Asphalt pavement construction device and construction method thereof

By setting up a dredging mechanism in the drain pipe, using the coordination of the eccentric wheel, threaded sleeve and mixing rod, the problem of asphalt discharge smoothness is solved, the construction efficiency and the simplicity of the equipment are improved, and the effective dredging of the drain pipe is achieved and Clean.

CN118958089APending Publication Date: 2024-11-15CHINA ROAD & BRIDGE
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411119051.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

During the process of cutting, the existing asphalt pavement construction device easily blocks the cutting port, affecting the smoothness and construction efficiency of the cutting. The existing technology has poor effect on splitting through the airflow cylinder and the cutting component, and cannot be effective. Unblock the discharge pipe.

Method used

The dredging mechanism is provided in the discharge pipe, including an eccentric wheel, a threaded sleeve, a second stirring rod and a second stirring blade. The second stirring rod and the second stirring blade are driven to rotate up and down in the discharge pipe by rotating the first stirring rod in the storage tank. Move to achieve effective clearance of the discharge pipe, and agitate and disperse the material pile with the telescopic rod and the material distribution mechanism.

Benefits of technology

The smoothness of the feed pipe is achieved, the construction efficiency is improved, the equipment structure is simplified, the power source is small and the dredging effect is excellent, and the feed pipe can be thoroughly cleaned and repaired, ensuring the continuity and quality of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958089A_ABST
    Figure CN118958089A_ABST
Patent Text Reader

Abstract

The invention discloses an asphalt pavement construction device and a construction method thereof.The asphalt pavement construction device comprises a guiding mechanism, a discharging mechanism, a flattening mechanism and a compacting mechanism, the discharging mechanism comprises a storage tank, and a feeding port and a plurality of discharging ports are formed in the storage tank; a plurality of blanking pipes, wherein each discharge port is communicated with one blanking pipe; and each discharging pipe is correspondingly provided with one dredging mechanism, and each dredging mechanism comprises an eccentric wheel, a second stirring rod and a threaded sleeve. The dredging mechanism is arranged in the discharging pipe, the interior of the discharging pipe is effectively dredged, discharging smoothness is guaranteed, and then the construction operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of road paving equipment, and more specifically, to an asphalt road construction device and a construction method thereof. Background Art

[0002] Asphalt pavement construction refers to laying asphalt on the prepared roadbed surface. In order to improve the mechanization of construction, asphalt pavement construction equipment is usually used to lay asphalt pavement. During the construction process, the asphalt pavement construction equipment first unloads the asphalt onto the roadbed, and then uses the flattening mechanism and compacting mechanism at the rear end to flatten and compact the asphalt. During the unloading process, due to the certain viscosity of the asphalt, it is easy to block the discharge port, affecting the smoothness of the discharge, and thus affecting the construction efficiency.

[0003] In order to solve the above technical problems, the invention patent with the authorization announcement number CN114016357B discloses a highway pavement asphalt mixture paving device, which divides the material guide base into several branch troughs, reduces the height of the material pile by paving the material, and then facilitates the material scraping component to spread the material pile evenly, and the airflow cylinder is set at the end of the slot of the corresponding branch trough, and the airflow is blown to impact the material pile, so that the airflow impacts the wave peak position of the material pile, so that the piled material moves to both sides, and the scraping component is open and closed to flip on both sides of the airflow output direction, so as to assist in spreading the material to both sides again, and then improve the uniformity of the overall paving of the asphalt mixture. In the above patent technology, the material pile below the discharge port is separated to both sides by setting the airflow cylinder and the scraping component, but the inside of the branch trough cannot be cleared, and the smoothness of material discharge cannot be effectively guaranteed. Furthermore, due to the high viscosity of the asphalt material, the effect of spreading the material to both sides is poor only by blowing the middle of the material pile by the airflow.

[0004] Therefore, there is an urgent need for an asphalt pavement construction device that can effectively dredge the material discharge pipe and ensure smooth material discharge. Summary of the invention

[0005] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.

[0006] Another object of the present invention is to provide an asphalt pavement construction device, which effectively dredges the inside of the discharge pipe by arranging a dredging mechanism in the discharge pipe, thereby ensuring smooth discharge of materials and thereby improving construction efficiency.

[0007] In order to achieve these purposes and other advantages according to the present invention, an asphalt pavement construction device is provided, which includes a traction mechanism, a feeding mechanism, a flattening mechanism and a compacting mechanism connected in sequence, wherein the feeding mechanism includes: The material storage tank is a cylindrical structure extending transversely along the road surface, the top of the material storage tank is provided with a feeding port, the bottom of the material storage tank is provided with a plurality of discharge ports at intervals transversely along the road surface, and each discharge port is provided with a corresponding discharge valve; a first stirring rod is coaxially provided inside the material storage tank, and a plurality of first stirring blades are provided on the rod at intervals transversely along the road surface; Multiple feeding pipes, one feeding pipe is provided for each discharge port, each feeding pipe is vertically arranged and communicated with the corresponding discharge port; Multiple dredging mechanisms, each unloading pipe is provided with a corresponding dredging mechanism, each dredging mechanism includes: An eccentric wheel, which is located in the storage tank and sleeved on the first stirring rod, the eccentric wheel and the first stirring rod are not coaxial, and a first sliding groove is arranged on the circumferential side surface of the eccentric wheel; A second stirring rod is coaxially arranged in the corresponding feeding tube, a first slider is arranged on the top of each second stirring rod, and the slider is arranged in the corresponding first slide groove, and a plurality of circles of second stirring blades are arranged at intervals along the vertical direction on each second stirring rod; an external thread is arranged on the circumferential side wall of the upper part of the second stirring rod; The threaded sleeve has a coaxial spiral transmission sleeve arranged on the corresponding second stirring rod, and the inner wall of the threaded sleeve is provided with an internal thread that forms a spiral transmission connection with the external thread on the second stirring rod. Each threaded sleeve is connected to the inner wall of the corresponding discharge pipe through a horizontally arranged first connecting rod.

[0008] Preferably, in the asphalt pavement construction device, each dredging mechanism further comprises: A rotating ring is rotatably sleeved on the bottom of the corresponding feeding pipe; A plurality of telescopic rods are arranged at intervals along the circumferential direction at the bottom of the corresponding feeding pipe, one end of each telescopic rod is hinged to the rotating ring, and the other end is hinged to the bottom of the second stirring rod.

[0009] Preferably, in the asphalt pavement construction device, each dredging mechanism further comprises: A first bearing sleeve is coaxially rotatably sleeved on the corresponding second stirring rod, and the first bearing sleeve is located below the threaded sleeve; A plurality of cross bars are arranged between the corresponding first bearing sleeve and the inner wall of the feeding tube at intervals along the circumferential direction, each cross bar extends along the radial direction of the feeding tube, one end of each cross bar is connected to the corresponding first bearing sleeve, and the other end is slidably connected to the inner wall of the corresponding feeding tube along the vertical direction; A plurality of dredging rod groups are provided, one dredging rod group is arranged on each cross bar, each dredging rod group comprises a plurality of dredging rods arranged at intervals on the corresponding cross bar, each dredging rod is arranged vertically and does not interfere with the first connecting rod.

[0010] Preferably, in the asphalt pavement construction device, each dredging mechanism further comprises: A plurality of second bearing sleeves, one second bearing sleeve is correspondingly arranged between any two adjacent circles of second stirring blades, and each second bearing sleeve is coaxially rotatably sleeved on the corresponding second stirring rod; A plurality of pairs of second connecting rods, one pair of second connecting rods corresponding to one second bearing sleeve, any pair of second connecting rods are symmetrically arranged on both sides of the corresponding second bearing sleeve, one end of each second connecting rod is connected to one side of the corresponding second bearing sleeve, and the other end extends horizontally along the radial direction of the corresponding second stirring rod and is slidably connected to the inner wall of the corresponding discharge pipe along the vertical direction; A plurality of scrapers are provided, and a scraper is provided at the top and the bottom of each pair of second connecting rods respectively. Each scraper is an annular structure whose center passes through the axis of the discharge pipe, and the outer circumferential edge of the scraper contacts the inner wall of the discharge pipe.

[0011] Preferably, the asphalt pavement construction device further comprises a plurality of material distribution mechanisms, each material discharge pipe is provided with a corresponding material distribution mechanism, and each material distribution mechanism comprises: The cylinder is a structure with open ends. The cylinder is coaxially sleeved on the outside of the corresponding feeding pipe, and the top of the cylinder is rotatably connected to the bottom of the storage tank; A gear ring is coaxially sleeved on the inner wall of the cylinder; Two first rotating shafts are arranged between the feeding tube and the cylinder body, and are symmetrically located on both sides of the cylinder body. The upper end of each first rotating shaft is rotatably connected to the bottom of the storage tank, and the lower end extends vertically downward to the bottom of the feeding tube. The lower end of the first rotating shaft is provided with a third stirring blade, and the third stirring blades on the two first rotating shafts do not interfere with each other. Two first gear plates, one first gear plate is coaxially rotatably sleeved on a first rotating shaft, and each first gear plate is meshed with a gear ring.

[0012] Preferably, in the asphalt pavement construction device, each material distribution mechanism further comprises: A second gear plate is coaxially sleeved on the cylinder body; A first bevel gear, coaxially sleeved on the first stirring rod; A second rotating shaft has one end located inside the storage tank and coaxially sleeved with a second bevel gear meshing with the first bevel gear, and the other end vertically extends downward through the side wall of the storage tank to the bottom of the storage tank and coaxially sleeved with a third gear disc meshing with the second gear disc.

[0013] Preferably, in the asphalt pavement construction device, each second rotating shaft is rotatably connected to the side wall of the storage tank via a bearing member.

[0014] The present invention also provides a construction method of the above-mentioned asphalt pavement construction device, which comprises the following steps: Step 1: Move the asphalt pavement construction device to the roadbed with asphalt under the action of the traction mechanism, and add asphalt material into the storage tank through the feeding port; Step 2: Move the asphalt pavement construction device longitudinally along the roadbed, and at the same time open the discharge valve of the discharge port. During the movement, the asphalt material falls onto the roadbed through multiple discharge pipes, and then the asphalt is flattened and compacted by the flattening mechanism and the compacting mechanism. During the movement, start the first stirring rod to rotate, drive the multiple first stirring blades to stir the material in the storage tank, and at the same time, the eccentric wheel rotates with the first stirring rod, driving the second stirring rod to move up and down in the discharge pipe. Because the second stirring rod and the threaded sleeve are spiral transmission sleeves, under the further action of the threaded sleeve, the second stirring rod moves up and down relative to the discharge pipe while rotating in the circumferential direction, thereby driving the second stirring blades to rotate relative to the discharge pipe; Step 3: Move the asphalt pavement construction device along the longitudinal direction of the roadbed until the asphalt paving construction work is completed.

[0015] The present invention has at least the following beneficial effects: 1. The present invention provides an asphalt pavement construction device, which can use the rotational force of the first stirring rod in the storage tank to drive the second stirring rod and the second stirring blade to rotate and move up and down in the discharge pipe through the cooperation of the eccentric wheel, the threaded sleeve, the second stirring rod and the second stirring blade, so as to effectively dredge the discharge pipe. Compared with the prior art, the present invention has the advantages of simple equipment structure, less power source equipment and excellent dredging effect; 2. The construction method of the asphalt pavement construction device provided by the present invention can timely and effectively clear the material discharge pipe during the construction process to ensure the smoothness of material discharge. At the same time, a material distribution mechanism is provided to stir the two sides of the material pile on the roadbed, and cooperate with multiple telescopic rods to guide the material pile to both sides to achieve the initial dispersion of the asphalt material, which is beneficial to the subsequent leveling operation of the leveling mechanism and improves the construction efficiency; 3. Furthermore, after completing the operation, the construction device of the present invention can effectively clean the discharge mechanism and remove the residual asphalt more thoroughly to prevent the residual asphalt from affecting the next construction operation. The overall structure in the discharge pipe can also be taken out for cleaning and regular maintenance to ensure the normal unblocking operation of the discharge pipe.

[0016] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of an asphalt pavement construction device described in one of the technical solutions of the present invention; Figure 2It is a structural schematic diagram of a feeding mechanism in another technical solution of the present invention; Figure 3 For the present invention Figure 2 A partial enlarged view of middle A; Figure 4 It is a top view of the barrel and the lower barrel in another technical solution of the present invention; Figure 5 It is a schematic structural diagram of a stirring rod in another technical solution of the present invention.

[0018] Explanation of the reference numerals: 1-traction mechanism; 2-feeding mechanism; 21-storage tank; 22-first stirring rod; 221-first stirring blade; 222-motor; 23-feeding pipe; 31-stirring rod; 32-spreading plate; 4-rolling roller; 51-eccentric wheel; 52-second stirring rod; 53-second stirring blade; 54-threaded sleeve; 55-first connecting rod; 61-rotating ring; 62-telescopic rod; 71-first bearing sleeve; 72-cross rod; 73-dredging rod; 81-second bearing sleeve; 82-second connecting rod; 83-scraper; 91-cylinder; 92-gear ring; 93-first rotating shaft; 94-third stirring blade; 95-first gear plate; 96-second gear plate; 97-first bevel gear; 98-second rotating shaft, 981-second bevel gear; 982-third gear plate; 99-fan blade. DETAILED DESCRIPTION

[0019] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments so that those skilled in the art can implement the invention with reference to the description.

[0020] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.

[0021] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials can be obtained from commercial channels unless otherwise specified.

[0022] In the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. to indicate directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0023] like Figures 1 to 5As shown, the present invention provides an asphalt pavement construction device, which includes a traction mechanism 1, a feeding mechanism 2, a flattening mechanism and a compacting mechanism connected in sequence, wherein the feeding mechanism 2 includes: The material storage tank 21 is a cylindrical structure extending transversely along the road surface. The top of the material storage tank 21 is provided with a feeding port, and the bottom is provided with a plurality of discharge ports at intervals transversely along the road surface, and each discharge port is provided with a corresponding discharge valve; a first stirring rod 22 is coaxially provided inside the material storage tank 21, and a plurality of first stirring blades 221 are provided on the rod at intervals transversely along the road surface; A plurality of feed pipes 23, one feed pipe 23 is provided for each discharge port, and each feed pipe 23 is vertically arranged and communicated with the corresponding discharge port; Multiple dredging mechanisms, each feeding pipe 23 is provided with a corresponding dredging mechanism, each dredging mechanism includes: An eccentric wheel 51, which is located in the storage tank 21 and sleeved on the first stirring rod 22, the eccentric wheel 51 and the first stirring rod 22 are not coaxial, and a first sliding groove is provided on the circumferential side surface of the eccentric wheel 51; The second stirring rod 52 is coaxially arranged in the corresponding feeding tube 23. A first slider is arranged on the top of each second stirring rod 52, which is arranged in the corresponding first slide groove. A plurality of circles of second stirring blades 53 are arranged at intervals along the vertical direction on each second stirring rod 52. An external thread is arranged on the circumferential side wall of the upper part of the second stirring rod 52. The threaded sleeve 54 has a coaxial spiral transmission sleeve arranged on the corresponding second stirring rod 52, and the inner wall of the threaded sleeve 54 and the external thread on the second stirring rod 52 form an internal thread connected by a spiral transmission, and each threaded sleeve 54 is connected to the inner wall of the corresponding discharge pipe 23 through a horizontally arranged first connecting rod 55.

[0024] In the above technical scheme, the present invention provides an asphalt pavement construction device, which is used to lay asphalt on the surface of a prepared roadbed to form an asphalt pavement layer. The asphalt pavement construction device includes a frame, a traction mechanism 1 arranged at the front end of the frame and used to drive the device to move along the longitudinal direction of the roadbed (the longitudinal direction of the roadbed is the direction of vehicle travel, and the transverse direction of the roadbed is the direction perpendicular to the direction of vehicle travel), a feeding mechanism 2 arranged at the rear end of the traction mechanism 1 and connected to the frame, a flattening mechanism arranged at the rear end of the feeding mechanism 2 and connected to the frame, and a compacting mechanism arranged at the rear end of the flattening mechanism and connected to the frame; the feeding mechanism 2 is used to guide the asphalt to the roadbed surface, the flattening mechanism is used to flatten the material discharged from the feeding mechanism 2 to the roadbed surface to form a material pile, and the compacting mechanism is used to roll and compact the flattened asphalt to form an asphalt pavement; the flattening mechanism and the compacting mechanism used in the present invention are both prior art, such as Figure 1As shown, the flattening mechanism includes a stirring rod 31 with a spiral structure extending transversely along the road surface, and a spreading plate 32 arranged at the rear end of the stirring rod 31, and the compacting mechanism is a rolling roller 4 extending transversely along the road surface; The unloading mechanism 2 of the present invention comprises a storage tank 21 for storing asphalt, a feeding port is provided on the top of the storage tank 21, asphalt is added into the storage tank 21 through the feeding port, a first stirring rod 22 is provided in the storage tank 21 for lateral rotation, a plurality of first stirring blades 221 are provided on the first stirring rod 22, the first stirring rod 22 rotates around its own axis relative to the storage tank 21, and the asphalt in the storage tank 21 can be stirred to ensure the uniformity of the asphalt in the storage tank 21; a plurality of discharge ports are provided at intervals along the lateral direction of the road surface at the bottom of the storage tank 21, and a discharge valve and a discharge pipe are provided corresponding to each discharge port. When the asphalt pavement construction is carried out, the discharge valve is opened, and the asphalt falls onto the roadbed through the discharge port and the discharge pipe. When the construction is completed, the discharge valve is closed; Each discharge pipe is provided with a corresponding dredging mechanism, which includes an eccentric wheel 51 fixedly mounted on the first stirring rod 22, the eccentric wheel 51 and the first stirring rod 22 are not coaxial, the eccentric wheel 51 is located directly above the corresponding discharge pipe 23, and the distance between the eccentric wheel 51 and the discharge pipe 23 changes with the rotation of the first stirring rod 22. A second stirring rod 52 is coaxially arranged in the discharge pipe 23, and the top of the second stirring rod 52 is associated with the eccentric wheel 51 through the sliding cooperation of the first slider and the first slide groove, so that the eccentric wheel 51 can drive the second stirring rod 52 to move up and down in the discharge pipe 23 in the vertical direction as the first stirring rod 22 rotates. A plurality of circles of second stirring blades 53 are arranged at intervals in the vertical direction on the second stirring rod 52, and each circle of the second stirring blades 53 includes a plurality of circles of second stirring blades 53 along the circumferential direction. The second stirring blades 53 are arranged at intervals, and further, each second stirring rod 52 is provided with a threaded sleeve 54 corresponding to the spiral transmission sleeve, and the inner wall of the threaded sleeve 54 is provided with an internal thread that matches the external thread on the outer wall of the second stirring rod 52. The threaded sleeve 54 is fixedly connected to the discharge pipe 23 through the first connecting rod 55, that is, the threaded sleeve 54 is located at the upper part of the discharge pipe 23 and is fixed. The second stirring rod 52 moves up and down in the vertical direction. Under the action of the spiral transmission setting of the threaded sleeve 54 and the second stirring rod 52 (the circumferential side wall of the second stirring rod near its top is provided with a section of external thread in the vertical direction, and the internal thread of the threaded sleeve is spirally connected with the section of external thread, and the length of the external thread is greater than the moving distance of the second stirring rod in the vertical direction, so that the first stirring rod 52 can be moved up and down in the vertical direction. Under the action of the rotation of the mixing rod, the second mixing rod moves vertically to the top or to the bottom, and the threaded sleeve is always connected to the second mixing rod by spiral transmission; the spiral groove of the external thread on the second mixing rod and the spiral angle of the spiral groove on the inner wall of the threaded sleeve are set to ensure that the second mixing rod can move relative to the threaded sleeve in the vertical direction while rotating relative to the threaded sleeve). The second mixing rod 52 also rotates in the circumferential direction, that is, it rotates up and down. The rotation and up and down movement of the second mixing rod 52 drives multiple second mixing blades 53 to rotate and move up and down in the discharge pipe 23, which can greatly stir the asphalt material inside the discharge pipe 23, thereby achieving effective dredging of the discharge pipe 23, ensuring the smoothness of unloading of the discharge pipe 23, and thus improving construction efficiency.

[0025] Preferably, the discharge valve at the discharge port includes two semicircular baffles, each of which has a semicircular notch in the middle. When the two baffles move toward each other to block the discharge port, the inner side walls of the circular structure formed by the two notches are just in close contact with the outer wall of the threaded sleeve 54. When unloading is required, the two baffles move away from each other to open the discharge port.

[0026] The present invention provides an asphalt pavement construction device, which can use the rotational force of the first stirring rod 22 in the storage tank 21 to drive the second stirring rod 52 and the second stirring blade 53 to rotate and move up and down in the discharge pipe 23, through the mutual cooperation of the eccentric wheel 51, the threaded sleeve 54, the second stirring rod 52, and the second stirring blade 53, so as to effectively dredge the discharge pipe 23. Compared with the prior art, the present invention has the advantages of simple equipment structure, less power source equipment, and excellent dredging effect.

[0027] In another technical solution, in the asphalt pavement construction device, each dredging mechanism further comprises: A rotating ring 61 is rotatably sleeved on the bottom of the corresponding feeding tube 23; A plurality of telescopic rods 62 are arranged at intervals along the circumferential direction at the bottom of the corresponding feeding tube 23 . One end of each telescopic rod 62 is hinged to the rotating ring 61 , and the other end is hinged to the bottom of the second stirring rod 52 .

[0028] Furthermore, the present invention provides a rotating ring 61 and a plurality of telescopic rods 62 at the bottom of the discharge tube 23. The rotating ring 61 is rotatably sleeved on the bottom of the discharge tube 23 through a bearing assembly. The center of the rotating ring 61 is located on the axis of the discharge tube 23. The rotating ring 61 is connected to the bottom of the second stirring rod 52 through a plurality of telescopic rods 62. The two ends of each telescopic rod 62 are respectively hinged to the rotating ring 61 and the second stirring rod 52, so that the rotation and up and down movement of the second stirring rod 52 can drive the rotating ring 61 to rotate relative to the discharge tube 23. At the same time, the plurality of telescopic rods 62 are adaptively rotated and telescoped between the rotating ring 61 and the second stirring rod 52, so that the inclination angle and length of the telescopic rod 62 are adapted to the spacing between the bottom of the rotating ring 61 and the bottom of the second stirring rod 52. The movement of the plurality of telescopic rods 62 can stir the top of the material pile that falls on the road surface to a greater extent, so that the middle (top) of the material pile moves autonomously to both sides, and the material pile is preliminarily dispersed, making preliminary preparations for subsequent leveling.

[0029] In another technical solution, in the asphalt pavement construction device, each dredging mechanism further comprises: A first bearing sleeve 71 is coaxially rotatably sleeved on the corresponding second stirring rod 52 , and the first bearing sleeve 71 is located below the threaded sleeve 54 ; A plurality of cross bars 72 are arranged between the corresponding first bearing sleeve 71 and the inner wall of the feeding tube 23 at intervals along the circumferential direction, each cross bar 72 extends along the radial direction of the feeding tube 23, one end of each cross bar 72 is connected to the corresponding first bearing sleeve 71, and the other end is slidably connected to the inner wall of the corresponding feeding tube 23 along the vertical direction; There are multiple dredging rod groups, one dredging rod group is arranged on each cross bar 72 , each dredging rod group includes multiple dredging rods 73 arranged at intervals on the corresponding cross bar 72 , and each dredging rod 73 is arranged vertically and does not interfere with the first connecting rod 55 .

[0030] In the above technical scheme, the dredging mechanism of the present invention further includes a first bearing sleeve 71 coaxially rotatably sleeved on the second stirring rod 52 through a bearing assembly, the first bearing sleeve 71 is located between the threaded sleeve 54 and the top circle of the second stirring blades 53, the first bearing sleeve 71 is slidably connected to the corresponding inner wall of the discharge pipe 23 along the vertical direction through a plurality of cross bars 72, the rotation and up and down movement of the second stirring rod 52 will drive the first bearing sleeve 71 to move up and down, the first bearing sleeve 71 does not rotate in a circle, and then drives the plurality of cross bars 72 to move up and down, thereby driving the plurality of dredging rods 73 to move up and down, the up and down movement of the dredging rods 73 can be inserted back and forth into the top of the discharge pipe and the discharge port area, so as to dredge the asphalt material accumulated at the top of the discharge pipe and the discharge port area, further ensuring the smoothness of unloading.

[0031] In another technical solution, in the asphalt pavement construction device, each dredging mechanism further comprises: A plurality of second bearing sleeves 81, wherein one second bearing sleeve 81 is correspondingly disposed between any two adjacent circles of second stirring blades 53, and each second bearing sleeve 81 is coaxially rotatably sleeved on the corresponding second stirring rod 52; A plurality of pairs of second connecting rods 82, one pair of second connecting rods 82 is correspondingly provided for one second bearing sleeve 81, and any pair of second connecting rods 82 are symmetrically provided on both sides of the corresponding second bearing sleeve 81, one end of each second connecting rod 82 is connected to one side of the corresponding second bearing sleeve 81, and the other end extends horizontally along the radial direction of the corresponding second stirring rod 52 and is slidably connected to the inner wall of the corresponding discharge pipe 23 along the vertical direction; A plurality of scrapers 83 are provided, with a scraper 83 correspondingly provided at the top and bottom of each pair of second connecting rods 82 . Each scraper 83 is an annular structure with its center passing through the axis of the discharge pipe 23 . The outer circumferential edge of the scraper 83 contacts the inner wall of the discharge pipe 23 .

[0032] In the above technical scheme, the present invention further provides a plurality of second bearing sleeves 81, each second bearing sleeve 81 is rotatably connected to the second stirring rod 52 through a bearing assembly, and the second bearing sleeve 81 is slidably connected to the inner wall of the discharge pipe 23 in the vertical direction through a pair of second connecting rods 82, and a scraper 83 of an annular structure in contact with the inner wall of the discharge pipe 23 is correspondingly provided at the top and bottom of the pair of second connecting rods 82, so that the second stirring rod 52 rotates up and down, driving the second bearing sleeve 81 to move up and down in the vertical direction, and then driving the scraper 83 to move up and down, so that the inner wall of the discharge pipe 23 can be scraped to prevent the asphalt with high viscosity from adhering to the inner wall of the discharge pipe 23; Preferably, a second chute extending in the vertical direction can be provided on both sides of the inner wall of the feeding tube 23, the lower end of the second chute is passed downward, and the other end of each second connecting rod 82 is connected to the second slider slidably provided in the second chute; the other ends of two symmetrically arranged cross bars 72 are also slidably connected to the inner wall of the feeding tube 23 in the vertical direction by using the above technology; The connection between the second stirring rod 52 and the first slider is preferably configured as follows: an electromagnet is provided on the side of the first slider opposite to the second stirring rod 52, and a metal block that is magnetically attracted to the electromagnet is rotatably provided on the top of the second stirring rod 52 through a bearing member; The hinge connection between the other end of each telescopic rod 62 and the bottom of the second stirring rod 52 is preferably set to be a detachable hinge, which can be achieved through existing technology, such as a pair of first ear plates are provided at the bottom of the second stirring rod 52, each first ear plate is provided with a first mounting hole, the other end of the telescopic rod 62 is provided with a second ear plate, the second ear plate is provided with a second mounting hole, the second ear plate is located between the pair of first ear plates, the two first mounting holes and the second mounting hole are connected by a pin shaft, the pin shaft does not interfere with the rotation of the second ear plate, one end of the pin shaft is provided with a fastening nut, when it needs to be removed, the fastening nut is loosened to remove the pin shaft, and the telescopic rod 62 and the bottom of the second stirring rod 52 can be disassembled, when the other end of the telescopic rod 62 is connected to the bottom of the second stirring rod 52, the second ear plate is inserted between the pair of first ear plates, the end of the pin shaft (the head of the pin shaft is provided with a stopper larger than the size of the first mounting hole) is passed through one of the first mounting holes, the second mounting hole and the other first mounting hole in turn, and then the fastening nut is screwed on the end of the pin shaft, so as to connect the other end of the telescopic rod 62 to the bottom of the second stirring rod 52; When the device is idle, the entire device can be placed on a higher work stand, the other end of the telescopic rod 62 can be removed from the bottom of the second stirring rod 52, the electromagnet can be powered off, and the second stirring rod 52 can be held from the bottom of the discharge tube 23 and rotated relative to the discharge tube 23, driving the second stirring rod 52 to rotate downward, driving all the third sliders and the second sliders to move vertically downward along the second slide groove, and rotating the second stirring rod 52 until the top of the second stirring rod 52 is disengaged from the threaded sleeve 54, so that the second stirring rod 52 can be removed from the bottom of the discharge tube 23. The integral structure formed by the rod 52, multiple cross bars 72, multiple dredging rods 73, multiple second connecting rods 82, multiple scrapers 83, and multiple second stirring rods 52 is removed from the discharge pipe 23. During the removal process, the scraper 83 can scrape the inner wall of the discharge pipe 23 from top to bottom to clean up the asphalt material adhering to the inner wall of the discharge pipe 23. At the same time, the overall structure can be cleaned; the electromagnet and the metal block selected in the present invention are made of strong magnetic attraction materials to ensure that the magnetic attraction force of the electromagnet and the metal block provides sufficient lifting force; For cleaning inside the storage tank 21, water can be added into the storage tank 21 through the feed port, and the first stirring rod 22 is started to rotate to clean the residual asphalt material in the storage tank 21, and the cleaning wastewater is discharged through the discharge port.

[0033] In another technical solution, the asphalt pavement construction device further includes a plurality of material distribution mechanisms, each material discharge pipe 23 is provided with a corresponding material distribution mechanism, and each material distribution mechanism includes: The cylinder 91 is a structure with both ends open. The cylinder 91 is coaxially sleeved on the outside of the corresponding discharge pipe 23. The top of the cylinder 91 is rotatably connected to the bottom of the storage tank 21. Preferably, a plurality of fan blades 99 are arranged at intervals on the inner wall of the cylinder 91. When the cylinder 91 rotates relative to the discharge pipe 23, the plurality of fan blades 99 are driven to rotate to form a downward airflow, which blows toward the material pile, thereby preventing the unpleasant smell of the material pile from rising upward. A gear ring 92 is coaxially sleeved on the inner wall of the cylinder 91; Two first rotating shafts 93 are provided between the feeding tube 23 and the cylinder 91 and are symmetrically located on both sides of the cylinder 91. The upper end of each first rotating shaft 93 is rotatably connected to the bottom of the storage tank 21, and the lower end extends vertically downward to the bottom of the feeding tube 23. The lower end of the first rotating shaft 93 is provided with a third stirring blade 94, and the third stirring blades 94 on the two first rotating shafts 93 do not interfere with each other; the third stirring blade 94 is detachably connected to the lower end of the first rotating shaft 93; Two first gear plates 95 , one first gear plate 95 is coaxially rotatably sleeved on a first rotating shaft 93 , and each first gear plate 95 is meshed with a gear ring 92 .

[0034] In the above technical scheme, the present invention further provides a rotating third stirring blade 94 at the bottom of both sides of the discharge pipe 23. Specifically, a cylinder 91 is coaxially sleeved on the outside of each discharge pipe 23, and its top is rotatably connected to the bottom of the storage tank 21. A gear ring 92 is provided on the inner wall of the cylinder 91 (a rack is provided on the inner wall of the cylinder 91 to form the gear ring 92). A first rotating shaft 93 is vertically provided on both sides of the annular space formed by the cylinder 91 and the discharge pipe 23, and the top of each first rotating shaft 93 is rotatably connected to the bottom of the storage tank 21. The cylinder 91 is connected to the bottom of the drum 91, and a third stirring blade 94 is provided, which is preferably a pair of horizontal rods symmetrically and detachably arranged at the bottom of the first rotating shaft 93. A first gear plate 95 meshing with the gear ring 92 is fixedly mounted on each first rotating shaft 93, so that the rotation of the cylinder 91 around its own axis can synchronously drive the two first rotating shafts 93 to rotate around their own axes under the meshing action of the first gear plate 95 and the gear ring 92, thereby driving the third stirring blade 94 to rotate, so as to stir the two sides of the material pile below the discharge port, and further promote the dispersion of the material pile to both sides.

[0035] In another technical solution, in the asphalt pavement construction device, each material distribution mechanism further includes: A second gear plate 96 is coaxially sleeved on the cylinder 91; A first bevel gear 97, which is coaxially sleeved on the first stirring rod 22; The second rotating shaft 98 has one end located inside the storage tank 21 and is coaxially sleeved with a second bevel gear 981 meshing with the first bevel gear 97, and the other end vertically extends downward through the side wall of the storage tank 21 to the bottom of the storage tank 21, and is coaxially sleeved with a third gear plate 982 meshing with the second gear plate 96.

[0036] In the above technical scheme, the present invention further provides a driving mechanism for driving the cylinder 91 to rotate, which includes a second gear plate 96 coaxially fixedly sleeved on the outside of the cylinder 91, a first bevel gear 97 coaxially fixedly sleeved on the first stirring rod 22, a vertically arranged second rotating shaft 98, a second bevel gear 981 fixedly sleeved on the top of the second rotating shaft 98 and meshing with the first bevel gear 97, and a third gear plate 982 fixedly sleeved on the bottom of the second rotating shaft 98 and meshing with the second gear plate 96. The second rotating shaft 98 is rotatably connected to the side wall of the storage tank 21, that is, the storage tank 21 does not interfere with the rotation of the second rotating shaft 98 around its own axis. By setting the transmission of the gear plate and the bevel gear, the rotation of the first stirring rod 22 drives the cylinder 91 to rotate, and there is no need to additionally set up other power source equipment.

[0037] In another technical solution, in the asphalt pavement construction device, each second rotating shaft 98 is connected to the side wall of the storage tank 21 in a sealed rotational connection via a bearing. The second rotating shaft 98 is connected to the side wall of the storage tank 21 in a sealed rotational connection via a bearing, which ensures that the second rotating shaft 98 can rotate around its own axis relative to the storage tank 21, while improving the sealing of the connection between the second rotating shaft 98 and the storage tank 21 to avoid leakage.

[0038] The present invention also provides a construction method of the above-mentioned asphalt pavement construction device, which comprises the following steps: Step 1: Move the asphalt pavement construction device to the roadbed with asphalt under the action of the traction mechanism 1, and add asphalt material into the storage tank 21 through the feeding port; Step 2: Move the asphalt pavement construction device longitudinally along the roadbed, and at the same time open the discharge valve of the discharge port. During the movement, the asphalt material falls onto the roadbed through multiple discharge pipes 23, and then the asphalt is flattened and compacted by the flattening mechanism and the compacting mechanism. During the movement, start the first stirring rod 22 to rotate, drive the multiple first stirring blades 221 to stir the material in the storage tank 21, and at the same time, the eccentric wheel 51 rotates with the first stirring rod 22, driving the second stirring rod 52 to move up and down in the discharge pipe 23. Because the second stirring rod 52 and the threaded sleeve 54 are spiral transmission sleeves, under the further action of the threaded sleeve 54, the second stirring rod 52 moves up and down relative to the discharge pipe 23 while rotating in the circumferential direction, thereby driving the second stirring blades 53 to rotate and move relative to the discharge pipe 23 in the vertical direction; Step 3: moving the asphalt pavement construction device along the longitudinal direction of the roadbed until the asphalt paving construction work is completed; Step 4. After the construction work is completed, the storage tank 21 and the discharge pipe 23 are cleaned to remove the residual asphalt. First, water is added to the storage tank 21 through the feeding port, and the first stirring rod 22 is started (the rotation of the first stirring rod 22 can be driven by the motor 222 arranged at one end of the storage tank 21) to rotate, driving the multiple first stirring blades 221 to rotate in the storage tank 21, stirring the inside of the storage tank 21 to remove the asphalt adhering to the inner wall of the storage tank 21, and the water in the storage tank 21 enters the discharge pipe through the discharge port. The rotation of the first stirring rod 22 can drive the second stirring rod 52 to rotate and move up and down, thereby driving the second stirring blade 53 to rotate in the discharge pipe 23; then, the asphalt pavement construction device is moved to an operating frame with a certain height, and the position corresponding to the discharge pipe 23 of the operating frame is hollowed out directly below, the electromagnet is powered off, and the other end of the telescopic rod 62 is aligned with the bottom of the second stirring rod 52. The third stirring blade 94 is disassembled from the lower end of the second rotating shaft 98; from the bottom of the feeding tube 23, hold the second stirring rod 52, rotate the second stirring rod 52 relative to the feeding tube 23, drive the second stirring rod 52 to rotate downward, drive the second stirring blade 53 to rotate in the feeding tube 23, drive the scraper 83 to move downward relative to the feeding tube 23, and scrape the inner wall of the feeding tube 23 from top to bottom to effectively and thoroughly remove the asphalt material adhered to the inner wall of the feeding tube 23, continue to rotate the second stirring rod 52 until the second stirring rod 52 is separated from the threaded sleeve 54, and take out the overall structure formed by the second stirring rod 52 and other parts connected thereto (such as the second stirring blade 53, the first bearing sleeve 71, the cross bar 72, the dredging rod 73, the second bearing sleeve 81, the second connecting rod 82, and the scraper 83) from the feeding tube 23, and the overall structure can be cleaned or repaired, and the damaged parts can be repaired or replaced in time; When construction work is needed again, the whole structure is inserted from the bottom of the feed tube 23 into the feed tube 23 from bottom to top. During the insertion process, the second slider is inserted from the bottom of the second slide groove into the corresponding second slide groove, and the slider at the other end of the cross bar 72 is inserted into the corresponding slide groove, and the whole structure is pushed vertically upward until the external thread on the second stirring rod 52 is adjacent to the threaded sleeve 54, and the whole structure is rotated relative to the feed tube 23, driving the second stirring rod 52 to rotate upward, and driving the whole structure to move upward until the top of the second stirring rod 52 contacts the electromagnet on the first slider, and the electromagnet is energized, and the second stirring rod 52 is connected to the first slider by magnetic attraction, completing the installation of the whole structure.

[0039] The construction method of the asphalt pavement construction device provided by the present invention can timely and effectively clear the discharge pipe 23 during the construction process to ensure the smoothness of unloading. At the same time, a material distribution mechanism is set to stir the two sides of the material pile on the roadbed, and cooperate with multiple telescopic rods 62 to guide the material pile to both sides to achieve preliminary dispersion of the asphalt material, which is beneficial to the subsequent leveling operation of the leveling mechanism and improves the construction efficiency. Furthermore, after completing the operation, the construction device of the present invention can effectively clean the discharge mechanism 2 and remove the residual asphalt more thoroughly to avoid the residual asphalt affecting the next construction operation. The overall structure in the discharge pipe 23 can also be taken out for cleaning and regular maintenance to ensure the normal clearing operation of the discharge pipe 23.

[0040] The number of devices and processing scales described here are used to simplify the description of the present invention. Applications, modifications and variations of the present invention will be obvious to those skilled in the art.

[0041] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. An asphalt pavement construction device, comprising a traction mechanism, a feeding mechanism, a leveling mechanism and a compacting mechanism, characterized in that: The unloading mechanism comprises: The material storage tank is a cylindrical structure extending transversely along the road surface, the top of the material storage tank is provided with a feeding port, the bottom of the material storage tank is provided with a plurality of discharge ports at intervals transversely along the road surface, and each discharge port is provided with a corresponding discharge valve; a first stirring rod is coaxially provided inside the material storage tank, and a plurality of first stirring blades are provided on the rod at intervals transversely along the road surface; Multiple feeding pipes, one feeding pipe is provided for each discharge port, each feeding pipe is vertically arranged and communicated with the corresponding discharge port; Multiple dredging mechanisms, each feeding pipe is provided with a corresponding dredging mechanism, each dredging mechanism includes: An eccentric wheel, which is located in the storage tank and sleeved on the first stirring rod, the eccentric wheel and the first stirring rod are not coaxial, and a first sliding groove is arranged on the circumferential side surface of the eccentric wheel; A second stirring rod is coaxially arranged in the corresponding feeding tube, a first slider is arranged on the top of each second stirring rod, and the slider is arranged in the corresponding first slide groove, and a plurality of circles of second stirring blades are arranged at intervals along the vertical direction on each second stirring rod; an external thread is arranged on the circumferential side wall of the upper part of the second stirring rod; The threaded sleeve has a coaxial spiral transmission sleeve arranged on the corresponding second stirring rod, and the inner wall of the threaded sleeve is provided with an internal thread that forms a spiral transmission connection with the external thread on the second stirring rod. Each threaded sleeve is connected to the inner wall of the corresponding discharge pipe through a horizontally arranged first connecting rod.

2. The asphalt pavement construction device according to claim 1, characterized in that: Each dredging agency also includes: A rotating ring is rotatably sleeved on the bottom of the corresponding feeding pipe; A plurality of telescopic rods are arranged at intervals along the circumferential direction at the bottom of the corresponding feeding pipe, one end of each telescopic rod is hinged to the rotating ring, and the other end is hinged to the bottom of the second stirring rod.

3. The asphalt pavement construction device according to claim 2, characterized in that: Each dredging agency also includes: A first bearing sleeve is coaxially rotatably sleeved on the corresponding second stirring rod, and the first bearing sleeve is located below the threaded sleeve; A plurality of cross bars are arranged between the corresponding first bearing sleeve and the inner wall of the feeding tube at intervals along the circumferential direction, each cross bar extends along the radial direction of the feeding tube, one end of each cross bar is connected to the corresponding first bearing sleeve, and the other end is slidably connected to the inner wall of the corresponding feeding tube along the vertical direction; A plurality of dredging rod groups are provided, one dredging rod group is arranged on each cross bar, each dredging rod group comprises a plurality of dredging rods arranged at intervals on the corresponding cross bar, each dredging rod is arranged vertically and does not interfere with the first connecting rod.

4. The asphalt pavement construction device according to claim 3, characterized in that: Each dredging agency also includes: A plurality of second bearing sleeves, one second bearing sleeve is correspondingly arranged between any two adjacent circles of second stirring blades, and each second bearing sleeve is coaxially rotatably sleeved on the corresponding second stirring rod; A plurality of pairs of second connecting rods, one pair of second connecting rods corresponding to one second bearing sleeve, any pair of second connecting rods are symmetrically arranged on both sides of the corresponding second bearing sleeve, one end of each second connecting rod is connected to one side of the corresponding second bearing sleeve, and the other end extends horizontally along the radial direction of the corresponding second stirring rod and is slidably connected to the inner wall of the corresponding discharge pipe along the vertical direction; A plurality of scrapers are provided, and a scraper is provided at the top and the bottom of each pair of second connecting rods respectively. Each scraper is an annular structure whose center passes through the axis of the discharge pipe, and the outer circumferential edge of the scraper contacts the inner wall of the discharge pipe.

5. The asphalt pavement construction device according to claim 4, characterized in that: It also includes a plurality of material distribution mechanisms, each material discharging pipe is provided with a corresponding material distribution mechanism, and each material distribution mechanism includes: The cylinder is a structure with open ends. The cylinder is coaxially sleeved on the outside of the corresponding feeding pipe, and the top of the cylinder is rotatably connected to the bottom of the storage tank; A gear ring is coaxially sleeved on the inner wall of the cylinder; Two first rotating shafts are arranged between the feeding tube and the cylinder body, and are symmetrically located on both sides of the cylinder body. The upper end of each first rotating shaft is rotatably connected to the bottom of the storage tank, and the lower end extends vertically downward to the bottom of the feeding tube. The lower end of the first rotating shaft is provided with a third stirring blade, and the third stirring blades on the two first rotating shafts do not interfere with each other. Two first gear plates, one first gear plate is coaxially rotatably sleeved on a first rotating shaft, and each first gear plate is meshed with a gear ring.

6. The asphalt pavement construction device according to claim 5, characterized in that: Each dispensing mechanism also includes: A second gear plate is coaxially sleeved on the cylinder body; A first bevel gear, coaxially sleeved on the first stirring rod; A second rotating shaft has one end located inside the storage tank and coaxially sleeved with a second bevel gear meshing with the first bevel gear, and the other end vertically extends downward through the side wall of the storage tank to the bottom of the storage tank and coaxially sleeved with a third gear disc meshing with the second gear disc.

7. The asphalt pavement construction device according to claim 6, characterized in that: Each second rotating shaft is rotatably connected to the side wall of the storage tank via a bearing member.

8. A construction method of the asphalt pavement construction device according to any one of claims 1 to 7, characterized in that: The steps include: Step 1: Move the asphalt pavement construction device to the roadbed with asphalt under the action of the traction mechanism, and add asphalt material into the storage tank through the feeding port; Step 2: Move the asphalt pavement construction device longitudinally along the roadbed, and at the same time open the discharge valve of the discharge port. During the movement, the asphalt material falls onto the roadbed through multiple discharge pipes, and then the asphalt is flattened and compacted by the flattening mechanism and the compacting mechanism. During the movement, start the first stirring rod to rotate, drive the multiple first stirring blades to stir the material in the storage tank, and at the same time, the eccentric wheel rotates with the first stirring rod, driving the second stirring rod to move up and down in the discharge pipe. Because the second stirring rod and the threaded sleeve are spiral transmission sleeves, under the further action of the threaded sleeve, the second stirring rod moves up and down relative to the discharge pipe while rotating in the circumferential direction, thereby driving the second stirring blades to rotate relative to the discharge pipe; Step 3: Move the asphalt pavement construction device along the longitudinal direction of the roadbed until the asphalt paving construction work is completed.

Citation Information

Patent Citations

  • Municipal asphalt pavement pothole repairing equipment

    CN111119018A

  • Scraping ring type fructose reaction kettle

    CN111715168A

  • Asphalt pavement finishing device

    CN118273203A

  • Orchard fertilizer applicator

    CN214757796U

  • Anti-blockage device for a waste pipe

    DE202023106124U1