Underground gas storage structure and system of compressed air energy storage power station and operation method

Through the coordination of multi-flap movable concrete lining block structure and protruding insertion holes, the problem of lining structure cracks in the underground gas storage in compressed air energy storage power station under high internal pressure is solved, and the safety and application range of the warehouse are improved.

CN118934038APending Publication Date: 2024-11-12CHINA THREE GORGES CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410975073.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The underground gas storage lining structure of compressed air energy storage power stations is prone to cracks under the action of high internal pressure, affecting the sealing structure and the stability of the warehouse.

Method used

The structure of multi-flap movable concrete lining block is adopted. The structure joints are opened and closed, and the protruding part and insertion holes are used to coordinate the guidance. The lining blocks are uniformly retracted, transmit high-pressure gas to the surrounding rock, and maintain the surrounding rock stability during maintenance. .

Benefits of technology

It improves the safety of the gas storage, reduces the strength requirements of surrounding rocks, expands the scope of application, and ensures the stability and sealing of the underground gas storage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934038A_ABST
    Figure CN118934038A_ABST
Patent Text Reader

Abstract

The invention provides a compressed air energy storage power station underground gas storage structure, system and operation method.The compressed air energy storage power station underground gas storage structure comprises a gas storage body, a gas storage cavity is formed in the gas storage body and located in a sealing layer, a concrete lining layer is arranged outside the sealing layer, the concrete lining layer is defined by a plurality of movable lining blocks, and the lining blocks are arranged in the sealing layer. A structural joint is arranged between every two adjacent lining blocks, a plurality of extending parts are fixedly arranged on the portion, located at the structural joints, of the left lining, inserting holes are correspondingly formed in the portion, located at the structural joints, of the right lining, and the extending parts penetrate into the inserting holes in a sliding mode. By means of the structure, the problem that the stability of a sealing structure or an underground gas storage is affected due to the fact that the gas storage lining structure cracks under the action of high internal pressure is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of underground gas storage reservoirs for compressed air energy storage power stations, and in particular to a structure, system and operation method of underground gas storage reservoirs for compressed air energy storage power stations. Background Art

[0002] Compressed air energy storage power stations are a new type of large-scale energy storage technology that has been vigorously developed both at home and abroad in recent years. The gas storage types of compressed air energy storage power stations include natural underground caves, artificial chambers, metal containers, composite materials, etc. Natural underground caves have obvious cost advantages, but they are difficult to promote on a large scale due to special geological and geographical conditions. Artificial chambers weaken the restrictions of special geographical conditions, but the cost is high, and the sealing is prone to failure under cyclic alternating loads. Metal pressure vessels have high operating reliability, mature design and manufacturing technology, and flexible installation and layout, but the gas storage scale is small and the cost is high. Composite materials have high storage pressure, good sealing, and corrosion resistance, but the current price is high and the pipe diameter is small, and it has not yet been applied to the field of compressed air energy storage. Artificial underground gas storage weakens the restrictions of special geographical conditions and is convenient for large-scale development and application, so it is increasingly valued by the engineering community.

[0003] The gas storage pressure of compressed air energy storage power stations is generally high. Under the action of high internal pressure, cracks will inevitably appear in the lining structure of artificial underground gas storage, which will affect the overall stress performance of the lining structure and may even cause failure of the sealing structure or instability of the underground gas storage. Summary of the invention

[0004] The purpose of the present invention is to provide an underground gas storage structure, system and operation method of a compressed air energy storage power station, so as to solve the problem that cracks are generated in the lining structure of the gas storage under the action of high internal pressure, thereby affecting the sealing structure or the stability of the underground gas storage.

[0005] To achieve the above-mentioned purpose, the present invention provides an underground gas storage structure of a compressed air energy storage power station, including a gas storage body, a gas storage cavity inside the gas storage body, the gas storage cavity is located in a sealing layer, a concrete lining layer is arranged outside the sealing layer, the concrete lining layer is formed by enclosing a plurality of movable lining blocks, a structural seam is arranged between two adjacent lining blocks, a plurality of extensions are fixedly arranged on the left-lobe lining at the structural seam, an insertion hole is correspondingly arranged on the right-lobe lining at the structural seam, and the extension slides into the insertion hole.

[0006] The sealing layer is a metal tank structure.

[0007] The wall thickness of the metal can body is 2-5 mm.

[0008] The protruding portion is a structure integrated with the lining block.

[0009] The protruding portion is a tie rod steel bar, one end of which is fixed to the left petal lining, and the other end of which is slidably inserted into the insertion hole.

[0010] One end of the tie rod reinforcement is an anchoring section, and the other end is a movable section. The anchoring section is anchored in the left-petal lining, and the movable section slides into the insertion hole of the right-petal lining.

[0011] A flexible connection layer is arranged in the structural seam.

[0012] The insertion hole is also filled with a flexible filling layer.

[0013] A compressed air energy storage power station underground gas storage system adopts the compressed air energy storage power station underground gas storage structure.

[0014] A method for operating an underground gas storage structure of a compressed air energy storage power station adopts the above-mentioned method. When the gas storage body is in operation, the high-pressure gas in the gas storage cavity causes the sealing layer to expand under pressure, the lining blocks are opened through the structural seams, and the high pressure in the gas storage cavity is transmitted to the surrounding rock through the concrete lining layer; when the gas storage body is under maintenance, the gas storage cavity is depressurized, the extension part cooperates with the insertion hole for guidance, the lining blocks are evenly retracted, the structural seams between the lining blocks are closed, and finally the concrete lining layer bears the surrounding rock pressure to maintain the stability of the surrounding rock.

[0015] Compared with the prior art, the present invention has the following technical effects: When the gas storage reservoir is in operation, the high-pressure gas in the gas storage cavity causes the sealing layer to expand under pressure, the lining blocks are opened through the structural seams, and the high pressure in the gas storage cavity is transmitted to the surrounding rock through the concrete lining layer; when the gas storage reservoir is overhauled, the gas storage cavity is depressurized, the extension part cooperates with the insertion hole for guidance, the lining blocks are evenly retracted, the structural seams between the lining blocks are closed, and finally the concrete lining layer bears the surrounding rock pressure to maintain the stability of the surrounding rock. The present invention solves the problem that the lining structure of the gas storage reservoir generates cracks under the action of high internal pressure, thereby affecting the sealing structure or the stability of the underground gas storage reservoir, greatly improving the safety of the gas storage reservoir, while also reducing the requirements for the surrounding rock strength in the construction of the underground gas storage reservoir, and expanding the scope of application of the underground gas storage reservoir. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0017] Figure 1 This is a structural diagram of the movable lining of the underground gas storage reservoir of the compressed air energy storage power station of the present invention.

[0018] Figure 2 This is a structural diagram of the movable lining structure joint of the present invention.

[0019] Figure 3 This is a structural diagram of the tie rod reinforcement of the present invention.

[0020] In the figure: Air storage cavity 1, sealing layer 2, lining block 3, left lobe lining 31, right lobe lining 32, structural joint 4, tie rod reinforcement 5, anchoring section 51, movable section 52, flexible connection layer 6, flexible filling layer 7. DETAILED DESCRIPTION

[0021] Embodiments of the present invention are described in detail below. Examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but should not be construed as limiting the present invention.

[0022] Embodiment 1: See also Figure 1-3 , an underground gas storage structure of a compressed air energy storage power station, including a gas storage body, a gas storage cavity 1 inside the gas storage body, the gas storage cavity 1 is located in a sealing layer 2, a concrete lining layer is arranged outside the sealing layer 2, the concrete lining layer is formed by enclosing a plurality of movable lining blocks 3, a structural seam 4 is arranged between two adjacent lining blocks 3, a plurality of extensions are fixedly arranged on the left lining 31 located at the structural seam 4, and an insertion hole is correspondingly arranged on the right lining 32 located at the structural seam 4, and the extension slides into the insertion hole. The present invention arranges matching extensions and insertion holes between the lining blocks 3, and the lining blocks 3 can open along the structural seam when subjected to high-pressure internal forces. During maintenance conditions, the structural seam is closed, and the lining blocks 3 can withstand the confining pressure of rocks.

[0023] The gas storage cavity 1 is used to store compressed air, and its shape can be a circular tunnel type or other types. In this embodiment, the circular tunnel type is taken as an example, and the diameter of the gas storage cavity 1 is 6m.

[0024] The sealing layer 2 is used for sealing compressed air, and the sealing layer 2 has air tightness and ductility.

[0025] The concrete lining layer is arranged outside the sealing layer 2. The main functions of the concrete lining layer are: on the one hand, to provide a flat laying condition for the sealing layer 2; on the other hand, to transfer the high gas pressure in the gas storage cavity 1 to the surrounding rock; finally, to maintain the stability of the surrounding rock when the gas storage body is under maintenance conditions.

[0026] In this embodiment, the sealing layer 2 is a metal can structure, and the wall thickness of the metal can is 2 mm, 4 mm or 5 mm.

[0027] Lining block 3 uses C25 strength grade concrete and the lining thickness is 0.6m.

[0028] In this embodiment, the concrete lining layer is composed of four petal-type lining blocks 3 , and the lining blocks 3 on both sides of each structural joint 4 are called left petal lining 31 and right petal lining 32 .

[0029] In one embodiment, the extension is a structure integral with the lining block 3. That is to say, the extension is a concrete structure integrally cast with the lining block 3. In this embodiment, the extension may be a truncated cone-shaped column.

[0030] In another embodiment, see Figure 1 The extended portion is a tie rod reinforcement 5, one end of the tie rod reinforcement 5 is fixed to the left petal lining 31, and the other end slides into the insertion hole, and the structure is simple.

[0031] In this embodiment, the tie rod reinforcement 5 is a Ø32 threaded reinforcement.

[0032] For further information, see Figure 2 One end of the tie rod reinforcement 5 is an anchoring section 51 , and the other end is a movable section 52 . The anchoring section 51 is anchored in the left petal lining 31 , and the movable section 52 slides into the insertion hole of the right petal lining 32 .

[0033] Specifically, 1 / 2 of the length of the tie rod steel bar is anchored in the lining block 3 on one side of the structural joint, and the other 1 / 2 of the length is inserted into the insertion hole of the lining block 3 on the other side.

[0034] Furthermore, a flexible connection layer 6 is provided in the structural joint 4 to improve the internal flatness of the concrete lining layer when it expands and contracts outwards.

[0035] Furthermore, the insertion hole is also filled with a flexible filling layer 7, which plays a role in enabling the tie rod reinforcement 5 to smoothly expand and contract when the lining block 3 is opened and closed.

[0036] The flexible connecting layer 6 and the flexible filling layer 7 can be filled rubber or asphalt.

[0037] Embodiment 2: A compressed air energy storage power station underground gas storage system adopts the compressed air energy storage power station underground gas storage structure.

[0038] Embodiment three: A method for operating an underground gas storage structure of a compressed air energy storage power station adopts the above-mentioned method. When the gas storage body is in operation, the high-pressure gas in the gas storage cavity 1 causes the sealing layer 2 to expand under pressure, and the lining blocks 3 are opened through the structural seams 4. The high pressure in the gas storage cavity 1 is transmitted to the surrounding rock through the concrete lining layer. When the gas storage body is under maintenance, the gas storage cavity 1 is depressurized, the protruding part cooperates with the insertion hole for guidance, the lining blocks 3 are evenly retracted, the structural seams 4 between the lining blocks 3 are closed, and finally the surrounding rock pressure is borne by the concrete lining layer to maintain the stability of the surrounding rock.

[0039] The present invention greatly improves the safety of the gas storage reservoir, and can also reduce the requirements for the surrounding rock strength in the construction of the underground gas storage reservoir, thereby expanding the application scope of the underground gas storage reservoir.

Claims

1. An underground gas storage structure of a compressed air energy storage power station, comprising a gas storage body, wherein the gas storage body has a gas storage cavity (1), characterized in that: The gas storage cavity (1) is located in the sealing layer (2), and a concrete lining layer is arranged outside the sealing layer (2). The concrete lining layer is formed by enclosing a plurality of movable lining blocks (3). A structural seam (4) is arranged between two adjacent lining blocks (3). A plurality of extensions are fixedly arranged on the left lining (31) located at the structural seam (4), and an insertion hole is correspondingly arranged on the right lining (32) located at the structural seam (4), and the extensions slide into the insertion holes.

2. The underground gas storage structure of the compressed air energy storage power station according to claim 1 is characterized in that: The sealing layer (2) is a metal tank structure.

3. The underground gas storage structure of the compressed air energy storage power station according to claim 2 is characterized in that: The wall thickness of the metal can body is 2-5 mm.

4. The underground gas storage structure of the compressed air energy storage power station according to claim 1 is characterized in that: The protruding portion is a structure integral with the lining block (3).

5. The underground gas storage structure of the compressed air energy storage power station according to claim 1 is characterized in that: The protruding portion is a tie rod steel bar (5), one end of which is fixed to the left petal lining (31), and the other end of which is slidably inserted into the insertion hole.

6. The underground gas storage structure of the compressed air energy storage power station according to claim 5 is characterized in that: One end of the tie rod steel bar (5) is an anchoring section (51), and the other end is a movable section (52); the anchoring section (51) is anchored in the left-flank lining (31), and the movable section (52) slides into the insertion hole of the right-flank lining (32).

7. The underground gas storage structure of the compressed air energy storage power station according to claim 1 is characterized in that: A flexible connection layer (6) is provided in the structural seam (4).

8. The underground gas storage structure of the compressed air energy storage power station according to claim 1 is characterized in that: The insertion hole is also filled with a flexible filling layer (7).

9. A compressed air energy storage power station underground gas storage system, characterized in that: An underground gas storage structure of a compressed air energy storage power station as described in any one of claims 1 to 8 is adopted.

10. An operating method of an underground gas storage structure of a compressed air energy storage power station using any one of claims 1 to 8, characterized in that: When the gas storage reservoir is in operation, the high-pressure gas in the gas storage cavity (1) causes the sealing layer (2) to expand under pressure, the lining blocks (3) are opened through the structural joints (4), and the high pressure in the gas storage cavity (1) is transmitted to the surrounding rock through the concrete lining layer. When the gas storage reservoir is under maintenance, the gas storage cavity (1) is depressurized, the extension portion cooperates with the insertion hole to guide, the lining blocks (3) are evenly retracted, the structural joints (4) between the lining blocks (3) are closed, and finally the concrete lining layer bears the surrounding rock pressure to maintain the stability of the surrounding rock.