Intelligent robot cooperative scheduling system and method based on multiple modes

By building a production progress probability distribution function and task allocation module, the problems of low material transportation efficiency and untimely robot scheduling in traditional factories are solved, and the coordinated scheduling of intelligent robots is realized, which improves the transportation efficiency and stability of the production line.

CN118938833APending Publication Date: 2024-11-12JIANGSU HENGRUN ELECTRIC POWER DESIGN INST CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411111769.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Material transportation efficiency in traditional factories is low, and robots are not scheduled in time, resulting in abnormal materials on the production line, reducing production efficiency.

Method used

By obtaining production line operation data and robot information, a probability distribution function of production progress is constructed, material shortage time is predicted, material transportation task information is generated, and task allocation is carried out according to the task sequence and robot cooperation degree to realize pre-scheduling of materials.

Benefits of technology

It improves material transportation efficiency, ensures the stability and smoothness of production line operation, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118938833A_ABST
    Figure CN118938833A_ABST
Patent Text Reader

Abstract

The invention relates to an intelligent robot cooperative scheduling system and method based on multiple modes, and belongs to the technical field of robot cooperative scheduling. The production progress is predicted according to the probability distribution function to obtain material shortage prediction time, material transportation task information is generated, the material transportation task information is sequenced by locking production equipment coordinates and material coordinates according to the material shortage prediction time, and a task sequence is obtained; and task allocation is performed on the robot according to the task sequence in combination with the robot cooperation degree to obtain the task allocation information, and the robot performs operation according to the task allocation information, so that beforehand scheduling of the production materials is realized, the production efficiency is improved, and the material transportation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of robot collaborative scheduling, and in particular relates to a multi-modal intelligent robot collaborative scheduling system and method. Background Art

[0002] Manufacturing not only affects the direction of the national economy, but is also inseparable from the daily lives of the people. Only when the national manufacturing industry develops in a good trend can other industries operate stably. With the rapid popularization of the industrial Internet platform system in more than 40 major categories of the national economy, the scale of the industry has also exceeded the trillion-yuan level. Manufacturing companies are rapidly advancing in the construction of smart factories using digitalization, networking, and intelligence. Discrete manufacturing companies use new technologies and new theories to complete the iteration and update of factory workshops, improve the manufacturing efficiency of factory workshops, and reduce production costs. This is the only way for enterprises to survive and develop.

[0003] In the traditional factory production line production process, the transportation of production materials is often done by operators using tools such as carts and forklifts to push production materials from the warehouse to the production site. Since the warehouse requires dedicated staff to manage the entry and exit of production materials, this will lead to reduced efficiency in the transportation of production materials. On the other hand, due to the different work sites, the distribution of production materials varies, and operators are prone to errors during the distribution process, further affecting the production efficiency of the production line. With the development of factory intelligence, more and more intelligent robots are entering factory workshops to replace human labor. However, the current smart factories generally have the problem of untimely robot scheduling, which leads to abnormal production line materials and reduced production efficiency. Summary of the invention

[0004] In order to solve the above-mentioned problems existing in the prior art, the present invention provides a multi-modal intelligent robot collaborative scheduling system and method, which obtains production line operation data and robot information, constructs a probability distribution function of the production progress according to the production line operation data, predicts the production progress according to the probability distribution function to obtain the material shortage prediction time and generates material transportation task information, sorts the material transportation task information according to the material shortage prediction time and by locking the production equipment coordinates and material coordinates to obtain a task sequence, assigns tasks to the robots according to the task sequence and the robot collaboration degree to obtain task assignment information, and the robots perform operations according to the task assignment information, thereby realizing the advance scheduling of production materials, improving production efficiency, improving material transportation efficiency, and further ensuring the stability and smoothness of the production line operation.

[0005] The purpose of the present invention can be achieved through the following technical solutions:

[0006] A multi-modal intelligent robot collaborative scheduling method specifically includes the following steps:

[0007] S1: Acquire production line operation data and robot information, wherein the robot information includes information about tasks to be performed;

[0008] S2: constructing a probability distribution function of the production progress according to the production line operation data, predicting the production progress according to the probability distribution function to obtain a material shortage prediction time, and generating material transportation task information;

[0009] S3: According to the material shortage prediction time, and by locking the production equipment coordinates and the material coordinates, the material transportation task information is sorted to obtain a task sequence;

[0010] S4: Assign tasks to the robots according to the task sequence and the robot collaboration degree to obtain task assignment information, and the robots perform operations according to the task assignment information.

[0011] Preferably, the step S2 specifically includes the following steps:

[0012] S201: The production line operation data includes equipment production efficiency, material demand probability and material remaining quantity;

[0013] S202: Construct a probability distribution function according to the material demand probability, where the probability distribution function is expressed as: Where S(v,t) represents the probability distribution function of the production equipment v in the preset time period t, λ t Represents the Poisson distribution parameter of material demand within the preset time period t, p t represents the material demand probability, k represents the preset parameter, and according to the probability distribution function and the production line operation data, the formula The material shortage prediction time is calculated, wherein Rt represents the material shortage prediction time, S(c, t) represents the probability distribution function, Wi represents the remaining quantity of the material, and Q represents the equipment production efficiency;

[0014] S203: When the material shortage prediction time is less than a preset threshold, the material transportation task information is generated, and the material transportation task information includes a production equipment number and a material number.

[0015] Preferably, the step S3 specifically includes the following steps:

[0016] S301: Obtaining production equipment coordinates and material coordinates according to the material transportation information;

[0017] S302: According to the production equipment coordinates and the material coordinates, combined with the material shortage forecast time, the formula Calculate the task priority factor, where AS(p sj ,p mj) represents the distance between the starting position coordinates and the target position coordinates of task j, p sj represents the starting position coordinates, p mj represents the target position coordinates, θ j represents the task priority factor of task j, t1 represents the material shortage forecast time, t2 represents the current time, (x s ,y s ) represents the coordinates of the production equipment, (x m ,y m ) represents the material coordinates, and the material transportation tasks are sorted in descending order according to the task priority factors to obtain the task sequence.

[0018] Preferably, the step S4 specifically includes the following steps:

[0019] S401: The pending task information includes the total number of pending tasks. According to the pending task information, the total number of pending tasks is calculated by the formula Calculate the cost of the task to be executed and the cost of the task to be accepted, where G i represents the cost of the task to be performed by robot i, H i represents the accepted task cost of robot i, O1 represents the total number of tasks to be performed, O2 represents the total number of tasks in the task sequence, represents the task priority factor of the j-th task, The task priority factor representing the k-th task is obtained according to the cost of the task to be executed, and the second modal set is obtained according to the cost of the accepted task;

[0020] S402: According to the first modal set and the second modal set, obtain a to-be-performed task cost index and an accepted task cost index through range normalization processing, and obtain a robot collaboration degree according to the to-be-performed task cost index and the accepted task cost index;

[0021] S403: When the robot collaboration degree is less than a preset threshold, the corresponding robot is marked as unschedulable; when the robot collaboration degree is greater than the preset threshold, the corresponding robot is marked as schedulable; and the schedulable robots are sorted in descending order according to the robot collaboration degree to obtain a schedulable robot sequence; tasks are assigned according to the task sequence and the schedulable robot sequence to obtain the task assignment information, and the robots perform operations according to the task assignment information.

[0022] Preferably, the range standardization process is as follows:

[0023] According to the cost of the task to be executed and the cost of the task to be accepted, the formula The cost index of the task to be executed and the cost index of the task to be accepted are obtained by processing, among which, represents the cost index of the task to be executed, represents the cost index of the accepted task, G i represents the cost of the task to be executed, G min represents the minimum cost of the task to be executed, G max represents the maximum cost of the task to be executed, H i represents the cost of accepting the task, H min Indicates the minimum cost of accepting the task, H max Indicates the maximum cost of accepting the task;

[0024] The analysis and calculation process of the robot cooperation degree is as follows:

[0025] According to the cost index of the task to be executed and the cost index of the accepted task, the formula The robot cooperation degree is calculated, where A i represents the robot cooperation degree of robot i, α represents the weight factor, represents the cost index of the task to be performed by robot i, represents the cost index of the task accepted by robot i, represents the task balancing factor of robot i.

[0026] A multi-modal intelligent robot collaborative scheduling system, comprising:

[0027] An information collection module, used to obtain production line operation data and robot information, wherein the robot information includes information on tasks to be performed;

[0028] A progress prediction module is used to construct a probability distribution function of the production progress according to the production line operation data, predict the production progress according to the probability distribution function, obtain the material shortage prediction time and generate material transportation task information;

[0029] The task allocation module is used to sort the material transportation task information according to the predicted material shortage time and by locking the production equipment coordinates and the material coordinates to obtain a task sequence, and to allocate tasks to the robots according to the task sequence combined with the robot collaboration degree to obtain task allocation information, and the robots perform operations according to the task allocation information.

[0030] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, a multi-modal intelligent robot collaborative scheduling method as described above is implemented.

[0031] A storage medium containing computer executable instructions, which, when executed by a computer processor, are used to execute a multi-modal intelligent robot collaborative scheduling method as described above.

[0032] The beneficial effects of the present invention are:

[0033] 1. By setting up a progress prediction module, a probability distribution function of the production progress is constructed according to the production line operation data, and the production progress is predicted according to the probability distribution function to obtain the material shortage prediction time. When the material shortage prediction time is less than the preset threshold, the material transportation task information is generated, so as to realize the advance scheduling of production equipment materials, ensure the smoothness and stability of the production line operation, and improve the production efficiency of the production line;

[0034] 2. By setting up a task assignment module, according to the predicted time of material shortage and by locking the production equipment coordinates and material coordinates, the material transportation task information is sorted to obtain the task sequence. According to the task sequence and the robot collaboration degree, tasks are assigned to the robots to obtain task assignment information. The robots perform operations according to the task assignment information, thereby achieving a high match between material transportation tasks and robots and improving the execution efficiency of material transportation tasks. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0036] Figure 1 It is a flow chart of the multi-modal intelligent robot collaborative scheduling method of the present invention. DETAILED DESCRIPTION

[0037] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.

[0038] See also Figure 1 , a multi-modal intelligent robot collaborative scheduling method, specifically comprising the following steps:

[0039] S1: Acquire production line operation data and robot information, wherein the robot information includes information about tasks to be performed;

[0040] S2: constructing a probability distribution function of the production progress according to the production line operation data, predicting the production progress according to the probability distribution function to obtain a material shortage prediction time, and generating material transportation task information;

[0041] S3: According to the material shortage prediction time, and by locking the production equipment coordinates and the material coordinates, the material transportation task information is sorted to obtain a task sequence;

[0042] S4: Assign tasks to the robots according to the task sequence and the robot collaboration degree to obtain task assignment information, and the robots perform operations according to the task assignment information.

[0043] Specifically, the step S2 comprises the following steps:

[0044] S201: The production line operation data includes equipment production efficiency, material demand probability and material remaining quantity;

[0045] S202: Construct a probability distribution function according to the material demand probability, where the probability distribution function is expressed as: Where S(v,t) represents the probability distribution function of the production equipment v in the preset time period t, λ t Represents the Poisson distribution parameter of material demand within the preset time period t, p t represents the material demand probability, k represents the preset parameter, and according to the probability distribution function and the production line operation data, the formula The material shortage time is calculated, where Rt represents the predicted material shortage time, S(v,t) represents the probability distribution function, Wi represents the remaining quantity of the material, and Q represents the equipment production efficiency;

[0046] S203: When the material shortage prediction time is less than a preset threshold, the material transportation task information is generated, and the material transportation task information includes a production equipment number and a material number.

[0047] It should be further explained that the Poisson distribution parameter of material demand refers to the average value of material demand in the preset time period t, and the material demand probability refers to the percentage of the average value of material demand in the preset time period t to the cumulative sum of the average values ​​of material demand in all preset time periods t. By predicting the material shortage prediction time of production equipment, when the material shortage prediction time is less than the preset threshold, the material transportation task information is generated, which realizes the advance scheduling of production equipment materials, ensures the smoothness and stability of production line operation, and improves the production efficiency of the production line.

[0048] Specifically, the step S3 comprises the following steps:

[0049] S301: Obtaining production equipment coordinates and material coordinates according to the material transportation information;

[0050] S302: According to the production equipment coordinates and the material coordinates, combined with the material shortage forecast time, the formula Calculate the task priority factor, where AS(p sj ,p mj ) represents the distance between the starting position coordinates and the target position coordinates of task j, p sj represents the starting position coordinates, p mj represents the target position coordinates, θ j represents the task priority factor of task j, t1 represents the material shortage forecast time, t2 represents the current time, (x s ,y s ) represents the coordinates of the production equipment, (x m ,y m ) represents the material coordinates, and the material transportation tasks are sorted in descending order according to the task priority factors to obtain the task sequence.

[0051] It should be further explained that the task sequence is expressed as: PR = [U 1a ,U 2b ,U 3c ,...,U nd ], where PR represents the task sequence, n = 1, 2, 3, ... n, n represents the task sequence number, a, b, c, d represent the task priority factors of the corresponding tasks, and a>b>c>d, U nd Represents a material transportation task with a task number of n and a task priority factor of d.

[0052] Specifically, the step S4 comprises the following steps:

[0053] S401: The pending task information includes the total number of pending tasks. According to the pending task information, the total number of pending tasks is calculated by the formula Calculate the cost of the task to be executed and the cost of the task to be accepted, where G i represents the cost of the task to be performed by robot i, H i represents the accepted task cost of robot i, O1 represents the total number of tasks to be performed, O2 represents the total number of tasks in the task sequence, represents the task priority factor of the j-th task, The task priority factor representing the k-th task is obtained according to the cost of the task to be executed, and the second modal set is obtained according to the cost of the accepted task;

[0054] S402: According to the first modal set and the second modal set, obtain a to-be-performed task cost index and an accepted task cost index through range normalization processing, and obtain a robot collaboration degree according to the to-be-performed task cost index and the accepted task cost index;

[0055] S403: When the robot collaboration degree is less than a preset threshold, the corresponding robot is marked as unschedulable; when the robot collaboration degree is greater than the preset threshold, the corresponding robot is marked as schedulable; and the schedulable robots are sorted in descending order according to the robot collaboration degree to obtain a schedulable robot sequence; tasks are assigned according to the task sequence and the schedulable robot sequence to obtain the task assignment information, and the robots perform operations according to the task assignment information.

[0056] It should be further explained that the total number of tasks to be executed represents the number of tasks that the robot was last assigned and not completed at the current time, and the total number of tasks in the task sequence represents the number of material transportation tasks obtained by predicting the material shortage time at the current time. The first modal set is expressed as: YU = [θ x1 ,θ x2 ,θ x3 ,...,θ xm ], where YU represents the first modal set, θ xm represents the task cost to be executed of task xm, and the second modal set is expressed as: BN = [θ x1 ,θ x2 ,θ x3 ,...,θ xs ], where BN represents the first modal set, θ xs Represents the accepted task cost of task xs.

[0057] Specifically, the range standardization process is as follows:

[0058] According to the cost of the task to be executed and the cost of the task to be accepted, the formula The cost index of the task to be executed and the cost index of the task to be accepted are obtained by processing, among which, represents the cost index of the task to be executed, represents the cost index of the accepted task, G i represents the cost of the task to be executed, G min represents the minimum cost of the task to be executed, G max represents the maximum cost of the task to be executed, H i represents the cost of accepting the task, H min Indicates the minimum cost of accepting the task, H max Indicates the maximum cost of accepting the task;

[0059] The analysis and calculation process of the robot cooperation degree is as follows:

[0060] According to the cost index of the task to be executed and the cost index of the accepted task, the formula The robot cooperation degree is calculated, where A i represents the robot cooperation degree of robot i, α represents the weight factor, represents the cost index of the task to be performed by robot i, represents the cost index of the task accepted by robot i, represents the task balancing factor of robot i.

[0061] It should be further explained that the task sequence is to sort the material transportation tasks according to the task priority factor, and the dispatchable robot sequence is to sort the robots according to the robot collaboration degree. Since the larger the task priority factor, the higher the task priority, and the larger the robot collaboration degree, the higher the robot's task-bearing capacity. When tasks are assigned, tasks with higher priorities are assigned to robots with higher task-bearing capacity.

[0062] A multi-modal intelligent robot collaborative scheduling system, comprising:

[0063] An information collection module, used to obtain production line operation data and robot information, wherein the robot information includes information on tasks to be performed;

[0064] A progress prediction module is used to construct a probability distribution function of the production progress according to the production line operation data, predict the production progress according to the probability distribution function to obtain a material shortage prediction time, and generate material transportation task information;

[0065] The task allocation module is used to sort the material transportation task information according to the predicted material shortage time and by locking the production equipment coordinates and the material coordinates to obtain a task sequence, and to allocate tasks to the robots according to the task sequence combined with the robot collaboration degree to obtain task allocation information, and the robots perform operations according to the task allocation information.

[0066] Furthermore, the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the multi-modal-based intelligent robot collaborative scheduling method as described above is implemented.

[0067] Furthermore, the present application also provides a storage medium containing computer executable instructions, which, when executed by a computer processor, are used to execute the multi-modal intelligent robot collaborative scheduling method as described above.

[0068] The working principle and use process of the present invention:

[0069] The production line operation data and robot information are obtained through the information collection module, and the probability distribution function of the production progress is constructed according to the production line operation data. The production progress is predicted according to the probability distribution function to obtain the material shortage prediction time and generate material transportation task information. According to the material shortage prediction time, the material transportation task information is sorted by locking the production equipment coordinates and material coordinates to obtain the task sequence. According to the task sequence and the robot collaboration degree, the robot is assigned tasks to obtain the task allocation information, and the robot performs operations according to the task allocation information.

[0070] The computer storage medium of the embodiment of the present invention may adopt any combination of one or more computer-readable media. The computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples (non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in combination with an instruction execution system, device or device.

[0071] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, which carry computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.

[0072] The program code included in the computer-readable medium can be transmitted with any appropriate medium, including but not limited to wireless, wire, optical cable, etc., or any suitable combination of the above. The computer program code for performing the operation of the present invention can be written in one or more programming languages ​​or their combinations, and the programming language includes object-oriented programming languages-such as Java, Smalltalk, C++, and also includes conventional procedural programming languages-such as "C" language or similar programming languages. The program code can be executed completely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on the remote computer, or completely on the remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0073] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A multi-modal intelligent robot collaborative scheduling method, characterized in that: The specific steps include: S1: Acquire production line operation data and robot information, wherein the robot information includes information about tasks to be performed; S2: constructing a probability distribution function of the production progress according to the production line operation data, predicting the production progress according to the probability distribution function to obtain a material shortage prediction time, and generating material transportation task information; S3: According to the material shortage prediction time, and by locking the production equipment coordinates and the material coordinates, the material transportation task information is sorted to obtain a task sequence; S4: Assign tasks to the robots according to the task sequence and the robot collaboration degree to obtain task assignment information, and the robots perform operations according to the task assignment information.

2. The multi-modal intelligent robot collaborative scheduling method according to claim 1, characterized in that: The step S2 specifically includes the following steps: S201: The production line operation data includes equipment production efficiency, material demand probability and material remaining quantity; S202: Construct a probability distribution function according to the material demand probability, where the probability distribution function is expressed as: Where S(v,t) represents the probability distribution function of the production equipment v in the preset time period t, λ t Represents the Poisson distribution parameter of material demand within the preset time period t, p t represents the material demand probability, k represents the preset parameter, and according to the probability distribution function and the production line operation data, the formula The material shortage prediction time is calculated, wherein Rt represents the material shortage prediction time, S(v,t) represents the probability distribution function, Wi represents the remaining quantity of the material, and Q represents the equipment production efficiency; S203: When the material shortage prediction time is less than a preset threshold, the material transportation task information is generated, and the material transportation task information includes a production equipment number and a material number.

3. The multi-modal intelligent robot collaborative scheduling method according to claim 1, characterized in that: The step S3 specifically comprises the following steps: S301: Obtaining production equipment coordinates and material coordinates according to the material transportation information; S302: According to the production equipment coordinates and the material coordinates, combined with the material shortage forecast time, the formula Calculate the task priority factor, where AS(p sj ,p mj ) represents the distance between the starting position coordinates and the target position coordinates of task j, p sj represents the starting position coordinates, p mj represents the target position coordinates, θ j represents the task priority factor of task j, t1 represents the material shortage forecast time, t2 represents the current time, (x s ,y s ) represents the coordinates of the production equipment, (x m ,y m ) represents the material coordinates, and the material transportation tasks are sorted in descending order according to the task priority factors to obtain the task sequence.

4. The multi-modal intelligent robot collaborative scheduling method according to claim 1, characterized in that: The step S4 specifically comprises the following steps: S401: The task information to be executed includes the total number of tasks to be executed. According to the task information to be executed, the total number of tasks to be executed is calculated by the formula Calculate the cost of the task to be executed and the cost of the task to be accepted, where G i represents the cost of the task to be performed by robot i, H i represents the accepted task cost of robot i, O1 represents the total number of tasks to be performed, O2 represents the total number of tasks in the task sequence, represents the task priority factor of the j-th task, The task priority factor representing the k-th task is obtained according to the cost of the task to be executed, and the second modal set is obtained according to the cost of the accepted task; S402: According to the first modal set and the second modal set, obtain a to-be-performed task cost index and an accepted task cost index through range normalization processing, and obtain a robot collaboration degree according to the to-be-performed task cost index and the accepted task cost index; S403: When the robot collaboration degree is less than a preset threshold, the corresponding robot is marked as unschedulable; when the robot collaboration degree is greater than the preset threshold, the corresponding robot is marked as schedulable; and the schedulable robots are sorted in descending order according to the robot collaboration degree to obtain a schedulable robot sequence; tasks are assigned according to the task sequence and the schedulable robot sequence to obtain the task assignment information, and the robots perform operations according to the task assignment information.

5. The multi-modal intelligent robot collaborative scheduling method according to claim 4 is characterized in that: The range standardization process is as follows: According to the cost of the task to be executed and the cost of the task to be accepted, the formula The cost index of the task to be executed and the cost index of the task to be accepted are obtained by processing, among which, represents the cost index of the task to be executed, represents the cost index of the accepted task, G i represents the cost of the task to be executed, G min represents the minimum cost of the task to be executed, G max represents the maximum cost of the task to be executed, H i represents the cost of accepting the task, H min Indicates the minimum cost of accepting the task, H max Indicates the maximum cost of accepting the task; The analysis and calculation process of the robot cooperation degree is as follows: According to the cost index of the task to be executed and the cost index of the accepted task, the formula The robot cooperation degree is calculated, where A i represents the robot cooperation degree of robot i, α represents the weight factor, represents the cost index of the task to be performed by robot i, represents the cost index of the task accepted by robot i, represents the task balancing factor of robot i.

6. A multi-modal intelligent robot collaborative scheduling system, the multi-modal intelligent robot collaborative scheduling system adopts the multi-modal intelligent robot collaborative scheduling method according to claim 1, characterized in that: include: An information collection module, used to obtain production line operation data and robot information, wherein the robot information includes information on tasks to be performed; A progress prediction module is used to construct a probability distribution function of the production progress according to the production line operation data, predict the production progress according to the probability distribution function to obtain a material shortage prediction time, and generate material transportation task information; The task allocation module is used to sort the material transportation task information according to the predicted material shortage time and by locking the production equipment coordinates and the material coordinates to obtain a task sequence, and to allocate tasks to the robots according to the task sequence combined with the robot collaboration degree to obtain task allocation information, and the robots perform operations according to the task allocation information.

7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, it implements a multi-modal intelligent robot collaborative scheduling method as described in any one of claims 1-5.

8. A storage medium containing computer executable instructions, characterized in that: The computer executable instructions, when executed by a computer processor, are used to execute a multi-modal intelligent robot collaborative scheduling method as described in any one of claims 1-5.

Citation Information

Patent Citations

  • Intelligent warehousing multi-robot task allocation method based on self-adaptive task pool

    CN111027875A

  • Manufacturing workshop production material predictive distribution method based on edge intelligence

    CN111932002A

  • Material distribution scheduling method and system considering batching error

    CN112801484A

  • Multi-robot intelligent scheduling method and system based on heterogeneous perception, robot and medium

    CN115860431A

  • Scheduling task generation method and device for unmanned vehicle, and medium

    CN117010626A