Human resource information management method based on big data
Through the management method of big data human resources information, real-time monitoring and deployment of personnel has been solved, and the problem of over-allocation and absence of personnel in project execution has been achieved, and the stable implementation of the project and progress guarantee are achieved.
Patent Information
- Application Number
- CN202411242604.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing human resources information management methods cannot comprehensively consider the working status of department personnel during project execution, resulting in excessive allocation of staff and absence from work that affects project stability and cannot replenish personnel in a timely manner.
Adopt a human resource information management method based on big data, obtain project tasks and department personnel data, monitor attendance in real time, and staff allocation and supplement. Priority is given to people who have no other project arrangements, and people who have time overlap but do not conflict. , and finally select the supplementary personnel with the least overlap time.
This reduces the situation where staff members are in multiple projects, ensures the stable implementation of projects, and promptly supplements of absentee personnel to avoid the impact of project progress and quality.
Smart Images

Figure HDA0005029728990000011
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of human resource management, and in particular to a human resource information management method based on big data. Background Art
[0002] With the advent of the era of economic globalization, the development of enterprises is no longer limited to the competition of technology and market, but more importantly, the competition of talents. Talents are the precious wealth of enterprises and institutions and the core of human resource management.
[0003] In the process of enterprise operation, after receiving the work project tasks, personnel will be allocated and transferred according to the project tasks, so that employees can fully utilize their own abilities to execute and complete the project;
[0004] The existing human resource information management methods cannot comprehensively consider the work status of department personnel when allocating and transferring project execution personnel. This may result in too many staff members taking on multiple projects and taking on multiple projects for too long, which may reduce the quality of staff work and affect the normal progress of multiple projects. In addition, during the project execution process, it is impossible to determine whether absent personnel will affect the project, and thus it is impossible to fill the corresponding positions in time, affecting the stable progress of the project. Summary of the invention
[0005] The present invention provides a human resources information management method based on big data to solve the problems mentioned in the above background technology.
[0006] The present invention provides the following technical solution: a human resources information management method based on big data, comprising:
[0007] Get the target project tasks and extract project data;
[0008] Obtain personnel data of target department;
[0009] According to the project data and the personnel data of the target department, the project participant data is formed through the personnel deployment strategy;
[0010] Execute target projects based on project data and project participant data;
[0011] Obtain attendance information of project participants in real time;
[0012] According to the attendance of project participants, attendance abnormality determination strategy is used to form attendance abnormality determination data;
[0013] Based on the attendance abnormality judgment data, a replenishment judgment strategy is formed to determine whether new personnel need to be added to the target project;
[0014] If it is determined that new personnel need to be added to the target project, the personnel addition strategy is used to generate replacement personnel data;
[0015] The step of obtaining the target project task and extracting project data includes:
[0016] Get the target project tasks;
[0017] Extract the project execution time period in the target project task and set it as the required execution time period;
[0018] Extract the required positions in the target project tasks;
[0019] The number of required personnel corresponding to each required position in the target project task is extracted and defined as the number of required personnel.
[0020] As an optional solution of the human resources information management method based on big data described in the present invention, the personnel deployment strategy includes:
[0021] Get all the job openings;
[0022] Steps S1 to S6 are executed for each required position.
[0023] As an optional solution of the human resources information management method based on big data of the present invention, the steps S1 to S6 are specifically as follows:
[0024] S1. Obtain all personnel corresponding to the required positions in the target department and set them as the first target personnel;
[0025] S2. Obtain the working status of each first target person;
[0026] The work status includes an unscheduled state and a scheduled state;
[0027] S3, extracting the first target personnel whose working status is unscheduled and defining them as the first unscheduled personnel;
[0028] S4. Obtain the number of the first unscheduled personnel, and set it as the first number of unscheduled personnel;
[0029] S5. Obtain the number of required personnel corresponding to the required positions and set it as the target number;
[0030] S6. comparing the first number of unscheduled personnel with the target number;
[0031] If the number of the first unscheduled personnel is ≥ the target number, the target number of unscheduled personnel are randomly selected as project participants;
[0032] If the number of first unscheduled personnel is less than the target number, all first unscheduled personnel will be regarded as project participants, and the first participant determination strategy will be implemented.
[0033] As an optional solution of the human resources information management method based on big data of the present invention, the first participant determination strategy includes:
[0034] Extract the first target personnel whose work status is arranged and define them as arranged personnel;
[0035] Obtain the scheduled unfinished project corresponding to each scheduled person, and define it as the first scheduled unfinished project;
[0036] Obtain the project execution time period of each first scheduled unfinished project and set it as the first scheduled execution time period;
[0037] Get the required execution time period;
[0038] Extract the first scheduled unfinished project whose first scheduled execution time period does not overlap with the required execution time period and define it as a non-overlapping project;
[0039] Obtain all personnel corresponding to the required positions in all non-overlapping projects and define them as non-overlapping personnel;
[0040] Get the number of non-overlapping personnel and define it as the number of non-overlapping personnel;
[0041] Get the target number;
[0042] Get the number of the first unscheduled personnel;
[0043] Calculate the first quantity, the first quantity = target quantity - the first number of unscheduled personnel;
[0044] If the number of non-overlapping personnel is greater than or equal to the first number, the first number of non-overlapping personnel are randomly selected as project participants;
[0045] If the number of non-overlapping personnel is less than the first number, all non-overlapping personnel will be regarded as project participants, and the second participant determination strategy will be implemented.
[0046] As an optional solution of the human resources information management method based on big data of the present invention, the second participant determination strategy includes:
[0047] Obtain the first target person other than the first unscheduled person and the non-overlapping person, and define him as the first determination person;
[0048] Obtain the scheduled but unfinished projects corresponding to each first judgement personnel and define them as the first judgement projects;
[0049] Obtaining a project execution time period of each first determination project, and setting it as the first determination project execution time period;
[0050] Obtain the start time and end time of each first determination item execution time period, and set them as the determination start time and determination end time respectively;
[0051] Get the required execution time period;
[0052] Get the start time and end time of the required execution time period, and set them as the execution start time and execution end time respectively;
[0053] Calculate the overlap duration between each first determination item execution time period and the required execution time period, and set it as the first overlap duration;
[0054] If the determination start time is greater than the execution start time, and the determination end time is greater than the execution end time, then the first overlap duration = execution end time - determination start time;
[0055] If the determination start time is greater than the execution start time, and the determination end time is less than or equal to the execution end time, then the first overlap duration is equal to the determination end time - the determination start time;
[0056] If the determination start time ≤ the execution start time, and the determination end time > the execution end time, then the first overlap duration = execution end time - execution start time;
[0057] If the determination start time ≤ the execution start time, and the determination end time ≤ the execution end time, then the first overlap duration = determination end time - execution start time;
[0058] Obtain each first determination person to form a first determination person set A;
[0059] Obtain the first overlap duration corresponding to each first determination person to form a first overlap duration set B;
[0060] The elements in the first determination personnel set A are matched one by one with the elements in the first overlap duration set B to form a first set;
[0061] Calculate the second quantity, the second quantity = the first quantity - the number of non-overlapping personnel;
[0062] Arrange the elements in the first set from small to large according to the value of the first overlap duration to form a duration sequence set;
[0063] Taking the first element in the time sequence set as the starting element, extracting the second number of elements to form a target element set;
[0064] The first judge corresponding to each element in the target element set is obtained and determined as the project participant.
[0065] As an optional solution of the human resources information management method based on big data of the present invention, the attendance abnormality determination strategy includes:
[0066] Get the attendance status of each project participant in real time;
[0067] The attendance conditions include normal conditions and abnormal conditions;
[0068] If the attendance of a project participant is abnormal, the project participant will be identified as an abnormal person;
[0069] Obtain the abnormal reasons of abnormal personnel;
[0070] The abnormal reasons include leave and resignation;
[0071] If the abnormal reason of the abnormal personnel is leave, the first supplementary judgment strategy is implemented;
[0072] If the abnormal reason of the abnormal personnel is resignation, the second supplementary determination strategy will be executed.
[0073] As an optional solution of the human resources information management method based on big data of the present invention, the supplementary determination strategy includes a first supplementary determination strategy, which is specifically:
[0074] Get the time period when the abnormal person takes leave, and set it as the leave time period;
[0075] Get the start time and end time of the leave period, and set them as the leave start time and leave end time respectively;
[0076] Get the execution start time and execution end time;
[0077] Calculate the overlap duration between the leave time period and the required execution time period, and set it as the second overlap duration;
[0078] If the leave end time is greater than the execution end time, then the second overlap duration = execution end time - leave start time;
[0079] If the leave end time ≤ the execution end time, the second overlap duration = leave end time - leave start time;
[0080] Calculate the required duration, which is the execution end time - execution start time.
[0081] If the second overlap duration is less than the required duration × 40%, no determination is made;
[0082] If the second overlap duration ≥ required duration × 40%, the position of the abnormal personnel is obtained, set as the target position, and the personnel replenishment strategy is implemented.
[0083] As an optional solution of the human resources information management method based on big data of the present invention, the supplementary determination strategy includes a second supplementary determination strategy, which is specifically:
[0084] Get the time when abnormal personnel leave the company;
[0085] Get the execution start time and execution end time;
[0086] Calculate the third overlap duration, which is the third overlap duration = execution end time - abnormal personnel departure time;
[0087] Get the required time;
[0088] If the third overlap duration is less than the required duration × 40%, no determination is made;
[0089] If the third overlap duration ≥ required duration × 40%, the position of the abnormal personnel is obtained, set as the target position, and the personnel replenishment strategy is implemented.
[0090] As an optional solution of the human resources information management method based on big data of the present invention, the personnel recruitment strategy includes:
[0091] Obtain all personnel corresponding to the target positions in the target department and set them as the second target personnel;
[0092] Obtain the current working status of the second target person;
[0093] Extract the second target personnel whose current working status is unscheduled and define them as the second unscheduled personnel;
[0094] Obtain the number of the second unscheduled personnel, and set it as the number of the second unscheduled personnel;
[0095] If the number of the second unscheduled personnel is ≥ 1, then one of the second unscheduled personnel is randomly selected as a substitute and added to the target project;
[0096] If the number of the second unscheduled personnel = 0, extract the second target personnel whose current working status is the scheduled status and define them as the scheduled personnel;
[0097] Obtain the scheduled unfinished project corresponding to each scheduled person and define it as the second scheduled unfinished project;
[0098] Obtain the start time and end time of each second scheduled unfinished project, and set them as the second start time and the second end time respectively;
[0099] Get the execution end time;
[0100] Extract the second scheduled unfinished project whose second start time is ≥ the execution end time and define it as the second determination project;
[0101] Obtaining the number of the second determination items, which is defined as the second determination item number;
[0102] If the number of second judgment items is ≥ 1, the personnel corresponding to the target position in the second judgment items are obtained and determined as the second judgment personnel;
[0103] Then, a second judge is randomly selected as a substitute and added to the target project;
[0104] If the number of second determination items = 0, all second end times are arranged in ascending order of value, and the second end time with the smallest value is set as the minimum end time;
[0105] Obtain the second determination item corresponding to the minimum end time and set it as the minimum item;
[0106] Get the personnel corresponding to the target position in the smallest project and set it as the smallest personnel;
[0107] Then, randomly select a minimum person as a substitute and add him to the target project.
[0108] The present invention has the following beneficial effects:
[0109] 1. This human resource information management method based on big data can allocate and transfer department personnel according to project task requirements before the execution of the target project, and give priority to personnel who have no other project arrangements in the corresponding positions. When the personnel who have no other project arrangements cannot meet the personnel needs of the target project's various required positions, the personnel who have other project arrangements but whose execution time periods of other projects do not overlap with the target project are selected next. When the combination of personnel who have no other project arrangements and personnel who have other project arrangements but whose execution time periods of other projects do not overlap with the target project cannot meet the needs of the target project, the personnel with less overlapping time are selected from the personnel who have other project arrangements and whose execution time periods of other projects overlap with the target project to supplement the target project, thereby reducing the situation where staff members are assigned to multiple projects as much as possible, ensuring that more staff members can concentrate on executing one project in more working time, and ensuring the stable execution of each project as much as possible.
[0110] 2. This human resource information management method based on big data can monitor the attendance of project participants in the target project in real time during the project execution. When it is determined that a project participant has taken too long a leave of absence, or a project participant has resigned within a short period of time during the implementation of the target project, other personnel can be promptly mobilized as substitutes to fill in the target project, so as to avoid the target project being affected by the lack of staff and affecting the project progress and completion quality.
[0111] 3. When selecting replacement personnel to be added to the target project, the human resource information management method based on big data gives priority to personnel who currently have no other project arrangements for the corresponding positions. When there are no personnel who currently have no other project arrangements, the method then gives priority to personnel who have other project arrangements but whose other projects will not be implemented until the target project is completed. When there are no personnel who currently have other project arrangements but whose other projects will not be implemented until the target project is completed, the method finally gives priority to personnel who have other project arrangements and whose other projects overlap with the target project in the execution time period, and selects the personnel with the least overlapping time to be added to the target project, thereby minimizing the situation where staff members take on multiple projects and the time they take on multiple projects, thereby ensuring the stable execution of each project. BRIEF DESCRIPTION OF THE DRAWINGS
[0112] Figure 1 This is a block diagram of the human resources information management method based on big data of the present invention. DETAILED DESCRIPTION
[0113] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0114] For example, see Figure 1 , a human resources information management method based on big data, comprising:
[0115] Get the target project tasks and extract project data;
[0116] Obtain personnel data of target department;
[0117] According to the project data and the personnel data of the target department, the project participant data is formed through the personnel deployment strategy;
[0118] Execute target projects based on project data and project participant data;
[0119] Obtain attendance information of project participants in real time;
[0120] According to the attendance of project participants, attendance abnormality determination strategy is used to form attendance abnormality determination data;
[0121] Based on the attendance abnormality judgment data, a replenishment judgment strategy is formed to determine whether new personnel need to be added to the target project;
[0122] If it is determined that new personnel need to be added to the target project, the personnel addition strategy is used to generate replacement personnel data;
[0123] The step of obtaining the target project task and extracting project data includes:
[0124] Get the target project tasks;
[0125] Extract the project execution time period in the target project task and set it as the required execution time period;
[0126] Extract the required positions in the target project tasks;
[0127] The number of required personnel corresponding to each required position in the target project task is extracted and defined as the number of required personnel.
[0128] Through the above-mentioned human resource information management method based on big data, department personnel can be allocated and transferred according to project task requirements before the execution of the target project, so as to reduce the situation of staff members taking on multiple projects as much as possible, ensure that more staff members can concentrate on executing one project during more working time, and ensure the stable execution of each project as much as possible; during the project execution, the attendance of project participants in the target project can be monitored in real time. When it is determined that a project participant has taken too long a leave of absence, or a project participant has resigned within a short period of time during the implementation of the target project, other personnel can be promptly transferred as substitutes to fill in the target project, so as to avoid the target project from affecting the progress of the project and the quality of the project completion due to the lack of staff. When selecting substitutes to be added to the target project, the situation of staff members taking on multiple projects is reduced as much as possible, the time for staff members to take on multiple projects is reduced, and the stable execution of each project is ensured.
[0129] Embodiment 2: This embodiment is an improvement made on the basis of embodiment 1. The human resource information management method based on big data and the personnel deployment strategy specifically include:
[0130] Get all the job openings;
[0131] Steps S1 to S6 are executed for each required position.
[0132] In this embodiment, the steps S1 to S6 are specifically:
[0133] S1. Obtain all personnel corresponding to the required positions in the target department and set them as the first target personnel;
[0134] S2. Obtain the working status of each first target person;
[0135] The work status includes an unscheduled state and a scheduled state. The scheduled state indicates that the person is not assigned to any unfinished or unstarted project, and the scheduled state indicates that the person is assigned to an executed but unfinished project or a project that has not yet started.
[0136] S3, extracting the first target personnel whose working status is unscheduled and defining them as the first unscheduled personnel;
[0137] S4. Obtain the number of the first unscheduled personnel, and set it as the first number of unscheduled personnel;
[0138] S5. Obtain the number of required personnel corresponding to the required positions and set it as the target number;
[0139] S6. comparing the first number of unscheduled personnel with the target number;
[0140] If the first number of unscheduled personnel is ≥ the target number, it means that the number of personnel who have not been assigned to any unfinished or unstarted projects can meet the needs of the target projects, then the target number of unscheduled personnel are randomly selected as project participants;
[0141] If the number of first unscheduled personnel is less than the target number, it means that the number of personnel who have not been assigned to any unfinished or unstarted projects cannot meet the target project requirements. In this case, all first unscheduled personnel will be regarded as project participants and the first participant determination strategy will be implemented.
[0142] In this embodiment, the first participant determination strategy includes:
[0143] Extract the first target personnel whose work status is arranged and define them as arranged personnel;
[0144] Obtain the scheduled unfinished project corresponding to each scheduled person, and define it as the first scheduled unfinished project;
[0145] Obtain the project execution time period of each first scheduled unfinished project and set it as the first scheduled execution time period;
[0146] Get the required execution time period;
[0147] Extract the first scheduled unfinished project whose first scheduled execution time period does not overlap with the required execution time period and define it as a non-overlapping project;
[0148] Obtain all personnel corresponding to the required positions in all non-overlapping projects and define them as non-overlapping personnel;
[0149] Get the number of non-overlapping personnel and define it as the number of non-overlapping personnel;
[0150] Get the target number;
[0151] Get the number of the first unscheduled personnel;
[0152] Calculate the first quantity, the first quantity = target quantity - the first number of unscheduled personnel;
[0153] If the number of non-overlapping personnel is ≥ the first number, it means that the combination of the number of non-overlapping personnel and the first number of unscheduled personnel can meet the target project's demand for the number of personnel in the required position, then the first number of non-overlapping personnel will be randomly selected as project participants;
[0154] If the number of non-overlapping personnel is less than the first number, it indicates that the number of non-overlapping personnel combined with the first number of unscheduled personnel cannot meet the target project's demand for the number of personnel in the required position. In this case, all non-overlapping personnel will be regarded as project participants, and the second participant determination strategy will be implemented.
[0155] In this embodiment, the second participant determination strategy includes:
[0156] Obtain the first target person other than the first unscheduled person and the non-overlapping person, and define him as the first determination person;
[0157] Obtain the scheduled but unfinished projects corresponding to each first judgement personnel and define them as the first judgement projects;
[0158] Obtaining a project execution time period of each first determination project, and setting it as the first determination project execution time period;
[0159] Obtain the start time and end time of each first determination item execution time period, and set them as the determination start time and determination end time respectively;
[0160] Get the required execution time period;
[0161] Get the start time and end time of the required execution time period, and set them as the execution start time and execution end time respectively;
[0162] Calculate the overlap duration between each first determination item execution time period and the required execution time period, and set it as the first overlap duration;
[0163] If the determination start time is greater than the execution start time, and the determination end time is greater than the execution end time, then the first overlap duration = execution end time - determination start time;
[0164] If the determination start time is greater than the execution start time, and the determination end time is less than or equal to the execution end time, then the first overlap duration is equal to the determination end time - the determination start time;
[0165] If the determination start time ≤ the execution start time, and the determination end time > the execution end time, then the first overlap duration = execution end time - execution start time;
[0166] If the determination start time ≤ the execution start time, and the determination end time ≤ the execution end time, then the first overlap duration = determination end time - execution start time;
[0167] Obtain each first determination person to form a first determination person set A;
[0168] Obtain the first overlap duration corresponding to each first determination person to form a first overlap duration set B;
[0169] The elements in the first determination personnel set A are matched one by one with the elements in the first overlap duration set B to form a first set;
[0170] Calculate the second quantity, the second quantity = the first quantity - the number of non-overlapping personnel;
[0171] Arrange the elements in the first set from small to large according to the value of the first overlap duration to form a duration sequence set;
[0172] Taking the first element in the time sequence set as the starting element, extracting the second number of elements to form a target element set;
[0173] Obtaining the first judge corresponding to each element in the target element set and defining them as project participants can minimize the time that personnel corresponding to the required positions take on multiple projects and ensure the stable execution of each project as much as possible.
[0174] Embodiment 3: This embodiment is an improvement made on the basis of embodiment 1. The human resource information management method based on big data and the attendance abnormality determination strategy specifically include:
[0175] Get the attendance status of each project participant in real time;
[0176] The attendance situation includes normal situation and abnormal situation. Normal situation refers to that the project participants work normally and do not take leave or resign. Abnormal situation refers to that the project participants take leave or resign.
[0177] If the attendance of a project participant is abnormal, the project participant will be identified as an abnormal person;
[0178] Obtain the abnormal reasons of abnormal personnel;
[0179] The abnormal reasons include leave and resignation;
[0180] If the abnormal reason of the abnormal personnel is leave, the first supplementary judgment strategy is implemented;
[0181] If the abnormal reason of the abnormal personnel is resignation, the second supplementary determination strategy will be executed.
[0182] In this embodiment, the replenishment determination strategy includes a first replenishment determination strategy, which is specifically:
[0183] Get the time period when the abnormal person takes leave, and set it as the leave time period;
[0184] Get the start time and end time of the leave period, and set them as the leave start time and leave end time respectively;
[0185] Get the execution start time and execution end time;
[0186] Calculate the overlap duration between the leave time period and the required execution time period, which is defined as the second overlap duration. That is, the second overlap duration is the duration that the abnormal personnel will delay the work of the target project due to the leave.
[0187] If the leave end time is greater than the execution end time, it means that the abnormal personnel can only return to work after the target project is completed. Then the second overlap time = execution end time - leave start time;
[0188] If the leave end time ≤ the execution end time, it means that the abnormal personnel can return to work before the end of the target project, then the second overlap time = leave end time - leave start time.
[0189] Calculate the required duration, which is the execution end time - execution start time.
[0190] If the second overlap duration is less than the required duration × 40%, it indicates that the abnormal personnel will not delay much working time of the target project due to the leave, and will not affect the normal progress of the target project, so no judgment is made;
[0191] If the second overlapping duration ≥ the required duration × 40%, it indicates that the abnormal personnel will delay a lot of working time of the target project due to leave, which will affect the normal progress of the target project. Other personnel need to be added to replace the work of the first judgment personnel. The position of the abnormal personnel is obtained, set as the target position, and the personnel replacement strategy is implemented.
[0192] In this embodiment, the supplementary determination strategy includes a second supplementary determination strategy, which is specifically:
[0193] Get the time when abnormal personnel leave the company;
[0194] Get the execution start time and execution end time;
[0195] Calculate the third overlap duration, which is the third overlap duration = execution end time - abnormal personnel departure time;
[0196] Get the required time;
[0197] If the third overlap duration is less than the required duration × 40%, it indicates that the abnormal personnel will not delay much working time of the target project due to resignation, and will not affect the normal progress of the target project, so no judgment is made;
[0198] If the third overlap duration ≥ required duration × 40%, it indicates that the abnormal personnel will delay a lot of working time of the target project due to their resignation, which will affect the normal progress of the target project. Other personnel need to be added to take over the work of the abnormal personnel. In this case, the position of the abnormal personnel will be obtained, set as the target position, and the personnel replacement strategy will be implemented.
[0199] In this embodiment, the personnel replenishment strategy includes:
[0200] Obtain all personnel corresponding to the target positions in the target department and set them as the second target personnel;
[0201] Obtain the current working status of the second target person;
[0202] Extract the second target personnel whose current working status is unscheduled and define them as the second unscheduled personnel. The second unscheduled personnel are personnel corresponding to the target positions who are not scheduled to any unfinished or unstarted projects at the current time;
[0203] Obtain the number of the second unscheduled personnel, and set it as the number of the second unscheduled personnel;
[0204] If the number of the second unscheduled personnel is ≥ 1, it means that the personnel corresponding to the target position have not been assigned to any unfinished or unstarted projects at the current time, then a second unscheduled personnel is randomly selected as a substitute and added to the target project;
[0205] If the number of the second unscheduled personnel = 0, it means that no personnel corresponding to the target position has been assigned to any unfinished or unstarted projects at the current time, that is, the personnel corresponding to all the target positions are currently assigned to unfinished projects or unstarted projects, then the second target personnel whose current working status is the scheduled status are extracted and defined as the scheduled personnel;
[0206] Obtain the scheduled unfinished project corresponding to each scheduled person and define it as the second scheduled unfinished project;
[0207] Obtain the start time and end time of each second scheduled unfinished project, and set them as the second start time and the second end time respectively;
[0208] Get the execution end time;
[0209] Extract the second scheduled unfinished project whose second start time is greater than or equal to the execution end time, and define it as the second determination project. The second determination project is the project that will be executed after the target project is completed.
[0210] Obtaining the number of the second determination items, which is defined as the second determination item number;
[0211] If the number of second judgment projects is ≥ 1, it indicates that there are projects that will be executed after the target project is completed. If the personnel corresponding to the target positions in the second judgment project are added to the target project to work, it will not affect the normal execution of the second judgment project. Then the personnel corresponding to the target positions in the second judgment project are obtained and determined as the second judgment personnel;
[0212] Then, a second judge is randomly selected as a substitute and added to the target project;
[0213] If the number of second determination projects = 0, indicating that there is no project that will be executed after the target project is completed, all second end times are arranged in ascending order of value, and the second end time with the smallest value is set as the minimum end time;
[0214] Obtain the second determination item corresponding to the minimum end time and define it as the minimum item. The minimum item is the second determination item that needs to be executed for the shortest time starting from the current time.
[0215] Get the personnel corresponding to the target position in the smallest project and set it as the smallest personnel;
[0216] Then, randomly selecting a minimum number of people as a substitute and adding him to the target project can minimize the time that the person in the target position spends taking on multiple projects and ensure the stable execution of each project as much as possible.
Claims
1. A human resources information management method based on big data, characterized by: include: Get the target project tasks and extract project data; Obtain personnel data of target department; According to the project data and the personnel data of the target department, the project participant data is formed through the personnel deployment strategy; Execute target projects based on project data and project participant data; Obtain attendance information of project participants in real time; According to the attendance of project participants, attendance abnormality determination strategy is used to form attendance abnormality determination data; Based on the attendance abnormality judgment data, a replenishment judgment strategy is formed to determine whether new personnel need to be added to the target project; If it is determined that new personnel need to be added to the target project, the personnel addition strategy is used to generate replacement personnel data; The step of obtaining the target project task and extracting project data includes: Get the target project tasks; Extract the project execution time period in the target project task and set it as the required execution time period; Extract the required positions in the target project tasks; The number of required personnel corresponding to each required position in the target project task is extracted and defined as the number of required personnel.
2. The human resources information management method based on big data according to claim 1 is characterized by: The staff deployment strategy includes: Get all the job openings; Steps S1 to S6 are executed for each required position.
3. The human resources information management method based on big data according to claim 2 is characterized by: The steps S1 to S6 are specifically: S1. Obtain all personnel corresponding to the required positions in the target department and set them as the first target personnel; S2. Obtain the working status of each first target person; The work status includes an unscheduled state and a scheduled state; S3, extracting the first target personnel whose working status is unscheduled and defining them as the first unscheduled personnel; S4. Obtain the number of the first unscheduled personnel, and set it as the first number of unscheduled personnel; S5. Obtain the number of required personnel corresponding to the required positions and set it as the target number; S6. comparing the first number of unscheduled personnel with the target number; If the number of the first unscheduled personnel is ≥ the target number, the target number of unscheduled personnel are randomly selected as project participants; If the number of first unscheduled personnel is less than the target number, all first unscheduled personnel will be regarded as project participants, and the first participant determination strategy will be implemented.
4. The human resources information management method based on big data according to claim 3 is characterized by: The first participant determination strategy includes: Extract the first target personnel whose work status is arranged and define them as arranged personnel; Obtain the scheduled unfinished project corresponding to each scheduled person, and define it as the first scheduled unfinished project; Obtain the project execution time period of each first scheduled unfinished project and set it as the first scheduled execution time period; Get the required execution time period; Extract the first scheduled unfinished project whose first scheduled execution time period does not overlap with the required execution time period and define it as a non-overlapping project; Obtain all personnel corresponding to the required positions in all non-overlapping projects and define them as non-overlapping personnel; Get the number of non-overlapping personnel and define it as the number of non-overlapping personnel; Get the target number; Get the number of the first unscheduled personnel; Calculate the first quantity, the first quantity = target quantity - the first number of unscheduled personnel; If the number of non-overlapping personnel is greater than or equal to the first number, the first number of non-overlapping personnel are randomly selected as project participants; If the number of non-overlapping personnel is less than the first number, all non-overlapping personnel will be regarded as project participants, and the second participant determination strategy will be implemented.
5. The human resources information management method based on big data according to claim 4 is characterized by: The second participant determination strategy includes: Obtain the first target person other than the first unscheduled person and the non-overlapping person, and define him as the first determination person; Obtain the scheduled but unfinished projects corresponding to each first judgement personnel and define them as the first judgement projects; Obtaining a project execution time period of each first determination project, and setting it as the first determination project execution time period; Obtain the start time and end time of each first determination item execution time period, and set them as the determination start time and determination end time respectively; Get the required execution time period; Get the start time and end time of the required execution time period, and set them as the execution start time and execution end time respectively; Calculate the overlap duration between each first determination item execution time period and the required execution time period, and set it as the first overlap duration; If the determination start time is greater than the execution start time, and the determination end time is greater than the execution end time, then the first overlap duration = execution end time - determination start time; If the determination start time is greater than the execution start time, and the determination end time is less than or equal to the execution end time, then the first overlap duration is equal to the determination end time - the determination start time; If the determination start time ≤ the execution start time, and the determination end time > the execution end time, then the first overlap duration = execution end time - execution start time; If the determination start time ≤ the execution start time, and the determination end time ≤ the execution end time, then the first overlap duration = determination end time - execution start time; Obtain each first determination person to form a first determination person set A; Obtain the first overlap duration corresponding to each first determination person to form a first overlap duration set B; The elements in the first determination personnel set A are matched one by one with the elements in the first overlap duration set B to form a first set; Calculate the second quantity, the second quantity = the first quantity - the number of non-overlapping personnel; Arrange the elements in the first set from small to large according to the value of the first overlap duration to form a duration sequence set; Taking the first element in the time sequence set as the starting element, extracting the second number of elements to form a target element set; The first judge corresponding to each element in the target element set is obtained and determined as the project participant.
6. The human resources information management method based on big data according to claim 5 is characterized by: The attendance abnormality determination strategy includes: Get the attendance status of each project participant in real time; The attendance conditions include normal conditions and abnormal conditions; If the attendance of a project participant is abnormal, the project participant will be identified as an abnormal person; Obtain the abnormal reasons of abnormal personnel; The abnormal reasons include leave and resignation; If the abnormal reason of the abnormal personnel is leave, the first supplementary judgment strategy is implemented; If the abnormal reason of the abnormal personnel is resignation, the second supplementary determination strategy will be executed.
7. The human resources information management method based on big data according to claim 6 is characterized by: The replenishment determination strategy includes a first replenishment determination strategy, specifically: Get the time period when the abnormal person takes leave, and set it as the leave time period; Get the start time and end time of the leave period, and set them as the leave start time and leave end time respectively; Get the execution start time and execution end time; Calculate the overlap duration between the leave time period and the required execution time period, and set it as the second overlap duration; If the leave end time is greater than the execution end time, then the second overlap duration = execution end time - leave start time; If the leave end time ≤ the execution end time, the second overlap duration = leave end time - leave start time; Calculate the required duration, which is the execution end time - execution start time. If the second overlap duration is less than the required duration × 40%, no determination is made; If the second overlap duration ≥ required duration × 40%, the position of the abnormal personnel is obtained, set as the target position, and the personnel replenishment strategy is implemented.
8. The human resources information management method based on big data according to claim 7 is characterized by: The replenishment determination strategy includes a second replenishment determination strategy, specifically: Get the time when abnormal personnel leave the company; Get the execution start time and execution end time; Calculate the third overlap duration, which is the third overlap duration = execution end time - abnormal personnel departure time; Get the required time; If the third overlap duration is less than the required duration × 40%, no determination is made; If the third overlap duration ≥ required duration × 40%, the position of the abnormal personnel is obtained, set as the target position, and the personnel replenishment strategy is implemented.
9. The human resources information management method based on big data according to claim 8 is characterized by: The personnel recruitment strategy includes: Obtain all personnel corresponding to the target positions in the target department and set them as the second target personnel; Obtain the current working status of the second target person; Extract the second target personnel whose current working status is unscheduled and define them as the second unscheduled personnel; Obtain the number of the second unscheduled personnel, and set it as the number of the second unscheduled personnel; If the number of the second unscheduled personnel is ≥ 1, then one of the second unscheduled personnel is randomly selected as a substitute and added to the target project; If the number of the second unscheduled personnel = 0, extract the second target personnel whose current working status is the scheduled status and define them as the scheduled personnel; Obtain the scheduled unfinished project corresponding to each scheduled person and define it as the second scheduled unfinished project; Obtain the start time and end time of each second scheduled unfinished project, and set them as the second start time and the second end time respectively; Get the execution end time; Extract the second scheduled unfinished project whose second start time is ≥ the execution end time and define it as the second determination project; Obtaining the number of the second determination items, which is defined as the second determination item number; If the number of second judgment items is ≥ 1, the personnel corresponding to the target position in the second judgment items are obtained and determined as the second judgment personnel; Then, a second judge is randomly selected as a substitute and added to the target project; If the number of second determination items = 0, all second end times are arranged in ascending order of value, and the second end time with the smallest value is set as the minimum end time; Obtain the second determination item corresponding to the minimum end time and set it as the minimum item; Get the personnel corresponding to the target position in the smallest project and set it as the smallest personnel; Then, randomly select a minimum person as a substitute and add him to the target project.
Citation Information
Patent Citations
Project management method and system, computer equipment and storage medium
CN113409005A
Detection service management method and system based on task information flow tracking
CN114154954A
Rail transit operation station service management automatic scheduling information processing method and system
CN117236576A
Intelligent government affair information resource management system based on block chain
CN117575276A
The management of work forces
WO2003081491A2
