Production operation optimization strategy generation method and device and terminal equipment
By obtaining historical production information and generating optimization strategies, the problem of low error operation monitoring efficiency and accuracy in industrial production operations is solved, the efficiency and quality of production operations are improved, and reliability is enhanced.
Patent Information
- Application Number
- CN202411022254.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-15
AI Technical Summary
In the prior art, the monitoring efficiency and accuracy of wrong operations in industrial production operations are low, resulting in low production efficiency and quality, and poor optimization results.
By obtaining historical production information, determining problem production stations, and generating target optimization strategies from historical operation records, we can optimize production operation processes and improve operation accuracy and efficiency.
It improves the accuracy and optimization effect of production stations with operational problems, improves the efficiency and quality of production operations, and enhances the reliability of production operations.
Smart Images

Figure CN118963270A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of industrial control technology, and in particular, relates to a method, device and terminal equipment for generating a production operation optimization strategy. Background Art
[0002] With the increasing development of automation technology and computer technology, the degree of automation in industrial production has also been improved. In the process of automated production, the same production project often involves multiple production operations, and each production operation is carried out in a production sequence.
[0003] Usually, each production operation is completed by at least one production station, and each production station includes at least one production operation, so there will be a situation where the operation sequence is different each time the production operation is performed. Since the time required for each production operation is different, the time required for different operation sequences will also be different, which will reduce the quality and efficiency of the production operation. Based on this, in order to improve the quality and efficiency of the production operation, a corresponding operation standard will be formulated for each production operation.
[0004] Due to the reasons of wrong operation, such as human wrong operation and / or equipment wrong operation, the production may not be carried out according to the corresponding operation standards, which reduces the efficiency and quality of production operations and has the problem of low reliability of production operations. Based on this, the wrong operation can be checked by manual monitoring at present, but the efficiency of manual checking is low and it is affected by human subjective factors, resulting in low accuracy of checking wrong operation, which in turn reduces the effect of optimizing the wrong operation. Summary of the invention
[0005] The embodiments of the present application provide a method, apparatus and terminal device for generating a production operation optimization strategy, which are intended to solve the problems of low efficiency and accuracy in monitoring erroneous operations in existing production stations and poor optimization effect of erroneous operations.
[0006] In a first aspect, an embodiment of the present application provides a method for generating a production operation optimization strategy, comprising:
[0007] Acquire historical production information, where the historical production information includes production information involved in all production stations during the execution of production operations;
[0008] Determine a problematic production station according to the historical production information; the problematic production station is a production station with an operation problem;
[0009] Acquire the historical operation record corresponding to the problematic production station from the historical production information;
[0010] Based on the historical operation records, a target optimization strategy is generated to optimize the production operation based on the target optimization strategy.
[0011] In a possible implementation of the first aspect, determining the problematic production station according to the historical production information includes:
[0012] Determine total duration data of each production station according to the historical production information, wherein the total duration data is the duration of the production station performing the production operation;
[0013] Determine the time distribution information of each production station according to the total time data;
[0014] Based on the duration distribution information, a problematic production station is determined.
[0015] In a possible implementation manner of the first aspect, the duration distribution information includes duration kurtosis information and duration standard deviation information, and determining the problematic production station based on the duration distribution information includes:
[0016] Performing weighted calculation on the duration kurtosis information and the duration standard deviation information to generate standardized evaluation information;
[0017] According to the standardized evaluation information, problematic production stations are identified.
[0018] In a possible implementation of the first aspect, the historical operation record includes operation information within a preset time period, the operation information includes operation sequence information and operation duration information, and generating a target optimization strategy based on the historical operation record includes:
[0019] Determine standard operation information, and determine abnormal operation information from all the operation information based on the operation duration information, the operation sequence information and the standard operation information;
[0020] According to the standard operation information, a target optimization strategy is generated to optimize the abnormal operation information based on the target optimization strategy.
[0021] In a possible implementation manner of the first aspect, generating a target optimization strategy according to the standard operation information includes:
[0022] Determine the operation accuracy rate, human operation error rate, and equipment operation error rate according to the abnormal operation information;
[0023] A target optimization strategy is generated according to the standard operation information, the operation accuracy rate, the human operation error rate and the equipment operation error rate.
[0024] In a possible implementation manner of the first aspect, generating a target optimization strategy according to the standard operation information, the operation accuracy rate, the human operation error rate, and the device operation error rate includes:
[0025] Determining whether a human operation abnormality condition is triggered according to the operation accuracy rate and the human operation error rate, and determining whether a device operation abnormality condition is triggered according to the operation accuracy rate and the device operation error rate;
[0026] When the abnormal human operation condition is triggered, determining the human operation standard related to the human operation in the standard operation information, and generating a first target optimization strategy based on the human operation standard, and / or, when the abnormal device operation condition is triggered, determining the equipment operation standard related to the equipment operation in the standard operation information, and generating a second target optimization strategy based on the equipment operation standard;
[0027] Among them, the first target optimization strategy is used to optimize the operation information related to human in the abnormal operation information, and the second target optimization strategy is used to optimize the operation information related to equipment in the abnormal operation information.
[0028] In a possible implementation manner of the first aspect, the operation sequence information includes at least one operation sequence, and the determination of standard operation information includes:
[0029] Determine the correct operating information within a preset time period;
[0030] Determine, according to the correct operation information, an operation time interval between each production operation in the correct operation information;
[0031] Standard operation information is determined according to the correct operation information and the operation time interval.
[0032] In a second aspect, an embodiment of the present application provides a device for generating a production operation optimization strategy, including:
[0033] An acquisition module, used to acquire historical production information, and to acquire historical operation records corresponding to the problematic production station from the historical production information, wherein the historical production information includes production information involved in the process of executing production operations at all production stations;
[0034] The determination module is used to determine a problematic production station according to the historical production information; the problematic production station is a production station with an operation problem;
[0035] A generation module, used to generate a target optimization strategy based on the historical operation record, so as to optimize the production operation based on the target optimization strategy
[0036] In a third aspect, an embodiment of the present application provides a terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, a method for generating a production operation optimization strategy as provided in the first aspect above is implemented.
[0037] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method for generating a production operation optimization strategy provided in the first aspect above is implemented.
[0038] It can be understood that the beneficial effects of the second to fourth aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here.
[0039] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0040] In an embodiment of the present application, by acquiring historical production information, the historical production information includes the production information involved in the execution of production operations by all production stations, and then based on the historical production information, the problem production station can be determined, and the problem production station is a production station with operational problems, which improves the accuracy of determining the production station with operational problems, and from the historical production information, the historical operation records corresponding to the problem production station are determined, so as to generate a target optimization strategy based on the historical operation records, and optimize the production operation based on the target optimization strategy, which can improve the effect of optimizing the production station with operational problems, thereby improving the efficiency and quality of production operations, and improving the reliability of production operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 It is a schematic diagram of a production process provided by an embodiment of the present application;
[0042] Figure 2 This is a flowchart of a method for generating a production operation optimization strategy provided by an embodiment of the present application;
[0043] Figure 3 This is a schematic diagram of the format of a data table of production information provided by an embodiment of the present application;
[0044] Figure 4 It is a schematic diagram of the format of another data table of production information provided by an embodiment of the present application;
[0045] Figure 5 It is a flowchart of the steps of another method for generating a production operation optimization strategy provided by an embodiment of the present application;
[0046] Figure 6 It is a schematic diagram of an example of a method for generating a production operation optimization strategy provided by an embodiment of the present application;
[0047] Figure 7 It is a structural schematic diagram of a device for generating a production operation optimization strategy provided by an embodiment of the present application;
[0048] Figure 8 It is a structural block diagram of a terminal device provided in one embodiment of the present application. DETAILED DESCRIPTION
[0049] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0050] With the development and popularization of automation technology, the degree of automation in the industrial manufacturing industry is getting higher and higher. For example, in the vehicle manufacturing industry, automation technology can be used to perform semi-automatic or fully automated assembly of automotive parts. In the electronic product manufacturing industry, automation technology can be used to perform semi-automatic or fully automated assembly of electronic components.
[0051] In the vehicle manufacturing industry, different models are often involved in manufacturing, that is, different production projects are involved, and multiple production operations are involved in the process of manufacturing vehicles, such as assembly, welding, painting, etc. The completion of production operations requires the execution of multiple production operations, which need to be performed in production stations. Production stations are work locations or places set up in automated production to perform specific production operations.
[0052] Specifically, different vehicle models may involve different production operations. For example, the assembly operation of vehicle model A may be different from that of vehicle model B. Vehicle model A needs to perform assembly operations a1, a2, and a3 to complete the assembly operation, while vehicle model B needs to perform assembly operation b1 to complete the assembly operation. The parts involved in assembly operation a1 may be different from the parts involved in assembly operation b1.
[0053] Exemplarily, the assembly work for vehicle type A includes production operations for assembling different parts of the vehicle, and different parts require different parts for assembly, which will involve different assembly operations, namely, assembly operation a1, assembly operation a2, and assembly operation a3.
[0054] See also Figure 1 , Figure 1 This application shows a schematic diagram of a production process provided by an embodiment of the present application, such as Figure 1As shown, the production operation may be a production operation for a vehicle with a model number of p and a vehicle identification number of 001. The vehicle may automatically move to the corresponding production station TR1-001L and record the time when the vehicle enters the production station, such as 2024-04-26:18:00:00. The production station TR1-001L may perform production operations for the vehicle and record the execution time of each production operation. For example, the execution time of production operation 1 is 2024-04-26:18:00:04, and the production operation 1 is 2024-04-26:18:00:04. The execution time of operation 2 is 2024-04-26:18:00:10, the execution time of production operation 3 is 2024-04-26:18:00:48, and the completion time of the last production operation is recorded. For example, production operation 3 can be the last production operation, and the completion time of production operation 3 is 2024-04-26:18:00:54. After production station TR1-001L completes all its production operations for the vehicle, it can control the vehicle to move to the next production station.
[0055] Generally, production operations can be performed by equipment and / or personnel in a production station, and since each production operation involves one or more production operations, the corresponding production operations can be performed by one or more production stations to improve the execution efficiency of the production operations. However, when a production station performs multiple production operations, there will be different operation sequences. Since different production operations require different times, different operation sequences will require different times, and different operation sequences will affect the quality of completing the production operation, thereby reducing the quality and efficiency of the production operation.
[0056] Based on this, in order to improve the quality and efficiency of production operations, corresponding operation standards will be formulated for each production operation, so that the production operation can be completed in accordance with the operation sequence of the operation standard. In the process of performing production operations according to the operation standards, there will be erroneous operations, which are production operations that do not meet the operation standards, such as human erroneous operations and equipment-related erroneous operations. Erroneous operations will reduce the quality and efficiency of production operations, resulting in low reliability of production operations.
[0057] At present, in order to reduce the occurrence of erroneous operations, relevant personnel can generally be arranged to monitor the production stations to check for possible erroneous operations in each production station. However, manual checking of erroneous operations often fails to detect erroneous operations in a timely manner, is inefficient, and is easily affected by human subjective factors, resulting in low accuracy in checking erroneous operations. For example, in order to avoid being discovered, an employee at a production station completes the production operation according to the operating standards when checking for erroneous operations, and does not complete the production operation according to the operating standards when not checking for erroneous operations. In this case, the human erroneous operations in the production station cannot be discovered in a timely manner.
[0058] Based on this, the present application provides a method for generating a production operation optimization strategy, by acquiring historical production information, the historical production information includes the production information involved in the execution of production operations by all production stations. Therefore, based on the historical production information, the problem production station can be determined, and the problem production station is a production station with operational problems, which improves the accuracy of determining the production station with operational problems, and from the historical production information, the historical operation records corresponding to the problem production station are determined, so as to generate a target optimization strategy based on the historical operation records, and optimize the production operation based on the target optimization strategy, which can improve the effect of optimizing the production station with operational problems, thereby improving the efficiency and quality of the production operation, and improving the reliability of the production operation.
[0059] See also Figure 2 , Figure 2 A flowchart of a method for generating a production operation optimization strategy provided by an embodiment of the present application is shown, which may specifically include the following steps:
[0060] Step 201, obtaining historical production information.
[0061] Among them, the historical production information may include the production information involved in the process of all production stations performing production operations. The production station may be a work position or place set up for performing specific production operations in automated production. The production operation may be each link involved in the production of products, including the processing, assembly, assembly, and testing of various parts. The production operation may be the operation required to achieve each link. The production information may be information related to the production operation. The production information may include operation information of the production operation, component identification information of the parts, equipment identification information of the production equipment, production date, and other information. The historical production information may include historical operation records. The historical operation records may include operation information within a preset time period. The operation information may include operation type information, operation sequence information, and operation duration information. The operation type information may be the operation type of the production operation, which may specifically correspond to each link involved in the production of products, such as the processing operation type for processing parts, the assembly operation type for assembling parts, etc. The operation sequence information may be the operation sequence of each production operation in the production operation. The operation sequence information may include at least one operation sequence. The operation sequence may be expressed as the order in which each production operation is executed. The operation duration information may be the duration of each production operation.
[0062] In the process of executing a certain production job, different production operations can be performed through different production stations, and the production information of all production operations in each production station can be recorded, such as recording the time of executing a certain production operation, recording the component identification information of the parts involved in executing a certain production operation, recording the equipment identification information of the equipment used to perform a certain production operation, etc., so that the production information of each production station in any time period can be obtained, and the production information of all production stations can be classified according to the type of production items, so that all classified production information can be stored in a database, and then when the production operation needs to be optimized or the production station needs to be monitored, the production information within a preset time period can be called from the database, which is the historical production information.
[0063] In actual applications, corresponding production employees can be configured in the production station, and the production employees can operate the automated equipment in the production station to perform production operations. Each time a production operation is performed, the operation information of the production operation, the equipment identification information of the automated equipment used, and the component identification information of the parts involved in the production operation are recorded, thereby obtaining the production information of each production station each time a production operation is performed.
[0064] For example, when the production operation is to tighten bolt A at a specific part of a vehicle, the production staff can input the operation information as the operation information for tightening bolt A, and input the parts involved in the production operation as bolt A and its part identification information as T0001, and input the automated equipment used to tighten bolt A as tightening gun a.
[0065] Exemplarily, parts and components may be configured with barcodes containing their part identification information, and equipment used to perform production operations may also be configured with barcodes containing their equipment identification information, thereby enabling employees to select operation information corresponding to the currently performed production operation each time they perform a production operation, and scan the barcodes of the parts and components and the barcodes of the equipment in sequence to read the part identification information of the parts and the equipment identification information of the equipment.
[0066] As an example, in the vehicle manufacturing industry, the production information of all production stations in the general assembly workshop (GA) and the body shop (BS) can be recorded, and the production information can be pre-processed through the relational database management system (Postgre Structured Query Language, PostgreSQL), such as data extraction, data conversion, data loading (Extract Transformation Load, ETL) and other operations. The processed production information can be synchronized to the data warehouse (Operational Data Store, ODS) through Change Data Capture (CDC), and stored in the format of the data table in the manufacturing operation platform (MOP) and stored in the local database.
[0067] See also Figure 3 , Figure 3 A schematic diagram of a data table format of production information provided in an embodiment of the present application is shown in FIG. Figure 3 As shown, the data table is used to store production information of different production stations, which may include the station identification of the production station, the vehicle identification, the total time of the production operation, and the time when the first production operation is completed. For example, the object of the production operation performed by the production station with the station identification F2_GA-TR1_001 is vehicle 001, the total time of executing all production operations is 50 seconds, and the completion time of the first production operation is 2024-04-26:18:00:04.
[0068] See also Figure 4 , Figure 4A schematic diagram of another format of a data table of production information provided in an embodiment of the present application is shown in FIG. Figure 4 As shown, the data table is used to store the production information of each production operation in the production station, which may include the vehicle model, the identification of the production station, the vehicle identification, the type of production operation, the description of the production operation, whether the production operation is successful, the completion time of the production operation, and the time difference with the first production operation. For example, a data table stores the production information of the production station with the station identification F2_GA-TR1_001 in the production project for the vehicle model pegsus, that is, it stores the operation information of each production operation in the production station, wherein the object of the production operation performed by the production station is vehicle 001, and the first production operation is recorded as a scanning operation, specifically an operation of scanning the front body controller, and the completion time of the production operation is 2024-04-26:18:00:04, and the completion time of the first production operation is 2024-04-26:18:00:04, and the time difference with the first production operation is 0 seconds, the production operation has been successfully operated, and the second production operation is a scanning operation , specifically, it is an operation of scanning the right wing body controller, and the completion time of this production operation is 2024-04-26:18:00:10, and the completion time of the first production operation is 2024-04-26:18:00:04, and the time difference with the first production operation is 6 seconds. This production operation has been successfully operated, and the third production operation is a tightening operation, specifically, it is an operation of tightening the bolt model T0001, and the completion time of this production operation is 2024-04-26:18:00:54, and the completion time of the first production operation is 2024-04-26:18:00:04, and the time difference with the first production operation is 50 seconds. This production operation has been successfully operated.
[0069] In practical applications, the production information can be preprocessed and the processed production information can be stored in the format of the above-mentioned data table, that is, the information can be stored in the format of a data table for storing production information of the production station based on the production station identification, vehicle identification, total time consumed by the production operation, execution time of the first production operation and other information; and the information can be stored in the format of a data table for storing production information of each production operation in the production station based on the vehicle model, production station identification, vehicle identification, type of production operation, description of the production operation, whether the production operation is successful, completion time of the production operation, time difference with the first production operation and other information, and then historical production information can be called from the local database when it is necessary to optimize the production operation.
[0070] Step 202, determining the problematic production station based on historical production information.
[0071] The problematic production station may be a production station with operation problems, and the operation problems may include but are not limited to problems related to the order in which the operation sequence of the production operation is executed and problems related to the operation time consumption of the production operation.
[0072] After obtaining the historical production information, the production operations performed by each production station within a preset time period can be determined based on the historical production information, and the order in which each production station performs the production operations can be determined, as well as the operation time of each production operation.
[0073] In actual applications, since historical production information can include the production information of each production station within a preset time period, and the production information can include the completion time of each production operation performed by the production station, the sequence of each production operation can be determined based on the completion time of each production operation, that is, the sequence of production operations in the production station, that is, the operation sequence information of each production operation is obtained.
[0074] For example, the historical production information may be the production information of each production station in the past 7 days, and the production information may include the production information of production station a on 2024-04-26, including production operation 1, production operation 2 and production operation 3, and the completion time of production operation 1 may be 2024-04-26:18:00:04, the completion time of production operation 3 may be 2024-04-26:18:00:10, and the completion time of production operation 2 may be 2024-04-26:18:00:54, and then the order of production operations in the production station can be determined based on the completion time of production operations 1 to 3, that is, the first operation executed is production operation 1, the second operation executed is production operation 3, and the third operation executed is production operation 2.
[0075] After obtaining the operation sequence information and operation duration of each production operation in the production station, the production stations having problems related to the order in which the operation sequences of the production operations are executed and / or having problems related to the operation duration of the production operations can be determined from all the production stations as problematic production stations based on the operation sequence information and operation duration of each production operation.
[0076] In an embodiment of the present application, step 202 may include steps 2021 to 2023:
[0077] Step 2021, determine the total duration data of each production station based on historical production information.
[0078] The total duration data may be the duration for a production station to perform a production operation, that is, the total time consumed by the production station to perform all production operations.
[0079] After obtaining the historical production information, the operation time of all production operations in each production station can be determined from the historical production information, and then the total time taken for each production station to perform all production operations can be determined based on the operation time of all production operations, that is, the total duration data.
[0080] In actual applications, since historical production information can include the production information of each production station within a preset time period, and the production information can include the completion time of each production operation performed by the production station, the time difference between two adjacent production operations can be determined based on the completion time of each production operation and the time when the object that needs to perform the production operation enters the production station, that is, the operation time of the previous production operation, and the operation time of all production operations can be obtained.
[0081] For example, the completion time of production operation 1 may be 2024-04-26:18:00:04, the completion time of production operation 3 may be 2024-04-26:18:00:10, the completion time of production operation 2 may be 2024-04-26:18:00:54, and the time when the object that needs to perform the production operation enters the production station may be 2024-04-26:18:00:00, and it can be determined that the operation time of production operation 1 is 4 seconds, the operation time of production operation 2 is 44 seconds, and the operation time of production operation 3 is 6 seconds, and the total time of all production operations in the production station may be 54 seconds.
[0082] Exemplarily, since the object that needs to perform the production operation enters the production station, it does not mean that it starts to perform the first production operation, so the operation time of the first production operation is less accurate. Based on this, the time difference between the completion time of each production operation and the completion time of the first production operation can also be recorded as the operation time. For example, the completion time of production operation 1 can be 2024-04-26:18:00:04, the completion time of production operation 3 can be 2024-04-26:18:00:10, and the completion time of production operation 2 can be 2024-04-26:18:00:54, then the operation time of production operation 1 is 0 seconds, the operation time of production operation 2 is 50 seconds, and the operation time of production operation 3 is 6 seconds, and the total time of all production operations in the production station can be 50 seconds.
[0083] It should be understood that the operation sequence information of each production operation in the production station is the sequence between the production operations in the same production operation. Similarly, the operation time of each production operation is the time difference between the production operations in the same production operation.
[0084] Step 2022: Determine the duration distribution information of each production station based on the total duration data.
[0085] Among them, the duration distribution information can be the distribution of the total duration data within a preset time period. The duration distribution information can include duration kurtosis information and duration standard deviation information. The duration kurtosis information can be used to describe the steepness of the distribution of the total duration data within the preset time period, and the duration standard deviation information can be used to describe the degree of discreteness of the distribution of the total duration data within the preset time period.
[0086] After obtaining the total duration data, the total duration data of each production station can be distributed and analyzed in the form of a histogram to obtain the duration distribution information of each production station, that is, the duration kurtosis information and duration standard deviation information of each production station.
[0087] Step 2023, determining the problematic production station based on the duration distribution information.
[0088] After obtaining the duration distribution information, it can be determined based on the duration distribution information that a production station with a greater degree of dispersion and a smaller degree of steepness in the total duration data distribution is a problematic production station.
[0089] It should be understood that due to human factors and / or equipment factors, the total duration data for each production operation will be different, and there will be data fluctuations within a certain range. However, if each production operation is performed in accordance with the corresponding operating standards, the distribution of the total duration data within the preset time will be normally distributed.
[0090] Based on this, the steepness of the total time data distribution can be evaluated by calculating the duration kurtosis information of the total time data distribution, and the dispersion of the total time data distribution can be evaluated by calculating the duration standard deviation information, and then based on the steepness and dispersion of the total time data distribution, it can be determined whether the distribution of the total time data of the production station is a normal distribution, and the production station whose distribution of the total time data does not match the normal distribution is determined to be a problem production station. For example, the approximation between the distribution of the total time data in the production station and the normal distribution can be determined, and when the approximation is greater than a preset approximation threshold, the distribution of the total time data is determined to be a normal distribution, and when the approximation is less than or equal to the preset approximation threshold, it can be determined that the distribution of the total time data does not match the normal distribution, and the production station is determined to be a problem production station.
[0091] In an embodiment of the present application, step 2023 may be performed in the following manner:
[0092] The duration kurtosis information and duration standard deviation information are weighted and calculated to generate standardized evaluation information. The problematic production station is determined based on the standardized evaluation information.
[0093] The standardized evaluation information may be used to evaluate the degree of standardization of the execution of the production operation, that is, to evaluate the deviation between the execution of the production operation and the corresponding operation standard.
[0094] After obtaining the duration kurtosis information and the duration standard deviation information, the weight information corresponding to the duration kurtosis information and the weight information corresponding to the duration standard deviation information can be determined, and then the duration kurtosis information and the duration standard deviation information can be weighted calculated based on the weight information corresponding to the duration kurtosis information and the weight information corresponding to the duration standard deviation information to generate standardized evaluation information.
[0095] In practical applications, the time kurtosis information and time standard deviation information of all production stations can be processed in a unified dimension by normalization.
[0096] Specifically, the Min-Max normalization method can be used to unify the dimensions. The Min-Max normalization method can be the following formula:
[0097]
[0098] Among them, when the time length kurtosis information is processed with a unified dimension, x can be the time length kurtosis information, x` can be the time length kurtosis information after processing, min(x) can be the smallest time length kurtosis information among all production stations, and max(x) can be the largest time length kurtosis information among all production stations. When the time length standard deviation information is processed with a unified dimension, x can be the time length standard deviation information, x` can be the time length standard deviation information after processing, min(x) can be the smallest time length standard deviation information among all production stations, and max(x) can be the largest time length standard deviation information among all production stations.
[0099] In addition, the dimensions can be unified by using the Z-score standardization method. The Z-score standardization method can be the following formula:
[0100]
[0101] When the duration kurtosis information is processed in a unified dimension, x can be the duration kurtosis information, x new can be the processed duration kurtosis information, μ can be the average value of all duration kurtosis information, σ can be the standard deviation of all duration kurtosis information, and when the duration standard deviation information is processed in a unified dimension, x can be the duration standard deviation information, x new It can be the processed duration standard deviation information, μ can be the average value of all duration standard deviation information, and σ can be the standard deviation of all duration standard deviation information.
[0102] After the duration kurtosis information and the duration standard deviation information are uniformly dimensionalized, the weight information corresponding to the duration kurtosis information and the weight information corresponding to the duration standard deviation information can be determined based on the standardization effect, and the duration kurtosis information and the duration standard deviation information can be weightedly calculated based on the weight information corresponding to the duration kurtosis information and the weight information corresponding to the duration standard deviation information to generate standardized evaluation information.
[0103] Specifically, the following formula can be used to generate standardized evaluation information:
[0104] Score=x1*std+x2*kurt
[0105] Among them, Score can be standardized evaluation information, std can be duration standard deviation information, kurt can be duration kurtosis information, x1 can be weight information corresponding to duration standard deviation information, and x2 can be weight information corresponding to duration kurtosis information.
[0106] In addition, since the data distribution with greater steepness and smaller discreteness has smaller deviation from the normal distribution, that is, the data distribution with greater time kurtosis information and smaller time standard deviation information has smaller deviation from the normal distribution, the difference between the time kurtosis information and the time standard deviation information can be determined after unifying the dimensions, and based on the difference between the time kurtosis information and the time standard deviation information, standardized evaluation information can be generated.
[0107] Specifically, the following formula can be used to generate standardized evaluation information:
[0108] Score=-std+kurt
[0109] Among them, the weight information x1 corresponding to the duration standard deviation information can take a value of -1, and the weight information x2 corresponding to the duration kurtosis information can take a value of 1.
[0110] After obtaining the standardized evaluation information of each production station, all the standardized evaluation information may be sorted according to the size of the standardized evaluation information, and then the problematic production station may be determined from all the production stations based on the sorting of the standardized evaluation information.
[0111] In practical applications, the standardized evaluation information of all production stations can be normalized and mapped to a specific interval [a, b], such as an interval from 0 to 100.
[0112] Specifically, when the Min-Max normalization method is used to unify the dimensions, the following formula can be used to normalize the standardized evaluation information of all production stations:
[0113] norY=a+k*(Y-Min)
[0114]
[0115] Among them, Y can be the standardized evaluation information, norY can be the normalized standardized evaluation information, a can be the minimum value of a specific interval, b can be the maximum value of a specific interval, k can be expressed as the normalization coefficient, Max can be the largest standardized evaluation information among all standardized evaluation information, and Max can be the smallest standardized evaluation information among all standardized evaluation information.
[0116] When the Z-score standardization method is used to unify the dimensions, the following formula can be used to normalize the standardized evaluation information of all production stations:
[0117] Score=50+Score*10
[0118] Among them, Score can be standardized evaluation information.
[0119] It should be understood that when executing a production operation, if it is not performed in accordance with the corresponding operating standards, that is, the production operation is not completed in accordance with the operating sequence of the operating standards, the total time required to complete all production operations will be different from the total time required to complete all production operations in accordance with the operating sequence of the operating standards, and / or the total time required for each production operation will be different from the total time required for each production operation completed in accordance with the operating sequence of the operating standards. Therefore, the problem production station can be determined based on the distribution of the total duration data of each production station, that is, the production station whose total duration data is significantly different from the total duration executed in accordance with the operating standards is determined as the problem production station.
[0120] In a specific implementation, the production station corresponding to the smallest standardized evaluation information can be determined as the problem production station; all standardized evaluation information can also be sorted from small to large, and a preset proportion of production stations can be determined as problem production stations, such as determining the top 10% of production stations as problem production stations, and the preset proportion can be customized by the user; the production station whose standardized evaluation information is less than a preset evaluation threshold can also be determined as a problem production station, and its preset evaluation threshold can be customized by the user.
[0121] Step 203: Obtain historical operation records corresponding to the problematic production station from historical production information.
[0122] After the problem production station is determined, the historical operation records for the problem production station can be obtained from the historical production information, that is, the operation information of each production operation of the problem production station within a preset time period can be obtained.
[0123] Step 204: Generate a target optimization strategy based on the historical operation records to optimize the production operation based on the target optimization strategy.
[0124] Among them, the target optimization strategy can be used to optimize production operations. The target optimization strategy may include but is not limited to strategies for optimizing the operation sequence of production operations, strategies for optimizing production equipment, strategies for operational training of production employees, etc.
[0125] After obtaining the historical operation records of the problematic production station, the operation information of each production operation of the problematic production station within a preset time period may be determined based on the historical operation records.
[0126] In practical applications, since the historical operation record includes operation information within a preset time period, the preset time period can be divided into at least two intervals according to a fixed time interval, and the operation information of each interval can be determined. For example, the historical operation record may include operation information within the past 7 days, and the past 7 days can be divided into 7 intervals according to a 24-hour time interval.
[0127] After obtaining the operation information of each production operation of the problem production station within a preset time period, the corresponding operation standard of each production operation in the problem production station can be determined, and the operation information of each production operation can be evaluated based on the corresponding operation standard, so as to determine the problematic production operation from all production operations, that is, determine the production operation whose operation sequence does not meet the operation standard, and / or determine the production operation whose operation time does not meet the operation standard.
[0128] In practical applications, the operation time of all production operations in each interval can be determined based on the operation time information of each interval, and the operation time of each interval can be compared with the total time corresponding to the operation standard to obtain the interval with the largest difference between the operation time and the total time corresponding to the operation standard. In this way, it can be determined that there are production operations that need to be optimized in the interval, and the operation standards corresponding to the production operations in the interval can be determined, so as to evaluate each production operation in the interval based on the corresponding operation standards.
[0129] In a specific implementation, the operation sequence of the operation standard can be determined, and based on the operation sequence of the operation standard, the execution sequence of each production operation can be evaluated to see whether it is correct, and then it can be determined that there are production operations with incorrect execution sequence, and the reasons for the incorrect execution sequence of production operations can be determined, such as human factors or equipment factors. Generally, the reasons for the incorrect execution sequence of production operations are usually human factors, that is, caused by incorrect operations of production employees, and then a target optimization strategy for optimizing the production employees' execution of production operations can be generated, such as generating a training plan to guide production employees to perform production operations. If the reason for the incorrect execution sequence of production operations is equipment factors, a target optimization strategy for optimizing the production equipment's execution of production operations can be generated, such as adjusting the execution sequence of production equipment's execution of production operations to the operation sequence of the operation standard.
[0130] At the same time, the total duration of the operation standard can also be determined, and based on the total duration of the operation standard, it can be evaluated whether the operation time of each production operation is reasonable, that is, the production operation whose operation time is greater than the total duration of the operation standard is determined to be an unreasonable production operation, and the reason why the operation time of the production operation is greater than the total duration of the operation standard can be determined, such as human factors or equipment factors. When the reason why the operation time of the production operation is greater than the total duration of the operation standard is human factors, that is, the production staff takes too long to perform the production operation, then a target optimization strategy for optimizing the production staff to perform the production operation can be generated, such as generating a training plan on how to perform the production operation, and when the reason why the operation time of the production operation is greater than the total duration of the operation standard is equipment factors, that is, there is a problem with the production equipment that causes the production staff to take too long to perform the production operation, then a target optimization strategy for optimizing the production equipment can be generated, such as adjusting the equipment parameters of the production equipment or maintaining the production equipment.
[0131] In addition, the operation information of the problematic production station can be used to determine that if the execution order of the production operation is the standard operation order but the operation fails, the cause of the operation failure can be determined to be equipment factors, and then a target optimization strategy can be generated for optimizing the production equipment, such as adjusting the equipment parameters of the production equipment or performing maintenance on the production equipment.
[0132] In an embodiment of the present application, step 204 may include steps 2041 to 2042:
[0133] Step 2041, determine standard operation information, and determine abnormal operation information from all operation information based on operation duration information, operation sequence information and standard operation information.
[0134] Among them, the standard operation information may be the operation standard for executing the production operation, which may be prepared by the user in advance for each production operation, and may include information such as the operation sequence for executing the production operation and the total time for executing the production operation. Different production operations may correspond to different operation standards, that is, different production operations may correspond to different standard operation information. Abnormal operation information may be operation information of production operations that need to be optimized, such as operation information of production operations with incorrect execution sequence and operation information of production operations that take too long to operate. The standard operation information may correspond to the operation type information corresponding to the abnormal operation information.
[0135] After obtaining the historical operation records of the problem production station, the operation information of each production operation of the problem production station within a preset time period can be determined, and the preset time period can be divided into at least one interval in the above manner, and then the operation duration information of the production operation in each interval can be determined, and the fluctuation range of the operation duration information for each interval can be determined, and then based on the fluctuation range of the operation duration information, the interval with the largest fluctuation range can be determined as the interval where there are production operations that need to be optimized, and all production operations and their corresponding standard operation information in the interval where there are abnormal operation information can be determined.
[0136] It should be understood that when comparing the operation time of each interval with the total time corresponding to the operation standard, it is necessary to determine the production operations in each interval and the standard operation information corresponding to each production operation. If the current interval includes at least two production operations, such as interval A including assembly operations and scanning operations, it is necessary to compare different types of production operations with their corresponding operation standards separately, which results in large computational complexity and low efficiency.
[0137] When a production operation that is not performed in accordance with the operating standard exists in a certain interval, the operation time is different from the total time corresponding to the operating standard, which will cause the operation time information of the interval to fluctuate. Based on this, the fluctuation range of the operation time information of each interval can be determined, and the interval with the largest fluctuation range is determined as the interval where the production operation that needs to be optimized exists. Then, it is only necessary to determine the standard operation information corresponding to the production operation in the interval where the production operation that needs to be optimized exists, without determining the standard operation information corresponding to all production operations in all intervals. This reduces the amount of calculation and improves the efficiency of determining the intervals where the production operations that need to be optimized exist.
[0138] After determining the standard operation information, the operation sequence of the standard operation information can be determined, and based on the operation sequence of the standard operation information and the operation sequence information, it can be determined that there are production operations with incorrect execution sequence, and the total duration of the standard operation information can be determined, and based on the total duration of the standard operation information and the operation duration information, it can be determined that the production operations that take too long to operate can be determined as abnormal operations, and the operation information of the production operations with incorrect execution sequence and the operation information of the production operations that take too long to operate can be determined as abnormal operation information.
[0139] Step 2042, generating a target optimization strategy according to the standard operation information, so as to optimize the abnormal operation information based on the target optimization strategy.
[0140] After determining the abnormal operation information, a target optimization strategy for optimizing the abnormal operation information can be generated based on the standard operation information, and the abnormal operation information can be optimized based on the target optimization strategy. Specifically, the target optimization strategy can be generated as described above.
[0141] In an embodiment of the present application, by acquiring historical production information, the historical production information includes the production information involved in the execution of production operations by all production stations, and then based on the historical production information, the problem production station can be determined, and the problem production station is a production station with operational problems, which improves the accuracy of determining the production station with operational problems, and from the historical production information, the historical operation records corresponding to the problem production station are determined, so as to generate a target optimization strategy based on the historical operation records, and optimize the production operation based on the target optimization strategy, which can improve the effect of optimizing the production station with operational problems, thereby improving the efficiency and quality of production operations, and improving the reliability of production operations.
[0142] See also Figure 5 , Figure 5 A flowchart of another method for generating a production operation optimization strategy provided by an embodiment of the present application is shown, which may specifically include the following steps:
[0143] Step 501, obtaining historical production information.
[0144] Step 502, determining the problematic production station based on historical production information.
[0145] Step 503: Obtain historical operation records corresponding to the problematic production station from historical production information.
[0146] The historical operation records may include operation information within a preset time period, and the operation information may include operation type information, operation sequence information, and operation duration information.
[0147] For the relevant descriptions of steps 501 to 503, please refer to steps 101 to 104, steps 1021 to 1023, and steps 1041 to 1043, and they will not be repeated here.
[0148] Step 504: determine standard operation information, and determine abnormal operation information from all operation information based on the operation duration information, the operation sequence information, and the standard operation information.
[0149] In an embodiment of the present application, determining the standard operation information in step 504 may include steps 5041 to 5045:
[0150] Step 5041, determining correct operation information within a preset time period.
[0151] The correct operation information may be the operation information with the best execution sequence of production operations and the shortest operation time of production operations, and the best execution sequence may be the execution sequence with the longest operation time of all production operations and the highest operation accuracy. The preset time period may be set by the user.
[0152] After obtaining the historical operation records corresponding to the problem production station, and when it is necessary to determine the standard operation information corresponding to the production operation in the problem production station, the operation information with the best execution order and the shortest operation time can be determined from the historical operation records as the correct operation information.
[0153] In practical applications, since the historical operation records include operation information within a preset time period, the operation information with the best execution sequence and the shortest operation time for production operation can be determined from the operation information within the preset time period, that is, the correct operation information.
[0154] In an embodiment of the present application, the correct operation information may be determined in the following manner:
[0155] The operation information is counted by type to obtain the number of each type of operation sequence information in the operation information, the operation sequence information with the largest number of types is determined as the target operation sequence information, and the operation information with the operation sequence information as the target operation sequence information is determined as the correct operation information.
[0156] The target operation information may be operation information with the best execution order and the shortest operation time for the production operation.
[0157] After the operation information is determined, the operation information may be classified according to the type of operation sequence information, and each type may be counted, thereby obtaining the number of each type of operation sequence information in all the operation information within a preset time period.
[0158] It should be understood that each time a production job is completed, the production operation will be performed in a different operation sequence, and then the operation information of different operation sequences can be recorded within a preset time period, and the operation information with the same operation sequence within the preset time period is regarded as the same type of operation information, that is, the operation information is classified according to the type of operation sequence information, and each type of operation information can be counted to obtain the number of each type of operation information, that is, the number of each type of operation sequence information in all the operation information within the preset time period is obtained.
[0159] For example, the preset time period can be the past 7 days, and then the operation information with different operation sequences in the past 7 days can be classified to obtain the operation information of performing the production operation according to the operation sequence A and the operation information of performing the production operation according to the operation sequence B. The operation information of performing the production operation according to the operation sequence A can be counted, and the operation information of performing the production operation according to the operation sequence B can be counted to obtain the number of operation information of performing the production operation according to the operation sequence A and the number of operation information of performing the production operation according to the operation sequence B.
[0160] After the number of each type of operation sequence information is obtained, the operation sequence information with the largest number may be determined as the target operation sequence information, and the operation information whose operation sequence information is the target operation sequence information may be determined as the target operation information.
[0161] It is necessary to understand that when the operation standard is not defined, production staff will perform production operations in different operation sequences, and in actual production, production staff will often perform production operations in the most labor-saving and least-step-performing manner, and then production staff can determine a more labor-saving and less-step-performing manner in multiple production operations, and thus will tend to perform production operations in a more labor-saving and less-step-performing manner in subsequent production operations, so that the number of times production operations are performed in a more labor-saving and less-step-performing manner increases. Based on this, it can be considered that the operation sequence information with the largest number in the preset time period is the target operation sequence information.
[0162] After the target operation sequence information is determined, the operation information whose operation sequence information is the target operation sequence information may be determined to be the correct operation information.
[0163] Step 5042: Determine the operation time interval between each production operation in the correct operation information according to the correct operation information.
[0164] The operation time interval may be the time interval between two adjacent production operations in the same production operation.
[0165] After obtaining the correct operation information, the time interval between every two adjacent production operations in each production operation within the preset time period can be determined, that is, the adjacent production operations are determined according to the execution order of the production operations, and then the time interval between every two adjacent production operations in all production operations within the preset time period can be obtained.
[0166] For example, a production operation within a preset time period may include production operation 1, production operation 2, and production operation 3, and production operation 1 is executed first, while production operation 3 is executed last. Therefore, according to the execution order, it can be determined that production operation 1 is adjacent to production operation 2, and production operation 2 is adjacent to production operation 3. The completion time of production operation 1 to production operation 3 is determined based on the operation information, so that the time interval between production operation 1 and production operation 2, as well as the time interval between production operation 2 and production operation 3 can be determined.
[0167] Step 5043, determining standard operation information based on the correct operation information and the operation time interval.
[0168] After the operation time interval between each production operation is obtained, the fluctuation degree of the operation time interval of each production operation within a preset time period may be determined based on the operation time interval between each production operation.
[0169] In actual applications, since the same production station can perform the same production operation in different time periods, for example, the same production operation can be performed on different vehicles of model A in a certain time period, and then the same production operation except for the execution objects can be performed multiple times within the preset time period. The operation time of each production operation in the production operations performed in different time periods will also be different, resulting in different time intervals between each two adjacent production operations. Therefore, the degree of fluctuation of the operation time interval of the same production operation within the preset time period can be determined.
[0170] For example, production operation A can be executed three times within a preset time period, and it is determined that the time interval between production operation 1 and production operation 2 in the first production operation is 1 second, while the time interval between production operation 1 and production operation 2 in the second production operation is 5 seconds, and the time interval between production operation 1 and production operation 2 in the third production operation is 2 seconds.
[0171] In a specific implementation, the standard deviation or variance of the operation duration interval of the same production operation within a preset time period can be determined, and the standard deviation or variance can be used to represent the degree of fluctuation of the operation duration interval of the same production operation within the preset time period.
[0172] After obtaining the degree of fluctuation of the time interval between each two adjacent production operations in each production operation within the preset time period, that is, obtaining the degree of fluctuation corresponding to each two adjacent production operations in each production operation within the preset time period, the degree of fluctuation corresponding to each two adjacent production operations can be compared with the fluctuation degree threshold. When the degree of fluctuation corresponding to two adjacent production operations is greater than the fluctuation degree threshold, it can be determined that the two adjacent production operations have large fluctuations during actual execution, and then the two adjacent production operations need to be optimized, such as adjusting the execution order of the production operations, that is, optimizing the correct operation information, and determining the optimized correct operation information as the standard operation information.
[0173] When the fluctuation degrees corresponding to every two adjacent production operations are less than or equal to the fluctuation degree threshold, it can be considered that there is no need to optimize the correct operation information, and the correct operation information is determined as the standard operation information.
[0174] Step 505: Generate a target optimization strategy based on the standard operation information to optimize the abnormal operation information based on the target optimization strategy.
[0175] In an embodiment of the present application, step 505 may include steps 5051 to 5052:
[0176] Step 5051, determining the operation accuracy rate, human operation error rate, and equipment operation error rate based on the abnormal operation information.
[0177] Among them, the operation accuracy rate can be the proportion of correct production operations to all production operations, correct production operations can be production operations performed in accordance with operation standards, the human operation error rate can be the proportion of production operations with incorrect execution sequence to all production operations, and the equipment operation error rate can be the proportion of production operations with failed operations to all production operations.
[0178] After determining the abnormal operation information, the number of abnormal operations in the problem production station, the number of all production operations in the problem production station, and the number of correct production operations in the problem production station can be determined based on the abnormal operation information, so that the proportion of correct production operations in all production operations in the problem production station can be determined; at the same time, the production operations with incorrect execution order can be determined based on the abnormal operation information, and the production operations with incorrect execution order can be counted, so as to obtain the proportion of production operations with incorrect execution order to all production operations, that is, to obtain the human operation error rate; the production operations with failed operations can be determined based on the abnormal operation information, and the production operations with failed operations can be counted, so as to obtain the proportion of production operations with failed operations to all production operations, that is, to obtain the equipment operation error rate.
[0179] Step 5052, generating a target optimization strategy based on standard operation information, operation accuracy, human operation error rate, and equipment operation error rate.
[0180] After obtaining the operation accuracy rate, human operation error rate and equipment operation error rate, the cause of the abnormal operation can be determined based on the operation accuracy rate, human operation error rate and equipment operation error rate, that is, whether the production operation abnormality is caused by human operation error or equipment operation error. Then, based on the cause of the abnormal operation, a target optimization strategy can be generated, and the abnormal operation can be optimized based on the target optimization strategy to solve the problem causing the abnormal operation.
[0181] In an embodiment of the present application, step 5052 may be performed in the following manner:
[0182] Based on the operation accuracy rate and the human operation error rate, determine whether the human operation abnormality condition is triggered, and based on the operation accuracy rate and the equipment operation error rate, determine whether the equipment operation abnormality condition is triggered. When the human operation abnormality condition is triggered, determine the human operation standard related to the human operation in the standard operation information, and generate a first target optimization strategy based on the human operation standard, and / or, when the equipment operation abnormality condition is triggered, determine the equipment operation standard related to the equipment operation in the standard operation information, and generate a second target optimization strategy based on the equipment operation standard.
[0183] Among them, the abnormal human operation condition can be used to determine whether there is a production operation abnormality caused by human operation errors, the abnormal equipment operation condition can be used to determine whether there is a production operation abnormality caused by equipment operation errors, the first target optimization strategy can be used to optimize the human-related operation information in the abnormal operation information, and the second target optimization strategy can be used to optimize the equipment-related operation information in the abnormal operation information.
[0184] After obtaining the operation accuracy, human operation error rate and equipment operation error rate, the operation accuracy of each problem production station can be compared with the operation accuracy of other problem production stations, and each problem production station can be sorted from small to large according to the operation accuracy. Then, the optimization priority of each problem production station can be determined based on the arrangement order of each problem production station. That is, the smaller the operation accuracy of the problem production station, the higher its optimization priority, and high-priority problem production stations are optimized first. That is, whether to trigger the optimization operation of the problem production station is determined based on the priority of the problem production station.
[0185] After determining the priority of the problem production station according to the operation accuracy rate and triggering the operation to optimize the problem production station based on the priority of the problem production station, the human operation error rate of the problem production station can be compared with the preset human operation error rate threshold. When the human operation error rate is less than the human operation error rate threshold, the human operation abnormality condition is triggered; when the human operation error rate is greater than or equal to the human operation error rate threshold, the human operation abnormality condition is not triggered; and the equipment operation error rate of the problem production station is compared with the preset equipment operation error rate threshold. When the equipment operation error rate is less than the equipment operation error rate threshold, the equipment operation abnormality condition is triggered; when the equipment operation error rate is greater than or equal to the equipment operation error rate threshold, the equipment operation abnormality condition is not triggered.
[0186] When an abnormal human operation condition is triggered, the human operation standard related to human operation in the standard operation information can be determined, and a first target optimization strategy is generated based on the human operation standard to optimize the human operation information related to human operation in the abnormal operation information based on the first target optimization strategy, and / or, when an abnormal device operation condition is triggered, the device operation standard related to device operation in the standard operation information is determined, and a second target optimization strategy is generated based on the device operation standard to optimize the device operation information related to the device in the abnormal operation information based on the second target optimization strategy.
[0187] In an embodiment of the present application, historical production information is obtained, and the historical production information includes the production information involved in the execution of production operations by all production stations. Then, based on the historical production information, the problem production station is determined, and the problem production station is a production station with operation problems. This improves the accuracy of determining the production station with operation problems. From the historical production information, the historical operation records corresponding to the problem production station are obtained. Based on the operation duration information in the historical operation records, the abnormal operation information is determined from all the operation information, and the standard operation information is determined. Based on the standard operation information, a target optimization strategy is generated to optimize the abnormal operation information based on the target optimization strategy. This can improve the effect of optimizing the production station with operation problems, thereby improving the efficiency and quality of production operations, and improving the reliability of production operations.
[0188] See also Figure 6 , Figure 6 An example schematic diagram of a method for generating a production operation optimization strategy provided by an embodiment of the present application is shown, which may specifically include the following steps:
[0189] Step 601, obtaining production information of each production line within a preset time period;
[0190] Among them, the production line can correspond to the production project.
[0191] In practical applications, different production lines can be established for different production projects, and the production line can include one or more production stations.
[0192] Step 602, preprocessing the production information to obtain historical production information;
[0193] Step 603, traverse the production line and determine the total duration data of the production station in one of the production lines based on the historical production information;
[0194] Step 604, determining the duration kurtosis information and duration standard deviation information corresponding to each production station according to the total duration data, and determining the duration distribution information of each production station based on the duration kurtosis information and duration standard deviation information;
[0195] Step 605, judging whether there is a problematic production station on the production line according to the time distribution information, if yes, executing step 606, if no, repeating step 603 until all production lines have been traversed, and ending the process;
[0196] Step 606, dividing the preset time period into at least one interval, and determining the operation information of the problematic production station in each interval, and then determining the interval where the production operation needs to be optimized;
[0197] Step 607, determining all production operations within the interval where production operations need to be optimized and their corresponding standard operation information, and determining abnormal operation information based on the standard operation information;
[0198] Step 608, determining the operation accuracy rate, the human operation error rate, and the equipment operation error rate according to the abnormal operation information, and generating a target optimization strategy based on the operation accuracy rate, the human operation error rate, and the equipment operation error rate, so as to optimize the production operation based on the target optimization strategy;
[0199] Step 609, determining the correct operation information, and determining the standard operation information based on the correct operation information.
[0200] In an embodiment of the present application, by acquiring historical production information, the historical production information includes the production information involved in the execution of production operations by all production stations, and then based on the historical production information, the problem production station can be determined, and the problem production station is a production station with operational problems, which improves the accuracy of determining the production station with operational problems, and from the historical production information, the historical operation records corresponding to the problem production station are determined, so as to generate a target optimization strategy based on the historical operation records, and optimize the production operation based on the target optimization strategy, which can improve the effect of optimizing the production station with operational problems, thereby improving the efficiency and quality of production operations, and improving the reliability of production operations.
[0201] Reference Figure 7 , Figure 7 A schematic diagram of the structure of a device for generating a production operation optimization strategy provided by an embodiment of the present application is shown, which may specifically include the following modules:
[0202] The acquisition module 701 is used to acquire historical production information and acquire historical operation records corresponding to the problematic production station from the historical production information. The historical production information includes production information involved in the process of executing production operations of all production stations.
[0203] The determination module 702 is used to determine a problematic production station based on historical production information; a problematic production station is a production station with an operation problem.
[0204] The generation module 703 is used to generate a target optimization strategy based on historical operation records, so as to optimize the production operation based on the target optimization strategy.
[0205] In one implementation, the determination module 702 may also be used to:
[0206] Based on historical production information, the total duration data of each production station is determined, and the total duration data is the duration of the production station performing the production operation.
[0207] Based on the total duration data, determine the duration distribution information of each production station.
[0208] Based on the duration distribution information, the problematic production station is identified.
[0209] In one implementation, the duration distribution information includes duration kurtosis information and duration standard deviation information. The determination module 702 may also be used to:
[0210] The duration kurtosis information and duration standard deviation information are weighted and calculated to generate standardized evaluation information.
[0211] Identify problem production stations based on standardized assessment information.
[0212] In one implementation, the historical operation record includes operation information within a preset time period, and the operation information includes operation sequence information and operation duration information. The generation module 703 may also be used to:
[0213] Standard operation information is determined, and based on the operation duration information, the operation sequence information and the standard operation information, abnormal operation information is determined from all operation information.
[0214] According to the standard operation information, a target optimization strategy is generated to optimize the abnormal operation information based on the target optimization strategy.
[0215] In one implementation, the generating module 703 may also be used to:
[0216] Determine the operation accuracy rate, human operation error rate, and equipment operation error rate based on abnormal operation information.
[0217] Generate target optimization strategies based on standard operation information, operation accuracy, human operation error rate, and equipment operation error rate.
[0218] In one implementation, the generating module 703 may also be used to:
[0219] Based on the operation accuracy rate and the human operation error rate, it is determined whether the human operation abnormality condition is triggered; and based on the operation accuracy rate and the device operation error rate, it is determined whether the device operation abnormality condition is triggered.
[0220] When an abnormal human operation condition is triggered, the human operation standard related to the human operation in the standard operation information is determined, and a first target optimization strategy is generated based on the human operation standard, and / or, when an abnormal equipment operation condition is triggered, the equipment operation standard related to the equipment operation in the standard operation information is determined, and a second target optimization strategy is generated based on the equipment operation standard.
[0221] Among them, the first target optimization strategy is used to optimize the operation information related to human in the abnormal operation information, and the second target optimization strategy is used to optimize the operation information related to equipment in the abnormal operation information.
[0222] In one implementation, the operation sequence information includes at least one operation sequence, and the generation module 703 may also be used to:
[0223] Determine the correct operating information within a preset time period.
[0224] According to the correct operation information, determine the operation time interval between each production operation in the correct operation information.
[0225] Determine standard operation information based on correct operation information and operation time interval.
[0226] In an embodiment of the present application, by acquiring historical production information, the historical production information includes the production information involved in the execution of production operations by all production stations, and then based on the historical production information, the problem production station can be determined, and the problem production station is a production station with operational problems, which improves the accuracy of determining the production station with operational problems, and from the historical production information, the historical operation records corresponding to the problem production station are determined, so as to generate a target optimization strategy based on the historical operation records, and optimize the production operation based on the target optimization strategy, which can improve the effect of optimizing the production station with operational problems, thereby improving the efficiency and quality of production operations, and improving the reliability of production operations.
[0227] It should be noted that the information interaction, execution process and other contents between the above-mentioned devices are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0228] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0229] See also Figure 8 , Figure 8 A structural block diagram of a terminal device provided by an embodiment of the present application is shown as follows: Figure 8 As shown, an embodiment of the present application provides a terminal device 81, which includes: at least one processor 811, a memory 812, and a computer program 8121 stored in the memory 812 and executable on the at least one processor 811, and when the processor 811 executes the computer program 8121, the steps in any one of the above method embodiments are implemented.
[0230] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any one of the above method embodiments can be implemented.
[0231] An embodiment of the present application provides a computer program product. When the computer program product runs on a mobile terminal, the mobile terminal can implement the steps in the above method embodiment when executing the computer program product.
[0232] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device capable of carrying the computer program code to the camera / terminal device, a recording medium, a computer memory, a read-only memory (ROM), a random access memory (RAM), an electrical carrier signal, a telecommunication signal, and a software distribution medium.
[0233] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for generating a production operation optimization strategy, characterized in that: include: Acquiring historical production information, wherein the historical production information includes production information involved in the process of all production stations performing production operations; Determine a problematic production station according to the historical production information; the problematic production station is a production station with an operation problem; Acquire the historical operation record corresponding to the problematic production station from the historical production information; Based on the historical operation records, a target optimization strategy is generated to optimize the production operation based on the target optimization strategy.
2. The method for generating a production operation optimization strategy according to claim 1, characterized in that: Determining the problematic production station according to the historical production information includes: Determine total duration data of each production station according to the historical production information, wherein the total duration data is the duration of the production station performing the production operation; Determine the time distribution information of each production station according to the total time data; Based on the duration distribution information, a problematic production station is determined.
3. The method for generating a production operation optimization strategy according to claim 2, characterized in that: The duration distribution information includes duration kurtosis information and duration standard deviation information. The determining of the problematic production station based on the duration distribution information includes: Performing weighted calculation on the duration kurtosis information and the duration standard deviation information to generate standardized evaluation information; Determine problematic production stations based on the standardized assessment information.
4. The method for generating a production operation optimization strategy according to any one of claims 1 to 3, characterized in that: The historical operation record includes operation information within a preset time period, and the operation information includes operation sequence information and operation duration information. The target optimization strategy is generated based on the historical operation record, including: Determine standard operation information, and determine abnormal operation information from all the operation information based on the operation duration information, the operation sequence information and the standard operation information; According to the standard operation information, a target optimization strategy is generated to optimize the abnormal operation information based on the target optimization strategy.
5. The method for generating a production operation optimization strategy according to claim 4, characterized in that: Generating a target optimization strategy according to the standard operation information includes: Determine the operation accuracy rate, human operation error rate, and equipment operation error rate according to the abnormal operation information; A target optimization strategy is generated according to the standard operation information, the operation accuracy rate, the human operation error rate and the equipment operation error rate.
6. The method for generating a production operation optimization strategy according to claim 5, characterized in that: The generating a target optimization strategy according to the standard operation information, the operation accuracy rate, the human operation error rate and the equipment operation error rate includes: Determining whether a human operation abnormality condition is triggered according to the operation accuracy rate and the human operation error rate, and determining whether a device operation abnormality condition is triggered according to the operation accuracy rate and the device operation error rate; When the abnormal human operation condition is triggered, determining the human operation standard related to the human operation in the standard operation information, and generating a first target optimization strategy based on the human operation standard, and / or, when the abnormal device operation condition is triggered, determining the equipment operation standard related to the equipment operation in the standard operation information, and generating a second target optimization strategy based on the equipment operation standard; Among them, the first target optimization strategy is used to optimize the operation information related to human in the abnormal operation information, and the second target optimization strategy is used to optimize the operation information related to equipment in the abnormal operation information.
7. The method for generating a production operation optimization strategy according to claim 4, characterized in that: The operation sequence information includes at least one operation sequence, and the determination standard operation information includes: Determine the correct operating information within a preset time period; Determine, according to the correct operation information, an operation time interval between each production operation in the correct operation information; Standard operation information is determined according to the correct operation information and the operation time interval.
8. A device for generating a production operation optimization strategy, characterized in that: include: An acquisition module, used to acquire historical production information, and to acquire historical operation records corresponding to the problematic production station from the historical production information, wherein the historical production information includes production information involved in the process of executing production operations at all production stations; A determination module, used to determine a problematic production station according to the historical production information; the problematic production station is a production station with an operation problem; A generation module is used to generate a target optimization strategy based on the historical operation records, so as to optimize the production operation based on the target optimization strategy.
9. A terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method for generating a production operation optimization strategy according to any one of claims 1 to 7 is implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method for generating a production operation optimization strategy according to any one of claims 1 to 7 is implemented.