Computer-based whole-station monitoring management system
By establishing a mapping table of equipment nodes and terminal submodules in the photovoltaic site, setting the installation and start-stop parameters of the backup submodules according to the preset evaluation model, the problem of high operation and maintenance and construction costs of the existing ECMS system is solved, and the cost of realization is realized. More efficient monitoring and management are achieved, reducing operation and maintenance costs.
Patent Information
- Application Number
- CN202410837668.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing electrical monitoring and management system (ECMS) of power plants has high operation and maintenance costs, and it is difficult to effectively reduce the control and monitoring efficiency and operation and maintenance costs of photovoltaic stations.
Using a computer-based full-station monitoring and management system, by establishing a mapping table of device nodes and terminal submodules, generating equipment evaluation value based on the preset evaluation model, setting the installation range and start-stop parameters of backup submodules, and realizing periodic monitoring. and manage to reduce overall operation and maintenance costs.
It reduces the cost and operation and maintenance costs of the system, ensures the safe operation of photovoltaic stations, and improves control and monitoring efficiency.
Smart Images

Figure CN118944280A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of site monitoring, and in particular to a computer-based full-site monitoring and management system. Background Art
[0002] The power plant electrical monitoring and management system (ECMS) uses automatic control technology, computer digital technology and digital information transmission technology to integrate the interrelated parts of the power plant system into an organic whole. The ECMS system functions include the monitoring and management of the power plant electrical equipment, mainly for the monitoring and management of the units (high and low voltage power supply systems, generators and transformers) to achieve the monitoring / monitoring, management and maintenance of the power plant electrical system in normal operation and accident situations.
[0003] Conventional ECMS systems adopt a hierarchical distributed structure, generally with station control layer, communication management layer, and field interval layer. The station control layer communicates with the communication management layer equipment through network cables. The communication management layer and the field interval layer equipment realize the control and monitoring functions of each interval equipment through communication lines. However, the current ECMS system has the problem of high operation and maintenance costs and construction costs. Summary of the invention
[0004] The purpose of this application is: to solve the above technical problems, this application provides a computer-based full-station monitoring and management system, aiming to improve the control and monitoring efficiency of photovoltaic stations and reduce overall operation and maintenance costs.
[0005] In some embodiments of the present application, multiple device nodes are established based on all equipment parameters in the photovoltaic station, and after a comprehensive evaluation of each device node is performed according to a preset evaluation model, the installation range of the spare sub-module is determined, thereby reducing the construction cost of the system. At the same time, the entire system is periodically monitored, and the corresponding spare sub-module start and stop parameters are set according to the failure risk value, thereby reducing the overall operation and maintenance cost and ensuring the safe operation of the photovoltaic station.
[0006] In some embodiments of the present application, a computer-based full-station monitoring and management system is provided, comprising:
[0007] Station control unit, including central control unit, terminal unit and monitoring unit;
[0008] The terminal unit includes a plurality of terminal submodules;
[0009] The central control unit is used to establish multiple device nodes according to device parameters;
[0010] The monitoring unit includes a plurality of monitoring submodules, each of which is arranged at a device node and is used to collect operating parameters of the device node;
[0011] The network department is used to build the communication network between the central control unit, terminal unit and monitoring unit;
[0012] The interval part includes a plurality of standby submodules. The central control unit is used to generate a device evaluation value of each device node and set the setting parameters of the standby submodule according to the device evaluation value.
[0013] In some embodiments of the present application, the central control unit includes:
[0014] The first processing module is used to establish a device node sequence A, A = (a1, a2 ... an), where ai is the i-th device node and n is the number of device nodes;
[0015] The first processing module is also used to establish a terminal submodule sequence B, B = (b1, b2 ... bm), where bi is the i-th terminal submodule and m is the number of terminal submodules;
[0016] According to the device node number sequence A and the terminal submodule number sequence B, a terminal submodule-device node mapping table is established;
[0017] The second processing module is used to obtain the station operation requirements, generate control instructions for each device node according to the station operation requirements, and send all control instructions to the corresponding terminal submodule according to the terminal submodule-device node mapping table;
[0018] The third processing module is used to establish the operation monitoring curve of each device node.
[0019] In some embodiments of the present application, the central control unit further includes:
[0020] The first evaluation module is used to establish a device evaluation value sequence C, C = (c1, c2...cn), where ci is the device evaluation value of the i-th device node;
[0021] The device node array A selects the target device node;
[0022] The second evaluation module is used to set the level of each device node according to the device evaluation value series C, and determine whether each device node is equipped with a spare submodule.
[0023] 4. The computer-based station-wide monitoring and management system according to claim 3, wherein the first evaluation module is further used for:
[0024] Select the target device node according to the device node sequence A;
[0025] Generate a device evaluation value c of the target device node according to a preset evaluation model;
[0026]
[0027] Wherein, e1 is the preset first fixed coefficient, e2 is the preset second fixed coefficient; t1 is the number of equipment evaluation indicators of the equipment node; t2 is the number of operation evaluation indicators of the equipment node; βi is the influencing factor of the i-th equipment evaluation indicator, pi is the reference value of the i-th equipment evaluation indicator; αi is the influencing factor of the i-th operation evaluation indicator; qi is the reference value of the i-th operation evaluation indicator;
[0028] Generate the device evaluation value of each device node in turn, and establish a device evaluation value sequence C, C = (c1, c2...cn).
[0029] In some embodiments of the present application, the second evaluation module is further used to:
[0030] Used to set the level of each device node according to the device evaluation value sequence C, and determine whether each device node is set with a spare submodule;
[0031] The second evaluation module is further used to preset a first device evaluation value threshold C1 and a second evaluation value threshold C2;
[0032] If ci<C1, set the i-th device node to a third-level device node;
[0033] If C1<c<C2, set the i-th device node as a secondary device node;
[0034] If c>C2, set the i-th device node as a first-level device node;
[0035] The third-level device node does not have a spare submodule, the second-level device node has a second-level spare submodule, and the first-level device node has a first-level spare submodule.
[0036] In some embodiments of the present application, the central control unit further includes:
[0037] A first control module, used to obtain the operating parameters of the terminal unit and the network unit according to the preset feedback time node, and generate a system failure risk value;
[0038] The second control module is used to set the start and stop parameters of each first-level standby submodule and each second-level standby submodule according to the system failure risk value.
[0039] In some embodiments of the present application, the first control module is used to:
[0040] Establish multiple time intervals based on feedback time nodes;
[0041] Get the network operation parameters for each time interval;
[0042] Generate network operation evaluation values in each time interval and establish network operation evaluation value series D, D = (d1, d2...d n1 ), where n1 is the number of time intervals between the last correction time node and the current feedback time node, d n1 is the network operation evaluation value of the time interval of the current feedback time node; d i is the network operation evaluation value of the time interval of the i-th feedback time node after the last correction time node;
[0043] Generate the failure risk value h of the current feedback time node;
[0044]
[0045] Among them, e3 is the preset third fixed coefficient; e4 is the preset fourth fixed coefficient; e5 is the preset fifth fixed coefficient; ηi is the influencing factor of the i-th terminal submodule; fi is the state evaluation value of the i-th terminal submodule at the current feedback time node; Δd is the average value of all data in the network operation evaluation value series D.
[0046] In some embodiments of the present application, the second control module is further used to:
[0047] Preset a first failure risk value interval (H1, H2), a second failure risk value interval (H2, H3) and a third failure risk value interval (H3, H4);
[0048] If h is in the preset first failure risk value interval, no start instruction is generated;
[0049] If h is in the preset second failure risk value interval, a first-level startup instruction is generated, and all first-level standby sub-modules are started according to the first-level startup instruction;
[0050] If h is in the preset third failure risk value interval, a secondary startup instruction is generated, and all primary backup sub-modules and all secondary backup sub-modules are started according to the secondary startup instruction.
[0051] Compared with the prior art, the computer-based full-station monitoring and management system of the present application has the following beneficial effects:
[0052] According to the parameters of all equipment in the photovoltaic station, multiple equipment nodes are established, and after comprehensive evaluation of each equipment node according to the preset evaluation model, the installation scope of the spare sub-module is determined, thereby reducing the cost of the system. At the same time, the entire system is monitored periodically, and the corresponding spare sub-module start and stop parameters are set according to the failure risk value, which reduces the overall operation and maintenance cost and ensures the safe operation of the photovoltaic station. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 It is a structural diagram of a computer-based full-station monitoring and management system in the preferred embodiment of the present application. DETAILED DESCRIPTION
[0054] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.
[0055] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0056] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0057] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0058] like Figure 1 As shown, a computer-based full-station monitoring and management system according to a preferred embodiment of the present application includes:
[0059] Station control unit, including central control unit, terminal unit and monitoring unit;
[0060] The terminal unit includes a plurality of terminal submodules;
[0061] The central control unit is used to establish multiple device nodes according to device parameters;
[0062] The monitoring unit includes a plurality of monitoring submodules, which are arranged at the device nodes and used to collect the operation parameters of the device nodes;
[0063] The network department is used to build the communication network between the central control unit, terminal unit and monitoring unit;
[0064] The interval part includes a plurality of standby submodules. The central control unit is used to generate a device evaluation value of each device node and set the setting parameters of the standby submodule according to the device evaluation value.
[0065] Specifically, the terminal submodule mainly includes the host, operator station, telecontrol workstation, engineer station, printer, GPS timing device and other equipment.
[0066] Specifically, the network department equipment mainly includes network equipment and protocol conversion interfaces.
[0067] Specifically, the station control part is connected to the interval part through an optical cable or a shielded twisted pair cable, and the network part has an open network structure.
[0068] Specifically, the backup submodule is preferably a protection and measurement and control unit. According to different voltage levels and electrical isolation units, each backup submodule is arranged in the corresponding switch cabinet. In the event of failure of the station control unit and the network unit, the backup submodule can still independently complete the monitoring and circuit breaker control functions of the interval layer, thereby ensuring the safe operation of the photovoltaic station.
[0069] Specifically, the central control unit includes:
[0070] The first processing module is used to establish a device node sequence A, A = (a1, a2 ... an), where ai is the i-th device node and n is the number of device nodes;
[0071] The first processing module is also used to establish a terminal submodule sequence B, B = (b1, b2...bm), where bi is the i-th terminal submodule and m is the number of terminal submodules;
[0072] According to the device node number sequence A and the terminal submodule number sequence B, a terminal submodule-device node mapping table is established;
[0073] The second processing module is used to obtain the station operation requirements, generate control instructions for each device node according to the station operation requirements, and send all control instructions to the corresponding terminal submodule according to the terminal submodule-device node mapping table;
[0074] The third processing module is used to establish the operation monitoring curve of each device node.
[0075] Specifically, the central control unit is the monitoring, measurement, control and management center for all station equipment. By establishing an association between each device node and the corresponding terminal sub-module, it can control and call each device in the station, and intuitively display the equipment status in each device node by generating an operation curve.
[0076] In a preferred embodiment of the present application, the central control unit further includes:
[0077] The first evaluation module is used to establish a device evaluation value sequence C, C = (c1, c2...cn), where ci is the device evaluation value of the i-th device node;
[0078] The device node array A selects the target device node;
[0079] The second evaluation module is used to set the level of each device node according to the device evaluation value series C, and determine whether each device node is equipped with a spare submodule.
[0080] Specifically, the first evaluation module is also used to:
[0081] Select the target device node according to the device node sequence A;
[0082] Generate a device evaluation value c of the target device node according to a preset evaluation model;
[0083]
[0084] Wherein, e1 is the preset first fixed coefficient, e2 is the preset second fixed coefficient; t1 is the number of equipment evaluation indicators of the equipment node; t2 is the number of operation evaluation indicators of the equipment node; βi is the influencing factor of the i-th equipment evaluation indicator, pi is the reference value of the i-th equipment evaluation indicator; αi is the influencing factor of the i-th operation evaluation indicator; qi is the reference value of the i-th operation evaluation indicator;
[0085] Generate the device evaluation value of each device node in turn, and establish a device evaluation value sequence C, C = (c1, c2...cn).
[0086] Specifically, the equipment evaluation index includes, but is not limited to, parameters such as the equipment node location, the equipment type of the equipment node, the number of equipment at the equipment node, the correlation between the equipment node and other equipment nodes, and the voltage level of the equipment node.
[0087] Specifically, the operation evaluation indicators include parameters such as the number of failures of device nodes, the failure frequency of device nodes, the impact of failures of device nodes, and the failure risk probability of the system.
[0088] Specifically, different evaluation indicators are normalized by presetting a first fixed coefficient and a second fixed coefficient.
[0089] Specifically, the second evaluation module is also used to:
[0090] Used to set the level of each device node according to the device evaluation value sequence C, and determine whether each device node is set with a spare submodule;
[0091] The second evaluation module is also used to preset a first device evaluation value threshold C1 and a second evaluation value threshold C2;
[0092] If ci<C1, set the i-th device node to a third-level device node;
[0093] If C1<c<C2, set the i-th device node as a secondary device node;
[0094] If c>C2, set the i-th device node as a first-level device node;
[0095] The third-level device node does not have a spare submodule, the second-level device node has a second-level spare submodule, and the first-level device node has a first-level spare submodule.
[0096] Specifically, the higher the device evaluation value, the higher the device importance of the current device node. The higher the level of the required backup submodule
[0097] Specifically, the primary backup submodule is superior to the secondary backup submodule in terms of the control sensitivity and device level of its device.
[0098] In a preferred embodiment of the present application, the central control unit further includes:
[0099] A first control module, used to obtain the operating parameters of the terminal unit and the network unit according to the preset feedback time node, and generate a system failure risk value;
[0100] The second control module is used to set the start and stop parameters of each first-level standby submodule and each second-level standby submodule according to the system failure risk value.
[0101] Specifically, the first control module is used for:
[0102] Establish multiple time intervals based on feedback time nodes;
[0103] Get the network operation parameters for each time interval;
[0104] Generate network operation evaluation values in each time interval and establish network operation evaluation value series D, D = (d1, d2...d n1 ), where n1 is the number of time intervals between the last correction time node and the current feedback time node, d n1 is the network operation evaluation value of the time interval of the current feedback time node; d i is the network operation evaluation value of the time interval of the i-th feedback time node after the last correction time node;
[0105] Generate the failure risk value h of the current feedback time node;
[0106]
[0107] Among them, e3 is the preset third fixed coefficient; e4 is the preset fourth fixed coefficient; e5 is the preset fifth fixed coefficient; ηi is the influencing factor of the i-th terminal submodule; fi is the state evaluation value of the i-th terminal submodule at the current feedback time node; Δd is the average value of all data in the network operation evaluation value series D.
[0108] Specifically, a plurality of evaluation indicators are set to comprehensively evaluate the status of the terminal submodule, thereby obtaining a status evaluation value of the terminal submodule. The higher the status evaluation value, the more unstable the current operation status of the terminal submodule.
[0109] Specifically, the more stable the operation status of the network unit is, the smaller the corresponding network operation evaluation value is.
[0110] Specifically, the greater the failure risk value, the greater the risk of failure of the station control unit and the network unit in the current system.
[0111] Specifically, the second control module is further used for:
[0112] Preset a first failure risk value interval (H1, H2), a second failure risk value interval (H2, H3) and a third failure risk value interval (H3, H4);
[0113] If h is in the preset first failure risk value interval, no start instruction is generated;
[0114] If h is in the preset second failure risk value interval, a first-level startup instruction is generated, and all first-level standby sub-modules are started according to the first-level startup instruction;
[0115] If h is in the preset third failure risk value interval, a secondary startup instruction is generated, and all primary backup sub-modules and all secondary backup sub-modules are started according to the secondary startup instruction.
[0116] Specifically, in the above embodiment, the failure risk of the system is periodically evaluated according to the preset feedback time nodes, and by establishing multiple failure risk value intervals, the start and stop parameters of each backup sub-module are dynamically adjusted according to the real-time failure risk value. Under the premise of ensuring the safe operation of the station, the operating time of each backup sub-module is reduced, thereby reducing the overall operation and maintenance cost.
[0117] According to the first concept of the present application, multiple device nodes are established according to all equipment parameters in the photovoltaic station, and after comprehensive evaluation of each device node according to a preset evaluation model, the installation scope of the spare sub-module is determined, thereby reducing the construction cost of the system. At the same time, the entire system is periodically monitored, and the corresponding spare sub-module start and stop parameters are set according to the failure risk value, thereby reducing the overall operation and maintenance cost and ensuring the safe operation of the photovoltaic station.
[0118] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.
Claims
1. A computer-based station-wide monitoring and management system, characterized in that: include: Station control unit, including central control unit, terminal unit and monitoring unit; The terminal unit includes a plurality of terminal submodules; The central control unit is used to establish multiple device nodes according to device parameters; The monitoring unit includes a plurality of monitoring submodules, each of which is arranged at a device node and is used to collect operating parameters of the device node; The network department is used to build the communication network between the central control unit, terminal unit and monitoring unit; The interval part includes a plurality of standby submodules. The central control unit is used to generate a device evaluation value of each device node and set the setting parameters of the standby submodule according to the device evaluation value.
2. The computer-based station-wide monitoring and management system as claimed in claim 1, characterized in that: The central control unit comprises: The first processing module is used to establish a device node sequence A, A = (a1, a2 ... an), where ai is the i-th device node and n is the number of device nodes; The first processing module is also used to establish a terminal submodule sequence B, B = (b1, b2 ... bm), where bi is the i-th terminal submodule and m is the number of terminal submodules; According to the device node number sequence A and the terminal submodule number sequence B, a terminal submodule-device node mapping table is established; The second processing module is used to obtain the station operation requirements, generate control instructions for each device node according to the station operation requirements, and send all control instructions to the corresponding terminal submodule according to the terminal submodule-device node mapping table; The third processing module is used to establish the operation monitoring curve of each device node.
3. The computer-based station-wide monitoring and management system as claimed in claim 1, characterized in that: The central control unit also includes: The first evaluation module is used to establish a device evaluation value sequence C, C = (c1, c2...cn), where ci is the device evaluation value of the i-th device node; The device node array A selects the target device node; The second evaluation module is used to set the level of each device node according to the device evaluation value series C, and determine whether each device node is equipped with a spare submodule.
4. The computer-based station-wide monitoring and management system as claimed in claim 3, characterized in that: The first evaluation module is also used for: Select the target device node according to the device node sequence A; Generate a device evaluation value c of the target device node according to a preset evaluation model; Wherein, e1 is the preset first fixed coefficient, e2 is the preset second fixed coefficient; t1 is the number of equipment evaluation indicators of the equipment node; t2 is the number of operation evaluation indicators of the equipment node; βi is the influencing factor of the i-th equipment evaluation indicator, pi is the reference value of the i-th equipment evaluation indicator; αi is the influencing factor of the i-th operation evaluation indicator; qi is the reference value of the i-th operation evaluation indicator; Generate the device evaluation value of each device node in turn, and establish a device evaluation value sequence C, C = (c1, c2...cn).
5. The computer-based station-wide monitoring and management system as claimed in claim 4, characterized in that: The second evaluation module is also used for: Used to set the level of each device node according to the device evaluation value sequence C, and determine whether each device node is set with a spare submodule; The second evaluation module is further used to preset a first device evaluation value threshold C1 and a second evaluation value threshold C2; If ci<C1, set the i-th device node to a third-level device node; If C1<c<C2, set the i-th device node as a secondary device node; If c>C2, set the i-th device node as a first-level device node; The third-level device node does not have a spare submodule, the second-level device node has a second-level spare submodule, and the first-level device node has a first-level spare submodule.
6. The computer-based station-wide monitoring and management system as claimed in claim 3, characterized in that: The central control unit also includes: A first control module, used to obtain the operating parameters of the terminal unit and the network unit according to the preset feedback time node, and generate a system failure risk value; The second control module is used to set the start and stop parameters of each first-level standby submodule and each second-level standby submodule according to the system failure risk value.
7. The computer-based station-wide monitoring and management system as claimed in claim 6, characterized in that: The first control module is used for: Establish multiple time intervals based on feedback time nodes; Get the network operation parameters for each time interval; Generate network operation evaluation values in each time interval and establish a network operation evaluation value series D, D = (d1, d2...d n1 ), where n1 is the number of time intervals between the last correction time node and the current feedback time node, d n1 is the network operation evaluation value of the time interval of the current feedback time node; d i is the network operation evaluation value of the time interval of the i-th feedback time node after the last correction time node; Generate the failure risk value h of the current feedback time node; Among them, e3 is the preset third fixed coefficient; e4 is the preset fourth fixed coefficient; e5 is the preset fifth fixed coefficient; ηi is the influencing factor of the i-th terminal submodule; fi is the state evaluation value of the i-th terminal submodule at the current feedback time node; Δd is the average value of all data in the network operation evaluation value series D.
8. The computer-based station-wide monitoring and management system as claimed in claim 7, characterized in that: The second control module is also used for: Preset a first failure risk value interval (H1, H2), a second failure risk value interval (H2, H3) and a third failure risk value interval (H3, H4); If h is in the preset first failure risk value interval, no start instruction is generated; If h is in the preset second failure risk value interval, a first-level startup instruction is generated, and all first-level standby sub-modules are started according to the first-level startup instruction; If h is in the preset third failure risk value interval, a secondary startup instruction is generated, and all primary backup sub-modules and all secondary backup sub-modules are started according to the secondary startup instruction.