Method and device for simulating wind erosion on construction site
By using a wind erosion monitoring device with adjustable baffles and a transparent cover, combined with an adjustable speed blower, the problems of high cost and data gaps in existing technologies have been solved, enabling accurate monitoring of wind erosion parameters and future climate simulation.
Patent Information
- Application Number
- CN202410991690.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-23
AI Technical Summary
Existing wind erosion monitoring methods are costly, have large measurement errors, cannot simulate future climate conditions, and cannot collect all wind erosion products, resulting in data gaps.
A device with a detachable base on one side, an adjustable baffle, and a transparent cover, combined with an adjustable speed blower, is used to simulate different wind speeds and slope conditions, collect wind-eroded particles, and measure their particle size distribution.
It enables low-cost and accurate monitoring of wind erosion parameters, collects all wind erosion products, and improves the accuracy of future climate change predictions.
Smart Images

Figure CN118937132A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of soil and water conservation classification, and in particular to a method and device for simulating wind erosion at a construction site. Background Art
[0002] Wind erosion refers to the process in which surface materials are eroded, worn away and moved away from their original locations under the action of wind. Its intensity is affected by many factors, including wind strength, surface conditions, surface particle size composition and density. Wind erosion of soil is a global environmental problem. Humans have begun to prevent and control natural soil erosion and soil erosion caused by engineering construction as early as the early 19th century.
[0003] With the development of social and economic conditions and changes in natural conditions, the research and adjustment of human wind erosion prevention and control strategies have also changed. How to effectively quantify the extent of wind erosion is the fundamental factor that determines the effectiveness of prevention and control policies.
[0004] At present, the monitoring of wind erosion parameters is mainly carried out manually on-site. First, according to the average dominant wind direction over many years, sand and gravel particles in the wind erosion process are collected in a fixed direction; then, after waiting for a complete wind erosion process, the collected sand and gravel particle samples are sieved in the laboratory according to the particle size, and the weight of sand and gravel with different particle sizes is measured; finally, the erosion effect of a wind erosion process on sand and gravel with different particle sizes is obtained. For example, the Chinese utility model patent CN219104682 U discloses an automatic monitoring and measurement device for wind erosion.
[0005] However, the evaluation method of calculating wind erosion parameters by the existing dust collection monitoring device mainly has the following problems:
[0006] 1. The construction cost is high, requiring a dedicated area and supporting facilities, and has high requirements for the foundation of the site (flat land and low human disturbance);
[0007] 2. The existing methods mainly rely on manual measurement and inversion calculation for the part that can be collected by the dust collector. The measurement errors and fluctuations are large, and it is impossible to monitor the uncollected wind erosion products and fluxes;
[0008] 3. The current method of monitoring wind erosion parameters mainly relies on changes in the natural environment and cannot simulate and test future variable climate conditions. Summary of the invention
[0009] Therefore, the problem to be solved by the present invention is how to obtain a low-cost monitoring method for obtaining wind erosion parameters as accurately as possible under simulated multiple environments.
[0010] To this end, the present invention provides a method for simulating wind erosion at a construction site, comprising:
[0011] Step 1: Use a base with a detachable baffle on one side to collect 0-5 cm surface soil samples from the riverside slope to be studied;
[0012] Step 2: Combine the enclosure with adjustable baffles with the base filled with topsoil to form an airtight space;
[0013] Step 3: Connect the adjustable-speed blower to the enclosure to ensure airtightness at the interface, and adjust the wind speed to the preset value to simulate the normal wind speed at the research point;
[0014] Step 4: Install a particle collection device at the opening on the opposite side of the cover where the fan is connected to receive particles generated by wind erosion and complete the measurement of wind erosion amount and particle size composition.
[0015] This method of simulating wind erosion at construction sites fills the data gap caused by incomplete collection of wind erosion products by existing wind erosion monitoring methods, that is, existing wind erosion data cannot collect all wind erosion products, and thus lacks monitoring of wind erosion parameters. Since the types and intensities of wind erosion have significant temporal and spatial variations, the technical solution of adjustable wind speed (wind fan) and slope windward angle (adjustable baffle) in this application has the technical effect of restoring the current and simulating the acquisition of wind erosion parameters under different degrees of future climate change conditions.
[0016] Optionally, the calculation formula for wind erosion is:
[0017]
[0018] Where E represents the wind erosion rate, W C represents the weight of particles produced by wind erosion collected in step 4, W i Represents the initial weight of the topsoil collected in step 1.
[0019] Optionally, in step 1, the surface soil structure is kept intact during sampling.
[0020] Optionally, in step 2, the angle of the adjustable baffle is adjusted to simulate the slope of the bank in a horizontal wind erosion scenario.
[0021] Optionally, the angle between the adjustable baffle and the top surface of the enclosure close to the particle collection device is equivalent to the windward angle of the slope.
[0022] Optionally, in step 3, the wind speed of the blower is adjusted to simulate wind erosion under different wind speed conditions.
[0023] By adding adjustment mechanisms for wind speed and slope windward angle to the device, simulation of various environments can be achieved, thereby improving the prediction accuracy under future changeable climates.
[0024] Optionally, the sealing cover is made of transparent material.
[0025] A device for simulating wind erosion at a construction site, using the method for simulating wind erosion at a construction site described above, the device comprises:
[0026] The base is in the form of a box with an open top, and at least one side of the base is detachable;
[0027] The sealing cover is in the form of a box with an opening at the bottom, and the sealing cover is arranged on the base and forms an airtight space with the base;
[0028] An adjustable baffle, hinged to the top of the enclosure and fixable relative to the enclosure;
[0029] A fan connected to the peripheral side of the enclosure to blow air into the airtight space;
[0030] A particle collecting device is connected to the sealing cover and communicated with the airtight space, and the particle collecting device is located on the opposite side of the fan.
[0031] Optionally, the sealing cover is a plexiglass cover.
[0032] Optionally, the particle capture device is made by stacking several layers of non-woven fabric.
[0033] The method and device for simulating wind erosion at a construction site provided by the present invention have the following advantages:
[0034] 1. A method for simulating wind erosion at a construction site provided by the present invention comprises the following steps:
[0035] Step 1: Use a base with a detachable baffle on one side to collect 0-5 cm surface soil samples from the riverside slope to be studied;
[0036] Step 2: Combine the enclosure with adjustable baffles with the base filled with topsoil to form an airtight space;
[0037] Step 3: Connect the adjustable-speed blower to the enclosure to ensure airtightness at the interface, and adjust the wind speed to the preset value to simulate the normal wind speed at the research point;
[0038] Step 4: Install a particle collection device at the opening on the opposite side of the cover where the fan is connected to receive particles generated by wind erosion and complete the measurement of wind erosion amount and particle size composition.
[0039] This method of simulating wind erosion at construction sites fills the data gap caused by incomplete collection of wind erosion products by existing wind erosion monitoring methods, that is, existing wind erosion data cannot collect all wind erosion products, and thus lacks monitoring of wind erosion parameters. Since the types and intensities of wind erosion have significant temporal and spatial variations, the technical solution of adjustable wind speed (wind fan) and slope windward angle (adjustable baffle) in this application has the technical effect of restoring the current and simulating the acquisition of wind erosion parameters under different degrees of future climate change conditions.
[0040] 2. The present invention provides a method for simulating wind erosion at a construction site, which simulates the slope of a bank in a horizontal wind erosion scenario by adjusting the angle of an adjustable baffle, and simulates wind erosion under different wind speed conditions by adjusting the wind speed of a blower.
[0041] This method of simulating wind erosion at a construction site achieves simulation of a variety of environments by adding adjustment mechanisms for wind speed and slope windward angle to the device, thereby improving the accuracy of predictions under future variable climates. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0043] Figure 1 It is a schematic structural view of a device for simulating wind erosion at a construction site provided in an embodiment of the present invention.
[0044] Description of reference numerals:
[0045] 1- fan;
[0046] 2- Base;
[0047] 3- Enclosure;
[0048] 4-Adjustable baffle;
[0049] 5- Particle capture device;
[0050] 6- Angle. DETAILED DESCRIPTION
[0051] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance. In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0053] Example 1
[0054] This embodiment provides a device for simulating wind erosion at a construction site, such as Figure 1 As shown, it includes a fan 1, a base 2, a cover 3, an adjustable baffle 4 and a particle capture device 5.
[0055] In this embodiment, the base 2 is in the form of a box with an open top, and one side of the base 2 is detachable. The base 2 of this structure is used for uniform sampling of topsoil, wherein the one-side detachability is to ensure the structural characteristics of the original topsoil as much as possible, and to obtain the topsoil in a manner similar to a shovel.
[0056] Specifically, the base 2 may be a stainless steel base 2 of 30*30*5 cm.
[0057] In this embodiment, the sealing cover 3 is in the form of a box with an opening at the bottom, and the sealing cover 3 is covered on the base 2 and forms an airtight space with the base 2. When in use, the sealing cover 3 is covered on the base 2 through the opening at the bottom thereof, and specifically, the inner wall of the sealing cover 3 and the surrounding of the base 2 can be tightly fitted, or the bottom of the sealing cover 3 can be directly placed on the upper surface of the base 2. In order to improve the sealing between the sealing cover 3 and the base 2, a sealing member, such as a sealing strip, can be provided at the contact between the sealing cover 3 and the base 2.
[0058] In this embodiment, in order to facilitate observation of wind erosion of the surface soil, the sealing cover 3 is made of a transparent material, for example, the sealing cover 3 is a plexiglass cover.
[0059] In this embodiment, the fan 1 is connected to the peripheral side of the enclosure 3 to blow air into the airtight space to simulate wind erosion under different wind speed conditions. The fan 1 can be replaced by other fans with adjustable speeds, and the wind speed entering the enclosure 3 can be recalibrated.
[0060] In this embodiment, the particle capture device 5 is connected to the enclosure 3 and communicated with the airtight space. The particle capture device 5 is located on the opposite side of the fan 1. The particle capture device 5 is used to quantify the particle size characteristics of the surface soil eroded by wind. Among them, the particle capture device 5 installed on the side of the air outlet of the enclosure 3 is made of 3 layers of non-woven fabrics, which are used to collect soil particles generated by wind erosion, and at the same time realize the weighing of the wind erosion amount and the screening analysis of the particle size. In some other embodiments, the amount of non-woven fabrics in the particle capture device 5 can also be changed according to demand.
[0061] In this embodiment, the adjustable baffle 4 is hinged to the top of the enclosure 3 and can be fixed relative to the enclosure 3. Specifically, a rotating shaft is fixed to the top surface of the enclosure 3, and the adjustable baffle 4 is hinged to the rotating shaft, so that the angle 6 between the adjustable baffle 4 and the top surface of the enclosure 3 close to the particle capture device 5 can be adjusted. The angle 6 between the adjustable baffle 4 and the top surface of the enclosure 3 close to the particle capture device 5 is equivalent to the windward angle of the slope, and the slope of the bank in the horizontal wind erosion scene can be simulated by adjusting the angle of the adjustable baffle 4.
[0062] In this embodiment, by adding a wind speed and slope wind angle adjustment mechanism to the device, simulation of various environments is achieved, thereby improving the prediction accuracy under future variable climates.
[0063] In order to fix the adjustable baffle 4 at a set angle, when the adjustable baffle 4 is adjusted to a predetermined angle, the adjustable baffle 4 is fixed to the sealing cover 3. For example, the fixing can be performed by bonding.
[0064] Example 2
[0065] This embodiment provides a method for simulating wind erosion at a construction site, using the device for simulating wind erosion at a construction site in Embodiment 1, and the method comprises the following steps:
[0066] Step 1: Use a base 2 with a detachable baffle on one side to collect a 0-5 cm surface soil sample of the riverside slope to be studied;
[0067] Step 2: Combine the enclosure 3 with the adjustable baffle 4 with the base 2 filled with topsoil to form an airtight space;
[0068] Step 3: Connect the adjustable-speed blower 1 to the enclosure 3 to ensure airtightness at the interface, and adjust the wind speed to a preset value to simulate the normal wind speed at the research point;
[0069] Step 4: Install a particle collection device 5 at the opening on the opposite side of the enclosure 3 connected to the fan 1 to receive particles generated by wind erosion and complete the measurement of wind erosion amount and particle size composition.
[0070] In this embodiment, the calculation formula of wind erosion amount is:
[0071]
[0072] Where E represents the wind erosion rate, W C represents the weight of particles produced by wind erosion collected in step 4, W i Represents the initial weight of the topsoil collected in step 1.
[0073] In this embodiment, in step 1, the surface soil structure is kept intact during sampling.
[0074] In this embodiment, in step 2, the angle of the adjustable baffle 4 is adjusted to simulate the slope of the bank in a horizontal wind erosion scenario.
[0075] In this embodiment, the included angle 6 between the adjustable baffle 4 and the top surface of the enclosure 3 close to the particle collection device 5 is equivalent to the windward angle of the slope.
[0076] In this embodiment, in step 3, the wind speed of the blower 1 is adjusted to simulate wind erosion under different wind speed conditions.
[0077] In this embodiment, the sealing cover 3 is made of transparent material.
[0078] The method for simulating wind erosion at a construction site provided in this embodiment fills the data gap caused by incomplete collection of wind erosion products by existing wind erosion monitoring methods, that is, the existing wind erosion data cannot collect all wind erosion products, and thus lacks monitoring of wind erosion parameters. Since the types and intensities of wind erosion have significant temporal and spatial variations, the technical solution of adjustable wind speed and slope windward angle of the present application has the technical effect of restoring the current and simulating the acquisition of wind erosion parameters under different degrees of future climate change conditions.
[0079] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A method for simulating wind erosion at a construction site, characterized in that: The following steps are involved: Step 1: Collect 0-5 cm surface soil samples of the riverside slope to be studied using a base (2) with a detachable baffle on one side; Step 2: combining the enclosure (3) with the adjustable baffle (4) with the base (2) filled with topsoil to form an airtight space; Step 3: Connect the adjustable speed blower (1) to the enclosure (3), ensure airtightness at the interface, and adjust the wind speed to a preset value to simulate the normal wind speed at the research point; Step 4: Install a particle collection device (5) at the opening on the opposite side of the enclosure (3) connected to the fan (1) to receive particles generated by wind erosion and complete the measurement of wind erosion amount and particle size composition.
2. The method for simulating wind erosion at a construction site according to claim 1, characterized in that: The calculation formula of wind erosion is: Where E represents the wind erosion rate, W C represents the weight of particles produced by wind erosion collected in step 4, W i Represents the initial weight of the topsoil collected in step 1.
3. The method for simulating wind erosion at a construction site according to claim 1, characterized in that: In step 1, the surface soil structure is kept intact during sampling.
4. The method for simulating wind erosion at a construction site according to claim 1, characterized in that: In step 2, the angle of the adjustable baffle (4) is adjusted to simulate the slope of the bank in a horizontal wind erosion scenario.
5. The method for simulating wind erosion at a construction site according to claim 4, characterized in that: The included angle (6) between the adjustable baffle (4) and the top surface of the enclosure (3) close to the particle collection device (5) is equivalent to the windward angle of the slope.
6. The method for simulating wind erosion at a construction site according to claim 1, characterized in that: In step 3, the wind speed of the blower (1) is adjusted to simulate wind erosion under different wind speed conditions.
7. The method for simulating wind erosion at a construction site according to claim 1, characterized in that: The sealing cover (3) is made of transparent material.
8. A device for simulating wind erosion at a construction site, using the method for simulating wind erosion at a construction site according to any one of claims 1 to 7, characterized in that: The device includes: The base (2) is in the form of a box with an open top, and at least one side of the base (2) is detachable; The sealing cover (3) is in the form of a box with an opening at the bottom, and the sealing cover (3) is placed on the base (2) and forms an airtight space with the base (2); An adjustable baffle (4) is hinged to the top of the enclosure (3) and can be fixed relative to the enclosure (3); A fan (1) is connected to the peripheral side of the enclosure (3) to blow air into the airtight space; A particle collection device (5) is connected to the enclosure (3) and communicated with the airtight space, and the particle collection device (5) is located on the opposite side of the fan (1).
9. The device for simulating wind erosion at a construction site according to claim 8, characterized in that: The sealing cover (3) is a plexiglass cover.
10. The device for simulating wind erosion at a construction site according to claim 8, characterized in that: The particle capture device (5) is made of a plurality of layers of non-woven fabric stacked together.
Citation Information
Patent Citations
Evaluation instrument of soil mass corrosion resistance under wind erosion, water erosion and coupling erosion
CN104502259A
Closed type wire sandstorm erosion simulation test device and closed type wire sandstorm erosion simulation test method
CN105547985A
Portable field soil wind erosion in-situ detection testing device and method
CN107255600A
Soil wind erosion process simulation experiment device and experiment method thereof
CN113465865A
Soil wind erosion indoor test simulation device
CN116087078A