Hydraulic compressed air energy storage system and method based on idle caves of hydropower station
By setting up a hydraulic compressed air energy storage system in idle caves of hydropower stations and using valves and water pump control systems, the start-stop and energy recovery of compressed air are easily achieved, and the problems of long start-stop time and large area in the existing technology are solved. , improves the economics and efficiency of the system.
Patent Information
- Application Number
- CN202410992212.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
AI Technical Summary
The existing compressed air energy storage system has problems such as long start-stop process time, large volume of soda and water mixing containers, large area of land and long construction time, and it is difficult to apply to large-scale long-term energy storage.
The hydraulic compressed air energy storage system based on idle caves in hydropower stations is adopted, and underground caves are used as energy storage containers to achieve convenient start-stop and energy recovery of compressed air through valves and water pump control systems, reducing construction volume and floor area.
It realizes convenient start and stop of compressed air energy storage, makes full use of underground cave resources, shortens construction time and footprint, and does not need to consider water resource replenishment and grid-connected operation issues, improving the economic and efficiency of the system.
Smart Images

Figure CN118934409A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of energy storage, and relates to a hydraulic compressed air energy storage system and method based on idle caves of a hydropower station. Background Art
[0002] The volatility, randomness and uncertainty of new energy sources pose serious challenges to the safe and stable operation of the power system. The trend of the gradually widening peak-to-valley difference of the power grid has further aggravated the problem. The power system's demand for flexible regulation resources has increased significantly. The power system urgently needs advanced large-scale energy storage technology to solve the problem of renewable energy access, so as to improve the efficiency, safety and economy of conventional power systems and regional energy systems.
[0003] Compressed air energy storage has the advantages of large capacity, long life, cleanliness, safety, reliability, and good economy. The existing non-supplementary compressed air energy storage working medium and energy storage medium are both air, the start-stop process is as long as more than 10 minutes, and the power increase and decrease rate is slow; hydraulic compressed air energy storage working medium is water and energy storage medium is air, but there are problems such as the high proportion of circulating water volume in the gas-water mixing container in the total system volume, the large volume of the gas-water mixing container, the large amount of civil construction in the lower reservoir of the hydropower station or the downstream river, the large area occupied by the volume of the lower reservoir of the hydropower station or the downstream river and the gas-water mixing container, and the long system construction period. As a result, the technical and economic efficiency of the system urgently needs to be improved, and it is difficult to apply it to large-scale long-term energy storage. In addition, there are also problems such as large volume of high-pressure gas storage containers and long construction time.
[0004] In addition, hydropower stations have large-scale underground cavern groups. In addition to permanent caverns, there are also a large number of temporary caverns such as water diversion branch tunnels, plant exploration tunnels, diversion tunnels, and construction tunnels. However, these cavern groups are often idle and fail to take advantage of the cave space resources.
[0005] In summary, existing compressed air energy storage has the following problems:
[0006] 1. The start-stop process of compressed air energy storage is long, and the power increase and decrease rate is slow;
[0007] 2. The circulating water volume in the hydraulic compressed air energy storage steam-water mixing container accounts for a high proportion of the total system volume, resulting in a large volume of the steam-water mixing container, large construction workload, large floor space, and a long system construction period;
[0008] 3. High-pressure gas storage containers have large volumes and require a long construction time.
[0009] The underground caverns of hydropower stations not only have large space, but also have excellent geological conditions, low construction cost, convenient nearby water sources, and can share the delivery channel of the hydropower station. Combining hydraulic compressed air energy storage with the underground cave resources and water resources of hydropower stations, the rational use of the underground caverns of hydropower stations to build hydraulic compressed air energy storage projects can not only realize the energy storage transformation of conventional hydropower stations, but also realize the complementary operation of conventional pumped storage; it can not only give full play to the cave resource advantages of hydropower stations and pumped storage stations, but also greatly shorten the construction time, promote the development and utilization of large-scale new energy, and improve the overall economy of new energy development and the quality of energy and electricity. Summary of the invention
[0010] In order to overcome the shortcomings of the above-mentioned prior art, the purpose of the present invention is to provide a hydraulic compressed air energy storage system and method based on idle caves in hydropower stations. The present invention can realize compressed air energy storage, is easy to start and stop, and makes full use of existing underground cave resources as energy storage containers, which is conducive to reducing construction volume, shortening construction time, and reducing floor space, without considering water resource replenishment and grid-connected operation issues.
[0011] In order to achieve the above object, the present invention adopts the following technical solutions:
[0012] The present invention discloses a hydraulic compressed air energy storage system based on an idle cave of a hydropower station, comprising a first steam-water mixing container, on which a water supply side interface, a first air port and a second air port are provided;
[0013] The water supply side interface of the first steam-water mixing container is respectively connected to the discharge port of the first water pump and the water inlet of the water turbine, and the output end of the water turbine is connected to the input end of the generator through a transmission device;
[0014] An eighth valve is provided at the discharge port of the first water pump, and a ninth valve is provided at the water inlet of the water turbine;
[0015] A sixth valve is provided on the water supply side interface of the first soda-water mixing container;
[0016] The exhaust port of the first soda-water mixing container is connected to the interface of the idle gas storage cave, the first gas port of the first soda-water mixing container is provided with a second valve, and the second gas port of the first soda-water mixing container is provided with a fourth valve.
[0017] Furthermore, the first soda-water mixing container is provided in parallel with a second soda-water mixing container, and the second soda-water mixing container is provided with a water supply side interface, a first gas port and a second gas port;
[0018] The water supply side interface of the second steam-water mixing container is connected to the first water pump and the water turbine, and a seventh valve is provided on the water supply side interface of the second steam-water mixing container;
[0019] The first gas port of the second soda-water mixing container is connected to the interface of the idle gas storage cave, a third valve is arranged on the first gas port of the second soda-water mixing container, and a fifth valve is arranged on the second gas port of the second soda-water mixing container.
[0020] Furthermore, a second water pump is arranged in parallel with the first water pump, a tenth valve is arranged at the water outlet of the second water pump, and the second water pump is connected to the first soda-water mixing container and the second soda-water mixing container via the tenth valve.
[0021] Furthermore, the first water pump is connected to the first motor, and the second water pump is connected to the second motor.
[0022] Furthermore, the input ends of the first water pump and the second water pump are both connected to a downstream reservoir, and the downstream reservoir is connected to the input end of the turbine.
[0023] Furthermore, the sixth valve and the seventh valve are connected to the downstream reservoir through the eleventh valve.
[0024] Furthermore, the downstream reservoir is connected to the upstream reservoir, and a pump turbine is provided between the upstream reservoir and the downstream reservoir.
[0025] Furthermore, both the first soda mixing container and the second soda mixing container are idle caves.
[0026] Furthermore, a first valve is provided at the interface of the idle gas storage cave.
[0027] Based on the above method, the present invention also discloses an energy storage method of a hydraulic compressed air energy storage system based on an idle cave in a hydropower station, comprising the following steps:
[0028] Energy storage process:
[0029] Close the fourth valve and the ninth valve, open the second valve, the sixth valve and the eighth valve, start the first water pump to inject water into the first soda-water mixing container, and the air in the first soda-water mixing container is compressed and discharged into the idle cave of the gas storage to achieve energy storage;
[0030] When the water level in the first steam-water mixing container rises to the threshold range, the second valve and the eighth valve are closed, and the fourth valve, the sixth valve and the ninth valve are opened, so that the water in the first steam-water mixing container passes through the turbine, and the output end of the turbine drives the generator to generate electricity through the transmission device;
[0031] Repeat the above steps to achieve continuous energy storage of hydraulically compressed air in the idle caverns for storing air;
[0032] Power generation process:
[0033] Close the second valve and the ninth valve, open the fourth valve, the sixth valve and the eighth valve, and start the first water pump to inject water into the first soda-water mixing container;
[0034] When the water level in the first steam-water mixing container rises to the threshold range, the second valve and the eighth valve are closed, and the fourth valve, the sixth valve and the ninth valve are opened, so that the water in the first steam-water mixing container passes through the turbine, and the output end of the turbine drives the generator to generate electricity through the transmission device;
[0035] Repeat the above steps to realize energy recovery and power generation in the idle gas storage caverns.
[0036] Compared with the prior art, the present invention has the following beneficial effects:
[0037] 1. The first soda-water mixing container of the present invention is a place for compressed air and air expansion. The first water pump is used to fill the first soda-water mixing container with water and pressurize it. The water flow in the first soda-water mixing container passes through the turbine to generate electricity and recover energy. The eighth valve is used to control the on-off of the outlet of the first water pump, and the ninth valve is used to control the on-off of the water inlet of the turbine. The sixth valve is used to control the on-off of the water supply side interface of the first soda-water mixing container. The exhaust port of the first soda-water mixing container is connected to the interface of the idle cave of the gas storage. When storing energy, it is used to store the compressed air in the idle cave of the gas storage. When recovering energy, it is used to discharge the high-pressure gas in the idle cave of the gas storage into the first soda-water mixing container. The high-pressure gas squeezes and discharges the water in the first soda-water mixing container, and the discharged water is used to generate electricity and recover energy through the turbine. The second valve is used to control the connection and interruption of the first soda-water mixing container and the idle cave of the gas storage, and the fourth valve is used to control the connection and interruption of the first soda-water mixing container and the atmosphere. The system of the present invention has a simple structure. Through the start and stop of each valve and the first water pump control device, continuous energy storage and energy recovery of the system are achieved. It is easy to operate and control, and fully utilizes existing underground cave resources as energy storage containers, which is conducive to reducing the amount of construction, shortening the construction time, and reducing the occupied area. There is no need to consider water resource replenishment and grid-connected operation issues.
[0038] 2. In the present invention, the first soda mixing container is connected in parallel with the second soda mixing container. When a fault occurs in the branch where the first soda mixing container is located, the branch where the first soda mixing container is located is closed and the branch where the second soda mixing container is located is started to ensure the stability of the system.
[0039] 3. In the present invention, a second water pump is arranged in parallel with the first water pump. When the first water pump fails, the first water pump is turned off and the second water pump is started to ensure the stability of the system.
[0040] 4. The first soda-water mixing container and the second soda-water mixing container of the present invention are both idle caves, which further fully utilizes idle resources, is conducive to reducing the construction workload, shortening the construction time, and reducing the floor space occupied by system equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1It is a schematic diagram of the overall structure of the present invention;
[0042] Figure 2 It is a schematic diagram of the structure of an embodiment of the present invention;
[0043] Figure 3 The figure is a flow chart of the method of the present invention.
[0044] Among them: 1. upstream reservoir; 2. downstream reservoir; 3. first water pump; 4. idle cave for gas storage; 5. first steam-water mixing container; 6. second steam-water mixing container; 7. turbine; 8. generator; 9. second water pump; 10. first motor; 11. first valve; 12. second valve; 13. third valve; 14. fourth valve; 15. fifth valve; 16. sixth valve; 17. seventh valve; 18. eighth valve; 19. ninth valve; 20. tenth valve; 21. eleventh valve; 22. second motor; 23. water pump turbine; 24. first idle cave; 25. second idle cave. DETAILED DESCRIPTION
[0045] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0046] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0047] The present invention is further described in detail below in conjunction with the accompanying drawings:
[0048] See also Figure 1The present invention discloses a hydraulic compressed air energy storage system based on an idle cave of a hydropower station, comprising a first soda-water mixing container 5, on which a water supply side interface, a first air port and a second air port are provided, and the first soda-water mixing container 5 is a place for compressing air and expanding air.
[0049] The water supply side interface of the first steam-water mixing container 5 is respectively connected to the discharge outlet of the first water pump 3 and the water inlet of the turbine 7. The output end of the turbine 7 is connected to the input end of the generator 8 through a transmission device. The first water pump 3 is used to fill the first steam-water mixing container 5 with water and increase the pressure. The water flow in the first steam-water mixing container 5 passes through the turbine 7 to generate electricity and recover energy.
[0050] An eighth valve 18 is provided on the discharge outlet of the first water pump 3 , and the eighth valve 18 is used to control the on-off of the discharge outlet of the first water pump 3 . A ninth valve 19 is provided at the water inlet of the turbine 7 , and the ninth valve 19 is used to control the on-off of the water inlet of the turbine 7 .
[0051] The water supply side interface of the first soda-water mixing container 5 is provided with a sixth valve 16 , and the sixth valve 16 is used to control the on-off of the water supply side interface of the first soda-water mixing container 5 .
[0052] The exhaust port of the first steam-water mixing container 5 is connected to the interface of the idle gas storage cave 4. When storing energy, it is used to store compressed air in the idle gas storage cave 4. When recovering energy, it is used to discharge the high-pressure gas in the idle gas storage cave 4 into the first steam-water mixing container 5. The high-pressure gas squeezes and discharges the water in the first steam-water mixing container 5. The discharged water is used to generate electricity and recover energy through the turbine 7. The first gas port of the first steam-water mixing container 5 is provided with a second valve 12, and the second gas port of the first steam-water mixing container 5 is provided with a fourth valve 14. The second valve 12 is used to control the connection and interruption of the first steam-water mixing container 5 and the idle gas storage cave 4, and the fourth valve 14 is used to control the connection and interruption of the first steam-water mixing container 5 and the atmosphere. The system structure of the present invention is simple. Through the start and stop of each valve and the first water pump 3 control device, the continuous energy storage and energy recovery of the system are realized, which is convenient for operation and control, and fully utilizes the existing underground cave resources as energy storage containers, which is conducive to reducing the construction volume, shortening the construction time, and reducing the occupied area, without considering the water resource replenishment and grid-connected operation problems.
[0053] Embodiment 1:
[0054] See also Figure 1 , this embodiment discloses a hydraulic compressed air energy storage system based on an idle cave of a hydropower station, comprising a first steam-water mixing container 5, on which a water supply side interface, a first air port and a second air port are provided;
[0055] The water supply side interface of the first steam-water mixing container 5 is respectively connected to the discharge port of the first water pump 3 and the water inlet of the water turbine 7, and the output end of the water turbine 7 is connected to the input end of the generator 8 through a transmission device;
[0056] An eighth valve 18 is provided at the discharge port of the first water pump 3, and a ninth valve 19 is provided at the water inlet of the water turbine 7;
[0057] The water supply side interface of the first soda-water mixing container 5 is provided with a sixth valve 16;
[0058] The exhaust port of the first soda-water mixing container 5 is connected to the interface of the air storage idle cave 4 , the first air port of the first soda-water mixing container 5 is provided with a second valve 12 , and the second air port of the first soda-water mixing container 5 is provided with a fourth valve 14 .
[0059] Preferably, the first soda-water mixing container 5 is arranged in parallel with the second soda-water mixing container 6, and the second soda-water mixing container 6 is provided with a water supply side interface, a first air port and a second air port. When there is a fault in the branch where the first soda-water mixing container 5 is located, the branch where the first soda-water mixing container 5 is located is closed and the branch where the second soda-water mixing container 6 is located is started to ensure the stability of the system.
[0060] The water supply side interface of the second steam-water mixing container 6 is connected to the first water pump 3 and the turbine 7, and a seventh valve 17 is provided on the water supply side interface of the second steam-water mixing container 6;
[0061] The first gas port of the second soda-water mixing container 6 is connected to the interface of the idle gas storage cave 4 , a third valve 13 is provided on the first gas port of the second soda-water mixing container 6 , and a fifth valve 15 is provided on the second gas port of the second soda-water mixing container 6 .
[0062] Preferably, the first water pump 3 is provided in parallel with the second water pump 9 , a tenth valve 20 is provided at the water outlet of the second water pump 9 , and the second water pump 9 is connected to the first soda-water mixing container 5 and the second soda-water mixing container 6 via the tenth valve 20 .
[0063] Preferably, the first water pump 3 is connected to the first motor 10 , and the second water pump 9 is connected to the second motor 22 .
[0064] Preferably, the input ends of the first water pump 3 and the second water pump 9 are both connected to the downstream reservoir 2 , and the downstream reservoir 2 is connected to the input end of the turbine 7 .
[0065] Preferably, the sixth valve 16 and the seventh valve 17 are connected to the downstream reservoir 2 via the eleventh valve 21 .
[0066] Preferably, the downstream reservoir 2 is connected to the upstream reservoir 1 , and a pump turbine 23 is provided between the upstream reservoir 1 and the downstream reservoir 2 .
[0067] Embodiment 2:
[0068] See also Figure 1 , this embodiment discloses a hydraulic compressed air energy storage system based on an idle cave of a hydropower station, comprising a first steam-water mixing container 5, on which a water supply side interface, a first air port and a second air port are provided;
[0069] The water supply side interface of the first steam-water mixing container 5 is respectively connected to the discharge port of the first water pump 3 and the water inlet of the water turbine 7, and the output end of the water turbine 7 is connected to the input end of the generator 8 through a transmission device;
[0070] An eighth valve 18 is provided at the discharge port of the first water pump 3, and a ninth valve 19 is provided at the water inlet of the water turbine 7;
[0071] The water supply side interface of the first soda-water mixing container 5 is provided with a sixth valve 16;
[0072] The exhaust port of the first soda-water mixing container 5 is connected to the interface of the air storage idle cave 4 , the first air port of the first soda-water mixing container 5 is provided with a second valve 12 , and the second air port of the first soda-water mixing container 5 is provided with a fourth valve 14 .
[0073] Preferably, the first soda mixing container 5 and the second soda mixing container 6 are both free caves, see Figure 2 The first soda mixing container 5 is a first idle cave 24 , and the second soda mixing container 6 is a second idle cave 25 .
[0074] Preferably, a first valve 11 is provided at the interface of the idle gas storage cave 4 .
[0075] Embodiment three:
[0076] The present embodiment discloses a hydraulic compressed air energy storage system based on an idle cave, comprising an upstream reservoir 1, a downstream reservoir 2, a water pump turbine 23, an idle cave, a first steam-water mixing container 5, a second steam-water mixing container 6, a water pump, a water turbine, a generator, an electric motor, a valve and a pipeline.
[0077] The upstream reservoir 1, the downstream reservoir 2 and the pump turbine 23 constitute a pumped storage power station. The idle cavern is connected to the first steam-water mixing container 5 and the second steam-water mixing container 6 through a valve. The outlets of the first steam-water mixing container 5 and the second steam-water mixing container 6 are respectively connected to the pump outlet and the turbine inlet through valves. The turbine outlet is connected to the lower reservoir of the hydropower station or the downstream river, and the pump inlet is connected to the lower reservoir of the hydropower station.
[0078] The downstream reservoir is connected to the pump-turbine 23 via a pipeline, and the pump-turbine unit is connected to the upstream reservoir via a bifurcated pipeline.
[0079] Preferably, during the energy storage process, the water pump consumes electrical energy to pump water from the water reservoir into the first soda-water mixing container 5, and the first soda-water mixing container 5 and the second soda-water mixing container 6 are both connected to the idle gas storage cave 4, and the gas in the idle cave is periodically and intermittently replenished; during the power generation process, the gas in the idle gas storage cave 4 is periodically and alternately discharged into the first soda-water mixing container 5 and the second soda-water mixing container 6, and the air in the first soda-water mixing container 5 and the second soda-water mixing container 6 expands and displaces the water flow, and the high-pressure water flow drives the turbine 7 to drive the generator 8 to generate electricity.
[0080] Preferably, the idle cave 4 for gas storage is connected to the first idle cave 24 and the second idle cave 25 respectively through valves, the first idle cave 24 and the second idle cave 25 are connected to the water pump outlet and the turbine inlet through valves, the water pump and the turbine are connected to the downstream reservoir, and the downstream reservoir is connected to the upstream reservoir through the water pump turbine and the branch pipeline.
[0081] Preferably, during the energy storage process, the water pump turbine pumps water from the downstream reservoir to the upstream reservoir, and the water pump pumps water from the downstream reservoir to the first soda-water mixing container 5 and the second soda-water mixing container 6 to compress the air pressure in the idle cave 4 for air storage, and water pumping for energy storage and water pumping for compressed air for energy storage are carried out simultaneously.
[0082] Preferably, during the power generation process, water flows from the upstream reservoir 1 through the pump turbine 23 and is released to the downstream reservoir 2, and the high-pressure air in the air storage idle cave 4 enters the first soda-water mixing container 5 and the second soda-water mixing container 6 to displace the water flow, driving the generator 8 to generate electricity.
[0083] Preferably, the expansion process of the first soda-water mixing container 5 and the expansion process of the second soda-water mixing container 6 constitute one stroke.
[0084] Preferably, the expansion process of the soda mixing container is divided into two stages: a stage in which the pressure of the idle cavity is equal to that of the soda mixing container and a stage in which the gas in the soda mixing container is fully expanded and depressurized.
[0085] The stage in which the idle cave and the soda-water mixing container have equal pressure: the stage in which the idle cave and the soda-water mixing container are connected. The air pressure in the idle cave is equal to the air pressure in the soda-water mixing container, and the water in the soda-water mixing container is squeezed and discharged to the lower reservoir of the hydropower station through the turbine 7. When the air pressure and gas volume in the soda-water mixing container reach the set value, the connection between the idle cave and the soda-water mixing container is cut off.
[0086] The gas in the soda-water mixing container fully expands and depressurizes the container: the gas in the soda-water mixing container gradually expands, displacing the water flow in the container to drive the turbine 7 to drive the generator 8 to generate electricity, until the gas pressure in the first soda-water mixing container 5 drops to atmospheric pressure, and the soda-water mixing container stops generating electricity.
[0087] When one of the soda-water mixing containers generates electricity, the amount of liquid in the container decreases, while the other soda-water mixing container is connected to the atmosphere, and the amount of liquid in the other soda-water mixing container increases by pumping water using a low-lift water pump.
[0088] Preferably, the pressure in the idle cave under the initial working condition before energy storage is the lowest value, but greater than the atmospheric pressure, the first soda-water mixing container 5 and the second soda-water mixing container 6 are at atmospheric pressure, and the liquid level is kept at the lowest.
[0089] Preferably, during the energy storage process, the soda-water mixing container is alternately filled with water to increase the pressure, and the pressurized gas is added to the idle caverns to increase the gas pressure in the idle caverns.
[0090] Preferably, in the energy storage-power generation cycle, the gas in the high-pressure gas storage container and each steam-water mixing container is in direct contact with the atmospheric environment, and the grid connection point of the electromechanical equipment of the compressed air energy storage is the same as the grid connection point of the pumped storage power station.
[0091] Preferably, the equipment for realizing energy conversion is a water turbine, a water pump, a water pump turbine, etc.
[0092] Based on the above structure, see Figure 3 The present invention discloses an energy storage method of a hydraulic compressed air energy storage system based on an idle cave in a hydropower station, comprising the following steps:
[0093] S1. Energy storage process:
[0094] Close the fourth valve 14 and the ninth valve 19, open the second valve 12, the sixth valve 16 and the eighth valve 18, start the first water pump 3 to inject water into the first soda-water mixing container 5, and the air in the first soda-water mixing container 5 is compressed and discharged into the air storage idle cave 4 to achieve energy storage;
[0095] When the water level in the first steam-water mixing container 5 rises to the threshold range, the second valve 12 and the eighth valve 18 are closed, and the fourth valve 14, the sixth valve 16 and the ninth valve 19 are opened, and the water in the first steam-water mixing container 5 passes through the turbine 7, and the output end of the turbine 7 drives the generator 8 to generate electricity through the transmission device;
[0096] Repeat the above steps to achieve continuous energy storage of the hydraulically compressed air in the idle air storage cave 4;
[0097] S2. Power generation process:
[0098] Close the second valve 12 and the ninth valve 19, open the fourth valve 14, the sixth valve 16 and the eighth valve 18, and start the first water pump 3 to inject water into the first soda-water mixing container 5;
[0099] When the water level in the first steam-water mixing container 5 rises to the threshold range, the second valve 12 and the eighth valve 18 are closed, and the fourth valve 14, the sixth valve 16 and the ninth valve 19 are opened, and the water in the first steam-water mixing container 5 passes through the turbine 7, and the output end of the turbine 7 drives the generator 8 to generate electricity through the transmission device;
[0100] Repeat the above steps to realize the recovery and power generation of the stored energy in the idle gas storage cave 4.
[0101] The present invention realizes compressed air energy storage through the idle gas storage cave 4, the first steam-water mixing container 5, the first water pump 3, the turbine 7 and various valves. Specifically, the first water pump 3 stores water and compressed air in the first steam-water mixing container 5, and the compressed air enters the idle gas storage cave 4 to realize energy storage. This step is repeated to realize continuous energy storage. It is convenient to start and stop, and fully utilizes existing underground cave resources as energy storage containers, which is conducive to reducing the amount of construction, shortening the construction time, and reducing the occupied area, and there is no need to consider the problems of water resource replenishment and grid-connected operation.
[0102] The above contents are only for explaining the technical idea of the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.
Claims
1. A hydraulic compressed air energy storage system based on an idle cave in a hydropower station, characterized in that: It comprises a first soda-water mixing container (5), on which a water supply side interface, a first gas port and a second gas port are provided; The water supply side interface of the first steam-water mixing container (5) is respectively connected to the discharge port of the first water pump (3) and the water inlet of the water turbine (7), and the output end of the water turbine (7) is connected to the input end of the generator (8) through a transmission device; An eighth valve (18) is provided at the discharge port of the first water pump (3), and a ninth valve (19) is provided at the water inlet of the water turbine (7); A sixth valve (16) is provided at the water supply side interface of the first soda-water mixing container (5); The exhaust port of the first soda-water mixing container (5) is connected to the interface of the air storage free cave (4), the first air port of the first soda-water mixing container (5) is provided with a second valve (12), and the second air port of the first soda-water mixing container (5) is provided with a fourth valve (14).
2. The hydraulic compressed air energy storage system based on the idle caves of the hydropower station according to claim 1 is characterized in that: The first soda-water mixing container (5) is provided with a second soda-water mixing container (6) in parallel, and the second soda-water mixing container (6) is provided with a water supply side interface, a first gas port and a second gas port; The water supply side interface of the second steam-water mixing container (6) is connected to the first water pump (3) and the water turbine (7), and a seventh valve (17) is provided on the water supply side interface of the second steam-water mixing container (6); The first gas port of the second soda-water mixing container (6) is connected to the interface of the gas storage free cave (4), a third valve (13) is provided on the first gas port of the second soda-water mixing container (6), and a fifth valve (15) is provided on the second gas port of the second soda-water mixing container (6).
3. The hydraulic compressed air energy storage system based on the idle caves of the hydropower station according to claim 2 is characterized in that: The first water pump (3) is provided with a second water pump (9) in parallel, a tenth valve (20) is provided at the water outlet of the second water pump (9), and the second water pump (9) is connected to the first soda-water mixing container (5) and the second soda-water mixing container (6) via the tenth valve (20).
4. The hydraulic compressed air energy storage system based on the idle caves of the hydropower station according to claim 3 is characterized in that: The first water pump (3) is connected to a first motor (10), and the second water pump (9) is connected to a second motor (22).
5. The hydraulic compressed air energy storage system based on the idle caves of the hydropower station according to claim 4 is characterized in that: The input ends of the first water pump (3) and the second water pump (9) are both connected to the downstream reservoir (2), and the downstream reservoir (2) is connected to the input end of the turbine (7).
6. The hydraulic compressed air energy storage system based on the idle caves of the hydropower station according to claim 2 is characterized in that: The sixth valve (16) and the seventh valve (17) are connected to the downstream reservoir (2) via the eleventh valve (21).
7. The hydraulic compressed air energy storage system based on the idle caves of the hydropower station according to any one of claims 5 and 6, characterized in that: The downstream reservoir (2) is connected to the upstream reservoir (1), and a water pump turbine (23) is arranged between the upstream reservoir (1) and the downstream reservoir (2).
8. The hydraulic compressed air energy storage system based on the idle caves of the hydropower station according to claim 2 is characterized in that: The first soda mixing container (5) and the second soda mixing container (6) are both free caves.
9. The hydraulic compressed air energy storage system based on idle caves of a hydropower station according to claim 1 is characterized in that: A first valve (11) is provided at the interface of the idle gas storage cave (4).
10. The energy storage method of the hydraulic compressed air energy storage system based on the idle caves of the hydropower station according to any one of claims 1 to 9, characterized in that: The following steps are involved: Energy storage process: The fourth valve (14) and the ninth valve (19) are closed, the second valve (12), the sixth valve (16) and the eighth valve (18) are opened, the first water pump (3) is started to inject water into the first soda-water mixing container (5), and the air in the first soda-water mixing container (5) is compressed and discharged into the air storage idle cave (4), thereby realizing energy storage; When the water level in the first steam-water mixing container (5) rises to a threshold range, the second valve (12) and the eighth valve (18) are closed, and the fourth valve (14), the sixth valve (16) and the ninth valve (19) are opened, so that the water in the first steam-water mixing container (5) passes through the water turbine (7), and the output end of the water turbine (7) drives the generator (8) to generate electricity through the transmission device; Repeat the above steps to achieve continuous energy storage of hydraulically compressed air in the idle air storage cave (4); Power generation process: The second valve (12) and the ninth valve (19) are closed, the fourth valve (14), the sixth valve (16) and the eighth valve (18) are opened, and the first water pump (3) is started to inject water into the first soda-water mixing container (5); When the water level in the first steam-water mixing container (5) rises to a threshold range, the second valve (12) and the eighth valve (18) are closed, and the fourth valve (14), the sixth valve (16) and the ninth valve (19) are opened, so that the water in the first steam-water mixing container (5) passes through the water turbine (7), and the output end of the water turbine (7) drives the generator (8) to generate electricity through the transmission device; Repeat the above steps to realize the recovery and power generation of the stored energy in the idle gas storage cave (4).