Technological method for downward layered filling coal mining of thick and extra-thick coal seam
Through the downward layered coal mining process, the gelling material and paste filling formula are used, combined with short-wall mechanized circulation mining, the problems of low recovery rate of coal-pressed resources and disaster hazards are solved, achieving high efficiency , safe and environmentally friendly coal seam mining.
Patent Information
- Application Number
- CN202411268919.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-15
AI Technical Summary
In the prior art, the 'three lower and one upper' coal pressure mining method has problems such as low resource recovery rate, ground collapse, mineral earthquake, and environmental damage. Traditional mining methods are prone to cause disaster hazards such as water, fire, and harmful gases. The applicable conditions are harsh.
The coal mining process method is adopted for thick and extra-thick coal seams. Through top-down layered filling and mining, the cementitious materials and paste filling formulas are used independently developed, combined with short-wall mechanized circulation interval strip mining and following Inject circulating filling to form reinforced concrete roof slabs, realize parallel operations, reduce roof slab support, and improve coal mining efficiency and safety.
It improves resource recovery rate, reduces the impact of coal mining on the ground and the environment, reduces the risk of mine disasters, and achieves efficient, safe and environmentally friendly coal seam mining, suitable for thick and extra-thick coal seams of various shapes.
Smart Images

Figure CN118958979A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, in particular to a process for downward layered filling coal mining in thick and extra-thick coal seams. Background Art
[0002] In my country's energy consumption structure, coal accounts for about 70%, of which more than 50% of coal production comes from the mining of thick and extra-thick coal seams. At the same time, in coal resources, "three downs and one up" (under buildings, under railways, under water bodies, and above pressurized water bodies) coal compression, coal compression by coal pillars left over from large tunnels, and coal compression in corner areas are common and account for a large proportion. Among them, the coal compression by coal pillars left over from large tunnels and the coal compression in corner areas cannot be mined by traditional non-filling mining methods and can only be abandoned. The traditional mining methods for "three downs and one up" coal compression are room-pillar type, strip type, Wangwili type (abbreviated as Wang mining) and other mining methods, which require the establishment of a large number of permanent support coal pillars, boundary protection coal pillars, pressure protection coal pillars, etc. in the goaf intervals. At present, only one layer with a thickness of about 3.5 meters can be mined, and layered mining is not allowed. The resource recovery rate is less than 3 0%, and a large number of goafs are left behind, which are potential disaster hazards of water accumulation, fire, accumulation of harmful gases, collapse of the roof of the goaf leading to mine earthquakes, etc., not only has the disadvantages of low resource recovery rate, but also easy to cause ground collapse, mine earthquakes, damage to ground structures, and serious damage to the surface environment of overlying rock strata and water bodies. The downward stratified filling mining technology effectively solves the above problems, and can achieve safe and high recovery rate recovery of thick and extra-thick coal seams. It is an effective way to mine thick and extra-thick coal seams in the "three down and one up" coal compression, coal compression of coal pillars left in large tunnels, and coal compression in corner areas. It has the advantages of improving the "three down and one up" coal compression recovery rate, reducing mine disasters such as impact ground pressure and spontaneous combustion of coal seams, and reducing mining damage to overlying rock water bodies and surface environment. Therefore, a process method for downward stratified filling coal mining in thick and extra-thick coal seams is needed.
[0003] The existing "three down and one up" coal mining generally adopts the strip method, room-and-pillar method, and Wangwili coal mining method (abbreviated as Wang mining). Goafs are left after mining. During the production process and after mining, it is easy to cause many hidden dangers of disasters such as water, fire, harmful gases (gas, carbon monoxide, etc.), coal dust, and roof, and the applicable conditions are relatively harsh. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention provides a process method for downward stratified filling mining in thick and extra-thick coal seams, which solves the problem that the existing "three down and one up" coal mining method generally adopts the strip method, the room-and-pillar method, and the Wangwili mining method (referred to as Wang mining) proposed in the above background technology, and all of them leave goafs after mining, which are prone to many disasters and hidden dangers such as water, fire, harmful gases (gas, carbon monoxide, etc.), coal dust, roof, etc. during the production process and after mining, and the applicable conditions are relatively harsh.
[0005] To achieve the above objectives, the present invention is implemented by the following technical scheme: a process for downward layered filling coal mining in thick and extra-thick coal seams, comprising the following steps:
[0006] Step 1: Layered development layout of the mining area: For thick and extra-thick coal seam working faces, carry out downward layered filling mining and development layout from top to bottom, and carry out layered filling mining in sequence from top to bottom until the filling mining of the entire coal seam is completed;
[0007] Step 2: Layout of filling mining working face: The working face is divided into odd-numbered layers and even-numbered layers. Each layered working face is composed of a working face transport (also air intake) chute, a working face boundary return air liaison lane, a working face return air (also for filling pipeline laying) chute, and a working face auxiliary transport liaison lane to form a complete working face ventilation, transportation, and filling system. The chute is generally arranged along the strike or pseudo-inclined direction, the mining strip is arranged along the inclination or pseudo-inclined direction, the transport chute is arranged at a lower level, and the return air chute is arranged at a higher level;
[0008] Step 3: Independently research and develop cementitious materials and paste filling formulas: Based on the physical and chemical properties of the solid waste aggregates used for filling and their hydration and hardening reaction mechanism, through independent research and development and formula optimization, develop suitable cementitious materials and additives, and optimize the selection of low-cost paste cementitious filling formulas;
[0009] Step 4: Working face circulation and parallel mining and filling operations: The mining and filling in the working face adopts short-wall mechanized circulation interval strip mining and follow-up circulation filling. The appropriate circulation strip width and height are designed according to the surrounding rock conditions of the mining strip. The cross section is a rectangular cross section. Mining and filling are parallel operations. Each strip is mined from the starting door of the transport chute to the return air chute. Each strip is arranged with equal width and height and is parallel to the return air connecting tunnel at the boundary of the working face. After mining a strip, all the recovery equipment is transferred to another strip mining position for strip mining operations. The mined strip is handed over to the filling area for filling operations, realizing parallel operations of strip mining and filling without affecting each other:
[0010] Step 5: Carry out working face equipment and mining support work: Strip short wall mechanized mining equipment uses a digging and anchoring machine (continuous mining machine or tunneling machine + bolting machine) + strip scraper conveyor (or belt conveyor) + transport chute belt conveyor (or scraper conveyor) to cut and transport the fallen coal to the coal bunker, and promptly follow up with anchor net cable support;
[0011] Step 6: Pre-buried anchor nets and cemented reinforced concrete regeneration roof process method: The first, third, fifth and other odd-numbered layer anchors are reserved with extended sections. Before filling the current layer, all the anchors of this layer are connected to the pre-buried anchors with wire rope buckles, and the extended anchors are extended to the bottom plate of the strip tunnel. The steel mesh is dragged close to the bottom plate, and each row of anchors is connected together with a steel belt (or steel ladder beam) under the bottom plate steel mesh. Each piece of the bottom plate steel mesh is tied firmly with No. 8 iron wire. After cementation and filling, a regenerated roof is formed, and it is reinforced concrete. Soil roof, when the filling body strength at 28 days needs to reach 3Mpa or above, a reinforced concrete structure strip is formed in the filling body through the cementing body and the anchor net cable and connecting steel belt inside it, and then the second layer below is mined without roof support, only anchor net support is needed, that is, after adopting this method, the first, third, fifth and other odd-numbered layers of the roof need anchor net cable support and the anchor cable is extended to drag the bottom net, and the second, fourth, sixth and other even-numbered layers do not need roof support:
[0012] Step 7: Construction of filling retaining wall: For strips with a slope of 3°, only the filling retaining wall is constructed at the entrance of the chute. For strips with a slope of 0-3°, the filling retaining wall needs to be constructed and filled in sections from the entrance of the transport chute to the direction of the return air chute:
[0013] Step 8: Filling pipeline layout: The pipeline layout path is: ground filling slurry hopper outlet (or paste filling pump pipe valve outlet) → ground high-pressure pipeline → wellbore (or borehole) laying high-pressure pipeline → underground main high-pressure pipeline → working face branch high-pressure pipeline → strip filling valve → strip filling mobile paste pipeline → working face strip filling mobile high-pressure pipeline. It is necessary to arrange the filling pipeline and exhaust pipeline in the strip according to the elevation change profile of the top and bottom plates of the mining and filling strip, and perform pipeline hanging connection; install the pipeline control valve on the outside of the closed wall of the mining and filling strip;
[0014] Step 9: Filling operation: Build a crushing and filling station on the ground, use various waste materials that can be used for filling as aggregates for cementing filling slurry, add self-developed cementing materials, and then add water to stir to form paste cementing slurry. Use potential energy gravity or paste filling pump to pump under pressure, and transport it to the filled empty area after mining underground through high-pressure pipelines. After the construction of the recovered strip retaining wall is completed, fill the empty area of each strip between two adjacent retaining walls with cementing slurry. After filling, a reinforced concrete structure strip similar to the embedded anchor net cable with a certain strength is formed in the odd-numbered strips. When mining the second, fourth, sixth and other even-numbered layers in the lower part, there is no need to support the roof, only the anchor net support:
[0015] Step 10: Layout angle of upper and lower layer strips: The direction of the mining strip roadway of the working face of odd-numbered layers needs to maintain a certain angle with the direction of the mining strip roadway of even-numbered layers, so that the upper layer roof and the lower layer coal rock wall form a shear beam structure, or the upper and lower layer strips are staggered by half the width of the roadway, which is conducive to supporting and controlling the deformation of the surrounding rock:
[0016] Step 11: All anchor cables are on the roof. There are no anchor cables or other supporting materials in each layered coal rock mass. They are all raw coal rock entities. When mining and cutting coal, there are no hard foreign objects such as anchor cables in the coal rock mass. Compared with the upward layered mining that requires cutting the anchor cables in the coal rock mass, this process method is safer.
[0017] Step 12: When the previous layered working face is backfilled and mined, anchor mesh support is adopted. The deformation of the surrounding rock such as roof settlement is small. By taking technical measures to fill and connect the top, the backfill body in the empty area of the mining strip is filled and connected to the top. After the backfill body reaches the expected strength, the next layered working face is arranged for backfilling and mining until the coal mining and backfilling of the entire thick and extra-thick coal seam mining working face are completed.
[0018] Optionally, in step five, when mining the strip, you can choose to cut the coal-falling anchor net cable support in one full section according to the geological conditions of the coal seam, or first cut the upper section strip of the coal-falling anchor net cable support strip and then pull the bottom to cut the lower section strip of the coal-falling anchor net support strip. When mining the upper section of the strip, use axial flow local fan for ventilation. After the upper section strip is connected, stop the local fan ventilation, and then start withdrawing the machine and pulling the bottom to mine the lower section strip.
[0019] Optionally, the filling operation in step nine specifically includes the following steps:
[0020] Step 1: After the excavation of the working face strip is completed, the preparation work for the filling operation is carried out, including storing the filling materials (filling aggregates, cementitious materials, additives, etc.) on the ground and debugging the filling system equipment; in the mine, the long anchor cables are connected to the strips, the anchor nets are connected to the steel belts, and the retaining walls are constructed to prepare for the filling of the paste slurry into the strips;
[0021] Step 2: When the strips mined in the working face meet the conditions for filling, the filling operation can be started on the strips where the mining has been completed and the pre-set anchor nets and retaining walls have been built. The filling operation of the mining strips is completed according to the paste cementing filling process method of "water-moistened pipe → continuous small amount of fine aggregate paste formula filling → continuous large amount of coarse aggregate paste formula filling → continuous small amount of fine aggregate paste formula filling → paste filling completed".
[0022] Optionally, in the step 10, the angle between the direction of the mining strip tunnel of the working face in the odd-numbered layers and the direction of the mining strip tunnel of the even-numbered layers is not less than 15°.
[0023] The present invention provides a process for coal mining in thick and extra-thick coal seams with downward layered filling, which has the following beneficial effects:
[0024] This process method for downward stratified filling mining in thick and extra-thick coal seams is a filling mining process method for underground coal mines with high mining safety, high production efficiency, high resource recovery rate, high solid waste utilization, relatively low cost, and good protection effect on overlying rock strata, water bodies and surface environment. This process method is suitable for mining compressed coal block sections in thick and extra-thick coal seams of various shapes.
[0025] The process method of downward layered filling coal mining in thick and extra-thick coal seams is combined with the high filling efficiency of paste-like materials. Innovative cementitious materials used in paste-bonded filling formulas, innovative half-tunnel or oblique layout methods of downward layered cementing roof filling mining working faces, and innovative odd-numbered layered working surface strips (tunnels) pre-buried long anchor net cable support technology methods have been developed to achieve safe, efficient, high recovery rate, high solid waste utilization, and low-cost mining in coal mines.
[0026] The process method of downward stratified filling coal mining in thick and extra-thick coal seams is to cement and fill the odd-numbered stratified working surface strips (tunnels) to form an anchor mesh reinforced concrete roof, and the even-numbered stratified working face does not require roof support during mining. The technical innovation is combined with a set of continuous mining equipment for pulling production, which maximizes the effectiveness of the filling mining system. It can not only meet the large-scale production of coal mines and greatly improve mining efficiency, but also the disturbance of the overlying rock strata and the surface due to downward stratified mining is greatly reduced, which can well protect the overlying rock strata water bodies and surface buildings (structures). It is an environmentally friendly green mining method.
[0027] The process method of downward stratified filling coal mining in thick and extra-thick coal seams can prevent and control mine disasters, and prevent gas gushing, water inrush, water accumulation in goafs, spontaneous combustion of coal seams, mine tremors, roof fall, surface collapse and other disasters. It is particularly suitable for safe, efficient and environmentally friendly mining of thick and extra-thick coal seams such as "three down and one up" coal compression, coal compression of coal pillars left over in large tunnels, and coal compression in corner areas. It is an ideal coal pillar mining method, which solves the technical problem of thick and extra-thick coal seams that cannot be fully mined safely, efficiently and with a high recovery rate and in an environmentally friendly manner. It effectively adapts to the mining needs of various complex compressed coal block sections and realizes safe, efficient, high recovery rate, green and environmentally friendly mining. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 This is a cross-sectional view of the arrangement of parallel staggered half-lanes for downward layered filling according to the present invention;
[0029] Figure 2 This is a cross-sectional view of the cross-arrangement of the downward layered filling branches of the present invention;
[0030] Figure 3It is a cross-sectional view of the segmented arrangement of the downward layered working surface of the present invention;
[0031] Figure 4 It is a schematic plan view of the arrangement of downward layered branches of the present invention;
[0032] Figure 5 This is a cross-sectional view of a half-lane laneway of a mining branch lane of the present invention;
[0033] Figure 6 This is a cross-sectional view of the upper and lower oblique crossing tunnels of the mining branch tunnel of the present invention;
[0034] Figure 7 This is a connection diagram of the steel belts of the odd-numbered layered mining and filling strips for laying the bottom and dragging the bottom net of the present invention;
[0035] Figure 8 This is a connection diagram of the bottom supporting mesh steel belt of the odd-numbered layered working face chute of the present invention;
[0036] Fig. 9 This is the layout diagram of the working face transportation, ventilation, and mining and filling equipment of the present invention. DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0038] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0039] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0040] See also Figure 1 and Fig. 9A process for mining coal in thick and extra-thick coal seams by layered filling, comprising the following steps:
[0041] Step 1: Layered development layout of the mining area: For thick and extra-thick coal seam working faces, carry out downward layered filling mining and development layout from top to bottom, and carry out layered filling mining in sequence from top to bottom until the filling mining of the entire coal seam is completed;
[0042] Step 2: Layout of filling mining working face: The working face is divided into odd-numbered layers and even-numbered layers. Each layered working face is composed of a working face transport (also air intake) chute, a working face boundary return air liaison lane, a working face return air (also for filling pipeline laying) chute, and a working face auxiliary transport liaison lane to form a complete working face ventilation, transportation, and filling system. The chute is generally arranged along the strike or pseudo-inclined direction, the mining strip is arranged along the inclination or pseudo-inclined direction, the transport chute is arranged at a lower level, and the return air chute is arranged at a higher level;
[0043] Step 3: Independently research and develop cementitious materials and paste filling formulas: Based on the physical and chemical properties of the solid waste aggregates used for filling and their hydration and hardening reaction mechanism, through independent research and development and formula optimization, develop suitable cementitious materials and additives, and optimize the selection of low-cost paste cementitious filling formulas;
[0044] Step 4: Working face circulation and parallel mining and filling operations: The mining and filling in the working face adopts short-wall mechanized circulation interval strip mining and follow-up circulation filling. The appropriate circulation strip width and height are designed according to the surrounding rock conditions of the mining strip. The cross section is a rectangular cross section. Mining and filling are parallel operations. Each strip is mined from the starting door of the transport chute to the return air chute. Each strip is arranged with equal width and height and is parallel to the return air connecting tunnel at the boundary of the working face. After mining a strip, all the recovery equipment is transferred to another strip mining position for strip mining operations. The mined strip is handed over to the filling area for filling operations, realizing parallel operations of strip mining and filling without affecting each other:
[0045] Step 5: Carry out working face equipment and mining support work: The strip short wall mechanized mining equipment adopts the digging and anchoring machine (continuous mining machine or tunneling machine + anchor bolter) + strip scraper conveyor (or belt conveyor) + transport chute belt conveyor (or scraper conveyor) to cut the fallen coal and transfer it to the coal bunker, and follow up with anchor net cable support in time; when mining the strip, you can choose to cut the fallen coal anchor net cable support with a full section at one time according to the geological conditions of the coal seam, or first cut the upper section strip of the coal falling anchor net cable support strip and then pull the bottom to cut the lower section strip of the coal falling anchor net support strip. When mining the upper section of the strip, use axial flow local fan for ventilation. After the upper section strip is connected, stop the local fan ventilation, and then start to withdraw the machine and pull the bottom to mine the strip of the lower section.
[0046] Step 6: Pre-buried anchor nets and cemented reinforced concrete regeneration roof process method: The first, third, fifth and other odd-numbered layer anchors are reserved with extended sections. Before filling the current layer, all the anchors of this layer are connected to the pre-buried anchors with wire rope buckles, and the extended anchors are extended to the bottom plate of the strip tunnel. The steel mesh is dragged close to the bottom plate, and each row of anchors is connected together with a steel belt (or steel ladder beam) under the bottom plate steel mesh. Each piece of the bottom plate steel mesh is tied firmly with No. 8 iron wire. After cementation and filling, a regenerated roof is formed, and it is reinforced concrete. Soil roof, when the filling body strength at 28 days needs to reach 3Mpa or above, a reinforced concrete structure strip is formed in the filling body through the cementing body and the anchor net cable and connecting steel belt inside it, and then the second layer below is mined without roof support, only anchor net support is needed, that is, after adopting this method, the first, third, fifth and other odd-numbered layers of the roof need anchor net cable support and the anchor cable is extended to drag the bottom net, and the second, fourth, sixth and other even-numbered layers do not need roof support:
[0047] Step 7: Construction of filling retaining wall: For strips with a slope of 3°, only the filling retaining wall is constructed at the entrance of the chute. For strips with a slope of 0-3°, the filling retaining wall needs to be constructed and filled in sections from the entrance of the transport chute to the direction of the return air chute:
[0048] Step 8: Filling pipeline layout: The pipeline layout path is: ground filling slurry hopper outlet (or paste filling pump pipe valve outlet) → ground high-pressure pipeline → wellbore (or borehole) laying high-pressure pipeline → underground main high-pressure pipeline → working face branch high-pressure pipeline → strip filling valve → strip filling mobile paste pipeline → working face strip filling mobile high-pressure pipeline. It is necessary to arrange the filling pipeline and exhaust pipeline in the strip according to the elevation change profile of the top and bottom plates of the mining and filling strip, and perform pipeline hanging connection; install the pipeline control valve on the outside of the closed wall of the mining and filling strip;
[0049] Step nine: Filling operation: Build a crushing and filling station on the ground, use various waste materials that can be used for filling as aggregates for cementing filling slurry, add self-developed cementing materials, and then add water to stir to form a paste cementing slurry. Use potential energy gravity or paste filling pump to pressurize and pump, and transport it to the filled empty area after mining underground through a high-pressure pipeline. After the recovered strip retaining wall is constructed, fill the empty area of each strip between two adjacent retaining walls with cementing slurry. After filling, a reinforced concrete structure strip with a certain strength of pre-buried anchor net cable is formed in the odd-numbered layered strips. When mining the second, fourth, sixth and other even-numbered layers in the lower part, there is no need for roof support, only anchor net support: The filling operation specifically includes the following steps: Step 1: After the excavation of the working face mining area strip is completed, preparations for the filling operation are carried out, including storing filling materials (filling aggregates, cementing materials, additives, etc.) on the ground and debugging the filling system equipment; prepare underground The odd-numbered strips are connected with long anchor cables to drag anchor nets and connect steel belts and other preset anchor net cables to build a retaining wall and prepare for the paste slurry to be filled into the strips; Step 2: When the strips mined in the working face have a filling condition, the strips mined in the working face and with the preset anchor net cables and retaining walls can be filled. The filling operation of the strips in the working face is completed according to the paste cementing filling process method of "water-wetting pipe → continuous filling with a small amount of fine aggregate paste formula → continuous filling with a large amount of coarse aggregate formula paste → continuous filling with a small amount of fine aggregate paste formula → paste filling is completed";
[0050] Step 10: Arrangement angle of upper and lower layer strips: The direction of the mining strip roadway of the working face of odd-numbered layers needs to maintain a certain angle with the direction of the mining strip roadway of even-numbered layers, so that the upper layer roof and the lower layer coal rock wall form a shear beam structure, or the upper and lower layer strips are staggered by half the width of the roadway, which is conducive to supporting and controlling the deformation of the surrounding rock; the angle between the direction of the mining strip roadway of the working face of odd-numbered layers and the direction of the mining strip roadway of even-numbered layers should not be less than 15;
[0051] Step 11: All anchor cables are on the roof. There are no anchor cables or other supporting materials in each layered coal rock mass. They are all raw coal rock entities. When mining and cutting coal, there are no hard foreign objects such as anchor cables in the coal rock mass. Compared with the upward layered mining that requires cutting the anchor cables in the coal rock mass, this process method is safer.
[0052] Step 12: When the previous layered working face is backfilled and mined, anchor wire mesh support is adopted. The deformation of the surrounding rock such as roof settlement is small. By taking technical measures to fill and connect the top, the backfill body in the empty area of the mining strip is filled and connected to the top. After the backfill body reaches the expected strength, the next layered working face is arranged for backfilling and mining until the coal mining and backfilling of the entire thick and extra-thick coal seam mining working face are completed;
[0053] The process method of downward stratified filling coal mining in thick and extra-thick coal seams can prevent and control mine disasters, and prevent gas gushing, water inrush, water accumulation in goafs, spontaneous combustion of coal seams, mine tremors, roof fall, surface collapse and other disasters. It is particularly suitable for safe, efficient and environmentally friendly mining of thick and extra-thick coal seams such as "three down and one up" coal compression, coal compression of coal pillars left over in large tunnels, and coal compression in corner areas. It is an ideal coal pillar mining method, which solves the technical problem of thick and extra-thick coal seams that cannot be fully mined safely, efficiently and with a high recovery rate and in an environmentally friendly manner. It effectively adapts to the mining needs of various complex compressed coal block sections and realizes safe, efficient, high recovery rate, green and environmentally friendly mining.
[0054] In summary, when using the process method of downward stratified filling mining in thick and extra-thick coal seams, firstly, the working face of the thick and extra-thick coal seams is subjected to downward stratified filling mining, and the stratified filling mining is arranged from top to bottom, and the stratified filling mining is carried out sequentially from top to bottom until the filling mining of the entire thick coal seam is completed, and then the filling mining working face is arranged. The working face is divided into odd-numbered layers and even-numbered layers. Each stratified working face consists of a working face transport chute, a working face boundary return air connection lane, a working face return air (also for filling pipeline laying) chute, The auxiliary transport connecting tunnel of the working face forms a complete ventilation, transportation and filling system of the working face. The drift is generally arranged along the strike or pseudo-inclined direction, the mining strip is arranged along the inclination or pseudo-inclined direction, the transport drift is arranged at a lower level, and the return air drift is arranged at a higher level. The independently developed cementitious materials and paste filling formulas are developed based on the physical and chemical properties of the solid waste aggregates used for filling and their hydration and hardening reaction mechanism. Through independent research and development and formula optimization, the corresponding cementitious materials and additives suitable for different solid wastes are developed, and the low-cost paste cementitious filling formula is optimized.Secondly, the working face circulation and mining and filling are carried out in parallel. The mining and filling in the working face adopts short-wall mechanized cycle interval strip mining and follow-up cycle filling. The appropriate cycle strip width and height are designed according to the surrounding rock conditions of the mining strip. The cross-section is a rectangular cross-section, and mining and filling are carried out in parallel. Each strip is mined from the beginning of the transport chute to the return air chute. Each strip is arranged with equal width and height and is parallel to the return air connecting tunnel at the boundary of the working face. After mining a strip, all the mining equipment is transferred to another strip mining position for strip mining operations. The mined strips are handed over to the filling area for filling operations, realizing parallel operations of strip mining and filling without affecting each other, and then the working face is carried out. Equipment and mining support work, among which the strip short wall mechanized mining equipment adopts anchor digger + strip scraper conveyor + transport chute belt conveyor to cut the fallen coal and transfer it to the coal bunker, and promptly follow up with anchor mesh support. When mining the strip, you can choose to cut the fallen coal anchor mesh support in one full section according to the geological conditions of the coal seam, or first cut the upper section strip of the coal fallen anchor mesh support strip and then pull the bottom to cut the lower section strip of the coal fallen anchor mesh support strip. When mining the upper section of the strip, use axial flow local fan for ventilation. After the upper section strip is connected, stop the local fan ventilation, and then start to withdraw the machine and pull the bottom to mine the strip of the lower section, and then carry out the work of pre-embedded anchor mesh bonded reinforced concrete to regenerate the roof, and reserve the first, third, fifth and other odd-numbered layered anchor cables. The extension section, before filling the current layer, all the anchor cables of this layer are connected to the pre-buried anchor cables with wire rope buckles, the extended anchor cables are extended to the bottom plate of the strip tunnel, and the steel mesh is dragged close to the bottom plate. Each row of anchor cables is connected together with a steel belt under the bottom plate steel mesh. Each piece of bottom plate steel mesh is firmly tied with No. 8 iron wire at the joint. After cementation and filling, a regenerated roof is formed, and it is a reinforced concrete roof. When the strength of the filling body at 28 days needs to reach 3Mpa or above, a reinforced concrete structure strip is formed in the filling body through the cementation body and the anchor mesh cable and connecting steel belt therein. Then, the second layer below is mined without the need for roof support, only anchor mesh support is needed. That is, after adopting this method, the downward layer The top plates of the first, third, and fifth odd-numbered layers need to be supported by anchor nets and the anchors should be extended to drag the bottom nets. The second, fourth, and sixth even-numbered layers do not need top plate support. Then, the filling retaining wall is constructed. For strips with a slope of 3° or more, the filling retaining wall is constructed only at the entrance of the chute. For strips with a slope of 0-3°, it is necessary to construct and fill them in sections from the entrance of the transport chute to the direction of the return air chute. Then, the filling pipeline is arranged: the pipeline arrangement path is: ground filling slurry hopper outlet → ground high-pressure pipeline → wellbore (or borehole) laying high-pressure pipeline → underground main high-pressure pipeline → working face branch high-pressure pipeline → strip filling valve → strip filling mobile paste pipeline → working face strip filling mobile high-pressure pipeline. It is necessary to arrange the filling pipeline and exhaust pipeline in the strip according to the profile diagram of the top and bottom plate elevation changes of the mining and filling strip, and to hang and connect the pipelines;A pipeline control valve is installed on the outside of the closed wall of the mining and filling strip, and then the filling operation is carried out. A crushing and filling station is built on the ground. Various waste materials that can be used for filling are used as aggregates for the cementing filling slurry. Self-developed cementing materials are added, and then water is added and stirred to form a paste cementing slurry. The slurry is pumped by potential energy gravity or a paste filling pump, and then transported to the filled empty area after mining underground through a high-pressure pipeline. After the construction of the recovered strip retaining wall is completed, the cementing slurry is filled in each strip empty area between two adjacent retaining walls. After filling, a reinforced concrete structure strip similar to a pre-buried anchor net cable with a certain strength is formed in the odd-numbered layered strips. When the second, fourth, sixth and other even-numbered layers in the lower part are mined, there is no need for roof support, only anchor net support. The specific filling operation is as follows. When the mining of the working face mining field strip is completed, the preparation work for the filling operation is carried out, including storing the filling materials (filling aggregates) on the ground. , cementitious materials, additives, etc.), debug the filling system equipment; make the preset anchor net rope work such as connecting long anchor ropes in a number of strips underground, build a retaining wall, and prepare for the paste slurry to be filled into the strips. When the strips mined in the working face have a filling condition, the filling operation can be started for the strips mined in the mining field and the pre-set anchor net ropes and retaining walls have been built. The filling operation of the mining field strips is in accordance with the formula of "water-wetting pipe → continuous filling of a small amount of fine aggregate paste" →Continuous large amount of coarse aggregate paste filling →Continuous small amount of fine aggregate paste filling →Paste filling completed" paste cementing filling process method is used to complete the filling operation; finally, the upper and lower layered strips are arranged at an angle. The direction of the mining strip roadway of the working face of the odd-numbered layer and the direction of the mining strip roadway of the even-numbered layer need to maintain a certain angle, so that the upper layer roof and the lower layer coal rock wall form a shear beam structure, or the upper and lower layered strips are arranged at half the width of the roadway, which is conducive to supporting and controlling the deformation of the surrounding rock. The excavation and The anchor nets and cables for supporting the mining tunnels are all on the roof. There are no anchor nets and cables and other supporting materials in each layered coal rock mass, which are all raw coal rock entities. There are no hard foreign objects such as anchor nets and cables in the coal rock mass when mining and cutting the coal. Compared with the anchor nets and cables in the coal rock mass that need to be cut in the upward layered mining, this process method is safer. After the filling and mining of the previous layered working face is completed and the filling body reaches the expected strength, the filling and mining of the next layered working face is arranged until the coal mining and filling of the entire thick (and extra-thick) coal seam mining working face are completed. The present invention provides a filling and mining process method for underground coal mines with high operation safety during mining and filling, high production efficiency, high resource recovery rate, relatively low cost, good surface subsidence control effect, and environmental friendliness. The process method is suitable for layered mining of thick and extra-thick coal seam compressed coal block sections of various shapes. ;
[0055] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A process for coal mining in thick and extra-thick coal seams by layered filling, characterized in that: The following steps are involved: Step 1: Layered development and layout of the mining area: For the working face of thick and extra-thick coal seams, carry out downward layered filling mining and development layout from top to bottom, and carry out layered filling mining in sequence from top to bottom until the entire coal seam is mined; Step 2: Layout of filling mining working face: The working face is divided into odd-numbered layers and even-numbered layers. Each layered working face is composed of a working face transport (also air intake) chute, a working face boundary return air liaison lane, a working face return air (also for filling pipeline laying) chute, and a working face auxiliary transport liaison lane to form a complete working face ventilation, transportation, and filling system. The chute is generally arranged along the strike or pseudo-inclined direction, the mining strip is arranged along the inclination or pseudo-inclined direction, the transport chute is arranged at a lower level, and the return air chute is arranged at a higher level; Step 3: Independently research and develop cementitious materials and paste filling formulas: Based on the physical and chemical properties of the solid waste aggregates used for filling and their hydration and hardening reaction mechanism, through independent research and development and formula optimization, develop suitable cementitious materials and additives, and optimize the selection of low-cost paste cementitious filling formulas; Step 4: Working face circulation and parallel mining and filling operations: The mining and filling in the working face adopts short-wall mechanized circulation interval strip mining and follow-up circulation filling. The appropriate circulation strip width and height are designed according to the surrounding rock conditions of the mining strip. The cross section is a rectangular cross section. Mining and filling are parallel operations. Each strip is mined from the starting door of the transport chute to the return air chute. Each strip is arranged with equal width and height and is parallel to the return air connecting tunnel at the boundary of the working face. After mining a strip, all the recovery equipment is transferred to another strip mining position for strip mining operations. The mined strip is handed over to the filling area for filling operations, realizing parallel operations of strip mining and filling without affecting each other: Step 5: Carry out work face equipment and mining support work: Strip short wall mechanized mining equipment uses a boring and anchoring machine (continuous mining machine or tunneling machine + bolting machine) + strip scraper conveyor (or belt conveyor) + transport chute belt conveyor (or scraper conveyor) to transfer the cut coal to the coal bunker and follow up with anchor net cable support in time; Step 6: Pre-buried anchor nets and cemented reinforced concrete regeneration roof process method: The first, third, fifth and other odd-numbered layer anchors are reserved with extended sections. Before filling the current layer, all the anchors of this layer are connected to the pre-buried anchors with wire rope buckles, and the extended anchors are extended to the bottom plate of the strip tunnel. The steel mesh is dragged close to the bottom plate, and each row of anchors is connected together with a steel belt (or steel ladder beam) under the bottom plate steel mesh. Each piece of the bottom plate steel mesh is tied firmly with No. 8 iron wire. After cementation and filling, a regenerated roof is formed, and it is reinforced concrete. Soil roof, when the filling body strength at 28 days needs to reach 3Mpa or above, a reinforced concrete structure strip is formed in the filling body through the cementing body and the anchor net cable and connecting steel belt inside it, and then the second layer below is mined without roof support, only anchor net support is needed, that is, after adopting this method, the first, third, fifth and other odd-numbered layers of the roof need anchor net cable support and the anchor cable is extended to drag the bottom net, and the second, fourth, sixth and other even-numbered layers do not need roof support: Step 7: Construction of filling retaining wall: For strips with a slope of 3°, only the filling retaining wall is constructed at the entrance of the chute. For strips with a slope of 0-3°, the filling retaining wall needs to be constructed and filled in sections from the entrance of the transport chute to the direction of the return air chute: Step 8: Filling pipeline layout: The pipeline layout path is: ground filling slurry hopper outlet (or paste filling pump pipe valve outlet) → ground high-pressure pipeline → wellbore (or borehole) laying high-pressure pipeline → underground main high-pressure pipeline (arranged along the tunnel) → working face branch high-pressure pipeline (along the filling and mining working face return air chute) → strip filling valve → strip filling mobile paste pipeline → working surface strip filling mobile high-pressure pipeline. It is necessary to arrange the filling pipeline and exhaust pipeline in the strip according to the elevation change profile of the top and bottom plates of the mining and filling strip, and perform pipeline hanging connection; install the pipeline control valve on the outside of the closed wall of the mining and filling strip; Step 9: Filling operation: Build a crushing and filling station on the ground, use various waste materials that can be used for filling as aggregates for cementing filling slurry, add self-developed cementing materials, and then add water to stir to form paste cementing slurry. Use potential energy gravity or paste filling pump to pump under pressure, and transport it to the filled empty area after mining underground through high-pressure pipelines. After the construction of the recovered strip retaining wall is completed, fill the empty area of each strip between two adjacent retaining walls with cementing slurry. After filling, a reinforced concrete structure strip similar to the embedded anchor net cable with a certain strength is formed in the odd-numbered strips. When mining the second, fourth, sixth and other even-numbered layers in the lower part, there is no need to support the roof, only the anchor net support: Step 10: Layout angle of upper and lower layer strips: The direction of the mining strip roadway of the working face of odd-numbered layers needs to maintain a certain angle with the direction of the mining strip roadway of even-numbered layers, so that the upper layer roof and the lower layer coal rock wall form a shear beam structure, or the upper and lower layer strips are staggered by half the width of the roadway, which is conducive to supporting and controlling the deformation of the surrounding rock: Step 11: All anchor cables are on the roof. There are no anchor cables or other supporting materials in each layered coal rock mass. They are all raw coal rock entities. When mining and cutting coal, there are no hard foreign objects such as anchor cables in the coal rock mass. Compared with the upward layered mining that requires cutting the anchor cables in the coal rock mass, this process method is safer. Step 12: When the previous layered working face is backfilled and mined, anchor mesh support is adopted. The deformation of the surrounding rock such as roof settlement is small. By taking technical measures to fill and connect the top, the backfill body in the empty area of the mining strip is filled and connected to the top. After the backfill body reaches the expected strength, the next layered working face is arranged for backfilling and mining until the coal mining and backfilling of the entire thick and extra-thick coal seam mining working face are completed.
2. The process for coal mining in thick and extra-thick coal seams according to claim 1 is characterized in that: In the step five, when mining the strip, you can choose to cut the coal-falling anchor net cable support in one full section according to the geological conditions of the coal seam, or first cut the upper section strip of the coal-falling anchor net cable support strip and then pull the bottom to cut the lower section strip of the coal-falling anchor net support strip. When mining the upper section of the strip, use axial flow local fan for ventilation. After the upper section strip is connected, stop the local fan ventilation, and then start withdrawing the machine and pulling the bottom to mine the lower section strip.
3. The process for coal mining in thick and extra-thick coal seams according to claim 1 is characterized in that: The filling operation in step nine specifically includes the following steps: Step 1: After the excavation of the working face strip is completed, the preparation work for the filling operation is carried out, including storing the filling materials (filling aggregates, cementitious materials, additives, etc.) on the ground and debugging the filling system equipment; in the mine, the long anchor cables are connected to the strips, the anchor nets are connected to the steel belts, and the retaining walls are constructed to prepare for the filling of the paste slurry into the strips; Step 2: When the strips mined in the working face have the conditions for filling, the filling operation can be started on the strips that have been mined and have been equipped with pre-set anchor nets and retaining walls. The filling operation of the strips in the mining area is completed according to the paste cementing filling process method of "water-moistened pipe → continuous filling with a small amount of fine aggregate paste formula → continuous filling with a large amount of coarse aggregate paste formula → continuous filling with a small amount of fine aggregate paste formula → paste filling is completed".
4. The process for coal mining in thick and extra-thick coal seams according to claim 1 is characterized in that: In the step 10, the angle between the mining strip roadway direction of the odd-numbered layer and the mining strip roadway direction of the even-numbered layer is not less than 15°.
Citation Information
Cited By
Layered interval paste filling coal mining method for three-under-three thick coal seam
CN119664340A
High-recovery-rate and high-roof-contact-rate roadway type strip filling mining method for thick coal seam
CN121111254A