Absolute settlement monitoring system and monitoring method for arch dam body and grouting adits on two banks
By setting up vertical drilling and bimetallic marks in the arch dam and grouting flat holes, combined with the precision level method, the problem of absolute settlement deformation cannot be obtained in the existing technology is solved, monitoring accuracy and efficiency are improved, and external error risks are avoided , meets safety monitoring specifications.
Patent Information
- Application Number
- CN202410920108.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-12
AI Technical Summary
The existing settlement monitoring methods for arch dams and grouting flat holes cannot obtain absolute settlement deformation, and there is a large risk of external error when observing the base point of the vertical displacement monitoring network outside the dam, which is difficult to meet the requirements of safety monitoring specifications, and the observation efficiency is low.
An absolute settlement monitoring system for the arch dam body and the grouting flat holes on both sides of the shore were designed. Each level was obtained by setting up vertical drilling holes and bimetallic standards in the foundation corridor and grouting flat holes, combined with precision level method and adjustment calculation. The absolute settlement deformation of the point is monitored through vertical height transmission and vertical transmission, and the settlement deformation between adjacent dam corridors is unified to avoid external errors.
It improves the accuracy and efficiency of settlement observation, avoids external error risks, meets the requirements of safety monitoring specifications, and reduces observation time and labor costs.
Smart Images

Figure CN118936408A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of dam safety monitoring, and in particular to an absolute settlement monitoring system and a monitoring method for an arch dam body and grouting flat tunnels on both sides. Background Art
[0002] The high arch dam is huge in scale and stands in the high mountain canyon. The arch dam body and the mountains on both sides form an integral structure, bearing multi-faceted and complex loads (water load, dam foundation uplift pressure, dam shoulder thrust, etc.). The long-term operation safety of the arch dam is related to the safety of people’s lives and property.
[0003] In order to effectively monitor the safety status and working performance of the arch dam and the mountains on both sides, four types of safety monitoring facilities are usually systematically arranged, including deformation, seepage and seepage pressure, stress strain and temperature, and a complete monitoring system for the dam and the grouting tunnels on both sides is established. Among them, the settlement of the arch dam body and the grouting tunnels on both sides is an important indicator for determining the safety of the dam. The leveling observation of different parts of the arch dam is used to reflect the settlement and deformation of the dam body itself, and the leveling observation of the grouting tunnels on both sides mainly reflects the settlement and deformation of the mountains on both sides of the arch dam; at the same time, the settlement of the arch dam body and the grouting tunnels on both sides is also an important support for revealing the long-term deformation law of the dam and mastering the working performance.
[0004] At present, the settlement monitoring methods of arch dams and grouting tunnels mainly include: static leveling method and precision leveling method. However, in many arch dam monitoring systems, whether static leveling method or precision leveling method is used, the settlement observations of the dam foundation, dam body elevations and dam crest are relatively independent, and the absolute settlement deformation cannot be obtained. Specifically, for the foundation corridor and the corresponding grouting tunnels on both sides, the dam body corridor and the corresponding grouting tunnels on both sides, and the dam crest and the corresponding grouting tunnels on both sides, the conventional method is to establish an independent single leveling route in the single-layer corridor and the corresponding grouting tunnels on both sides, and the leveling route passes through the corridor (or dam crest) and the corresponding grouting tunnels on both sides, and set the leveling relative working base point in the corresponding grouting tunnel inside the mountain body near the deep end of the mountain body, and obtain the settlement of the leveling points of the remaining parts at the same elevation relative to the working base point through observation and solution. However, this observation method has not yet established a unified settlement monitoring system for arch dams and grouting tunnels on both sides, and it is even more impossible to obtain the absolute settlement of the arch dam body and grouting tunnels.
[0005] In addition, the method of calculating the vertical settlement of the dam by using the base points of the vertical displacement monitoring network outside the dam as the base points of the vertical displacement monitoring of the dam can obtain the absolute settlement of the arch dam body and the grouting adit. However, this method is affected and restricted by many factors, and the observation results are at risk of introducing large external errors. Especially for large-scale arch dams, the settlement observation accuracy is difficult to meet the requirements of the error limits (±0.3mm and ±1.0mm, respectively) for the vertical displacement of the dam foundation and dam body specified in the "Technical Specifications for Safety Monitoring of Concrete Dams" (DL / T5178-2016). On the one hand, this method has a long observation distance from the outside to the dam, and the leveling observation route is long, resulting in a large cumulative settlement observation error, especially the settlement observation accuracy of the dam foundation is difficult to meet the requirements of the specification; on the other hand, the base point of the vertical displacement monitoring network outside the dam is used as the dam settlement base point, and the vertical displacement monitoring network outside the dam is generally located in the reservoir basin area of the dam. Affected by factors such as the large-scale seepage field in the reservoir basin due to the water storage of the reservoir, the deformation law of the reservoir basin is complex, and there are many factors affecting the surroundings. The base point of the vertical displacement monitoring network cannot go deep into the rock mass infinitely, and the long-term stability of the base point is difficult to be guaranteed. Not only that, because this method uses the base point of the vertical displacement observation network as the dam settlement base point, it is necessary to observe from a distant base point, the leveling observation route is long, the observation time and labor cost are large, and the efficiency is low. Summary of the invention
[0006] In view of the shortcomings of the prior art, the present invention proposes an absolute settlement monitoring system and method for the arch dam body and the grouting tunnels on both sides, unifies the leveling observation benchmarks of the arch dam body and the grouting tunnels on both sides, obtains the absolute settlement of the arch dam body and the grouting tunnels on both sides, avoids the risk of introducing large external errors by using the base point of the vertical displacement monitoring network outside the dam as the base point of the dam for observation, and at the same time improves the settlement observation accuracy and efficiency.
[0007] In order to achieve the above-mentioned purpose, the present invention is designed to provide an absolute settlement monitoring system for an arch dam body and grouting adit on both banks, which is particularly characterized in that it comprises a foundation corridor located at the lower part of the arch dam body and abutting against the rock masses on both banks at both ends, and a foundation observation room M is provided in the arch crown beam dam section of the foundation corridor. f The left side of the foundation corridor is connected to the left bank grouting flat tunnel of the foundation corridor at the bottom of the mountain, and the right side of the foundation corridor is connected to the right bank grouting flat tunnel of the foundation corridor at the bottom of the mountain. The left bank grouting flat tunnel of the foundation corridor is provided with a left bank observation room M deep in the mountain. L , or a right bank observation room M is set deep in the mountain of the right bank grouting flat tunnel of the foundation corridor R ;
[0008] The left bank observation room M L , or right bank observation room M RA vertical borehole is arranged toward the deep part of the rock mass, the bottom end of the vertical borehole is regarded as a fixed point, and a bimetallic mark is arranged in the vertical borehole. The first relative settlement deformation S of the bimetallic mark head relative to the fixed point is obtained through the bimetallic mark. M ;
[0009] The foundation corridor left bank grouting flat tunnel, the foundation corridor, and the foundation corridor right bank grouting flat tunnel bottom plate are provided with a foundation leveling line D f , the basic leveling line D f There are multiple basic leveling points Df arranged at intervals on the j ;
[0010] The arch dam body is provided with i layers of dam body corridors arranged in parallel from the foundation corridor to the dam top, and the two ends of each layer of dam body corridor are respectively connected to the rock masses on the left and right banks. The arch crown beam dam section of the i-th layer of the dam body corridor corresponds to the basic observation room M. f There is a dam observation room M directly above the i , upper and lower adjacent dam observation rooms M i Between, and the dam observation room M i With the basic observation room M f There are vertical height transfer H i , through vertical transmission H i Obtain the fourth relative settlement deformation HT(i) between adjacent dam corridors;
[0011] The left side of each layer of the dam body corridor is connected to the grouting flat tunnel on the left bank of the dam body corridor located inside the mountain, and the right side of each layer of the dam body corridor is connected to the grouting flat tunnel on the right bank of the dam body corridor located inside the mountain. The dam body leveling line D is set on the bottom plate of the dam body corridor, the grouting flat tunnel on the left bank of the dam body corridor, and the grouting flat tunnel on the right bank of the dam body corridor of the i-th layer. i , the dam leveling line D i There are multiple dam level points D arranged at intervals. ij ;
[0012] The dam crest leveling line D is set on the bottom plate of the arch dam crest. N , the dam top leveling line D N There are multiple dam crest level points D arranged at intervals. Nj .
[0013] Furthermore, the vertical drilling depth is greater than or equal to 100 m, and the diameter is greater than or equal to 273 mm.
[0014] Furthermore, the bimetallic marker head is connected to a bimetallic marker, and the bimetallic marker is used to monitor the first relative settlement deformation S of the bimetallic marker head relative to the fixed point. M .
[0015] Furthermore, the vertical height transfer H in the i-th section i The upper end is the fixed end, the lower end is the measuring end, and the vertical height H i A vertical height transmitter is provided at the measuring end, and the vertical height transmitter is used to monitor the fourth relative settlement deformation HT(i) between corresponding adjacent dam body galleries.
[0016] Furthermore, the vertical height H i Between the fixed end and the measuring end is an indium steel rod that is less affected by temperature and is protected by a PVC tube.
[0017] Furthermore, the basic level point Df on the bottom plate of the basic corridor j Located in the middle of the dam section, the dam level point D on the bottom plate of the dam gallery ij Located in the middle of the dam section.
[0018] The present invention also provides an absolute settlement monitoring method for an arch dam body and grouting tunnels on both sides, which is suitable for the above-mentioned absolute settlement monitoring system for an arch dam body and grouting tunnels on both sides. The method is particularly characterized in that it comprises the following steps:
[0019] S1) In the left bank observation room M L and the right bank observation room M R Among them, the observation room floor with better rock geological conditions and stable rock deformation is selected for vertical drilling, and the bottom of the vertical drilling hole is regarded as a fixed point. The bimetallic marker is automatically monitored by a bi-marker to obtain the first relative settlement deformation S of the bimetallic marker head relative to the fixed point. M ;
[0020] S2) Based on the precise leveling observation and adjustment calculation, obtain the basic leveling points Df j Relative to the basic observation room M f The third relative settlement deformation S at the level point J , and basic observation room M f The second relative settlement deformation S of the level point relative to the bimetallic marker head JHT , then the foundation level points Df on the bottom plate of the foundation corridor, or the grouting flat tunnel on the left bank of the foundation corridor, or the grouting flat tunnel on the right bank of the foundation corridor j The absolute settlement AS J =S M +S JHT +S J ;
[0021] S3) From the 1st layer to the i-th layer (i=1, 2, ..., N) of the dam body corridor, the vertical height transmitter of the corresponding layer is used to monitor the fourth relative settlement deformation HT(i) between adjacent dam body corridors. Then the sum of the relative deformations of the dam body corridors from the 1st layer to the i-th layer is HT(1)+HT(2)+...+HT(i);
[0022] S4) Based on the precise leveling observation and adjustment calculation, the dam level points D on the bottom plate of the i-th dam gallery are obtained. ij Relative to the corresponding layer of the dam observation room M i The fifth relative settlement deformation S at the level point B (i) and each dam top level point D Nj The sixth relative settlement deformation S relative to the level point at the dam crown beam B (N), then the dam level points D on the bottom plate of the dam corridor of the i-th layer, or the grouting flat tunnel on the left bank of the dam corridor of the i-th layer, or the grouting flat tunnel on the right bank of the dam corridor of the i-th layer ij The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (i) Each dam crest level point D Nj The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (N).
[0023] Furthermore, in S2), each basic leveling point Df j The first-class closed level is used for monitoring; in S4), each dam level point D ij The first-class closed leveling is used for monitoring, and the leveling points D Nj The first-class closed level is used for monitoring.
[0024] The advantages of the present invention are:
[0025] 1. The present invention sets a left bank observation room M in the grouting flat tunnel on the left bank of the foundation corridor. L , or set up a right bank observation room M in the grouting flat tunnel on the right bank of the foundation corridor R , and then in the left bank observation room M L , or the right bank observation room M R A vertical borehole is drilled in the rock mass to a depth of at least 100 m (the specific depth is determined by the project scale and the building level). The bottom of the vertical borehole is regarded as a fixed point, and a bimetallic marker is set in the vertical borehole to obtain the first relative settlement deformation S of the bimetallic marker head relative to the fixed point. M; Then set up a basic observation room M in the arch crown dam section of the foundation corridor f , obtain each basic leveling point Df j Relative to the basic observation room M f The third relative settlement deformation S at the level point J , and basic observation room M f The second relative settlement deformation S of the level point relative to the bimetallic marker head JHT , thereby obtaining the foundation level points Df on the bottom plate of the foundation corridor, or the grouting flat tunnel on the left bank of the foundation corridor, or the grouting flat tunnel on the right bank of the foundation corridor j The absolute settlement AS J =S M +S JHT +S J ;
[0026] 2. The present invention is in the arch crown beam dam section of each layer of the dam body corridor, and corresponds to the basic observation room M f The dam observation room M is set up directly above i , and then in the upper and lower adjacent dam observation rooms M i Between, and the dam observation room M i With the basic observation room M f Set vertical height H between i , through vertical transmission H i The fourth relative settlement deformation HT(i) between adjacent dam corridors is obtained, and the sum of the relative deformations of the dam corridors from the 1st layer to the i-th layer is HT(1)+HT(2)+...+HT(i); based on precise leveling observation and adjustment calculation, the dam level points D on the bottom plate of the i-th layer dam corridor are obtained. ij Relative to the corresponding layer of the dam observation room M i The fifth relative settlement deformation S at the level point B (i) and each dam top level point D Nj The sixth relative settlement deformation S relative to the level point at the dam crown beam B (N), then each dam level point D ij The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (i) Each dam crest level point D Nj The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (N);
[0027] 3. On the one hand, the present invention establishes an absolute settlement monitoring system for the arch dam body and the grouting tunnels on both sides, proposes a monitoring method for the monitoring system and a calculation method for absolute settlement, unifies the leveling observation benchmarks of the arch dam body and the grouting tunnels on both sides, and obtains the absolute settlement of the arch dam body and the grouting tunnels on both sides; on the other hand, compared with the method of calculating the dam settlement by using the base point of the vertical displacement monitoring network outside the dam as the base point of the vertical displacement monitoring of the dam, the present invention effectively avoids the risk of introducing large external errors due to the long observation distance, effectively guarantees the observation accuracy of the monitoring results, and does not need to perform long-distance observation and calculation from the base point of the vertical displacement monitoring network farther away, greatly improving the observation efficiency;
[0028] The absolute settlement monitoring system and method of the arch dam body and the grouting tunnels on both sides of the arch dam of the present invention unify the level observation benchmarks of the arch dam body and the grouting tunnels on both sides, obtain the absolute settlement of the arch dam body and the grouting tunnels on both sides, effectively avoid the risk of introducing large external errors by using the base point of the vertical displacement monitoring network outside the dam as the base point of the dam for observation, ensure the observation accuracy and greatly improve the observation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a structural schematic diagram of the absolute settlement monitoring system of the arch dam body and the grouting adit on both sides of the bank in the present invention;
[0030] Figure 2 for Figure 1 Basic leveling line D f and basic level point Df j Layout drawing;
[0031] Figure 3 for Figure 1 The vertical height H i Layout drawing;
[0032] Figure 4 is the absolute settlement of all measuring points of the foundation gallery and the foundation gallery grouting flat tunnel changing with time in the embodiment;
[0033] Figure 5 is the absolute settlement of all measuring points of the 4th layer dam corridor and the corresponding grouting adit in the embodiment changing with time;
[0034] In the figure: foundation corridor 1, grouting tunnel on the left bank of foundation corridor 2, grouting tunnel on the right bank of foundation corridor 3, bimetallic mark 4, dam corridor 5, grouting tunnel on the left bank of dam corridor 6, grouting tunnel on the right bank of dam corridor 7, dam top leveling line D N , Dam crest level point D Nj ;
[0035] Basic corridor 1 includes: Basic observation room M f , basic leveling line Df , basic leveling point Df j ;
[0036] The left bank grouting tunnel 2 of the foundation corridor includes: the left bank observation room M L , basic leveling line D f , basic leveling point Df j ;
[0037] The right bank grouting tunnel 3 of the foundation corridor includes: right bank observation room M R , basic leveling line D f , basic leveling point Df j ;
[0038] The dam corridor 5 includes: dam observation room M i , dam leveling line D i , dam level point D ij , vertical transfer H i ;
[0039] The grouting flat tunnel 6 on the left bank of the dam corridor includes: dam leveling line D i , dam level point D ij ;
[0040] The grouting flat tunnel 7 on the right bank of the dam corridor includes: dam leveling line D i , dam level point D ij . DETAILED DESCRIPTION
[0041] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0042] In the description of the present invention, it is necessary to understand that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.
[0043] The absolute settlement monitoring system of the arch dam body and the grouting flat tunnels on both banks of the present invention comprises a foundation corridor 1 located at the lower part of the arch dam body and abutting the rock masses on both banks at both ends, and a foundation observation room M is provided in the arch crown beam dam section of the foundation corridor 1. f The left side of the foundation corridor 1 is connected to the foundation corridor left bank grouting flat tunnel 2 located at the bottom of the mountain, and the right side of the foundation corridor 1 is connected to the foundation corridor right bank grouting flat tunnel 3 located at the bottom of the mountain. The left bank grouting flat tunnel 2 of the foundation corridor is provided with a left bank observation room M deep in the mountain. LOr the right bank observation room M is set deep in the mountain of the right bank grouting flat tunnel 3 of the foundation corridor R .
[0044] like Figure 1 and Figure 2 As shown in the figure, according to the dam type and dam structure characteristics of the arch dam, and the spatial distribution of the grouting tunnels on both sides, an observation room (M) is set up in the grouting tunnel 2 on the left bank of the foundation gallery of the arch dam foundation and the grouting tunnel 3 on the right bank of the foundation gallery. L and M R ), Left Bank Observation Room M L and the right bank observation room M R They are located deep in the mountains on both sides of the arch dam. A basic observation room M is set up in the arch crown beam dam section of the foundation corridor 1. f .
[0045] The left bank observation room M L , or right bank observation room M R A vertical borehole is arranged toward the deep part of the rock mass, the bottom end of the vertical borehole is regarded as a fixed point, and a bimetallic mark 4 is arranged at the top of the vertical borehole. The first relative settlement deformation S of the head of the bimetallic mark 4 relative to the fixed point is obtained through the bimetallic mark 4. M .
[0046] In this embodiment, based on the left bank observation room M in the grouting flat tunnel on both sides of the dam foundation L and the right bank observation room M R Based on the deep geological conditions of the foundation, combined with the comprehensive monitoring results of various monitoring facilities in the deep rock mass (such as plumb lines, multi-point displacement meters and bedrock deformation meters), a right bank observation room M with better rock geological conditions and stable rock deformation was selected. R In the right bank observation room M R Install 1 set of bimetallic mark 4 in the middle drill hole.
[0047] Specifically, the vertical drilling depth is greater than or equal to 100m (the specific depth is determined according to the project scale and building level), and the diameter is greater than or equal to 273mm.
[0048] The bimetallic marker 4 is connected to a bimetallic marker, which is used to monitor the first relative settlement deformation S of the bimetallic marker 4 relative to the fixed point. M .
[0049] The bottom plates of the grouting flat tunnel 2 on the left bank of the foundation corridor, the foundation corridor 1, and the grouting flat tunnel 3 on the right bank of the foundation corridor are provided with a foundation leveling line D f , the basic leveling line D f There are multiple basic leveling points Df arranged at intervals on the j .
[0050] Preferably, the basic level point Df on the bottom plate of the basic corridor 1 j Located in the middle of the dam section, the dam level point D on the bottom plate of the dam gallery 5 ij Located in the middle of the dam section.
[0051] In this embodiment, Figure 2 As shown in the figure, a foundation leveling line D is arranged according to the structural characteristics of the foundation corridor 1, the grouting flat tunnel 2 on the left bank of the foundation corridor, and the grouting flat tunnel 3 on the right bank of the foundation corridor. f In each dam section of the foundation corridor 1, a basic level point Df is arranged on the corridor bottom plate. j In the grouting flat tunnel 2 on the left bank of the foundation corridor and the grouting flat tunnel 3 on the right bank of the foundation corridor, a foundation level point Df is arranged on the bottom plate of each flat tunnel at reasonable intervals. j , basic leveling point Df j It is usually located in the middle of the dam section.
[0052] The arch dam body is provided with i layers of dam body corridors 5 arranged in parallel from the foundation corridor 1 to the dam top, and the two ends of each layer of dam body corridors 5 are respectively connected to the rock masses on the left and right banks. The arch crown beam dam section of the i-th layer of the dam body corridor 5 corresponds to the basic observation room M. f There is a dam observation room M directly above the i , upper and lower adjacent dam observation rooms M i Between, and the dam observation room M i With the basic observation room M f There are vertical height transfer H i , through vertical transmission H i The fourth relative settlement deformation HT(i) between adjacent dam body galleries 5 is obtained.
[0053] In this embodiment, Figure 3 As shown, a dam observation room M is arranged in each dam corridor 5 at different elevations in the arch crown beam dam section. i , vertical height transmission H is arranged from bottom to top in the arch crown beam dam section i , vertical transmission height H i It includes N sections, where N is the total number of dam corridors plus the number of foundation corridors (the number is 1). The first section is vertically connected to the foundation observation room M of the crown beam dam section. f and the first floor dam observation room M i , the vertical transmission height H of the i-th segment (2≤i≤N-1) i Connecting the i-1st and i-th dam body observation rooms of the arch beam dam section M i-1 and M i , the Nth vertical transmission height H N Connecting the N-1th floor observation room of the arch beam dam section M N-1and dam top.
[0054] Specifically, the vertical height H of the i-th section i The upper end is the fixed end, the lower end is the measuring end, and the vertical height H i The measuring end is provided with a vertical height transmitter, which is used to monitor the fourth relative settlement deformation HT(i) between the corresponding adjacent dam body galleries 5 .
[0055] Preferably, the vertical height H i Between the fixed end and the measuring end is an indium steel rod that is less affected by temperature and is protected by a PVC tube.
[0056] The left side of each layer of the dam body corridor 5 is connected to the grouting flat tunnel 6 on the left bank of the dam body corridor located inside the mountain, and the right side of each layer of the dam body corridor 5 is connected to the grouting flat tunnel 7 on the right bank of the dam body corridor located inside the mountain. The dam body leveling line D is set on the bottom plate of the dam body corridor 5, the grouting flat tunnel 6 on the left bank of the dam body corridor, and the grouting flat tunnel 7 on the right bank of the dam body corridor of the i-th layer. i , the dam leveling line D i There are multiple dam level points D arranged at intervals. ij .
[0057] like Figure 1 As shown in the figure, according to the structural characteristics of the i-th layer (1≤i≤N) dam corridor 5, the grouting flat tunnel 6 on the left bank of the dam corridor, and the grouting flat tunnel 7 on the right bank of the dam corridor, the i-th layer of dam leveling line D is arranged. i , a dam level point D is arranged in each dam section of the i-th dam corridor 5 ij , select reasonable spacing to arrange dam level point D in the grouting flat tunnel 6 on the left bank of the dam corridor and the grouting flat tunnel 7 on the right bank of the dam corridor ij .
[0058] The dam crest leveling line D is set on the bottom plate of the arch dam crest. N , the dam top leveling line D N There are multiple dam crest level points D arranged at intervals. Nj Specifically, a dam crest level point D is arranged on each dam section of the arch dam crest. Nj .
[0059] The bimetallic mark 4 in the grouting flat tunnel 2 on the left bank of the foundation gallery or the grouting flat tunnel 3 on the right bank of the foundation gallery, and the vertical height H of the crown beam dam section i , dam leveling lines at various elevations D i and dam level point D ij , and the dam crest leveling line D N and dam crest level point D Nj , together forming an absolute settlement monitoring system for the arch dam body and the grouting tunnels on both sides.
[0060] The present invention also provides an absolute settlement monitoring method for an arch dam body and grouting tunnels on both sides, which is suitable for the above-mentioned absolute settlement monitoring system for an arch dam body and grouting tunnels on both sides, and includes the following steps:
[0061] S1) In the left bank observation room M L and the right bank observation room M R Among them, the observation room floor with better rock geological conditions and stable rock deformation is selected for vertical drilling, and the bottom of the vertical drilling hole is regarded as a fixed point. The bimetallic marker 4 is automatically monitored by the double marker to obtain the first relative settlement deformation S of the head of the bimetallic marker 4 relative to the fixed point. M .
[0062] The bimetallic marker 4 penetrates deep into the mountain rock mass. Generally, the mountains on both sides of the high arch dam are strong and the deep rock mass is relatively stable. In addition, the bimetallic marker 4 itself has a deep vertical drilling depth. For high arch dams, the drilling depth is generally not less than 100m, so that the bottom of the bimetallic marker 4 further penetrates deep into the mountain rock mass. Therefore, the bottom of the bimetallic marker 4 can be regarded as a fixed point. The bimetallic marker 4 is the working base point of the dam body and grouting flat tunnel settlement monitoring system, and the bimetallic marker 4 is automatically monitored in combination with the bimetallic marker instrument. The first relative settlement deformation of the marker head within the vertical drilling range of the bimetallic marker 4 relative to the fixed point at the bottom of the hole is obtained as S M .
[0063] S2) Based on the precise leveling observation and adjustment calculation, obtain the basic leveling points Df j Relative to the basic observation room M f The third relative settlement deformation S at the level point J , and basic observation room M f The second relative settlement deformation S of the level point relative to the head of the bimetallic mark 4 JHT , then the foundation level points Df on the bottom plate of foundation corridor 1, or grouting flat tunnel 2 on the left bank of foundation corridor, or grouting flat tunnel 3 on the right bank of foundation corridor j The absolute settlement AS J =S M +S JHT +S J .
[0064] Preferably, in step S2), each basic level point Df j The first-class closed level is used for monitoring.
[0065] S3) From the 1st layer to the i-th layer (i=1, 2, ..., N) of the dam body corridor (5), the vertical height transmitter of the corresponding layer is used to monitor the fourth relative settlement deformation HT(i) between adjacent dam body corridors (5), and the sum of the relative deformations of the dam body corridors (5) from the 1st layer to the i-th layer is HT(1)+HT(2)+...+HT(i).
[0066] S4) Based on the precise leveling observation and adjustment calculation, the dam level points D on the bottom plate of the i-th dam corridor (5) are obtained. ij Relative to the corresponding layer of the dam observation room M i The fifth relative settlement deformation S at the level point B (i) and each dam top level point D Nj The sixth relative settlement deformation S relative to the level point at the dam crown beam B (N), then the dam level points D on the bottom plate of the i-th dam gallery (5), or the grouting flat tunnel (6) on the left bank of the i-th dam gallery, or the grouting flat tunnel (7) on the right bank of the i-th dam gallery ij The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (i) Each dam crest level point D Nj The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (N).
[0067] Preferably, in step S4), each dam level point D ij The first-class closed leveling is used for monitoring, and the leveling points D Nj The first-class closed level is used for monitoring.
[0068] Vertical height transfer H of dam body arch crown beam dam section i The vertical height transmitter is used for automatic monitoring. The vertical height transmitter H of the i-th section (i=1,2,...,N) from bottom to top is i The fourth relative settlement deformation between adjacent dam corridors 5 obtained by monitoring is HT(i); the dam leveling line D between the i-th dam corridor 5 and the corresponding grouting flat tunnel i The observations were all carried out according to the first-class closed leveling method. After the observation and adjustment calculation based on the precise leveling method, the dam level point D of the i-th dam corridor 5 and the corresponding grouting flat tunnel was obtained. ij Relative to the observation room M at the i-th layer of the dam i The fifth relative settlement deformation at the level point is S B (i) The crest leveling line D of the dam crestN The sixth relative settlement deformation relative to the level point at the dam crown beam is S B (N).
[0069] The bottom of the vertical borehole is taken as the fixed point, the bimetallic mark 4 is the working base point of the absolute settlement monitoring system of the dam body and the corresponding grouting horizontal hole, and the vertical transmission height H i It is a monitoring facility for the relative settlement between the dam corridors 5 at various elevations. By superimposing the first relative settlement deformation S of the bimetallic marker 4 head relative to the fixed point M 、Basic Observation Room M f The second relative settlement deformation S relative to the bimetallic mark 4 head JHT , vertically transfer height H from the 1st to the i-th segment (i = 1, 2, ..., N) i The sum of the relative deformations between the adjacent monitored dam corridors HT(1)+HT(2)+...+HT(i), the relative deformations of the dam corridor at the i-th layer and the corresponding grouting flat tunnel relative to the observation room at the i-th layer of the dam i The fifth relative settlement deformation S B (i), and finally the absolute displacement between the i-th layer of the dam corridor and the corresponding grouting tunnel is the absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (i) Each dam crest level point D Nj The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (N).
[0070] On the one hand, the present invention establishes an absolute settlement monitoring system for the arch dam body and the grouting tunnels on both sides, proposes a monitoring method for the monitoring system and a calculation method for absolute settlement, unifies the leveling observation benchmarks of the arch dam body and the grouting tunnels on both sides, and obtains the absolute settlement of the arch dam body and the grouting tunnels on both sides; on the other hand, compared with the method of calculating the dam settlement by using the base points of the vertical displacement monitoring network outside the dam as the base points of the vertical displacement monitoring of the dam, the present invention effectively avoids the risk of introducing large external errors due to the long observation distance, effectively guarantees the observation accuracy of the monitoring results, and does not need to perform long-distance observation and calculation from the farther base points of the vertical displacement monitoring network, thereby greatly improving the observation efficiency.
[0071] Taking an arch dam on the Jinsha River as an example, by the end of December 2023, the first relative settlement deformation S M =0.13mm, basic observation room M fThe second relative settlement deformation S of the level point relative to the bimetallic marker head in the observation room of the foundation gallery grouting flat tunnel JHT =4.01mm, the third relative settlement deformation S between a certain measuring point of the foundation corridor and the foundation corridor grouting flat tunnel relative to the level point at the foundation observation room J =-0.23mm, then the absolute settlement AS of the foundation corridor and the foundation corridor grouting flat tunnel at this measuring point J =S M +S JHT +S J =0.13+4.01-0.23=3.91mm, that is, the cumulative absolute settlement of the measuring point is 3.91mm. Based on a similar method, the absolute settlement of all measuring points in the foundation corridor and the foundation corridor grouting flat tunnel can be obtained, such as Figure 4 As shown, the absolute settlement of all measuring points of the foundation gallery and the foundation gallery grouting tunnel changes with time.
[0072] Taking the 4th layer (elevation 945m) dam corridor and the corresponding horizontal tunnels on both sides of the arch dam on the Jinsha River as an example, as of the end of December 2023, the sum of the relative deformations between the adjacent dam corridors monitored by vertical transmission from the 1st to the 4th section HT(1)+HT(2)+...+HT(4)=-6.78mm, and the fifth relative settlement deformation S of a certain measuring point of the 4th layer dam corridor and the corresponding grouting horizontal tunnel relative to the 4th layer dam observation room M4 is B (4) = -1.15 mm. The absolute displacement of the measuring point in the 4th layer dam corridor and grouting tunnel is AS B =S M +S JHT +HT(1)+HT(2)+...+HT(4)+S B (4) = 0.13 + 4.01 - 6.78 - 1.15 = -3.79 mm, that is, the cumulative absolute settlement of this measuring point is -3.79 mm. Based on a similar method, the absolute settlement of all measuring points of the 4th layer dam corridor and the corresponding grouting flat tunnel can be obtained, as follows: Figure 5 As shown, the absolute settlement of all measuring points of the 4th-layer dam corridor and the corresponding grouting tunnel changes with time.
[0073] Moreover, the method of solving the dam settlement by using the base point of the vertical displacement monitoring network outside the dam as the base point of the vertical displacement monitoring of the dam has a long observation distance and there is a risk of introducing large external errors. This method effectively guarantees the observation accuracy of the monitoring results, and the observation results truly and accurately reflect the settlement change law of the dam and the grouting adit; and, this method does not need to conduct long-distance observations from the base points of the vertical displacement monitoring network farther away. The traditional method starts from the base points of the vertical displacement network farther away and completes the observation of the leveling routes of the corridor adit on each layer. The single observation and solution time is about 20 to 25 days. The single observation and solution time of the method proposed in this patent is about 4 to 8 days, which greatly improves the observation efficiency.
[0074] The absolute settlement monitoring system and method of the arch dam body and the grouting tunnels on both sides of the arch dam of the present invention unify the level observation benchmarks of the arch dam body and the grouting tunnels on both sides, obtain the absolute settlement of the arch dam body and the grouting tunnels on both sides, effectively avoid the risk of introducing large external errors by using the base point of the vertical displacement monitoring network outside the dam as the base point of the dam for observation, ensure the observation accuracy and greatly improve the observation efficiency.
[0075] The above embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited to the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications made without departing from the spirit and principles of the present invention shall be equivalent replacement methods and shall be included in the protection scope of the present invention.
Claims
1. An absolute settlement monitoring system for an arch dam body and grouting tunnels on both sides, characterized by: The invention comprises a foundation corridor (1) located at the lower part of the arch dam body and abutting the rock masses on both banks at both ends. The arch crown beam section of the foundation corridor (1) is provided with a foundation observation room M. f The left side of the foundation corridor (1) is connected to a foundation corridor left bank grouting flat tunnel (2) located at the bottom of the mountain, and the right side of the foundation corridor (1) is connected to a foundation corridor right bank grouting flat tunnel (3) located at the bottom of the mountain. A left bank observation room M is arranged deep in the mountain of the foundation corridor left bank grouting flat tunnel (2). L , or a right bank observation room M is provided deep in the mountain of the right bank grouting flat tunnel (3) of the foundation corridor R ; The left bank observation room M L , or right bank observation room M R A vertical borehole is arranged toward the deep part of the rock mass, the bottom end of the vertical borehole is regarded as a fixed point, and a bimetallic mark (4) is arranged at the top end of the vertical borehole. The first relative settlement deformation S of the head of the bimetallic mark (4) relative to the fixed point is obtained through the bimetallic mark (4). M ; The bottom plates of the left bank grouting tunnel (2) of the foundation gallery, the foundation gallery (1), and the right bank grouting tunnel (3) of the foundation gallery are provided with a foundation leveling line D f , the basic leveling line D f There are multiple basic leveling points Df arranged at intervals on the j ; The arch dam body is provided with i layers of dam body galleries (5) arranged in parallel from the foundation gallery (1) to the dam top, and both ends of each layer of dam body galleries (5) are respectively connected to the rock masses on the left and right banks, and the arch crown beam dam section of the i-th layer of the dam body gallery (5) corresponds to the foundation observation room M f There is a dam observation room M directly above the i , upper and lower adjacent dam observation rooms M i Between, and the dam observation room M i With the basic observation room M f There are vertical height transfer H i , through vertical transmission H i Obtaining a fourth relative settlement deformation HT(i) between adjacent dam body galleries (5); The left side of each layer of the dam body corridor (5) is connected to a grouting flat tunnel (6) on the left bank of the dam body corridor located inside the mountain, and the right side of each layer of the dam body corridor (5) is connected to a grouting flat tunnel (7) on the right bank of the dam body corridor located inside the mountain. A dam leveling line D is arranged on the bottom plate of the dam body corridor (5), the grouting flat tunnel (6) on the left bank of the dam body corridor, and the grouting flat tunnel (7) on the right bank of the dam body corridor of the i-th layer. i , the dam leveling line D i There are multiple dam level points D arranged at intervals. ij ; The dam crest leveling line D is set on the bottom plate of the arch dam crest. N , the dam top leveling line D N There are multiple dam crest level points D arranged at intervals. Nj .
2. The absolute settlement monitoring system for the arch dam body and the grouting adit on both sides of the dam according to claim 1 is characterized by: The vertical drilling hole has a depth greater than or equal to 100 m and a diameter greater than or equal to 273 mm.
3. The absolute settlement monitoring system for the arch dam body and the grouting adit on both sides of the dam according to claim 2 is characterized by: The bimetallic marker (4) is connected to a bimetallic marker, and the bimetallic marker is used to monitor a first relative settlement deformation S of the bimetallic marker (4) relative to a fixed point. M .
4. The absolute settlement monitoring system for the arch dam body and the grouting adit on both sides of the dam according to claim 1 is characterized by: The vertical height H of the i-th section i The upper end is the fixed end, the lower end is the measuring end, and the vertical height H i A vertical height transmitter is provided at the measuring end, and the vertical height transmitter is used to monitor the fourth relative settlement deformation HT(i) between the corresponding adjacent dam body galleries (5).
5. The absolute settlement monitoring system for the arch dam body and the grouting adit on both sides of the dam according to claim 4 is characterized by: The vertical height H i Between the fixed end and the measuring end is an indium steel rod that is less affected by temperature and is protected by a PVC tube.
6. The absolute settlement monitoring system for the arch dam body and the grouting adit on both sides of the dam according to claim 1 is characterized by: The basic level point Df on the bottom plate of the basic corridor (1) j Located in the middle of the dam section, the dam level point D on the bottom plate of the dam gallery (5) ij Located in the middle of the dam section.
7. An absolute settlement monitoring method for an arch dam body and grouting tunnels on both sides, adapted to the absolute settlement monitoring system for an arch dam body and grouting tunnels on both sides as claimed in any one of claims 1 to 6, characterized in that: The steps include: S1) In the left bank observation room M L and the right bank observation room M R Among them, the bottom plate of the observation room with better rock geological conditions and stable rock deformation is selected for vertical drilling, and the bottom end of the vertical drilling hole is regarded as a fixed point. The bimetallic marker (4) is automatically monitored by a double marker to obtain the first relative settlement deformation S of the head of the bimetallic marker (4) relative to the fixed point. M ; S2) Based on the precise leveling observation and adjustment calculation, obtain the basic leveling points Df j Relative to the basic observation room M f The third relative settlement deformation S at the level point J , and basic observation room M f The second relative settlement deformation S of the level point relative to the head of the bimetallic mark (4) JHT , then the foundation level points Df on the bottom plate of the foundation corridor (1), or the grouting flat tunnel on the left bank of the foundation corridor (2), or the grouting flat tunnel on the right bank of the foundation corridor (3) j The absolute settlement AS J =S M +S JHT +S J ; S3) from the 1st layer to the i-th layer (i=1, 2, ..., N) of the dam body gallery (5), the vertical height transmitter of the corresponding layer is used to monitor the fourth relative settlement deformation HT(i) between adjacent dam body galleries (5), and the sum of the relative deformations of the dam body gallery (5) from the 1st layer to the i-th layer is HT(1)+HT(2)+...+HT(i); S4) Based on the precise leveling observation and adjustment calculation, the dam level points D on the bottom plate of the i-th dam corridor (5) are obtained. ij Relative to the corresponding layer of the dam observation room M i The fifth relative settlement deformation S at the level point B (i) and each dam top level point D Nj The sixth relative settlement deformation S relative to the level point at the dam crown beam B (N), then the dam level points D on the bottom plate of the i-th dam gallery (5), or the grouting flat tunnel (6) on the left bank of the i-th dam gallery, or the grouting flat tunnel (7) on the right bank of the i-th dam gallery ij The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (i) Each dam crest level point D Nj The absolute settlement AS B =S M +S JHT +HT(1)+HT(2)+...+HT(i)+S B (N).
8. The absolute settlement monitoring method of the arch dam body and the grouting adit on both sides of the dam according to claim 7 is characterized by: S2), each basic leveling point Df j The first-class closed level is used for monitoring; in S4), each dam level point D ij The first-class closed leveling is used for monitoring, and the leveling points D Nj The first-class closed level is used for monitoring.