Pressure-bearing testing device for PE (Poly Ethylene) water supply pipeline
By designing a clamping and testing mechanism, using telescopic cylinders and test heads to conduct pressure testing on the inner wall of the PE water supply pipe, the problem of inaccurate testing of the inner side wall in the prior art is solved, and more accurate pressure testing is achieved.
Patent Information
- Application Number
- CN202411084618.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing PE water supply pipeline pressure-bearing test device mainly tests the outer side walls, which cannot accurately reflect the pressure-bearing condition of the inner side walls, resulting in inaccurate test results.
A PE water supply pipe pressure-bearing test device including a clamping mechanism and a testing mechanism is designed. The pipe is clamped and adjusted through a centering clamping unit and a adjustment unit, and the inner wall of the pipe is tested by a telescopic cylinder and a test head. , and obtain the inner wall pressure data through the fixing plate, gear and pressure sensor.
It improves the accuracy of the test and can conduct multiple pressure tests at different locations in the inner wall of PE water supply pipes. It is suitable for PE water supply pipes of various specifications.
Smart Images

Figure CN118937098A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of pipeline testing equipment, and in particular relates to a PE water supply pipeline pressure testing device. Background Art
[0002] PE (polyethylene) material is widely used in the field of water pipe manufacturing due to its high strength, corrosion resistance, and non-toxicity. Because it will not rust, it is an ideal pipe to replace ordinary iron water pipes. PE water pipes need to be tested for pressure after production;
[0003] The existing Chinese patent with application number CN202320605529.0 specifically relates to a PE water supply pipe pressure test device, which includes a test bench, a power mechanism, a pipe clamping mechanism and a pipe pressure test mechanism. The test bench is penetrated with strip holes from top to bottom. The power mechanism includes a motor and two pinions, one of which is fixedly connected to the output shaft of the motor, and the motor is fixedly arranged on the lower side of the test bench. The pipe clamping mechanism includes an arc sleeve, a friction pad and a large gear. A lower fixed cylinder, an arc sleeve and an upper fixed cylinder are fixedly arranged above the large gear in sequence, and a friction pad is fixedly arranged outside the arc sleeve. A lower U-shaped rod passes through the lower fixed cylinder and the large gear, and the lower U-shaped rod is fixedly connected to a one-way sleeve, and an upper U-shaped rod is sleeved above the upper fixed cylinder and the one-way sleeve. The utility model protects the PE water supply pipe by fixing the friction pad outside the arc sleeve to prevent it from being crushed. At the same time, the motor drives the arc sleeve to rotate and then drives the pipe to move, so as to perform pressure tests on different positions of the pipe.
[0004] However, when the PE water supply pipe is in normal use, the pressure it bears mainly comes from the internal water pressure, that is, the main part that bears the pressure is the inner wall of the PE water supply pipe. The above-mentioned patent is a pressure test on the outer wall of the PE water supply pipe. The test result cannot accurately reflect the pressure result of the inner wall of the PE water supply pipe. Therefore, it is necessary to propose a PE water supply pipe pressure test device for performing pressure test on the inner wall of the PE water supply pipe to improve the accuracy of the test. Summary of the invention
[0005] In view of the deficiencies in the prior art, an object of the present invention is to provide a PE water supply pipe pressure test device for performing a pressure test on the inner wall of the PE water supply pipe to improve the accuracy of the test.
[0006] The purpose of the present invention can be achieved through the following technical solutions:
[0007] PE water supply pipe pressure test device, including support platform:
[0008] The clamping mechanism is arranged on the support platform and is used to clamp and fix the PE water supply pipe. The clamping mechanism includes a pair of centering clamping units and an adjusting unit. The two centering clamping units are respectively used to center and clamp the two ends of the PE water supply pipe. The adjusting unit is used to control and adjust the distance between the two centering clamping units.
[0009] The testing mechanism includes a mounting plate fixed on the support platform, a telescopic cylinder horizontally facing the clamping mechanism is fixed on the mounting plate, a test head is fixed on the driving rod at the output end of the telescopic cylinder, and the test head is used to perform a pressure test on the inner wall of the PE water supply pipe. The telescopic cylinder and the PE water supply pipe clamped by the centering clamping unit are placed coaxially;
[0010] The test head includes a pair of fixed plates placed perpendicular to each other, the two fixed plates are arranged along the axis direction of the clamped PE water supply pipe, the two fixed plates are fixed to each other, a rotating cavity is opened on the fixed plates, a gear is rotatably connected in the rotating cavity, the planes where the two gears are located are placed perpendicular to each other, and the central axes of the gears pass through the central axis of the PE water supply pipe, a first rotating motor for driving the gears to rotate is fixedly installed on the fixed plates, a pair of racks placed symmetrically about the central axis are meshed on the gears, the racks are slidably engaged with the fixed plates, a pressure sensor is fixed at one end of the racks, and the two pressure sensors at the same fixed plate are placed symmetrically about the central axis of the corresponding gears;
[0011] The length of the fixing plate along the axis of the rack is smaller than the diameter of the gear;
[0012] The gear diameter is set to R, and the total length of the rack and the corresponding pressure sensor along the rack axis is set to L, L ≥ R;
[0013] The rack and the gear are kept in meshing state, and the maximum distance between the pressure sensor and the central axis of the PE water supply pipe clamped by the corresponding rack end is set to M;
[0014] The inner diameter range of the PE water supply pipe that the test head can test is L~2M;
[0015] The adjustment unit includes a slide fixed on the support platform, any one of the centering clamping units is fixed on one side of the slide close to the telescopic cylinder, and the other centering clamping unit is slidably connected to the slide;
[0016] The centering clamping units all include a horizontally placed slideway shaft, which is placed vertically with the telescopic cylinder, a pair of first sliders are slidably clamped in the slideway shaft, the two first sliders are symmetrically placed with respect to the vertical plane where the central axis of the telescopic cylinder is located, a clamping block is fixed on the upper end of the first slider, the slideway shaft is rotatably connected with the first screw rods placed coaxially, and the threads of the first screw rods located on both sides of the symmetry plane of the two first slider rods are in opposite directions, the first slider rods are sleeved on the first screw rods and threadedly connected thereto, and a second rotating motor for driving the first screw rod to rotate is installed at either end of the slideway shaft;
[0017] The slideway shaft in the centering clamping unit close to the telescopic cylinder is fixed on the slide table, and the slideway shaft in the other centering clamping unit is slidably connected to the slide table;
[0018] An isosceles triangle groove is provided on the side of the two clamping blocks in the centering clamping unit, and any groove is symmetrical about the horizontal plane where the central axis of the telescopic cylinder is located; the adjustment unit also includes a sliding groove provided at the upper end of the slide and coaxially placed with the telescopic cylinder, a second screw rod coaxially placed is rotatably connected in the sliding groove, a third rotating motor for driving the second screw rod to rotate is installed at the end of the slide away from the telescopic cylinder, a second slider with threaded connection is sleeved on the second screw, the second slider is slidably engaged in the sliding groove, and the slide groove shaft in the centering clamping unit away from the end of the telescopic cylinder is fixed on the second slider;
[0019] A pair of slide rails coaxially arranged with the second screw rod are fixed on the slide platform, and third sliders are slidably connected to the slide rails. The two third sliders are located on both sides of the second slider, and the two ends of the slide slot shaft above the second slider are respectively fixed to the two third sliders.
[0020] Beneficial effects of the present invention:
[0021] 1. The adjustment unit is used to control and adjust the distance between the two centering clamping units according to the length of the PE water supply pipe to be tested, and the two centering clamping units are used to center and clamp the two ends of the PE water supply pipe respectively. Then, the telescopic cylinder is used to drive the test head into the PE water supply pipe, and the test head is used to perform a pressure test on the inner wall of the PE water supply pipe. The telescopic cylinder is used to drive the test head to move along the central axis of the PE water supply pipe, and the pressure test can be performed on multiple positions of the inner wall of the PE water supply pipe to improve the accuracy of the test.
[0022] 2. Through the coordinated arrangement of the fixed plate, the gear, the first rotating motor, the rack and the pressure sensor, the first rotating motor is turned on, the first rotating motor drives the gear, and the gear drives the rack and the pressure sensor, so that the pressure sensors are close to the inner wall of the PE water supply pipe and squeezed against it. The inner wall of the PE water supply pipe is subjected to a pressure test by the pressure sensor to obtain pressure data, and the two corresponding pressure sensors in any fixed plate respectively test the two opposite sides of the circumferential wall in the PE water supply pipe. At the same time, the two fixed plates are placed perpendicular to each other, so that the test parts of the corresponding pressure sensors on the two fixed plates are staggered, and the rotation direction of the first rotating motor is alternately changed to make the rack reciprocate, and the test head is moved in the PE water supply pipe in cooperation with the drive of the driving unit, so that different positions of the inner wall of the PE water supply pipe can be tested simultaneously;
[0023] 3. It can realize load-bearing test on various specifications of PE water supply pipes with different inner diameters. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0026] Figure 2 It is a partial structural schematic diagram of the slide of the present invention;
[0027] Figure 3 It is a partial structural schematic diagram of the telescopic cylinder of the present invention;
[0028] Figure 4 It is a partial structural schematic diagram of the second screw of the present invention;
[0029] Figure 5 It is a schematic diagram of the test head structure of the present invention. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] like Figures 1 to 5 As shown, the PE water supply pipe pressure test device includes a support platform 100:
[0032] The clamping mechanism is arranged on the support platform 100 and is used to clamp and fix the PE water supply pipe 400. The clamping mechanism includes a pair of centering clamping units 201 and an adjusting unit 202. The two centering clamping units 201 are respectively used to center and clamp the two ends of the PE water supply pipe 400, and the adjusting unit 202 is used to control and adjust the distance between the two centering clamping units 201.
[0033] The testing mechanism includes a mounting plate 301 fixed on the support platform 100, a telescopic cylinder 302 horizontally facing the clamping mechanism is fixed on the mounting plate 301, a test head 303 is fixed on the driving rod at the output end of the telescopic cylinder 302, and the test head 303 is used to perform a pressure test on the inner wall of the PE water supply pipe 400, and the telescopic cylinder 302 is coaxially placed with the PE water supply pipe 400 clamped by the centering clamping unit 201;
[0034] The adjustment unit 202 is used to control and adjust the distance between the two centering clamping units 201 according to the length of the PE water supply pipe 400 being tested, and the two centering clamping units 201 are used to center and clamp the two ends of the PE water supply pipe 400 respectively. Then, the telescopic cylinder 302 drives the test head 303 to extend into the PE water supply pipe 400, and the test head 303 is used to perform a pressure test on the inner wall of the PE water supply pipe 400. The telescopic cylinder 302 cooperates to drive the test head 303 to move along the central axis direction of the PE water supply pipe 400, so that pressure tests can be performed on multiple positions of the inner wall of the PE water supply pipe 400, thereby improving the accuracy of the test.
[0035] Preferably, the telescopic cylinder 302 may be a multi-stage telescopic cylinder 302 .
[0036] The test head 303 includes a pair of fixed plates 3031 placed perpendicular to each other, the two fixed plates 3031 are arranged along the axis direction of the clamped PE water supply pipe 400, the two fixed plates 3031 are fixed to each other, a rotating cavity is opened on each fixed plate 3031, a gear 3032 is rotatably connected in the rotating cavity, the planes where the two gears 3032 are located are placed perpendicular to each other, and the central axes of the gears 3032 pass through the central axis of the PE water supply pipe 400, a first rotating motor 3033 for driving the gears 3032 to rotate is fixedly installed on each fixed plate 3031, a pair of racks 3034 placed symmetrically about the central axis thereof are meshed and connected to each gear 3032, the racks 3034 are slidably engaged with the fixed plates 3031, a pressure sensor 3035 is fixed at one end of each rack 3034, and the two pressure sensors 3035 at the same fixed plate 3031 are placed symmetrically about the central axis of the corresponding gear 3032;
[0037] After the test head 303 is inserted into the PE water supply pipe 400, the first rotating motor 3033 is turned on, the first rotating motor 3033 drives the gear 3032, and the gear 3032 drives the rack 3034 and the pressure sensor 3035, so that the pressure sensor 3035 is close to the inner wall of the PE water supply pipe 400 and squeezed with it. The pressure sensor 3035 performs a pressure test on the inner wall of the PE water supply pipe 400 to obtain pressure data, and the corresponding two pressure sensors 3031 in any fixed plate 3031 are 35 respectively test the two opposite side walls in the PE water supply pipe 400, and at the same time, the two fixing plates 3031 are placed perpendicular to each other, so that the test parts corresponding to the pressure sensors 3035 on the two fixing plates 3031 are staggered, and the rack 3034 is reciprocated by alternately changing the rotation direction of the first rotating motor 3033, and the test head 303 is moved in the PE water supply pipe 400 in cooperation with the drive of the driving unit, so as to realize the pressure test on different positions of the inner wall of the same PE water supply pipe 400.
[0038] The length of the fixing plate 3031 along the axis direction of the rack 3034 is smaller than the diameter of the gear 3032;
[0039] The diameter of the gear 3032 is set to R, and the total length of the rack 3034 and the corresponding pressure sensor 3035 along the axis of the rack 3034 is set to L, L ≥ R;
[0040] The rack 3034 and the gear 3032 are kept in meshing state, and the maximum distance between the pressure sensor 3035 and the central axis of the PE water supply pipe 400 clamped by the corresponding end of the rack 3034 is set to M;
[0041] The inner diameter range of the PE water supply pipe 400 that can be tested by the test head 303 is L to 2M;
[0042] In summary, it is possible to carry out load-bearing tests on PE water supply pipes 400 of various specifications with inner diameters ranging from L to 2M.
[0043] In order to facilitate the adjustment of the distance between the two centering clamping units 201 according to the length of the tested PE water supply pipe 400, the adjustment unit 202 includes a slide 2021 fixed on the support platform 100, any centering clamping unit 201 is fixed to the side of the slide 2021 close to the telescopic cylinder 302, and the other centering clamping unit 201 is slidably connected to the slide 2021; according to the length of the PE water supply pipe 400, the centering clamping unit 201 on the slide 2021 away from the telescopic cylinder 302 can be pushed to adjust its position.
[0044] In order to facilitate the clamping of the PE water supply pipe 400, the centering clamping unit 201 includes a horizontally placed chute shaft 2011, the chute shaft 2011 is placed vertically with the telescopic cylinder 302, a pair of first sliders 2012 are slidably clamped in the chute shaft 2011, the two first sliders 2012 are symmetrically placed about the vertical plane where the central axis of the telescopic cylinder 302 is located, and a clamping block 2013 is fixed on the upper end of the first slider 2012, the chute shaft 2011 is rotatably connected to the first screw rod 2014 placed coaxially, and the screw threads of the first screw rod 2014 on both sides of the symmetry plane of the two first sliders 2012 are opposite in direction, the first sliders 2012 are sleeved on the first screw rod 2014 and threadedly connected thereto, and a second rotating motor 2015 for driving the first screw rod 2014 to rotate is installed at either end of the chute shaft 2011;
[0045] The slide shaft 2011 in the centering clamping unit 201 close to the telescopic cylinder 302 is fixed on the slide 2021, and the slide shaft 2011 in the other centering clamping unit 201 is slidably connected to the slide 2021;
[0046] The first screw 2014 is driven by the second rotating motor 2015, and the first screw 2014 drives the first slider 2012 to perform threaded transmission, thereby driving the first slider 2012 in the slide shaft 2011 to drive the clamping block 2013, so that the two clamping blocks 2013 move closer to or away from each other. When the two clamping blocks 2013 move closer to each other, the PE water supply pipe 400 between the two clamping blocks 2013 can be clamped.
[0047] In order to keep the clamped PE water supply pipe 400 coaxial with the telescopic cylinder 302, an isosceles triangle groove 2016 is provided on the side surfaces where the two clamping blocks 2013 in the centering clamping unit 201 are close to each other, and each groove 2016 is symmetrical about the horizontal plane where the central axis of the telescopic cylinder 302 is located; after clamping the PE water supply pipe 400, the two side walls of the isosceles triangle groove 2016 are tangent to the outer side wall of the PE water supply pipe 400, so that the clamped PE water supply pipe 400 is kept coaxial with the telescopic cylinder 302.
[0048] In order to facilitate automatic control of the movement and adjustment of the centering clamping unit 201 away from the end of the telescopic cylinder 302, the adjusting unit 202 also includes a sliding groove opened at the upper end of the slide 2021 and coaxially placed with the telescopic cylinder 302, in which a coaxially placed second screw 2022 is rotatably connected, and a third rotating motor 2023 for driving the second screw 2022 to rotate is installed at one end of the slide 2021 away from the telescopic cylinder 302, and a second slider 2024 with a threaded connection is sleeved on the second screw 2022, and the second slider 2024 is slidably engaged in the sliding groove, and the sliding groove shaft 2011 in the centering clamping unit 201 away from the end of the telescopic cylinder 302 is fixed on the second slider 2024; the second screw 2022 is driven by the third rotating motor 2023, and the second screw 2022 drives the second slider 2024 to perform threaded transmission, thereby driving the centering clamping unit 201 away from the end of the telescopic cylinder 302 to move and adjust.
[0049] A pair of slide rails 2025 coaxially placed with the second screw rod 2022 are fixed on the slide 2021, and a third slider 2026 is slidably connected to the slide rails 2025. The two third sliders 2026 are located on both sides of the second slider 2024, and the two ends of the slide groove shaft 2011 above the second slider 2024 are respectively fixed to the two third sliders 2026; through the slide rails 2025 and the third slider 2026, the guidance and stability of the movement of the centering clamping mechanism away from the end of the telescopic cylinder 302 are improved.
[0050] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0051] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A PE water supply pipe pressure test device, comprising a support platform (100), It is characterized in that Also includes: A clamping mechanism, the clamping mechanism is arranged on the support platform (100) and is used to clamp and fix the PE water supply pipe (400), the clamping mechanism comprises a pair of centering clamping units (201) and an adjustment unit (202), the two centering clamping units (201) are respectively used to center and clamp the two ends of the PE water supply pipe (400), and the adjustment unit (202) is used to control and adjust the distance between the two centering clamping units (201); The testing mechanism comprises a mounting plate (301) fixed on a support platform (100), a telescopic cylinder (302) horizontally facing a clamping mechanism is fixed on the mounting plate (301), a test head (303) is fixed on a driving rod at the output end of the telescopic cylinder (302), the test head (303) is used to perform a pressure test on the inner wall of a PE water supply pipe (400), and the telescopic cylinder (302) and the PE water supply pipe (400) clamped by a centering clamping unit (201) are placed coaxially.
2. The PE water supply pipe pressure test device according to claim 1, It is characterized in that The test head (303) comprises a pair of fixing plates (3031) placed perpendicularly to each other. The two fixing plates (3031) are arranged along the axis direction of the clamped PE water supply pipe (400). The two fixing plates (3031) are fixed to each other. A rotating cavity is provided on each fixing plate (3031). A gear (3032) is rotatably connected in the rotating cavity. The planes where the two gears (3032) are located are placed perpendicularly to each other. The central axes of the gears (3032) pass through the central axis of the PE water supply pipe (400). The fixing plates (3031) are fixed to each other. ) are fixedly mounted with a first rotating motor (3033) for driving the gear (3032) to rotate, the gear (3032) is meshedly connected with a pair of racks (3034) that are centrally symmetrically arranged about the central axis thereof, the racks (3034) are slidably engaged with the fixed plate (3031), a pressure sensor (3035) is fixed at one end of the racks (3034), and the two pressure sensors (3035) at the same fixed plate (3031) are centrally symmetrically arranged about the central axis of the corresponding gear (3032).
3. The PE water supply pipe pressure test device according to claim 2, It is characterized in that The length of the fixing plate (3031) along the axis of the rack (3034) is smaller than the diameter of the gear (3032); The diameter of the gear (3032) is set to R, and the total length of the rack (3034) and the corresponding pressure sensor (3035) along the axis of the rack (3034) is set to L, where L≥R; The rack (3034) and the gear (3032) are kept in meshing state, and the maximum distance between the pressure sensor (3035) and the central axis of the PE water supply pipe (400) clamped by the corresponding rack (3034) end is set to M; The inner diameter range of the PE water supply pipe (400) that can be tested by the test head (303) is L to 2M.
4. The PE water supply pipe pressure test device according to claim 3, It is characterized in that The adjustment unit (202) comprises a slide table (2021) fixed on the support table (100), any one of the centering clamping units (201) is fixed on one side of the slide table (2021) close to the telescopic cylinder (302), and the other centering clamping unit (201) is slidably connected to the slide table (2021).
5. The PE water supply pipe pressure testing device according to claim 4, It is characterized in that The centering clamping unit (201) comprises a horizontally placed slide shaft (2011), the slide shaft (2011) is placed vertically with the telescopic cylinder (302), a pair of first sliders (2012) are slidably clamped in the slide shaft (2011), the two first sliders (2012) are symmetrically placed with respect to the vertical plane where the central axis of the telescopic cylinder (302) is located, a clamping block (2013) is fixed on the upper end of the first slider (2012), the slide shaft (2011) is rotatably connected with a first screw rod (2014) placed coaxially, and the screw threads of the first screw rod (2014) located on both sides of the symmetry plane of the two first sliders (2012) have opposite spiral directions, the first sliders (2012) are sleeved on the first screw rod (2014) and threadedly connected thereto, and a second rotating motor (2015) for driving the first screw rod (2014) to rotate is installed at either end of the slide shaft (2011); The slide groove shaft (2011) in the centering clamping unit (201) close to the telescopic cylinder (302) is fixed on the slide table (2021), and the slide groove shaft (2011) in the other centering clamping unit (201) is slidably connected to the slide table (2021).
6. The PE water supply pipe pressure test device according to claim 5, It is characterized in that An isosceles triangle groove (2016) is provided on the side surfaces of the two clamping blocks (2013) in the centering clamping unit (201), and each groove (2016) is symmetrical about the horizontal plane where the central axis of the telescopic cylinder (302) is located.
7. The PE water supply pipe pressure test device according to claim 6, It is characterized in that The adjusting unit (202) further comprises a sliding groove which is provided at the upper end of the slide (2021) and is coaxially arranged with the telescopic cylinder (302); a coaxially arranged second screw rod (2022) is rotatably connected in the sliding groove; a third rotating motor (2023) for driving the second screw rod (2022) to rotate is installed at one end of the slide (2021) away from the telescopic cylinder (302); a second sliding block (2024) which is threadedly connected is sleeved on the second screw rod (2022); the second sliding block (2024) is slidably engaged in the sliding groove; and a sliding groove shaft (2011) in the centering clamping unit (201) at the end away from the telescopic cylinder (302) is fixed on the second sliding block (2024).
8. The PE water supply pipe pressure testing device according to claim 7, It is characterized in that A pair of slide rails (2025) coaxially arranged with the second screw rod (2022) are fixed on the slide table (2021), and third sliders (2026) are slidably connected to the slide rails (2025). The two third sliders (2026) are located on both sides of the second slider (2024), and the two ends of the slide slot shaft (2011) above the second slider (2024) are respectively fixed to the two third sliders (2026).
Citation Information
Cited By
Transportation and installation integrated trolley for lining steel pipe of water delivery tunnel and construction method of transportation and installation integrated trolley
CN119491955A
Water conveyance tunnel lining steel pipe transportation and installation integrated trolley and construction method thereof
CN119491955B