Pump station drainage amount control method and related equipment
Through automated water level monitoring and information analysis, combined with flood discharge standards, scientific control of flood discharge at pump stations is achieved, and the problem of unreasonable flood discharge at traditional pump stations is solved, which reduces safety risks and saves labor costs.
Patent Information
- Application Number
- CN202410993336.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
AI Technical Summary
Traditional pump stations have unreasonable and unscientific flood discharge methods in flood disasters, and an automated control method that can adapt to different flood disasters is needed to reduce manual monitoring costs and improve the scientific nature of emissions.
By obtaining the water level information of the target area and the peripheral area, combining meteorological, drainage conditions and geological and geomorphological information, we can determine whether the flood limit water level is reached, and automatically control flood discharge according to preset flood discharge standards, reduce safety risks and improve the rationality and scientificity of emissions. .
It realizes flood discharge without manual real-time monitoring, saves manpower and time costs, improves the scientificity and rationality of flood discharge, and adapts to the needs of different flood disasters.
Smart Images

Figure CN118939015A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pumping stations, and in particular to a method for controlling drainage volume of a pumping station and related equipment. Background Art
[0002] In the rapid urbanization process, the areas on both sides of rivers and streams are constantly occupied. After the land is hardened, the flood convergence is all piped into the rivers and streams, and the pressure on flood control and drainage of rivers and streams has increased dramatically. In today's rapid development, it is difficult and costly to increase the width of rivers and streams to increase the flow area and thus enhance the flow capacity of rivers and streams. Therefore, the use of flood drainage pump stations is becoming more and more popular.
[0003] Traditional pumping stations manually control the discharge volume when discharging flood water. Especially when floods occur, manual monitoring is required around the clock, which is time-consuming and labor-intensive. Although relevant cities control flood discharge by controlling water levels, once the water level reaches the warning line, the pumping station will automatically discharge water to the outside. However, since the specific circumstances of each flood disaster are different, this flood discharge method will also be very irrational and unscientific. Therefore, there is an urgent need for a flood discharge method suitable for various flood disasters. Summary of the invention
[0004] In order to help improve the rationality and scientificity of flood discharge, the present application provides a pump station drainage control method and related equipment.
[0005] In the first aspect, the present application provides a method for controlling the drainage volume of a pump station, which adopts the following technical solution:
[0006] A method for controlling flood discharge volume of a pump station, comprising:
[0007] Obtaining a target water level in a target area, and determining whether the target water level has reached a warning water level;
[0008] If the target water level reaches the warning water level, obtaining a target change of the target water level;
[0009] Based on the target change and the preset time interval, judging whether the target water level can reach the target flood limit water level;
[0010] If the target water level can reach the target flood limit water level, the flood in the target area is discharged to the peripheral area based on the preset flood discharge standard;
[0011] If the target water level cannot reach the target flood limit water level, obtaining the peripheral water level of the peripheral area;
[0012] Determining whether the peripheral water level reaches the peripheral flood limit water level;
[0013] If the peripheral water level does not exceed the peripheral flood limit water level, the flood in the target area is discharged to the peripheral area based on the preset flood discharge standard.
[0014] By adopting the above technical solution, it is judged whether the target water level reaches the warning water level. If it reaches the warning water level, it indicates that the target water level in the target area is already relatively high, and real-time alert is required. The target change of the target water level is continuously obtained. According to the target change, it is judged whether the target water level can reach the flood limit water level within the preset time interval. If it can reach the flood limit water level, it indicates that within the preset time interval, the target water level in the target area will surge to the flood limit water level, causing a greater risk to the safety of life and property of the residents in the target area. Therefore, the flood in the target area is discharged to the peripheral area according to the preset flood discharge standard, thereby reducing the safety risk;
[0015] If the target water level cannot reach the flood limit water level, it means that even if the target water level will increase within the preset time interval, it will still be within a relatively safe range. In order to further determine whether it is necessary and possible to discharge flood water to the peripheral area, the peripheral water level is continued to be obtained and it is determined whether the peripheral water level has reached the flood limit water level. If it has not reached, it means that the peripheral water level is still within a safe range and the peripheral area can continue to accommodate more flood water. Therefore, the flood water in the target area is discharged to the peripheral area according to the preset flood discharge standard, thereby reducing the safety risk in the target area;
[0016] First determine whether the target water level has reached the flood limit. If not, then continue to determine whether the peripheral water level has reached the flood limit. Combine the target water level and the peripheral water level to determine whether it is necessary and possible to discharge flood water to the peripheral area. This not only does not require real-time manual monitoring, which helps save labor and time costs, but also can control flood water discharge according to the actual conditions of the target area and the peripheral area, thereby helping to improve the rationality and scientificity of flood water discharge.
[0017] Optionally, if the target water level reaches the warning water level, the specific steps of obtaining the target change of the target water level include:
[0018] If the target water level reaches the warning water level, obtaining meteorological information in the target area;
[0019] Based on the meteorological information, obtaining rainfall information in the target area;
[0020] Obtain the upstream drainage conditions and downstream drainage conditions corresponding to the target area;
[0021] The target change of the target water level is obtained based on the rainfall information, the upstream drainage condition and the downstream drainage condition.
[0022] Optionally, the specific steps of acquiring the target change of the target water level based on the rainfall information, the upstream drainage condition and the downstream drainage condition include:
[0023] Get the area and unit rainfall of the target area;
[0024] Based on the area of the region and the unit rainfall, obtaining the total rainfall;
[0025] Obtain target water retention in target area;
[0026] Based on the total rainfall and the target water retention amount, obtaining an inflow amount;
[0027] The target change of the target water level is obtained based on the inflow amount, the upstream drainage condition and the downstream drainage condition.
[0028] Optionally, the specific steps of obtaining the target change of the target water level based on the inflow, the upstream drainage condition and the downstream drainage condition include:
[0029] Obtain the upstream water level and downstream water level corresponding to the target area;
[0030] Based on the inflow, the upstream water level and the downstream water level, obtaining the water collection status and drainage status of the target area;
[0031] Determine whether the drainage condition is better than the water collection condition, and generate a determination result;
[0032] Based on the judgment result, the target change of the target water level is obtained.
[0033] Optionally, the specific steps of obtaining the target water retention capacity of the target area include:
[0034] Acquiring geological and geomorphological information and environmental information of the target area;
[0035] Based on the geological and geomorphic information and the environmental information, obtaining a water retention threshold value of a target area;
[0036] Get the current water retention in the target area;
[0037] Based on the current water retention amount and the water retention amount threshold, a target water retention amount is obtained.
[0038] Optionally, the specific steps of obtaining the water retention threshold of the target area based on the geological and geomorphic information and the environmental information include:
[0039] Based on the geological and geomorphic information, obtaining the geological type and water storage engineering information of the target area;
[0040] Based on the geological type, obtain the specific water retention capacity;
[0041] Based on the area of the region and the unit water retention capacity, obtaining a first water retention capacity;
[0042] Based on the water storage project information, obtaining a second water retention capacity;
[0043] Based on the environmental information, obtaining vegetation information;
[0044] Based on the vegetation information, obtaining a third water retention amount;
[0045] The water retention amount threshold is acquired based on the first water retention amount, the second water retention amount, and the third water retention amount.
[0046] Optionally, the specific steps of obtaining the third water retention capacity based on the vegetation information include:
[0047] Based on the vegetation information, obtaining vegetation type and vegetation coverage;
[0048] Based on the vegetation type, obtaining vegetation growth characteristics;
[0049] The third water retention amount is acquired based on the vegetation type, the vegetation growth characteristics, and the vegetation coverage rate.
[0050] In the second aspect, the present application also discloses a pump station drainage control system, which adopts the following technical solution:
[0051] A pump station drainage control system, comprising:
[0052] A first acquisition module is used to acquire a target water level in a target area and determine whether the target water level reaches a warning water level;
[0053] a second acquisition module, wherein if the target water level reaches the warning water level, the second acquisition module is used to acquire a target change of the target water level;
[0054] A first judgment module is used to judge whether the target water level can reach the target flood limit water level based on the target change situation and the preset time interval;
[0055] A first execution module, if the target water level can reach the target flood limit water level, the first execution module is used to discharge the flood in the target area to the peripheral area based on a preset flood discharge standard;
[0056] a third acquisition module, wherein if the target water level cannot reach the target flood limit water level, the third acquisition module is used to acquire the peripheral water level of the peripheral area;
[0057] The second judgment module is used to judge whether the peripheral water level reaches the peripheral flood limit water level;
[0058] The second execution module is used to discharge the flood in the target area to the peripheral area based on the preset flood discharge standard if the peripheral water level does not exceed the peripheral flood limit water level.
[0059] By adopting the above technical solution, it is judged whether the target water level reaches the warning water level. If it reaches the warning water level, it indicates that the target water level in the target area is already relatively high, and real-time alert is required. The target change of the target water level is continuously obtained. According to the target change, it is judged whether the target water level can reach the flood limit water level within the preset time interval. If it can reach the flood limit water level, it indicates that within the preset time interval, the target water level in the target area will surge to the flood limit water level, causing a greater risk to the safety of life and property of the residents in the target area. Therefore, the flood in the target area is discharged to the peripheral area according to the preset flood discharge standard, thereby reducing the safety risk;
[0060] If the target water level cannot reach the flood limit water level, it means that even if the target water level will increase within the preset time interval, it will still be within a relatively safe range. In order to further determine whether it is necessary and possible to discharge flood water to the peripheral area, the peripheral water level is continued to be obtained and it is determined whether the peripheral water level has reached the flood limit water level. If it has not reached, it means that the peripheral water level is still within a safe range and the peripheral area can continue to accommodate more flood water. Therefore, the flood water in the target area is discharged to the peripheral area according to the preset flood discharge standard, thereby reducing the safety risk in the target area;
[0061] First determine whether the target water level has reached the flood limit. If not, then continue to determine whether the peripheral water level has reached the flood limit. Combine the target water level and the peripheral water level to determine whether it is necessary and possible to discharge flood water to the peripheral area. This not only does not require real-time manual monitoring, which helps save labor and time costs, but also can control flood water discharge according to the actual conditions of the target area and the peripheral area, thereby helping to improve the rationality and scientificity of flood water discharge.
[0062] In a third aspect, the present application provides a computer device, which adopts the following technical solution:
[0063] An intelligent terminal comprises a memory and a processor, wherein the memory is used to store a computer program that can be run on the processor, and when the processor loads the computer program, the method of the first aspect is executed.
[0064] By adopting the above technical solution, a computer program is generated based on the method of the first aspect and stored in a memory to be loaded and executed by a processor, thereby manufacturing an intelligent terminal based on the memory and the processor for user convenience.
[0065] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution:
[0066] A computer-readable storage medium stores a computer program, and when the computer program is loaded by a processor, the method of the first aspect is executed.
[0067] By adopting the above technical solution, a computer program is generated based on the method of the first aspect and stored in a computer-readable storage medium so as to be loaded and executed by a processor. The computer-readable storage medium facilitates the readability and storage of the computer program.
[0068] In summary, this application includes the following beneficial technical effects:
[0069] First determine whether the target water level has reached the flood limit. If not, then continue to determine whether the peripheral water level has reached the flood limit. Combine the target water level and the peripheral water level to determine whether it is necessary and possible to discharge flood water to the peripheral area. This not only does not require real-time manual monitoring, which helps save labor and time costs, but also can control flood water discharge according to the actual conditions of the target area and the peripheral area, thereby helping to improve the rationality and scientificity of flood water discharge. BRIEF DESCRIPTION OF THE DRAWINGS
[0070] Figure 1 This is a main flow chart of a method for controlling flood discharge volume of a pump station according to an embodiment of the present application;
[0071] Figure 2 is a flowchart of steps S201 to S204;
[0072] Figure 3 is a flowchart of steps S301 to S305;
[0073] Figure 4 is a flowchart of steps S401 to S404;
[0074] Figure 5 is a flowchart of steps S501 to S504;
[0075] Figure 6 is a flowchart of steps S601 to S607;
[0076] Figure 7 is a flowchart of steps S701 to S703;
[0077] Figure 8 It is a module diagram of a pump station drainage control system according to an embodiment of the present application.
[0078] Description of reference numerals:
[0079] 1. First acquisition module; 2. Second acquisition module; 3. First judgment module; 4. First execution module; 5. Third acquisition module; 6. Second judgment module; 7. Second execution module. DETAILED DESCRIPTION
[0080] In a first aspect, the present application discloses a method for controlling the drainage volume of a pump station.
[0081] Reference Figure 1 , a method for controlling the drainage volume of a pump station, comprising steps S101 to S107:
[0082] Step S101: obtaining a target water level of a target area, and determining whether the target water level reaches a warning water level.
[0083] Specifically, the target area is the area where flood discharge is required, which may be a town or region; the target water level is the water level in the target area. In this embodiment, a water level monitoring department is set up in each area, and the water level monitoring department selects the water levels of relevant rivers or lakes in the target area to represent the target water level of the target area; the warning water level refers to the water level at which a dangerous situation may occur in the river section when the water level of a river, lake or lake rises. In this embodiment, the warning water level refers to the water level at which there may be safety risks in the target area.
[0084] Step S102: If the target water level reaches the warning water level, the target change of the target water level is obtained.
[0085] Specifically, in this embodiment, the target change condition is the change condition of the target water level, such as when the water level rises or when the water level drops.
[0086] Step S103: Based on the target change situation and the preset time interval, determine whether the target water level can reach the target flood limit water level.
[0087] Specifically, the preset time interval is a pre-set time interval. In this embodiment, the preset time interval can be 2 hours after the current time node, or other times can be set according to actual conditions and user needs; the target flood limit water level is the flood limit water level of the target area. In order to prevent possible floods in the target area and ensure the safety of the dam and downstream, the upper limit water level allowed for water storage during the flood season. In this embodiment, the target flood limit water level refers to the water level in the target area that presents a greater safety risk.
[0088] Step S104: If the target water level can reach the target flood limit water level, the flood in the target area is discharged to the peripheral area based on the preset flood discharge standard.
[0089] Specifically, the preset flood discharge standard is a pre-set standard for controlling flood discharge, and the peripheral area is the urban peripheral area corresponding to the target area. In this embodiment, the peripheral area refers to the area where the target area discharges flood.
[0090] Step S105: If the target water level cannot reach the target flood limit water level, the peripheral water level of the peripheral area is obtained.
[0091] Specifically, the peripheral water level refers to the water level of the peripheral area. In this embodiment, the peripheral water level refers to the water level of the flood drainage area of the target area.
[0092] Step S106: Determine whether the peripheral water level reaches the peripheral flood limit water level.
[0093] Specifically, the outer flood limit water level refers to the flood limit water level in the outer area. It is the upper limit water level allowed for water storage during the flood season to prevent possible flood backflow or other situations in the outer area and ensure the safety of the dam and downstream. In this embodiment, the outer flood limit water level refers to the water level in the outer area where there is a greater safety risk.
[0094] Step S107: If the peripheral water level does not exceed the peripheral flood limit water level, the flood in the target area is discharged to the peripheral area based on the preset flood discharge standard.
[0095] Specifically, in this embodiment, if the peripheral water level exceeds the peripheral flood limit water level, it indicates that the peripheral water level has also reached the critical value. Therefore, before the target water level in the target area reaches the target flood limit water level, no flood water will be discharged to the peripheral area.
[0096] The pump station drainage control method provided in the present embodiment determines whether the target water level has reached the warning water level. If it has reached the warning water level, it indicates that the target water level in the target area is already relatively high and real-time alert is required. The target change of the target water level continues to be obtained. According to the target change, it is determined whether the target water level can reach the flood limit water level within the preset time interval. If it can reach the flood limit water level, it indicates that within the preset time interval, the target water level in the target area will surge to the flood limit water level, posing a greater risk to the safety of life and property of the residents in the target area. Therefore, the flood in the target area is discharged to the surrounding area according to the preset flood discharge standard, thereby reducing the safety risk.
[0097] If the target water level cannot reach the flood limit water level, it means that even if the target water level will increase within the preset time interval, it will still be within a relatively safe range. In order to further determine whether it is necessary and possible to discharge flood water to the peripheral area, the peripheral water level will continue to be obtained and determined whether the peripheral water level has reached the flood limit water level. If not, it means that the peripheral water level is still within a safe range and the peripheral area can continue to accommodate more floods. Therefore, the flood in the target area is discharged to the peripheral area according to the preset flood discharge standards, thereby reducing the safety risk in the target area.
[0098] First determine whether the target water level has reached the flood limit. If not, then continue to determine whether the peripheral water level has reached the flood limit. Combine the target water level and the peripheral water level to determine whether it is necessary and possible to discharge flood water to the peripheral area. This not only does not require real-time manual monitoring, which helps save labor and time costs, but also can control flood water discharge according to the actual conditions of the target area and the peripheral area, thereby helping to improve the rationality and scientificity of flood water discharge.
[0099] Reference Figure 2 In one implementation of this embodiment, if the target water level reaches the warning water level in step S102, the specific steps of obtaining the target change of the target water level include steps S201 to S204:
[0100] Step S201: If the target water level reaches the warning water level, the meteorological information in the target area is obtained.
[0101] Specifically, in this embodiment, the meteorological information refers to the weather information corresponding to the target area, including rainfall information and the like.
[0102] Step S202: Based on the meteorological information, obtain rainfall information in the target area.
[0103] Specifically, in this embodiment, the rainfall information refers to information related to rainfall in the target area, including rainfall time and rainfall amount.
[0104] Step S203: Obtaining the upstream drainage status and the downstream drainage status corresponding to the target area.
[0105] Specifically, in this embodiment, the upstream drainage condition refers to the drainage condition of the upstream area of the river in the target area used to characterize the target water level, including the flow rate to the target area per hour; the downstream drainage condition refers to the drainage condition of the downstream area of the river in the target area used to characterize the target water level, including the drainage volume that can accommodate the flow rate of the target area per hour, etc.
[0106] Step S204: based on rainfall information, upstream drainage conditions and downstream drainage conditions, obtain target changes in target water levels.
[0107] The pump station drainage control method provided in this embodiment obtains rainfall information based on the meteorological information in the target area, and then obtains the upstream drainage status and the downstream drainage status based on the rainfall information, and finally calculates the target change of the target water level based on the rainfall information, the upstream drainage status and the downstream drainage status; combining the rainfall information of the target area and the upstream drainage status and the downstream drainage status helps to know whether the flood in the target area will continue to increase and whether the flood in the target area can be discharged smoothly, thereby helping to know the change of the target water level.
[0108] Reference Figure 3 In one implementation of this embodiment, the specific steps of obtaining the target change of the target water level based on the rainfall information, the upstream drainage condition and the downstream drainage condition in step S204 include steps S301 to S305:
[0109] Step S301: Obtain the area and unit rainfall of the target area.
[0110] Specifically, the regional area is the area of the target area; the unit rainfall is the rainfall per unit time and per unit area. In this embodiment, the target area is divided into several unit areas according to the unit area, and the rainfall per unit time in each unit area is the unit rainfall of the area.
[0111] Step S302: Obtain the total rainfall based on the regional area and unit rainfall.
[0112] Specifically, in this embodiment, the total rainfall is the sum of all unit rainfalls within a preset time interval.
[0113] Step S303: Obtain the target water retention capacity of the target area.
[0114] Specifically, in this embodiment, the target water retention amount is the amount of water that can be absorbed or stored in the target area.
[0115] Step S304: based on the total rainfall and the target water conservation amount, the inflow amount is obtained.
[0116] Specifically, the inflow refers to the amount of water flowing into the river representing the target water level. In this embodiment, the inflow is the total rainfall minus the target water retention amount.
[0117] Step S305: Based on the inflow, upstream drainage conditions and downstream drainage conditions, the target change of the target water level is obtained.
[0118] Specifically, in this embodiment, the target change of the target water level is obtained according to the amount of the inflow.
[0119] The pump station drainage control method provided in this embodiment calculates the total rainfall based on the unit rainfall and regional area, then obtains the target water retention volume, calculates the inflow volume through the target water retention volume and total rainfall, and finally estimates the target change of the target water level based on the inflow volume, upstream drainage conditions and downstream drainage conditions.
[0120] Reference Figure 4 In one implementation of this embodiment, the specific steps of obtaining the target change of the target water level based on the inflow, the upstream drainage condition and the downstream drainage condition in step S305 include steps S401 to S404:
[0121] Step S401: Obtain the upstream water level and the downstream water level corresponding to the target area.
[0122] Specifically, in this embodiment, the upstream water level is used to characterize the water level of the upstream area of the river corresponding to the target water level of the target area; the downstream water level is used to characterize the water level of the downstream area of the river corresponding to the target water level of the target area.
[0123] Step S402: Based on the inflow, upstream water level and downstream water level, the water collection and drainage conditions of the target area are obtained.
[0124] Specifically, in this embodiment, the water flow condition, i.e., the water flow into the target area, is used to characterize the situation of the target water level river, including the water flow condition of the upstream area and the other water flow conditions flowing into the river in the target area; the drainage condition is the condition of the target area discharging flood water to the downstream area.
[0125] Step S403: determine whether the drainage condition is better than the water collection condition, and generate a determination result.
[0126] Specifically, in this embodiment, it is determined whether the drainage condition is better than the water collection condition, that is, whether the amount of water discharged from the river is more than the amount of water collected into the river. If so, the drainage condition is determined to be better than the water collection condition; if not, the water collection condition is determined to be better than the drainage condition; the judgment results include the drainage condition being better than the water collection condition and the water collection condition being better than the drainage condition.
[0127] Step S404: Based on the judgment result, the target change of the target water level is obtained.
[0128] Specifically, in this embodiment, the corresponding target change situation is obtained according to the judgment result.
[0129] The pump station drainage control method provided in this embodiment obtains the upstream water level and the downstream water level, and obtains the water collection condition and the drainage condition based on the inflow amount, the upstream water level and the downstream water level, judges whether the drainage condition is better than the water collection condition, and generates a judgment result, and finally obtains the target change of the target water level based on the judgment result.
[0130] Reference Figure 5 In one implementation of this embodiment, the specific steps of step S303 to obtain the target water retention capacity of the target area include steps S501 to S504:
[0131] Step S501: Acquire geological and geomorphological information and environmental information of the target area.
[0132] Specifically, in this embodiment, the geological and geomorphic information includes the geological type and geomorphic conditions of the target area; the environmental information includes the vegetation types and coverage conditions of different types of vegetation in the target area.
[0133] Step S502: Based on the geological and geomorphological information and environmental information, the water retention threshold of the target area is obtained.
[0134] Specifically, in this embodiment, the water retention threshold is the maximum amount of water that can be absorbed and stored in the target area.
[0135] Step S503: Obtain the current water retention capacity of the target area.
[0136] Specifically, in this embodiment, the current water retention amount is the amount of water that has been absorbed and stored in the target area at the current time node.
[0137] Step S504: based on the current water retention amount and the water retention amount threshold, obtain the target water retention amount.
[0138] Specifically, in this embodiment, the target water retention amount is the difference between the water retention amount threshold and the current water retention amount.
[0139] The pump station drainage control method provided in this embodiment calculates the water retention threshold of the target area based on the geological and geomorphic information and environmental information of the target area, then obtains the current water retention, and finally calculates the target water retention based on the water retention threshold and the current water retention.
[0140] Reference Figure 6 In one implementation of this embodiment, step S502 obtains the water retention threshold of the target area based on the geological and geomorphic information and the environmental information, and the specific steps include steps S601 to S607:
[0141] Step S601: Based on the geological and geomorphological information, the geological type and water storage project information of the target area are obtained.
[0142] Specifically, geological types include rocks, sand, and soil, and in this embodiment, the composition ratio of different geological types is also included, for example, rocks account for 20%, sand accounts for 20%, soil accounts for 50%, and other types account for 10%, etc.; the water storage project information includes relevant information of the projects that can be stored in the target area, including the number of water storage projects and the water storage capacity and location of different water storage projects.
[0143] Step S602: Based on the geological type, obtain unit water retention capacity.
[0144] Specifically, the amount of water absorbed per unit area by different geological types is preset, and the absorption amount is the unit water retention amount. In this embodiment, the average water retention amount is calculated based on the proportion of different geological types in the target area and the water absorption capacity of different geological types. Therefore, the water retention amount per unit area is consistent regardless of whether the geological types are the same.
[0145] Step S603: Obtain a first water retention capacity based on the regional area and the unit water retention capacity.
[0146] Specifically, in this embodiment, the first water retention capacity is the sum of all unit water retention capacities, that is, the amount of water absorbed by different geological types in the target area, such as rock, sand, and soil.
[0147] Step S604: Based on the water storage project information, obtain the second water retention capacity.
[0148] Specifically, in this embodiment, the second water retention capacity is the sum of the water that can be stored in all water storage projects.
[0149] Step S605: Acquire vegetation information based on the environmental information.
[0150] Specifically, in this embodiment, the vegetation information includes vegetation types and coverage rates of different vegetation.
[0151] Step S606: Based on the vegetation information, obtain the third water retention amount.
[0152] Specifically, in this embodiment, the third water retention amount is the amount of water absorbed by all vegetation in the target area.
[0153] Step S607: obtaining a water retention threshold based on the first water retention amount, the second water retention amount, and the third water retention amount.
[0154] Specifically, in this embodiment, the water retention threshold is the sum of the first water retention amount, the second water retention amount, and the third water retention amount.
[0155] The pump station drainage control method provided in this embodiment calculates the first water retention capacity, the second water retention capacity and the third water retention capacity respectively, and then calculates the sum of the first water retention capacity, the second water retention capacity and the third water retention capacity to calculate the water retention capacity threshold.
[0156] Reference Figure 7 In one implementation of this embodiment, step S606 obtains the third water retention capacity based on vegetation information, and the specific steps include steps S701 to S703:
[0157] Step S701: Based on vegetation information, obtain vegetation type and vegetation coverage.
[0158] Specifically, the vegetation type refers to the main type of vegetation in the target area; and the vegetation coverage rate refers to the coverage rate of different types of vegetation in the target area.
[0159] Step S702: based on the vegetation type, obtaining vegetation growth characteristics.
[0160] Specifically, in this embodiment, the vegetation growth characteristics are the characteristics of vegetation growth, including water preference or water aversion.
[0161] Step S703: Obtain a third water retention amount based on vegetation type, vegetation growth characteristics, and vegetation coverage.
[0162] Specifically, in this embodiment, the water absorption capacity and absorption amount of vegetation of different types and different growth characteristics per unit area are preset, so the third water retention amount can be calculated according to the vegetation type, vegetation growth characteristics and vegetation coverage.
[0163] The pump station drainage control method provided in this embodiment obtains vegetation type and vegetation coverage rate based on vegetation information, and then obtains vegetation growth characteristics based on vegetation type, and finally obtains the third water retention amount based on vegetation type, vegetation growth characteristics and vegetation coverage rate.
[0164] In a second aspect, the present application also discloses a pump station drainage control system.
[0165] Reference Figure 8 , a pump station drainage control system, comprising:
[0166] The first acquisition module is used to acquire the target water level of the target area and determine whether the target water level reaches the warning water level;
[0167] The second acquisition module is used to acquire the target change of the target water level if the target water level reaches the warning water level;
[0168] The first judgment module is used to judge whether the target water level can reach the target flood limit water level based on the target change situation and the preset time interval;
[0169] The first execution module is used to discharge the flood in the target area to the peripheral area based on the preset flood discharge standard if the target water level can reach the target flood limit water level;
[0170] The third acquisition module is used to acquire the peripheral water level of the peripheral area if the target water level cannot reach the target flood limit water level;
[0171] The second judgment module is used to judge whether the peripheral water level reaches the peripheral flood limit water level;
[0172] The second execution module is used to discharge the flood in the target area to the peripheral area based on the preset flood discharge standard if the peripheral water level does not exceed the peripheral flood limit water level.
[0173] In a third aspect, an embodiment of the present application discloses an intelligent terminal, including a memory and a processor, wherein the memory is used to store a computer program that can be run on the processor, and when the processor loads the computer program, a method for controlling the drainage volume of a pump station according to the above embodiment is executed.
[0174] In a fourth aspect, an embodiment of the present application discloses a computer-readable storage medium, and a computer program is stored in the computer-readable storage medium, wherein when the computer program is loaded by a processor, a method for controlling drainage volume of a pump station of the above embodiment is executed.
[0175] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for controlling flood discharge from a pump station, characterized in that: include: Obtaining a target water level in a target area, and determining whether the target water level has reached a warning water level; If the target water level reaches the warning water level, obtaining a target change of the target water level; Based on the target change and the preset time interval, judging whether the target water level can reach the target flood limit water level; If the target water level can reach the target flood limit water level, the flood in the target area is discharged to the peripheral area based on the preset flood discharge standard; If the target water level cannot reach the target flood limit water level, obtaining the peripheral water level of the peripheral area; Determining whether the peripheral water level reaches the peripheral flood limit water level; If the peripheral water level does not exceed the peripheral flood limit water level, the flood in the target area is discharged to the peripheral area based on the preset flood discharge standard.
2. A method for controlling flood discharge from a pumping station according to claim 1, characterized in that: If the target water level reaches the warning water level, the specific steps of obtaining the target change of the target water level include: If the target water level reaches the warning water level, obtaining meteorological information in the target area; Based on the meteorological information, obtaining rainfall information in the target area; Obtain the upstream drainage conditions and downstream drainage conditions corresponding to the target area; The target change of the target water level is obtained based on the rainfall information, the upstream drainage condition and the downstream drainage condition.
3. A method for controlling flood discharge from a pumping station according to claim 2, characterized in that: The specific steps of obtaining the target change of the target water level based on the rainfall information, the upstream drainage condition and the downstream drainage condition include: Get the area and unit rainfall of the target area; Based on the area of the region and the unit rainfall, obtaining the total rainfall; Obtain target water retention in target area; Based on the total rainfall and the target water retention amount, obtaining an inflow amount; The target change of the target water level is obtained based on the inflow amount, the upstream drainage condition and the downstream drainage condition.
4. A method for controlling flood discharge from a pumping station according to claim 3, characterized in that: The specific steps of obtaining the target change of the target water level based on the inflow, the upstream drainage condition and the downstream drainage condition include: Obtain the upstream water level and downstream water level corresponding to the target area; Based on the inflow, the upstream water level and the downstream water level, obtaining the water collection status and drainage status of the target area; Determine whether the drainage condition is better than the water collection condition, and generate a determination result; Based on the judgment result, the target change of the target water level is obtained.
5. A method for controlling flood discharge from a pumping station according to claim 3, characterized in that: The specific steps of obtaining the target water retention capacity of the target area include: Acquiring geological and geomorphological information and environmental information of the target area; Based on the geological and geomorphic information and the environmental information, obtaining a water retention threshold value of a target area; Get the current water retention in the target area; Based on the current water retention amount and the water retention amount threshold, a target water retention amount is obtained.
6. A method for controlling flood discharge from a pumping station according to claim 5, characterized in that: The specific steps of obtaining the water retention threshold of the target area based on the geological and geomorphic information and the environmental information include: Based on the geological and geomorphic information, obtaining the geological type and water storage engineering information of the target area; Based on the geological type, obtain the specific water retention capacity; Based on the area of the region and the unit water retention capacity, obtaining a first water retention capacity; Based on the water storage project information, obtaining a second water retention capacity; Based on the environmental information, obtaining vegetation information; Based on the vegetation information, obtaining a third water retention amount; The water retention amount threshold is acquired based on the first water retention amount, the second water retention amount, and the third water retention amount.
7. A method for controlling flood discharge from a pumping station according to claim 6, characterized in that: The specific steps of obtaining the third water retention amount based on the vegetation information include: Based on the vegetation information, obtaining vegetation type and vegetation coverage; Based on the vegetation type, obtaining vegetation growth characteristics; The third water retention amount is acquired based on the vegetation type, the vegetation growth characteristics, and the vegetation coverage rate.
8. A pump station drainage control system, characterized in that: include: A first acquisition module is used to acquire a target water level in a target area and determine whether the target water level reaches a warning water level; a second acquisition module, wherein if the target water level reaches the warning water level, the second acquisition module is used to acquire a target change of the target water level; A first judgment module is used to judge whether the target water level can reach the target flood limit water level based on the target change situation and the preset time interval; A first execution module, if the target water level can reach the target flood limit water level, the first execution module is used to discharge the flood in the target area to the peripheral area based on a preset flood discharge standard; a third acquisition module, wherein if the target water level cannot reach the target flood limit water level, the third acquisition module is used to acquire the peripheral water level of the peripheral area; The second judgment module is used to judge whether the peripheral water level reaches the peripheral flood limit water level; The second execution module is used to discharge the flood in the target area to the peripheral area based on the preset flood discharge standard if the peripheral water level does not exceed the peripheral flood limit water level.
9. An intelligent terminal, comprising a memory and a processor, characterized in that: The memory is used to store a computer program that can be run on the processor, and when the processor loads the computer program, it executes the method according to any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored therein, characterized in that: When the computer program is loaded by a processor, the method according to any one of claims 1 to 7 is executed.