High-voltage generator and high-voltage generator temperature adjusting method and system
The neural network model predicts the refrigeration level of high-voltage generators, which solves the problem of temperature regulation and extends the service life of the equipment.
Patent Information
- Application Number
- CN202411199374.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-29
AI Technical Summary
The internal temperature of the high-voltage generator is difficult to adjust, resulting in local temperature accumulation and affecting the service life of the equipment.
A neural network model is used to combine temperature detection equipment and gas pressure parameters to predict the refrigeration level and adjust the refrigeration effect to adjust the temperature of the high-pressure generator.
By combining multi-factor prediction and adjustment of the refrigeration effect, the internal temperature of the high-pressure generator is effectively adjusted and the service life of the equipment is extended.
Smart Images

Figure CN118939061A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of high-voltage generators, and in particular to a high-voltage generator, a method and a system for regulating the temperature of the high-voltage generator. Background Art
[0002] At present, UHV transmission substations are developing rapidly. As an indispensable key equipment in the power system, the safe and stable operation of UHV GIS is crucial to the reliability and efficiency of the entire power grid. In order to ensure the normal operation of the equipment and study possible problems, it is necessary to conduct long-term live and partial discharge tests on UHV GIS products. Usually, high-voltage power is provided by a high-voltage generator that can output stable UHV.
[0003] For example, a two-stage voltage regulation controller for a UHV DC generator with publication number CN108258922A includes: a rectifier for rectifying a three-phase AC power supply into a DC power supply; a filter for filtering the DC power supply obtained after rectification; an inverter for converting the filtered DC power supply into AC power; a medium frequency transformer for transforming AC power into high-voltage AC power; and a voltage doubling circuit for rectifying the transformed high-voltage AC power and doubling the voltage into a high-voltage DC output.
[0004] Since high-voltage generators usually operate at high power, a large amount of electrical energy will be converted into heat energy, causing the internal temperature to rise. Even in a stable state, when current passes through components such as coils, heat will still be generated due to resistance, especially in areas with large contact resistance. The structure of the UHV generator is complex and highly enclosed, so it is difficult for heat to be dissipated quickly and effectively, making it difficult to adjust the temperature inside the high-voltage generator, which can easily lead to local temperature accumulation and affect the service life of the high-voltage generator. Summary of the invention
[0005] In order to solve the problem that the temperature in a high-voltage generator is difficult to adjust, which easily leads to local temperature accumulation and affects the service life of the high-voltage generator, the present invention provides a high-voltage generator, a high-voltage generator temperature adjustment method and a system.
[0006] In a first aspect, the present invention provides a method for regulating the temperature of a high-voltage generator, which adopts the following technical solution: A method for regulating the temperature of a high voltage generator comprises the following steps: S1, obtaining the detection temperature of the shell according to the temperature detection device on the shell of the high-voltage generator; Obtain coil parameters and coil current of the high voltage generator and calculate coil temperature; Obtain the gas pressure parameters of the insulating gas in the high voltage generator and calculate the gas temperature; S2, inputting the detected temperature, coil temperature and gas temperature at the current time point into the trained neural network model, and the model outputs the cooling level at the current time point and the predicted cooling level at the next time point; S3, controlling the corresponding refrigeration effect according to the refrigeration level at the current time point and the predicted refrigeration level at the next time point to adjust the temperature of the high voltage generator.
[0007] By adopting the above technical solution, there are many factors that affect the inside of the high-voltage generator. The temperature of multiple factors is predicted, and then the refrigeration effect is adjusted according to the predicted structure, so that the temperature inside the high-voltage generator can be better adjusted and the service life of the high-voltage generator is extended.
[0008] Optionally, obtaining the detected temperature of the housing according to a temperature detection device on the housing of the high-voltage generator includes: Obtain the temperature of the mth temperature measurement point of the shell at the i-th time point based on the temperature measurement sensor , m=1,2,…M, M is the total number of temperature measurement points, i is the time point, and m is the number of temperature measurement points; Set the temperature of the mth temperature measurement point at the i-th time point The corresponding weight , m=1,2,…M, M is the total number of temperature measurement points, i is the time point, and m is the number of temperature measurement points; The detected temperature at the i-th time point The calculation formula is: , i is the time point.
[0009] By adopting the above technical solution, after measuring the temperature of points at multiple positions, weights are configured according to the degree of influence of different positions on the overall high-voltage generator, and the comprehensive detection temperature at a moment is calculated.
[0010] Optionally, in step S1, the coil parameters include coil resistance R, coil thermal conductivity K and coil surface area A, the coil temperature includes primary coil temperature and secondary coil temperature, and the calculation formula of the primary coil temperature at the i-th time point is:
[0011] The calculation formula for the secondary coil temperature at the i-th time point is:
[0012] Where i is the time point, t represents the coil power-on time, is the primary coil temperature at the ith time point, is the primary coil circuit at the ith time point, is the initial primary coil temperature, is the secondary coil temperature at the i-th time point, is the secondary coil circuit at the ith time point, is the initial secondary coil temperature.
[0013] By adopting the above technical solution, the theoretical coil temperature is obtained by calculating based on the heat generated by the coil and the parameters of the coil itself.
[0014] Optionally, in step S1, obtaining the gas pressure parameters of the insulating gas in the high voltage generator and calculating the gas temperature includes: Obtain the initial gas pressure parameter P and the initial gas temperature T; Get the air pressure parameters at the i-th time point , and construct the formula with the initial gas pressure parameter P and the initial gas temperature T:
[0015] Among them, at time point i, V is the volume inside the high voltage generator, is the gas temperature at the i-th time point.
[0016] Optionally, the refrigeration levels include level 0, level 1, level 2, and level 3. Before model training, a judgment rule is established based on the acquired detection temperature, coil temperature, and gas temperature at each time point. The refrigeration level at each time point is judged based on the judgment rule. The specific steps include: Respectively obtaining a first difference between the detection temperature and the coil temperature, a second difference between the gas temperature and the coil temperature, and a third difference between the coil temperature and the gas temperature at each time point; When the detection temperature, coil temperature and gas temperature are all lower than the temperature threshold, the refrigeration level is judged to be zero; When one of the detection temperature, coil temperature and gas temperature is greater than the temperature threshold, and at the same time the difference value associated therewith is less than the difference threshold, the refrigeration level is judged to be level one; When one of the detection temperature, coil temperature and gas temperature is greater than the temperature threshold, and the difference value associated therewith is greater than the difference threshold, or when two of the detection temperature, coil temperature and gas temperature are greater than the temperature threshold, the refrigeration level is judged to be level 2; When the measured temperature, the coil temperature and the gas temperature are all above the temperature threshold and / or the first difference, the second difference and the third difference are all greater than the difference threshold, it is determined that the refrigeration level is level three.
[0017] Optionally, the training process of the neural network model includes: Obtain the historical detection temperature, historical coil temperature and historical gas temperature at all historical time points; Calculate the historical refrigeration levels corresponding to all historical time points according to the refrigeration level judgment rule; Construct a data set of all historical detection temperatures, historical coil temperatures, historical gas temperatures, and historical refrigeration levels, and divide the data set into a training set and a test set; The historical detection temperature, historical coil temperature, and historical gas temperature at a certain historical time point are input into the initial prediction model for training, and the model output is the historical refrigeration level at a certain historical time point and the refrigeration level at the next historical time point; The initial prediction model is tested through the test set, and the predicted cooling level at a certain historical time point and the predicted cooling level at the next historical time point are output; Determine a corresponding loss value based on the predicted cooling level at a certain historical time point and the predicted cooling level at the next historical time point output by the prediction model and the mean square error loss function, and judge whether the loss value is less than a threshold; If it is less than the threshold, stop training and use the initial prediction model as the corresponding prediction model; If it is not less than the threshold, the parameters corresponding to the initial prediction model are corrected based on the loss value, and the prediction model is updated.
[0018] Optionally, the step of controlling the corresponding refrigeration effect to adjust the temperature of the high-voltage generator according to the refrigeration level at the current time point and the predicted refrigeration level at the next time point includes: Determine the magnitude of the cooling level at the current time point and the predicted cooling level at the next time point; When the refrigeration level at the current time point is not less than the predicted refrigeration level at the next time point, the refrigeration level at the current time point is retained to perform refrigeration control corresponding to the refrigeration effect to adjust the temperature of the high-voltage generator; When the refrigeration level at the current time point is less than the predicted refrigeration level at the next time point, the predicted refrigeration level is used to control the corresponding refrigeration effect to adjust the temperature of the high-voltage generator.
[0019] In a second aspect, a high voltage generator temperature regulation system comprises: The detection module obtains the detection temperature of the shell detection point through the temperature detection device in the high-voltage generator, obtains the coil parameters of the high-voltage generator and detects the coil current through the current detection device, and detects the air pressure parameters through the pressure sensor in the high-voltage generator; The processing module is connected to the detection module, and comprehensively determines the refrigeration level corresponding to each historical time point based on the detection temperature, coil temperature and gas temperature obtained at all historical time points; the detection temperature, coil temperature and gas temperature at each time point are input into the neural network model, and the model outputs the refrigeration level at the current time point and the predicted refrigeration level at the next time point, and analyzes the refrigeration level at the current time point and the predicted refrigeration level at the next time point to generate control information; The refrigeration module adjusts the refrigeration level according to the control information to regulate the temperature of the high-voltage generator.
[0020] In a third aspect, a high voltage generator comprises a housing, an iron core, a primary coil, a secondary coil and the above-mentioned temperature adjustment system, wherein the housing is filled with an insulating medium, the iron core is fixedly arranged in the housing, the primary coil is wound on the iron core, a low voltage input port connected to the primary coil is arranged on the housing, the secondary coil is wound around the primary coil, and a high voltage output component connected to the secondary coil is arranged on the housing; The system is arranged on the housing, the temperature detection device comprises a temperature sensor, and the temperature sensor is arranged at a position where a high temperature point is easily generated on the inner wall of the housing; the current detection device and the pressure sensor are both arranged in the housing; The processing module is arranged outside the housing, and the temperature sensor, the current detection device and the pressure sensor are all connected to the processing module through the housing; The refrigeration module includes a controller and a pipeline. A coolant injection port is opened on the shell. The controller is arranged outside the shell and is used to control the injection of coolant from the coolant injection port. One end of the pipeline is connected to the coolant injection port. The pipeline is arranged between the iron core and the primary coil.
[0021] In summary, the present invention has the following beneficial technical effects: the refrigeration levels corresponding to the detected temperature, coil temperature and gas temperature are judged and predicted through the model, and the temperature in the high-voltage generator is adjusted based on the refrigeration effects corresponding to the refrigeration level at the current time point and the refrigeration level at the next time point, so that the temperature in the high-voltage generator can be flexibly adjusted according to demand, which can prevent the occurrence of over-high temperature in advance to a certain extent and extend the service life of the high-voltage generator. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 The present invention is a flow chart of a method for regulating the temperature of a high-voltage generator according to an embodiment of the present invention.
[0023] Figure 2 It is a structural schematic diagram of a high-voltage generator temperature regulation system according to an embodiment of the present invention.
[0024] Figure 3 It is a structural schematic diagram of a high voltage generator according to an embodiment of the present invention.
[0025] Among them, 1. Insulator; 2. High-voltage conductive rod; 3. Secondary coil; 4. Low-voltage input port; 5. Shell; 6. Primary coil; 7. Cooling pipe; 8. Coolant injection port; 9. Iron core. DETAILED DESCRIPTION
[0026] The following is combined with Figure 1-3 The present invention is described in further detail.
[0027] Example 1 Reference Figure 1 A high voltage generator temperature adjustment method according to this embodiment comprises the following steps: S1, obtaining the detection temperature of the shell detection point according to the temperature detection device in the high voltage generator; specifically including: Obtain the temperature of the mth temperature measurement point of the shell at the i-th time point based on the temperature measurement sensor , m=1,2,…M, M is the total number of temperature measurement points, i is the time point, and m is the number of temperature measurement points; Set the temperature of the mth temperature measurement point at the i-th time point The corresponding weight , m=1,2,…M, M is the total number of temperature measurement points, i is the time point, and m is the number of temperature measurement points; The detected temperature at the i-th time point The calculation formula is: , i is the time point.
[0028] The coil parameters and coil current of the high voltage generator are obtained and the coil temperature is calculated; the coil parameters include the coil resistance R, the coil thermal conductivity K and the coil surface area A, and the coil temperature includes the primary coil temperature and the secondary coil temperature. The calculation formula of the primary coil temperature at the i-th time point is:
[0029] The calculation formula for the secondary coil temperature at the i-th time point is:
[0030] Where i is the time point, t represents the coil power-on time, is the primary coil temperature at the ith time point, is the primary coil circuit at the ith time point, is the initial primary coil temperature, is the secondary coil temperature at the i-th time point, is the secondary coil circuit at the ith time point, is the initial secondary coil temperature.
[0031] Obtaining the gas pressure parameters of the insulating gas in the high voltage generator and calculating the gas temperature include: Obtain the initial gas pressure parameter P and the initial gas temperature T; Get the air pressure parameters at the i-th time point , and construct the formula with the initial gas pressure parameter P and the initial gas temperature T:
[0032] Among them, at time point i, V is the volume inside the high voltage generator, is the gas temperature at the i-th time point.
[0033] S2, inputting the detected temperature, coil temperature and gas temperature at the current time point into the trained neural network model, and the model outputs the cooling level at the current time point and the predicted cooling level at the next time point; The refrigeration levels include level 0, level 1, level 2, and level 3. Before model training, a judgment rule is established based on the acquired detection temperature, coil temperature, and gas temperature at each time point. The refrigeration level at each time point is judged based on the judgment rule. The specific steps include: Respectively obtaining a first difference between the detection temperature and the coil temperature, a second difference between the gas temperature and the coil temperature, and a third difference between the coil temperature and the gas temperature at each time point; When the detection temperature, coil temperature and gas temperature are all lower than the temperature threshold, the refrigeration level is judged to be zero; zero level corresponds to no refrigeration; When one of the detection temperature, coil temperature and gas temperature is greater than the temperature threshold, and the difference value associated with it is less than the difference threshold, the refrigeration level is judged to be level 1; at this time, only one of the three temperatures is abnormal, and there is no sudden temperature rise, so a lower refrigeration level is sufficient; When one of the detected temperature, coil temperature and gas temperature is greater than the temperature threshold, and the difference associated with it is greater than the difference threshold, or when two of the detected temperature, coil temperature and gas temperature are greater than the temperature threshold, the refrigeration level is judged to be level two; if two temperatures are abnormal, or one temperature is abnormal and the temperature rises suddenly, a slightly higher refrigeration level is required.
[0034] When the measured temperature, coil temperature and gas temperature are all above the temperature threshold and / or the first difference, the second difference and the third difference are all greater than the difference threshold, the refrigeration level is determined to be level 3. This is a situation where all temperatures are abnormal or there is an abnormal development between all temperatures, so the highest refrigeration level is required to cool down as soon as possible to avoid damaging the high-voltage generator.
[0035] In this embodiment, in the sealed high-voltage generator, the temperature difference between the shell temperature, coil temperature and insulating gas temperature at the same time point may vary due to various factors. However, in general, the coil temperature is often the highest among the three. Due to the Joule heat generated when the current passes through the coil, the coil temperature may be significantly higher than the shell temperature and the insulating gas temperature.
[0036] The temperature difference between the coil temperature and the shell detection temperature is generally between 25-40 degrees Celsius, especially in high-voltage generators with large power and long running time, the temperature difference may be close to 40 degrees Celsius; the high-voltage generator is in a high-load operation state, and according to the internal heat dissipation conditions, the temperature difference between the coil temperature and the insulating gas temperature is in the range of 30-50 degrees Celsius; the temperature difference between the shell detection temperature and the insulating gas temperature is relatively small, which may be between 5-20 degrees Celsius. When the internal heat exchange is relatively uniform, the temperature difference may be between 5-10 degrees Celsius; and in some special cases, such as when the gas flow is not smooth, the temperature difference may expand to 15-20 degrees Celsius.
[0037] Therefore, the first difference threshold between the coil temperature and the shell detection temperature is set to 55 degrees, the second difference threshold between the coil temperature and the gas temperature is set to 65 degrees, and the third difference threshold between the shell detection temperature and the gas temperature is set to 25 degrees.
[0038] The training process of the neural network model includes: Obtain the historical detection temperature, historical coil temperature and historical gas temperature at all historical time points; Calculate the historical refrigeration levels corresponding to all historical time points according to the refrigeration level judgment rule; Construct a data set of all historical detection temperatures, historical coil temperatures, historical gas temperatures, and historical refrigeration levels, and divide the data set into a training set and a test set; The historical detection temperature, historical coil temperature, and historical gas temperature at a certain historical time point are input into the initial prediction model for training, and the model output is the historical refrigeration level at a certain historical time point and the refrigeration level at the next historical time point; The initial prediction model is tested through the test set, and the predicted cooling level at a certain historical time point and the predicted cooling level at the next historical time point are output; Determine a corresponding loss value based on the predicted cooling level at a certain historical time point and the predicted cooling level at the next historical time point output by the prediction model and the mean square error loss function, and judge whether the loss value is less than a threshold; If it is less than the threshold, stop training and use the initial prediction model as the corresponding prediction model; If it is not less than the threshold, the parameters corresponding to the initial prediction model are corrected based on the loss value, and the prediction model is updated.
[0039] S3, controlling the corresponding refrigeration effect according to the refrigeration level at the current time point and the predicted refrigeration level at the next time point to adjust the temperature of the high-voltage generator, the specific steps include: Determine the magnitude of the cooling level at the current time point and the predicted cooling level at the next time point; When the refrigeration level at the current time point is not less than the predicted refrigeration level at the next time point, the refrigeration level at the current time point is retained to perform the refrigeration control and the corresponding refrigeration effect to adjust the temperature of the high-voltage generator; this means that the temperature abnormality at the current time point is greater than the temperature abnormality at the next time point, then the refrigeration effect can be controlled according to the refrigeration level at the current time point.
[0040] When the refrigeration level at the current time point is less than the predicted refrigeration level at the next time point, the predicted refrigeration level is used to control the corresponding refrigeration effect to adjust the temperature of the high-voltage generator. In particular, when the current refrigeration level may be zero and the next refrigeration level is greater than zero, the refrigeration level at the next time point will be used to perform refrigeration treatment on the current time point, which can effectively prevent or mitigate the occurrence of abnormal conditions at the next time point and is conducive to extending the service life of the high-voltage generator.
[0041] Example 2 Reference Figure 2 The difference between this embodiment and embodiment 1 is that this embodiment provides a high voltage generator temperature adjustment system, including: The detection module obtains the detection temperature of the shell detection point through the temperature detection device in the high-voltage generator, obtains the coil parameters of the high-voltage generator and detects the coil current through the current detection device, and detects the air pressure parameters through the pressure sensor in the high-voltage generator; The processing module is connected to the detection module, and comprehensively determines the refrigeration level corresponding to each historical time point based on the detection temperature, coil temperature and gas temperature obtained at all historical time points; the detection temperature, coil temperature and gas temperature at each time point are input into the neural network model, and the model outputs the refrigeration level at the current time point and the predicted refrigeration level at the next time point, and analyzes the refrigeration level at the current time point and the predicted refrigeration level at the next time point to generate control information; The refrigeration module adjusts the refrigeration level according to the control information to regulate the temperature of the high-voltage generator.
[0042] Example 3 Reference Figure 3The difference between this embodiment and embodiment 1 and embodiment 2 is that this embodiment provides a high-voltage generator, including a shell, an iron core, a primary coil, a secondary coil and the above-mentioned temperature adjustment system, the shell is filled with an insulating medium, the insulating medium adopts 0.5MPaSF6 gas, the iron core is fixedly arranged in the shell, the primary coil is wound on the iron core, a low-voltage input port connected to the primary coil is arranged on the shell, the secondary coil is wound around the primary coil, and a high-voltage output component connected to the secondary coil is arranged on the shell; in this embodiment, the high-voltage output component adopts a high-voltage conductive rod and an insulator, the high-voltage conductive rod connects the secondary coil and the insulator, the insulator is embedded in the shell, and the equipment requiring high-voltage power input is connected from here. The low voltage coil is wound with 10*20 copper wire, with 100 turns, a resistance of 0.01Ω, and a low voltage input current of 195A; the high voltage coil adopts a 3-winding structure, used in parallel, and the high voltage winding is wound with 2mm diameter copper wire. The high voltage is induced by the principle of electromagnetic induction. Through U1 / U2=N1 / N2, it is concluded that each coil is wound with 6500 turns, and the resistance of each coil is 100Ω. After the three windings are connected in parallel, the resistance is 33.3Ω. The low voltage input voltage is 0-20kV, the high voltage output voltage is 1300kV, the high voltage output current is 3A, and the maximum capacitive load is 20000pF. The system is set on the shell, and the temperature detection device includes a temperature sensor, which is set on the inner wall of the shell. By simulating the entire high-voltage generator, the corresponding points on the inner wall of the shell that are prone to abnormally high temperatures are found, and the temperature sensors are arranged corresponding to these points; the current detection device and the pressure sensor are both set in the shell; In another embodiment, a temperature measuring optical fiber may also be provided, a gas flow passage is provided in the secondary coil, and the temperature measuring optical fiber is arranged in the gas flow passage of the secondary coil. The abnormal points of the secondary coil are then monitored by the temperature measuring optical fiber, and then analyzed in combination with the calculated theoretical value.
[0043] The processing module is arranged outside the housing, and the temperature measuring optical fiber, the temperature sensor, the current detection device and the pressure sensor are all connected to the processing module through the housing; The refrigeration module includes a controller and a pipeline. A coolant injection port is opened on the shell. The controller is arranged outside the shell and is used to control the coolant to be injected from the coolant injection port. One end of the pipeline is connected to the coolant injection port. The pipeline is arranged between the iron core and the primary coil. The diameter of the pipeline is 20 mm. The pipeline is filled with circulating coolant. The controller is used to control the flow rate and temperature of the coolant so as to dissipate heat from the high-voltage generator and adjust the temperature inside the high-voltage generator.
[0044] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. As for the method disclosed in the embodiment, since it corresponds to the system disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0045] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0046] The above disclosure is only a preferred embodiment of the present invention, but the present invention is not limited thereto. Any non-creative changes that can be thought of by a person skilled in the art, as well as several improvements and modifications made without departing from the principle of the present invention, should fall within the protection scope of the present invention.
Claims
1. A method for regulating the temperature of a high voltage generator, It is characterized in that The following steps are involved: S1, obtaining the detection temperature of the shell according to the temperature detection device on the shell of the high-voltage generator; Obtain coil parameters and coil current of the high voltage generator and calculate coil temperature; Obtain the gas pressure parameters of the insulating gas in the high voltage generator and calculate the gas temperature; S2, inputting the detected temperature, coil temperature and gas temperature at the current time point into the trained neural network model, and the model outputs the cooling level at the current time point and the predicted cooling level at the next time point; S3, controlling the corresponding refrigeration effect according to the refrigeration level at the current time point and the predicted refrigeration level at the next time point to adjust the temperature of the high voltage generator.
2. The high voltage generator temperature adjustment method according to claim 1, It is characterized in that The detection temperature of the shell is obtained according to the temperature detection device on the high-voltage generator shell, including: Obtain the temperature of the mth temperature measurement point of the shell at the i-th time point based on the temperature measurement sensor , m=1,2,…M, M is the total number of temperature measurement points, i is the time point, and m is the number of temperature measurement points; Set the temperature of the mth temperature measurement point at the i-th time point The corresponding weight , m=1,2,…M, M is the total number of temperature measurement points, i is the time point, and m is the number of temperature measurement points; The detected temperature at the i-th time point The calculation formula is: , i is the time point.
3. The high voltage generator temperature adjustment method according to claim 1, It is characterized in that In step S1, the coil parameters include coil resistance R, coil thermal conductivity K and coil surface area A, and the coil temperature includes primary coil temperature and secondary coil temperature. The calculation formula of the primary coil temperature at the i-th time point is: The calculation formula for the secondary coil temperature at the i-th time point is: Where i is the time point, t represents the coil power-on time, is the primary coil temperature at the ith time point, is the primary coil circuit at the ith time point, is the initial primary coil temperature, is the secondary coil temperature at the i-th time point, is the secondary coil circuit at the ith time point, is the initial secondary coil temperature.
4. The high voltage generator temperature adjustment method according to claim 1, It is characterized in that In step S1, obtaining the gas pressure parameters of the insulating gas in the high voltage generator and calculating the gas temperature includes: Obtain the initial gas pressure parameter P and the initial gas temperature T; Get the air pressure parameters at the i-th time point , and construct the formula with the initial gas pressure parameter P and the initial gas temperature T: Among them, at time point i, V is the volume inside the high voltage generator, is the gas temperature at the i-th time point.
5. The high voltage generator temperature adjustment method according to claim 1, It is characterized in that The refrigeration levels include level 0, level 1, level 2, and level 3. Before model training, a judgment rule is established based on the acquired detection temperature, coil temperature, and gas temperature at each time point. The refrigeration level at each time point is judged based on the judgment rule. The specific steps include: Respectively obtaining a first difference between the detection temperature and the coil temperature, a second difference between the gas temperature and the coil temperature, and a third difference between the coil temperature and the gas temperature at each time point; When the detection temperature, coil temperature and gas temperature are all lower than the temperature threshold, the refrigeration level is judged to be zero; When one of the detection temperature, coil temperature and gas temperature is greater than the temperature threshold, and at the same time the difference value associated therewith is less than the difference threshold, the refrigeration level is judged to be level one; When one of the detection temperature, coil temperature and gas temperature is greater than the temperature threshold, and the difference value associated therewith is greater than the difference threshold, or when two of the detection temperature, coil temperature and gas temperature are greater than the temperature threshold, the refrigeration level is judged to be level 2; When the measured temperature, the coil temperature and the gas temperature are all above the temperature threshold and / or the first difference, the second difference and the third difference are all greater than the difference threshold, it is determined that the refrigeration level is level three.
6. The high voltage generator temperature adjustment method according to claim 5, It is characterized in that The training process of the neural network model includes: Obtain the historical detection temperature, historical coil temperature and historical gas temperature at all historical time points; Calculate the historical refrigeration levels corresponding to all historical time points according to the refrigeration level judgment rule; Construct a data set of all historical detection temperatures, historical coil temperatures, historical gas temperatures, and historical refrigeration levels, and divide the data set into a training set and a test set; The historical detection temperature, historical coil temperature, and historical gas temperature at a certain historical time point are input into the initial prediction model for training, and the model output is the historical refrigeration level at a certain historical time point and the refrigeration level at the next historical time point; The initial prediction model is tested through the test set, and the predicted cooling level at a certain historical time point and the predicted cooling level at the next historical time point are output; Determine a corresponding loss value based on the predicted cooling level at a certain historical time point and the predicted cooling level at the next historical time point output by the prediction model and the mean square error loss function, and judge whether the loss value is less than a threshold; If it is less than the threshold, stop training and use the initial prediction model as the corresponding prediction model; If it is not less than the threshold, the parameters corresponding to the initial prediction model are corrected based on the loss value, and the prediction model is updated.
7. The high voltage generator temperature regulation method according to claim 6, It is characterized in that The step of controlling the corresponding refrigeration effect according to the refrigeration level at the current time point and the predicted refrigeration level at the next time point to adjust the temperature of the high-voltage generator includes: Determine the magnitude of the cooling level at the current time point and the predicted cooling level at the next time point; When the refrigeration level at the current time point is not less than the predicted refrigeration level at the next time point, the refrigeration level at the current time point is retained to perform refrigeration control corresponding to the refrigeration effect to adjust the temperature of the high-voltage generator; When the refrigeration level at the current time point is less than the predicted refrigeration level at the next time point, the predicted refrigeration level is used to control the corresponding refrigeration effect to adjust the temperature of the high-voltage generator.
8. A high voltage generator temperature control system, It is characterized in that include: The detection module obtains the detection temperature of the shell detection point through the temperature detection device in the high-voltage generator, obtains the coil parameters of the high-voltage generator and detects the coil current through the current detection device, and detects the air pressure parameters through the pressure sensor in the high-voltage generator; The processing module is connected to the detection module, and comprehensively determines the refrigeration level corresponding to each historical time point based on the detection temperature, coil temperature and gas temperature obtained at all historical time points; The detected temperature, coil temperature and gas temperature at each time point are input into the neural network model, the model outputs the cooling level at the current time point and the predicted cooling level at the next time point, and the cooling level at the current time point and the predicted cooling level at the next time point are analyzed to generate control information; The refrigeration module adjusts the refrigeration level according to the control information to regulate the temperature of the high-voltage generator.
9. A high voltage generator, It is characterized in that The invention comprises a shell, an iron core, a primary coil, a secondary coil and the temperature regulating system according to claim 8, wherein the shell is filled with an insulating medium, the iron core is fixedly arranged in the shell, the primary coil is wound on the iron core, a low-voltage input port connected to the primary coil is arranged on the shell, the secondary coil is wound around the primary coil, and a high-voltage output component connected to the secondary coil is arranged on the shell; The system is arranged on the housing, the temperature detection device comprises a temperature sensor, and the temperature sensor is arranged at a position where a high temperature point is easily generated on the inner wall of the housing; the current detection device and the pressure sensor are both arranged in the housing; The processing module is arranged outside the housing, and the temperature sensor, the current detection device and the pressure sensor are all connected to the processing module through the housing; The refrigeration module includes a controller and a pipeline. A coolant injection port is opened on the shell. The controller is arranged outside the shell and is used to control the injection of coolant from the coolant injection port. One end of the pipeline is connected to the coolant injection port. The pipeline is arranged between the iron core and the primary coil.
Citation Information
Patent Citations
Internal heat radiator used for high-pressure generator of X-ray machine
CN102610475A
Thermal management control method and device, electronic equipment and computer readable storage medium
CN116598660A
Control method and system of data center liquid cooling heat dissipation system
CN118338630A
High voltage power supply cooling device
CN207476103U
High-voltage power supply cooling device
CN216162593U