Method for determining maximum dry density and minimum dry density of original gradation of sand gravel material in situ without barrel

By conducting the maximum and minimum dry density detection of bucket-free gravel on the hard foundation test site, the problem of poor steel barrel compaction is solved, and the accurate density control and quality improvement of gravel is achieved.

CN118937150APending Publication Date: 2024-11-12SHAANXI QINHAI TESTING TECH CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411076058.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The prior art has deviations in determining the maximum dry density and minimum dry density of gravel materials, especially the compaction effect of large-gravel gravel materials is poor, and the use of steel drums has uneven bottoms, deformation, inconvenient filling and limited vibration. The problem of quality control standards has been reduced.

Method used

In-situ barrel-free method is used to perform foundation rolling on a hard foundation test site with a width of at least 8m, screen gravel with different particle sizes, and use test pits to test the maximum and minimum dry density to ensure the rolling process. The displacement degree of freedom is used, and the dry density is calculated by measuring the volume through the irrigation method to eliminate the limitations and artificial deviations of the steel barrel.

Benefits of technology

The accurate maximum dry density and minimum dry density of gravel materials are achieved, the quality control deviation is reduced, the compaction effect and simplicity of operation are improved, the cost is low and the effect is good.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118937150A_ABST
    Figure CN118937150A_ABST
Patent Text Reader

Abstract

The invention discloses a method for determining the maximum dry density and the minimum dry density of the original gradation of gravel stone in an in-situ barrel-free manner. The method comprises the following steps: step 1, carrying out foundation treatment; step 2, screening test materials; step 3, test point location preparation; step 4, preparing test materials with different gravel contents; step 5, spreading materials; step 6, rolling; 7, detecting the maximum dry density; 8, preparing and filling a minimum dry density test material; step 9, detecting the minimum dry density; step 10, result arrangement; according to the method, the maximum dry density is determined firstly, then the gradation of the sand gravel materials is screened again, the gravel content of the actual sand gravel materials is determined, then the minimum dry density of the same gravel content is determined, and the problem that the gravel content of the maximum dry density and the gravel content of the minimum dry density are different in deviation is solved; and the influence on the sand gravel full-grading curve in the test pit when part of excess materials are not loaded is eliminated, and the sand gravel full-grading test device is low in cost, good in using effect, simple to operate and convenient to popularize and use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of sand and gravel dam filling configuration, and particularly relates to an in-situ bucket-free method for determining the maximum dry density and the minimum dry density of the original gradation of sand and gravel materials. Background Art

[0002] Gravel is a common filling material for earth-rock dams and is widely used in rockfill bearing. It is crucial to ensure that the gravel can be compacted reasonably to reduce the subsequent settlement and deformation. The application of the maximum dry density and minimum dry density in the relative density test of coarse-grained soil in the standard "Test Procedure for Coarse-Grained Soil in Hydropower and Water Conservancy Projects" DL / T5356-2006 is only applicable to materials with a particle size of less than 60mm. For gravel with a maximum particle size of 800mm, the maximum and minimum dry densities are conventionally determined by the scaled approximation method, but the actual results are quite different from the true values. For example, the maximum dry density determined by the scaled method is 2.06g / cm 3 The actual maximum dry density on site can reach 2.40g / cm 3 The actual relative density on site is too high, which lowers the quality control standard. The industry standard "Technical Specification for Compacted Gravel and Stone Material Density Bucket Method for Hydropower and Water Conservancy Projects" T / CEC 5001-2016 proposes to use prototype grading to conduct relative density tests on gravel and stone materials to determine the maximum and minimum dry density. According to the actual maximum particle size, large steel drums are processed for outdoor maximum and minimum dry density tests. In the actual process, (1) the flatness of the bottom of the large steel drum cannot be effectively guaranteed. After rolling, the large area of ​​the steel drum causes part of the bottom to be leveled with fine material, resulting in a certain amount of paving; (2) the steel drum is prone to deformation during the rolling process, and the bottom of the steel drum cannot be effectively compacted if the thickness is too large. If the steel drum is too small, it is easy to cause single particle transmission when filling large particle size materials, resulting in the weakening of the vibration of the surrounding materials; (3) The thickness of the steel drum paving material is not easy to control. If the thickness of the loading material is flush with the steel drum, During the rolling process, the sides of the steel drum will inevitably be deformed. The thickness of the charge is slightly higher than the steel drum, which will cause artificial deviations in the thickness of the charge and reduce the compaction effect at the bottom of the steel drum, failing to achieve the expected maximum dry density. (4) The steel drum itself limits the lateral displacement of gravel and stone materials, resulting in the inability of some particles to move naturally after the high-frequency vibration of the vibrating roller near the steel drum. Restricted by the steel drum, they can only move along a trajectory limited by the steel drum interface, reducing the free combination effect of each level of ingredients after vibration. (5) The gravel content that first determines the minimum dry density and the maximum dry density after rolling within the steel drum changes, and the maximum and minimum dry densities of the same gravel content cannot be accurately determined, resulting in certain deviations and other defects. Summary of the invention

[0003] The technical problem to be solved by the present invention is to overcome the deficiencies of the above-mentioned prior art and provide an in-situ bucket-free method for determining the maximum dry density and the minimum dry density of the original gradation of sand and gravel materials, which is free of steel barrels, easy to operate, can accurately control the gravel content between the maximum dry density and the minimum dry density, eliminates the difficulty in controlling the thickness of the sampling points and weakens the limited displacement of materials of various particle sizes after vibration.

[0004] The technical solution adopted to solve the above technical problems is: a method for determining the maximum dry density and the minimum dry density of the original gradation of sand and gravel without a bucket in situ, comprising the following steps:

[0005] Step 1: Foundation treatment: Select a hard foundation test site with a width of at least 8m. After the site is leveled, use rolling equipment to roll the foundation. Spread the test material on the test site to a depth of 70 to 90cm and roll it densely according to the foundation rolling method.

[0006] Step 2: Screening of test materials: Select representative gravel and stone materials in the material source area, air-dry them under natural conditions, and screen them to classify and stack gravel and stone materials with particle sizes of <5mm, 5mm, 10mm, 20mm, 40mm, 60mm, 80mm, 100mm, 200mm, 300mm, 400mm, 500mm, and 600mm for standby use;

[0007] Step 3: Test point preparation: on the treated foundation, 70-90cm thick mixed gravel is spread, and test pits are excavated at the test points according to the requirements. After the test pits are dug, a layer of plastic paper is laid inside. Two groups of parallel tests are carried out for each test material;

[0008] Step 4: Preparation of test materials with different gravel contents: Prepare the test materials with the required gravel contents according to the expected particle grading curve. First weigh the large-size particles at the bottom of the pile, then pour the small-size gravel evenly on the large-size gravel after weighing them in descending order, and finally stir them evenly with a backhoe.

[0009] Step 5: Laying materials: Evenly load the mixed test materials into the test pit. When loading, fill the test pit with all the configured test materials and wrap the surface layer with plastic paper;

[0010] Step 6: Rolling: The rolling equipment should be statically pressed from the center line of the test pit to both sides for at least 8 times, and then the vibration mode should be turned on, and rolling should be carried out from the center to both sides for at least 16 times, and the settlement of adjacent times should be stable and less than 1mm;

[0011] Step 7: Maximum dry density test: After rolling is completed, restore the measuring point mark, use the volume rate ring to rate the surface volume, dig out all the sand and gravel in the plastic paper of the original test pit from the center of the measuring point, weigh them, and re-screen and weigh them and store them in grades to determine the grading curve and gravel content of the sand and gravel in the test pit. Use the water filling method to measure the volume of the test pit, calculate the maximum dry density, and drain all the water in the plastic paper to ensure that the test pit is dry, and then conduct the minimum dry density test;

[0012] Step 8. Preparation and filling of materials for minimum dry density test: according to the gradation curve and gravel content screened after the maximum dry density test is completed, the test materials are evenly loaded into the original test pit. During the loading process, the artificial loose filling method is adopted, and no impact and vibration are allowed. The loading height shall not exceed the height of the volume rate setting ring, and the mass of the sand and gravel in the test pit is recorded;

[0013] Step 9: Minimum dry density test: Use the water filling method to measure the surface volume of the test pit, and calculate the volume of the minimum dry density gravel material in combination with the maximum dry density volume, and then calculate the minimum dry density;

[0014] Step 10. Result collation: Calculate the maximum dry density and minimum dry density results respectively, and draw a three-factor correlation diagram based on the actual gravel content tested.

[0015] In step 1 of the present invention, the number of times the foundation is rolled is no less than 16 times, until the settlement of adjacent times is ensured to be less than 1 mm.

[0016] In step three of the present invention, the diameter of the test pit is 3 to 5 times the maximum particle size of the gravel material, and the depth of the test pit is controlled to be no less than 1.5 times the maximum particle size and no more than 1 m.

[0017] When configuring the test materials in step 4 of the present invention, the materials are configured according to 1.0 to 1.1 times the estimated charging mass of the test pit.

[0018] In step eight of the present invention, the test materials are configured according to 0.85 to 0.95 times the estimated loading mass of the test pit.

[0019] After re-screening the sand and gravel materials in step seven of the present invention, the actual gravel content needs to be determined.

[0020] Compared with the prior art, the present invention has the following advantages:

[0021] 1. The present invention adopts the test pit excavated in situ as the loading test pit, which increases the displacement freedom during the rolling process of sand and gravel materials.

[0022] 2. The present invention first performs maximum dry density and then re-screens the gravel material gradation to determine the actual gravel content of the gravel material, and then performs minimum dry density with the same gravel content, thereby solving the problem of inconsistency between the maximum dry density and the minimum dry density gravel content.

[0023] 3. The present invention adopts a density test pit excavated directly downward from the paving layer as a loading container. The maximum dry density is fully loaded according to 1.0 to 1.1 times the estimated loading mass of the test pit, and the minimum dry density is fully loaded according to 0.85 to 0.95 times the estimated loading mass of the test pit, thereby eliminating the influence of some remaining materials on the full gradation curve of sand and gravel in the test pit when some of the remaining materials are not loaded.

[0024] 4. The present invention adopts the test pit excavated in situ as the loading container, and the method of excavating the entire test pit from top to bottom during density testing eliminates the influence of 10-20 cm of sand and gravel reserved on the upper part after rolling by a fixed container barrel on the density of the entire test pit, thereby achieving low cost, good use effect, simple operation, and easy promotion and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a flow chart of the present invention.

[0026] Figure 2 It is a schematic diagram of maximum dry density charging of the present invention.

[0027] Figure 3 It is an example of a three-factor correlation diagram drawn by the present invention. DETAILED DESCRIPTION

[0028] The present invention is further described in detail below with reference to the accompanying drawings and embodiments, but the present invention is not limited to these embodiments.

[0029] Example 1

[0030] exist Figure 1 The present invention relates to a method for determining the maximum dry density and the minimum dry density of the original gradation of sand and gravel materials in situ without a bucket, comprising the following steps:

[0031] Step 1, foundation treatment: Select a hard foundation test site with a width of at least 8m. The length of the site is selected according to the actual test. In this embodiment, the width × length is 8m × 46m. After the site is leveled, use rolling equipment to roll the foundation. The number of times of rolling the foundation in step 1 is not less than 16 times, and ensure that the settlement of adjacent times is less than 1mm. Spread the test material on the test site for 70 to 90cm. In this embodiment, spread 80cm and roll it densely according to the method of foundation rolling;

[0032] Step 2: Screening of test materials: Select representative gravel and stone materials in the material source area, air-dry them under natural conditions, and screen them to classify and stack gravel and stone materials with particle sizes of <5mm, 5mm, 10mm, 20mm, 40mm, 60mm, 80mm, 100mm, 200mm, 300mm, 400mm, 500mm, and 600mm for standby use;

[0033] Step 3: Test point preparation: on the treated foundation, lay a 70-90 cm thick mixed gravel material. In this embodiment, lay 80 cm thick. Figure 2 As shown, a test pit is excavated at the test point according to the requirements. The diameter of the test pit is 3 to 5 times the maximum particle size of the gravel and stone materials. The depth of the test pit is controlled to be no less than 1.5 times the maximum particle size and no more than 1m. After the test pit is dug, a layer of plastic paper is laid inside. Two groups of parallel tests are carried out for each test material.

[0034] Step 4, preparation of test materials with different gravel contents: the test materials with the required gravel content are configured according to the expected particle grading curve. In this embodiment, the required test materials are configured according to the particle grading curves of different gravel contents (60%, 67.4%, 74.7%, 83.4%, 92%). First, weigh the bottom of the large-size stockpile, and then pour the small-size gravel evenly on the large-size gravel after weighing successively, and finally stir evenly with a backhoe; in order to ensure the change of the grading curve caused by the residual material, when configuring the test materials, configure them according to 1.0 to 1.1 times the estimated loading mass of the test pit;

[0035] Step 5: Laying materials: Evenly load the mixed test materials into the test pit. When loading, fill the test pit with all the configured test materials and wrap the surface layer with plastic paper;

[0036] Step 6: Rolling: The rolling equipment should be statically pressed from the center line of the test pit to both sides for at least 8 times, and then the vibration mode should be turned on, and rolling should be carried out from the center to both sides for at least 16 times, and the settlement of adjacent times should be stable and less than 1mm;

[0037] Step 7, maximum dry density test: after the rolling is completed, restore the measuring point mark, use the volume rate ring to rate the surface volume, dig out all the sand and gravel in the plastic paper of the original test pit from the center of the measuring point and weigh them, and re-screen the sand and gravel to determine the actual gravel content. The actual gravel content is used for the subsequent related calculations. The density on the three-factor diagram drawn by the prior art corresponds to the pre-allocated gravel content, which deviates from the actual one. This method can ensure that the result is more accurate, and the chart produced by this method is more standard. After weighing, the gravel is graded and stored to determine the grading curve and gravel content of the sand and gravel in the test pit. The volume of the test pit is measured by the water filling method, and the maximum dry density is calculated, as shown in Table 1. The water in the plastic paper is completely discharged to ensure that the test pit is dry, and the minimum dry density test is carried out;

[0038] Table 1 Maximum dry density test results of different gravel contents

[0039]

[0040] It can be seen from the above table that the actual gravel content of the pre-mixed gravel material has changed compared with the pre-mixed gravel content due to the influence of different factors such as the different quality of the residual material and the crushing of some gravel materials during the rolling process. In the subsequent three-factor diagram drawing process, this method needs to draw a chart according to the actual detected gravel content and the corresponding density. Compared with the existing method of directly drawing a chart based on the pre-mixed gravel content, it can ensure that the result is more accurate and the chart produced in this way is more standard.

[0041] Step 8. Preparation and filling of materials for minimum dry density test: According to the grading curve and gravel content screened after the maximum dry density test is completed, the test materials are configured according to 0.85 to 0.95 times the estimated loading mass of the test pit, and the test materials are evenly loaded into the original test pit. During the loading process, the artificial loose filling method is adopted, and no impact and vibration are allowed. The loading height shall not exceed the volume rate setting ring height, and the mass of sand and gravel in the test pit is recorded;

[0042] Step 9, minimum dry density test: Use the water filling method to measure the surface volume of the test pit, and calculate the volume of the minimum dry density gravel material in combination with the maximum dry density volume, and then calculate the minimum dry density, as shown in Table 2;

[0043] Table 2 Minimum dry density test results of different gravel contents

[0044]

[0045] It can be seen from the above table that after the gravel content of the pre-mixed sand and gravel material changes, the minimum dry density is mixed according to the changed gravel content and all loaded into the test pit to ensure that the maximum dry density and the minimum dry density used in the drawing of the three-factor chart are the results of the test of sand and gravel with the same gravel content.

[0046] Step 10: Result collation: Calculate the maximum dry density and minimum dry density results respectively, and draw a three-factor correlation diagram based on the actual gravel content tested, such as Figure 3 shown.

Claims

1. A method for determining the maximum dry density and minimum dry density of the original gradation of sand and gravel without a bucket in situ, characterized in that The following steps are involved: Step 1: Foundation treatment: Select a hard foundation test site with a width of at least 8m. After the site is leveled, use rolling equipment to roll the foundation. Spread the test material on the test site to a depth of 70 to 90cm and roll it densely according to the foundation rolling method. Step 2: Screening of test materials: Select representative gravel and stone materials in the material source area, air-dry them under natural conditions, and screen them to classify and stack gravel and stone materials with particle sizes of <5mm, 5mm, 10mm, 20mm, 40mm, 60mm, 80mm, 100mm, 200mm, 300mm, 400mm, 500mm, and 600mm for standby use; Step 3: Test point preparation: on the treated foundation, 70-90cm thick mixed gravel is spread, and test pits are excavated at the test points according to the requirements. After the test pits are dug, a layer of plastic paper is laid inside. Two groups of parallel tests are carried out for each test material; Step 4: Preparation of test materials with different gravel contents: Prepare the test materials with the required gravel contents according to the expected particle grading curve. First weigh the large-size particles at the bottom of the pile, then pour the small-size gravel evenly on the large-size gravel after weighing them in descending order, and finally stir them evenly with a backhoe. Step 5: Laying materials: Evenly load the mixed test materials into the test pit. When loading, fill the test pit with all the configured test materials and wrap the surface layer with plastic paper; Step 6: Rolling: The rolling equipment should be statically pressed from the center line of the test pit to both sides for at least 8 times, and then the vibration mode should be turned on, and rolling should be carried out from the center to both sides for at least 16 times, and the settlement of adjacent times should be stable and less than 1mm; Step 7: Maximum dry density test: After rolling is completed, restore the measuring point mark, use the volume rate ring to rate the surface volume, dig out all the sand and gravel in the plastic paper of the original test pit from the center of the measuring point, weigh them, and re-screen and weigh them and store them in grades to determine the grading curve and gravel content of the sand and gravel in the test pit. Use the water filling method to measure the volume of the test pit, calculate the maximum dry density, and drain all the water in the plastic paper to ensure that the test pit is dry, and then conduct the minimum dry density test; Step 8. Preparation and filling of materials for minimum dry density test: according to the gradation curve and gravel content screened after the maximum dry density test is completed, the test materials are evenly loaded into the original test pit. During the loading process, the artificial loose filling method is adopted, and no impact and vibration are allowed. The loading height shall not exceed the height of the volume rate setting ring, and the mass of the sand and gravel in the test pit is recorded; Step 9. Minimum dry density test: Use the water filling method to measure the surface volume of the test pit, and calculate the volume of the minimum dry density gravel material in combination with the maximum dry density volume, and then calculate the minimum dry density; Step 10. Result collation: Calculate the maximum dry density and minimum dry density results respectively, and draw a three-factor correlation diagram based on the actual gravel content tested.

2. The method for determining the maximum dry density and the minimum dry density of the original gradation of gravel and sand in situ without a bucket according to claim 1 is characterized by: In the step 1, the foundation is rolled at least 16 times, ensuring that the settlement of adjacent times is less than 1 mm.

3. The method for determining the maximum dry density and the minimum dry density of the original gradation of gravel and stone materials in situ without a bucket according to claim 1 is characterized by: In the step three, the diameter of the test pit is 3 to 5 times the maximum particle size of the gravel and stone materials, and the depth of the test pit is controlled to be no less than 1.5 times the maximum particle size and no more than 1m.

4. The method for determining the maximum dry density and the minimum dry density of the original gradation of gravel and stone materials in situ without a bucket according to claim 1 is characterized by: When configuring the test materials in step 4, configure them according to 1.0 to 1.1 times the estimated loading mass of the test pit.

5. The method for determining the maximum dry density and the minimum dry density of the original gradation of gravel and sand in situ without a bucket according to claim 1 is characterized by: The test materials in step eight are configured according to 0.85 to 0.95 times the estimated loading mass of the test pit.

6. The method for determining the maximum dry density and the minimum dry density of the original gradation of gravel and stone materials in situ without a bucket according to claim 1 is characterized by: After re-screening the sand and gravel in step 7, the actual gravel content needs to be determined.

Citation Information

Cited By

  • Construction method of rolling model for coarse aggregate compaction

    CN121637940A