Asphalt mixture simulation test device and test method thereof

Through the asphalt mixture simulation test device integrating precipitation erosion, ultraviolet irradiation, high temperature and salt spray corrosion systems, the problems of manual operation inconvenience and error in multi-factor cycle tests are solved, and an automated and efficient test process is realized, saving resources.

CN118961552AInactive Publication Date: 2024-11-15GUANGZHOU MARITIME INST
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202410814163.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the asphalt mixture stability detection, multi-factor circulation test requires manual circulation between separate test devices, resulting in waste of manpower, material resources and financial resources, and inconvenient operation, which makes it easy to cause artificial errors.

Method used

Design a simulation test device for asphalt mixture, integrating precipitation erosion, ultraviolet irradiation, high temperature and salt spray corrosion systems, and automate multi-factor cycle tests through the control system to avoid manual cycling operations between different single-factor test devices.

Benefits of technology

The multi-factor cycle test integration and automation of asphalt mixtures has been realized, saving manpower, material resources and financial resources, reducing test consumables, avoiding human errors, and improving the test efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118961552A_ABST
    Figure CN118961552A_ABST
Patent Text Reader

Abstract

The invention relates to an asphalt mixture simulation test device and a test method thereof, and the device comprises a test box which comprises a main box body with an opening at the top end and a box cover arranged at the opening, and the middle part in the main box body is provided with a placing net for placing an asphalt mixture test piece; the rainfall flushing system is detachably arranged at the bottom of the box cover and used for simulating rainfall; the irradiation system is detachably arranged at the bottom of the box cover and is used for realizing ultraviolet irradiation; the high-temperature generation system is arranged on the inner side wall of the main box body and is used for heating the inner cavity of the test box; the salt mist corrosion system is detachably arranged at the bottom of the box cover and used for spraying salt mist; and the control system is electrically connected with the rainfall scouring system, the irradiation system, the high-temperature generation system and the salt spray corrosion system and used for controlling the rainfall scouring system, the irradiation system, the high-temperature generation system and the salt spray corrosion system according to a preset program. According to the invention, integration and automation of the multi-factor cyclic test of the asphalt mixture can be ensured, and manpower, material resources and financial resources are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of asphalt mixture testing, and in particular relates to an asphalt mixture simulation testing device and a testing method thereof. Background Art

[0002] Asphalt pavement has become the main choice for highway pavement due to its advantages such as smooth surface, no joints, comfortable driving, low vibration, low noise, wear resistance, short construction period, renewable utilization, and suitable for phased construction. However, asphalt pavement is usually affected by various environmental factors, resulting in performance degradation. Among them, ambient temperature, ultraviolet radiation, rainfall erosion, and salt spray corrosion are the main environmental factors that cause the performance degradation of coastal asphalt pavement. At present, in the stability detection of asphalt mixtures, the experimental research on various influencing factors, such as precipitation erosion test, ultraviolet aging test, high temperature aging test, and salt spray corrosion test, are all carried out separately, that is, a separate test device is designed for each influencing factor. For multi-factor cyclic tests, in most cases, the test device is designed according to a single factor, and then each specimen is cycled in different test devices in turn by manual means to achieve the purpose of multi-factor circulation. This operation mode brings great instability to the test personnel and also causes waste of manpower, material resources, and financial resources. Summary of the invention

[0003] The purpose of the present invention is to provide an asphalt mixture simulation test device and a test method thereof, which can ensure that the multi-factor cycle test of the asphalt mixture can be integrated and automated, thereby saving manpower, material resources and financial resources.

[0004] The present invention is achieved through the following technical solutions:

[0005] An asphalt mixture simulation test device, comprising:

[0006] The test box includes a main box body with an opening at the top and a box cover arranged on the top of the main box body, and a placement net for placing asphalt mixture test pieces is arranged in the middle of the main box body;

[0007] A precipitation flushing system, which is detachably arranged at the bottom of the box cover, is used to simulate precipitation;

[0008] An irradiation system, which is detachably arranged at the bottom of the box cover and is used to realize ultraviolet light irradiation;

[0009] A high temperature generating system, which is arranged on the inner wall of the main box and is used to heat the inner cavity of the test box;

[0010] Salt spray corrosion system: the salt spray corrosion system is detachably arranged at the bottom of the box cover and is used to spray salt spray;

[0011] A control system, which is electrically connected to the precipitation scouring system, the irradiation system, the high temperature generating system and the salt spray corrosion system respectively, and is used to control the precipitation scouring system, the irradiation system, the high temperature generating system and the salt spray corrosion system according to a preset program.

[0012] Furthermore, a vertical baffle is provided at the bottom of the main box body, which divides the bottom of the main box body into a precipitation collection chamber and a brine collection chamber. A first valve assembly for opening or closing the precipitation collection chamber and a second valve assembly for opening or closing the brine collection chamber are provided on the inner side wall of the main box body. The control system is respectively connected to the first valve assembly and the second valve assembly for controlling the first valve assembly and the second valve assembly according to a preset program.

[0013] Furthermore, the control system includes a six-speed conversion switch and six cycle timers. The cycle timer includes a controller electrically connected to the six-speed conversion switch and a duration counter, a cycle counter and a clock source electrically connected to the controller respectively. The six gears of the six-speed conversion switch are electrically connected to the first valve assembly, the second valve assembly, the precipitation flushing system, the irradiation system, the high temperature generation system and the salt spray corrosion system respectively.

[0014] Furthermore, a support frame is provided at the bottom of the box cover, and the precipitation flushing system includes a first power source device, a first circulating water pipe, a rectangular branch pipe and a plurality of shower heads. The rectangular branch pipe is detachably arranged on the support frame, and the plurality of shower heads are arranged on the rectangular branch pipe at intervals. An adjusting component for controlling the water output of the shower heads is provided at the shower outlet. A first through hole is provided on the upper part of one side wall of the main box body, and one end of the first circulating water pipe is connected to the rectangular branch pipe, and the other end thereof passes through the first through hole and is connected to the first power source device.

[0015] Furthermore, the salt spray corrosion system includes a second power source device, a second circulating water pipe and a plurality of outlet pipes. A second through hole is opened on the upper part of one side wall of the main box body. The second circulating water pipe is detachably arranged on the support. One end of the second circulating water pipe passes through the second through hole and is connected to the second power source device. The plurality of outlet pipes are arranged at intervals on the part of the second circulating water pipe located in the test box. An atomization component for atomizing salt water is provided on the end of the outlet pipe away from the second circulating water pipe.

[0016] Furthermore, a third through hole and a fourth through hole connected to the precipitation collection chamber are provided on one side wall of the main box body, the first power source device is arranged in the precipitation collection chamber, one end of the first circulating water pipe passes through the first through hole and the third through hole once and is connected to the first power source device, a pure water injection pipe is passed through the fourth through hole, a first drain hole connected to the precipitation collection chamber is provided at the bottom of the main box body, and a first valve is provided on the first drain hole;

[0017] A fifth through hole and a sixth through hole connected to the salt water collection chamber are provided on one side wall of the main box body, and the second power source device is arranged in the salt water collection chamber. One end of the second circulating water pipe passes through the second through hole and the fifth through hole once and is connected to the second power source device. A salt water injection pipe is passed through the sixth through hole. A second drain hole connected to the salt water collection chamber is provided at the bottom of the main box body, and a second valve is provided on the second drain hole.

[0018] Furthermore, an upper slide groove and a lower slide groove are provided on two opposite side walls of the main box body, and the length direction of the upper slide groove and the lower slide groove is perpendicular to the length direction of the vertical baffle. The first valve assembly and the second valve assembly include a movable plate, a slider arranged on the movable plate, and an electric push rod connected to the slider and the main box body at both ends respectively. The two ends of the movable plate of the first valve assembly are respectively slidably set on the two upper slide grooves, and the two ends of the movable plate of the second valve assembly are respectively slidably set on the two lower slide grooves.

[0019] Furthermore, the high temperature generating system includes a mounting bracket and a plurality of power-adjustable thermal resistors, the mounting bracket is arranged on the side wall of the main box body, and the plurality of thermal resistors are arranged on the mounting bracket, and / or, the irradiation system includes a plurality of ultraviolet lamps, and the plurality of ultraviolet lamps are arranged at intervals on the support frame.

[0020] Furthermore, the test box includes an inner layer and an outer layer. The inner layer is made of a waterproof and flame-retardant plate material, and the outer layer is made of a heat-insulating material.

[0021] The present invention also provides an asphalt mixture simulation test method. Based on the above-mentioned asphalt mixture simulation test device, the method comprises the following steps:

[0022] Place the prepared asphalt mixture specimen on the placement net;

[0023] Determine the number of cycles and determine the order of multi-factor cyclic effects on asphalt mixture specimens, including precipitation, temperature, ultraviolet light and salt spray;

[0024] For each cycle, determine the cycle start time, cycle time and interval length for each factor;

[0025] According to the number of cycles, the order of the cyclic action of each factor, and the cycle start time, cycle time and interval length of each factor, the precipitation erosion system, irradiation system, high temperature generation system and salt spray corrosion system are controlled to carry out cyclic experiments.

[0026] Compared with the prior art, the beneficial effects of the present invention are as follows: by setting up a precipitation scouring system, an irradiation system, a high temperature generating system and a salt spray corrosion system, the test device for the water-light-temperature-salt cycle of conventional asphalt mixtures is integrated, so that both single-factor cycle tests and multi-factor cycle tests can be realized, and the precipitation scouring system, the irradiation system, the high temperature generating system and the salt spray corrosion system can be controlled by a control system, and the cycle time of each factor can be precisely controlled to realize the automation of the experiment. At the same time, the operational inconvenience brought to the test personnel by manual control can be avoided, thereby avoiding human test errors. At the same time, it can also avoid manually completing the cycle of each asphalt mixture specimen in different single-factor test devices, thereby saving test consumables and reducing manpower waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a structural schematic diagram of the asphalt mixture simulation test device of the present invention;

[0028] Figure 2 It is a structural schematic diagram of a test box in the asphalt mixture simulation test device of the present invention;

[0029] Figure 3 It is a structural schematic diagram of a test box and a precipitation flushing system in the asphalt mixture simulation test device of the present invention;

[0030] Figure 4 It is a structural schematic diagram of a test box and an irradiation system in the asphalt mixture simulation test device of the present invention;

[0031] Figure 5 It is a structural schematic diagram of the test box and the high temperature generating system in the asphalt mixture simulation test device of the present invention;

[0032] Figure 6 It is a structural schematic diagram of a test box and a salt spray corrosion system in the asphalt mixture simulation test device of the present invention;

[0033] Figure 7 It is a schematic diagram of a control system in the asphalt mixture simulation test device of the present invention;

[0034] Figure 8 It is a schematic diagram of time control when the asphalt mixture simulation test device of the present invention performs a multi-factor test.

[0035] In the figure, 1-test box, 11-main box body, 12-box cover, 13-placement net, 14-vertical baffle, 15-first valve, 16-second valve, 17-upper slide, 18-lower slide, 19-box inner layer, 110-box outer layer, 111-support frame, 112-pure water injection pipe, 113-salt water injection pipe, 2-precipitation flushing system, 21-first power source equipment, 22-first circulating water pipe, 23-rectangular branch pipe, 24-shower, 3-irradiation system, 31- Ultraviolet lamp, 4-high temperature generating system, 41-thermal resistor, 5-salt spray corrosion system, 51-second power source equipment, 52-second circulating water pipe, 53-water outlet pipe, 54-atomization component, 6-control system, 61-six-speed conversion switch, 62-controller, 63-duration counter, 64-cycle counter, 65-clock source, 7-first valve assembly, 71-movable plate, 72-slider, 73-electric push rod, 8-second valve assembly, 9-asphalt mixture specimen. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0037] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0040] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0041] See also Figure 1 and Figure 2 , Figure 1 It is a structural schematic diagram of the asphalt mixture simulation test device of the present invention, Figure 2 The schematic diagram of the structure of the test box in the asphalt mixture simulation test device of the present invention. An asphalt mixture simulation test device includes a test box 1, a precipitation scouring system 2, an irradiation system 3, a high temperature generation system 4, a salt spray corrosion system 5 and a control system 6. The test box 1 includes a main box body 11 with an opening at the top and a box cover 12 arranged on the top of the main box body 11. A placement net 13 for placing an asphalt mixture specimen 9 is arranged in the middle of the main box body 11. The precipitation scouring system 2 is detachably arranged at the bottom of the box cover 12 for simulating precipitation. The irradiation system 3 is detachably arranged at the bottom of the box cover 12 for realizing ultraviolet light irradiation. The high temperature generation system 4 is arranged on the inner side wall of the main box body 11 for heating the inner cavity of the test box 1. The salt spray corrosion system 5 is detachably arranged at the bottom of the box cover 12 for spraying salt spray. The control system 6 is electrically connected to the precipitation scouring system 2, the irradiation system 3, the high temperature generation system 4 and the salt spray corrosion system 5 respectively, and is used to control the precipitation scouring system 2, the irradiation system 3, the high temperature generation system 4 and the salt spray corrosion system 5 according to a pre-set program.

[0042] The asphalt mixture simulation test device of the present invention integrates the test device of the water (precipitation scouring test)-light (ultraviolet aging test)-temperature (high temperature aging test)-salt (salt spray corrosion test) cycle action of conventional asphalt mixture by setting a precipitation scouring system 2, an irradiation system 3, a high temperature generation system 4 and a salt spray corrosion system 5, so that both single-factor cycle test and multi-factor cycle test can be realized. The precipitation scouring system 2, the irradiation system 3, the high temperature generation system 4 and the salt spray corrosion system 5 are controlled by a control system 6, and the cycle action time of each factor is accurately controlled to realize the automation of the experiment, and at the same time, the inconvenience of operation brought to the test personnel by human control can be avoided, thereby avoiding human test errors, and at the same time, it can also avoid the manual completion of the cycle of each asphalt mixture specimen 9 in different single-factor test devices, thereby saving test consumables and reducing manpower waste.

[0043] Specifically, the test box 1 has the functions of waterproof, flame retardant and heat preservation, and provides space for the stability test of asphalt mixture. The test box 1 includes a main box 11 and a box cover 12. The box cover 12 is detachable, which is convenient for placing the asphalt mixture on the placement net 13 in the middle position inside the main box 11, and the placement net 13 can also drain the asphalt mixture specimen 9. The placement net 13 can be made of a wire mesh and can be fixed to the side wall of the main box 11 by angle steel, bolts, etc. In one embodiment, the test box 1 includes an inner layer 19 of the box and an outer layer 110 of the box. The inner layer 19 of the box is made of a waterproof and flame retardant plate, and the outer layer 110 of the box is made of a heat preservation material. Preferably, the inner layer 19 of the box is made of a polyvinyl chloride flame retardant board, and the outer layer 110 of the box is made of a polyurethane board. The polyvinyl chloride flame retardant board has the advantages of corrosion resistance, fire resistance and flame retardancy, UV resistance (aging resistance), high hardness, high strength, reliable insulation performance, no water absorption, and no deformation. The polyurethane board has a small thermal conductivity, which is conducive to heat preservation.

[0044] Since a precipitation scouring system 2 and a salt spray corrosion system 5 are provided in the asphalt mixture simulation test device of the present invention, in order to collect pure water and salt water separately, in one embodiment, a vertical baffle 14 is provided at the bottom of the main box body 11, and the vertical baffle 14 separates the bottom of the main box body 11 into a precipitation collection chamber and a salt water collection chamber. A first valve assembly 7 for opening or closing the precipitation collection chamber and a second valve assembly 8 for opening or closing the salt water collection chamber are provided on the inner side wall of the main box body 11. The control system 6 is respectively connected to the first valve assembly 7 and the second valve assembly 8, and is used to control the first valve assembly 7 and the second valve assembly 8 according to a preset program. The vertical baffle 14 can be set in the middle position of the bottom of the main box body 11, and the bottom of the main box body 11 is evenly divided into a precipitation collection chamber and a salt water collection chamber. The precipitation collection chamber is used to collect pure water during the precipitation scour test, and the salt water collection chamber is used to collect salt water during the salt spray corrosion test. That is, during the precipitation scour test, the precipitation collection chamber is opened by the first valve assembly 7, and the salt water collection chamber is closed by the second valve assembly 8; during the salt spray corrosion test, the precipitation collection chamber is closed by the first valve assembly 7, and the salt water collection chamber is opened by the second valve assembly 8.

[0045] In one embodiment, an upper slide groove 17 and a lower slide groove 18 are provided on two opposite side walls of the main box body 11, and the length direction of the upper slide groove 17 and the lower slide groove 18 is perpendicular to the length direction of the vertical baffle 14. The first valve assembly 7 and the second valve assembly 8 include a movable plate 71, a slider 72 arranged on the movable plate 71, and an electric push rod 73 with two ends respectively connected to the slider 72 and the main box body 11. The two ends of the movable plate 71 of the first valve assembly 7 are respectively slidably set on the two upper slide grooves 17, and the two ends of the movable plate 71 of the second valve assembly 8 are respectively slidably set on the two lower slide grooves 18. A double-slide guide rail structure including an upper slide groove 17 and a lower slide groove 18 is respectively arranged on two opposite side walls of the main housing 11. For the first valve assembly 7, the electric push rod 73 drives the slider 72 and the movable plate 71 to move along the upper slide groove 17, thereby moving the movable plate 71 to the top of the precipitation collection chamber to close the precipitation collection chamber, or moving the movable plate 71 to the top of the brine collection chamber to open the precipitation collection chamber; and for the second valve assembly 8, the electric push rod 73 drives the slider 72 and the movable plate 71 to move along the lower slide groove 18, thereby moving the movable plate 71 to the top of the precipitation collection chamber to open the brine collection chamber, or moving the movable plate 71 to the top of the brine collection chamber to close the brine collection chamber. In addition, for ease of arrangement, the electric push rods 73 of the first valve assembly 7 and the second valve assembly 8 are respectively arranged on two opposite side walls of the main housing 11.

[0046] Please refer to Figure 3 , Figure 3The structure diagram of the test box and the precipitation flushing system in the asphalt mixture simulation test device of the present invention. The precipitation flushing system 2 is used to simulate precipitation, so as to realize the precipitation flushing test on the asphalt mixture specimen 9. In one embodiment, a support frame 111 is provided at the bottom of the box cover 12, and the precipitation flushing system 2 includes a first power source device 21, a first circulating water pipe 22, a rectangular branch pipe 23 and a plurality of showers 24. The rectangular branch pipe 23 is detachably arranged on the support frame 111, and a plurality of showers 24 are arranged at intervals on the rectangular branch pipe 23. The water outlet of the shower 24 is provided with an adjustment component for controlling the water output of the shower 24. A first through hole is opened at the upper part of one side wall of the main box body 11. One end of the first circulating water pipe 22 is connected to the rectangular branch pipe 23, and the other end thereof passes through the first through hole and is connected to the first power source device 21. A support frame 111 is provided at the bottom of the box cover 12 to facilitate the detachable installation between the precipitation flushing system 2 and the box cover 12. The first power source device 21 is placed at the pure water source, and the pure water is transported to each shower head 24 through the first circulating water pipe 22 and the rectangular branch pipe 23, and the precipitation flushing test is performed on the asphalt mixture specimen 9 by spraying water through the shower head 24. The regulating component at the water outlet of the shower head 24 can control the water output of the shower head 24 to simulate the amount of precipitation. The regulating component for controlling the water output of the shower head 24 is a prior art and will not be described in detail here. The first power source device 21 can use a submersible water pump.

[0047] Please refer to Figure 6 , Figure 6The structure diagram of the test box and the salt spray corrosion system in the asphalt mixture simulation test device of the present invention. The salt spray corrosion system 5 is used to spray salt spray, so as to realize the salt spray corrosion test of the asphalt mixture specimen 9. In one embodiment, the salt spray corrosion system 5 includes a second power source device 51, a second circulating water pipe 52 and a plurality of water outlet pipes 53. A second through hole is provided on the upper part of one side wall of the main box body 11. The second circulating water pipe 52 is detachably arranged on the support member. One end of the second circulating water pipe 52 passes through the second through hole and is connected to the second power source device 51. The plurality of water outlet pipes 53 are arranged at intervals on the part of the second circulating water pipe 52 located in the test box 1. An atomizing assembly 54 for atomizing salt water is provided on one end of the water outlet pipe 53 away from the second circulating water pipe 52. The second power source device 51 is placed at the salt water source, and the salt water is transported to the atomizing assembly 54 through the second circulating water pipe 52 and the water outlet pipe 53. The salt water is atomized into salt spray by the atomizing assembly 54, so as to perform a salt spray corrosion test on the asphalt mixture specimen 9. The atomizing assembly 54 can adopt an existing atomizing assembly 54, such as an ultrasonic atomizing assembly 54, which mainly includes piezoelectric ceramics, an atomizing chamber with a certain volume, and a fan. When the salt spray corrosion system 5 is working, the high-frequency voltage output device outputs a vibration frequency of more than 1.7MHz, and the piezoelectric ceramics generate high-frequency vibrations under the action of the high-frequency voltage, which excites water and air with a certain pressure to generate cavitation bubbles of particles within 5um. After the cavitation bubbles enter the atomizing chamber, the fan generates a strong wind to diffuse them into the entire test box 1. The second power source device 51 can be a submersible water pump.

[0048] In one embodiment, a third through hole and a fourth through hole connected to the precipitation collection chamber are formed on one side wall of the main box body 11, the first power source device 21 is arranged in the precipitation collection chamber, one end of the first circulating water pipe 22 passes through the first through hole and the third through hole once and is connected to the first power source device 21, a pure water injection pipe 112 is penetrated in the fourth through hole, a first drain hole connected to the precipitation collection chamber is formed at the bottom of the main box body 11, and a first valve 15 is provided on the first drain hole; a fifth through hole and a sixth through hole connected to the brine collection chamber are formed on one side wall of the main box body 11, the second power source device 51 is arranged in the brine collection chamber, one end of the second circulating water pipe 52 passes through the second through hole and the fifth through hole once and is connected to the second power source device 51, a brine injection pipe 113 is penetrated in the sixth through hole, a second drain hole connected to the brine collection chamber is formed at the bottom of the main box body 11, and a second valve 16 is provided on the second drain hole. The first power source device 21 is set in the precipitation collection chamber. Before use, pure water is first injected into the precipitation collection chamber through the pure water injection pipe 112 as a pure water source. When the precipitation flushing test is performed, the first power source device 21 transports the pure water in the precipitation collection chamber to the shower 24, and the precipitation collection chamber collects the pure water falling from the shower 24, so that the pure water in the precipitation collection chamber can be recycled, reducing the consumption of pure water. Similarly, the second power source device 51 is set in the salt water collection chamber. Before use, salt water is first injected into the salt water collection chamber through the salt water injection pipe 113 as a salt water source. When the salt spray corrosion test is performed, the second power source device 51 transports the salt water in the salt water collection chamber to the atomizing component 54, and the salt water collection chamber collects the salt water falling from the atomizing component 54, so that the salt water in the salt water collection chamber can be recycled, reducing the consumption of salt water. After all the tests are completed, the first valve 15 and the second valve 16 can be opened to discharge the pure water in the precipitation collection chamber through the first drain hole, and the salt water in the salt water collection chamber can be discharged through the second drain hole.

[0049] Please refer to Figure 5 , Figure 5The schematic diagram of the structure of the test box and the high temperature generation system in the asphalt mixture simulation test device of the present invention. The high temperature generation system 4 is used to heat the inner cavity of the test box 1, so as to realize the high temperature aging test of the asphalt mixture specimen 9. In one embodiment, the high temperature generation system 4 includes a mounting bracket and a plurality of power-adjustable thermal resistors 41, the mounting bracket is arranged on the side wall of the main box body 11, and the plurality of thermal resistors 41 are arranged on the mounting bracket. The plurality of thermal resistors 41 are arranged on the side wall of the main box body 11 through the mounting bracket, and a distance of more than 10 cm is maintained from the inner wall of the main box body 11 to prevent the thermal resistors 41 from causing thermal deformation of the box body of the main box body 11. When performing the high temperature aging test, the power of the thermal resistors 41 can be adjusted as needed to achieve different target temperatures. Preferably, the number of mounting brackets is two, and the two mounting brackets are respectively arranged on the two opposite inner walls of the main box body 11, and the plurality of thermal resistors 41 are respectively arranged on the two mounting brackets.

[0050] Please refer to Figure 4 , Figure 4 Schematic diagram of the structure of the test box and the irradiation system in the asphalt mixture simulation test device of the present invention. The irradiation system 3 is used to irradiate ultraviolet light, thereby realizing the ultraviolet aging test of the asphalt mixture specimen 9. In one embodiment, the irradiation system 3 includes a plurality of ultraviolet lamp tubes 31, and the plurality of ultraviolet lamp tubes 31 are arranged at intervals on the support frame 111. The number and irradiation power of the ultraviolet lamp tubes 31 should be determined in combination with the sunlight radiation amount in the study area and the bottom area of ​​the test box 1.

[0051] Please refer to Figure 7 , Figure 7The schematic diagram of the control system in the asphalt mixture simulation test device of the present invention. The control system 6 is used to control the first valve assembly 7, the second valve assembly 8, the precipitation scouring system 2, the irradiation system 3, the high temperature generation system 4 and the salt spray corrosion system 5 to perform a cyclic test according to a pre-set program, such as the cyclic action order of each factor, the cyclic start time and cycle time of each factor, and the opening and closing state of the first valve assembly 7 and the second valve assembly 8 in each test. In one embodiment, the control system 6 includes a six-speed conversion switch 61 and six cycle timers, and the cycle timer includes a controller 62 electrically connected to the six-speed conversion switch 61 and a duration counter 63, a cycle count counter 64 and a clock source 65 electrically connected to the controller 62, respectively. The six gears of the six-speed conversion switch 61 are electrically connected to the first valve assembly 7, the second valve assembly 8, the precipitation scouring system 2, the irradiation system 3, the high temperature generation system 4 and the salt spray corrosion system 5. The duration counter 63 counts according to the pulse signal provided by the clock source 65. The cycle timer realizes the function settings of timing, counting and output signal through the PLC control program, specifically including the ability to set the number of cycles, the cycle time, the initial value, the counting function, and the cycle start and stop functions. The six-speed conversion switch 61 realizes the switching operation between the neutral position and the corresponding test system position through the control switch, relay, etc. according to the input signal of the cycle timer.

[0052] Please refer to Figure 8 , Figure 8 The present invention also provides an asphalt mixture simulation test method, based on the above-mentioned asphalt mixture simulation test device, the method comprises the following steps:

[0053] S1, placing the prepared asphalt mixture specimen 9 on the placement net 13;

[0054] S2, determining the number of cycles and determining the multi-factor cyclic action order of the asphalt mixture specimen 9, the factors including precipitation, temperature, ultraviolet light and salt spray;

[0055] S3. For each cycle, determine the cycle start time, cycle time and interval length of each factor;

[0056] S4. According to the number of cycles, the order of the cyclic action of each factor, and the cycle start time, cycle time and interval length of each factor, the precipitation scouring system 2, the irradiation system 3, the high temperature generation system 4 and the salt spray corrosion system 5 are controlled to conduct a cyclic experiment.

[0057] In the above step S1, the prepared asphalt mixture specimens 9 are placed on the placement net 13 in the main box 11 to ensure that each asphalt mixture specimen 9 is directly under the shower 24 of the precipitation flushing system 2, and then the box cover 12 is covered at the top opening of the main box 11.

[0058] In the above step S2, according to actual needs, the multi-factor cyclic action order of the asphalt mixture specimen 9 is determined, such as according to the "water-temperature-light-salt" order or according to the "water-salt-light-temperature" order, and the number of cycles n is determined, that is, the asphalt mixture specimen 9 is tested n times according to the multi-factor cyclic action order.

[0059] In the above step S3, the cycle time t of each factor is first determined. i and the interval duration Δt i~i+1 , i is the code for the order of the cycles of each factor, i = 1, 2, 3, 4. When setting the first cycle, the initial value of the cycle of each factor is t0, that is, the start time t of the single factor test system s (i), then combined with the cycle time t i and the interval duration Δt i~i+1 , determine the cycle start time t of each single factor test system according to the following formula s (i)

[0060]

[0061] The interval length of the single factor cyclic action Δt i , determined by the following formula:

[0062]

[0063] In the formula, m is the number of influencing factors.

[0064] The cycle stop time of a single-factor cycle is the cycle start time plus the cycle time.

[0065] Further, in one embodiment, when the above-mentioned vertical baffle 14, the first valve assembly 7 and the second valve assembly 8 are provided in the test box 1, the opening and closing states of the first valve assembly 7 and the second valve assembly 8 need to be determined. Specifically, in different single-factor tests, the opening and closing states of the first valve assembly 7 and the second valve assembly 8 are as follows:

[0066] During the precipitation flushing test, the first valve assembly 7 is opened to open the precipitation collecting chamber, and the second valve assembly 8 is closed to close the salt water collecting chamber; during the high temperature aging test, the first valve assembly 7 is closed to close the precipitation collecting chamber, and the second valve assembly 8 is closed to close the salt water collecting chamber; during the ultraviolet aging test, the first valve assembly 7 is closed to close the precipitation collecting chamber, and the second valve assembly 8 is closed to close the salt water collecting chamber; during the salt spray corrosion test, the first valve assembly 7 is closed to close the precipitation collecting chamber, and the second valve assembly 8 is opened to open the salt water collecting chamber.

[0067] According to the multi-factor cyclic action sequence of the asphalt mixture specimen 9 and the cyclic start time t s (i) and the cycle stop time, determine the opening time and closing time of the first valve component 7 and the second valve component 8.

[0068] In the above step S4, the control system 6 includes a six-speed conversion switch 61 and six cycle timers. For each multi-factor cycle test, the six cycle timers are started, and a start command is sent through the controller 62. Each controller 62 writes the start time of each cycle of the corresponding single-factor test into the duration counting memory and starts counting. When the value of the duration counter 63 reaches the cycle start time, the output signal of the power supply is triggered, and the six-speed conversion switch 61 receives the signal and turns on the power to start the system for implementing the corresponding factor cycle test. For example, in the cycle timer corresponding to the precipitation flushing system 2, when the value of the duration counter 63 reaches the cycle start time of the precipitation flushing test, the six-speed conversion switch 61 turns on the power of the precipitation flushing system 2, and starts the precipitation flushing system 2 to perform the precipitation flushing test on the asphalt mixture specimen 9.

[0069] Count the running cycle time. After the corresponding cycle timer is started, the duration counter 63 will compare the counter value with the set cycle time after each count. If the value of the duration counter 63 is less than the cycle time, the duration timer continues to count; if the value of the duration counter 63 is equal to the cycle time, the count is reset and the output signal of power disconnection is triggered. When the six-speed conversion switch 61 receives the power disconnection signal from the duration timer, it automatically switches the gear to the idle gear, and the corresponding single-factor action ends.

[0070] Count the interval duration. After the duration counter 63 is reset, the cycle timer starts to count the interval duration. When the value of the duration counter 63 is equal to the interval duration, the count is reset again and the output signal of power on is triggered. When the six-speed conversion switch 61 receives the power on signal from the duration timer, it automatically switches the idle gear to the corresponding single-factor test control gear. In this way, one cycle of the single-factor action is completed and the next cycle is started.

[0071] Determine the number of cycles. When the output signal is triggered twice in succession, the cycle counter increases by 1. When the value of the cycle counter is equal to the set number of cycles, the cycle timer will stop counting. When the cycle timer stops counting, perform specific operations according to specific needs, such as outputting results, issuing alarms, etc.

[0072] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Therefore, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. An asphalt mixture simulation test device, characterized in that: include: A test box, the test box comprising a main box body with an opening at the top and a box cover arranged on the top of the main box body, wherein a placement net for placing asphalt mixture test pieces is arranged in the middle of the main box body; A precipitation flushing system, which is detachably arranged at the bottom of the box cover and is used to simulate precipitation; An irradiation system, which is detachably arranged at the bottom of the box cover and is used to achieve ultraviolet light irradiation; A high temperature generating system, which is arranged on the inner wall of the main box body and is used to heat the inner cavity of the test box; A salt spray corrosion system, which is detachably arranged at the bottom of the box cover and is used for spraying salt spray; A control system, wherein the control system is electrically connected to the precipitation scouring system, the irradiation system, the high temperature generating system and the salt spray corrosion system respectively, and is used to control the precipitation scouring system, the irradiation system, the high temperature generating system and the salt spray corrosion system according to a preset program.

2. The asphalt mixture simulation test device according to claim 1, characterized in that: A vertical baffle is provided at the bottom of the main box body, and the vertical baffle divides the bottom of the main box body into a precipitation collection chamber and a salt water collection chamber. A first valve assembly for opening or closing the precipitation collection chamber and a second valve assembly for opening or closing the salt water collection chamber are provided on the inner side wall of the main box body. The control system is connected to the first valve assembly and the second valve assembly respectively, and is used to control the first valve assembly and the second valve assembly according to a preset program.

3. The asphalt mixture simulation test device according to claim 2, characterized in that: The control system includes a six-speed conversion switch and six cycle timers. The cycle timer includes a controller electrically connected to the six-speed conversion switch and a duration counter, a cycle counter and a clock source electrically connected to the controller respectively. The six gears of the six-speed conversion switch are electrically connected to the first valve assembly, the second valve assembly, the precipitation flushing system, the irradiation system, the high temperature generation system and the salt spray corrosion system respectively.

4. The asphalt mixture simulation test device according to claim 2, characterized in that: A support frame is provided at the bottom of the box cover, and the precipitation flushing system includes a first power source device, a first circulating water pipe, a rectangular branch pipe and a plurality of shower heads. The rectangular branch pipe is detachably arranged on the support frame, and the plurality of shower heads are arranged on the rectangular branch pipe at intervals. An adjusting component for controlling the water output of the shower heads is provided at the shower outlet. A first through hole is provided on the upper part of one side wall of the main box body, and one end of the first circulating water pipe is connected to the rectangular branch pipe, and the other end thereof passes through the first through hole and is connected to the first power source device.

5. The asphalt mixture simulation test device according to claim 4, characterized in that: The salt spray corrosion system includes a second power source device, a second circulating water pipe and a plurality of water outlet pipes. A second through hole is opened on the upper part of one side wall of the main box body. The second circulating water pipe is detachably arranged on the support. One end of the second circulating water pipe passes through the second through hole and is connected to the second power source device. The plurality of water outlet pipes are arranged at intervals on the part of the second circulating water pipe located in the test box. An atomization component for atomizing salt water is provided on the end of the water outlet pipe away from the second circulating water pipe.

6. The asphalt mixture simulation test device according to claim 5, characterized in that: A third through hole and a fourth through hole communicating with the precipitation collection chamber are provided on one side wall of the main box body, the first power source device is arranged in the precipitation collection chamber, one end of the first circulating water pipe passes through the first through hole and the third through hole once and is connected to the first power source device, a pure water injection pipe is passed through the fourth through hole, a first drain hole communicating with the precipitation collection chamber is provided at the bottom of the main box body, and a first valve is provided on the first drain hole; A fifth through hole and a sixth through hole connected to the brine collection chamber are provided on one side wall of the main box body, the second power source device is arranged in the brine collection chamber, one end of the second circulating water pipe passes through the second through hole and the fifth through hole once and is connected to the second power source device, a brine injection pipeline is passed through the sixth through hole, a second drain hole connected to the brine collection chamber is provided at the bottom of the main box body, and a second valve is provided on the second drain hole.

7. The asphalt mixture simulation test device according to claim 2, characterized in that: An upper slide groove and a lower slide groove are provided on two opposite side walls of the main box body, and the length direction of the upper slide groove and the lower slide groove is perpendicular to the length direction of the vertical baffle. The first valve assembly and the second valve assembly include a movable plate, a slider arranged on the movable plate, and an electric push rod connected to the slider and the main box body at both ends. The two ends of the movable plate of the first valve assembly are respectively slidably arranged on the two upper slide grooves, and the two ends of the movable plate of the second valve assembly are respectively slidably arranged on the two lower slide grooves.

8. The asphalt mixture simulation test device according to claim 1, characterized in that: The high temperature generating system comprises a mounting bracket and a plurality of power-adjustable thermal resistors, wherein the mounting bracket is arranged on the side wall of the main box body, and the plurality of thermal resistors are arranged on the mounting bracket, and / or the irradiation system comprises a plurality of ultraviolet lamps, and the plurality of ultraviolet lamps are arranged at intervals on the supporting frame.

9. The asphalt mixture simulation test device according to claim 1, characterized in that: The test box comprises an inner layer and an outer layer. The inner layer is made of a waterproof and flame-retardant plate material, and the outer layer is made of a heat-insulating material.

10. A method for simulating an asphalt mixture test, characterized in that: Based on the asphalt mixture simulation test device according to any one of claims 1 to 9, the method comprises the following steps: Place the prepared asphalt mixture specimen on the placement net; Determine the number of cycles and determine the order of cyclic action of multiple factors on asphalt mixture specimens, the factors including precipitation, temperature, ultraviolet light and salt spray; For each cycle, determine the cycle start time, cycle time and interval length for each factor; According to the number of cycles, the order of the cyclic action of each factor, and the cycle start time, cycle time and interval length of each factor, the precipitation erosion system, irradiation system, high temperature generation system and salt spray corrosion system are controlled to carry out cyclic experiments.

Citation Information

Patent Citations

  • Mineral spring water bottle fragment flotation machine

    CN107413533A

  • Test device and method for dynamically simulating environmental erosion of windward surface and rotors of airplane

    CN109823567A

  • Multi-field coupling erosion simulation box for asphalt mixture and method

    CN110702596A

  • Test device for simulating acid rain corrosion of asphalt mixture

    CN110779857A

  • Transport cart capable of preventing waste residues of lead storage batteries from being scattered

    CN116279067A