Project management system quality evaluation method and device, computer equipment and medium

By generating a project management system quality assessment model and an indicator hierarchical model, data collection, assessment analysis, and query of countermeasures and suggestions are carried out, which solves the problem of low efficiency in traditional project management system quality assessment and achieves rapid identification and accurate quality assessment.

CN118941243APending Publication Date: 2024-11-12CHINA SOUTHERN POWER GRID DIGITAL GRID GROUP (GUANGDONG) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411032155.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional project management systems employ inefficient quality assessment methods that fail to quickly identify quality issues.

Method used

By generating a project management system quality assessment model and an indicator hierarchical model, data collection, assessment analysis, and query of countermeasures and suggestions are conducted to improve the efficiency and accuracy of the assessment.

Benefits of technology

It enables rapid identification of quality issues in the project management system, improves the systematicness, effectiveness, accuracy, and reliability of the assessment results, and avoids omissions in the assessment of certain unit contents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941243A_ABST
    Figure CN118941243A_ABST
Patent Text Reader

Abstract

The invention relates to a project management system quality evaluation method and device, computer equipment and a storage medium. The method comprises the steps of generating a project management system quality evaluation model and a project management system quality evaluation index layering model in response to configuration operation on a project management system quality evaluation initial model and a project management system quality evaluation index layering initial model, determining a project management system quality evaluation index set according to the project management system quality evaluation model and the project management system quality evaluation index hierarchical model; performing data acquisition according to the project management system quality evaluation index set to obtain project management system quality evaluation data; performing data assessment analysis according to the project management system quality assessment data to obtain a project management system quality assessment result; wherein the data evaluation analysis comprises descriptive statistical analysis, inference statistical analysis and visual statistical analysis; and querying in a countermeasure suggestion scheme database according to a project management system quality evaluation result to obtain a project management system quality improvement countermeasure suggestion scheme. By adopting the method, the quality evaluation efficiency can be improved, and the project management system quality can be quickly identified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of computer technology, and in particular to a project management system quality evaluation method, device, computer equipment and storage medium. Background Art

[0002] Project management refers to the process of applying specialized knowledge, skills, tools and methods in project activities to enable the project to achieve or exceed the set requirements and expectations under the conditions of limited resources. Project management is the overall monitoring and control of some activities related to the successful achievement of a series of goals.

[0003] However, traditional project management system quality assessment methods have low quality assessment efficiency or are unable to quickly identify project management system quality problems. Summary of the invention

[0004] Based on this, it is necessary to provide a project management system quality evaluation method, device, computer equipment and storage medium that can improve quality assessment efficiency and quickly identify the quality of the project management system in response to the above technical problems.

[0005] In a first aspect, a project management system quality evaluation method is provided, the method comprising:

[0006] In response to configuration operations on the project management system quality assessment initial model and the project management system quality assessment indicator hierarchical initial model, a project management system quality assessment model and a project management system quality assessment indicator hierarchical model are generated, and a project management system quality assessment indicator set is determined according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model;

[0007] Collect data based on the project management system quality assessment indicator set to obtain project management system quality assessment data;

[0008] Conduct data evaluation and analysis based on the project management system quality evaluation data to obtain the project management system quality evaluation results; the data evaluation and analysis includes descriptive statistical analysis, inferential statistical analysis and visual statistical analysis;

[0009] According to the project management system quality assessment results, a query is made in the countermeasures and suggestions database to obtain countermeasures and suggestions for improving the quality of the project management system.

[0010] In one of the embodiments, the method also includes: in response to an input operation on a project input requirement input box, determining project input requirement information; in response to a configuration operation on a project process processing rule configuration box, determining project process processing rule information; in response to an input operation on a project output result requirement input box, determining project output result requirement information; and constructing a model based on the project input requirement information, project process processing rule information, project output result requirement information and the IPO learning model to obtain an initial model for project management system quality assessment.

[0011] In one of the embodiments, the method also includes: determining the first-level indicator evaluation layer information in response to the configuration operation of the first-level indicator evaluation layer configuration box; determining the second-level indicator evaluation layer information in response to the configuration operation of the second-level indicator evaluation layer configuration box; determining the indicator hierarchy model information in response to the configuration operation of the hierarchical model; and constructing a model based on the first-level indicator evaluation layer information, the second-level indicator evaluation layer information and the indicator hierarchy model information to obtain an initial model of the project management system quality assessment indicator hierarchy.

[0012] In one of the embodiments, a set of quality assessment indicators of a project management system is determined according to a project management system quality assessment model and a hierarchical model of quality assessment indicators of a project management system, including: obtaining each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator according to the project management system quality assessment model and the hierarchical model of quality assessment indicators of a project management system; performing importance assessment according to each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator to obtain an indicator importance score table; constructing an indicator matrix according to the indicator importance score table to obtain an indicator judgment matrix; performing importance sorting and consistency check according to the indicator judgment matrix to obtain a set of quality assessment indicators of a project management system.

[0013] In one of the embodiments, data collection is performed according to a project management system quality assessment indicator set to obtain project management system quality assessment data, including: matching in a data collection method database according to the project management system quality assessment indicator set to obtain a data collection method; matching a collection tool according to the data collection method to obtain a data collection tool; selecting a data collection group according to the project management system quality assessment indicator set to obtain a data collection group; calling the data collection tool to perform data collection in a data source corresponding to the project management system quality assessment indicator set according to the data collection method and the data collection group to obtain the project management system quality assessment data.

[0014] In one of the embodiments, data evaluation and analysis are performed based on project management system quality assessment data to obtain project management system quality assessment results, including: performing data cleaning processing on the project management system quality assessment data to obtain processed project management system quality assessment data; performing descriptive statistical analysis on the project management system quality assessment data to obtain a first analysis result; performing inferential statistical analysis on the project management system quality assessment data to obtain a second analysis result; performing visual statistical analysis on the project management system quality assessment data to obtain a third analysis result; and generating the project management system quality assessment results based on the first analysis result, the second analysis result, and the third analysis result.

[0015] In one of the embodiments, a query is made in a countermeasure suggestion database based on the project management system quality assessment results to obtain countermeasure suggestion solutions for improving the project management system quality, including: analyzing the project management system quality assessment results to obtain project management system quality problems; querying in a countermeasure suggestion database based on the project management system quality problems to obtain corresponding initial countermeasure suggestion solutions; performing solution evaluation processing on each initial countermeasure suggestion solution to obtain solution evaluation results; the solution evaluation processing includes feasibility assessment and risk assessment; and determining the countermeasure suggestion solution for improving the project management system quality based on the solution evaluation results.

[0016] In a second aspect, a project management system quality evaluation device is provided, which includes: an indicator determination module, a data collection module, an evaluation and analysis module, and a countermeasure query module.

[0017] Among them, the indicator determination module is used to respond to the configuration operation of the project management system quality assessment initial model and the project management system quality assessment indicator hierarchical initial model, generate the project management system quality assessment model and the project management system quality assessment indicator hierarchical model, and determine the project management system quality assessment indicator set according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model; the data collection module is used to collect data according to the project management system quality assessment indicator set to obtain the project management system quality assessment data; the evaluation and analysis module is used to perform data evaluation and analysis based on the project management system quality assessment data to obtain the project management system quality evaluation results; wherein the data evaluation and analysis includes descriptive statistical analysis, inferential statistical analysis and visual statistical analysis; the countermeasure query module is used to query in the countermeasure suggestion program database according to the project management system quality assessment results to obtain the project management system quality improvement countermeasure suggestion program.

[0018] In a third aspect, a computer device is provided. The computer device includes a memory and a processor. The memory stores a computer program. When the processor executes the computer program, the steps of any method in the above method embodiments are implemented.

[0019] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of any method in the above method embodiments are implemented.

[0020] The project management system quality evaluation method, device, computer equipment and storage medium generate a project management system quality evaluation model and a project management system quality evaluation indicator hierarchical model in response to the configuration operation of the project management system quality evaluation initial model and the project management system quality evaluation indicator hierarchical model, and determine the project management system quality evaluation indicator set according to the project management system quality evaluation model and the project management system quality evaluation indicator hierarchical model; then, data collection is performed according to the project management system quality evaluation indicator set to obtain project management system quality evaluation data; then, data evaluation and analysis are performed according to the project management system quality evaluation data to obtain project management system quality evaluation results; wherein, the data The evaluation and analysis includes descriptive statistical analysis, inferential statistical analysis and visual statistical analysis; finally, according to the project management system quality evaluation results, a query is made in the countermeasures and suggestions database to obtain the project management system quality improvement countermeasures and suggestions, so as to facilitate users to improve the quality of the project management system according to the project management system quality improvement countermeasures and suggestions, thereby improving the efficiency of quality evaluation, being able to quickly identify project management system quality problems, and obtaining comprehensive and accurate project management system quality evaluation data based on the project management system quality evaluation indicator set, thereby avoiding the omission of evaluation of some unit contents of the project, and greatly improving the systematicity, effectiveness, accuracy and reliability of the project management system quality evaluation. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is an application environment diagram of a project management system quality evaluation method in one embodiment;

[0022] Figure 2 A first flow chart of a project management system quality evaluation method in one embodiment;

[0023] Figure 3 A second flow chart of a project management system quality evaluation method in one embodiment;

[0024] Figure 4 A third flow chart of a project management system quality evaluation method in one embodiment;

[0025] Figure 5 A schematic diagram of a process for determining a set of quality assessment indicators of a project management system according to a quality assessment model of a project management system and a hierarchical model of quality assessment indicators of a project management system in one embodiment;

[0026] Figure 6 A schematic diagram of a process for collecting data according to a set of quality assessment indicators of a project management system to obtain quality assessment data of a project management system in one embodiment;

[0027] Figure 7 A schematic diagram of a process for performing data evaluation and analysis based on project management system quality evaluation data to obtain a project management system quality evaluation result in one embodiment;

[0028] Figure 8 A flowchart of obtaining a project management system quality improvement countermeasure suggestion scheme by querying a countermeasure suggestion scheme database according to a project management system quality assessment result in an embodiment;

[0029] Fig. 9 It is a structural block diagram of a project management system quality evaluation device in one embodiment;

[0030] Fig.10 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0032] In order to facilitate understanding of the present application, the present application will be described more fully below with reference to the relevant drawings. Embodiments of the present application are provided in the drawings. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive.

[0033] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.

[0034] It is understood that the terms "first", "second", etc. used in this application may be used herein to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish a first element from another element. For example, without departing from the scope of this application, a first resistor may be referred to as a second resistor, and similarly, a second resistor may be referred to as a first resistor. Both the first resistor and the second resistor are resistors, but they are not the same resistor.

[0035] It can be understood that the “connection” in the following embodiments should be understood as “electrical connection”, “communication connection”, etc. if the connected circuits, modules, units, etc. have electrical signals or data transmission between each other.

[0036] When used herein, the singular forms "a", "an", and "said / the" may also include plural forms, unless the context clearly indicates otherwise. It should also be understood that the terms "include / comprise" or "have" etc. specify the presence of stated features, wholes, steps, operations, components, parts or combinations thereof, but do not exclude the possibility of the presence or addition of one or more other features, wholes, steps, operations, components, parts or combinations thereof.

[0037] The project management system quality evaluation method provided in this application can be applied to Figure 1 In the application environment shown, the terminal 102 communicates with the server 104 through a network. The terminal 102 may be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, and portable wearable devices, and the server 104 may be implemented as an independent server or a server cluster consisting of multiple servers.

[0038] In one embodiment, Figure 2 As shown in the figure, a project management system quality evaluation method is provided. Figure 1 The server 104 in the example is used for explanation, and the steps include the following steps 201 to 204.

[0039] Step 201, in response to the configuration operation of the project management system quality assessment initial model and the project management system quality assessment indicator hierarchical initial model, generate a project management system quality assessment model and a project management system quality assessment indicator hierarchical model, and determine a project management system quality assessment indicator set according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model.

[0040] The project management system quality assessment indicator set includes at least one project management system quality assessment indicator. It is understandable that the project management system quality assessment initial model is used to obtain each project management system quality assessment indicator. The project management system quality assessment indicator hierarchical model is used to perform indicator hierarchical processing on each project management system quality assessment indicator.

[0041] Specifically, when the server 104 identifies the configuration operation of the project management system quality assessment initial model and the project management system quality assessment indicator hierarchical initial model, it can generate the project management system quality assessment model and the project management system quality assessment indicator hierarchical model according to the operation results of the configuration operation of the project management system quality assessment initial model and the project management system quality assessment indicator hierarchical initial model; then, determine the project management system quality assessment indicator set according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model.

[0042] In one embodiment, if Figure 3 As shown, the method further includes steps 301 to 304.

[0043] Step 301, in response to an input operation performed on a project input requirement input box, determining project input requirement information.

[0044] Step 302, in response to a configuration operation on a project process processing rule configuration box, determining project process processing rule information.

[0045] Step 303: In response to an input operation on the project output result requirement input box, determine the project output result requirement information.

[0046] Step 304, constructing a model based on the project input requirement information, the project process processing rule information, the project output result requirement information and the IPO learning model to obtain an initial model for project management system quality assessment.

[0047] Among them, the IPO (Input-Process-Output) learning model is a simple model that describes the learning process. It includes three main stages: input, process, and output. Project input requirement information includes project input requirements and project constraints. Project process processing rule information is used to characterize the data processing required for the quality management process of the project management system. Project output result requirement information includes project output result requirements.

[0048] Specifically, when server 104 recognizes that an input operation is performed on the project input requirement input box, it can determine the project input requirement information; then, when it recognizes that a configuration operation is performed on the project process processing rule configuration box, it determines the project process processing rule information; then, when it recognizes that an input operation is performed on the project output result requirement input box, it determines the project output result requirement information; finally, a model is constructed based on the project input requirement information, the project process processing rule information, the project output result requirement information and the IPO learning model to obtain an initial model of the project management system quality assessment, thereby improving the construction efficiency of the initial model of the project management system quality assessment and facilitating the acquisition of project management system quality assessment indicators and the performance of project management system quality assessment.

[0049] In this embodiment, in response to an input operation on a project input requirement input box, the project input requirement information is determined; then, in response to a configuration operation on a project process processing rule configuration box, the project process processing rule information is determined; next, in response to an input operation on a project output result requirement input box, the project output result requirement information is determined; finally, a model is constructed based on the project input requirement information, the project process processing rule information, the project output result requirement information and the IPO learning model to obtain an initial model of project management system quality assessment, thereby improving the construction efficiency of the initial model of project management system quality assessment and facilitating the acquisition of project management system quality assessment indicators and the performance of project management system quality assessment.

[0050] In one embodiment, if Figure 4 As shown, the method further includes steps 401 to 404.

[0051] Step 401, in response to the configuration operation on the first-level indicator evaluation layer configuration box, determine the first-level indicator evaluation layer information.

[0052] Step 402, in response to the configuration operation on the secondary indicator evaluation layer configuration box, determine the secondary indicator evaluation layer information.

[0053] Step 403: Determine the indicator hierarchy model information in response to the configuration operation on the hierarchy model.

[0054] Step 404, constructing a model based on the first-level indicator evaluation layer information, the second-level indicator evaluation layer information and the indicator hierarchy model information to obtain an initial hierarchical model of the project management system quality assessment indicator.

[0055] Specifically, the server 104 determines the first-level indicator evaluation layer information in response to the configuration operation of the first-level indicator evaluation layer configuration box; then, in response to the configuration operation of the second-level indicator evaluation layer configuration box, it determines the second-level indicator evaluation layer information; then, in response to the configuration operation of the hierarchical model, it determines the indicator hierarchy model information; finally, according to the first-level indicator evaluation layer information, the second-level indicator evaluation layer information and the indicator hierarchy model information, a model is constructed to obtain an initial model of the project management system quality assessment indicator hierarchy, thereby improving the construction efficiency of the project management system quality assessment indicator hierarchy initial model, and facilitating the indicator hierarchy processing of each project management system quality assessment indicator and conducting project management system quality assessment.

[0056] In this embodiment, in response to the configuration operation of the first-level indicator evaluation layer configuration box, the first-level indicator evaluation layer information is determined; then, in response to the configuration operation of the second-level indicator evaluation layer configuration box, the second-level indicator evaluation layer information is determined; then, in response to the configuration operation of the hierarchical model, the indicator hierarchy model information is determined; finally, a model is constructed based on the first-level indicator evaluation layer information, the second-level indicator evaluation layer information and the indicator hierarchy model information to obtain a hierarchical initial model of project management system quality assessment indicators, thereby improving the construction efficiency of the hierarchical initial model of project management system quality assessment indicators and facilitating the indicator hierarchy processing of each project management system quality assessment indicator and conducting project management system quality assessment.

[0057] In one embodiment, if Figure 5 As shown, determining a set of quality assessment indicators of a project management system according to a quality assessment model of a project management system and a hierarchical model of quality assessment indicators of a project management system includes steps 501 to 504.

[0058] Step 501, according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model, obtain each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator.

[0059] Step 502, perform importance assessment based on each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator to obtain an indicator importance score table.

[0060] Step 503, constructing an indicator matrix according to the indicator importance scoring table to obtain an indicator judgment matrix.

[0061] Step 504, performing importance ranking and consistency check according to the indicator judgment matrix to obtain a set of project management system quality assessment indicators.

[0062] Specifically, the server 104 obtains each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model; then, an importance assessment is performed according to each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator to obtain an indicator importance score table; then, an indicator matrix is ​​constructed according to the indicator importance score table to obtain an indicator judgment matrix; finally, importance ranking and consistency check are performed according to the indicator judgment matrix to obtain a project management system quality assessment indicator set, thereby improving the generation efficiency of the project management system quality assessment indicator set and facilitating the project management system quality assessment.

[0063] In a specific example, the first-level indicator is A i (i=1,2,3……) indicates that the weight of the first-level index is Q i (i=1, 2, 3...), and ∑Q i =1, the secondary indicator is A ij (i=1,2,3……;j=1,2,3……) indicates that the corresponding weight of the secondary index is Q ij (i=1,2,3……;j=1,2,3……),and ∑Q ij =1. Then, the 1-9 scale method is used to compare each first-level indicator with the corresponding second-level indicator, and the relative importance of each first-level indicator and the corresponding second-level indicator is obtained; then, the indicator importance score table is generated according to the relative importance of each first-level indicator and the corresponding second-level indicator; then, the indicator matrix is ​​constructed according to the indicator importance score table to obtain the indicator judgment matrix; finally, the importance is sorted and the consistency test is carried out according to the indicator judgment matrix to obtain the project management system quality evaluation indicator set.

[0064] In addition, the importance ranking and consistency test according to the indicator judgment matrix are implemented based on the following expression:

[0065]

[0066] Where, formula (1) is the feature vector W i Formula (2) is the maximum characteristic root λ max Calculate the maximum characteristic root λ based on the indicator judgment and evidence max The calculation method is to use formula (3) to calculate the characteristic vector W iThe value of is normalized and used as the weight value index CI; the consistency test coefficient CR is calculated according to the standard value of the average random consistency index RI by formula (4). The above is only a specific example, which can be flexibly set according to user needs in actual applications and is not limited here.

[0067] In this embodiment, each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator are obtained according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model; then, an importance assessment is performed according to each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator to obtain an indicator importance score table; then, an indicator matrix is ​​constructed according to the indicator importance score table to obtain an indicator judgment matrix; finally, importance sorting and consistency check are performed according to the indicator judgment matrix to obtain a project management system quality assessment indicator set, thereby improving the generation efficiency of the project management system quality assessment indicator set, facilitating the project management system quality assessment, and improving the accuracy and comprehensiveness of the project management system quality assessment.

[0068] Step 202: collect data based on the project management system quality assessment indicator set to obtain project management system quality assessment data.

[0069] Specifically, the server 104 may collect data according to the project management system quality assessment indicator set to obtain project management system quality assessment data.

[0070] In one embodiment, if Figure 6 As shown, data collection is performed according to a set of quality assessment indicators of a project management system to obtain quality assessment data of the project management system, including steps 601 to 604.

[0071] Step 601, matching the project management system quality assessment indicator set in the data collection method database to obtain the data collection method.

[0072] Step 602, matching the data collection tool according to the data collection method to obtain the data collection tool.

[0073] Step 603: select a data collection group according to the project management system quality assessment indicator set to obtain a data collection group.

[0074] Step 604, calling a data collection tool, collecting data in a data source corresponding to the project management system quality assessment indicator set according to a data collection method and a data collection group, and obtaining project management system quality assessment data.

[0075] Among them, the data collection method includes a questionnaire survey; the data collection tool includes an electronic questionnaire. Specifically, the server 104 matches the data collection method database according to the project management system quality assessment indicator set to obtain the data collection method; then, the collection tool is matched according to the data collection method to obtain the data collection tool; then, the data collection group is selected according to the project management system quality assessment indicator set to obtain the data collection group; finally, the data collection tool is called to collect data in the data source corresponding to the project management system quality assessment indicator set according to the data collection method and the data collection group to obtain the project management system quality assessment data, thereby improving the efficiency and comprehensiveness of the acquisition of the project management system quality assessment data, and thus improving the efficiency and accuracy of the project management system quality assessment.

[0076] In a specific example, the method also includes: performing reliability analysis on each project management system quality assessment data to obtain corresponding reliability analysis results; if the reliability analysis result is reliable, retaining the project management system quality assessment data; if the reliability analysis result is unreliable, discarding the project management system quality assessment data.

[0077] It is understandable that the reliability analysis of the quality assessment data of each project management system can be, but is not limited to, using Stata to perform statistical analysis on the reliability and validity of the data. The reliability and validity of the data are determined based on the following calculation expression of the Cronbach coefficient:

[0078]

[0079] Wherein, N is the number of questions; C is the average covariance between questions; and v is the average variance of questions. The above are only specific examples, which can be flexibly set according to user needs in actual applications and are not limited here.

[0080] In this embodiment, a data collection method is obtained by matching the project management system quality assessment indicator set in the data collection method database; then, a collection tool is matched according to the data collection method to obtain a data collection tool; then, a data collection group is selected according to the project management system quality assessment indicator set to obtain a data collection group; finally, the data collection tool is called to collect data in the data source corresponding to the project management system quality assessment indicator set according to the data collection method and the data collection group to obtain the project management system quality assessment data, thereby improving the efficiency and comprehensiveness of obtaining the project management system quality assessment data, and thus improving the efficiency and accuracy of the project management system quality assessment.

[0081] Step 203: Perform data evaluation and analysis based on the project management system quality evaluation data to obtain the project management system quality evaluation results.

[0082] The data evaluation analysis includes descriptive statistical analysis, inferential statistical analysis and visual statistical analysis. Specifically, the server 104 performs data evaluation analysis based on the project management system quality evaluation data to obtain the project management system quality evaluation results.

[0083] In one embodiment, if Figure 7 As shown, data evaluation and analysis are performed based on the project management system quality evaluation data to obtain the project management system quality evaluation results, including steps 701 to 705.

[0084] Step 701, performing data cleaning processing on the project management system quality assessment data to obtain processed project management system quality assessment data.

[0085] Step 702: Perform descriptive statistical analysis on the project management system quality assessment data to obtain a first analysis result.

[0086] Step 703, perform inferential statistical analysis on the project management system quality assessment data to obtain a second analysis result.

[0087] Step 704: Perform visual statistical analysis on the project management system quality assessment data to obtain a third analysis result.

[0088] Step 705: Generate a project management system quality assessment result based on the first analysis result, the second analysis result, and the third analysis result.

[0089] Specifically, the server 104 performs data cleaning processing on the project management system quality assessment data to obtain the processed project management system quality assessment data, thereby processing missing data and abnormal data through data cleaning processing; then, descriptive statistical analysis is performed on the project management system quality assessment data to obtain a first analysis result, thereby providing an overall description of the data; for example, the mean, median and standard deviation of the data; then, inferential statistical analysis is performed on the project management system quality assessment data to obtain a second analysis result, thereby performing inferential statistics on the data; for example, hypothesis testing and variance analysis; then, visual statistical analysis is performed on the project management system quality assessment data to obtain a third analysis result, thereby performing data statistical analysis and display through charts and graphic visualization tools; finally, the project management system quality assessment results are generated based on the first analysis result, the second analysis result and the third analysis result, thereby improving the accuracy, comprehensiveness and reliability of the project management system quality assessment results.

[0090] In this embodiment, data cleaning processing is performed on the project management system quality assessment data to obtain processed project management system quality assessment data; then, descriptive statistical analysis is performed on the project management system quality assessment data to obtain a first analysis result; then, inferential statistical analysis is performed on the project management system quality assessment data to obtain a second analysis result; then, visual statistical analysis is performed on the project management system quality assessment data to obtain a third analysis result; finally, the project management system quality assessment result is generated according to the first analysis result, the second analysis result and the third analysis result, thereby improving the accuracy, comprehensiveness and reliability of the project management system quality assessment result.

[0091] Step 204, querying the countermeasure suggestion database according to the project management system quality assessment result, and obtaining the countermeasure suggestion scheme for improving the quality of the project management system.

[0092] Specifically, the server 104 can query the countermeasures and suggestions database according to the project management system quality assessment results to obtain the countermeasures and suggestions for improving the project management system quality, thereby facilitating users to improve the quality of the project management system according to the project management system quality improvement countermeasures and suggestions, thereby improving the efficiency of quality assessment, and being able to quickly identify project management system quality problems. By obtaining comprehensive and accurate project management system quality assessment data based on the project management system quality assessment indicator set, it avoids missing assessments of some unit contents of the project, thereby greatly improving the systematicity, effectiveness, accuracy and reliability of the project management system quality assessment.

[0093] In one embodiment, if Figure 8 As shown, according to the project management system quality assessment result, a query is performed in the countermeasure suggestion database to obtain the project management system quality improvement countermeasure suggestion program, including steps 801 to 804.

[0094] Step 801, analyzing the project management system quality assessment results to obtain the project management system quality issues;

[0095] Step 802, querying the countermeasure suggestion database according to the quality problem of the project management system to obtain the corresponding initial countermeasure suggestion;

[0096] Step 803, performing a solution evaluation process on each initial countermeasure suggestion solution to obtain a solution evaluation result;

[0097] Step 804, determining a project management system quality improvement countermeasure and suggestion plan based on the plan evaluation results.

[0098] Among them, the scheme evaluation process includes feasibility evaluation and risk evaluation. The server 104 can analyze the project management system quality evaluation results to obtain the quality problems of the project management system; then, according to the quality problems of the project management system, query in the countermeasure suggestion database to obtain the corresponding initial countermeasure suggestion; then, perform scheme evaluation on each initial countermeasure suggestion to obtain the scheme evaluation result; finally, determine the countermeasure suggestion for improving the quality of the project management system according to the scheme evaluation result, so as to facilitate the user to improve the quality of the project management system according to the countermeasure suggestion for improving the quality of the project management system, and also facilitate the analysis of the feasibility and potential risks of the quality evaluation results of the project management system.

[0099] In a specific example, the criticality of each project management system quality issue is sorted to obtain the criticality of each project management system quality issue; the project management system quality issues with a criticality greater than a threshold are retained, and the project management system quality issues with a criticality less than or equal to the threshold are discarded. The above is only a specific example, which can be flexibly set according to user needs in actual applications and is not limited here.

[0100] In one embodiment, the method further includes: periodically acquiring project management system quality assessment tracking data; analyzing the project management system quality assessment tracking data to obtain a project management system quality tracking analysis report, thereby improving the compliance and effectiveness of the project management system quality assessment. Specifically, the quality assessment tracking data may include, but is not limited to, video surveillance tracking data, electronic tag physical tracking data, tracking activity data, tracking time data, and tracking audit inspection data. The above are only specific examples, which can be flexibly set according to user needs in actual applications and are not limited here.

[0101] In this embodiment, an analysis is performed based on the project management system quality assessment results to obtain the project management system quality problems; then, a query is performed in the countermeasure suggestion database based on the project management system quality problems to obtain the corresponding initial countermeasure suggestion plans; then, a plan evaluation is performed on each initial countermeasure suggestion plan to obtain a plan evaluation result; finally, a project management system quality improvement countermeasure suggestion plan is determined based on the plan evaluation result, thereby facilitating users to improve the project management system quality based on the project management system quality improvement countermeasure suggestion plan.

[0102] The above-mentioned project management system quality evaluation method generates a project management system quality evaluation model and a project management system quality evaluation indicator hierarchical model in response to the configuration operation of the project management system quality evaluation initial model and the project management system quality evaluation indicator hierarchical model, and determines the project management system quality evaluation indicator set according to the project management system quality evaluation model and the project management system quality evaluation indicator hierarchical model; then, data collection is performed according to the project management system quality evaluation indicator set to obtain project management system quality evaluation data; then, data evaluation and analysis are performed according to the project management system quality evaluation data to obtain project management system quality evaluation results; wherein the data evaluation and analysis includes describing Descriptive statistical analysis, inferential statistical analysis and visual statistical analysis; finally, according to the project management system quality assessment results, a query is made in the countermeasures and suggestions database to obtain the project management system quality improvement countermeasures and suggestions, so as to facilitate users to improve the quality of the project management system according to the project management system quality improvement countermeasures and suggestions, improve the quality assessment efficiency, and be able to quickly identify the quality problems of the project management system. By obtaining comprehensive and accurate project management system quality assessment data based on the project management system quality assessment indicator set, it avoids the omission of assessment of some unit contents of the project, and greatly improves the systematicity, effectiveness, accuracy and reliability of the project management system quality assessment.

[0103] It should be understood that although Figure 2-8 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 2-8 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.

[0104] Second, as Fig. 9 As shown, a project management system quality evaluation device is provided, which includes: an indicator determination module 910, a data collection module 920, an evaluation and analysis module 930 and a countermeasure query module 940.

[0105] Among them, the indicator determination module 910 is used to respond to the configuration operation of the project management system quality assessment initial model and the project management system quality assessment indicator hierarchical initial model, generate a project management system quality assessment model and a project management system quality assessment indicator hierarchical model, and determine the project management system quality assessment indicator set according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model; the data collection module 920 is used to collect data according to the project management system quality assessment indicator set to obtain project management system quality assessment data; the evaluation and analysis module 930 is used to perform data evaluation and analysis based on the project management system quality assessment data to obtain project management system quality evaluation results; wherein the data evaluation and analysis includes descriptive statistical analysis, inferential statistical analysis and visual statistical analysis; the countermeasure query module 940 is used to query in the countermeasure suggestion program database according to the project management system quality assessment results to obtain project management system quality improvement countermeasure suggestion programs.

[0106] In one of the embodiments, the device further includes: a project management system quality assessment initial model building module.

[0107] Among them, the initial model construction module for project management system quality assessment is used to determine the project input requirement information in response to the input operation on the project input requirement input box; the initial model construction module for project management system quality assessment is used to determine the project process processing rule information in response to the configuration operation on the project process processing rule configuration box; the initial model construction module for project management system quality assessment is used to determine the project output result requirement information in response to the input operation on the project output result requirement input box; the initial model construction module for project management system quality assessment is used to construct a model according to the project input requirement information, the project process processing rule information, the project output result requirement information and the IPO learning model to obtain the initial model of project management system quality assessment.

[0108] In one of the embodiments, the device also includes a hierarchical initial model building module for project management system quality assessment indicators.

[0109] Among them, the project management system quality assessment indicator hierarchical initial model construction module is used to respond to the configuration operation of the first-level indicator evaluation layer configuration box to determine the first-level indicator evaluation layer information; the project management system quality assessment indicator hierarchical initial model construction module is used to respond to the configuration operation of the second-level indicator evaluation layer configuration box to determine the second-level indicator evaluation layer information; the project management system quality assessment indicator hierarchical initial model construction module is used to respond to the configuration operation of the hierarchical model to determine the indicator hierarchy model information; the project management system quality assessment indicator hierarchical initial model construction module is used to construct a model based on the first-level indicator evaluation layer information, the second-level indicator evaluation layer information and the indicator hierarchy model information to obtain the project management system quality assessment indicator hierarchical initial model.

[0110] In one embodiment, the data acquisition module 920 includes a data acquisition unit.

[0111] Among them, the data collection unit is used to obtain each first-level indicator, the weight of each first-level indicator, the second-level indicators corresponding to each first-level indicator, and the weight of the second-level indicators corresponding to each first-level indicator according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model; the data collection unit is used to perform importance assessment according to each first-level indicator, the weight of each first-level indicator, the second-level indicators corresponding to each first-level indicator, and the weight of the second-level indicators corresponding to each first-level indicator, and obtain an indicator importance score table; the data collection unit is used to construct an indicator matrix according to the indicator importance score table, and obtain an indicator judgment matrix; the data collection unit is used to perform importance sorting and consistency testing according to the indicator judgment matrix, and obtain a set of project management system quality assessment indicators.

[0112] In one of the embodiments, the evaluation and analysis module includes an evaluation and analysis unit.

[0113] Among them, the evaluation and analysis unit is used to perform data cleaning processing on the project management system quality assessment data to obtain the processed project management system quality assessment data; the evaluation and analysis unit is used to perform descriptive statistical analysis on the project management system quality assessment data to obtain a first analysis result; the evaluation and analysis unit is used to perform inferential statistical analysis on the project management system quality assessment data to obtain a second analysis result; the evaluation and analysis unit is used to perform visual statistical analysis on the project management system quality assessment data to obtain a third analysis result; the evaluation and analysis unit is used to generate a project management system quality assessment result based on the first analysis result, the second analysis result and the third analysis result.

[0114] In one of the embodiments, the countermeasure query module includes a countermeasure query unit.

[0115] Among them, the countermeasure query unit is used to analyze according to the project management system quality assessment results to obtain the quality problems of the project management system; the countermeasure query unit is used to query in the countermeasure suggestion database according to the project management system quality problems to obtain the corresponding initial countermeasure suggestion plans; the countermeasure query unit is used to perform plan evaluation processing on each initial countermeasure suggestion plan to obtain the plan evaluation results; the plan evaluation processing includes feasibility assessment and risk assessment; the countermeasure query unit is used to determine the project management system quality improvement countermeasure suggestion plan according to the plan evaluation results.

[0116] For the specific definition of the project management system quality evaluation device, please refer to the definition of the project management system quality evaluation method above, which will not be repeated here. Each module in the above-mentioned project management system quality evaluation device can be implemented in whole or in part by software, hardware and their combination. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0117] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Fig.10 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store project management system quality assessment data. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a project management system quality assessment method is implemented.

[0118] Those skilled in the art will understand that Fig.10 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0119] In a third aspect, a computer device is provided. The computer device includes a memory and a processor. The memory stores a computer program. When the processor executes the computer program, the steps of any method in the above method embodiments are implemented.

[0120] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of any method in the above method embodiments are implemented.

[0121] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing related hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), RAMbus direct RAM (RDRAM), direct RAMbus dynamic RAM (DRDRAM), and RAMbus dynamic RAM (RDRAM), etc.

[0122] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0123] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A project management system quality evaluation method, the method comprising: In response to the configuration operation of the project management system quality assessment initial model and the project management system quality assessment indicator hierarchical initial model, a project management system quality assessment model and a project management system quality assessment indicator hierarchical model are generated, and a project management system quality assessment indicator set is determined according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model; Collect data according to the project management system quality assessment indicator set to obtain project management system quality assessment data; Performing data evaluation and analysis based on the project management system quality evaluation data to obtain a project management system quality evaluation result; wherein the data evaluation and analysis includes descriptive statistical analysis, inferential statistical analysis and visual statistical analysis; According to the project management system quality assessment results, a query is made in the countermeasure suggestion database to obtain the project management system quality improvement countermeasure suggestion program.

2. The method according to claim 1, characterized in that The method further comprises: In response to an input operation being performed on the project input requirement input box, determining project input requirement information; In response to performing a configuration operation on the project process processing rule configuration box, determining project process processing rule information; In response to an input operation being performed on the project output result requirement input box, determining project output result requirement information; The model is constructed according to the project input requirement information, the project process processing rule information, the project output result requirement information and the IPO learning model to obtain the initial model of the project management system quality assessment.

3. The method according to claim 1, characterized in that The method further comprises: In response to a configuration operation on the first-level indicator evaluation layer configuration box, determining first-level indicator evaluation layer information; In response to a configuration operation on the secondary indicator evaluation layer configuration box, determining secondary indicator evaluation layer information; In response to a configuration operation on the hierarchy model, determining indicator hierarchy model information; A model is constructed according to the first-level indicator evaluation layer information, the second-level indicator evaluation layer information and the indicator hierarchy model information to obtain the project management system quality assessment indicator hierarchical initial model.

4. The method according to claim 1, characterized in that: The step of determining a set of project management system quality assessment indicators according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model comprises: Obtaining each first-level indicator, the weight of each first-level indicator, the second-level indicator corresponding to each first-level indicator, and the weight of the second-level indicator corresponding to each first-level indicator according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model; An importance evaluation is performed based on each of the first-level indicators, the weight of each of the first-level indicators, the second-level indicators corresponding to each of the first-level indicators, and the weight of the second-level indicators corresponding to each of the first-level indicators to obtain an indicator importance score table; Constructing an indicator matrix according to the indicator importance scoring table to obtain an indicator judgment matrix; Importance ranking and consistency test are performed according to the indicator judgment matrix to obtain the project management system quality assessment indicator set.

5. The method according to claim 1, characterized in that The data collection according to the project management system quality assessment indicator set to obtain project management system quality assessment data includes: According to the project management system quality assessment indicator set, the data collection method is matched in the data collection method database to obtain the data collection method; Matching the data collection tool according to the data collection method to obtain the data collection tool; Selecting a data collection group according to the project management system quality assessment indicator set to obtain a data collection group; The data collection tool is called to collect data in a data source corresponding to the project management system quality assessment indicator set according to the data collection method and the data collection group to obtain the project management system quality assessment data.

6. The method according to claim 1, characterized in that The data evaluation and analysis is performed based on the project management system quality evaluation data to obtain the project management system quality evaluation results, including: Performing data cleaning on the project management system quality assessment data to obtain processed project management system quality assessment data; Performing the descriptive statistical analysis on the project management system quality assessment data to obtain a first analysis result; Performing the inferential statistical analysis on the project management system quality assessment data to obtain a second analysis result; Performing the visual statistical analysis on the project management system quality assessment data to obtain a third analysis result; The project management system quality assessment result is generated according to the first analysis result, the second analysis result and the third analysis result.

7. The method according to claim 1, characterized in that The method of querying the countermeasures and suggestions database according to the project management system quality assessment result to obtain the countermeasures and suggestions for improving the quality of the project management system includes: Analyze the project management system quality assessment results to obtain the project management system quality issues; According to the quality issues of the project management system, a query is made in the countermeasure suggestion database to obtain a corresponding initial countermeasure suggestion; Performing a scheme evaluation process on each of the initial countermeasure suggestion schemes to obtain a scheme evaluation result; the scheme evaluation process includes a feasibility evaluation and a risk assessment; Determine the proposed countermeasures and suggestions for improving the quality of the project management system based on the evaluation results of the plan.

8. A project management system quality evaluation device, characterized in that: The device comprises: An indicator determination module is used to generate a project management system quality assessment model and a project management system quality assessment indicator hierarchical model in response to configuration operations on the project management system quality assessment initial model and the project management system quality assessment indicator hierarchical model, and determine a project management system quality assessment indicator set according to the project management system quality assessment model and the project management system quality assessment indicator hierarchical model; A data collection module, used to collect data according to the project management system quality assessment indicator set to obtain project management system quality assessment data; An evaluation and analysis module, used to perform data evaluation and analysis based on the project management system quality evaluation data to obtain a project management system quality evaluation result; wherein the data evaluation and analysis includes descriptive statistical analysis, inferential statistical analysis and visual statistical analysis; The countermeasure query module is used to query the countermeasure suggestion database according to the project management system quality assessment result to obtain the countermeasure suggestion scheme for improving the project management system quality.

9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.