecting the water release effect, and the performance of mud is affected by factors such as formation permeability and water pressure, resulting in drilling Unstable and difficult to meet the needs of modern coal mining.

Method used

The long-distance directional arc-shaped multi-angle layer-passing goaf water accumulation technology is adopted. Through detailed geological exploration and hydrological testing, a hydraulic connection model is constructed, the drilling layout and directional drilling are optimized, and the drilling trajectory is monitored and adjusted in real time. Combining drilling parameters and hydrogeological parameters, precisely control the drilling trajectory and drainage scheme to ensure drilling quality and drainage efficiency.

Benefits of technology

It improves drilling accuracy and drainage efficiency, reduces drilling deviation and resource waste, reduces drilling costs and safety hazards, and ensures the safety of coal mine production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934023A_ABST
    Figure CN118934023A_ABST
Patent Text Reader

Abstract

The invention discloses a long-distance directional arc-shaped multi-angle layer-penetrating goaf ponding exploration and drainage technology, and relates to the technical field of coal mine water exploration and drainage. In the prior art, under the conditions of a large coal seam inclination angle and fault development, a drill hole may deviate from a design path, and the water exploration and drainage effect is affected; and in actual operation, the performance of the slurry is influenced by various factors such as stratum permeability and water pressure, so that the stability of a drill hole and the water exploration and drainage effect are influenced. Through detailed geological exploration and hydrological testing, distribution of a water accumulation area and a water-bearing layer of a goaf is accurately recognized, drilling operation is conducted in a targeted mode, resource waste is avoided, directional arc-shaped multi-angle drilling is conducted, hole forming quality inspection is conducted, the drilling quality is ensured, the unnecessary drilling number is reduced, and the drilling cost is reduced; efficient drainage is performed for water accumulation areas with different depths and angles, the drainage efficiency is improved, water level changes and drainage flow are monitored in real time, and the drainage effect is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine water exploration and drainage, and in particular to a process for exploring and draining water in goaf areas based on long-distance directional arc multi-angle penetration. Background Art

[0002] In the process of coal mining, water accumulation in goaf has always been an important factor affecting safe production. Traditional methods of water exploration and drainage, such as underground drilling and ground drilling, have problems such as low detection accuracy, great construction difficulty, and low efficiency, which are difficult to meet the needs of modern coal mining. Regarding the problem of water accumulation in goaf during coal mining, a patent application with publication number: CN117432466A discloses a method for accurately exploring and releasing water in old goaf by long-distance directional drilling through multiple coal seams. The method is to arrange the drilling site at the water tank, design low-position fan-shaped branch holes and high-position fan-shaped branch holes in sequence according to the water level elevation, drill using directional drilling technology, and adjust the position of the directional drilling end hole in real time according to the water output during the exploration and release process. When no water is seen in the branch hole during the drilling process, the high-position fan-shaped branch hole lowers the end hole elevation, and the low-position fan-shaped branch hole increases the end hole elevation. Different mud fluids are selected to flush the borehole according to different stratum properties. Parameter design, drilling construction and parameter analysis are also required for directional drilling. Through the mutual feedback between the three, the scope of the old kiln water accumulation area can be accurately grasped, providing a reference for the accurate exploration and release design of old kiln water accumulation.

[0003] Although the above patent improves the accuracy and efficiency of water exploration and release by using a method of long-distance directional drilling through multiple coal seams to accurately explore and release old empty water, it still has the following problems:

[0004] In the existing technology, directional drilling technology is used. However, under the conditions of large coal seam inclination and developed faults, the borehole may deviate from the designed path, affecting the exploration and water release effect; and in actual operation, the performance of the mud is affected by many factors such as formation permeability and water pressure, thereby affecting the stability of the borehole and the exploration and water release effect. Summary of the invention

[0005] The purpose of the present invention is to provide a process for the exploration and release of water in goaf areas based on long-distance directional arc-shaped multi-angle penetration, which can achieve precise control and adjustment of the drilling trajectory by optimizing the drilling layout, directional drilling and real-time monitoring; at the same time, it can comprehensively evaluate the connectivity and distribution of water accumulation among multiple coal seams, and provide a more comprehensive and accurate basis for precise exploration and release of water, so as to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions:

[0007] A long-distance directional arc multi-angle layer penetration exploration and release of water in goaf areas technology, comprising the following steps:

[0008] S1: Geological survey and determination of waterlogging areas: Conduct geological surveys on the goaf to obtain underground geological structure information, determine the area, scope and source of waterlogging, and build a long-distance directional arc multi-angle drilling plan;

[0009] S2: Directional arc multi-angle drilling: Determine the drilling parameters based on the long-distance directional arc multi-angle penetration drilling plan, install and debug the drilling equipment, control the angle and trajectory of the drilling equipment based on the obtained drilling parameters, and perform arc multi-angle drilling;

[0010] S3: Water discharge and monitoring: Drainage facilities are installed in the borehole to drain the water in the goaf according to the amount of water and the drainage capacity of the drainage facilities. The water level changes and drainage flow in the goaf are monitored in real time, and the drainage plan is adjusted according to the monitoring data.

[0011] Furthermore, the geological survey and waterlogging area determination in S1 are specifically as follows:

[0012] According to the mining area geology and historical mining data, the coal seam roof and floor characteristics and possible aquifer locations are determined, and the roof and floor characteristics and aquifer characteristics of the excavated coal seam are extracted based on the determination results;

[0013] According to the feature extraction results, the aquifer information of the roof and floor is obtained, the geological characteristics of the goaf are determined, and the lithology and aquifer distribution data of the roof and floor are identified based on the geological characteristics of the goaf;

[0014] Construct a preliminary exploration plan based on the identification results, including the location, angle and depth of the borehole, and execute the exploration plan. At the same time, record the hydrogeological parameters obtained during the drilling process;

[0015] Conduct hydrological tests based on hydrogeological parameters to evaluate the water richness and permeability of aquifers and identify abnormally water-rich areas and waterlogged areas;

[0016] Combined with the hydrological test results, a hydraulic connection model between the aquifer and the goaf was constructed to analyze the hydraulic connection characteristics of the aquifer and goaf, and to determine the hydraulic connection and water accumulation range between aquifers;

[0017] At the same time, the specific locations of the abnormally water-rich area in the tunnel roof aquifer and the water-accumulated area in the front goaf are determined based on the hydraulic connection characteristics.

[0018] Furthermore, a long-distance directional arc multi-angle drilling plan is constructed, which specifically includes:

[0019] Based on the specific location of the abnormally water-rich area of ​​the tunnel roof aquifer and the water-filled area ahead, the main objectives and tasks of drilling are clarified, and the strata that need to be penetrated and the potential hydrogeological risks are determined based on the hydrogeological parameters;

[0020] Construct a long-distance directional drilling plan to determine the entry point, target point and expected drilling trajectory of the borehole, set the angle, curvature and depth of the borehole, and calculate the azimuth and inclination of the borehole;

[0021] A drilling simulation model is constructed based on the long-distance directional drilling plan. The drilling simulation model performs trajectory simulation and optimization, determines the long-distance directional arc trajectory, identifies potential problems based on the simulation results, and formulates corresponding water prevention and control plans.

[0022] Furthermore, the drilling simulation model also includes: determining the optimal tunnel hole depth and drilling site layout area based on the top and bottom plate lithology and aquifer distribution data, combined with the analysis results of long-distance and high-vertical drilling characteristics.

[0023] Furthermore, the optimal tunnel hole depth is 100-400 meters, and the angle between the drilling site layout area and the tunnel is not less than 45 degrees.

[0024] Furthermore, the directional arc multi-angle drilling in S2 also includes: after the borehole of the arc multi-angle drilling reaches the predetermined depth in the long-distance directional arc multi-angle through-layer drilling plan, the hole quality inspection and analysis are performed based on the acquired borehole diameter, depth and inclination parameters to verify whether the drilling trajectory and quality meet the design requirements of the long-distance directional arc multi-angle through-layer drilling plan.

[0025] Furthermore, the angle and trajectory of the drilling equipment are controlled in S2 to perform arc multi-angle drilling, specifically:

[0026] Match the corresponding drilling equipment based on the drilling parameters in the long-distance directional drilling plan and formulate the corresponding drilling parameter table;

[0027] Install the drilling equipment to the predetermined position based on the drilling parameter table, calibrate the angle of the drilling equipment, start the drilling equipment to drill, and verify the equipment status and parameter settings;

[0028] During the drilling process, the position, angle and trajectory of the drill bit are monitored in real time. The movement trajectory of the drill bit is predicted based on the actual operating parameters of the drill bit monitored in real time. Adjustment instructions are generated based on the prediction results to adjust the movement direction and trajectory of the drill bit in real time.

[0029] Furthermore, real-time monitoring of the position, angle and trajectory of the drill bit also includes:

[0030] Extracting timestamps based on real-time monitored drill data, and marking the actual operating parameters of the drill bit, including actual rotation speed, actual drilling speed, and actual hole depth parameters, for the first time based on the time series;

[0031] Performing a second time mark on the rotation speed, drilling speed and hole depth parameters of the drill bit preset in the drilling parameter table, aligning the first time mark and the second time mark according to the time series, and obtaining an alignment result;

[0032] Based on the alignment result, the actual data and the preset data are synchronized, a data error value between the actual data and the preset data is calculated, and a data error amplitude is determined;

[0033] The actual operating parameters of the drill bit are adjusted based on the rotation speed error amplitude, and the drilling parameters and drilling trajectory are optimized in real time.

[0034] Furthermore, predicting the motion trajectory of the drill bit based on the actual operating parameters of the drill bit monitored in real time also includes: analyzing the influencing factors of the drilling motion trajectory of each hole segment based on the prediction results, and matching corresponding trajectory control measures based on the analysis results, wherein the drilling motion trajectory of each hole segment includes a hole opening segment trajectory and a correction segment drilling trajectory.

[0035] Furthermore, the drainage and monitoring of accumulated water in S3 are specifically as follows:

[0036] Based on the hydraulic connection between aquifers and the scope of water accumulation combined with drilling data, the amount of water accumulation in the goaf is assessed, corresponding drainage equipment is installed according to the amount of water accumulation, and a drainage plan is formulated based on the amount of water accumulation in the goaf and the drainage capacity of the drainage facilities;

[0037] Continue to carry out drainage operations according to the drainage plan, monitor the drainage flow and water level changes in the goaf in real time, analyze the monitored water level data, determine the discharge of accumulated water in the goaf, and evaluate the drainage effect;

[0038] The drainage plan is adjusted according to the monitoring data and analysis results, and an emergency plan is formulated. When an abnormality occurs during the drainage process, the emergency response mechanism is immediately triggered and an early warning alarm is issued.

[0039] Compared with the prior art, the present invention has the following beneficial effects:

[0040] Through detailed geological surveys and hydrological tests, the distribution of waterlogged areas and aquifers in goafs can be accurately identified. The constructed hydraulic connection model helps to understand the flow patterns of groundwater, carry out drilling operations in a targeted manner, avoid waste of resources, conduct directional arc drilling at multiple angles and perform hole quality inspections to ensure borehole quality, reduce the number of unnecessary boreholes, reduce drilling costs, and efficiently drain waterlogged areas of different depths and angles to improve drainage efficiency. Water level changes and drainage flow are monitored in real time, and drainage plans are adjusted in a timely manner according to actual conditions to ensure drainage effects. Safety hazards such as mine collapse and ground subsidence caused by waterlogging are significantly reduced, thereby ensuring production safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 This is a process flow chart of the invention based on long-distance directional arc multi-angle layer penetration to explore and release water accumulated in goaf areas. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] In order to solve the technical problems that the existing technology adopts directional drilling technology, but under the conditions of large coal seam inclination and developed faults, the borehole may deviate from the designed path, affecting the exploration and drainage effect; and in actual operation, the performance of the mud fluid is affected by multiple factors such as formation permeability and water pressure, thus affecting the stability of the borehole and the exploration and drainage effect, please refer to Figure 1 , this embodiment provides the following technical solutions:

[0044] A long-distance directional arc multi-angle layer penetration exploration and release of water in goaf areas technology, comprising the following steps:

[0045] S1: Geological survey and determination of waterlogging area: Conduct geological survey on the goaf to obtain underground geological structure information, determine the area, scope and source of waterlogging, and build a long-distance directional arc multi-angle drilling plan, specifically:

[0046] According to the mining area geology and historical mining data, the coal seam roof and floor characteristics and possible aquifer locations are determined, and the roof and floor characteristics and aquifer characteristics of the excavated coal seam are extracted based on the determination results;

[0047] According to the feature extraction results, the aquifer information of the roof and floor is obtained, the geological characteristics of the goaf are determined, and the lithology and aquifer distribution data of the roof and floor are identified based on the geological characteristics of the goaf;

[0048] Based on the identification results, a preliminary exploration plan is constructed, including the location, angle and depth of the drilling hole, and the exploration plan is executed. At the same time, the hydrogeological parameters obtained during the drilling process are recorded, including data parameters such as core, water level, and water pressure;

[0049] Conduct hydrological tests based on hydrogeological parameters to evaluate the water richness and permeability of aquifers and identify abnormally water-rich areas and waterlogged areas;

[0050] Combined with the hydrological test results, a hydraulic connection model between the aquifer and the goaf was constructed to analyze the hydraulic connection characteristics of the aquifer and goaf, and to determine the hydraulic connection and water accumulation range between aquifers;

[0051] At the same time, the specific locations of abnormally water-rich areas in the tunnel roof aquifer and water-accumulated areas in the front goaf are determined based on the hydraulic connection characteristics;

[0052] S2: Directional arc multi-angle drilling: Based on the long-distance directional arc multi-angle penetration drilling plan, the drilling parameters are determined, including the location, depth, angle and number of holes, and the drilling equipment is installed and debugged. Based on the obtained drilling parameters, the angle and trajectory of the drilling equipment are controlled to perform arc multi-angle drilling;

[0053] In this embodiment, the directional arc multi-angle drilling in S2 further includes: after the borehole of the arc multi-angle drilling reaches the predetermined depth in the long-distance directional arc multi-angle penetration drilling scheme, based on the acquired borehole diameter, depth and inclination parameters, performing a hole quality inspection and analysis to verify whether the drilling trajectory and quality meet the design requirements of the long-distance directional arc multi-angle penetration drilling scheme;

[0054] S3: Water discharge and monitoring: Drainage facilities are installed in the borehole to drain the water in the goaf according to the amount of water and the drainage capacity of the drainage facilities. The water level changes and drainage flow in the goaf are monitored in real time, and the drainage plan is adjusted according to the monitoring data.

[0055] In this embodiment, through detailed geological surveys and hydrological tests, the distribution of waterlogged areas and aquifers in the goaf is accurately identified. The constructed hydraulic connection model helps to understand the flow patterns of groundwater, carry out drilling operations in a targeted manner, avoid waste of resources, conduct directional arc drilling at multiple angles and perform hole quality inspections to ensure the quality of drilling holes, reduce the number of unnecessary holes, reduce drilling costs, and efficiently drain waterlogged areas of different depths and angles to improve drainage efficiency. The water level changes and drainage flow are monitored in real time, and the drainage plan is adjusted in time according to actual conditions to ensure drainage effects, significantly reduce safety hazards such as mine collapse and ground subsidence caused by waterlogging, and ensure production safety.

[0056] In this embodiment, a long-distance directional arc multi-angle layer drilling scheme is constructed, which specifically includes:

[0057] Based on the specific locations of the abnormally water-rich area of ​​the tunnel roof aquifer and the water-accumulated area in the front goaf, the main objectives and tasks of drilling are clarified, such as verifying the scope of water accumulation, evaluating the water-richness of the aquifer, obtaining deep geological structure information, etc., and determining the strata that need to be penetrated and the potential hydrogeological risks based on the hydrogeological parameters;

[0058] The long-distance directional drilling plan is constructed to determine the entry point, target point and expected drilling trajectory of the borehole, set the angle, curvature and depth of the borehole to meet the needs of layer penetration and multi-angle exploration, calculate the azimuth and inclination of the borehole, and ensure that the borehole can move forward along the predetermined trajectory;

[0059] A drilling simulation model is built based on the long-distance directional drilling plan. The drilling simulation model performs trajectory simulation and optimization, determines the long-distance directional arc trajectory, and identifies potential problems based on the simulation results, and formulates corresponding water prevention and control plans, including drainage, plugging and monitoring measures;

[0060] In this embodiment, the drilling simulation model also includes: based on the top and bottom plate lithology and aquifer distribution data, combined with the analysis results of the long-distance and high-vertical drilling characteristics, determining the optimal tunnel penetration depth and drilling site layout area, the optimal tunnel penetration depth distance is 100-400 meters, which can not only effectively detect the location of the tunnel, but also maintain a certain safety distance to avoid affecting the stability of the tunnel due to drilling too close. The angle between the drilling site layout area and the tunnel is not less than 45 degrees, ensuring that the drilling trajectory can penetrate into the tunnel at a suitable angle, and at the same time, it is also beneficial to the operation of the drilling equipment and the control of the drilling direction, which helps to avoid the drilling being directly perpendicular to the tunnel, thereby reducing the potential impact of drilling activities on the stability of the tunnel.

[0061] In this embodiment, the roof and floor characteristics of the excavated coal seam and the water-richness of the aquifer are explored, the geological characteristics of the goaf are determined, and the preliminary exploration is used to more accurately lock the abnormally water-rich area of ​​the aquifer on the roof of the tunnel and the water-accumulated area in the goaf in front of the tunnel. At the same time, the hydraulic connection characteristics of the aquifer and the goaf are accurately obtained, providing a strong data basis for building a drilling plan, so that the long-distance directional arc multi-angle cross-layer drilling plan can effectively explore the roof and floor characteristics of the excavated coal seam, the water-richness of the aquifer and the water accumulation in the goaf, providing important information for safe production in coal mines.

[0062] In this embodiment, the angle and trajectory of the drilling equipment are controlled in S2 to perform arc multi-angle drilling, specifically:

[0063] Match the corresponding drilling equipment based on the drilling parameters in the long-distance directional drilling plan, including directional drilling rigs, drill rods, drill bits, measuring instruments, etc., and formulate the corresponding drilling parameter table, including the specific location coordinates, design depth, design angle, etc. of each borehole;

[0064] Install the drilling equipment to the predetermined position based on the drilling parameter table, calibrate the drilling equipment to ensure that the drilling direction is consistent with the designed angle, start the drilling equipment to drill, and verify the equipment status and parameter settings;

[0065] During the drilling process, the position, angle and trajectory of the drill bit are monitored in real time. The movement trajectory of the drill bit is predicted based on the actual operating parameters of the drill bit monitored in real time. Adjustment instructions are generated based on the prediction results to adjust the movement direction and trajectory of the drill bit in real time.

[0066] Based on the prediction results, the influencing factors of the drilling motion trajectory of each hole section are analyzed, and the corresponding trajectory control measures are matched based on the analysis results, wherein the drilling motion trajectory of each hole section includes the hole opening section trajectory and the deviation correction section drilling trajectory, the hole opening section trajectory control is to ensure the linearity of the borehole, and the deviation correction section drilling trajectory control is mainly affected by factors such as drilling parameters, formation inclination, device angle, reverse torsion angle and the position of trajectory points, which can effectively control the drilling trajectory to ensure that the borehole moves forward according to the designed route, while reducing deflection and bending, and improving the quality of the hole;

[0067] In this embodiment, real-time monitoring of the position, angle and trajectory of the drill bit also includes:

[0068] Extracting timestamps based on real-time monitored drill data, and marking the actual operating parameters of the drill bit, including actual rotation speed, actual drilling speed, and actual hole depth parameters, for the first time based on the time series;

[0069] Performing a second time mark on the rotation speed, drilling speed and hole depth parameters of the drill bit preset in the drilling parameter table, aligning the first time mark and the second time mark according to the time series, and obtaining an alignment result;

[0070] Based on the alignment result, the actual data and the preset data are synchronized, a data error value between the actual data and the preset data is calculated, and a data error amplitude is determined;

[0071] The actual operating parameters of the drill bit are adjusted based on the rotation speed error amplitude, and the drilling parameters and drilling trajectory are optimized in real time.

[0072] In this embodiment, by real-time monitoring and adjustment of the position, angle and trajectory of the drill bit, it is ensured that the drilling is carried out accurately according to the designed route, the deviation is reduced, and the drilling accuracy is improved. Based on the comparison of real-time data and preset data, the deviation in the drilling process is timely discovered and corrected, the drilling parameters are optimized, unnecessary repetitive operations and correction work are reduced, the drilling efficiency is improved, the deflection and bending of the borehole are reduced, and the hole quality is improved.

[0073] In this embodiment, the drainage and monitoring of accumulated water in S3 are specifically as follows:

[0074] Based on the hydraulic connection between aquifers and the scope of water accumulation combined with drilling data, the amount of water accumulation in the goaf is assessed, corresponding drainage equipment is installed according to the amount of water accumulation, and a drainage plan is formulated based on the amount of water accumulation in the goaf and the drainage capacity of the drainage facilities;

[0075] Continue to carry out drainage operations according to the drainage plan, monitor the drainage flow and water level changes in the goaf in real time, analyze the monitored water level data, determine the discharge of accumulated water in the goaf, and evaluate the drainage effect;

[0076] The drainage plan is adjusted according to the monitoring data and analysis results, and an emergency plan is formulated. When an abnormality occurs during the drainage process, the emergency response mechanism is immediately triggered and an early warning alarm is issued.

[0077] In this embodiment, by accurately assessing the amount of accumulated water, lowering the water level in the goaf, reducing the impact of accumulated water on the stability of the goaf, ensuring the safety of the goaf, scientifically formulating drainage plans and real-time monitoring of water level changes, drainage operations are made more efficient and orderly, reducing unnecessary waste of resources and time costs, and timely adjusting drainage plans and formulating emergency plans and other measures to ensure the safety and stability of the goaf, improve drainage efficiency, reduce safety risks, provide data support for decision-making, and facilitate environmental protection.

[0078] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A long-distance directional arc multi-angle penetration technology for exploring and releasing water in goaf areas, characterized in that: The following steps are involved: S1: Geological survey and determination of waterlogging areas: Conduct geological surveys on the goaf to obtain underground geological structure information, determine the area, scope and source of waterlogging, and build a long-distance directional arc multi-angle drilling plan; S2: Directional arc multi-angle drilling: Determine the drilling parameters based on the long-distance directional arc multi-angle penetration drilling plan, install and debug the drilling equipment, control the angle and trajectory of the drilling equipment based on the obtained drilling parameters, and perform arc multi-angle drilling; S3: Water discharge and monitoring: Drainage facilities are installed in the borehole to drain the water in the goaf according to the amount of water and the drainage capacity of the drainage facilities. The water level changes and drainage flow in the goaf are monitored in real time, and the drainage plan is adjusted according to the monitoring data.

2. A long-distance directional arc multi-angle layer penetration technology for exploring and releasing water in goaf areas as claimed in claim 1, characterized in that: The geological survey and waterlogging area determination in S1 are as follows: According to the mining area geology and historical mining data, the coal seam roof and floor characteristics and possible aquifer locations are determined, and the roof and floor characteristics and aquifer characteristics of the excavated coal seam are extracted based on the determination results; According to the feature extraction results, the aquifer information of the roof and floor is obtained, the geological characteristics of the goaf are determined, and the lithology and aquifer distribution data of the roof and floor are identified based on the geological characteristics of the goaf; Construct a preliminary exploration plan based on the identification results, including the location, angle and depth of the borehole, and execute the exploration plan. At the same time, record the hydrogeological parameters obtained during the drilling process; Conduct hydrological tests based on hydrogeological parameters to evaluate the water richness and permeability of aquifers and identify abnormally water-rich areas and waterlogged areas; Combined with the hydrological test results, a hydraulic connection model between the aquifer and the goaf was constructed to analyze the hydraulic connection characteristics of the aquifer and goaf, and to determine the hydraulic connection and water accumulation range between aquifers. At the same time, the specific locations of the abnormally water-rich area in the tunnel roof aquifer and the water-accumulated area in the front goaf are determined based on the hydraulic connection characteristics.

3. A long-distance directional arc multi-angle layer penetration exploration and release of water in goaf areas as claimed in claim 2, characterized in that: Construct a long-distance directional arc multi-angle drilling plan, including: Based on the specific location of the abnormally water-rich area of ​​the tunnel roof aquifer and the water-filled area ahead, the drilling objectives and tasks are clarified, and the strata that need to be penetrated and the potential hydrogeological risks are determined based on the hydrogeological parameters; Construct a long-distance directional drilling plan to determine the entry point, target point and expected drilling trajectory of the borehole, set the angle, curvature and depth of the borehole, and calculate the azimuth and inclination of the borehole; A drilling simulation model is constructed based on the long-distance directional drilling plan. The drilling simulation model performs trajectory simulation and optimization, determines the long-distance directional arc trajectory, identifies potential problems based on the simulation results, and formulates corresponding water prevention and control plans.

4. A long-distance directional arc multi-angle layer penetration technology for exploring and releasing water in goaf areas as claimed in claim 3, characterized in that: The drilling simulation model also includes: determining the optimal tunnel hole depth and drilling site layout area based on the top and bottom plate lithology and aquifer distribution data combined with the analysis results of long-distance and high-vertical-distance drilling characteristics.

5. A long-distance directional arc multi-angle layer penetration technology for exploring and releasing water in goaf areas as claimed in claim 4, characterized in that: The optimal tunnel hole depth is 100-400 meters, and the angle between the drilling site layout area and the tunnel is not less than 45 degrees.

6. A long-distance directional arc multi-angle layer penetration technology for exploring and releasing water in goaf areas as claimed in claim 5, characterized in that: The directional arc multi-angle drilling in S2 also includes: after the borehole of the arc multi-angle drilling reaches the predetermined depth in the long-distance directional arc multi-angle penetration drilling plan, the hole quality inspection and analysis are performed based on the acquired borehole diameter, depth and inclination parameters to verify whether the drilling trajectory and quality meet the design requirements of the long-distance directional arc multi-angle penetration drilling plan.

7. A long-distance directional arc multi-angle layer penetration technology for exploring and releasing water in goaf areas as claimed in claim 6, characterized in that: In S2, the angle and trajectory of the drilling equipment are controlled to perform arc-shaped multi-angle drilling, specifically: Match the corresponding drilling equipment based on the drilling parameters in the long-distance directional drilling plan and formulate the corresponding drilling parameter table; Install the drilling equipment to the predetermined position based on the drilling parameter table, calibrate the angle of the drilling equipment, start the drilling equipment to drill, and verify the equipment status and parameter settings; During the drilling process, the position, angle and trajectory of the drill bit are monitored in real time. The movement trajectory of the drill bit is predicted based on the actual operating parameters of the drill bit monitored in real time. Adjustment instructions are generated based on the prediction results to adjust the movement direction and trajectory of the drill bit in real time.

8. The long-distance directional arc multi-angle layer penetration technology for exploring and releasing water in goaf areas as claimed in claim 7 is characterized by: Real-time monitoring of the drill bit’s position, angle and trajectory, including: Extracting timestamps based on real-time monitored drill data, and marking the actual operating parameters of the drill bit, including actual rotation speed, actual drilling speed, and actual hole depth parameters, for the first time based on the time series; Performing a second time mark on the rotation speed, drilling speed and hole depth parameters of the drill bit preset in the drilling parameter table, aligning the first time mark and the second time mark according to the time series, and obtaining an alignment result; Based on the alignment result, the actual data and the preset data are synchronized, a data error value between the actual data and the preset data is calculated, and a data error amplitude is determined; The actual operating parameters of the drill bit are adjusted based on the rotation speed error amplitude, and the drilling parameters and drilling trajectory are optimized in real time.

9. A long-distance directional arc multi-angle layer penetration exploration and release of water in goaf areas as claimed in claim 8, characterized in that: Predicting the motion trajectory of the drill bit based on the actual operating parameters of the drill bit monitored in real time also includes: analyzing the influencing factors of the drilling motion trajectory of each hole segment based on the prediction results, and matching corresponding trajectory control measures based on the analysis results, wherein the drilling motion trajectory of each hole segment includes a hole opening segment trajectory and a correction segment drilling trajectory.

10. A long-distance directional arc multi-angle layer penetration exploration and release of water in goaf as claimed in claim 9, characterized in that: The drainage and monitoring of accumulated water in S3 are specifically as follows: Based on the hydraulic connection between aquifers and the scope of water accumulation combined with drilling data, the amount of water accumulation in the goaf is assessed, corresponding drainage equipment is installed according to the amount of water accumulation, and a drainage plan is formulated based on the amount of water accumulation in the goaf and the drainage capacity of the drainage facilities; Continue to carry out drainage operations according to the drainage plan, monitor the drainage flow and water level changes in the goaf in real time, analyze the monitored water level data, determine the discharge of accumulated water in the goaf, and evaluate the drainage effect; The drainage plan is adjusted according to the monitoring data and analysis results, and an emergency plan is formulated. When an abnormality occurs during the drainage process, the emergency response mechanism is immediately triggered and an early warning alarm is issued.