AGV batch charging scheduling method and system
By calculating the remaining power and task priority of the AGV car in real time, determining the charging sequence, solving the problem of AGV batch charging coordination, improving the working efficiency and power management of the AGV, and ensuring task continuity.
Patent Information
- Application Number
- CN202411179069.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-12
AI Technical Summary
In scenarios where AGVs are numerous and transportation routes are complex and frequent, it is difficult for the prior art to effectively coordinate and control the batch charging of multiple AGVs, affecting the task accuracy, efficiency, stability and safety of AGVs.
By calculating the remaining power of each AGV in real time, calculating the priority score based on the remaining power, task urgency and operating rate, determining the charging sequence, and controlling the AGV to go to the charging area to charge in the priority order, realizing the priority charging strategy.
Ensure that the AGV is on standby at any time when the power is sufficient, reduce the waiting time due to insufficient power, improve overall working efficiency, and enable AGV to seamlessly complete various tasks.
Smart Images

Figure CN118941057A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of charging scheduling, and more specifically, to a method and system for batch charging scheduling of AGVs. Background Art
[0002] The AGV dispatch system is a control software used for task scheduling, vehicle management and traffic management. It is mainly used in smart logistics warehousing and other fields, especially in scenarios with a large number of AGVs, complex transportation routes and frequent transportation. There are many types of AGVs. When performing tasks, flexibly arranging the charging strategy of AGVs is the key link to ensure the continuous and efficient operation of AGVs.
[0003] The current status of AGV charging methods shows a trend of diversification and continuous innovation. The charging strategy not only determines the accuracy and efficiency of the task, but also affects the stability and safety of the AGV itself. Different types of AGVs have different charging currents and voltages. Coordinating and controlling the batch charging of numerous AGVs is a scheduling system that must be considered. Summary of the invention
[0004] The present invention aims at the technical problems existing in the prior art and provides a method and system for scheduling batch charging of AGVs.
[0005] According to a first aspect of the present invention, a method for scheduling batch charging of AGVs is provided, comprising:
[0006] Calculate the remaining power of each AGV in real time;
[0007] Adding the AGVs whose remaining power is less than the first preset power threshold to the list of AGVs to be charged;
[0008] Calculate the priority score of each AGV based on the remaining power of each AGV, the urgency of the task to be executed, and the operating rate of the AGV;
[0009] According to the priority score of each AGV, the charging order of all AGVs is determined, and each AGV is controlled to go to the charging area for charging according to the charging order.
[0010] According to a second aspect of the present invention, a batch charging scheduling system for AGVs is provided, comprising:
[0011] The first calculation module is used to calculate the remaining power of each AGV in real time;
[0012] The second calculation module is used to add the AGVs whose remaining power is less than the first preset power threshold to the list of AGVs to be charged, and calculate the priority score of each AGV according to the remaining power of each AGV, the urgency of the task to be executed, and the operating rate of the AGV;
[0013] The charging control module is used to determine the charging order of all AGVs according to the priority score of each AGV, and control each AGV to go to the charging area for charging according to the charging order.
[0014] The present invention provides an AGV batch charging scheduling method and system. Through a priority charging strategy, according to the task priority, the scheduling system can ensure that the AGV is on standby at any time with sufficient power, reduce the waiting time caused by insufficient power, and enable the AGV to complete various tasks seamlessly, thereby improving overall work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A flow chart of a method for batch charging and scheduling of AGV vehicles provided by the present invention;
[0016] Figure 2 This is a schematic diagram of the interface of the AGV charging scheduling platform;
[0017] Figure 3 This is a structural schematic diagram of an AGV vehicle batch charging scheduling system provided by the present invention. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. In addition, the technical features in the various embodiments or single embodiments provided by the present invention can be arbitrarily combined with each other to form a feasible technical solution. This combination is not subject to the constraints of the sequence of steps and / or the structural composition mode, but must be based on the ability of ordinary technicians in this field to achieve. When the combination of technical solutions is contradictory or cannot be achieved, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0019] Figure 1 A flow chart of a method for batch charging and scheduling of AGV vehicles provided by the present invention is shown as follows: Figure 1 As shown, the method includes:
[0020] Step 1: Calculate the remaining power of each AGV in real time.
[0021] Understandably, each AGV is usually equipped with a fuel gauge to monitor the battery status in real time. These sensors can accurately measure the remaining battery power, and the AGV onboard software obtains this data and converts it into a recognizable signal. The AGV communicates with the dispatch platform wirelessly and transmits the power data in real time to the dispatch platform's server for processing and display.
[0022] The remaining power of a battery is represented by SOC, which indicates the ratio of its remaining capacity to the total available capacity after the battery has been used or left unused for a period of time, usually expressed as a percentage.
[0023] The remaining power of each AGV is calculated in real time, including:
[0024] Obtain the current power, initial battery power, and fully charged battery capacity of each AGV, and calculate the remaining power SOC of each AGV.
[0025] Specifically, the current power, initial battery power and full battery charge of each AGV are obtained, and the remaining power SOC of each AGV is calculated, including:
[0026] Get the current battery voltage of each AGV, and calculate the current power of the AGV based on the current battery voltage and battery capacity;
[0027] Calculate the battery full charge capacity based on the battery rated voltage and battery capacity of the AGV vehicle;
[0028] The remaining power SOC of each AGV is calculated by the following formula:
[0029] SOC = 100% × (battery current capacity - battery initial capacity) / (battery full charge - battery initial capacity).
[0030] Step 2: Add the AGVs whose remaining power is less than the first preset power threshold to the list of AGVs to be charged.
[0031] It is understandable that the battery of the AGV will only be charged when the remaining battery power SOC is less than 30%. Therefore, all AGVs whose remaining battery power SOC is less than 30% are added to the AGV list to be charged. The AGVs in the AGV list are all AGVs that need to be charged.
[0032] Step 3: Calculate the priority score of each AGV based on the remaining power of each AGV, the urgency of the task to be executed, and the operating rate of the AGV.
[0033] It is understandable that for the AGVs to be charged in the AGV list, the charging priority of each AGV is calculated, and each AGV is arranged to be charged according to the charging priority order.
[0034] Specifically, the priority score of each AGV is calculated based on the remaining power of each AGV, the urgency of the task to be performed, and the operating rate of the AGV. The operating rate refers to the proportion of AGVs performing tasks to all AGVs.
[0035] The calculation of the priority score of each AGV includes: Score(t) = (100-Soc(t)) × 30 + OperatingRate(t) × 50 + TaskPriority(t) × 20, where Score(t) is the priority score of the AGV at time t, Soc(t) is the remaining power of the AGV at time t, OperatingRate(t) is the operating rate of the AGV performing the task at time t, that is, the proportion of AGVs performing the task to all AGVs, and TaskPriority(t) is the task urgency of the AGV performing the task.
[0036] Step 4: Determine the charging order of all AGVs based on the priority score of each AGV, and control each AGV to go to the charging area to charge according to the charging order.
[0037] It is understandable that the battery voltage of each AGV is monitored in real time, and the remaining battery capacity SOC is calculated based on the battery voltage, and the calculated remaining capacity of each AGV is uploaded to the dispatching platform. The dispatching platform calculates the charging priority of each AGV based on the remaining capacity of each AGV, whether the AGV is performing a task, and the urgency of the task, and controls each AGV to go to the charging area to charge according to the charging priority of all AGVs in the order of charging.
[0038] Among them, Figure 2 As shown in the figure, some parameters of AGV charging can be set on the dispatching platform. Figure 2 In the AGV system, when the remaining power SOC of the AGV is less than 30%, it needs to be charged. When the power reaches more than 80%, it can undertake the task. You can also set the safe charging power and charging time, as well as the lower limit of the charging power that allows the task to be interrupted, and whether it is charging during idle time.
[0039] Among them, when charging, each AGV car is controlled to go to the charging area to charge according to the charging order, and also includes: setting the charging time of the AGV car according to the electricity price in different time periods, so that the AGV car can be charged in the time period with low electricity price.
[0040] Understandably, in areas where peak and valley time-of-use electricity prices are implemented, electricity prices are usually cheaper at night than during the day. The specific price difference varies by power company and region, but generally speaking, electricity prices at night are more than 20% cheaper than during the day. For example, in some areas, the electricity price during the day may be 1.2 yuan / kWh, while the electricity price at night drops to 0.8 yuan / kWh, a price difference of about 40%.
[0041] Therefore, based on the difference in electricity prices, the dispatching system prioritizes sequential charging at night and arranges the order in which tasks are issued.
[0042] In addition, different charging methods are adopted for different types of AGVs. For traction AGVs (always moving), according to the walking path, on the premise that the power is not less than 30%, a charging + task execution cycle charging strategy is arranged to ensure that the vehicle and the task will not stop.
[0043] Because roller and lifting AGVs (fixed position) can be charged in real time, priority is given to off-peak charging strategies and charging is done when electricity prices are at their lowest.
[0044] Among them, there are many charging modes for AGV cars, and the configuration of charging pile management includes ground charging and side charging mode selection. Ground charging does not need to communicate directly with the charging pile, but communicates with the car body to open the charging port for charging. There are currently two charging modes for ground charging. The first is timed long charging, which sends charging to specify the charging time. The second is to send charging tasks based on the car current, which is less than 30%. When the charging power is greater than 80%, the charging can be completed and the task can be started. Side charging is mainly achieved by communicating with the charging pile to realize automatic charging, and controlling the extension and retraction of the charging head of the charger through TCP communication to charge. The communication protocol is a custom protocol. When the body power is less than 30% (dynamically set), the charging task is issued and the car reaches the charging position. The dispatching system sends a start charging instruction, the charging pile extends the charging head, and docks the charging (charging pile online mode). By setting parameters such as charging voltage, charging current, and charging time, when the car current reaches 80% (the power that can be accepted for the task), the dispatcher sends an end charging instruction, the charging head retracts, and the charging ends.
[0045] See also Figure 3 , provides an AGV car batch charging scheduling system, the system includes:
[0046] The first calculation module 301 is used to calculate the remaining power of each AGV in real time;
[0047] The second calculation module 302 is used to add the AGVs whose remaining power is less than the first preset power threshold to the list of AGVs to be charged, and calculate the priority score of each AGV according to the remaining power of each AGV, the urgency of the task to be executed, and the operating rate of the AGV;
[0048] The charging control module 303 is used to determine the charging order of all AGVs according to the priority score of each AGV, and control each AGV to go to the charging area for charging according to the charging order.
[0049] It can be understood that the AGV vehicle batch charging scheduling system provided by the present invention corresponds to the AGV vehicle batch charging scheduling method provided by the aforementioned embodiments. The relevant technical features of the AGV vehicle batch charging scheduling system can refer to the relevant technical features of the AGV vehicle batch charging scheduling method, which will not be repeated here.
[0050] An embodiment of the present invention provides an AGV batch charging scheduling method and system. Through a priority charging strategy, according to the task priority, the scheduling system can ensure that the AGV is on standby at any time with sufficient power, reduce the waiting time caused by insufficient power, and enable the AGV to complete various tasks seamlessly, thereby improving overall work efficiency.
[0051] It should be noted that in the above embodiments, the description of each embodiment has its own emphasis, and for parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0052] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0053] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded computer, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0054] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0055] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0056] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0057] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for batch charging and scheduling of AGV vehicles, characterized in that: include: Calculate the remaining power of each AGV in real time; Adding the AGVs whose remaining power is less than the first preset power threshold to the list of AGVs to be charged; Calculate the priority score of each AGV based on the remaining power of each AGV, the urgency of the task to be executed, and the operating rate of the AGV; According to the priority score of each AGV, the charging order of all AGVs is determined, and each AGV is controlled to go to the charging area for charging according to the charging order.
2. The AGV batch charging scheduling method according to claim 1 is characterized in that: The real-time calculation of the remaining power of each AGV includes: Obtain the current power, initial battery power, and fully charged battery capacity of each AGV, and calculate the remaining power SOC of each AGV.
3. The AGV batch charging scheduling method according to claim 2 is characterized in that: The method of obtaining the current power, initial battery power and full battery charge of each AGV and calculating the remaining power SOC of each AGV includes: Get the current battery voltage of each AGV, and calculate the current power of the AGV based on the current battery voltage and battery capacity; Calculate the battery full charge capacity based on the battery rated voltage and battery capacity of the AGV vehicle; The remaining power SOC of each AGV is calculated by the following formula: SOC = 100% × (battery current capacity - battery initial capacity) / (battery full charge - battery initial capacity).
4. The AGV batch charging scheduling method according to claim 1 is characterized in that: The priority score of each AGV is calculated based on the remaining power of each AGV, the urgency of executing the task and the operating rate of the AGV, including: Score(t)=(100-Soc(t))×30+OperatingRate(t)×50+TaskPriority(t)×20, wherein Score(t) is the priority score of the AGV at time t, Soc(t) is the remaining power of the AGV at time t, OperatingRate(t) is the operating rate of the AGV executing the task at time t, that is, the proportion of AGVs executing the task to all AGVs, and TaskPriority(t) is the task urgency of the AGV executing the task.
5. The AGV batch charging scheduling method according to claim 1 is characterized in that: When the remaining power of the AGV reaches a second preset power threshold, the AGV meets the conditions for accepting the task.
6. The AGV batch charging scheduling method according to claim 5 is characterized in that: The first preset power threshold is 30%, and the second preset power threshold is 80%.
7. The AGV batch charging scheduling method according to claim 1 is characterized in that: The controlling each AGV to go to the charging area for charging according to the charging sequence also includes: According to the electricity price in different time periods, the charging time of the AGV car is set so that the AGV car can be charged during the time period with low electricity price.
8. The AGV batch charging scheduling method according to claim 7 is characterized in that: The method of controlling each AGV to go to the charging area to charge according to the charging sequence includes: Different charging modes are used for charging different types of AGVs; For AGVs that are in the process of executing tasks, charging is arranged during the execution of the tasks so that the tasks are not interrupted; For roller and lifting AGVs in fixed positions, priority is given to off-peak charging strategies, and charging is carried out during the period when electricity prices are at their lowest.
9. An AGV car batch charging scheduling system, characterized in that: include: The first calculation module is used to calculate the remaining power of each AGV in real time; The second calculation module is used to add the AGVs whose remaining power is less than the first preset power threshold to the list of AGVs to be charged, and calculate the priority score of each AGV according to the remaining power of each AGV, the urgency of the task to be executed, and the operating rate of the AGV; The charging control module is used to determine the charging order of all AGVs according to the priority score of each AGV, and control each AGV to go to the charging area for charging according to the charging order.
Citation Information
Cited By
Charging management method and device for automatic guiding device and storage medium
CN119218013A
High-efficiency management and distribution system of low-altitude aircraft