Novel rapid and effective connection method between steel frames

Through the plug-in and matching technology of quick connection parts, the complex and time-consuming problem of traditional steel frame connection methods is solved, the rapid and stable connection between steel frames is achieved, construction efficiency and safety is improved, and it is suitable for temporary venue construction.

CN118958490AInactive Publication Date: 2024-11-15NINGXIA RENJIE CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411066424.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The connection method of traditional steel frames is complex and time-consuming, making it difficult to complete a large amount of connection work in a short time, affecting construction efficiency and safety, especially in the construction of temporary venues, which may lead to increased labor costs and economic losses.

Method used

Quick connections, including clamps, stabilizer rods, triggers and locking parts, can quickly connect and disassemble between steel frames through plug-in fit, simplifying operation, improving work efficiency, and enhancing connection stability and vibration resistance. ability.

Benefits of technology

It realizes rapid and effective connection and disassembly between steel frames, reduces manpower consumption and economic losses, improves the flexibility and safety of connections, and ensures that the venue is put into use on time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958490A_ABST
    Figure CN118958490A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of steel frame connection, in particular to a novel rapid and effective connection method between steel frames. The method comprises the following steps that S1, firstly, a connecting steel frame, a first steel frame, a second steel frame and two quick connecting pieces of corresponding sizes are prepared, stabilizing grooves are formed in the outer walls of the first steel frame and the second steel frame, and a first butt-joint groove and a second butt-joint groove are formed in the two ends of the connecting steel frame; according to the novel rapid and effective connecting method between the steel frames, the two rapid connecting pieces are installed on the two steel frames needing to be connected, the lower portions of the connecting steel frames are aligned with the rapid connecting pieces, then the connecting steel frames are pressed downwards, and the rapid connecting pieces and the connecting steel frames are matched in an inserted connection mode, so that operation is easy, and the working efficiency of connection between the steel frames is improved; and meanwhile, the quick connecting piece can be conveniently disassembled, objects formed after the steel frame is built can be conveniently stored, the connecting flexibility of the steel frame is greatly improved, and therefore the practicability of the quick connecting piece is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel frame connection, in particular to a novel fast and effective connection method between steel frames. Background Art

[0002] At present, in today's construction engineering and industrial manufacturing fields, steel frame structures have been increasingly widely used due to their excellent strength, stability and economy. However, how to achieve efficient, fast and stable connections between steel frames has always been a key problem that needs to be solved.

[0003] Among the traditional means of connecting steel frames, welding is one of the common methods, but its process is extremely complicated. It not only has extremely high requirements on the technical level of construction workers, but the high temperature generated during the welding process can easily cause local properties of the steel to change, thus bringing potential risks to the reliability of the overall structure. Bolts are also one of the common methods, but the workload of bolt connection is large and requires too much time and physical strength.

[0004] However, taking temporary exhibition venues as an example, the construction time is usually limited, and traditional connection methods are difficult to complete the connection of a large number of steel frames in a short period of time, which may lead to increased labor costs, not only wasting time, but also causing economic losses. Moreover, under the pressure of time constraints, construction workers may ignore the connection quality to a certain extent in order to catch up with the progress, affecting the stability and safety of the entire steel frame structure connection, thereby affecting the timely commissioning of the venue.

[0005] In view of this, we propose a new fast and effective connection method between steel frames. Summary of the invention

[0006] The purpose of the present invention is to provide a novel fast and effective connection method between steel frames to solve the problems raised in the above background technology.

[0007] To achieve the above object, the present invention provides a novel fast and effective method for connecting steel frames, comprising the following steps:

[0008] S1. First, prepare a connecting steel frame, a first steel frame, a second steel frame and two quick connectors of corresponding sizes, and the outer walls of the first steel frame and the second steel frame both have stabilizing grooves, and both ends of the connecting steel frame both have first docking grooves and second docking grooves;

[0009] S2, then, clamp the two quick connectors on the outer walls of the first steel frame and the second steel frame respectively, so that the two quick connectors are clamped inside the stable groove;

[0010] S3, then, leaving a length of the connecting steel frame between the first steel frame and the second steel frame, and pressing the connecting steel frame downward from above the two quick connectors, so that the two quick connectors are plugged into and matched with the first docking groove and the second docking groove;

[0011] In the above process, the quick connector used includes a quick connector, which includes at least a clamping member capable of clamping the outer walls of the first steel frame and the second steel frame, and the inner walls of the clamping member are provided with bearing plates on both sides, and the upper surfaces of the two bearing plates are respectively provided with a first docking rod and a second docking rod;

[0012] A stabilizing support groove is provided on one side of the first docking rod, a triggering member is provided at the lower part of the stabilizing support groove, a locking member is provided at the side of the stabilizing support groove, a stabilizing support rod is connected to the lower part of the opening of the second docking rod through a hinge, and a starting member is provided on the side of the stabilizing support rod close to the hinge;

[0013] The first docking rod and the second docking rod are respectively used to be plugged into and matched with the first docking groove and the second docking groove, and drive the starting member to rotate the stabilizing rod 90°, so that the end of the stabilizing rod away from the hinge enters the interior of the stabilizing groove. At the same time, the stabilizing rod applies pressure to the trigger member, causing the trigger member to deform, thereby driving the locking member to be plugged into and matched with the end of the stabilizing rod away from the hinge.

[0014] As a further improvement of the technical solution, the clamping member at least includes a stabilizing shell, first elastic members are arranged inside the openings at both ends of the stabilizing shell, and a clamping plate is arranged at one end of the first elastic member away from the stabilizing shell.

[0015] As a further improvement of the present technical solution, the starting member includes at least a control block, a starting groove for sliding connection with the control block is opened on one side of the second docking groove close to the first docking groove, and a starting block is arranged on one side above the starting groove close to the second docking groove.

[0016] As a further improvement of the technical solution, the trigger member at least includes a groove, a second elastic member is arranged inside the groove, and a trigger plate is arranged at one end of the second elastic member away from the groove.

[0017] As a further improvement of the technical solution, the locking member at least includes a movable groove, a third elastic member is arranged inside the movable groove, and a locking frame is arranged at one end of the third elastic member close to the stabilizing groove.

[0018] As a further improvement of the technical solution, a stabilizing plate for plugging and matching with the stabilizing groove is provided on one side of the clamping plate close to the bearing plate.

[0019] As a further improvement of the technical solution, a guide plate is provided at one end of the clamping plate close to the bearing plate.

[0020] As a further improvement of the technical solution, an elastic sealing block is provided at an opening of one side of the movable groove away from the stabilizing groove.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] 1. In the new method for quick and effective connection between steel frames, two quick connectors are installed on the two steel frames to be connected, and the bottom of the connected steel frame is aligned with the quick connector, and then the connected steel frame is pressed downward to make the quick connector and the connected steel frame plug and match. It is not only simple to operate, but also improves the work efficiency of the connection between the steel frames, and is also convenient for disassembly of the quick connector, and convenient for storing objects after the steel frame is built, which greatly improves the flexibility of the steel frame connection, thereby improving the practicality of the quick connector.

[0023] 2. In the new fast and effective connection method between steel frames, after pressing for plug-in, the starting member is driven to rotate the stabilizing rod 90 degrees, so that the end of the stabilizing rod away from the hinge enters the interior of the stabilizing groove. At the same time, the stabilizing rod applies pressure to the trigger member to deform the trigger member. At this time, the locking member is driven to plug and match the end of the stabilizing rod away from the hinge, which increases the stability of the connection between the two steel frames and also enhances the vibration resistance of the entire steel frame structure, thereby increasing the safety of the connection between the steel frames.

[0024] 3. In the new fast and effective connection method between steel frames, the steel frames are connected by quick connectors, which can achieve the effect of rapid disassembly and reinstallation, reduce the difficulty and cost of maintenance, reduce the manpower required for steel frame connection, reduce the physical exertion of construction workers, reduce economic losses, and effectively increase the time for the venue to be put into use, thereby improving the practicality of the quick connectors. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the cutaway structure of the first docking rod of the present invention;

[0026] Figure 2 It is a schematic diagram of the explosion structure of the steel frame connection of the present invention;

[0027] Figure 3 It is a schematic diagram of the connection structure between steel frames of the present invention;

[0028] Figure 4 It is a schematic diagram of the structure of the quick-connector of the present invention;

[0029] Figure 5 It is a schematic diagram of the cross-sectional structure of the connection between steel frames of the present invention;

[0030] Figure 6 For the present invention Figure 5The enlarged structural diagram at A in the middle;

[0031] Figure 7 It is a schematic diagram of the structure of the clamping member of the present invention;

[0032] Figure 8 It is a schematic diagram of the cutaway structure of the starting member of the present invention;

[0033] Fig. 9 For the present invention Figure 8 Enlarged structural diagram at B in the middle.

[0034] The meaning of each number in the figure is:

[0035] 10. Connecting steel frame; 11. First steel frame; 12. Second steel frame; 13. Stable groove; 14. First docking groove; 15. Second docking groove;

[0036] 20, quick-connect part; 21, clamping part; 211, stabilizing shell; 212, first elastic part; 213, clamping plate; 22, stabilizing plate; 23, guide plate; 24, bearing plate;

[0037] 30. first docking rod; 31. stabilizing groove; 32. triggering member; 321. groove; 322. second elastic member; 323. triggering plate; 33. locking member; 331. moving groove; 332. third elastic member; 333. locking frame; 34. elastic sealing block;

[0038] 40. Second docking rod; 41. Stabilizing rod; 42. Starting member; 421. Control block; 422. Starting slot; 423. Starting block. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] Example

[0041] See also Figure 1-Figure 9 As shown, the purpose of this embodiment is to provide a new type of fast and effective connection method between steel frames, including the following steps:

[0042] Step 1: First, prepare a connecting steel frame 10, a first steel frame 11, a second steel frame 12 and two quick connectors of corresponding sizes, and the outer walls of the first steel frame 11 and the second steel frame 12 both have a stabilizing groove 13, and both ends of the connecting steel frame 10 both have a first docking groove 14 and a second docking groove 15;

[0043] Step 2: After that, the two quick connectors are clamped on the outer walls of the first steel frame 11 and the second steel frame 12 respectively, so that the two quick connectors are clamped inside the stable groove 13;

[0044] Step 3: Then, leave a length of the connecting steel frame 10 between the first steel frame 11 and the second steel frame 12, and press the connecting steel frame 10 downward from above the two quick connectors, so that the two quick connectors are plugged into and matched with the first docking groove 14 and the second docking groove 15;

[0045] In the above process, the quick connector used includes a quick connector 20, which at least includes a clamping member 21 capable of clamping the outer walls of the first steel frame 11 and the second steel frame 12, and a bearing plate 24 is provided on both sides of the inner wall of the clamping member 21, and the upper surfaces of the two bearing plates 24 are respectively provided with a first docking rod 30 and a second docking rod 40;

[0046] A stabilizing groove 31 is provided on one side of the first docking rod 30, a triggering member 32 is provided at the lower part of the stabilizing groove 31, a locking member 33 is provided at the side of the stabilizing groove 31, a stabilizing rod 41 is connected to the lower part of the opening of the second docking rod 40 through a hinge, and a starting member 42 is provided on the side of the stabilizing rod 41 close to the hinge;

[0047] The first docking rod 30 and the second docking rod 40 are used to respectively plug and cooperate with the first docking groove 14 and the second docking groove 15, and drive the starting member 42 to rotate the stabilizing rod 41 90°, so that the end of the stabilizing rod 41 away from the hinge enters the interior of the stabilizing groove 31. At the same time, the stabilizing rod 41 applies pressure to the trigger member 32, causing the trigger member 32 to deform, thereby driving the locking member 33 to plug and cooperate with the end of the stabilizing rod 41 away from the hinge.

[0048] First, the specific structure of the clamping member 21 is disclosed. The clamping member 21 at least includes a stabilizing shell 211. First elastic members 212 are disposed inside openings at both ends of the stabilizing shell 211. A clamping plate 213 is disposed at one end of the first elastic member 212 away from the stabilizing shell 211.

[0049] The improvement lies in: pulling the two clamping plates 213 to both sides so that the first elastic member 212 is deformed and elongated. At this time, aligning the two clamping plates 213 with the stabilizing groove 13, and clamping the two clamping plates 213 inside the stabilizing groove 13 by the resilience of the first elastic member 212, the installation of the quick connector can be completed. It is not only simple to operate, but also improves the working efficiency of the connection between the steel frames, and is also convenient for disassembly of the quick connector, which is convenient for storing objects after the steel frame is built, greatly improving the flexibility of the steel frame connection, thereby improving the practicality of the quick connector.

[0050] Secondly, the specific structure of the starting member 42 is disclosed. The starting member 42 at least includes a control block 421. A starting groove 422 for sliding connection with the control block 421 is opened on one side of the second docking groove 15 close to the first docking groove 14, and a starting block 423 is provided above the starting groove 422 on one side close to the second docking groove 15.

[0051] The improvement lies in that: the connecting steel frame 10 is pressed downward from the top of the two quick connectors so that the two quick connectors are plugged into the first docking groove 14 and the second docking groove 15. At the same time, the control block 421 slides inside the starting groove 422 and contacts the starting block 423. The control block 421 is blocked by the starting block 423, so that the control block 421 rotates 90°, which drives the stabilizing rod 41 to flip 90°, and starts the rotation of the connection between the connecting steel frame 10, the first steel frame 11, the second steel frame 12 and the two quick connectors, thereby increasing the work efficiency of the connection between the connecting steel frame 10, the first steel frame 11, the second steel frame 12 and the two quick connectors, reducing the physical exertion of construction personnel, and reducing economic losses, thereby improving the practicality of the quick connector.

[0052] The specific structure of the trigger member 32 is disclosed again. The trigger member 32 at least includes a groove 321 . A second elastic member 322 is disposed inside the groove 321 . A trigger plate 323 is disposed at one end of the second elastic member 322 away from the groove 321 .

[0053] The improvement lies in that after the stabilizing rod 41 is flipped 90°, the end of the stabilizing rod 41 away from the hinge applies pressure to the trigger plate 323, causing the second elastic member 322 to deform and shrink. At this time, the locking member 33 is plugged into the end of the stabilizing rod 41, playing an auxiliary role, increasing the stability of the connection between the two steel frames, and also enhancing the vibration resistance of the entire steel frame structure, thereby increasing the safety of the connection between the steel frames.

[0054] Next, the specific structure of the locking member 33 is disclosed. The locking member 33 at least includes a moving groove 331 . A third elastic member 332 is disposed inside the moving groove 331 . A locking frame 333 is disposed at one end of the third elastic member 332 close to the stabilizing groove 31 .

[0055] The improvement lies in that after the trigger plate 323 moves downward, the obstruction to the locking frame 333 is released, and through the resilience of the third elastic member 332, the locking frame 333 is moved closer to the stabilizing rod 41 and plugged into and matched with the end of the stabilizing rod 41. This not only simplifies the operation, but also improves the working efficiency of the connection between the steel frame 10, the first steel frame 11, the second steel frame 12 and the two quick connectors, increases the stability of the connection between the steel frame and the two steel frames, and enhances the vibration resistance of the entire steel frame structure, thereby improving the practicality of the quick connector.

[0056] In order to increase the stability of the clamping member 21 on the first steel frame 11 and the second steel frame 12, prevent the clamping member 21 from falling off during use, and reduce the safety of the quick connector, a stabilizing plate 22 for plugging into the stabilizing groove 13 is provided on one side of the clamping plate 213 close to the bearing plate 24.

[0057] The improvement lies in that: by plugging and matching the stabilizing plate 22 with the stabilizing groove 13, the bearing area of ​​the quick connector and the first steel frame 11 and the second steel frame 12 can be increased, the stability of the connection can be increased, and the vibration resistance of the entire steel frame structure can be enhanced, the frequency of accidents can be reduced, and the safety of the connection between the steel frames can be increased.

[0058] Since the clamping member 21 may take a long time to install the first steel frame 11 and the second steel frame 12 when installing the quick connector, in order to improve the working efficiency of the connection between the steel frames, a guide plate 23 is provided at one end of the clamping plate 213 close to the bearing plate 24.

[0059] The improvement lies in that: through the tilted state of the guide plate 23, the clamping member 21 can be aligned with the first steel frame 11 or the second steel frame 12, and pressure is applied to the guide plate 23 from both sides of the first steel frame 11 or the second steel frame 12 to push the clamping member 21, so that the quick connector can be installed, thereby improving the flexibility of the use of the quick connector, and also improving the work efficiency of the connection between the steel frames, reducing cost consumption, and thus reducing economic losses.

[0060] When the quick connector is in use, it is inevitable that objects will enter from the inside of the movable groove 331, affecting the use of the third elastic member 332 and the second elastic member 322, which may reduce the service life of the quick connector. Therefore, an elastic sealing block 34 is provided at the opening of the movable groove 331 away from the stabilizing groove 31.

[0061] The improvement lies in that: by providing an elastic sealing block 34, the opening on the side of the movable groove 331 can be sealed, thereby increasing the safety of the use of the quick connector, reducing the factors affecting the use of the third elastic member 332 and the second elastic member 322, and improving the service life of the quick connector. Similarly, when the quick connector needs to be disassembled, the elastic sealing block 34 needs to be opened. At this time, the quick connector can be disassembled, thereby improving the flexibility of the use of the elastic sealing block 34.

[0062] In summary, the working principle of the present solution is as follows: first, align the clamping member 21 with the first steel frame 11 or the second steel frame 12, and apply pressure to the guide plate 23 through both sides of the first steel frame 11 or the second steel frame 12 to push the clamping member 21, so that the first elastic member 212 is deformed and elongated. At the same time, the resilience of the first elastic member 212 clamps the two clamping plates 213 inside the stable groove 13. After that, leave a length of the connecting steel frame 10 between the first steel frame 11 and the second steel frame 12, and press the connecting steel frame 10 downward from the top of the two quick connectors, so that the two quick connectors are plugged into the first docking groove 14 and the second docking groove 15. At the same time, the control block 421 slides inside the starting groove 422 and contacts the starting block 423. The starting block 423 blocks the control block 421, causing the control block 421 to rotate 90°, thereby driving the stabilizing rod 41 to flip 90°. At the same time, the end of the stabilizing rod 41 away from the hinge applies pressure to the trigger plate 323, causing the second elastic member 322 to deform and shrink. At this time, the obstruction to the locking frame 333 is removed, and the resilience of the third elastic member 332 is used to move the locking frame 333 closer to the stabilizing rod 41 and plug and match it with the end of the stabilizing rod 41, thereby completing the connection work of the quick connector to the steel frame.

[0063] When it is necessary to disassemble the connected steel frame, first, open the elastic sealing block 34. At this time, extend your finger into the interior of the movable groove 331, hook the handle on one side of the locking frame 333, and pull it outward to cause the third elastic member 332 to deform and contract, so that the locking frame 333 is disconnected from the end of the stabilizing rod 41. At the same time, through the resilience of the second elastic member 322, the end of the stabilizing rod 41 away from the hinge is bounced up, so that the stabilizing rod 41 is reset and drives the connecting steel pipe 10 to move upward. At this time, push the connecting steel pipe 10 upward again, so that the first docking rod 30 and the second docking rod 40 are disconnected from the first docking groove 14 and the second docking groove 15, and then, pull the two clamping plates 213 to both sides, so that the first elastic member 212 is deformed and elongated. At this time, take out the two clamping plates 213 from the first steel frame 11 and the second steel frame 12, and the disassembly of the connected steel frame can be completed.

[0064] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A new type of fast and effective connection method between steel frames, characterized in that: The steps include: S1. First, prepare a connecting steel frame (10), a first steel frame (11), a second steel frame (12) and two quick connectors of corresponding sizes, and the outer walls of the first steel frame (11) and the second steel frame (12) are provided with a stabilizing groove (13), and both ends of the connecting steel frame (10) are provided with a first docking groove (14) and a second docking groove (15); S2. Afterwards, the two quick connectors are clamped on the outer walls of the first steel frame (11) and the second steel frame (12) respectively, so that the two quick connectors are clamped inside the stabilizing groove (13); S3, then, leaving a length of the connecting steel frame (10) between the first steel frame (11) and the second steel frame (12), and pressing the connecting steel frame (10) downward from above the two quick connectors, so that the two quick connectors are plugged into and matched with the first docking groove (14) and the second docking groove (15); In the above process, the quick connector used includes a quick connector (20), the quick connector (20) at least including a clamping member (21) capable of clamping the outer walls of the first steel frame (11) and the second steel frame (12), the inner walls of the clamping member (21) are provided with bearing plates (24) on both sides, and the upper surfaces of the two bearing plates (24) are respectively provided with a first docking rod (30) and a second docking rod (40); A stabilizing groove (31) is provided on one side of the first docking rod (30), a triggering member (32) is provided at the lower part of the stabilizing groove (31), a locking member (33) is provided at the side of the stabilizing groove (31), a stabilizing rod (41) is connected to the lower part of the opening of the second docking rod (40) via a hinge, and a starting member (42) is provided on the side of the stabilizing rod (41) close to the hinge; The first docking rod (30) and the second docking rod (40) are respectively used to be plugged into and matched with the first docking groove (14) and the second docking groove (15), and drive the starting member (42) to rotate the stabilizing rod (41) 90 degrees, so that the end of the stabilizing rod (41) away from the hinge enters the interior of the stabilizing groove (31); at the same time, the stabilizing rod (41) applies pressure to the trigger member (32), causing the trigger member (32) to deform, thereby driving the locking member (33) to be plugged into and matched with the end of the stabilizing rod (41) away from the hinge.

2. The novel fast and effective connection method between steel frames according to claim 1 is characterized in that: The clamping member (21) comprises at least a stabilizing shell (211), first elastic members (212) are arranged inside openings at both ends of the stabilizing shell (211), and a clamping plate (213) is arranged at one end of the first elastic member (212) away from the stabilizing shell (211).

3. The novel fast and effective connection method between steel frames according to claim 1 is characterized in that: The starter (42) comprises at least a control block (421); a starter groove (422) for slidingly connecting with the control block (421) is provided on one side of the second docking groove (15) close to the first docking groove (14); and a starter block (423) is provided above the starter groove (422) on one side close to the second docking groove (15).

4. The novel fast and effective connection method between steel frames according to claim 1 is characterized in that: The trigger member (32) comprises at least a groove (321), a second elastic member (322) is arranged inside the groove (321), and a trigger plate (323) is arranged at one end of the second elastic member (322) away from the groove (321).

5. The novel fast and effective connection method between steel frames according to claim 1 is characterized in that: The locking member (33) comprises at least a movable groove (331), a third elastic member (332) is arranged inside the movable groove (331), and a locking frame (333) is arranged at one end of the third elastic member (332) close to the stabilizing groove (31).

6. The novel fast and effective connection method between steel frames according to claim 2 is characterized in that: A stabilizing plate (22) for plugging and matching with the stabilizing groove (13) is provided on one side of the clamping plate (213) close to the bearing plate (24).

7. The novel fast and effective connection method between steel frames according to claim 2 is characterized in that: A guide plate (23) is provided at one end of the clamping plate (213) close to the bearing plate (24).

8. The novel fast and effective connection method between steel frames according to claim 5 is characterized in that: An elastic sealing block (34) is provided at an opening of one side of the movable groove (331) away from the stabilizing groove (31).