Inspection method, inspection jig, and inspection device for ball screw device
By using the inspection fixture to insert the gap between the screw shaft in the ball screw device, the number of balls is judged based on the insertion situation, and the problem of difficulty in confirming the number of balls after assembly is solved, and the accurate judgment of the number of balls and the improvement of assembly quality is achieved.
Patent Information
- Application Number
- CN202380028257.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-03-28
- Filing Date
- 2023-02-28
- Publication Date
- 2024-11-12
AI Technical Summary
After the ball screw device is assembled, it is difficult to confirm the number of balls in the circulation path from the outside, resulting in the problem of too few or too many balls.
It provides an inspection method and device, by inserting the inspection fixture into the gap between the nut and the lead screw shaft, determine the number of balls according to the insertion situation, and determine the number of balls by using different widths and step portions of the narrow and wide width portions. And automatically determine the number of balls through load and sensors.
After the ball screw device is assembled, the number of balls in the circulation path is simply and accurately confirmed, ensuring the number of balls is appropriate, and the assembly quality is improved.
Smart Images

Figure CN118946747A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an inspection method, an inspection jig and an inspection device for a ball screw device. Background Art
[0002] In a ball screw device, a plurality of balls are arranged in a rolling path formed by a thread groove formed on the inner circumference of a nut and a thread groove formed on the outer circumference of a screw shaft. The end point and the starting point of the rolling path are connected through a return path formed in a circulation component such as a tube, and a circulation path for the balls to circulate is formed by these rolling paths and the return path. As a method for assembling the balls in the circulation path, for example, the following patent document 1 shows a method for assembling the balls from the inner circumference of a nut. In addition, the following patent document 2 shows a method for providing an opening for inserting the balls on the outer circumference of a nut and assembling the balls in the circulation path from the opening.
[0003] Prior art literature
[0004] Patent Literature
[0005] Patent Document 1: Japanese Patent No. 2530403
[0006] Patent Document 2: Japanese Patent Application Publication No. 2001-99256 Summary of the invention
[0007] Problems to be solved by the invention
[0008] When assembling the balls in the circulation path of the ball screw device, sometimes the balls are not normally provided due to the malfunction of the assembly equipment, or the balls enter the thread groove that is not used as the circulation path, so the number of balls assembled in the circulation path becomes too small or too large. However, when the ball screw device is assembled, the balls are almost invisible from the outside, so it is difficult to confirm the number of balls.
[0009] Therefore, an object of the present invention is to provide an inspection method capable of easily checking the number of balls in a circulation path after a ball screw device is assembled.
[0010] Means for solving problems
[0011] In order to achieve the above-mentioned purpose, the present invention provides an inspection method for a ball screw device, which is a method for inspecting the number of balls arranged in a circulation path of the ball screw device, wherein an inspection jig is inserted from a gap between a nut and a screw shaft of the ball screw device into between the balls arranged in the circulation path, and the number of balls is inspected based on the insertion status of the inspection jig at this time.
[0012] In a ball screw device, a circumferential gap is provided between the balls to enable the balls to roll in a circulation path. Therefore, when the number of balls arranged in the circulation path is more than the appropriate number, the total gap amount between the balls becomes smaller, and when the number of balls arranged in the circulation path is less than the appropriate number, the total gap amount between the balls becomes larger. Therefore, after the ball screw device is assembled, when the inspection jig is inserted from the gap between the nut and the screw shaft to between the multiple balls arranged in the circulation path, the insertion condition of the inspection jig will be different depending on the number of balls arranged in the circulation path. Therefore, according to the insertion condition of the inspection jig inserted between the balls, it is possible to confirm whether the number of balls arranged in the circulation path is appropriate.
[0013] The inspection jig includes, for example, a narrow portion and a wide portion arranged at the rear side of the insertion direction of the narrow portion. The circumferential width of the narrow portion is larger than the total gap amount between the balls when the number of the balls arranged in the circulation path is too large, and is smaller than the total gap amount between the balls when the number of the balls arranged in the circulation path is appropriate. The circumferential width of the wide portion is larger than the total gap amount between the balls when the number of the balls arranged in the circulation path is appropriate, and is smaller than the total gap amount between the balls when the number of the balls arranged in the circulation path is too small. When the inspection jig is used, if the narrow portion is not inserted between the balls of the circulation path, it can be determined that the number of the balls is too large. In addition, if the narrow portion is inserted between the balls of the circulation path and the wide portion is not inserted between the balls of the circulation path, it can be determined that the number of the balls is appropriate. In addition, if the wide portion is inserted between the balls of the circulation path, it can be determined that the number of the balls is too small.
[0014] The inspection jig may include a step portion connecting the narrow width portion and the wide width portion. By providing the step portion, it is possible to clearly know where the inspection jig can be inserted, so it is easy to determine the number of balls using the inspection jig.
[0015] The inspection jig may be provided with a mark indicating an insertion depth for determining whether the number of balls is appropriate. In this case, the position of the mark when the inspection jig is inserted can be used to determine whether the number of balls is appropriate.
[0016] In addition, the number of balls may be checked by using a plurality of inspection jigs having different circumferential widths. In this case, whether the number of balls in the circulation path is appropriate can be confirmed by whether each inspection jig can be inserted between the balls.
[0017] In the case of having three or more circulation paths arranged in different axial regions, the inspection jig can be directly inserted into the circulation path at the axial end, but the inspection jig cannot be directly inserted between the balls of the middle circulation path, so it is difficult to inspect the number of balls. Therefore, it is preferable to use the first inspection jig and the second inspection jig as the inspection jig, insert the first inspection jig from one axial side between the balls of the middle circulation path, and insert the second inspection jig from the other axial side between the balls of the middle circulation path. According to the insertion of each inspection jig at this time, the number of balls arranged in the middle circulation path can be inspected.
[0018] When inserting the inspection jig between the balls, the balls in the circulation path need to be moved. At this time, by inserting the inspection jig between the balls while reciprocating the screw shaft and the nut relative to each other in the rotation direction, the balls are easy to roll in the circulation path, so it is easy to insert the inspection jig between the balls. In addition, the inspection jig can be inserted between the balls while being held in a state of being relatively movable relative to the screw shaft and the nut of the ball screw device in the rotation direction of the ball screw device.
[0019] In the inspection method, the inspection jig can be inserted between the balls of the circulation path, and when a predetermined load is applied to the inspection jig, the inspection jig is stopped. Whether the number of balls of the circulation path is appropriate can be determined based on the stop position of the inspection jig.
[0020] The above-mentioned inspection method can be automatically performed by an inspection device of a ball screw device, which includes: an inspection jig; a driving unit, which inserts the inspection jig between the balls arranged in the circulation path; and a judgment unit, which judges whether the number of balls in the circulation path is appropriate based on the insertion condition of the inspection jig.
[0021] Effects of the Invention
[0022] As described above, according to the present invention, the number of balls in the circulation path can be easily checked after the ball screw device is assembled. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a three-dimensional view of the ball screw device and the inspection jig.
[0024] Figure 2 It is a cross-sectional view of the above-mentioned ball screw device.
[0025] Figure 3 This is a schematic diagram showing the insertion state of the inspection jig when the number of balls is too small.
[0026] Figure 4 This is a schematic diagram showing the insertion state of the inspection jig when the number of balls is appropriate.
[0027] Figure 5 This is a schematic diagram showing the insertion state of the inspection jig when the number of balls is too large.
[0028] Figure 6 This is a schematic diagram showing a state where the number of balls in the three-row circulation path is inspected.
[0029] Figure 7 1 is a flowchart showing a process of inspecting the number of balls in the three-row circulation path.
[0030] Figure 8 is a block diagram of the inspection device.
[0031] Fig. 9 It is a schematic diagram showing a state where the number of balls in the circulation paths of four rows is inspected. DETAILED DESCRIPTION
[0032] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.
[0033] In an inspection method according to one embodiment of the present invention, Figure 1 As shown, the inspection jig 40 is inserted between the nut 10 and the screw shaft 20 of the ball screw device 1. In addition, in this specification, the circumferential direction centered on the rotation axis of the ball screw device 1 is referred to as the "circumferential direction", and the rotation axis direction of the ball screw device 1 is referred to as the "axial direction".
[0034] [Structure of ball screw device]
[0035] like Figure 2 As shown, the ball screw device 1 has a nut 10, a screw shaft 20 and a plurality of balls 30. A spiral thread groove 11 is formed on the inner circumferential surface of the nut 10. A spiral thread groove 21 is formed on the outer circumferential surface of the screw shaft 20. A plurality of balls 30 are arranged on a rolling path formed by the thread groove 11 of the nut 10 and the thread groove 21 of the screw shaft 20. The end point and the starting point of each rolling path are connected through a return passage (not shown), thereby forming a circulation path for the balls 30 to circulate. The return passage is formed by known circulation components such as a U-shaped tube and a circulation block embedded in the nut 10.
[0036] In this embodiment, circulation paths (circulation paths S1, S2, S3 in three rows in the example in the figure) are provided at a plurality of locations separated in the axial direction. In the example in the figure, each circulation path S1, S2, S3 is formed by a thread groove 11, 21 of one circle (360°) and a return path (not shown), and the same number of balls 30 are arranged in each circulation path S1, S2, S3. Thread grooves 11, 21 without balls 30 are provided in the axial direction between the circulation paths S1, S2, S3.
[0037] [Structure of inspection jig]
[0038] like Figure 1 As shown, the inspection jig 40 is plate-shaped. The thickness of the inspection jig 40 is smaller than the radial clearance between the inner circumference of the nut 10 (the minimum diameter of the thread groove 11) and the outer circumference of the screw shaft 20 (the maximum diameter of the thread groove 21). The inspection jig 40 has a rigidity that does not deform when inserted between the balls 30 (details will be described later), for example, it has a thickness of more than 1 / 2 of the radial clearance between the inner circumference of the nut 10 and the outer circumference of the screw shaft 20. The inspection jig 40 is formed of a material softer than the nut 10, the screw shaft 20 and the balls 30, for example, it is formed of a resin.
[0039] The inspection jig 40 has a narrow portion 41 provided on the leading side in the insertion direction (hereinafter referred to as the "front end side") and a wide portion 42 provided on the rear side in the insertion direction of the narrow portion 41 (hereinafter referred to as the "base end side") and having a circumferential width wider than the narrow portion. In the illustrated example, the narrow portion 41 and the wide portion 42 are each composed of an axial region with a constant circumferential width. A step portion 43 connecting the narrow portion 41 and the wide portion 42 is provided between the narrow portion 41 and the wide portion 42. The step portion 43 is tapered in a manner that the circumferential width widens toward the base end side (the wide portion 42 side). The front end portion 44 of the inspection jig 40 is tapered in a manner that the circumferential width decreases toward the front end side.
[0040] The circumferential width of the narrow portion 41 of the inspection jig 40 is larger than the total gap between the balls 30 when the number of balls 30 arranged in each circulation path S1 to S3 is too large (for example, one more than the appropriate number). That is, when the number of balls 30 arranged in each circulation path S1 to S3 is too large, the total gap between the balls 30 is smaller than the circumferential width of the narrow portion 41 of the inspection jig 40, so the narrow portion 41 of the inspection jig 40 cannot be inserted between the balls 30. In this case, Figure 3 As shown, when the inspection jig 40 is inserted between the balls 30 of the circulation path S (a circulation path with the same structure as the circulation paths S1 to S3) from one axial side (the left side in the figure), the inspection jig 40 stops halfway at the front end 44 in a state of being inserted between the balls 30.
[0041] In addition, the circumferential width of the narrow portion 41 of the inspection jig 40 is smaller than the total gap amount between the balls 30 when the number of balls 30 arranged in each circulation path S1 to S3 is appropriate. That is, when the number of balls 30 arranged in each circulation path S1 to S3 is appropriate, the total gap amount between the balls 30 is larger than the circumferential width of the narrow portion 41 of the inspection jig 40, so Figure 4 As shown, the narrow width portion 41 of the inspection jig 40 is inserted between the balls 30 in the circulation path S.
[0042] The circumferential width of the wide portion 42 of the inspection jig 40 is larger than the total gap between the balls 30 when the number of balls 30 arranged in each circulation path S1 to S3 is appropriate. That is, when the number of balls 30 arranged in each circulation path S1 to S3 is appropriate, the total gap between the balls 30 is smaller than the circumferential width of the wide portion 42 of the inspection jig 40, so the wide portion 42 of the inspection jig 40 cannot be inserted between the balls 30. In this case, Figure 4 As shown, when the inspection jig 40 is inserted between the balls 30 in the circulation path S from one axial side (left side in the figure), the inspection jig 40 stops with the step portion 43 between the narrow portion 41 and the wide portion 42 abutting against the balls 30 .
[0043] In addition, the circumferential width of the wide portion 42 of the inspection jig 40 is smaller than the total gap amount between the balls 30 when the number of balls 30 arranged in each circulation path S1 to S3 is too small (for example, one less than the appropriate number). That is, when the number of balls 30 arranged in each circulation path S1 to S3 is too small, the total gap amount between the balls 30 is larger than the circumferential width of the wide portion 42 of the inspection jig 40, so Figure 5 As shown, the wide portion 42 of the inspection jig 40 is inserted between the balls 30 in the circulation path S.
[0044] Thus, by inserting the inspection jig 40 between the balls 30 of the circulation path S and confirming its stop position, it is possible to determine whether the number of balls 30 of the circulation path S is appropriate. Specifically, if the inspection jig 40 stops before the narrow portion 41 is inserted between the balls 30, that is, when the front end portion 44 is inserted between the balls 30 (refer to Figure 3 ), it can be determined that there are too many balls 30 in the circulation path S. If the inspection jig 40 is stopped with the narrow width portion 41 inserted between the balls 30 (refer to Figure 4 ), it can be determined that the balls 30 of the circulation path S are appropriate. If the inspection jig 40 is stopped with the wide portion 42 inserted between the balls 30 (refer to Figure 5 ), it can be determined that there are too few balls 30 in the circulation path S.
[0045]
Process of inspection method
[0046] In this embodiment, two inspection jigs 40 are used to inspect the number of balls 30 in the three rows of circulation paths S1 to S3. Figure 6 and Figure 7 The inspection method is described. In addition, the two inspection jigs 40 have the same structure, but here, in order to distinguish the two inspection jigs 40, they are marked with numbers such as "40 (A)" and "40 (B)". In addition, the movement to the side where each inspection jig 40 (A) and 40 (B) is inserted into the gap between the nut 10 and the screw shaft 20 is called "forward", and the movement in the opposite direction is called "reverse".
[0047] First, a check jig 40 (A) is advanced and inserted into the gap between the nut 10 and the screw shaft 20 from one axial side. If a load greater than a specified value is applied to the check jig 40 (A), the check jig 40 (A) is stopped (step 101). Then, it is confirmed whether the narrow portion 41 of the check jig 40 (A) is inserted between the balls 30 of the circulation path S1 (step 102). If not, it is determined that the number of balls 30 in the circulation path S1 is too large (step 103, refer to Figure 3 ), the inspection is completed. Next, it is confirmed whether the narrow portion 41 of the inspection jig 40 (A) is inserted between the balls 30 of the circulation path S2 (step 104). If not, it is determined that the number of balls 30 in the circulation path S2 is too large (step 105, see Figure 3 ), the inspection is completed. Next, it is confirmed whether the wide portion 42 of the inspection jig 40 is inserted between the balls 30 of the circulation path S1 (step 106). If inserted, it is determined that the number of balls 30 in the circulation path S1 is too small (step 107, refer to Figure 5 ), the inspection is completed.
[0048] On the other hand, Figure 6 As shown, if the narrow width portion 41 is inserted between the balls 30 of the circulation paths S1 and S2 and the wide width portion 42 is not inserted between the balls 30 of the circulation path S1 , the process proceeds to the next step.
[0049] In the next step 108, the narrow portion 41 of the inspection jig 40 (A) is kept inserted between the balls 30 of the circulation paths S1 and S2, and the inspection jig 40 (B) is moved forward to be inserted into the gap between the nut 10 and the screw shaft 20 from the other axial side. Then, if a load above the specified value is applied to the inspection jig 40 (B), the inspection jig 40 (B) is stopped. Thereafter, it is confirmed whether the narrow portion 41 of the inspection jig 40 (B) is inserted between the balls 30 of the circulation path S3 (step 109). If not, it is determined that the number of balls 30 in the circulation path S3 is too large (step 110, refer to Figure 3 ), the inspection is completed.
[0050] At this time, the narrow width portion 41 of the inspection jig 40 (A) has been inserted between the balls 30 of the circulation path S2 (see Figure 6 ), so if the number of balls 30 in the circulation path S2 is appropriate, the narrow portion 41 of the inspection jig 40 (B) cannot be further inserted. Therefore, it is confirmed whether the narrow portion 41 of the inspection jig 40 (B) is inserted between the balls 30 in the circulation path S2 (step 111). If inserted, it is determined that the number of balls 30 in the circulation path S2 is too small (step 112), and the inspection ends.
[0051] On the other hand, Figure 6 As shown, if the narrow width portion 41 of the inspection jig 40 (B) is inserted between the balls 30 of the circulation path S3 and is not inserted between the balls 30 of the circulation path S2 , the process proceeds to the next step.
[0052] Next, one inspection jig 40 (A) is retracted and pulled out from between the balls 30 of the circulation path S2 (step 113). Then, the other inspection jig 40 (B) is further advanced, and if a load greater than a specified value is applied, the inspection jig 40 (B) is stopped (step 114). Then, it is confirmed whether the wide portion 42 of the inspection jig 40 (B) is inserted between the balls 30 of the circulation path S3 (step 115). If inserted, it is determined that the number of balls 30 of the circulation path S3 is too small (step 116), and the inspection is completed.
[0053] On the other hand, if the wide portion 42 of the inspection jig 40 (B) is not inserted between the balls 30 of the circulation path S3, then combined with the results so far, it is determined that the number of balls 30 in all circulation paths S1 to S3 is neither too much nor too little, but appropriate (step 117), and the inspection is completed.
[0054]
Structure of inspection device
[0055] The above check is for example done using Figure 8The inspection device shown is automatically performed. The inspection device has: a nut rotating part 51, which rotates the nut 10 of the ball screw device 1; a screw shaft fixing part (not shown in the figure), which fixes the screw shaft 20; an inspection jig holding part (not shown in the figure), which holds the inspection jig 40 in a state that can move in the axial direction and the circumferential direction; an inspection jig driving part 52, which moves the inspection jig 40 in the axial direction; a control part 53, which controls the nut rotating part 51 and the inspection jig driving part 52; a sensor 54, which confirms the position of the inspection jig 40; a determination part 55, which determines whether the number of balls 30 is appropriate; and a display part 56 such as a monitor, which displays the inspection result. In addition, a screw shaft rotating part that rotates the screw shaft 20 can be provided instead of the nut rotating part 51, and a nut fixing part can be provided instead of the screw shaft fixing part.
[0056] The inspection jig drive unit 52 applies force to the inspection jig 40 through a force applying unit such as a spring that utilizes elastic force, air pressure, or hydraulic pressure. As a result, a load greater than the force of the force applying unit is not applied to the inspection jig 40. That is, when the inspection jig 40 is inserted between the balls of the circulation path, if a load greater than the force of the force applying unit is applied, the inspection jig 40 is stopped. In addition, a load meter or a torque meter may be provided in the inspection jig drive unit 52, or a servo motor capable of detecting torque may be used as the inspection jig drive unit 52. In this case, if a load greater than a specified value is detected to be applied to the inspection jig 40, it is sufficient to control the inspection jig drive unit 52 so that the inspection jig 40 stops.
[0057] The inspection device is provided with a ball screw device 1 and an inspection jig 40, and the inspection jig 40 is arranged on the axial extension line of the gap between the nut 10 of the ball screw device 1 and the screw shaft 20 in the radial direction (see Figure 1 ). From this state, the inspection jig 40 is moved axially by the inspection jig driving unit 52, inserted into the gap between the nut 10 and the screw shaft 20, and inserted between the balls 30 arranged in the circulation paths S1 to S3. At this time, the inspection jig 40 is maintained in a state of being able to move freely in the circumferential direction, so that the circumferential position of the inspection jig 40 is automatically adjusted by the front end portion 44 of the inspection jig 40 contacting the balls 30, so that the front end portion 44 of the inspection jig 40 can be easily inserted between the balls 30. In addition, when the inspection jig 40 is inserted between the balls 30, the nut 10 is reciprocated in the rotation direction by the nut rotating unit 51, so that the balls 30 can easily move in the circulation path S1, so it is easy to insert the inspection jig 40 between the balls 30 while bringing the balls 30 close. At this time, the inspection jig 40 may be inserted between the balls 30 while maintaining the inspection jig 40 movable relative to the screw shaft 20 and the nut 10 in the rotation direction of the ball screw device 1 (the circumferential direction centered on the axis of the screw shaft 20 and the nut 10 ).
[0058] Then, when the inspection jig 40 stops, the stop position of the inspection jig 40 is detected by the sensor 54. Based on the stop position (i.e., the insertion status) of the inspection jig 40 detected by the sensor 54, the determination unit 55 determines whether the number of balls 30 in the circulation paths S1 to S3 is appropriate, and displays the determination result on the display unit 56.
[0059] The present invention is not limited to the above-described embodiment. Hereinafter, other embodiments of the present invention will be described, but descriptions of the same aspects as the above-described embodiment will be omitted.
[0060] For example, Fig. 9 , the number of balls 30 in the four rows of circulation paths S1 to S4 is checked. In this case, by confirming that the narrow portion 41 of one inspection jig 40 (A) is inserted between the balls 30 in the middle circulation path S2 and the narrow portion 41 of another inspection jig 40 (B) is not inserted between the balls 30 in the middle circulation path S2, it is possible to confirm that the number of balls 30 in the circulation path S2 is appropriate. Similarly, in another middle circulation path S3, by confirming that the narrow portion 41 of another inspection jig 40 (B) is inserted between the balls 30 and the narrow portion 41 of one inspection jig 40 (A) is not inserted between the balls 30, it is possible to confirm that the number of balls 30 is appropriate.
[0061] Therefore, even in the case where the ball screw device 1 has more than four rows of circulation paths, by inserting the inspection jig 40 between the balls 30 of the middle circulation path from one axial side and the other axial side respectively, and confirming the insertion status of each inspection jig 40 at this time, it is possible to determine whether the number of balls in the middle circulation path is appropriate.
[0062] In the above-mentioned embodiment, the situation in which the number of balls in the circulation path is automatically checked by the inspection device is shown, but it is not limited to this. The operator can also manually insert the inspection jig 40 between the nut 10 and the screw shaft 20, and determine whether the number of balls is appropriate based on its insertion condition (for example, the insertion depth of the inspection jig 40).
[0063] In addition, if a mark for confirming the insertion depth is provided on the inspection jig 40, it is easy to confirm the stop position of the inspection jig 40. For example, when the inspection is performed automatically, the stop position of the inspection jig 40 can be confirmed by detecting the position of the mark provided on the inspection jig 40 by the sensor 54. In addition, when the inspection is performed manually, the operator can confirm the stop position of the inspection jig 40 by visually confirming the position of the mark provided on the inspection jig 40.
[0064] For example, the inspection jig 40 can be set Figure 1 The mark 45 is provided in a state where the inspection jig 40 is properly inserted (for example, Figure 4 In the state shown in the figure), the position overlaps with the axial end of the nut 10 in the radial direction. That is, as long as the axial end of the nut 10 overlaps with the mark 45 when the inspection jig 40 is observed from the outer peripheral side, it can be determined that the inspection jig 40 is properly inserted and the number of balls 30 in the circulation path S is appropriate. On the other hand, if the mark 45 is separated from the nut 10 in the axial direction when the inspection jig 40 is observed from the outer peripheral side, or the mark 45 is hidden in the inner periphery of the nut 10 and cannot be seen, it can be determined that the inspection jig 40 is not properly inserted and the number of balls in the circulation path S is inappropriate.
[0065] In the above embodiment, the inspection jig 40 having the narrow portion 41 and the wide portion 42 is used, but the present invention is not limited thereto, and a plurality of inspection jigs having different circumferential widths may be used to inspect the number of balls. For example, an inspection jig having the same width as the narrow portion 41 and an inspection jig having the same width as the wide portion 42 may be prepared, and these inspection jigs may be sequentially inserted between the balls in the circulation path to inspect the number of balls.
[0066] Description of symbols
[0067] 1: ball screw device; 10: nut; 11: thread groove; 20: screw shaft; 21: thread groove; 30: ball; 40: inspection jig; 41: narrow width portion; 42: wide width portion; 43: step portion; 44: front end portion; 51: nut rotating portion; 52: inspection jig driving portion; 53: control portion; 54: sensor; 55: determination portion; 56: display portion; S, S1~S4: circulation path.
Claims
1. A method for inspecting a ball screw device, for inspecting the number of balls arranged in a circulation path of the ball screw device, wherein: An inspection jig is inserted from a gap between a nut and a screw shaft of the ball screw device into between the balls arranged in the circulation path, and the number of the balls is inspected based on the insertion condition of the inspection jig at this time.
2. The method for inspecting a ball screw device according to claim 1, wherein: The inspection jig includes a narrow width portion and a wide width portion provided at the rear side of the narrow width portion in the insertion direction. The circumferential width of the narrow portion is larger than the total gap between the balls when the number of the balls arranged in the circulation path is too large, and is smaller than the total gap between the balls when the number of the balls arranged in the circulation path is appropriate. The circumferential width of the wide portion is larger than the total gap amount between the balls when the number of the balls arranged in the circulation path is appropriate, and smaller than the total gap amount between the balls when the number of the balls arranged in the circulation path is too small.
3. The method for inspecting a ball screw device according to claim 2, wherein: The inspection jig includes a step portion connecting the narrow width portion and the wide width portion.
4. The inspection method for a ball screw device according to any one of claims 1 to 3, wherein: The inspection jig is provided with a mark for confirming the insertion depth.
5. The method for inspecting a ball screw device according to claim 1, wherein: The number of the balls is inspected using a plurality of inspection jigs having different circumferential widths.
6. The method for inspecting a ball screw device according to any one of claims 1 to 5, wherein: The ball screw device has three or more circulation paths arranged in different axial regions. Using a first inspection jig and a second inspection jig as the inspection jig, The first inspection jig is inserted between the balls of the middle circulation path from one axial side, and the second inspection jig is inserted between the balls of the middle circulation path from the other axial side, and the number of balls arranged in the middle circulation path is inspected according to the insertion status of each inspection jig at this time.
7. The inspection method for a ball screw device according to any one of claims 1 to 6, wherein: The inspection jig is inserted between the balls while the screw shaft and the nut of the ball screw device are relatively reciprocated in a rotation direction.
8. The method for inspecting a ball screw device according to any one of claims 1 to 7, wherein: The inspection jig is inserted between the balls while the inspection jig is held in a state in which the inspection jig is relatively movable with respect to the screw shaft and the nut of the ball screw device in the rotation direction of the ball screw device.
9. The method for inspecting a ball screw device according to any one of claims 1 to 8, wherein: The inspection jig is inserted between the balls in the circulation path, and when a predetermined load is applied to the inspection jig, the inspection jig is stopped.
10. An inspection jig for a ball screw device, which is inserted between balls arranged in a circulation path of the ball screw device and is used to inspect the number of the balls, wherein: The inspection jig comprises a narrow width portion and a wide width portion provided at the rear side of the narrow width portion in the insertion direction. The circumferential width of the narrow portion is larger than the total gap between the balls when the number of the balls arranged in the circulation path is too large, and is smaller than the total gap between the balls when the number of the balls arranged in the circulation path is appropriate. The circumferential width of the wide portion is larger than the total gap amount between the balls when the number of the balls arranged in the circulation path is appropriate, and smaller than the total gap amount between the balls when the number of the balls arranged in the circulation path is too small.
11. An inspection device for a ball screw device, for inspecting the number of balls arranged in a circulation path of the ball screw device, wherein: The inspection device has: Check the fixture; an inspection jig driving unit that inserts the inspection jig between the balls arranged in the circulation path; and A determination unit determines whether the number of balls in the circulation path is appropriate based on the insertion status of the inspection jig.
