Multi-battery pack voltage synchronous control method, device and system and energy storage device
By calculating and iteratively updating the battery pack voltage processing time to optimize the waiting time, the multi-battery pack voltage synchronization control is realized, solving the problems of complexity of traditional solutions and unsatisfactory synchronization effects, and improving voltage synchronization consistency.
Patent Information
- Application Number
- CN202410992081.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-15
AI Technical Summary
In multi-battery package configuration, the traditional voltage synchronization control scheme combined with hardware and software is complex and the synchronization effect is not ideal, resulting in the maximum and minimum single-body voltage being out of synchronization.
By determining the cell voltage processing time of each pair of battery packs, calculating the waiting time, and iteratively update using recursive prediction algorithms, the waiting time is optimized to achieve voltage synchronization control, and optimization is performed only at the software level.
The voltage synchronization control process is simplified, the synchronization effect is improved, and the maximum and minimum battery voltage remains consistent at the same time, solving the problem of out-of-synchronization of the battery pack voltage.
Smart Images

Figure CN118953148A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of battery management technology, and in particular to a method, device, system and energy storage device for synchronously controlling the voltage of multiple battery packs. Background Art
[0002] At present, there are cases where two or more battery packs are configured on the entire vehicle. When multiple battery packs are configured, the maximum and minimum single cell voltages are not synchronized with the single cell voltages of all battery packs.
[0003] In the related art, hardware synchronization is usually achieved by using a synchronization adjustment circuit, which is commonly an operational amplifier and a voltage synchronization adjustment circuit. Specifically, hardware synchronization can be achieved based on the circuit waveform and the reference voltage. However, after the cell voltage of each battery pack passes through the synchronization adjustment circuit, it still needs to cooperate with the software calculation unit to achieve voltage synchronization control. The voltage synchronization process is complicated and the synchronization effect is not ideal. Summary of the invention
[0004] The present invention provides a multi-battery pack voltage synchronization control method, device, system and energy storage device to solve the defects of the traditional hardware and software combined voltage synchronization control solution, which has a complex implementation process and unsatisfactory synchronization effect.
[0005] In one aspect, the present invention provides a method for synchronously controlling voltages of multiple battery packs, comprising:
[0006] Taking every two battery packs in the multiple battery packs as a group of objects to be synchronized, and for each group of objects to be synchronized, determining a first processing duration corresponding to a cell voltage of a first battery pack and a second processing duration corresponding to a cell voltage of a second battery pack in the objects to be synchronized at a current moment;
[0007] Subtract the first processing time from the second processing time at the current moment to obtain the waiting time at the current moment;
[0008] Based on the first processing time, the second processing time and the waiting time at the current time, predict the waiting time at the next time, so as to iteratively update the waiting time to obtain the waiting time at each time;
[0009] Based on the waiting time at each moment, voltage synchronization control is performed on the first battery pack and the second battery pack.
[0010] According to the multi-battery pack voltage synchronization control method provided by the present invention, the prediction of the waiting time at the next moment based on the first processing time, the second processing time and the waiting time at the current moment includes:
[0011] Determine the system state quantity at the current moment according to the first processing time length and the second processing time length at the current moment;
[0012] Establishing a state equation between the first processing time, the second processing time and the waiting time;
[0013] Determining the system gain at the next moment by a recursive prediction algorithm according to the system state quantity at the current moment and the state equation;
[0014] Based on the waiting time at the current moment and the system gain at the next moment, the waiting time at the next moment is calculated.
[0015] According to the multi-battery pack voltage synchronization control method provided by the present invention, the system gain at the next moment is determined by a recursive prediction algorithm based on the system state quantity at the current moment and the state equation, including:
[0016] Based on the system state quantity at the current moment and the state equation, predict the system state quantity at the next moment;
[0017] Based on the system state quantity at the next moment and the system state quantity at the current moment, predicting the state quantity covariance at the next moment;
[0018] Based on the state quantity covariance at the next moment, the system gain at the next moment is predicted.
[0019] According to the multi-battery pack voltage synchronization control method provided by the present invention, the system state quantity at the next moment is predicted based on the system state quantity at the current moment and the state equation, including:
[0020] Deriving the system state quantity based on the state equation to obtain a first derivative result;
[0021] Derivative the waiting time based on the state equation to obtain a second derivative result;
[0022] The system state quantity at the next moment is obtained according to the first derivation result, the second derivation result and the system state quantity at the current moment.
[0023] According to the multi-battery pack voltage synchronization control method provided by the present invention, the waiting time at the next moment is calculated based on the waiting time at the current moment and the system gain at the next moment, including:
[0024] Multiplying the system gain at the next moment by a preset initial supplementary error to obtain a time increment;
[0025] The waiting time at the current moment is added to the time increment to obtain the waiting time at the next moment.
[0026] According to the multi-battery pack voltage synchronization control method provided by the present invention, the determining of the first processing duration corresponding to the cell voltage of the first battery pack and the second processing duration corresponding to the cell voltage of the second battery pack in the synchronization object at the current moment includes:
[0027] Obtaining a first transmission duration of the first battery pack in the analog front-end chip, a first operating duration of the first battery pack in the data processing chip, a second transmission duration of the second battery pack in the analog front-end chip, and a second operating duration of the second battery pack in the data processing chip at the current moment;
[0028] Add the first transmission duration and the first running duration to obtain a first processing duration;
[0029] The second transmission duration and the second running duration are summed to obtain a second processing duration.
[0030] According to the method for synchronously controlling voltages of multiple battery packs provided by the present invention, synchronously controlling the voltages of the first battery pack and the second battery pack based on the waiting time at each moment includes:
[0031] On the basis of the second processing time duration corresponding to the second battery pack at each moment, the waiting time duration at the corresponding moment is increased so that the cell voltages of the first battery pack and the second battery pack are sent synchronously at the same moment.
[0032] On the other hand, the present invention also provides a multi-battery pack voltage synchronization control device, comprising:
[0033] A determination module, used to take every two battery packs in the multiple battery packs as a group of objects to be synchronized, and for each group of objects to be synchronized, determine a first processing duration corresponding to a cell voltage of a first battery pack and a second processing duration corresponding to a cell voltage of a second battery pack in the objects to be synchronized at a current moment;
[0034] A calculation module, configured to obtain a waiting time at the current moment by subtracting the first processing time from the second processing time at the current moment;
[0035] A prediction module, configured to predict the waiting time at the next moment based on the first processing time, the second processing time and the waiting time at the current moment, so as to iteratively update the waiting time to obtain the waiting time at each moment;
[0036] A control module is used to perform voltage synchronization control on the first battery pack and the second battery pack based on the waiting time at each moment.
[0037] On the other hand, the present invention also provides a multi-battery pack voltage synchronization control system, comprising:
[0038] Multiple battery packs;
[0039] A control device, wherein the multiple battery packs are respectively connected to the control device, and the control device includes a memory, a processor, and a computer program stored in the memory and running on the processor, and when the processor executes the program, any one of the above-mentioned methods for synchronously controlling the voltage of multiple battery packs is implemented.
[0040] On the other hand, the present invention further provides an energy storage device, comprising: the above-mentioned multi-battery pack voltage synchronization control system.
[0041] The multi-battery pack voltage synchronization control method, device, system and energy storage device provided by the present invention treat every two battery packs in the multiple battery packs as a group of objects to be synchronized, and for each group of objects to be synchronized, determine the first processing time corresponding to the cell voltage of the first battery pack and the second processing time corresponding to the cell voltage of the second battery pack in the objects to be synchronized at the current moment, and then calculate the waiting time at the current moment, and predict the waiting time at the next moment based on the first processing time, the second processing time and the waiting time at the current moment, so as to iteratively update the waiting time to obtain the waiting time at each moment, and finally perform voltage synchronization control on the first battery pack and the second battery pack based on the waiting time at each moment. Since the waiting time is mainly determined by the different processing time of the transmission and processing links of each battery pack in the relevant chip, and the voltage synchronization control of multiple battery packs is achieved by increasing the waiting time, the control process only involves software-level optimization, which is easier to implement and has a better synchronization effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0043] Figure 1 is a flow chart of a method for synchronously controlling voltages of multiple battery packs provided in an embodiment of the present invention;
[0044] Figure 2 It is a schematic diagram of the voltage transmission process between the first high-voltage connector HVC1 and the second high-voltage connector HVC2 in absolute time under an ideal state;
[0045] Figure 3 It is a schematic diagram of the voltage transmission process between the first high-voltage connector HVC1 and the second high-voltage connector HVC2 in absolute time in an actual state;
[0046] Figure 4 It is a schematic diagram of the software architecture for realizing synchronous voltage control of two battery packs;
[0047] Figure 5 is a schematic structural diagram of a multi-battery pack voltage synchronization control device provided by an embodiment of the present invention;
[0048] Figure 6 is a schematic diagram of the structure of a multi-battery pack voltage synchronization control system provided by an embodiment of the present invention;
[0049] Figure 7 It is a structural diagram of the control device;
[0050] Figure 8 It is a schematic diagram of the connection status between the two battery packs Pack_A and Pack_B and the PDCU on the vehicle side;
[0051] Fig. 9 It is a schematic diagram of the specific connection structure between the two battery packs and the entire vehicle. DETAILED DESCRIPTION
[0052] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0053] Combine the following Figures 1 to 9 The detailed scheme of the multi-battery pack voltage synchronization control method, device, system and energy storage device provided by the embodiments of the present invention is described.
[0054] Figure 1 It is a flow chart of a method for synchronously controlling voltages of multiple battery packs provided in an embodiment of the present invention.
[0055] like Figure 1 As shown, the multi-battery pack voltage synchronization control method provided by the embodiment of the present invention can be executed by a control device having data receiving and sending and data processing functions. The method specifically includes the following steps:
[0056] Step 110: Take every two battery packs in the multiple battery packs as a group of objects to be synchronized, and for each group of objects to be synchronized, determine a first processing duration corresponding to the cell voltage of the first battery pack and a second processing duration corresponding to the cell voltage of the second battery pack in the objects to be synchronized at the current moment.
[0057] The solution provided in this embodiment is mainly aimed at the situation where two or more battery packs are configured, and the voltage synchronization link can be performed with every two battery packs as a group.
[0058] It is understandable that the voltage of each battery cell needs to pass through multiple related chips before it can be transmitted to the vehicle through its own CAN line. In actual applications, the multiple related chips specifically include AFE (Analog Front End) chips, ADS33771 chips, CDD3371 chips and other chips that can realize data collection and processing.
[0059] In this embodiment, the first processing duration represents the time taken for the cell voltage of the first battery pack to be transmitted and run in the above-mentioned related chip, and the second processing duration represents the time taken for the cell voltage of the second battery pack to be transmitted and run in the above-mentioned related chip.
[0060] Step 120: Subtract the first processing duration from the second processing duration at the current moment to obtain the waiting duration at the current moment.
[0061] In actual applications, the first battery pack is connected to the vehicle end through the first high-voltage connector HVC_1, and the second battery pack is connected to the vehicle end through the second high-voltage connector HVC_2. In an ideal state, the voltage transmission process between the first high-voltage connector HVC_1 and the second high-voltage connector HVC_2 in absolute time is as follows: Figure 2 As shown by Figure 2 It can be seen that the time points at which the first high-voltage connector HVC_1 and the second high-voltage connector HVC_2 complete initialization are consistent, so the voltages of the two battery packs are synchronized.
[0062] However, in actual conditions, the voltage transmission process between the first high voltage connector HVC_1 and the second high voltage connector HVC_2 in absolute time is as follows: Figure 3 As shown by Figure 3 It can be seen that due to the existence of initialization error (up to 50ms), the time point when the second high-voltage connector HVC_2 completes initialization is later than the time point when the first high-voltage connector HVC_1 completes initialization, resulting in a time deviation corresponding to interval A and interval B between the two within the same sampling task cycle. Assuming that a sampling task cycle is 100ms, the time deviation corresponding to interval A and interval B is less than 100ms. The above time deviation is the main reason for the asynchronous voltage of the two battery packs.
[0063] In this embodiment, by obtaining the difference between the first processing time and the second processing time, the waiting time at the current moment can be obtained, thereby providing a data basis for subsequent iterative updates.
[0064] Step 130: Based on the first processing time, the second processing time and the waiting time at the current time, predict the waiting time at the next time, so as to iteratively update the waiting time and obtain the waiting time at each time.
[0065] It should be noted that this embodiment predicts the waiting time at the next moment through the relevant data at the previous moment, and implements iterative update of the waiting time at subsequent moments, so that the waiting time at each moment can be obtained.
[0066] Step 140: Based on the waiting time at each moment, voltage synchronization control is performed on the first battery pack and the second battery pack.
[0067] In this embodiment, by calculating the waiting time at each moment, the voltage sampling time deviation between the first battery pack and the second battery pack at each moment can be compensated, so that the voltage sampling links of the first battery pack and the second battery pack are more consistent, thereby realizing voltage synchronization control and ensuring that the maximum and minimum battery cell voltages at the same moment are consistent with the values of each single cell voltage.
[0068] In one embodiment, determining a first processing duration corresponding to a cell voltage of a first battery pack and a second processing duration corresponding to a cell voltage of a second battery pack in an object to be synchronized at a current moment specifically includes:
[0069] The first step is to obtain the first transmission duration of the first battery pack in the analog front-end chip, the first operating duration of the first battery pack in the data processing chip, the second transmission duration of the second battery pack in the analog front-end chip, and the second operating duration of the second battery pack in the data processing chip at the current moment.
[0070] In the second step, the first transmission duration and the first running duration are summed to obtain a first processing duration.
[0071] In the third step, the second transmission duration is summed with the second running duration to obtain a second processing duration.
[0072] Figure 4 The software architecture for realizing synchronous voltage control of two battery packs is shown as an example, and the software architecture mainly includes a basic software layer (BSW), a runtime environment layer (RTE), and an application software layer (ASW). Since the first battery pack and the second battery pack are connected to their respective corresponding ADS33771 chips through the AFE harness, in the basic software layer, the first transmission duration of the first battery pack in the analog front-end chip is recorded as Ta_AFE, and the second transmission duration of the second battery pack in the analog front-end chip is recorded as Tb_AFE. Since the front-end analog chips corresponding to the two battery packs are different, there is a certain deviation between the first transmission duration and the second transmission duration, and the maximum deviation does not exceed the sampling task cycle of the front-end analog chip, for example, not more than 100ms.
[0073] After the cell voltage of the first battery pack and the cell voltage of the second battery pack pass through their respective ADS33771 chips, the cell voltage and chip recovery valid flag of each of the two battery packs will be transmitted to the CDD33771 chip, and then transmitted to the application software layer through the runtime environment layer. In this process, the cell voltage collected by the first battery pack through the ADS33771 chip passes through the runtime environment layer and the running time of the CDD33771 chip, which is the first running time Ta_RTE, and the cell voltage collected by the second battery pack through the ADS33771 chip passes through the runtime environment layer and the running time of the CDD33771 chip, which is the second running time Tb_RTE.
[0074] In the application software layer, the cell voltages of the two battery packs and the chip recovery valid flags will be transmitted in the chip channel in the form of the original single cell voltage signals. Figure 4 In the example shown, the highest bit of the chip channel is equal to 1. At the same time, the original signal of the single cell voltage is converted from the original value to the physical value through the AFE configuration. Through the functional safety-related SM channel configuration and the SM signal after SM screening, the maximum and minimum cell voltages can be calculated. In this process, the duration of the maximum and minimum cell voltages calculated according to each cell voltage can be recorded as Tcount, and then it will be transmitted to the transit waiting layer in the form of a CAN signal. The waiting time in the transit waiting layer is recorded as T_wait. Then the signal passes through the runtime environment layer and enters the COM component in the basic software layer. In this process, the transmission time in the runtime environment layer is recorded as T_RTE, and the time of running in the COM component is recorded as T_COM. After passing through the COM component, it is sent to the vehicle end through the vehicle bus to achieve voltage consistency certification.
[0075] In this embodiment, the following relationship exists between the first transmission time Ta_AFE, the second transmission time Tb_AFE, the first operation time Ta_RTE, the second operation time Tb_RTE, the time Tcount for calculating the maximum and minimum cell voltages according to each cell voltage, and the waiting time T_wait:
[0076] Ta_AFE+Ta_RTE+Tcount=Tb_AFE+Tb_RTE+Tcount+Twait(1)
[0077] The first transmission duration Ta_AFE and the second transmission duration Tb_AFE can be expressed as:
[0078]
[0079]
[0080] Wherein, i represents the ith cell in the first battery pack, n represents the number of cells in the first battery pack, Ti represents the transmission time of the cell voltage of the ith cell in the analog front-end chip, j represents the jth cell in the second battery pack, m represents the number of cells in the second battery pack, and Tj represents the transmission time of the cell voltage of the jth cell in the analog front-end chip.
[0081] After simplifying the above formula (1), we can get the following formula:
[0082] Ta_AFE+Ta_RTE=Tb_AFE+Tb_RTE+Twait (4)
[0083] From the above formula (4), we can get:
[0084] Twait=Ta_AFE+Ta_RTE-Tb_AFE-Tb_RTE (5)
[0085] In one embodiment, based on the first processing time, the second processing time, and the waiting time at the current moment, predicting the waiting time at the next moment specifically includes:
[0086] First, the system state quantity at the current moment is determined according to the first processing duration and the second processing duration at the current moment.
[0087] In this embodiment, the system state quantity T can be specifically expressed as follows:
[0088] T=[T1;T2] (6)
[0089] T1=Ta_AFE+Ta_RTE (7)
[0090] T2=Tb_AFE+Tb_RTE (8)
[0091] In the formula, T represents the system state quantity, T1 represents the first processing time, T2 represents the second processing time, Ta_AFE represents the first transmission time, Ta_RTE represents the first operation time, Tb_AFE represents the second transmission time, and Tb_RTE represents the second operation time.
[0092] Then, a state equation between the first processing time, the second processing time and the waiting time is established.
[0093] In this embodiment, the state equation is the equation corresponding to the above equation (4).
[0094] Then, according to the system state quantity and state equation at the current moment, the system gain at the next moment is determined by a recursive prediction algorithm.
[0095] In some embodiments, the recursive prediction algorithm may use a Kalman filter algorithm, which is an optimal filtering algorithm for estimating system state quantities. The algorithm may use a dynamic model of the system and observation data to update an estimate of the system state quantities.
[0096] This embodiment is specifically implemented using an EKF (Extended Kalman Filter) algorithm. The EKF algorithm is a nonlinear filtering method that estimates the system state quantity by linearizing the nonlinear system and using the framework of Kalman filtering.
[0097] In a specific implementation, the system gain at the next moment is determined by a recursive prediction algorithm according to the system state quantity and state equation at the current moment, which specifically includes:
[0098] First, based on the system state quantity and state equation at the current moment, the system state quantity at the next moment is predicted.
[0099] Then, based on the system state quantity at the next moment and the system state quantity at the current moment, the state quantity covariance at the next moment is predicted.
[0100] Finally, based on the state quantity covariance at the next moment, the system gain at the next moment is predicted.
[0101] In this embodiment, the process of implementing system gain prediction using the EKF algorithm is as follows:
[0102] The first step is to set the initial system state quantity, state quantity covariance and other related parameters. The specific initialization parameters are as follows:
[0103] Set the initial system state x_0 = 0, where x represents the system state T;
[0104] Set the initial state quantity covariance P_0=I, and the initial error to 0.00001;
[0105] Set the initial forgetting factor lambda = 1;
[0106] Set the initial least squares estimate hat{theta}_0=0;
[0107] Set the initial least squares covariance matrix Q_0=I.
[0108] The second step is to predict the system state quantity at the next moment based on the system state quantity and state equation at the current moment.
[0109] In a specific implementation, based on the system state quantity and state equation at the current moment, the system state quantity at the next moment is predicted, which specifically includes:
[0110] Firstly, the system state quantity is derived based on the state equation to obtain the first derivative result.
[0111] Then, the waiting time is derived based on the state equation to obtain a second derivative result.
[0112] Finally, the system state quantity at the next moment is obtained according to the first derivative result, the second derivative result and the system state quantity at the current moment.
[0113] In this embodiment, the prediction process of the system state quantity is as follows:
[0114] x_{k|k-1}=Ax_{k-1}+Bu_{k-1} (9)
[0115] Wherein, A represents the derivative of the state equation shown in formula (4) with respect to the system state quantity T, i.e., the first derivative result; B represents the derivative of the state equation shown in formula (4) with respect to the waiting time Twait, i.e., the second derivative result; x_{k|k-1} represents the predicted value of the state quantity at the kth moment; x_{k-1} represents the system state quantity at the k-1th moment; and u_{k-1} represents the control input quantity at the k-1th moment.
[0116] In this embodiment, the prediction process of the state quantity covariance is specifically as follows:
[0117] P{k|k-1}=AP{k-1}A T +Q (10)
[0118] Where P{k|k-1} represents the covariance prediction value at the kth moment, P{k-1} represents the state quantity covariance at the k-1th moment, A represents the derivative of the state equation shown in formula (4) with respect to the system state quantity T, and Q represents the covariance matrix of the process noise.
[0119] The third step is to update the system gain, system state quantity and state quantity covariance, as follows:
[0120] The updating process of system gain is as follows:
[0121] K_k=P{k|k-1}C T (CP{k|k-1}C T +R) -1 (11)
[0122] Where K_k represents the system gain at the kth moment, P{k|k-1} represents the covariance prediction value at the kth moment, C represents the matrix of the observation model, and R represents the covariance matrix of the observation noise.
[0123] The update process of the system status is as follows:
[0124] x_k=x{k|k-1}+K_k(y_k-Cx{k|k-1}) (12)
[0125] In the formula, x_k represents the system state at the kth moment, x{k|k-1} represents the predicted value of the state at the kth moment, K_k represents the system gain at the kth moment, y_k represents the observed value at the kth moment, and C represents the matrix of the observation model.
[0126] The updating process of the state quantity covariance is as follows:
[0127] P_k=(I-K_kC)P_{k|k-1} (13)
[0128] Where P_k represents the state quantity covariance at the kth moment, I represents the initial value of the state quantity covariance, K_k represents the system gain at the kth moment, C represents the matrix of the observation model, and P_{k|k-1} represents the covariance prediction value at the kth moment.
[0129] The fourth step is to update the least squares estimate, the least squares covariance matrix, and the forgetting factor as follows:
[0130] The updating process of the least squares estimate is as follows:
[0131] hat{theta}_k=hat{theta}_{k-1}+P{k-1}C T (CP{k-1}C T +R) -1 (y_k-Cha
[0132] t{x}_{k|k-1})(14)
[0133] In the formula, hat{theta}_k represents the least squares estimate at the kth moment, hat{theta}_{k-1} represents the least squares estimate at the k-1th moment, P{k-1} represents the covariance of the state quantity at the k-1th moment, C represents the matrix of the observation model, R represents the covariance matrix of the observation noise, and hat{x}_{k|k-1} represents the waiting time at the initial moment.
[0134] The updating process of the least squares covariance matrix is as follows:
[0135] Q_k=(IP{k-1}C T (CP{k-1}C T +R) -1 C)P{k-1} (15)
[0136] Where Q_k represents the least squares covariance matrix at the kth moment, I represents the initial value of the least squares covariance matrix, P{k-1} represents the state quantity covariance at the k-1th moment, C represents the matrix of the observation model, and R represents the covariance matrix of the observation noise.
[0137] The updating process of the forgetting factor is as follows:
[0138] lambda_k=lambda_{k-1}+(1-lambda_{k-1})e -gamma k (16)
[0139] In the formula, lambda_k represents the forgetting factor at the kth moment, lambda_{k-1} represents the forgetting factor at the k-1th moment, and gamma represents a preset constant.
[0140] It is understandable that the forgetting factor is an important adjustment parameter. Through fine-tuning, the performance of the Kalman filter can be optimized in different application scenarios, so that it can not only effectively track the system state quantity, but also adapt to environmental changes while maintaining good stability and accuracy.
[0141] By repeating the above steps 2 to 4 until the convergence condition is reached, the system gain at each moment after the current moment can be obtained.
[0142] Finally, based on the waiting time at the current moment and the system gain at the next moment, the waiting time at the next moment is calculated.
[0143] In a specific implementation, the waiting time at the next moment is calculated according to the waiting time at the current moment and the system gain at the next moment, which specifically includes:
[0144] First, the system gain at the next moment is multiplied by the preset initial complementary error to obtain the time increment.
[0145] Then, the waiting time at the current moment is added to the time increment to obtain the waiting time at the next moment.
[0146] In this embodiment, taking the current moment as the k-1th moment as an example, the waiting time at the kth moment can be specifically calculated by the following formula:
[0147] Twait(k)=Twait(k-1)+Kk×Toffset (17)
[0148] Among them, Twait(k) represents the waiting time at the kth moment, Twait(k-1) represents the waiting time at the k-1th moment, Kk represents the system gain, and Toffset represents the initial compensation error, which can generally be taken as 100ms.
[0149] This embodiment mainly estimates the system gain at each moment through the above-mentioned EKF algorithm, thereby ensuring the iterative solution of the waiting time, thereby obtaining the waiting time at each moment.
[0150] In one embodiment, based on the waiting time at each moment, voltage synchronization control is performed on the first battery pack and the second battery pack, specifically including:
[0151] On the basis of the second processing time duration corresponding to the second battery pack at each moment, the waiting time duration at the corresponding moment is increased, so that the cell voltages of the first battery pack and the second battery pack are sent synchronously at the same moment.
[0152] It can be understood that the main purpose of this embodiment is to solve the waiting time at each moment to ensure that the left and right sides of the above equation (4) are equal at each moment, so as to synchronize the voltage transmission process of the two battery packs.
[0153] To sum up, the multi-battery pack voltage synchronization control method provided in this embodiment can ensure that the maximum and minimum battery cell voltages are consistent with the values of each single cell voltage at the same time by solving the waiting time and adding a waiting time verification process, thereby solving the voltage asynchrony problem caused by the existence of two or more battery packs, and can make all single cell voltages uploaded by the BMS synchronized with the maximum and minimum single cell voltage values.
[0154] Based on the same general inventive concept, the present invention also protects a multi-battery pack voltage synchronization control device, system and energy storage device. The multi-battery pack voltage synchronization control device, system and energy storage device provided by the present invention are described below. The multi-battery pack voltage synchronization control device, system and energy storage device described below can be referenced to each other with the multi-battery pack voltage synchronization control method described above.
[0155] Figure 5 It is a structural schematic diagram of a multi-battery pack voltage synchronization control device provided in an embodiment of the present invention.
[0156] like Figure 5 As shown, the multi-battery pack voltage synchronization control device provided by the embodiment of the present invention specifically includes:
[0157] The determination module 210 is used to take every two battery packs in the multiple battery packs as a group of objects to be synchronized, and for each group of objects to be synchronized, determine the first processing time corresponding to the battery cell voltage of the first battery pack and the second processing time corresponding to the battery cell voltage of the second battery pack in the objects to be synchronized at the current moment.
[0158] The calculation module 220 is used to obtain the waiting time at the current moment by subtracting the first processing time from the second processing time at the current moment.
[0159] The prediction module 230 is used to predict the waiting time at the next moment based on the first processing time, the second processing time and the waiting time at the current moment, so as to iteratively update the waiting time to obtain the waiting time at each moment.
[0160] The control module 240 is used to perform voltage synchronization control on the first battery pack and the second battery pack based on the waiting time at each moment.
[0161] In one embodiment, the prediction module 230 may be specifically used for:
[0162] Determine the system state quantity at the current moment according to the first processing duration and the second processing duration at the current moment;
[0163] Establishing a state equation between the first processing time, the second processing time and the waiting time;
[0164] According to the system state quantity and state equation at the current moment, the system gain at the next moment is determined by a recursive prediction algorithm;
[0165] Based on the waiting time at the current moment and the system gain at the next moment, the waiting time at the next moment is calculated.
[0166] In one embodiment, in the prediction module 230, the system gain at the next moment is determined by a recursive prediction algorithm according to the system state quantity and state equation at the current moment, specifically including:
[0167] Based on the system state quantity and state equation at the current moment, the system state quantity at the next moment is predicted;
[0168] Based on the system state quantity at the next moment and the system state quantity at the current moment, the state quantity covariance at the next moment is predicted;
[0169] Based on the state quantity covariance at the next moment, the system gain at the next moment is predicted.
[0170] In one embodiment, in the prediction module 230, based on the system state quantity and state equation at the current moment, the system state quantity at the next moment is predicted, specifically including:
[0171] Derivative the system state quantity based on the state equation to obtain a first derivative result;
[0172] Derivative the waiting time based on the state equation to obtain a second derivative result;
[0173] The system state quantity at the next moment is obtained according to the first derivative result, the second derivative result and the system state quantity at the current moment.
[0174] In one embodiment, in the prediction module 230, the waiting time at the next moment is calculated according to the waiting time at the current moment and the system gain at the next moment, specifically including:
[0175] Multiply the system gain at the next moment by the preset initial supplementary error to obtain the time increment;
[0176] Add the current waiting time to the time increment to get the next waiting time.
[0177] In one embodiment, the determination module 210 may be specifically used to:
[0178] Obtaining a first transmission duration of the first battery pack in the analog front-end chip, a first operating duration of the first battery pack in the data processing chip, a second transmission duration of the second battery pack in the analog front-end chip, and a second operating duration of the second battery pack in the data processing chip at the current moment;
[0179] The first transmission duration is added to the first running duration to obtain a first processing duration;
[0180] The second transmission duration and the second running duration are summed to obtain a second processing duration.
[0181] In one embodiment, the control module 240 may be specifically used for:
[0182] On the basis of the second processing time duration corresponding to the second battery pack at each moment, the waiting time duration at the corresponding moment is increased, so that the cell voltages of the first battery pack and the second battery pack are sent synchronously at the same moment.
[0183] The multi-battery pack voltage synchronization control device provided in the embodiment of the present invention mainly utilizes the different processing times of the transmission and processing links of each battery pack in the relevant chip to further determine the waiting time, and realizes voltage synchronization control of multiple battery packs by increasing the waiting time. The control process only involves software-level optimization, is easier to implement, and has a better synchronization effect.
[0184] Figure 6 It is a schematic diagram of the structure of a multi-battery pack voltage synchronization control system provided by an embodiment of the present invention.
[0185] like Figure 6 As shown, the multi-battery pack voltage synchronization control system provided by the embodiment of the present invention specifically includes:
[0186] a plurality of battery packs 310;
[0187] The control device 320, the plurality of battery packs 310 are respectively connected to the control device 320, such as Figure 7As shown, the control device may specifically include: a processor 410, a communication interface 420, a memory 430 and a communication bus 440, wherein the processor 410, the communication interface 420 and the memory 430 communicate with each other via the communication bus 440. The processor 410 may call the logic instructions in the memory 430 to execute the multi-battery pack voltage synchronization control method provided in the above embodiments.
[0188] In addition, the logic instructions in the above-mentioned memory 430 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
[0189] In practical applications, the control device 320 may be a PDCU (Powertrain Domain Control Unit) on the vehicle side, and each battery pack 310 may be connected to the PDCU via a CAN bus.
[0190] Figure 8 The example shows the connection status between two battery packs Pack_A and Pack_B and the PDCU of the vehicle. Figure 8 As shown, the cells in battery packs Pack_A and Pack_B can be connected via high-voltage copper busbars. Figure 8In the illustrated situation, battery pack Pack_A is provided with battery cells No. 1 to No. 52, and battery pack Pack_B is provided with battery cells No. 53 to No. 88. The BDU (Battery Energy Distribution) in battery pack Pack_A can transmit the high-voltage sampling signal through HVC_1 (i.e., the first high-voltage connector in battery pack Pack_A) through the PM_CAN harness to the PDCU at the vehicle end in the form of high-voltage sampling. In addition, the battery cells in battery pack Pack_A can transmit the single-cell sampling signal through HVC_1 through the PM_CAN harness to the PDCU at the vehicle end in the form of single-cell sampling. Similarly, the battery cells in battery pack Pack_B can transmit the single-cell sampling signal through HVC_2 (i.e., the second high-voltage connector in battery pack Pack_B) through the PM_CAN harness to the PDCU at the vehicle end in the form of single-cell sampling.
[0191] Fig. 9 The specific connection structure between two battery packs and the vehicle end is shown as an example. Fig. 9 As shown, two battery packs Pack_A and Pack_B are connected, and HVC_1 in the battery pack Pack_A is connected to the PDCU of the vehicle. At the same time, the two battery packs Pack_A and Pack_B can be charged through the OBC (On-Board Charger) and the DC converter DCDC using the fast charging port or the slow charging port. In addition, the battery ABM is also connected to the PDCU of the vehicle. The PDCU of the vehicle is connected to the MCU (Micro Controller Unit) through related intermediate devices, so as to realize the drive control of the drive motor M.
[0192] In addition, an embodiment of the present invention further provides an energy storage device, which includes the multi-battery pack voltage synchronization control system provided in the above embodiment.
[0193] It is understandable that the energy storage device may be a vehicle, an operating machine, etc. By setting up a multi-battery pack voltage synchronization control system, the voltage consistency of multiple battery packs can be ensured, thereby improving the operating safety and stability of the entire energy storage device.
[0194] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0195] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0196] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for synchronously controlling voltage of multiple battery packs, characterized in that: include: Taking every two battery packs in the multiple battery packs as a group of objects to be synchronized, and for each group of objects to be synchronized, determining a first processing duration corresponding to a cell voltage of a first battery pack and a second processing duration corresponding to a cell voltage of a second battery pack in the objects to be synchronized at a current moment; Subtract the first processing time from the second processing time at the current moment to obtain the waiting time at the current moment; Based on the first processing time, the second processing time and the waiting time at the current time, predict the waiting time at the next time, so as to iteratively update the waiting time to obtain the waiting time at each time; Based on the waiting time at each moment, voltage synchronization control is performed on the first battery pack and the second battery pack.
2. The method for synchronously controlling voltages of multiple battery packs according to claim 1, characterized in that: The predicting the waiting time at the next moment based on the first processing time, the second processing time and the waiting time at the current moment includes: Determine the system state quantity at the current moment according to the first processing time length and the second processing time length at the current moment; Establishing a state equation between the first processing time, the second processing time and the waiting time; Determining the system gain at the next moment by a recursive prediction algorithm according to the system state quantity at the current moment and the state equation; Based on the waiting time at the current moment and the system gain at the next moment, the waiting time at the next moment is calculated.
3. The method for synchronously controlling voltages of multiple battery packs according to claim 2, characterized in that: The determining the system gain at the next moment by a recursive prediction algorithm according to the system state quantity at the current moment and the state equation comprises: Based on the system state quantity at the current moment and the state equation, predict the system state quantity at the next moment; Based on the system state quantity at the next moment and the system state quantity at the current moment, predicting the state quantity covariance at the next moment; Based on the state quantity covariance at the next moment, the system gain at the next moment is predicted.
4. The method for synchronously controlling voltages of multiple battery packs according to claim 3, characterized in that: The predicting of the system state quantity at the next moment based on the system state quantity at the current moment and the state equation includes: Deriving the system state quantity based on the state equation to obtain a first derivative result; Derivative the waiting time based on the state equation to obtain a second derivative result; The system state quantity at the next moment is obtained according to the first derivation result, the second derivation result and the system state quantity at the current moment.
5. The method for synchronously controlling voltages of multiple battery packs according to claim 2, characterized in that: The step of calculating the waiting time at the next moment according to the waiting time at the current moment and the system gain at the next moment includes: Multiplying the system gain at the next moment by a preset initial supplementary error to obtain a time increment; The waiting time at the current moment is added to the time increment to obtain the waiting time at the next moment.
6. The method for synchronously controlling voltages of multiple battery packs according to claim 1, characterized in that: The determining of a first processing duration corresponding to a cell voltage of a first battery pack and a second processing duration corresponding to a cell voltage of a second battery pack in the object to be synchronized at the current moment includes: Obtaining a first transmission duration of the first battery pack in the analog front-end chip, a first operating duration of the first battery pack in the data processing chip, a second transmission duration of the second battery pack in the analog front-end chip, and a second operating duration of the second battery pack in the data processing chip at the current moment; Add the first transmission duration and the first running duration to obtain a first processing duration; The second transmission duration and the second running duration are summed to obtain a second processing duration.
7. The method for synchronously controlling voltages of multiple battery packs according to claim 1, characterized in that: The step of performing voltage synchronization control on the first battery pack and the second battery pack based on the waiting time at each moment includes: On the basis of the second processing time duration corresponding to the second battery pack at each moment, the waiting time duration at the corresponding moment is increased so that the cell voltages of the first battery pack and the second battery pack are sent synchronously at the same moment.
8. A multi-battery pack voltage synchronization control device, characterized in that: include: A determination module, used to take every two battery packs in the multiple battery packs as a group of objects to be synchronized, and for each group of objects to be synchronized, determine a first processing duration corresponding to a cell voltage of a first battery pack and a second processing duration corresponding to a cell voltage of a second battery pack in the objects to be synchronized at a current moment; A calculation module, configured to obtain a waiting time at the current moment by subtracting the first processing time from the second processing time at the current moment; A prediction module, configured to predict the waiting time at the next moment based on the first processing time, the second processing time and the waiting time at the current moment, so as to iteratively update the waiting time to obtain the waiting time at each moment; A control module is used to perform voltage synchronization control on the first battery pack and the second battery pack based on the waiting time at each moment.
9. A multi-battery pack voltage synchronization control system, characterized in that: include: Multiple battery packs; A control device, wherein the multiple battery packs are respectively connected to the control device, the control device comprises a memory, a processor and a computer program stored in the memory and running on the processor, and when the processor executes the program, the method for synchronous voltage control of multiple battery packs as claimed in any one of claims 1 to 7 is implemented.
10. An energy storage device, characterized in that: It includes the multi-battery pack voltage synchronization control system as described in claim 9.