Iron tower base station comprehensive energy efficiency control method based on AI

Through AI-based methods, users and communication needs of tower base stations are analyzed, and the power supply power of RF modules is optimized, which solves the problem of insufficient energy efficiency optimization in the existing technology, and achieves more efficient energy consumption reduction and user experience improvement.

CN118945782AActive Publication Date: 2024-11-12CHINA TOWER CO LTD

Patent Information

Application Number
CN202411212297.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-12
Estimated Expiration
2044-08-30

AI Technical Summary

Technical Problem

The prior art ignores the differentiated power supply power adjustment of RF modules based on the analysis results of the historical communication data of the base station in the energy efficiency optimization management of tower base stations, making it difficult for energy efficiency to meet the requirements.

Method used

Using an AI-based method, by determining the distribution data of different types of buildings and the historical access usage data of users with signal problems, using AI models to analyze signal problem coefficients and communication demand coefficients, optimize the power supply power of RF modules, and adjust the power supply strategy to meet different User signal strength requirements.

Benefits of technology

It effectively avoids the poor communication problem of users with signal problems, reduces the energy consumption of base stations, and ensures the user's communication experience and realizes the optimization of energy efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118945782A_ABST
    Figure CN118945782A_ABST
Patent Text Reader

Abstract

The invention provides an iron tower base station comprehensive energy efficiency control method based on AI, and belongs to the technical field of power supply, and the method specifically comprises the steps: determining signal problem users in access users through employing a signal problem coefficient, obtaining the historical access use data of different signal problem users in different time periods in an iron tower base station, and obtaining the access use data of the different signal problem users; power optimization time periods in the time periods are determined based on historical access use data of different signal problem users in different time periods and the signal problem coefficients, and in the power optimization time periods, the signal intensities of different users of the iron tower base station under the power supply powers of different radio frequency modules are determined; and the power supply strategy of the radio frequency module of the iron tower base station in the power optimization time period is determined by combining the historical access use data of different users in the power optimization time period, so that the energy efficiency of the iron tower base station is effectively controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of communication base stations, and in particular to an AI-based comprehensive energy efficiency control method for tower base stations. Background Art

[0002] Tower base stations are the "mother of 5G" and undertake the important tasks of network signal coverage and transmission, providing users with a faster and more stable communication experience. On the other hand, in order to achieve energy efficiency optimization of tower base stations, the invention patent application CN202410136236.1 "Integrated control module and method for power supply and communication services for low-carbon emission base stations" reduces the energy consumption of mobile communication base stations, improves energy utilization, and reduces carbon emissions of mobile communication base stations through effective linkage between mobile communication base stations and power supply systems. However, there are the following technical problems:

[0003] When performing energy efficiency optimization management, the existing technical solutions ignore the differentiated adjustment of the power supply power of the base station's RF module based on the analysis results of the base station's historical communication data. If the same power supply power is used, it will inevitably lead to the energy efficiency of the tower base station being difficult to meet the requirements.

[0004] In response to the above technical problems, the present invention provides an AI-based comprehensive energy efficiency control method for tower base stations. Summary of the invention

[0005] To achieve the purpose of the present invention, the present invention adopts the following technical solutions:

[0006] According to one aspect of the present invention, an AI-based comprehensive energy efficiency control method for a tower base station is provided.

[0007] An AI-based comprehensive energy efficiency control method for a tower base station, specifically comprising:

[0008] S1 determines the distribution data of different types of buildings within a preset area with the tower base station as the center, and when it is determined based on the distribution data that the tower base station can adjust the power supply power of the radio frequency module, proceeds to the next step;

[0009] S2 determines the signal strength of the access user of the tower base station during historical access, and determines the signal problem coefficients of different access users by using the trained AI model through the analysis results of the signal strength, and determines the signal problem users among the access users by using the signal problem coefficients;

[0010] S3 obtains historical access usage data of different signal problem users in the tower base station at different time periods, and determines the power optimization period in the period based on the historical access usage data of different signal problem users at different time periods and the signal problem coefficient;

[0011] S4 determines the signal strength of different users of the tower base station under different power supply powers of the RF modules during the power optimization period, and determines the power supply strategy of the RF module of the tower base station during the power optimization period based on the historical access usage data of different users during the power optimization period.

[0012] A further technical solution is that the types of buildings include residential areas, commercial offices, hospitals and shopping malls.

[0013] A further technical solution is that the distribution data includes the building area of ​​the building and the distance from the tower base station.

[0014] A further technical solution is that the AI ​​model is built using one or a combination of convolutional neural networks, recurrent neural networks, long short-term memory networks, and artificial neural networks.

[0015] A further technical solution is that the historical access usage data includes the historical access times of the signal problem user in different time periods and the historical access durations of different historical access times.

[0016] A further technical solution is that the method for determining the power optimization period is:

[0017] Determine the historical access times of the user with signal problems in the time period based on the historical access usage data of the user with signal problems in the time period, and determine the base station usage frequency coefficient of the user with signal problems in the time period in combination with the historical access durations of the user with signal problems with different historical access times in the time period;

[0018] Determine the communication demand coefficients of different signal problem users in the said time period by multiplying the base station use frequency coefficients of different signal problem users in the said time period by the signal problem coefficients;

[0019] The weights of the communication demand coefficients of different signal problem users in the time period are used to determine the working reliability demand coefficient of the tower base station in the time period, and the working reliability demand coefficient is used to determine whether the tower base station in the time period is a power optimization period.

[0020] A further technical solution is that the signal strength of the user is determined according to a monitoring result of the signal strength of the tower base station under different power supply powers of the radio frequency modules.

[0021] The beneficial effects of the present invention are:

[0022] 1. The power optimization period in the period is determined based on the historical access usage data of different signal problem users in different time periods and the signal problem coefficient, thereby avoiding the technical problem of poor communication of signal problem users caused by optimizing the power supply power of the RF module during the period when the usage frequency of signal problem users is too high. On the basis of reducing the interference to the communication use of signal problem users, it also lays the foundation for further reducing the energy consumption of base stations.

[0023] 2. The power supply strategy of the RF module of the tower base station during the power optimization period is determined based on the signal strength of different users under different RF module power supply powers and historical access usage data. This takes into account the different requirements of different users for signal strength due to different usage frequencies, as well as the signal strength of different users under different RF module power supply powers. On the basis of reducing the energy consumption of the base station, it also ensures the communication experience of the users.

[0024] Other features and advantages will be described in the following description. The objects and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description and drawings.

[0025] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The above and other features and advantages of the present invention will become more apparent by describing in detail exemplary embodiments thereof with reference to the attached drawings.

[0027] Figure 1 It is a flow chart of a comprehensive energy efficiency control method for tower base stations based on AI;

[0028] Figure 2 is a flow chart of a method for determining a base station usage demand coefficient within a distance interval;

[0029] Figure 3 is a flow chart of a method for determining a signal problem coefficient of an access user;

[0030] Figure 4 is a flow chart of a method of determining a power optimization period. DETAILED DESCRIPTION

[0031] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.

[0032] To solve the above problems, according to one aspect of the present invention, Figure 1 As shown, a comprehensive energy efficiency control method for a tower base station based on AI is provided, which specifically includes:

[0033] S1 determines the distribution data of different types of buildings within a preset area with the tower base station as the center, and when it is determined based on the distribution data that the tower base station can adjust the power supply power of the radio frequency module, proceeds to the next step;

[0034] Furthermore, the types of buildings include residential areas, commercial offices, hospitals and shopping malls.

[0035] Specifically, the distribution data includes the building area of ​​the building and the distance from the tower base station.

[0036] It should be noted that determining that the tower base station is capable of adjusting the power supply of the radio frequency module specifically includes:

[0037] Based on the distribution data of the buildings, determine the buildings in different distance intervals within a preset area range, and determine the base station usage demand coefficients in different distance intervals based on the building areas of different types of buildings in different distance intervals and the distances from the tower base station;

[0038] Determine preset weight coefficients corresponding to different distance intervals according to distance ranges corresponding to different distance intervals, and determine the comprehensive use demand coefficient of the tower base station using the weight sum constructed by using the preset weight coefficients and the base station use demand coefficient;

[0039] Based on the comprehensive usage demand coefficient, it is determined whether the tower base station can adjust the power supply of the radio frequency module.

[0040] Specifically, Figure 2 As shown, the method for determining the base station usage demand coefficient within the distance interval is:

[0041] Determining demand coefficient evaluation values ​​of different types of buildings using a preset mapping function based on the building areas of different types of buildings and the distances from the tower base station;

[0042] The base station usage demand coefficient within the distance interval is determined based on the sum of demand coefficient evaluation values ​​of different types of buildings.

[0043] Further, when the comprehensive usage demand coefficient of the tower base station is within a preset range, it is determined that the tower base station can adjust the power supply power of the radio frequency module.

[0044] It should also be noted that determining that the tower base station is capable of adjusting the power supply of the radio frequency module specifically includes:

[0045] S11 determines whether the distance between the buildings within the preset area and the tower base station is greater than the total building area of ​​the preset distance based on the distribution data of the buildings. If so, proceed to the next step. If not, determine that the tower base station cannot adjust the power supply of the radio frequency module.

[0046] S12 determines the total building area of ​​the building within the preset area range, and judges whether the total building area of ​​the building is greater than the preset building area. If so, proceed to the next step; if not, proceed to step S15;

[0047] S13 determines whether the average distance between different buildings and the tower base station is greater than a preset distance. If so, it is determined that the tower base station cannot adjust the power supply of the radio frequency module. If not, proceed to the next step.

[0048] S14 determines the signal strength requirement coefficients of different buildings based on the types of different buildings and the distances from the tower base station, and judges whether the total area of ​​the buildings whose signal strength requirement coefficients are greater than the preset requirement threshold meets the requirements. If not, it is determined that the tower base station cannot adjust the power supply of the radio frequency module. If so, proceed to the next step.

[0049] S15 determines the base station usage demand coefficients in different distance intervals based on the building areas of different types of buildings in different distance intervals and the distances from the tower base station, and judges whether the base station usage demand coefficients in the specified distance intervals meet the requirements. If not, it is determined that the tower base station cannot adjust the power supply of the radio frequency module. If so, proceed to the next step.

[0050] S16 determines the preset weight coefficients corresponding to different distance intervals according to the distance ranges corresponding to different distance intervals, and determines the comprehensive usage demand coefficient of the tower base station using the weights and weights constructed using the preset weight coefficients and the base station usage demand coefficient, and determines whether the tower base station can adjust the power supply of the RF module based on the comprehensive usage demand coefficient.

[0051] Furthermore, the specified distance interval is a distance interval within a specified distance range.

[0052] S2 determines the signal strength of the access user of the tower base station during historical access, and determines the signal problem coefficients of different access users by using the trained AI model through the analysis results of the signal strength, and determines the signal problem users among the access users by using the signal problem coefficients;

[0053] Specifically, Figure 3 As shown, the method for determining the signal problem coefficient of the access user is:

[0054] Determining the cumulative access time of the access user in different signal strength intervals based on the analysis result of the signal strength of the access user;

[0055] Determine the frequency of use coefficient in different signal strength intervals based on the ratio of the accumulated access duration in different signal strength intervals to the total access duration;

[0056] The problem strength interval is determined by the signal strength range corresponding to different signal strength intervals, and based on the usage frequency coefficient of the access user in the problem strength interval, the signal problem coefficient of the access user is determined using the trained AI model.

[0057] Furthermore, the value range of the signal problem coefficient of the access user is between 0 and 1, wherein when the signal problem coefficient of the access user is greater than a preset problem threshold, the access user is determined to be a signal problem user.

[0058] It can be understood that the problem strength interval is a signal strength interval within a specified strength range.

[0059] It should also be noted that the method for determining the signal problem coefficient of the access user is:

[0060] When it is determined based on the analysis result of the signal strength of the access user that the signal strength is greater than the preset signal strength, it is determined that the access user is not a user with signal problems;

[0061] When the signal strength is not greater than the preset signal strength, the following conditions apply:

[0062] When the access duration when the signal strength is not greater than the preset signal strength is less than the preset access duration, it is determined that the access user is not a user with signal problems;

[0063] When the signal strength is not greater than the preset signal strength and the access time is not less than the preset access time,

[0064] Acquire the number of access times of the access user and the access durations of different access times, determine the access frequency coefficient of the access user based on the number of access times of the access user and the access durations of different access times, and when the access frequency coefficient of the access user is less than a preset frequency coefficient, determine that the access user is not a signal problem user;

[0065] When the access frequency coefficient of the access user is not less than the preset frequency coefficient:

[0066] Based on the analysis result of the signal strength of the access user, determine the cumulative access duration of the access user in different signal strength intervals, and determine the frequency of use coefficient in different signal strength intervals in combination with the number of accesses of the access user in different signal strength intervals and the access durations of different access times;

[0067] When the frequency of use coefficient of the user within the specified signal strength interval meets the requirement, it is determined that the access user is not a user with signal problems;

[0068] When the frequency of use coefficient of the user within the specified signal strength range does not meet the requirement:

[0069] The problem strength interval is determined by the signal strength range corresponding to different signal strength intervals, and based on the usage frequency coefficient of the access user in the problem strength interval, the signal problem coefficient of the access user is determined using the trained AI model.

[0070] Furthermore, the AI ​​model is built using one or a combination of convolutional neural networks, recurrent neural networks, long short-term memory networks, and artificial neural networks.

[0071] S3 obtains historical access usage data of different signal problem users in the tower base station at different time periods, and determines the power optimization period in the period based on the historical access usage data of different signal problem users at different time periods and the signal problem coefficient;

[0072] It should also be noted that the historical access usage data includes the historical access times of the signal problem user in different time periods and the historical access durations for different historical access times.

[0073] Specifically, Figure 4 As shown, the method for determining the power optimization period is:

[0074] Determine the historical access times of the user with signal problems in the time period based on the historical access usage data of the user with signal problems in the time period, and determine the base station usage frequency coefficient of the user with signal problems in the time period in combination with the historical access durations of the user with signal problems with different historical access times in the time period;

[0075] Determine the communication demand coefficients of different signal problem users in the said time period by multiplying the base station use frequency coefficients of different signal problem users in the said time period by the signal problem coefficients;

[0076] The weights of the communication demand coefficients of different signal problem users in the time period are used to determine the working reliability demand coefficient of the tower base station in the time period, and the working reliability demand coefficient is used to determine whether the tower base station in the time period is a power optimization period.

[0077] Furthermore, the method for determining the base station usage frequency coefficient of the signal problem user in the time period is:

[0078] Taking the historical access times of the user with signal problems in the time period and the historical access durations of the users with signal problems at different historical access times in the time period as input values, a prediction model based on BP neural network is used to determine the base station usage frequency coefficient of the users with signal problems in the time period.

[0079] Specifically, when the working reliability requirement coefficient is less than a preset threshold, it is determined that the tower base station does not belong to a power optimization period during the time period.

[0080] It should be further explained that the method for determining the power optimization period is:

[0081] Determine the historical access times of the user with signal problems in the time period based on the historical access usage data of the user with signal problems in the time period;

[0082] When the total number of historical access times of the user with signal problems during the period does not meet the requirement:

[0083] Then determining the time period as a power optimization time period;

[0084] When the total number of historical access times of the user with signal problems during the period meets the requirement:

[0085] Determine the total historical access duration of the user with the signal problem in the time period. When the total historical access duration of the user with the signal problem in the time period does not meet the requirement:

[0086] Then determining the time period as a power optimization time period;

[0087] When the total historical access duration of the user with signal problems during the period meets the requirement:

[0088] Determine the historical access times of the user with signal problems in the time period based on the historical access usage data of the user with signal problems in the time period, and determine the base station usage frequency coefficient of the user with signal problems in the time period in combination with the historical access durations of the user with signal problems with different historical access times in the time period;

[0089] When the base station usage frequency coefficient in the time period is greater than the preset frequency threshold and the number of signal problem users does not meet the requirement:

[0090] Then determining the time period as a power optimization time period;

[0091] When the base station usage frequency coefficient in the time period is greater than the number of signal problem users with a preset frequency threshold and meets the requirement:

[0092] Determine the communication demand coefficients of different signal problem users in the said time period by multiplying the base station use frequency coefficients of different signal problem users in the said time period by the signal problem coefficients;

[0093] The weights of the communication demand coefficients of different signal problem users in the time period are used to determine the working reliability demand coefficient of the tower base station in the time period, and the working reliability demand coefficient is used to determine whether the tower base station in the time period is a power optimization period.

[0094] S4 determines the signal strength of different users of the tower base station under different power supply powers of the RF modules during the power optimization period, and determines the power supply strategy of the RF module of the tower base station during the power optimization period based on the historical access usage data of different users during the power optimization period.

[0095] Furthermore, the signal strength of the user is determined according to a monitoring result of the signal strength of the tower base station under different power supply powers of the radio frequency modules.

[0096] It should be noted that the method for determining the power supply strategy of the radio frequency module of the tower base station during the power optimization period is:

[0097] Determine the access duration of different users in the power optimization period based on historical access usage data of different users in the power optimization period, and determine the user usage demand values ​​of different users in the power optimization period based on the access duration;

[0098] Determine the signal usage influence coefficient of different users under different power supplies of the radio frequency modules based on the signal strength of different users under different power supplies of the radio frequency modules, and determine the signal influence value of different users by multiplying the signal usage influence coefficient by the user usage demand value;

[0099] By weighting the signal impact values ​​of different users under different RF module power supplies and determining the signal usage stability coefficient under different RF module power supplies, the power consumption of the tower base station under different RF module power supplies is determined, and the time period matching coefficient under different RF module power supplies is determined based on the ratio of the signal usage stability coefficient to the power consumption, and the power supply power of the RF module of the tower base station in the power optimization period is determined by the time period matching coefficient.

[0100] Furthermore, the power supply power of the radio frequency module corresponding to the maximum time period matching coefficient is used as the power supply power of the radio frequency module of the tower base station in the power optimization time period.

[0101] It should also be noted that the method for determining the power supply strategy of the radio frequency module of the tower base station during the power optimization period is:

[0102] Determine the signal usage influence coefficients of different users under the power supply powers of different RF modules based on the signal strengths of different users under the power supply powers of different RF modules, and judge whether the proportion of users whose signal usage influence coefficients under the power supply powers of the RF modules do not meet the requirements is within a preset proportion interval, if so, proceed to the next step, if not, determine that the power supply power of the RF module cannot be used in the time period;

[0103] Determine the access duration of different users in the power optimization period based on the historical access usage data of different users in the power optimization period, and determine the user usage demand values ​​of different users in the power optimization period based on the access duration, and judge whether the sum of the user usage demand values ​​of users whose signal usage influence coefficients do not meet the requirements meets the requirements, if so, proceed to the next step, if not, determine that the power supply power of the radio frequency module cannot be used in the period;

[0104] Determine the signal impact values ​​of different users by multiplying the signal usage impact coefficient by the user usage demand value, determine whether the number of users whose signal impact values ​​do not meet the requirements meets the requirements, if so, proceed to the next step, if not, determine that the power supply power of the radio frequency module cannot be used in the said time period;

[0105] By weighting the signal impact values ​​of different users under different RF module power supplies and determining the signal usage stability coefficient under different RF module power supplies, the power consumption of the tower base station under different RF module power supplies is determined, and the time period matching coefficient under different RF module power supplies is determined based on the ratio of the signal usage stability coefficient to the power consumption, and the power supply power of the RF module of the tower base station in the power optimization period is determined by the time period matching coefficient.

[0106] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0107] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0108] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.

Claims

1. A comprehensive energy efficiency control method for tower base stations based on AI, characterized in that: Specifically include: Taking the tower base station as the center, determining the distribution data of different types of buildings within a preset area, and when determining based on the distribution data that the tower base station can adjust the power supply power of the radio frequency module, proceeding to the next step; Determine the signal strength of the access user of the tower base station during historical access, and determine the signal problem coefficients of different access users by using the trained AI model through the analysis results of the signal strength, and determine the signal problem users among the access users by using the signal problem coefficients; Obtaining historical access and usage data of different signal problem users in the tower base station at different time periods, and determining a power optimization period in the period based on the historical access and usage data of different signal problem users at different time periods and a signal problem coefficient; During the power optimization period, the signal strength of different users of the tower base station under different power supply powers of the RF modules is determined, and the power supply strategy of the RF module of the tower base station during the power optimization period is determined in combination with the historical access usage data of different users during the power optimization period.

2. The clinical data intelligent collection method according to claim 1, characterized in that: The types of buildings include residential areas, commercial offices, hospitals and shopping malls.

3. The clinical data intelligent collection method according to claim 1, characterized in that: The distribution data includes the building area of ​​the building and the distance from the tower base station.

4. The clinical data intelligent collection method according to claim 1, characterized in that: Determining that the tower base station is capable of adjusting the power supply of the radio frequency module specifically includes: Based on the distribution data of the buildings, determine the buildings in different distance intervals within a preset area range, and determine the base station usage demand coefficients in different distance intervals based on the building areas of different types of buildings in different distance intervals and the distances from the tower base station; Determine preset weight coefficients corresponding to different distance intervals according to distance ranges corresponding to different distance intervals, and determine the comprehensive use demand coefficient of the tower base station using the weight sum constructed by using the preset weight coefficients and the base station use demand coefficient; Based on the comprehensive usage demand coefficient, it is determined whether the tower base station can adjust the power supply of the radio frequency module.

5. The clinical data intelligent collection method according to claim 4, characterized in that: The method for determining the base station usage demand coefficient within the distance interval is: Determining demand coefficient evaluation values ​​of different types of buildings using a preset mapping function based on the building areas of different types of buildings and the distances from the tower base station; The base station usage demand coefficient within the distance interval is determined based on the sum of demand coefficient evaluation values ​​of different types of buildings.

6. The clinical data intelligent collection method according to claim 1, characterized in that: The method for determining the signal problem coefficient of the access user is: Determining the cumulative access time of the access user in different signal strength intervals based on the analysis result of the signal strength of the access user; Determine the frequency of use coefficient in different signal strength intervals based on the ratio of the accumulated access duration in different signal strength intervals to the total access duration; The problem strength interval is determined by the signal strength range corresponding to different signal strength intervals, and based on the usage frequency coefficient of the access user in the problem strength interval, the signal problem coefficient of the access user is determined using the trained AI model.

7. The clinical data intelligent collection method according to claim 6, characterized in that: The value range of the signal problem coefficient of the access user is between 0 and 1, wherein when the signal problem coefficient of the access user is greater than a preset problem threshold, the access user is determined to be a signal problem user.

8. The clinical data intelligent collection method according to claim 1, characterized in that: The AI ​​model is built using one or a combination of convolutional neural networks, recurrent neural networks, long short-term memory networks, and artificial neural networks.

9. The clinical data intelligent collection method according to claim 1, characterized in that: The historical access usage data includes the historical access times of the signal problem user in different time periods and the historical access durations of different historical access times.

10. The clinical data intelligent collection method according to claim 1, characterized in that: The method for determining the power supply strategy of the radio frequency module of the tower base station during the power optimization period is: Determine the access duration of different users in the power optimization period based on historical access usage data of different users in the power optimization period, and determine the user usage demand values ​​of different users in the power optimization period based on the access duration; Determine the signal usage influence coefficient of different users under different power supplies of the radio frequency modules based on the signal strength of different users under different power supplies of the radio frequency modules, and determine the signal influence value of different users by multiplying the signal usage influence coefficient by the user usage demand value; By weighting the signal impact values ​​of different users under different RF module power supplies and determining the signal usage stability coefficient under different RF module power supplies, the power consumption of the tower base station under different RF module power supplies is determined, and the time period matching coefficient under different RF module power supplies is determined based on the ratio of the signal usage stability coefficient to the power consumption, and the power supply power of the RF module of the tower base station in the power optimization period is determined by the time period matching coefficient.

Citation Information

Patent Citations

  • Method and apparatus for adjusting transmit power of cell in multi-carrier system

    CN110651508A

  • Method and device for base station load early warning

    CN111132190A

  • Intelligent control method and device for 5G small base station and 5G small base station

    CN115175380A

  • Base station power control method and device, equipment and computer storage medium

    CN116916419A

  • Power supply and communication service integrated regulation and control module and method for low-carbon-emission base station

    CN118075848A

Cited By

  • Method and system for maintaining and managing digital television coverage broadcast

    CN121442393A

  • A method and system for maintaining management of digital television overlay broadcasting

    CN121442393B