Intelligent operation management system for coke oven machinery

By designing the intelligent operation management system of coke oven machinery and using the MODBUS TCP protocol to communicate with PLC, the information collection and planning management of the coke oven equipment is realized, the shortcomings of the existing system in terms of intelligence and sustainable development are solved, and the system is improved The functions and maintainability ensure efficient, safe and reliable operation of coke oven operations.

CN118938792APending Publication Date: 2024-11-12DALIAN HUARUI HEAVY IND COKE OVEN VEHICLE EQUIP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410983355.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing coke oven management system has shortcomings in terms of intelligence and sustainable development, especially in terms of production planning optimization, equipment interconnection, safety and compliance, which is difficult to meet the complex needs of the modern metallurgical industry.

Method used

A coke oven machinery intelligent operation management system is designed, including the operation planning system and the vehicle control system. Communication is established with the PLC through the MODBUS TCP protocol, information collection and planning instructions for the four major vehicle equipment are realized, parameters are set, and monthly plans are generated. , analyze the focus coefficient, and provide simulation orchestration planning and data export functions to meet different scenarios and user needs.

Benefits of technology

It improves the system's functions, performance and maintainability, ensures efficient, safe and reliable operation of coke oven operations, meets a variety of operating scenarios and production requirements, and achieves more flexible and efficient coke planning management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118938792A_ABST
    Figure CN118938792A_ABST
Patent Text Reader

Abstract

The invention provides an intelligent operation management system for coke oven machinery. The intelligent operation management system comprises an operation planning system and a vehicle control system, the operation planning system comprises a parameter setting unit, a plan issuing unit and a statistical analysis unit. The operation planning system is arranged on a coke oven central control industrial personal computer, and establishes communication with a PLC (Programmable Logic Controller) in a vehicle control system of the coke oven in a MODBUS TCP (Transmission Control Protocol) mode; and the PLC establishes communication connection with PLC systems of the four vehicle devices of the coke oven, so that the operation planning system acquires information and sends planning instructions to the four vehicle devices. Technical indexes of the coke oven operation management system relate to multiple aspects of functions, performance, safety, maintainability and the like of the system, and the indexes are crucial for ensuring efficient, safe and reliable operation of coke oven operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of metallurgical coking, and in particular to an intelligent operation management system for coke oven machinery. Background Art

[0002] In the coke oven operation plan management system, the development channel of technology often involves automation, digitalization, big data, the Internet of Things and other aspects. Some foreign coke oven management systems have introduced intelligent and artificial intelligence technologies for predictive maintenance, production plan optimization and other aspects. The Internet of Things technology is widely used in foreign coke oven management systems to achieve interconnection between equipment, thereby achieving more intelligent production management. In some developed countries, coke oven management systems are paying more and more attention to sustainable development, including technological innovations in reducing carbon emissions and reducing energy consumption. Foreign coke oven management systems invest more resources in security and compliance, and adopt advanced security technologies to ensure the reliability and stability of the system. Summary of the invention

[0003] According to the technical problems mentioned in the above background technology, a coke oven machinery intelligent operation management system is provided.

[0004] The technical means adopted by the present invention are as follows:

[0005] The intelligent operation management system of coke oven machinery includes: an operation planning system and a vehicle control system; the operation planning system includes: a parameter setting unit, a plan issuing unit and a statistical analysis unit; the operation planning system is set on the coke oven central control industrial computer, and establishes communication with the PLC in the vehicle control system of the coke oven through MODBUS TCP; the PLC establishes communication with the PLC system of the four major vehicle equipment of the coke oven, thereby realizing the operation planning system to collect information and send plan instructions for the four major vehicle equipment;

[0006] The parameter setting unit is used to realize the registration of personnel / department parameters, the maintenance of the focus sequence, the maintenance of global parameters and the maintenance of the shift schedule;

[0007] The plan issuing unit is used to realize the generation of monthly plan, the management of the push plan and the viewing of the push plan;

[0008] The statistical analysis unit is used to analyze the focus pushing coefficient, generate a focus pushing process curve and realize vehicle statistics;

[0009] The interfaces of the PLC are respectively connected to the plan issuing unit and the statistical analysis unit of the operation planning system.

[0010] Furthermore, the PLC interface inputs the coal loading time and the coal loading status into the plan issuing unit to realize the arrangement of the coke pushing plan; at the same time, the PLC interface inputs the coke pushing time, the current value, the coking time and the coke pushing status into the plan issuing unit to realize the viewing of the coke pushing plan.

[0011] Furthermore, the PLC interface inputs information on whether the coke is pushed successfully, vehicle information and furnace number information into the plan issuing unit to realize vehicle statistics.

[0012] Furthermore, the operation planning system generates a monthly planning table based on the input basic information and shift information of the coke oven production, which includes the estimated production time, shift group and oven number sorting information;

[0013] The operation planning system sends the information in the monthly plan table to the coke oven central control PLC system. After receiving the information, the PLC system stores it in a data block to form a data set, which is then split into a coke pushing plan data set and a coal loading plan data set, and sent to the PLC systems of the corresponding functional equipment respectively.

[0014] Then, the pushing stroke data and pushing current data are collected, and the two types of data are packaged and stored in data blocks to form data sets. At the same time, the coal loading bottom plate advance and retreat, and bottom plate current data sets are established. The data sets are sent to the job planning system together with the corresponding production furnace number. After receiving the data sets, the job planning system generates a production chart based on the logical relationship at the bottom of the plan to record the data of the production process.

[0015] Furthermore, in the PLC system of the four major vehicle equipment of the coke oven, after receiving the production data set sent by the operation planning system, the logic block unpacks it and decomposes the planned production furnace number and the planned production time; according to the actual production furnace number and the actual production time, the planned production furnace number and the planned production time are compared to determine whether the production furnace numbers are the same and how much the production time deviates; finally, the information is aggregated together with multiple production data information into a data set and sent to the operation planning system.

[0016] Furthermore, the statistical analysis unit obtains the actual difference and deviation results according to the focusing time, current value, coking time and focusing state within a period of time, and then calculates the focusing coefficient to achieve the analysis of the focusing coefficient.

[0017] Compared with the prior art, the present invention has the following advantages:

[0018] The technical indicators of the coke oven operation management system of the present invention involve multiple aspects such as the system's functions, performance, safety, maintainability, etc. These indicators are crucial to ensure the efficient, safe and reliable operation of the coke oven operation:

[0019] 1. Flexible operation. Manual insertion, manual filing, and deletion plan operations are designed for more operation scenarios and random notes, meeting the different scenario requirements of different customers.

[0020] 2. Comprehensive coverage. You can choose one of the three options: 2-1 sequence, 5-2 sequence, and 9-2 sequence, which can meet all existing on-site production requirements and realize cross sequence. The K coefficient parameter can be configured, the focus push interval time can be configured, and the maintenance parameters can be configured. Two maintenance modes, fixed interval number of routes and fixed interval time, can be set.

[0021] 3. Simulate the arrangement plan. The system can restore the real focus pushing plan with high fidelity. According to different settings, the system can simulate the corresponding focus pushing plan.

[0022] 4. Customize the exported data fields. According to user needs, you can configure the export field items for pages with many fields and export them as needed.

[0023] 5. Disordered note editing. If a furnace number disrupts the original note sequence due to special circumstances, the system will automatically mark this furnace number in red until this furnace number returns to the normal note sequence and the reminder disappears. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0025] Figure 1 It is a schematic diagram of the overall system structure of the present invention.

[0026] Figure 2 It is a schematic diagram of the current curve of the push focus of the present invention. DETAILED DESCRIPTION

[0027] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0028] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0029] like Figure 1-2 As shown, the present invention provides a coke oven machinery intelligent operation management system, characterized in that it includes: an operation planning system and a vehicle control system; the operation planning system includes: a parameter setting unit, a plan issuing unit and a statistical analysis unit; the operation planning system is arranged on the coke oven central control industrial computer, and establishes communication with the PLC in the vehicle control system of the coke oven through MODBUS TCP; the PLC establishes communication with the PLC system of the four major vehicle equipment of the coke oven, thereby realizing the operation planning system to collect information and send plan instructions for the four major vehicle equipment.

[0030] As a preferred embodiment, in the present application, the parameter setting unit is used to realize the registration of personnel / department parameters, the maintenance of the coke pushing sequence, the maintenance of global parameters, and the maintenance of the shift schedule. In the present application, the parameter setting unit can realize the pre-editing of basic data such as shifts, production time, coke pushing type, etc.

[0031] The plan issuing unit is used to realize the generation of monthly plan, the management of coke pushing plan and the viewing of coke pushing plan. As a preferred embodiment, in the present application, the plan issuing unit can generate a plan for the whole month, including the arrangement of team shifts and the setting of maintenance.

[0032] The statistical analysis unit is used to analyze the pushing coefficient, generate the pushing process curve (accurately retrieve the travel and current information of "coal loading bottom plate forward", "coal loading bottom plate backward", "pushing forward" of a certain plan, a specified furnace number on a certain day, and make a curve chart) and realize vehicle statistics. As a preferred embodiment, in this application, the pushing plan can be viewed, and can also be manually modified and edited to deal with emergencies and chaotic situations. At the same time, the data information that has been produced can be directly viewed.

[0033] The interfaces of the PLC are respectively connected to the plan issuing unit and the statistical analysis unit of the operation planning system.

[0034] Preferably, as a preferred implementation mode, the PLC interface inputs the coal loading time and the coal loading status into the plan issuing unit to realize the arrangement of the coke pushing plan; at the same time, the PLC interface inputs the coke pushing time, current value, coking time and coke pushing status into the plan issuing unit to realize the viewing of the coke pushing plan.

[0035] As a preferred implementation, the PLC interface inputs information on whether the coke is pushed successfully, vehicle information, and furnace number information into the plan issuing unit to implement vehicle statistics.

[0036] As a preferred embodiment, in the present application, the operation planning system generates a monthly schedule based on the input basic information and shift information of the coke oven production, and the schedule includes the estimated production time, shift group and oven number sorting information;

[0037] The operation planning system sends the information in the monthly plan table to the coke oven central control PLC system. After receiving the information, the PLC system stores it in a data block to form a data set, which is then split into a coke pushing plan data set and a coal loading plan data set, and sent to the PLC systems of the corresponding functional equipment respectively.

[0038] Then, the pushing stroke data and pushing current data are collected, and the two types of data are packaged and stored in data blocks to form data sets. At the same time, the coal loading bottom plate advance and retreat, and bottom plate current data sets are established. The data sets are sent to the job planning system together with the corresponding production furnace number. After receiving the data sets, the job planning system generates a production chart based on the logical relationship at the bottom of the plan to record the data of the production process.

[0039] As a preferred implementation mode, in the PLC system of the four major vehicle equipment of the coke oven, after receiving the production data set sent by the job planning system, the logic block unpacks it and decomposes the planned production furnace number and the planned production time; compares the actual production furnace number and the actual production time with the planned production furnace number and the planned production time to determine whether the production furnace numbers are the same and how much the production time deviates; finally, the information is aggregated together with multiple production data information into a data set and sent to the job planning system.

[0040] As a preferred implementation, the statistical analysis unit obtains the actual difference and deviation results based on the focusing time, current value, coking time and focusing state within a period of time, and then calculates the focusing coefficient to achieve the analysis of the focusing coefficient.

[0041] As a preferred embodiment, in the present application, the analysis of the focus push coefficient includes the following steps:

[0042] First, analyze the current data of the last 15 days for each furnace number separately. If any abnormality is found, it means that the data of a certain furnace number is abnormal during the analysis period.

[0043] Read the recent coke oven production data and analyze the coke current in three sections. For the furnace front section and the coke guide grid section, since the current fluctuations are gentle, the average current is analyzed in comparison with the standard average current. For the coke cake contact section, since the current fluctuations are large, the maximum current is analyzed in comparison with the standard maximum current.

[0044] After analyzing all the data, if the probability that the average current in the furnace front section and the coke guide grid section is higher than the theoretical value exceeds 60%, or the probability that the maximum current in the coke cake contact section exceeds the theoretical value exceeds 60%, it is determined that there is an overall risk of the current being too high.

[0045] Read the recent coke oven production data and analyze the coke current in three sections. For the furnace front section and the coke guide grid section, since the current fluctuations are gentle, the average current is analyzed in comparison with the standard average current. For the coke cake contact section, since the current fluctuations are large, the maximum current is analyzed in comparison with the standard maximum current.

[0046] Normally, the probability that the data of a single furnace is higher than the standard average value should be 50%. Theoretically, the data of 7 consecutive furnaces is higher than the standard value of 0.5 to the 7th power, which is approximately 0.78%. Therefore, if the measured data is higher than the standard for 7 consecutive furnaces, it is considered that there is a risk of gradually increasing current.

[0047] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0048] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0049] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0050] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0051] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0052] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0053] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. The intelligent operation management system of coke oven machinery is characterized by: include: Operation planning system and vehicle control system; The operation plan system includes: a parameter setting unit, a plan issuing unit and a statistical analysis unit; the operation plan system is set on the coke oven central control industrial computer, and establishes communication with the PLC in the vehicle control system of the coke oven through MODBUS TCP; the PLC establishes communication with the PLC system of the four major vehicle equipment of the coke oven, thereby realizing the operation plan system to collect information and send plan instructions for the four major vehicle equipment; The parameter setting unit is used to realize the registration of personnel / department parameters, the maintenance of the focus sequence, the maintenance of global parameters and the maintenance of the shift schedule; The plan issuing unit is used to realize the generation of monthly plan, the management of the push plan and the viewing of the push plan; The statistical analysis unit is used to analyze the focus pushing coefficient, generate a focus pushing process curve and realize vehicle statistics; The interfaces of the PLC are respectively connected to the plan issuing unit and the statistical analysis unit of the operation planning system.

2. The coke oven machinery intelligent operation management system according to claim 1 is characterized in that: The PLC interface inputs the coal loading time and the coal loading status into the plan issuing unit to realize the arrangement of the coke pushing plan; at the same time, the PLC interface inputs the coke pushing time, the current value, the coking time and the coke pushing status into the plan issuing unit to realize the viewing of the coke pushing plan.

3. The coke oven machinery intelligent operation management system according to claim 1 or 2, characterized in that: The PLC interface inputs whether the coke is pushed successfully, vehicle information and furnace number information into the plan issuing unit to realize vehicle statistics.

4. The coke oven machinery intelligent operation management system according to claim 1 is characterized in that: The operation planning system generates a monthly planning table based on the input basic information and shift information of coke oven production, which includes the estimated production time, shift group and oven number sorting information; The operation planning system sends the information in the monthly plan table to the coke oven central control PLC system. After receiving the information, the PLC system stores it in a data block to form a data set, which is then split into a coke pushing plan data set and a coal loading plan data set, and sent to the PLC systems of the corresponding functional equipment respectively. Then, the data of pushing coke stroke and pushing coke current are collected, and the two types of data are packaged and stored in data blocks to form data sets; at the same time, the data sets of coal loading bottom plate advance and retreat and bottom plate current are established; The data set is sent together with the corresponding production furnace number to the job planning system. After receiving it, the job planning system generates a production chart based on the underlying logical relationship of the plan to record the data of the production process.

5. The coke oven machinery intelligent operation management system according to claim 1 is characterized in that: In the PLC system of the four major vehicle equipment of the coke oven, after receiving the production data set sent by the operation planning system, the logic block unpacks it and decomposes the planned production furnace number and the planned production time; By comparing the actual production furnace number and actual production time with the planned production furnace number and planned production time, whether the production furnace numbers are the same and how much the production time deviates; finally, the information is aggregated together with multiple production data information into a data set and sent to the job planning system.

6. The coke oven machinery intelligent operation management system according to claim 1, characterized in that: The statistical analysis unit obtains the actual difference and deviation results according to the focusing time, current value, coking time and focusing state within a period of time, and then calculates the focusing coefficient to realize the analysis of the focusing coefficient.