Enterprise-level reform design scheme processing method and device, computer equipment and medium
By constructing multiple evaluation models and combining data from different research methods, the problem of inaccurate evaluation of enterprise change design plans is solved, the efficiency and accuracy of the execution of change design plans is improved, and the sense of security of employees is enhanced.
Patent Information
- Application Number
- CN202411029797.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-12
AI Technical Summary
During the process of enterprise transformation, the lack of reasonable and efficient research data processing methods has led to inaccurate evaluation of the change plan design, wasted resources and a reduced sense of security for employees.
By obtaining data from multiple research methods, building different evaluation models, combining the first and second scores, determining the scoring ratings of enterprise-level change design plans, and generating corresponding execution strategies to improve the evaluation efficiency and accuracy of change design plans sex.
Accurate analysis and multi-dimensional evaluation of a variety of research data is achieved, and the efficiency and accuracy of the implementation strategy determination of enterprise-level change design solutions is improved, resource waste is reduced, and employee sense of security is enhanced.
Smart Images

Figure CN118940953A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to an enterprise-level transformation design solution method, device, computer equipment and storage medium. Background Art
[0002] With the continuous changes in the external environment of enterprises and the continuous adjustments in the development strategies and organizational structures within enterprises, the complexity and uncertainty factors faced by enterprises have increased, and enterprise changes have become more and more frequent. However, blindly and continuously carrying out enterprise changes will not only consume the limited resources within the enterprise, but will also easily cause varying degrees of reduction in the sense of security and belonging of the employees of the enterprise.
[0003] Moreover, even if the survey data of the masses is collected through surveys and other means, there is no reasonable and efficient way to process the collected survey data. Therefore, when the enterprise changes, it is impossible to accurately understand the actual situation of the masses based on the grassroots survey data, which leads to inaccurate evaluation of the planned design of the enterprise change and unreasonable processing strategies. Summary of the invention
[0004] Based on this, it is necessary to provide an enterprise-level change design solution processing method, device, computer equipment and storage medium that can improve the efficiency and accuracy of enterprise-level change design solution evaluation in response to the above technical problems.
[0005] In a first aspect, a method for processing an enterprise-level change design solution is provided, the method comprising:
[0006] Obtain the target enterprise-level transformation design plan;
[0007] Obtaining first survey result data and second survey result data according to the target enterprise-level change design plan; wherein the first survey result data is survey result data for the target enterprise-level change design plan obtained through the first survey method, and the second survey result data is survey result data for the target enterprise-level change design plan obtained through the second survey method;
[0008] A first score is obtained according to the first survey result data and the first evaluation model, and a second score is obtained according to the second survey result data and the second evaluation model;
[0009] The target scoring level of the target enterprise-level change design solution is determined based on the first scoring and the second scoring, and the corresponding execution strategy is generated based on the target scoring level.
[0010] In some embodiments, a method for constructing a first evaluation model includes: obtaining the survey level of the survey subjects participating in the first survey method; adjusting the weight ratio corresponding to each survey level according to the enterprise-level change design direction; and constructing the first evaluation model according to the weight ratio of each survey level, the number of survey subjects at each survey level, the survey result data of the survey subjects at each survey level, and the weight ratio of each survey level.
[0011] In some embodiments, the construction formula of the first evaluation model includes:
[0012]
[0013] Among them, Q represents the first score of the target enterprise-level change design plan, A is 0 or 1, B, C, D, ..., N represent the number of survey subjects corresponding to each survey level, K1, K2, K3, K4 ..., K n Indicates the weight ratio corresponding to each survey level, B i , C i , D i ,…,N i Indicates the positive survey result data in the first survey result data corresponding to each survey level, K1, K2, K3, K4..., K n The sum of is 1.
[0014] In some embodiments, the construction formula of the second evaluation model includes:
[0015]
[0016] Among them, G represents the second score of the target enterprise-level change design plan, Z represents the total number of survey subjects who participated in the evaluation through the second survey method, and Z i Indicates the positive survey result data in the second survey result data of the survey result data.
[0017] In some embodiments, a target scoring level to which a target enterprise-level change design solution belongs is determined based on a first score and a second score, including: determining a first candidate level of the target enterprise-level change design solution based on the first score; determining a second candidate level of the target enterprise-level change design solution based on the second score; judging whether the level difference between the first candidate level and the second candidate level is greater than a preset level difference threshold; if so, determining the target scoring level to be a rejection level; if not, taking the first candidate level as the target scoring level.
[0018] In some embodiments, determining a first candidate level of a target enterprise-level change design solution based on a first score includes: when the first score is between a first threshold, determining the first candidate level of the target enterprise-level change design solution as a rejected level; when the first score is between a second threshold, determining the first candidate level of the target enterprise-level change design solution as a to-be-optimized level; when the first score is between a third threshold, determining the first candidate level of the target enterprise-level change design solution as a passed level; when the first score is between a fourth threshold, determining the first candidate level of the target enterprise-level change design solution as an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
[0019] In some embodiments, determining a second candidate level of the target enterprise-level change design solution based on the second score includes: when the first score is between the first threshold, determining the first candidate level of the target enterprise-level change design solution as a rejected level; when the first score is between the second threshold, determining the first candidate level of the target enterprise-level change design solution as a to-be-optimized level; when the first score is between the third threshold, determining the first candidate level of the target enterprise-level change design solution as a passed level; when the first score is between the fourth threshold, determining the first candidate level of the target enterprise-level change design solution as an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
[0020] In some embodiments, the target rating level includes at least one of a rejected level, a level to be optimized, a passed level, and an excellent level, and a corresponding execution strategy is generated according to the target rating level, including: in response to the target rating level being a rejected level, marking the target enterprise-level change design plan with a return label and sending a prompt message indicating that the design needs to be redesigned to the design terminal; in response to the target rating level being an optimized level, marking the target enterprise-level change design plan with a return label and sending a prompt message indicating that the design needs to be optimized to the design terminal; in response to the target rating level being a passed level and an excellent level, marking the target enterprise-level change design plan as passed.
[0021] In a second aspect, a device for processing an enterprise-level transformation design solution is provided, the device comprising:
[0022] Enterprise design acquisition module, used to obtain the target enterprise-level transformation design plan;
[0023] A survey data acquisition module is used to acquire first survey result data and second survey result data according to the target enterprise-level change design plan; wherein the first survey result data is the survey result data for the target enterprise-level change design plan obtained through the first survey method, and the second survey result data is the survey result data for the target enterprise-level change design plan obtained through the second survey method;
[0024] A rating prediction module, used to obtain a first rating based on the first survey result data and the first evaluation model, and to obtain a second rating based on the second survey result data and the second evaluation model;
[0025] The grade determination module is used to determine the target grade of the target enterprise-level change design plan according to the first score and the second score, and generate a corresponding execution strategy according to the target grade.
[0026] In a third aspect, a computer device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method of the first aspect when executing the computer program.
[0027] A computer-readable storage medium stores a computer program, which implements the steps of the method of the first aspect when executed by a processor.
[0028] The above-mentioned enterprise-level change design solution processing method, device, computer equipment and storage medium obtain first survey result data for the target enterprise-level change design solution through a first survey method, obtain second survey result data for the target enterprise-level change design solution through a second survey method, and then call the evaluation models for different survey methods to score according to the first survey result data and the second survey result data respectively, and judge the target score level of the target enterprise-level change design solution in combination with the first score obtained by the first evaluation model and the second score obtained by the second evaluation model, and execute the corresponding execution strategy according to the target score level. This solution can reasonably and efficiently analyze the survey data collected through various methods, and accurately evaluate the planned design solutions of enterprise changes based on multiple dimensions, thereby improving the determination efficiency and execution accuracy of the execution strategy of the enterprise-level change design solution. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is an application environment diagram of the enterprise-level change design solution processing method in some embodiments;
[0030] Figure 2 A flowchart of a method for processing an enterprise-level transformation design solution in some embodiments;
[0031] Figure 3 A flowchart of the enterprise-level change design solution processing method in some application examples;
[0032] Figure 4 It is a structural block diagram of an enterprise-level transformation design solution processing device in some embodiments;
[0033] Figure 51 is a diagram of the internal structure of a computer device in some embodiments. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0035] The enterprise-level change design solution processing method provided in this application can be applied to Figure 1 In the application environment shown, the terminal 102 communicates with the server 104 via a network.
[0036] Specifically, the server 104 obtains the target enterprise-level change design plan, and obtains the first survey result data and the second survey result data sent by the terminal 102; wherein the first survey result data is the survey result data for the target enterprise-level change design plan obtained through the first survey method, and the second survey result data is the survey result data for the target enterprise-level change design plan obtained through the second survey method, a first score is obtained according to the first survey result data and the first evaluation model, a second score is obtained according to the second evaluation model and the second evaluation model, a target score level of the target enterprise-level change design plan is determined according to the first score and the second score, and a corresponding execution strategy is generated according to the target score level.
[0037] The terminal 102 may be, but is not limited to, various personal computers, laptop computers, smart phones, tablet computers, and portable wearable devices, and the server 104 may be implemented as an independent server or a server cluster consisting of multiple servers.
[0038] In some embodiments, Figure 2 As shown in the figure, a method for processing enterprise-level change design solutions is provided, which is applied to Figure 1 The server in the example is used to illustrate the following steps:
[0039] Step S202: Obtain a target enterprise-level transformation design plan.
[0040] Among them, the enterprise-level change design plan refers to a series of strategic plans formulated based on the external environment and internal conditions of the enterprise. The target enterprise-level change design plan refers to the enterprise-level change design plan to be evaluated.
[0041] Among them, the formulation of enterprise-level change design plans is a complex and systematic process, which can include the following steps: clarifying change goals, conducting current situation assessments, identifying key issues, formulating change strategies, designing specific plans, organizing implementation teams, communication and training, establishing monitoring mechanisms, adjustment and optimization, and evaluation and summary.
[0042] For example, clarifying the transformation goals is to determine the specific goals that the company hopes to achieve through the transformation; conducting a current situation assessment is to fully understand the current situation of the company, including but not limited to the internal and external environments, the internal environment includes one or more of the company's employee status, the company's equipment production situation and the company's financial situation, and the external environment is but not limited to market conditions, market employment environment and international markets; identifying key issues is to find out the main problems and obstacles that prevent the company from achieving its goals; formulating a transformation strategy is to determine the corresponding transformation strategy based on the problem; designing a specific plan is to plan the specific steps and measures for the transformation in detail; organizing an implementation team is to form a team responsible for implementing the transformation plan; communication and training is to convey the importance of change and the implementation plan to employees, so as to improve the efficiency of the reform plan and provide necessary training; establishing a monitoring mechanism is to track the progress of change, discover and solve problems in a timely manner; adjustment and optimization is to make necessary adjustments and optimizations to the plan based on actual conditions; evaluation and summary is to evaluate the effect of the change, summarize experience and lessons, and provide reference for future improvements.
[0043] Exemplarily, the completed enterprise-level change design plan submitted by the user through the terminal can be directly obtained as the target enterprise-level change design plan, or data can be collected from various stages of the above-mentioned enterprise-level change design plan to generate the target enterprise-level change design plan.
[0044] Step S204: Obtain first survey result data and second survey result data according to the target enterprise-level change design plan; wherein the first survey result data is survey result data for the target enterprise-level change design plan obtained through the first survey method, and the second survey result data is survey result data for the target enterprise-level change design plan obtained through the second survey method.
[0045] The first survey method may be an evaluation method of real-name survey, and the survey subjects may be required to provide all or part of their valid identity information during the survey using the first survey method. The second survey method may be an evaluation method of anonymous survey, and the survey subjects may not be required to provide any valid identity information during the survey using the second survey method.
[0046] Specifically, the target enterprise-level change design plan can be sent to multiple user terminals of the enterprise through the server. Users of the user terminals can evaluate the target enterprise-level change design plan using the first survey method and the second survey method respectively and send the first survey result data and the second survey result data for the target enterprise-level change design plan to the server.
[0047] Step S206: obtaining a first score according to the first survey result data and the first evaluation model, and obtaining a second score according to the second survey result data and the second evaluation model.
[0048] The first evaluation model and the second evaluation model are generated by different construction methods. The first evaluation model is a model used to evaluate the first survey result data, and the second evaluation model is a model used to evaluate the second survey result data.
[0049] Step S208: Determine the target scoring level to which the target enterprise-level change design solution belongs based on the first scoring level and the second scoring level, and generate a corresponding execution strategy based on the target scoring level.
[0050] Specifically, the scores obtained by the two different evaluation models are combined to determine which rating level the target enterprise-level change design plan belongs to, and the rating level it is determined to belong to is used as the target rating level. Among them, the rating levels can be divided in advance according to the needs of enterprise reform, and different rating levels can correspond to different execution tasks. According to the different rated levels determined, the progress of different execution strategies can be responded to quickly and accurately. For example, the rating levels can include rejection level, optimization level, pass level and excellent level, and the execution strategies can include return, pass, instruction modification, etc.
[0051] The above-mentioned enterprise-level change design solution processing method obtains first survey result data for the target enterprise-level change design solution through a first survey method, obtains second survey result data for the target enterprise-level change design solution through a second survey method, and then calls evaluation models for different survey methods to score according to the first survey result data and the second survey result data respectively, and judges the target score level of the target enterprise-level change design solution in combination with the first score obtained by the first evaluation model and the second score obtained by the second evaluation model, and executes the corresponding execution strategy according to the target score level. This solution can reasonably and efficiently analyze the survey data collected through various methods, and accurately evaluate the planned design solutions of enterprise changes based on multiple dimensions, thereby improving the determination efficiency and execution accuracy of the execution strategy of the enterprise-level change design solution.
[0052] In some embodiments, a method for constructing a first evaluation model includes: obtaining the survey level of the survey subjects participating in the first survey method; adjusting the weight ratio corresponding to each survey level according to the enterprise-level change design direction; and constructing the first evaluation model according to the weight ratio of each survey level, the number of survey subjects at each survey level, the survey result data of the survey subjects at each survey level, and the weight ratio of each survey level.
[0053] In this embodiment, the survey result data can be divided into survey levels according to the different levels of the survey objects, and the weight ratios corresponding to different survey levels can be adjusted according to the different enterprise-level change design directions. In this embodiment, by taking a hierarchical survey and assigning different weight ratios to each survey level according to the different enterprise-level change design directions represented by the target enterprise-level change design scheme, the dimension of the enterprise-level change design direction can be integrated into the evaluation system, and the survey result data of each survey level can be more effectively used, so as to more reasonably and effectively obtain the first score that conforms to the enterprise-level change design direction according to the different enterprise-level change design directions, thereby improving the accuracy of the execution strategy.
[0054] Exemplarily, when the target enterprise-level change design plan is related to the strategic prospects of enterprise development, the weight ratio corresponding to the research level of the research object at the decision-making level and the shareholder level (for example, the boss and the shareholder) can be increased. More specifically, the weight ratio of the decision-making level and the shareholder level can be determined by obtaining the share ratio of the decision-making level and the shareholder level and distributing the share ratio differently; when the target enterprise-level change design plan is related to grassroots leaders, the weight ratio corresponding to the research level of the research object at the leadership level (other leaders except the boss and shareholders) can be increased, so as to facilitate the formulation of plans for the leadership according to the leaders; when the target enterprise-level change design plan is related to enterprise scientific research, the weight ratio corresponding to the research level of the research object at the scientific research level (for example, scientific researchers) can be increased; when the target enterprise-level change design plan is related to grassroots personnel, the weight ratio corresponding to the research level of the research object at the employee level (for example, enterprise employees) can be increased, and so on.
[0055] In some embodiments, more specifically, the first evaluation model may be constructed with reference to the following formula:
[0056]
[0057] Among them, Q represents the first score of the target enterprise-level change design plan, A is 0 or 1, B, C, D, ..., N represent the number of survey subjects corresponding to each survey level, K1, K2, K3, K4 ..., K n Indicates the weight ratio corresponding to each survey level, B i, C i , D i ,…,N i Indicates the positive survey result data in the first survey result data corresponding to each survey level, K1, K2, K3, K4..., K n The sum of is 1.
[0058] For example, assuming there are 5 survey levels, the construction formula of the above model is:
[0059]
[0060] In the formula, Q is the first score of the target enterprise-level change design plan, and the value range of Q can be 0 to 1, A is whether the survey subjects of level a agree, and the value of A is 0 and 1, B is the total number of survey subjects of level b, and B i is the number of B-level survey subjects who passed, C is the total number of C-level survey subjects, i is the number of C-level survey subjects who passed, D is the total number of D-level survey subjects, i is the number of people who passed the D-level survey, E is the total number of people who passed the E-level survey, and E i is the number of people who passed the e-level survey object, K1, K2, K3, K4 and K5 are the proportion coefficients (weight ratios) corresponding to the a-level, b-level, c-level, d-level and e-level survey levels respectively, and the sum of K1, K2, K3, K4 and K5 is 1.
[0061] Exemplarily, levels a, b, c, d and e are respectively the boss decision-making level, shareholder level, leadership level, scientific research level, and employee level, and when the coefficient of K1 exceeds 40%, the boss decision-making level has a veto power, and the first score Q obtained by the first survey method (for example, real-name survey) is closely related to the company's decision-making ability.
[0062] In some embodiments, the construction formula of the second evaluation model includes:
[0063]
[0064] Among them, G represents the second score of the target enterprise-level change design plan, Z represents the total number of survey subjects who participated in the evaluation through the second survey method, and Z i The second score G obtained by anonymous survey is highly democratic and can make up for the evaluation loopholes of the first score.
[0065] In some embodiments, a target scoring level to which a target enterprise-level change design solution belongs is determined based on a first score and a second score, including: determining a first candidate level of the target enterprise-level change design solution based on the first score; determining a second candidate level of the target enterprise-level change design solution based on the second score; judging whether the level difference between the first candidate level and the second candidate level is greater than a preset level difference threshold; if so, determining the target scoring level to be a rejection level; if not, taking the first candidate level as the target scoring level.
[0066] In this embodiment, the first candidate level and the second candidate level to which the target enterprise-level change design solution belongs can be determined according to the first score and the second score, respectively, and then the final target score level can be determined by judging the level difference between the first candidate level and the second candidate level. The target score level is at least one of the multiple score levels. Through this embodiment, the rating result corresponding to the first score can be combined with the rating result corresponding to the second score, and by comparing the levels of the two, a more comprehensive evaluation can be performed, and the occurrence of erroneous evaluation can be reduced.
[0067] Exemplarily, the scoring levels may include a rejected level, a level to be optimized, a passed level, and an excellent level, etc. Each scoring level may be divided according to different score ranges.
[0068] In some embodiments, the first candidate level of the target enterprise-level change design solution can be first determined according to the first score, for example: when the first score is between the first threshold, the first candidate level of the target enterprise-level change design solution is determined to be a rejection level; when the first score is between the second threshold, the first candidate level of the target enterprise-level change design solution is determined to be an optimization level; when the first score is between the third threshold, the first candidate level of the target enterprise-level change design solution is determined to be a pass level; when the first score is between the fourth threshold, the first candidate level of the target enterprise-level change design solution is determined to be an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values. The first candidate level is the score level corresponding to the target enterprise plan determined solely based on the first score.
[0069] Exemplarily, the first threshold corresponding to the rejection level can be 0-20%, the second threshold corresponding to the optimization level can be 20%-60%, the third threshold corresponding to the pass level can be 60%-80%, and the fourth threshold corresponding to the excellent level can be 80%-100%. Therefore, according to the level of investigation and evaluation, the situation of enterprise-level change design can be intuitively obtained, and the status of enterprise personnel on the enterprise-level change design plan can be timely understood. When the scoring level of the enterprise-level change design plan is the rejection level, the enterprise-level change design plan will be sent back for redesign. When the scoring level of the enterprise-level change design evaluation plan is the optimization level, the enterprise-level change design plan will be optimized. When the scoring level of the enterprise-level change design plan is the pass level and the excellent level, the enterprise-level change design plan will be implemented.
[0070] It is worth noting that the above-mentioned scoring levels and their corresponding thresholds can be adjusted according to the needs of the enterprise. The above embodiments are only examples and are not intended to be limiting.
[0071] In some embodiments, the second candidate level of the target enterprise-level change design solution can also be determined according to the second score. Specifically, when the first score is between the first threshold, the first candidate level of the target enterprise-level change design solution is determined to be a rejection level; when the first score is between the second threshold, the first candidate level of the target enterprise-level change design solution is determined to be an optimization level; when the first score is between the third threshold, the first candidate level of the target enterprise-level change design solution is determined to be a pass level; when the first score is between the fourth threshold, the first candidate level of the target enterprise-level change design solution is determined to be an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values. Among them, the first candidate level is the score level corresponding to the target enterprise plan determined solely according to the second score.
[0072] Furthermore, it can be determined whether the grade difference between the first candidate grade (the grade corresponding to the first grade Q) and the second candidate grade (the grade corresponding to the second grade G) is greater than a preset grade difference threshold.
[0073] Exemplarily, the rating of Q can be compared with the rating of G. When there is a difference of two levels between the rating of Q and the rating of G, the target enterprise-level change design plan can be directly judged as a rejected level. For example, if the rating of Q is a passed level and the rating of G is a rejected level, there is a difference of two levels between the rating of Q and the rating of G. That is, for example, the level difference threshold is 1, then 2 is greater than 1. Therefore, the target enterprise-level change design plan is directly rated as a rejected level for rejection modification. When the level difference between the rating of Q and the rating of G is within 1 level, for example, the rating of Q is a passed level and the rating of G is a level to be optimized, there is a difference of 1 level between the rating of Q and the rating of G. Therefore, it is not greater than the level difference threshold 1. Therefore, the first candidate level obtained according to the real-name survey result data can be used as the target rating of the target enterprise-level change design plan for processing.
[0074] In some embodiments, the target rating level includes at least one of a rejected level, a level to be optimized, a passed level, and an excellent level, and a corresponding execution strategy is generated according to the target rating level, including: in response to the target rating level being a rejected level, marking the target enterprise-level change design plan with a return label and sending a prompt message indicating that the design needs to be redesigned to the design terminal; in response to the target rating level being an optimized level, marking the target enterprise-level change design plan with a return label and sending a prompt message indicating that the design needs to be optimized to the design terminal; in response to the target rating level being a passed level and an excellent level, marking the target enterprise-level change design plan as passed.
[0075] In this embodiment, different execution strategies may be executed according to the target execution corresponding to the comprehensive scoring result obtained from the survey result data collected by the first survey method and the second survey method, thereby improving the accuracy of the enterprise-level change design.
[0076] Next, the enterprise-level transformation design solution processing method involved in this application is further described in detail with reference to an application example. Figure 3 As shown, the following steps may be specifically included:
[0077] S1: Establish a digital value system based on the asset dynamic value chain model. Specifically, support decision-making, predict and respond to asset changes and needs based on big data and analysis.
[0078] Specifically, the establishment of a digital value system in S1 is to establish data-driven, Internet platform-based, digital transformation, talent training and openness of digital technology. Digital technology enables enterprises to obtain various data and information, driving enterprises to innovate efficiently and quickly. Internet platform-based, digital transformation is the transformation from traditional offline business to online business, from brand communication to customer relationship management, from product design to supply chain integration, disruptive innovation in all aspects, talent training is digital technology for enterprise personnel to obtain new technologies, new concepts and new business models, and to maximize their innovation capabilities in digital transformation. The openness of digital technology is that enterprises need to find breakthroughs in innovative resources, enhance their innovation capabilities, and enhance their core competitiveness and market value. In addition, the establishment of a digital value system is intelligent, and management decisions are transformed from empirical qualitative decisions to data-first quantitative decisions, which improves decision-making efficiency and quality. Intelligent decision-making is the value center of high-quality development of manufacturing enterprises. Its key support is to build an intelligent business operating system. The characteristics of an intelligent business operating system are: intelligence, integration and ecology. Intelligence can accurately grasp customer needs in real time and allocate resources reasonably. Integration is the end-to-end collaborative operation of the vertical and horizontal departments of the enterprise to efficiently solve operational problems and form an integrated management system. Ecology is the sharing of data by enterprises and departments in the vertical and horizontal value chains, with the goal of maximizing overall value and sustainable development, to form an ecological value chain of mutual benefit and cooperation. Agility is to adapt to the ever-changing customer needs, build an agile production and supply system and organizational system, and dynamically lead market development. The intelligent business operating system has four core capabilities: management deployment and security capabilities, visualization capabilities, data model capabilities and intelligent analysis and decision-making capabilities. The intelligent business operating system can collect, integrate, store and analyze various business data, including sales data, customer data, market data, etc. Through data mining and deep learning, the system can discover business opportunities hidden in the data and help enterprises make more informed decisions. The intelligent business operating system can provide enterprises with various decision-making support, such as market forecasting, risk assessment, optimization suggestions, etc. through built-in intelligent algorithms and models. These decision-making supports can help enterprises make faster and more accurate decisions in complex and changing business environments. Building an intelligent business operating system includes building a model library, database, method library and knowledge base management system to solve management problems, so as to achieve process automation, digital operation and intelligent decision-making of enterprises. The decision-making capabilities of the intelligent business operating system include digital recognition capability, digital control capability and digital reconstruction capability. The three decision-making capabilities work together to promote the digital transformation of enterprises through the affiliation between different dimensions and the mutual connection, and promote the re-creation of enterprise value. Digital transformation is an enterprise strategy formed by changes in the business environment caused by the rapid development of digital technology. Decision-making ability is the driving force given to enterprises based on environmental changes. Intelligent decision-making ability improves the business insight of enterprises and provides scientific prediction capabilities for their strategic planning.
[0079] Step S2: Generate a target enterprise-level transformation design plan.
[0080] Specifically, the formulation of a target enterprise-level change design plan may include the following steps: clarifying the change goal, conducting a status quo assessment, identifying key issues, formulating a change strategy, designing a specific plan, organizing an implementation team, communication and training, establishing a monitoring mechanism, adjustment and optimization, and evaluation and summary. Clarifying the change goal is to determine the specific goal that the enterprise expects to achieve through the change. Conducting a status quo assessment is to fully understand the current situation of the enterprise, including but not limited to the internal and external environment. The internal environment includes more than one of the enterprise's employee status, enterprise equipment production status, and enterprise financial status. The external environment includes but is not limited to market conditions, market employment environment, and international markets. Identifying key issues is to find out the main problems and obstacles that prevent the enterprise from achieving its goals. Formulating a change strategy is to determine the corresponding change strategy based on the problem. Designing a specific plan is to plan the specific steps and measures of the change in detail. Organizing an implementation team is to form a team responsible for implementing the change plan. Communication and training is to convey the importance of change and the implementation plan to employees, thereby improving the efficiency of the reform plan and providing necessary training. Establishing a monitoring mechanism is to track the progress of the change, promptly discover and solve problems, and adjust and optimize. According to the actual situation, the plan is to make necessary adjustments and optimizations. Evaluation and summary is to evaluate the effect of the change, summarize the experience and lessons, and provide reference for future improvements.
[0081] S3: Construct the first evaluation model and the second evaluation model.
[0082] Specifically, the evaluation model corresponding to the real-name survey method (the first evaluation model) can divide the enterprise personnel into level A, level B, level C, level D and level E for graded survey. The real-name survey formula is as follows:
[0083]
[0084] In the formula, Q is the first score of the target enterprise-level change design plan, and the value range of Q can be 0 to 1, A is whether the survey subjects of level a agree, and the value of A is 0 and 1, B is the total number of survey subjects of level b, and B i is the number of B-level survey subjects who passed, C is the total number of C-level survey subjects, i is the number of C-level survey subjects who passed, D is the total number of D-level survey subjects, i is the number of people who passed the D-level survey, E is the total number of people who passed the E-level survey, and E iis the number of people who passed the e-level survey, K1, K2, K3, K4 and K5 are the corresponding proportion coefficients (weight ratios) of the survey levels of a, b, c, d and e respectively, and the sum of K1, K2, K3, K4 and K5 is 1. And when the coefficient of K1 exceeds 40%, the boss decision-making level has a veto power, and the first score Q obtained by the first survey method (for example, real-name survey) is closely related to the decision-making ability of the enterprise.
[0085] Specifically, the second evaluation model is an evaluation model corresponding to anonymous survey data, which can be used to conduct anonymous surveys on enterprise personnel. The formula of the second evaluation model is as follows:
[0086]
[0087] Among them, G represents the second score of the target enterprise-level change design plan, and the value range of G is 0 to 1. Z represents the total number of survey subjects who participated in the evaluation through the second survey method. i It represents the number of people who have passed the target enterprise-level change design plan. The result G obtained through anonymous survey is highly democratic.
[0088] S4: Establish a rating scale based on the evaluation model.
[0089] The scoring levels can be divided into rejected, optimized, passed and excellent. The rejected, optimized, passed and excellent levels are related to the values of Q and G. The value of the rejected level is 0-20%, the value of the optimized level is 20%-60%, the value of the passed level is 60%-80%, and the value of the excellent level is 80%-100%. Therefore, according to the scoring levels, the situation of the target enterprise-level change design plan can be intuitively obtained, and the status of enterprise personnel on the target enterprise-level change design plan can be timely understood.
[0090] S5: Obtain the first survey result data and the second survey result data according to the target enterprise-level transformation design plan.
[0091] S6: Obtain a first score according to the first survey result data and the first evaluation model, and obtain a second score according to the second survey result data and the second evaluation model.
[0092] S7: Determine a first candidate level according to the first score, and determine a second candidate level according to the second score.
[0093] S8: Determine whether the level difference between the first candidate level and the second candidate level is greater than a preset level difference threshold. If yes, execute step S10, if no, execute step S9.
[0094] S9: Determine the target scoring level as the rejection level, mark the target enterprise-level change design plan with a return label, and send a prompt message indicating that the plan needs to be redesigned to the design terminal.
[0095] S10: Taking the first candidate grade as the target scoring grade.
[0096] S11: If it is a level to be optimized, the target enterprise-level change design plan is marked with a return label and a prompt message indicating that the design is to be optimized is sent to the design terminal.
[0097] S12: If it is at the passing level or excellent level, the target enterprise-level transformation design plan will be marked as passed.
[0098] S13: If it is a rejection level, the target enterprise-level change design plan is marked with a return label and a prompt message indicating that it needs to be redesigned is sent to the design terminal.
[0099] It should be understood that although Figure 2 and Figure 3 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 2 and Figure 3 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.
[0100] In some embodiments, Figure 4 As shown, an enterprise-level change design solution processing device is provided, including: an enterprise design acquisition module 402, a survey data acquisition module 404, a score prediction module 406 and a level determination module 408, wherein:
[0101] An enterprise design acquisition module 402 is used to acquire a target enterprise-level transformation design plan;
[0102] A survey data acquisition module 404 is used to acquire first survey result data and second survey result data according to the target enterprise-level change design plan; wherein the first survey result data is survey result data for the target enterprise-level change design plan obtained through the first survey method, and the second survey result data is survey result data for the target enterprise-level change design plan obtained through the second survey method;
[0103] A rating prediction module 406, configured to obtain a first rating based on the first survey result data and the first evaluation model, and obtain a second rating based on the second survey result data and the second evaluation model;
[0104] The grade determination module 408 is used to determine the target grade of the target enterprise-level change design solution according to the first grade and the second grade, and generate a corresponding execution strategy according to the target grade.
[0105] In some embodiments, the score prediction module 406 is also used to construct a first evaluation model, specifically used to obtain the survey level of the survey subjects participating in the first survey method; adjust the weight ratio corresponding to each survey level according to the enterprise-level change design direction; and construct the first evaluation model according to the weight ratio of each survey level, the number of survey subjects at each survey level, the survey result data of the survey subjects at each survey level, and the weight ratio of each survey level.
[0106] In some embodiments, the rating prediction module 406 is further used to construct a second evaluation model.
[0107] In some embodiments, the grade determination module 408 is specifically used to determine a first candidate grade of the target enterprise-level change design solution based on a first score; determine a second candidate grade of the target enterprise-level change design solution based on a second score; determine whether the grade difference between the first candidate grade and the second candidate grade is greater than a preset grade difference threshold; if so, determine the target score grade to be a rejection grade; if not, use the first candidate grade as the target score grade.
[0108] In some embodiments, the grade determination module 408 is specifically used to determine that the first candidate grade of the target enterprise-level change design solution is a rejected grade when the first score is between the first threshold; to determine that the first candidate grade of the target enterprise-level change design solution is a to-be-optimized grade when the first score is between the second threshold; to determine that the first candidate grade of the target enterprise-level change design solution is a passed grade when the first score is between the third threshold; and to determine that the first candidate grade of the target enterprise-level change design solution is an excellent grade when the first score is between the fourth threshold; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
[0109] In some embodiments, the grade determination module 408 is specifically used to determine that the first candidate grade of the target enterprise-level change design solution is a rejected grade when the first score is between the first threshold; to determine that the first candidate grade of the target enterprise-level change design solution is a to-be-optimized grade when the first score is between the second threshold; to determine that the first candidate grade of the target enterprise-level change design solution is a passed grade when the first score is between the third threshold; and to determine that the first candidate grade of the target enterprise-level change design solution is an excellent grade when the first score is between the fourth threshold; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
[0110] In some embodiments, in response to the target scoring level being a rejected level, the level determination module 408 marks the target enterprise-level change design plan with a return label and sends a prompt message indicating that the design needs to be redesigned to the design terminal; in response to the target scoring level being an optimized level, the level determination module 408 marks the target enterprise-level change design plan with a return label and sends a prompt message indicating that the design needs to be optimized to the design terminal; in response to the target scoring level being a passed level and an excellent level, the target enterprise-level change design plan is marked as passed.
[0111] For the specific definition of the enterprise-level change design solution processing device, please refer to the definition of the enterprise-level change design solution processing method above, which will not be repeated here. Each module in the above-mentioned enterprise-level change design solution processing device can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0112] In some embodiments, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 5 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for processing an enterprise-level change design solution is implemented.
[0113] Those skilled in the art will understand that Figure 5The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0114] In some embodiments, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program: obtaining a target enterprise-level change design plan; obtaining first survey result data and second survey result data according to the target enterprise-level change design plan; wherein the first survey result data is survey result data for the target enterprise-level change design plan obtained through a first survey method, and the second survey result data is survey result data for the target enterprise-level change design plan obtained through a second survey method; obtaining a first score according to the first survey result data and a first evaluation model, and obtaining a second score according to the second survey result data and a second evaluation model; determining a target score level to which the target enterprise-level change design plan belongs according to the first score and the second score, and generating a corresponding execution strategy according to the target score level.
[0115] In some embodiments, when the processor executes the computer program, the processor further implements the following steps: constructing a first evaluation model.
[0116] In some embodiments, when the processor executes the computer program, it also implements the following steps: obtaining the survey level of the survey subjects participating in the first survey method; adjusting the weight ratio corresponding to each survey level according to the enterprise-level change design direction; and constructing a first evaluation model according to the weight ratio of each survey level, the number of survey subjects at each survey level, the survey result data of the survey subjects at each survey level, and the weight ratio of each survey level.
[0117] In some embodiments, when the processor executes the computer program, the processor further implements the following steps: constructing a second evaluation model.
[0118] In some embodiments, when the processor executes the computer program, the following steps are also implemented: determining a first candidate level of the target enterprise-level change design plan based on the first score; determining a second candidate level of the target enterprise-level change design plan based on the second score; judging whether the level difference between the first candidate level and the second candidate level is greater than a preset level difference threshold; if so, determining the target score level to be a rejection level; if not, taking the first candidate level as the target score level.
[0119] In some embodiments, when the processor executes the computer program, the following steps are also implemented: when the first score is between the first threshold, the first candidate level of the target enterprise-level change design plan is determined to be a rejected level; when the first score is between the second threshold, the first candidate level of the target enterprise-level change design plan is determined to be an optimized level; when the first score is between the third threshold, the first candidate level of the target enterprise-level change design plan is determined to be a passed level; when the first score is between the fourth threshold, the first candidate level of the target enterprise-level change design plan is determined to be an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
[0120] In some embodiments, when the processor executes the computer program, the following steps are also implemented: when the first score is between the first threshold, the first candidate level of the target enterprise-level change design plan is determined to be a rejected level; when the first score is between the second threshold, the first candidate level of the target enterprise-level change design plan is determined to be an optimized level; when the first score is between the third threshold, the first candidate level of the target enterprise-level change design plan is determined to be a passed level; when the first score is between the fourth threshold, the first candidate level of the target enterprise-level change design plan is determined to be an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
[0121] In some embodiments, when the processor executes the computer program, the following steps are also implemented: in response to the target scoring level being a rejection level, the target enterprise-level change design plan is marked with a return label and prompt information indicating that it needs to be redesigned is sent to the design terminal; in response to the target scoring level being an optimization level, the target enterprise-level change design plan is marked with a return label and prompt information indicating that the design needs to be optimized is sent to the design terminal; in response to the target scoring level being a pass level and an excellent level, the target enterprise-level change design plan is marked as passed.
[0122] In some embodiments, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented: obtaining a target enterprise-level change design plan; obtaining first survey result data and second survey result data according to the target enterprise-level change design plan; wherein the first survey result data is survey result data for the target enterprise-level change design plan obtained through a first survey method, and the second survey result data is survey result data for the target enterprise-level change design plan obtained through a second survey method; obtaining a first score according to the first survey result data and a first evaluation model, and obtaining a second score according to the second survey result data and a second evaluation model; determining a target score level to which the target enterprise-level change design plan belongs according to the first score and the second score, and generating a corresponding execution strategy according to the target score level.
[0123] In some embodiments, when the computer program is executed by a processor, the following steps are further implemented: constructing a first evaluation model.
[0124] In some embodiments, when the computer program is executed by the processor, the following steps are also implemented: obtaining the survey level of the survey subjects participating in the first survey method; adjusting the weight ratio corresponding to each survey level according to the enterprise-level change design direction; and constructing a first evaluation model according to the weight ratio of each survey level, the number of survey subjects at each survey level, the survey result data of the survey subjects at each survey level, and the weight ratio of each survey level.
[0125] In some embodiments, when the computer program is executed by the processor, the following steps are further implemented: constructing a second evaluation model.
[0126] In some embodiments, when the computer program is executed by the processor, the following steps are also implemented: determining a first candidate level of the target enterprise-level change design solution based on the first score; determining a second candidate level of the target enterprise-level change design solution based on the second score; judging whether the level difference between the first candidate level and the second candidate level is greater than a preset level difference threshold; if so, determining the target score level to be a rejection level; if not, taking the first candidate level as the target score level.
[0127] In some embodiments, when the computer program is executed by the processor, the following steps are also implemented: when the first score is between the first threshold, the first candidate level of the target enterprise-level change design plan is determined to be a rejected level; when the first score is between the second threshold, the first candidate level of the target enterprise-level change design plan is determined to be an optimized level; when the first score is between the third threshold, the first candidate level of the target enterprise-level change design plan is determined to be a passed level; when the first score is between the fourth threshold, the first candidate level of the target enterprise-level change design plan is determined to be an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
[0128] In some embodiments, when the computer program is executed by the processor, the following steps are also implemented: when the first score is between the first threshold, the first candidate level of the target enterprise-level change design plan is determined to be a rejected level; when the first score is between the second threshold, the first candidate level of the target enterprise-level change design plan is determined to be an optimized level; when the first score is between the third threshold, the first candidate level of the target enterprise-level change design plan is determined to be a passed level; when the first score is between the fourth threshold, the first candidate level of the target enterprise-level change design plan is determined to be an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
[0129] In some embodiments, when the computer program is executed by the processor, the following steps are also implemented: in response to the target scoring level being a rejection level, the target enterprise-level change design plan is marked with a return label and a prompt message indicating that the design needs to be redesigned is sent to the design terminal; in response to the target scoring level being an optimization level, the target enterprise-level change design plan is marked with a return label and a prompt message indicating that the design needs to be optimized is sent to the design terminal; in response to the target scoring level being a pass level and an excellent level, the target enterprise-level change design plan is marked as passed.
[0130] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0131] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0132] In addition, the term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the characters in this article generally indicate that the associated objects before and after are in an "or" relationship.
[0133] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A method for processing an enterprise-level change design solution, the method comprising: Obtain the target enterprise-level transformation design plan; Acquire first survey result data and second survey result data according to the target enterprise-level change design plan; wherein the first survey result data is survey result data for the target enterprise-level change design plan obtained through a first survey method, and the second survey result data is survey result data for the target enterprise-level change design plan obtained through a second survey method; Obtain a first score according to the first survey result data and the first evaluation model, and obtain a second score according to the second survey result data and the second evaluation model; A target scoring level to which the target enterprise-level change design solution belongs is determined according to the first scoring and the second scoring, and a corresponding execution strategy is generated according to the target scoring level.
2. The method according to claim 1, characterized in that The method for constructing the first evaluation model comprises: Obtaining the survey level of the survey subjects who participated in the first survey method; Adjust the weight ratios corresponding to each of the survey levels according to the enterprise-level change design direction; The first evaluation model is constructed according to the weight ratio of each survey level, the number of survey subjects of each survey level, the survey result data of the survey subjects of each survey level, and the weight ratio of each survey level.
3. The method according to claim 2, characterized in that The construction formula of the first evaluation model includes: Among them, Q represents the first score of the target enterprise-level change design plan, A is 0 or 1, B, C, D, ..., N represent the number of survey subjects corresponding to each survey level, K1, K2, K3, K4 ..., K n Indicates the weight ratio corresponding to each survey level, B i , C i , D i ,…,N i Indicates the positive survey result data in the first survey result data corresponding to each survey level, K1, K2, K3, K4..., K n The sum of is 1.
4. The method according to claim 1, characterized in that: The construction formula of the second evaluation model includes: Where G represents the second score of the target enterprise-level change design solution, Z represents the total number of survey subjects who participated in the evaluation through the second survey method, and Z i Represents the positive survey result data in the second survey result data.
5. The method according to claim 1, characterized in that Determining the target scoring level of the target enterprise-level change design solution according to the first scoring and the second scoring includes: Determining a first candidate level of the target enterprise-level change design solution according to the first score; Determining a second candidate level of the target enterprise-level change design solution according to the second score; Determining whether a level difference between the first candidate level and the second candidate level is greater than a preset level difference threshold; If yes, then determining the target rating level to be a rejection level; If not, the first candidate level is used as the target scoring level.
6. The method according to claim 5, characterized in that Determining a first candidate level of the target enterprise-level change design solution according to the first score includes: When the first score is between the first threshold, the first candidate level of the target enterprise-level change design solution is determined to be a rejected level; when the first score is between the second threshold, the first candidate level of the target enterprise-level change design solution is determined to be an optimized level; when the first score is between the third threshold, the first candidate level of the target enterprise-level change design solution is determined to be a passed level; when the first score is between the fourth threshold, the first candidate level of the target enterprise-level change design solution is determined to be an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values; and / or, Determining a second candidate level of the target enterprise-level change design solution according to the second score includes: When the first score is between the first threshold, the first candidate level of the target enterprise-level change design plan is determined to be a rejected level; when the first score is between the second threshold, the first candidate level of the target enterprise-level change design plan is determined to be an optimized level; when the first score is between the third threshold, the first candidate level of the target enterprise-level change design plan is determined to be a passed level; when the first score is between the fourth threshold, the first candidate level of the target enterprise-level change design plan is determined to be an excellent level; wherein the first threshold, the second threshold, the third threshold and the fourth threshold are continuously changing threshold values.
7. The method according to claim 1, characterized in that The target scoring level includes at least one of a rejected level, a level to be optimized, a passed level, and an excellent level. The generating a corresponding execution strategy according to the target scoring level includes: In response to the target scoring level being a rejection level, marking the target enterprise-level change design solution with a rejection label and sending a prompt message indicating that the solution needs to be redesigned to a design terminal; In response to the target scoring level being a level to be optimized, marking the target enterprise-level change design solution with a return label and sending a prompt message indicating that the design needs to be optimized to the design terminal; In response to the target scoring levels being a passing level and an excellent level, the target enterprise-level change design solution is marked as passed.
8. An enterprise-level change design solution processing device, characterized in that: The device comprises: Enterprise design acquisition module, used to obtain the target enterprise-level transformation design plan; A survey data acquisition module, used to acquire first survey result data and second survey result data according to the target enterprise-level change design plan; wherein the first survey result data is survey result data for the target enterprise-level change design plan obtained through a first survey method, and the second survey result data is survey result data for the target enterprise-level change design plan obtained through a second survey method; a rating prediction module, configured to obtain a first rating based on the first survey result data and the first evaluation model, and obtain a second rating based on the second survey result data and the second evaluation model; The grade determination module is used to determine the target grade of the target enterprise-level change design solution according to the first grade and the second grade, and generate a corresponding execution strategy according to the target grade.
9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
