Dragging device and method for construction of bridge crossing railway line

By designing and setting up the dragging device for erecting the dragging unit and the thrust unit during the bridge construction, the position adjustment and stability of the bridge box girder when crossing the railway line is solved, the precise dragging and correction of the bridge box girder is achieved, and the construction is improved Efficiency and precision.

CN118958173APending Publication Date: 2024-11-15CCCC SECOND PUBLIC BUREAU FOURTH ENG CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411443024.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

When the existing bridge construction dragging device spans the railway line, it is impossible to achieve precise position adjustment and stable drag of the bridge box girder. The front traction method causes the box girder to easily deviate and inertial sliding, which is difficult to correct and has low position accuracy. .

Method used

Design a drag device including erecting towing unit and thrust unit. The erecting unit realizes stable erecting and correction of bridge box girders through traction slide rails and position adjustment mechanism. The erecting unit uses thrust oil cylinders and thrust oil cylinders to achieve fixed distance drag and horizontal position adjustment. , ensure the accuracy and stability of the bridge box girder during the dragging process.

Benefits of technology

The accurate position control of the bridge box girder during the dragging process is realized, offset is avoided, dragging accuracy and stability is improved, and the convenience of subsequent splicing and installation is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958173A_ABST
    Figure CN118958173A_ABST
Patent Text Reader

Abstract

The invention discloses a dragging device and method for construction of a bridge crossing a railway line, and relates to the technical field of bridge construction dragging. The device comprises two supporting cross beams and a to-be-dragged bridge box girder, and further comprises an erecting and dragging unit which is arranged between the two supporting cross beams and internally comprises an erecting assembly and a limiting assembly; the pushing unit is arranged between the two supporting cross beams, a pushing assembly and an adjusting assembly are arranged in the pushing unit, and the pushing assembly is used for achieving dragging and pushing of the bridge box girder. The device has the advantages that a clamping erection mounting mode is adopted, the stability of the bridge box girder in the dragging process can be guaranteed, real-time horizontal position deviation rectification can be conducted in cooperation with a deviation rectification oil cylinder in the push-pull process, the accuracy of the dragging position of the bridge box girder is guaranteed, and the safety of the bridge box girder is guaranteed. And meanwhile, dragging fixed-distance movement of the bridge box girder can be achieved in a rear hydraulic pushing mode, accurate control over the position of the bridge box girder is achieved, and convenience of follow-up splicing installation of the bridge box girder is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of traction in bridge construction, and in particular to a traction device and method for construction of a bridge across a railway line. Background Art

[0002] The construction process of existing bridges is usually to first set up multiple groups of bridge pile foundations, and then erect the prefabricated bridge box girders on the multiple groups of bridge pile foundations in sequence, and then splice and fix them to complete the erection. The erection of the bridge box girder is usually completed by hoisting with an external crane. When the bridge needs to cross the railway line during construction, the crane's boom length is limited and the bridge box girder on one side of the railway line cannot be hoisted across the railway line to the other side. At this time, a towing device is required for assistance.

[0003] Existing devices use a variety of methods to drag the bridge box girder, such as a bridge pushing and dragging structure device with publication number CN219710081U, which includes a support platform, a traction mechanism and a pushing mechanism; the support platform is arranged to extend in the transverse direction; the traction mechanism includes a traction jack and a traction steel strand, the cylinder body of the traction jack is arranged on the support platform and is located at one end of the support platform in the transverse direction, the plunger of the traction jack is arranged in the transverse direction and its free end is arranged toward the other end of the support platform in the transverse direction, and one end of the traction steel strand is connected to the free end of the plunger.

[0004] In order to ensure the stability of the box girder towing, the existing towing device usually welds the box girder to the towing device, but the welded fixed box girder cannot be accurately adjusted, and the box girder is prone to overall front-to-back deviation during towing. In addition, the existing devices mostly use the front traction method to achieve the towing of the box girder. When the towing stops, the box girder is prone to continue to slide due to inertia and deviate. For example, the above-mentioned prior art reference uses bolts to fix the steel box girder, so that the left and right position of the steel box girder cannot be corrected and adjusted during the towing process. Some of the prior art devices have a correction system. The conventional traction device can only realize single-point push correction. Due to the long length of the steel box girder, the closer the offset position is to the correction system, the higher the accuracy required for correction, the greater the difficulty of correction and the longer the time required. At the same time, the front and rear positions of the steel box girder cannot be synchronized during single-point correction. When the front part is corrected, the rear part of the steel box girder is prone to synchronous offset. The device uses a traction mechanism to pull the steel box girder. This method cannot accurately locate the position of the steel box girder during the traction process, that is, it cannot ensure that the steel box girder stops at a specific position, and the accuracy of the traction position is low. Therefore, it is urgent to design a traction device and method for the construction of a bridge across a railway line to solve the above problems. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a towing device and method for constructing a bridge across a railway line, which solves the problems raised in the above-mentioned background technology.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: A traction device for bridge construction across a railway line, comprising two supporting beams and a bridge box beam to be towed, wherein both ends of the two supporting beams are arranged on two temporary foundations on both sides of the railway line, and further comprising: The erection and dragging unit is arranged between two supporting beams and is used to realize the erection, placement and dragging movement of bridge box girders of different sizes. It includes an erection component and a limit component. The erection component is used to realize the placement and erection of the bridge box girder, and the limit component is used to improve the stability of the bridge box girder during the dragging and moving process; The pushing unit is arranged between two supporting beams and is used for achieving fixed-distance dragging and pushing of the bridge box girder. It includes a pushing component and an adjusting component. The pushing component is used for dragging and pushing the bridge box girder, and the adjusting component is used for achieving position correction of the bridge box girder during the dragging and pushing process.

[0007] Preferably, the erection assembly comprises two dragging slide rails arranged at the lower part of the two supporting beams, two mobile bases are installed between the two dragging slide rails through two sliding mechanisms, two lifting oil cylinders are arranged on the two mobile bases, and the upper ends of each of the two lifting oil cylinders are jointly provided with an erection plate, and the bridge box beam is placed on the two erection plates, and a positioning mechanism is installed between the two mobile bases; The sliding mechanism comprises two dragging sliding members, and the two dragging sliding members are respectively slidably sleeved on corresponding dragging slide rails, and the moving base is fixedly installed between the two dragging sliding members.

[0008] Preferably, the positioning mechanism comprises a middle position box, a self-locking motor is arranged in the middle position box, a driving roller is rotatably installed between the driving end of the self-locking motor and the inner wall of the middle position box, and a driving gear is fixedly installed on the driving roller; Two adjusting plates are slidably installed in the middle box, and a shrinkage connecting plate is slidably installed between the two adjusting plates and the middle box, and the two shrinkage connecting plates are respectively fixedly installed on the two moving bases, and a driven gear plate 1 and a driven gear plate 2 are respectively fixedly installed on the two adjusting plates, and the driven gear plate 1 and the driven gear plate 2 are both meshed with the driving gear, and the driven gear plate 2 is located at the lower part of the driven gear plate 1.

[0009] Preferably, two retractable spring rods are fixedly installed between the two mobile bases, and a measuring tape for measuring the distance between the two mobile bases is provided between the two mobile bases.

[0010] Preferably, the limiting assembly includes two connecting openings opened on two supporting beams, and multiple towing auxiliary wheels are rotatably installed in the two supporting beams, and the multiple towing auxiliary wheels are matched with the corresponding connecting openings, and the multiple towing auxiliary wheels are matched with the bridge box girder to promote the towing movement of the bridge box girder.

[0011] Preferably, the push assembly comprises two push rails fixedly mounted at the lower part of the two supporting beams, each of the push rails is slidably sleeved with a push sliding member, and each push sliding member is mounted with a push reciprocating mechanism; The pushing reciprocating mechanism includes a fixed plate fixedly mounted on the pushing sliding member, a pushing cylinder fixedly mounted on the fixed plate, a locking piston rod fixedly mounted on the fixed plate, a reset structure installed between the pushing cylinder and the corresponding moving base, and a conduction structure installed between the pushing cylinder and the locking piston rod.

[0012] Preferably, the reset structure includes a welding plate fixedly mounted on the driving end of the push cylinder, a lower extension plate is fixedly mounted on the lower portion of the movable base, and the lower extension plate is welded and fixed to the welding plate, and a plurality of traction spring rods are fixedly mounted between the welding plate and the housing of the push cylinder.

[0013] Preferably, the conduction structure comprises an oil storage tank fixedly mounted on the fixed plate for storing hydraulic oil, a second oil guide pipe is fixedly connected between the oil storage tank and the push cylinder, and a first oil guide pipe is fixedly connected between the oil storage tank and the locking piston rod. When the oil storage tank is working, the hydraulic oil in the oil storage tank is respectively poured into the locking piston rod and the push cylinder through the first oil guide pipe and the second oil guide pipe; A piston push rod is slidably installed in the locking piston rod, a clamping piece is fixedly installed on the piston push rod, and a plurality of locking grooves matching with the clamping piece are arranged at regular intervals on the push slide rail.

[0014] Preferably, the adjustment assembly includes a plurality of correcting cylinders fixedly installed in two supporting beams, a side limit box is fixedly installed on the driving end of each of the correcting cylinders, and the plurality of side limit boxes are slidably installed in the corresponding supporting beams, a plurality of correcting guide wheels are rotatably installed in each of the side limit boxes, and the plurality of correcting guide wheels are in contact with the side of the bridge box beam.

[0015] A hauling method for bridge construction across a railway line, used for the hauling device for bridge construction, comprises the following steps: S1. Pour two temporary concrete foundations in front of the bridge support columns on both sides of the railway line, and set up supporting steel frames on the temporary foundations. Then, set up two supporting beams on the two temporary concrete foundations and weld them to the supporting steel frames; S2. According to the length of the bridge box girder to be towed, the length of the erection assembly in the towing unit is set, and after adjustment, the bridge box girder is erected on the erection assembly by an external crane to complete the erection and placement of the bridge box girder; S3. After the bridge box girder is erected, the pushing assembly in the pushing unit is started to drag and push the bridge box girder at a fixed distance, so that the bridge box girder moves steadily and smoothly between the two supporting beams; S4. After the bridge box girder crosses the railway line from the temporary foundation on one side, it is moved to the temporary foundation on the other side, and the height position of the bridge box girder is adjusted by erecting the assembly, and the bridge box girder is hoisted out by the hoisting on the other side of the railway line, and the bridge box girder is erected on the bridge support column to complete the dragging process; S5. The pushing component adopts a segmented dragging method to move the bridge box girder, and controls the moving distance of the bridge box girder each time to remain consistent. After each segmented movement is completed, the horizontal position of the bridge box girder is adjusted by adjusting the component to correct the position of the bridge box girder to avoid position deviation of the bridge box girder during the dragging process.

[0016] The present invention provides a traction device and method for construction of a bridge across a railway line, which has the following beneficial effects: 1. When dragging the bridge box girder, the towing device adopts the method of extruding and erecting two sets of erection plates, which can not only ensure the relative stability of the bridge box girder during the towing process, but also enable the bridge box girder to correct its horizontal position at any time during the towing process, thereby ensuring the accuracy of the towing position of the bridge box girder.

[0017] 2. When dragging the bridge box girder, the towing device adopts the method of two supporting beams and limited sliding of the towing slide rail. After the position of the supporting beam is adjusted, it is only necessary to pull the bridge box girder to make it move linearly along the track of the towing slide rail, which can effectively ensure the accuracy of the towing direction and position of the bridge box girder.

[0018] 3. When the towing device is towing the bridge box girder, the towing and movement of the bridge box girder is achieved by pushing the rear section of the push cylinder. This pushing method can accurately control the towing position of the bridge box girder, and the towing and pushing stability is higher. When the pushing stops, the bridge box girder will not shake due to inertia, thereby achieving accurate control of the position of the bridge box girder.

[0019] 4. When this towing device is towing the bridge box girder, the cooperation of multiple sets of symmetrically arranged deviation correction cylinders and multiple sets of deviation correction guide wheels can realize accurate deviation correction control of the horizontal position of the bridge box girder, so that the bridge box girder always maintains the accurate position during the towing process, avoiding position deviation that affects the subsequent splicing and installation of the bridge box girder.

[0020] To sum up, the present invention adopts a clamping and erecting installation method, which can not only ensure the stability of the bridge box girder dragging process, but also cooperate with the correction cylinder to perform real-time horizontal position correction during the pushing and pulling process, thereby ensuring the accuracy of the bridge box girder dragging position. At the same time, by adopting the rear hydraulic pushing method, the bridge box girder can be dragged and moved at a fixed distance, and the position of the bridge box girder can be accurately controlled, thereby improving the convenience of subsequent bridge box girder splicing and installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings, wherein: Figure 1 This is a schematic diagram of the structure of a traction device for bridge construction across a railway line proposed by the present invention; Figure 2 for Figure 1 Schematic diagram of the structure after cutting off part of the supporting beam and rotating it to a certain angle; Figure 3 for Figure 2 Schematic diagram of the structure after removing the bridge box girder; Figure 4 for Figure 3 Schematic diagram of the structure of the middle supporting beam; Figure 5 for Figure 4 A front view of Figure 6 for Figure 4 Structural schematic diagram of the middle and side limit boxes; Figure 7 for Figure 3 Schematic diagram of the structure after removing the two supporting beams; Figure 8 for Figure 7 The schematic diagram of the structure of the two mobile bases and the middle box; Fig. 9 for Figure 8 Schematic diagram of the internal structure of the center median box; Fig.10 for Fig. 9 A magnified view of the node in the middle A area; Fig.11 for Figure 7 A schematic diagram of the structure of two sliding rails and a mounting plate; Fig.12 for Fig.11 Schematic diagram of the structure of the push cylinder and the fixed plate.

[0022] In the figure: 1 supporting beam, 2 bridge box beam, 3 moving base, 4 erection plate, 5 pulling slide, 6 pulling auxiliary wheel, 7 side limit box, 8 middle box, 9 connecting opening, 10 pulling slide, 11 pushing slide, 12 correcting guide wheel, 13 correcting cylinder, 14 contraction spring rod, 15 pushing slide, 16 contraction connecting plate, 17 lifting cylinder, 18 self-locking motor, 19 adjustment plate, 20 driving roller, 21 driving gear, 22 driven gear plate 1, 23 driven gear plate 2, 24 locking groove, 25 fixed plate, 26 pushing cylinder, 27 lower extension plate, 28 welding plate, 29 pulling spring rod, 30 oil storage tank, 31 locking piston rod, 32 engaging part, 33 oil guide pipe 1, 34 oil guide pipe 2. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0024] Example 1: Reference Figure 1-Figure 3 , a traction device for construction of a bridge across a railway line, comprising two supporting beams 1 and a bridge box beam 2 to be traction, wherein both ends of the two supporting beams 1 are arranged on two temporary foundations on both sides of the railway line; Support steel frames are set up on two temporary foundations, and then two supporting beams 1 are welded and fixed to the two supporting steel frames respectively, so as to complete the erection of the two supporting beams 1. When the bridge box girder 2 is dragged from one side of the supporting beam 1 to the other side, the dragging work of the bridge box girder 2 across the railway line can be completed.

[0025] The traction device also includes: The erection and dragging unit is arranged between the two supporting beams 1, and is used to realize the erection, placement and dragging movement of the bridge box beams 2 of different sizes, so that the bridge box beams 2 can remain stable when being dragged across the railway line, and it is convenient to correct the horizontal position; The pushing unit is arranged between the two supporting beams 1, and is used to realize the fixed-distance dragging and pushing of the bridge box girder 2. The fixed-distance dragging of the bridge box girder 2 can be performed, which is more conducive to the position adjustment of the bridge box girder 2 and improves the accuracy of the dragging position.

[0026] Example 2: Reference Figure 2-Figure 5 as well as Figure 7-10 The technical solution of this embodiment is different from that of the first embodiment in that the erection and dragging unit includes an erection component and a limiting component, wherein the erection component is used to realize the placement and erection of the bridge box girder 2, and the limiting component is used to improve the stability of the bridge box girder 2 during the dragging and moving process; The erection assembly includes two dragging slide rails 10 arranged at the lower part of the two supporting beams 1, and two mobile bases 3 are installed between the two dragging slide rails 10 through two sliding mechanisms. The sliding mechanism includes two dragging slide members 5, and the two dragging slide members 5 are respectively slidably sleeved on the corresponding dragging slide rails 10, and the mobile base 3 is fixedly installed between the two dragging slide members 5; The two dragging slide members 5 are respectively slidably engaged on the corresponding dragging slide rails 10, and can slide stably and parallelly on the dragging slide rails 10, thereby driving the two mobile bases 3 to slide linearly between the two supporting beams 1, ensuring that the position accuracy of the bridge box girder 2 in the general direction will not deviate when it is dragged; Two lifting cylinders 17 are provided on each of the two mobile bases 3, and a mounting plate 4 is commonly provided at the upper ends of each of the two lifting cylinders 17, and the bridge box girder 2 is placed on the two mounting plates 4, and the bridge box girder 2 is mounted on the mounting plates 4, and the two mounting plates 4 respectively support the two sides of the bridge box girder 2, so that the bridge box girder 2 can slide with the sliding of the mounting plates 4, and the bridge box girder 2 only needs to be suspended and placed on the two mounting plates 4, and the installation is more convenient and quick.

[0027] A positioning mechanism is installed between the two mobile bases 3, and the positioning mechanism includes a middle position box 8, a self-locking motor 18 is arranged in the middle position box 8, a driving roller 20 is rotatably installed between the driving end of the self-locking motor 18 and the inner wall of the middle position box 8, and a driving gear 21 is fixedly installed on the driving roller 20; The self-locking motor 18 is a large torque motor with a self-locking function, which can self-lock after stopping rotation, that is, when the self-locking motor 18 is started, it will drive the driving roller 20 to rotate, and when the driving roller 20 rotates, it will drive the driving gear 21 to rotate. When the self-locking motor 18 stops, the driving roller 20 and the driving gear 21 will not rotate; Two adjustment plates 19 are slidably installed in the middle box 8, and a shrinkage connecting plate 16 is slidably installed between the two adjustment plates 19 and the middle box 8, and the two shrinkage connecting plates 16 are respectively fixedly installed on the two moving bases 3, and the two adjustment plates 19 are respectively fixedly installed with a driven gear plate 1 22 and a driven gear plate 2 23, and the driven gear plate 1 22 and the driven gear plate 2 23 are both meshed with the driving gear 21, and the driven gear plate 2 23 is located at the lower part of the driven gear plate 1 22; The rotation of the driving gear 21 will drive the driven gear plate 1 22 and the driven gear plate 2 23 meshing therewith to move, thereby driving the two adjustment plates 19 to move. Since the driven gear plate 1 22 and the driven gear plate 23 are respectively located at the upper and lower parts of the driving gear 21, the moving directions of the driven gear plate 1 22 and the driven gear plate 23 are opposite when the driving gear 21 rotates, that is, the two adjustment plates 19 will move in the same direction or move towards each other (that is, when one moves to the left, the other moves to the right, and the moving distances of the two are the same), and the two movable bases 3 can be driven to move through the two contraction connecting plates 16; The positions of the two mobile bases 3 can be adjusted through the self-locking motor 18, thereby adjusting the distance between the two erection plates 4 on the two mobile bases 3. Before placing the bridge box girder 2, the spacing between the two erection plates 4 can be flexibly adjusted according to the length of the bridge box girder 2, so that the bridge box girder 2 can be placed exactly between the two erection plates 4, which can effectively improve the stability of the bridge box girder 2 during dragging, and is more conducive to the dragging work of the bridge box girder 2.

[0028] In a further embodiment, two retractable spring rods 14 are fixedly installed between the two mobile bases 3. The two retractable spring rods 14 can not only facilitate the retraction between the two mobile bases 3, but also limit the two mobile bases 3 so that there will be no positional deviation when the two mobile bases 3 are moved and adjusted in position. A measuring tape is provided between the two mobile bases 3 for measuring the distance between the two mobile bases 3, so that the distance control is more precise.

[0029] The limiting assembly includes two communicating openings 9 opened on the two supporting beams 1, and multiple traction auxiliary wheels 6 are rotatably installed in the two supporting beams 1, and the multiple traction auxiliary wheels 6 are matched with the corresponding communicating openings 9, and the multiple traction auxiliary wheels 6 are matched with the bridge box beam 2 to promote the traction movement of the bridge box beam 2; After the bridge box girder 2 is erected and placed, its lower sides will be placed in a fit on multiple towing auxiliary wheels 6. When the bridge box girder 2 is towed and moved, its sides will move on the towing auxiliary wheels 6, driving the multiple towing auxiliary wheels 6 to roll, which can not only provide support to the bridge box girder 2 to a certain extent, but also promote the towing and movement of the bridge box girder 2, reduce its resistance during towing and movement, and improve its towing and movement efficiency.

[0030] Example 3: Reference Figure 2-Figure 6 as well as Figure 11-Figure 12 The difference between this embodiment and the second embodiment is that the pushing unit includes a pushing component and an adjusting component, wherein the pushing component is used to realize the dragging and pushing of the bridge box girder 2, and the adjusting component is used to realize the position correction of the bridge box girder 2 during the dragging and pushing process; The push assembly includes two push rails 11 fixedly mounted on the lower part of the two supporting beams 1, each push rail 11 is slidably sleeved with a push slide 15, and the push slide 15 is slidably engaged with the corresponding push rail 11, so that the push slide 15 can slide smoothly on the push rail 11; Each push sliding member 15 is equipped with a push reciprocating mechanism, which includes a fixed plate 25 fixedly mounted on the push sliding member 15, a push oil cylinder 26 fixedly mounted on the fixed plate 25, and a reset structure installed between the push oil cylinder 26 and the corresponding moving base 3; The reset structure includes a welding plate 28 fixedly mounted on the driving end of the push cylinder 26, a lower extension plate 27 fixedly mounted on the lower part of the mobile base 3, and the lower extension plate 27 is welded and fixed to the welding plate 28, and a plurality of traction spring rods 29 are fixedly mounted between the welding plate 28 and the housing of the push cylinder 26; When the push cylinder 26 is started, its driving end will drive the welding plate 28 to move forward. When the welding plate 28 moves forward, it will drive the lower extension plate 27 fixed thereon to move, thereby pushing the corresponding moving base 3 to move forward. At the same time, when the welding plate 28 moves forward, multiple traction spring rods 29 will be stretched.

[0031] A locking piston rod 31 is fixedly mounted on the fixed plate 25, and a conducting structure is installed between the push cylinder 26 and the locking piston rod 31. The conducting structure includes an oil storage tank 30 fixedly mounted on the fixed plate 25 for storing hydraulic oil. A second oil guide pipe 34 is fixedly connected between the oil storage tank 30 and the push cylinder 26, and a first oil guide pipe 33 is fixedly connected between the oil storage tank 30 and the locking piston rod 31. When the oil storage tank 30 is working, the hydraulic oil in the oil storage tank 30 is respectively poured into the locking piston rod 31 and the push cylinder 26 through the first oil guide pipe 33 and the second oil guide pipe 34; When the oil tank 30 starts to fill oil, the hydraulic oil therein will be poured into the push cylinder 26 through the oil guide pipe 2 34. At this time, the driving end of the push cylinder 26 will be pushed forward, and the hydraulic oil in the oil tank 30 will also be poured into the locking piston rod 31 through the oil guide pipe 1 33 at the same time. When the oil tank 30 starts to return oil, the hydraulic oil in the push cylinder 26 will be sucked out through the oil guide pipe 2 34, and the hydraulic oil in the locking piston rod 31 will be sucked out through the oil guide pipe 1 33, thereby completing the synchronous oil filling and oil return of the push cylinder 26 and the locking piston rod 31.

[0032] A piston push rod is slidably installed in the locking piston rod 31, a locking member 32 is fixedly installed on the piston push rod, and a plurality of locking grooves 24 cooperating with the locking member 32 are provided at regular intervals on the push rail 11; When the hydraulic oil in the locking piston rod 31 increases, it will push the piston push rod on it to move forward. The forward movement of the piston push rod will drive the engaging member 32 to move forward, and the engaging member 32 will move forward and engage with the locking groove 24 at the corresponding position on the push slide rail 11, completing the positioning of the locking piston rod 31 in the direction perpendicular to the supporting beam 1 (that is, horizontally, the same applies below), and when the engaging member 32 is completely engaged, that is, the piston push rod is pushed to the maximum position, at this time, the oil guide pipe 1 33 stops filling with oil, and the hydraulic oil in the oil storage tank 30 will only be injected into the push cylinder 26 through the oil guide pipe 2 34.

[0033] When the locking piston rod 31 is positioned, the horizontal and transverse fixation of the push cylinder 26 is completed through the fixed plate 25, that is, when the push cylinder 26 is filled with oil, its rear part will not move, and its driving end will drive the movable base 3 forward through the welding plate 28 and the lower extension plate 27. The forward push of the movable base 3 will drive the bridge box girder 2 thereon to move horizontally and longitudinally between the two supporting beams 1, thereby completing the dragging and pushing of the bridge box girder 2.

[0034] In a further embodiment, since the lower part of the mobile base 3 is rigidly connected, when the push oil cylinder 26 stops injecting oil and its driving end stops moving, the mobile base 3 will stop synchronously, so that the bridge box girder 2 on it stops moving synchronously, and the front and rear parts of the bridge box girder 2 are blocked by the erection plate 4, so that the bridge box girder 2 will not slip due to inertia when it stops, and the position control is more accurate; When the fixed-distance movement of the bridge box girder 2 is completed, the oil storage tank 30 is started to return the oil. When returning the oil, the hydraulic oil in the locking piston rod 31 will be sucked out through the oil guide pipe 1 33, thereby driving the locking member 32 back to its original position to separate it from the locking groove 24, that is, releasing the overall fixed state of the locking member 32, the locking piston rod 31, the fixing plate 25 and the pushing cylinder 26 thereon; After the locking piston rod 31 has finished absorbing the oil, the oil storage tank 30 will immediately absorb the hydraulic oil in the push cylinder 26 through the second oil guide pipe 34. At this time, the driving end of the push cylinder 26 will retract into its main body. Since the driving end of the push cylinder 26 is fixed to the movable base 3 through the welding plate 28 and the lower extension plate 27, and the weight of the bridge box girder 2 on the movable base 3 is relatively large, the driving end of the push cylinder 26 cannot drive the welding plate 28 to move back when moving back. Since the rear end of the push cylinder 26 is released from the positioning, it can be realized that when the push cylinder 26 returns the oil, the rear body of the push cylinder 26 will move forward and complete the recovery sleeve of the driving end, instead of the driving end retracting and moving into the active part as usual; When the rear body of the pushing cylinder 26 moves forward, it will drive the fixed plate 25 and the structure thereon to move forward as a whole, that is, the fixed plate 25 is pushed forward on the pushing rail 11 through the pushing sliding member 15, thereby completing the forward movement operation of the entire pushing assembly. After the forward movement is completed, when the above-mentioned oil injection operation is repeated, the engaging member 32 will continue to engage in the locking groove 24 of the next position on the pushing rail 11, completing the rear positioning again, and at the same time, the pushing cylinder 26 starts to push the movable base 3 forward, that is, driving the bridge box girder 2 to continue to move forward to the next position, and then the oil is collected to release the positioning, and the above-mentioned operation is repeated, so as to realize the staged fixed-distance dragging and pushing of the bridge box girder 2 until the bridge box girder 2 moves to the predetermined position, completing the overall dragging process.

[0035] In a further embodiment, the adjustment assembly includes a plurality of deflection correction cylinders 13 fixedly installed in the two supporting beams 1, a side limit box 7 is fixedly installed on the driving end of each deflection correction cylinder 13, and the plurality of side limit boxes 7 are slidably installed in the corresponding supporting beams 1, and a plurality of deflection correction guide wheels 12 are rotatably installed in each side limit box 7, and the plurality of deflection correction guide wheels 12 are in contact with the side of the bridge box beam 2; When the bridge box girder 2 is dragged and moved at a fixed distance each time, the correction cylinder 13 at the corresponding position can be started to drive the corresponding side limit box 7 to move, and the correction guide wheel 12 on it can move and squeeze the side of the bridge box girder 2. Through the cooperation of multiple correction cylinders 13 on the left and right sides and the correction guide wheel 12, the horizontal longitudinal position of the bridge box girder 2 (i.e., parallel to the direction of the supporting beam 1) can be adjusted, and the horizontal longitudinal correction of the bridge box girder 2 can be completed, so that the position of the bridge box girder 2 is more accurate and there will be no deviation; When the bridge box girder 2 is dragged and moved, the multiple correcting guide wheels 12 will be squeezed and fit with the side of the bridge box girder 2, and can play the same role as the dragging auxiliary wheels 6, that is, to promote the dragging and movement of the bridge box girder 2, reduce its dragging and movement resistance, and improve its dragging and movement efficiency.

[0036] The embodiment of the present invention further provides a traction method for bridge construction across a railway line, which is used for the traction device for bridge construction, and comprises the following steps: S1. Pour two temporary concrete foundations in front of the bridge support columns on both sides of the railway line, and set up supporting steel frames on the temporary foundations. Then, set up two supporting beams 1 on the two temporary concrete foundations and weld them to the supporting steel frames; S2, according to the length of the bridge box girder 2 to be towed, by setting the length of the erection assembly in the towing unit, and after adjustment, erecting the bridge box girder 2 on the erection assembly by an external crane, so as to complete the erection and placement of the bridge box girder 2; S3, after the bridge box girder 2 is erected, the pushing assembly in the pushing unit is started to drag and push the bridge box girder 2 at a fixed distance, so that the bridge box girder 2 moves steadily and smoothly between the two supporting beams 1; S4, after the bridge box girder 2 crosses the railway line from the temporary foundation on one side, it moves to the temporary foundation on the other side, and adjusts the height position of the bridge box girder 2 by erecting the assembly, and hoists the bridge box girder 2 out by the hoisting on the other side of the railway line, and erects the bridge box girder 2 on the bridge support column, completing the dragging process; S5. The pushing component adopts a segmented dragging method to move the bridge box girder 2, and controls the moving distance of the bridge box girder 2 to remain consistent each time. After each segmented movement is completed, the horizontal position of the bridge box girder 2 is adjusted by the adjusting component to correct the position of the bridge box girder 2 to avoid position deviation of the bridge box girder 2 during the dragging process.

[0037] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A traction device for construction of a bridge across a railway line, comprising two supporting beams (1) and a bridge box beam (2) to be traction, wherein both ends of the two supporting beams (1) are arranged on two temporary foundations on both sides of the railway line, and characterized in that: Also includes: An erection and dragging unit is arranged between two supporting beams (1) and is used to realize the erection, placement and dragging of bridge box beams (2) of different sizes, and comprises an erection component and a limiting component, wherein the erection component is used to realize the placement and erection of the bridge box beam (2), and the limiting component is used to improve the stability of the bridge box beam (2) during the dragging and moving process; The pushing unit is arranged between two supporting crossbeams (1) and is used to achieve fixed-distance dragging and pushing of the bridge box girder (2), and comprises a pushing component and an adjusting component, wherein the pushing component is used to achieve dragging and pushing of the bridge box girder (2), and the adjusting component is used to achieve position correction of the bridge box girder (2) during the dragging and pushing process.

2. A traction device for construction of a bridge across a railway line according to claim 1, characterized in that: The erection assembly comprises two dragging slide rails (10) arranged at the bottom of two supporting beams (1), two movable bases (3) are installed between the two dragging slide rails (10) via two sliding mechanisms, two lifting cylinders (17) are arranged on the two movable bases (3), and the upper ends of each of the two lifting cylinders (17) are commonly provided with an erection plate (4), and the bridge box girder (2) is placed on the two erection plates (4), and a positioning mechanism is installed between the two movable bases (3); The sliding mechanism comprises two dragging slides (5), and the two dragging slides (5) are respectively slidably mounted on corresponding dragging slide rails (10), and the movable base (3) is fixedly mounted between the two dragging slides (5).

3. A traction device for construction of a bridge across a railway line according to claim 2, characterized in that: The positioning mechanism comprises a middle position box (8), a self-locking motor (18) is arranged in the middle position box (8), a driving roller (20) is rotatably mounted between the driving end of the self-locking motor (18) and the inner wall of the middle position box (8), and a driving gear (21) is fixedly mounted on the driving roller (20); Two adjustment plates (19) are slidably mounted in the middle box (8), and a shrinkage connection plate (16) is slidably mounted between the two adjustment plates (19) and the middle box (8), and the two shrinkage connection plates (16) are respectively fixedly mounted on the two movable bases (3), and a driven gear plate 1 (22) and a driven gear plate 2 (23) are respectively fixedly mounted on the two adjustment plates (19), and the driven gear plate 1 (22) and the driven gear plate 2 (23) are both meshed with the driving gear (21), and the driven gear plate 2 (23) is located at the lower part of the driven gear plate 1 (22).

4. A traction device for construction of a bridge across a railway line according to claim 3, characterized in that: Two retractable spring rods (14) are fixedly installed between the two mobile bases (3), and a measuring tape for measuring the distance between the two mobile bases (3) is arranged between the two mobile bases (3).

5. The traction device for construction of a bridge across a railway line according to claim 3, characterized in that: The limiting assembly comprises two connecting openings (9) formed on two supporting crossbeams (1), a plurality of towing auxiliary wheels (6) being rotatably mounted in the two supporting crossbeams (1), and the plurality of towing auxiliary wheels (6) are matched with corresponding connecting openings (9), and the plurality of towing auxiliary wheels (6) are matched with the bridge box girder (2) to promote the towing movement of the bridge box girder (2).

6. The traction device for construction of a bridge across a railway line according to claim 1, characterized in that: The push assembly comprises two push rails (11) fixedly mounted on the lower parts of the two supporting beams (1), each of the push rails (11) being slidably sleeved with a push sliding member (15), and each of the push sliding members (15) being mounted with a push reciprocating mechanism; The push reciprocating mechanism comprises a fixed plate (25) fixedly mounted on the push sliding member (15), a push oil cylinder (26) fixedly mounted on the fixed plate (25), a locking piston rod (31) fixedly mounted on the fixed plate (25), a reset structure installed between the push oil cylinder (26) and the corresponding movable base (3), and a conduction structure installed between the push oil cylinder (26) and the locking piston rod (31).

7. A traction device for construction of a bridge across a railway line according to claim 6, characterized in that: The reset structure comprises a welding plate (28) fixedly mounted on the driving end of the push cylinder (26); a lower extension plate (27) is fixedly mounted on the lower part of the movable base (3); the lower extension plate (27) and the welding plate (28) are fixedly welded; and a plurality of traction spring rods (29) are fixedly mounted between the welding plate (28) and the housing of the push cylinder (26).

8. The traction device for construction of a bridge across a railway line according to claim 6, characterized in that: The conduction structure comprises an oil storage tank (30) fixedly mounted on the fixed plate (25) for storing hydraulic oil, a second oil guide pipe (34) being fixedly connected between the oil storage tank (30) and the push cylinder (26), and a first oil guide pipe (33) being fixedly connected between the oil storage tank (30) and the locking piston rod (31), and when the oil storage tank (30) is in operation, the hydraulic oil in the oil storage tank (30) is respectively poured into the locking piston rod (31) and the push cylinder (26) through the first oil guide pipe (33) and the second oil guide pipe (34); A piston push rod is slidably mounted inside the locking piston rod (31), a locking piece (32) is fixedly mounted on the piston push rod, and a plurality of locking grooves (24) matching the locking piece (32) are provided at regular intervals on the push rail (11).

9. A traction device for construction of a bridge across a railway line according to claim 6, characterized in that: The adjustment assembly comprises a plurality of deflection correction cylinders (13) fixedly mounted in two supporting beams (1), a side limit box (7) fixedly mounted on the driving end of each deflection correction cylinder (13), and the plurality of side limit boxes (7) are slidably mounted in the corresponding supporting beams (1), a plurality of deflection correction guide wheels (12) are rotatably mounted in each of the side limit boxes (7), and the plurality of deflection correction guide wheels (12) are in contact with the side of the bridge box beam (2).

10. A hauling method for bridge construction across a railway line, used for the hauling device for bridge construction as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Cast two temporary concrete foundations in front of the bridge support columns on both sides of the railway line, and set up supporting steel frames on the temporary foundations. Then, set up two supporting beams (1) on the two temporary concrete foundations and weld them to the supporting steel frames; S2, according to the length of the bridge box girder (2) to be towed, the length of the erection assembly in the erection towing unit is adjusted, and after adjustment, the bridge box girder (2) is erected on the erection assembly by an external crane, thereby completing the erection and placement of the bridge box girder (2); S3, after the bridge box girder (2) is erected, the pushing assembly in the pushing unit is started to achieve fixed-distance dragging and pushing of the bridge box girder (2), so that the bridge box girder (2) moves steadily and smoothly between the two supporting beams (1); S4, after the bridge box girder (2) crosses the railway line from the temporary foundation on one side, it is moved to the temporary foundation on the other side, and the height position of the bridge box girder (2) is adjusted by means of the erection assembly, the bridge box girder (2) is hoisted out by means of the hoisting device on the other side of the railway line, and the bridge box girder (2) is erected on the bridge support column, thereby completing the dragging process; S5. The pushing component adopts a segmented dragging method to move the bridge box girder (2), and controls the moving distance of the bridge box girder (2) to remain consistent each time. After each segmented movement is completed, the horizontal position of the bridge box girder (2) is adjusted by the adjusting component to correct the position of the bridge box girder (2) to avoid position deviation of the bridge box girder (2) during the dragging process.

Citation Information

Patent Citations

  • Pushing device for small steel box girder construction

    CN114775451A

  • Single-span steel truss girder dragging construction process

    CN115182262A

  • Rotary supporting device for self-balancing bridge girder erection machine

    CN116949945A

  • Steel box girder splicing and position adjusting method and device

    CN118461466A

  • Steel approach bridge pushing equipment

    CN211006376U