Method for determining design water level of underground water sealing hole in inland area
Through pressurized water experiments and hydrogeological models, the design water level of groundwater sealing holes in inland mountainous areas was determined, which solved the problem of difficult water sealing design in inland areas, achieved stable water level determination, and improved design accuracy and reliability.
Patent Information
- Application Number
- CN202310542641.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-15
- Publication Date
- 2024-11-15
AI Technical Summary
When building groundwater sealing reservoirs in inland mountainous areas, there is a lack of reliable design water level determination methods, which makes water sealing design difficult and cannot simply follow the experience of coastal areas.
Hydrogeological parameters are obtained through pressurized water experiments, groundwater seepage field model is established, the lowest groundwater level and fluctuation values of independent hydrogeological units are determined, and the design water level is calculated based on the geomorphic characteristics and rock mass permeability to ensure the stability of groundwater sealing holes.
The design water level has been stabilized in the underground water sealing reservoir in the inland mountainous areas, improved the design accuracy and reliability, and met the construction needs of inland areas.
Smart Images

Figure CN118965482A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of underground water seal caverns, and in particular relates to a method for determining a design water level of an underground water seal cavern in an inland area. Background Art
[0002] Underground oil storage is an important part of the country's oil reserves. Underground oil storage mainly uses underground water-sealed caverns to store oil. Underground water-sealed caverns refer to underground space systems excavated in rock mass at a certain depth below the stable groundwater level that use the water-sealed principle to store crude oil.
[0003] The calculation of the design water level is the basis of water seal design and also the core technology. At present, most of the existing underground water seal caverns at home and abroad are built in coastal areas with rich underground freshwater resources. However, with the advancement of the construction of the third and fourth phases of the national reserve, the number of available storage sites in coastal areas is slightly insufficient, or for strategic deployment, it is necessary to build underground water seal caverns in inland areas.
[0004] However, inland areas usually do not have good groundwater resources, and some reservoirs are located in mountainous and hilly areas. The natural water seal environment is poor, the groundwater seepage field is unstable, and the water seal design is very difficult. The experience of determining the design water level of water seal holes in coastal areas cannot be simply applied. Summary of the invention
[0005] The disclosed embodiment proposes a method for determining the design water level of an underground water-sealed cavern in an inland area, so as to solve the problem that there is no practical method for determining the design water level when constructing underground water-sealed caverns in inland mountainous areas.
[0006] A first aspect of an embodiment of the present disclosure provides a method for determining a design water level of an underground water sealing hole in an inland area, characterized by comprising:
[0007] Obtaining hydrogeological parameters of the target area based on observation and water pressure test, wherein the water pressure test is a combination of one or more of the following: pressure-fallback test, new Lvrong test, pulse test and water drop test;
[0008] Establishing a model for the groundwater seepage field in the target area based on the hydrogeological parameters, and determining independent hydrogeological units in the target area based on the model, wherein the replenishment and consumption of groundwater in the independent hydrogeological units are in a balanced state;
[0009] The groundwater level fluctuation value in the independent hydrogeological unit is obtained, the lowest groundwater level in the independent hydrogeological unit is simulated based on the model, and the design water level of the groundwater sealing cave constructed in the independent hydrogeological unit is determined based on the lowest groundwater level and the groundwater level fluctuation value.
[0010] In some embodiments of the present disclosure, obtaining the hydrogeological parameters of the target area based on the water pressure test includes:
[0011] performing the push-in-and-pull-back experiment on the target area;
[0012] When the pressure in the press-in-retract test cannot reach the preset pressure, a new Lu Rong test is performed instead;
[0013] If the injection flow rate of the pressure-reduction test is less than the preset value during the water injection period, or if the pumping volume of the Xinlvrong test is less than the preset value when the wellhead pressure is pressurized to the second-stage design pressure, a pulse test shall be performed instead;
[0014] If the dissipation period of the injection-retraction test is less than 2 minutes, or if the wellhead pressure is lower than the design pressure when the maximum pump flow rate is reached in the Xinlvrong test, a water drop test shall be performed instead.
[0015] In some embodiments of the present disclosure, establishing a model for the groundwater seepage field in the target area based on the hydrogeological parameters includes:
[0016] Based on the hydrogeological conceptual model, a mathematical model of groundwater seepage field is established for the target area using the hydrogeological parameters;
[0017] A finite element model of groundwater seepage field in the target area is obtained based on the mathematical model.
[0018] In some embodiments of the present disclosure, the hydrogeological conceptual model refers to:
[0019] The geological materials constituting the model are heterogeneous and anisotropic;
[0020] The upper boundary of the model is the precipitation recharge, evaporation and well spring discharge boundary, and the lower boundary is the non-flow boundary;
[0021] Underground caverns and water curtains are generalized as fixed head boundaries.
[0022] In some embodiments of the present disclosure, the groundwater seepage field mathematical model refers to:
[0023]
[0024] Among them: x, y, z are the distances in three directions of space, t is time, K xx , K yy , K zz are the permeability coefficients in the x, y, and z main directions respectively, μ is the elastic water release coefficient, W is the source and sink term, including evaporation, rainfall infiltration recharge, well pumping and spring discharge, etc., and H is the total head, including pressure head and position head.
[0025] In some embodiments of the present disclosure, before determining the independent hydrogeological units in the target area based on the model, the method further includes:
[0026] Based on the hydrogeological data, a stable groundwater level area with groundwater level fluctuation within a preset range is enclosed in the target area.
[0027] In some embodiments of the present disclosure, determining the independent hydrogeological units in the target area based on the model includes:
[0028] In an area where the groundwater level in the target area is stable, multiple sections are selected according to geomorphic features, the multiple sections form a closed figure, and hydraulic equipotential lines of the sections are calculated based on the finite element model;
[0029] Determine whether there is a precipitation funnel structure in the hydraulic equipotential lines, wherein the precipitation funnel structure refers to a structure in which the overall water level slowly drops to a certain water level and then slowly rises;
[0030] The hydrogeological unit formed by the cross-sectional position corresponding to the lowest water level of each precipitation funnel structure is an independent hydrogeological unit in the target area.
[0031] In some embodiments of the present disclosure, obtaining the groundwater level fluctuation value in the independent hydrogeological unit includes:
[0032] A hole is drilled at the lowest point of the groundwater level in the independent hydrogeological unit, the groundwater level in the hole is observed over a long period of time, and the water level fluctuation is obtained.
[0033] In some embodiments of the present disclosure, determining the design water level of the underground water seal cave constructed in the independent hydrogeological unit based on the lowest underground water level and the underground water level fluctuation value includes:
[0034] The design water level = the lowest groundwater level - the groundwater level fluctuation value - the preset safety margin;
[0035] In some embodiments of the present disclosure, determining the design water level of the underground water seal cave constructed in the independent hydrogeological unit based on the lowest underground water level and the underground water level fluctuation value further includes:
[0036] When the groundwater level fluctuation value is less than 5 meters and the average permeability coefficient of the reservoir rock mass is lower than 0.1Lu, the preset safety margin is 5 meters;
[0037] When the groundwater level fluctuation value is greater than 5 meters and the average permeability coefficient of the reservoir rock mass is lower than 0.1Lu, the preset safety margin is 10 meters;
[0038] When the groundwater level fluctuation value is greater than 5m and the average permeability coefficient of the reservoir rock mass is higher than 0.1Lu, the preset safety margin is 15 meters.
[0039] In summary, the method for determining the design water level of underground water seal caverns in inland areas provided by the present embodiment determines the independent hydrogeological unit of the target area by modeling the target area, and then determines the design water level of the underground water seal cavern constructed in the independent hydrogeological unit according to the lowest groundwater level and water level fluctuation value in the independent hydrogeological unit. Because the groundwater seepage field in the independent hydrogeological unit is stable, a relatively stable lowest groundwater level can be obtained, and the design water level of the underground water seal cavern obtained thereby is also relatively stable, thereby meeting the needs of building underground water seal caverns in inland mountainous areas. The method has high precision, strong reliability and wide application range. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The features and advantages of the present disclosure will be more clearly understood by referring to the accompanying drawings, which are schematic and should not be construed as limiting the present disclosure in any way. In the accompanying drawings:
[0041] Figure 1 is a flow chart of a method for determining a design water level of an underground water-sealed cave in an inland area according to some embodiments of the present disclosure;
[0042] Figure 2 It is a partial display diagram of a finite element model of an underground water-sealed cave project in an inland mountainous area shown in an embodiment of the present disclosure;
[0043] Figure 3 It is a schematic diagram of a relatively independent hydrogeological unit of a closed underground water-sealed cave project in an inland mountain area shown in an embodiment of the present disclosure;
[0044] Figure 4 It is an elevation profile diagram of sections 1, 2, 3, and 4 used for finite element analysis of an underground water-sealed cave project in an inland mountain area shown in an embodiment of the present disclosure;
[0045] Figure 5 This is an embodiment of the present disclosure. Figure 4 Numerical simulation diagram of hydraulic equipotential lines of middle sections 1 and 2;
[0046] Figure 6 It is a water level profile diagram of the north and south sides of a reservoir area of an underground water-sealed cave project in an inland mountainous area shown in an embodiment of the present disclosure;
[0047] Figure 7 This is an embodiment of the present disclosure. Figure 4 Numerical simulation diagram of hydraulic equipotential lines of middle sections 3 and 4;
[0048] Figure 8It is a water level profile diagram of the east and west sides of a reservoir area of an underground water-sealed cave project in an inland mountainous area shown in an embodiment of the present disclosure;
[0049] Fig. 9 This is a water level monitoring map of YZK3 borehole in a mountain valley of an underground water-sealed cave project in an inland mountainous area shown in an embodiment of the present disclosure. DETAILED DESCRIPTION
[0050] In the detailed description below, many specific details of the present disclosure are set forth by way of example in order to provide a thorough understanding of the relevant disclosure. However, it will be apparent to one of ordinary skill in the art that the present disclosure can be implemented without these details. It should be understood that the use of the terms "system," "device," "unit," and / or "module" in the present disclosure is a method for distinguishing different parts, elements, parts, or assemblies at different levels in a sequential arrangement. However, these terms may be replaced by other expressions if other expressions can achieve the same purpose.
[0051] It should be understood that when a device, unit or module is referred to as being "on," "connected to," or "coupled to" another device, unit or module, it may be directly on, connected to, coupled to, or communicating with other devices, units or modules, or there may be intermediate devices, units or modules, unless the context clearly indicates an exception. For example, the term "and / or" as used in this disclosure includes any and all combinations of one or more of the relevant listed items.
[0052] The terms used in this disclosure are only for describing specific embodiments and are not intended to limit the scope of this disclosure. As shown in the specification and claims of this disclosure, unless the context clearly indicates an exception, the words "one", "a kind" and / or "the" do not specifically refer to the singular, but may also include the plural. Generally speaking, the terms "include" and "comprise" only indicate the inclusion of clearly identified features, wholes, steps, operations, elements and / or components, and such expressions do not constitute an exclusive list, and other features, wholes, steps, operations, elements and / or components may also be included.
[0053] Figure 1 FIG. 1 is a flow chart of a method for determining the design water level of an underground water-sealed cave in an inland area according to some embodiments of the present disclosure. Figure 1 As shown, the method for determining the design water level of an underground water-sealed cave in an inland area comprises the following steps:
[0054] S110, obtaining hydrogeological parameters of the target area based on observation and water pressure experiment, wherein the water pressure experiment is a combination of one or more of the following: pressure-in-and-fall-back experiment, Xinlürong experiment, pulse experiment and falling water experiment.
[0055] This disclosure uses a groundwater sealing cave project in an inland mountainous area as an example to illustrate the entire process.
[0056] Specifically, in the project, monitoring data of surrounding rivers, wells, springs, rainfall, etc. in the mountainous area over the years were obtained, and water level fluctuations in 10 surrounding hydrological boreholes were observed over a long period of time.
[0057] At the same time, the hydrogeological parameters of the target area are obtained based on the improved water pressure test, and the water pressure test is a combination of one or more of the pressure-fall test, the new Lvrong test, the pulse test and the falling water test.
[0058] Wherein, a push-in-and-drop-back experiment is first performed on the target area;
[0059] When the pressure in the press-in-retract test cannot reach the preset pressure, a new Lu Rong test is performed instead;
[0060] If the injection flow rate of the pressure-reduction test is less than the preset value during the water injection period, or if the pumping volume of the Xinlvrong test is less than the preset value when the wellhead pressure is pressurized to the second-stage design pressure, a pulse test shall be performed instead;
[0061] If the dissipation period of the injection-retraction test is less than 2 minutes, or if the wellhead pressure is lower than the design pressure when the maximum pump flow rate is reached in the Xinlvrong test, a water drop test shall be performed instead.
[0062] The specific single-hole water pressure test process is as follows:
[0063] A.1 Press-in-drop test
[0064] a) After the water curtain hole is constructed, immediately install the plug and orifice equipment, open the water inlet valve and exhaust valve, and supply water to the water curtain hole until the exhaust valve discharges water, in order to remove the air in the hole. Close the water inlet valve and exhaust valve, and read the hydrostatic pressure after 24 hours. Determine the test pressure based on the hydrogeological environment of the reservoir area, and the test pressure should not be less than the hydrostatic pressure + water supply pressure of the water curtain system.
[0065] b) Water filling period: Open the water inlet valve and supply water to the water curtain hole until the pressure gauge reading reaches the test pressure, and keep the pressure stable, and record the water supply flow rate. Measure the flow rate and pressure every 1 minute, and test for a total of 15 minutes.
[0066] c) Pressure dissipation period: When the water pressure test phase is over, stop water injection, close the water inlet valve, and start observing the pressure dissipation in the water curtain hole. Record the pressure in the water pressure pipe every 0.25 minutes in the first 1-2 minutes; record the pressure in the water pressure pipe every 0.5 minutes in the 2-7 minutes; record the pressure in the water pressure pipe every 1 minute in the 7-30 minutes; record the pressure in the water pressure pipe every 2 minutes in the 30-60 minutes; and record the pressure in the water pressure pipe every 5 minutes in the 60-80 minutes.
[0067] d) The condition for ending the observation is that the observation lasts for 80 minutes or the water curtain hole pressure dissipates to the hydrostatic pressure.
[0068] e) The test data shall be uniformly recorded in the “Press-In-Put-Back Test Record Sheet” in Appendix D.
[0069] Note: If the water curtain hole is subjected to a segmented water pressure test, the plug diameter and water pressure pipe length should be determined according to the hole diameter and the test section position. After the plug is installed to the specified depth, the test pressure is used for testing. Before the test, the water stopping effect of the plug needs to be checked. If there is water backflow around the plug, it should be handled. The test process is the same as above.
[0070] A.2 New Lvrong Test
[0071] The Xinlvrong test is mainly suitable for segmented tests of vertical and inclined water curtain holes. It is carried out using multiple pressure points and multiple pressure stages. The pressure in the test section increases from low to high and then returns to low. The pressure increase should be different from the pressure reduction trajectory.
[0072] The maximum test pressure at different depths can be determined according to the following formula, and the test pressure at other stages can be determined according to the principle of equal division:
[0073] Pm=1.5H+Pst
[0074] Where: Pm—maximum test pressure;
[0075] Pst—orifice hydrostatic pressure;
[0076] H—Burial depth of top of test section.
[0077] When the hydrostatic pressure at the orifice is 0, different pressures and pressure stages can be selected at different depths according to Table 1.
[0078] Table 1 Pressure, pressure stage and conditions for transition to secondary test of the new Lvrong test
[0079]
[0080]
[0081] The specific test process of the new Lvrong test is as follows:
[0082] a) Test section isolation: Determine the plug diameter and the length of the pressure pipe according to the aperture and test section location. The test section length is generally 10m. After the plug is installed at the designed depth, the maximum test pressure should be used for testing, the water level inside and outside the pipe should be measured, and the water-stopping effect of the plug should be checked. If there is water backflow around the plug, it should be handled.
[0083] b) Determination of static water level or pressure of groundwater: Before the test, the groundwater level or pressure of the test hole section should be observed every 5 minutes. When the water level fluctuation amplitude of three consecutive readings is less than 1cm / minute or the pressure fluctuation amplitude is less than 0.01mPa / minute, the observation can be stopped. The water level or pressure measured at the last time is used as the static water level or static water pressure.
[0084] c) Determine the test pressure and pressure stage according to the burial depth of the test section.
[0085] d) Flow rate observation: After adjusting the pressure to the design value and keeping it stable, measure the flow rate every 1 minute. When the test results meet one of the following standards (the difference between the maximum and minimum values of four consecutive readings is less than 10% of the final value; when the flow rate gradually decreases, the values of four consecutive readings are all less than 0.5L / minute; when the flow rate gradually increases, the four consecutive readings no longer have an increasing trend), this section of the test work can be ended. The final flow reading is used as the flow rate for calculation.
[0086] e) The test data shall be uniformly recorded in the “Lv Rong Test Record Sheet” in Appendix D.
[0087] A.3 Water drop test
[0088] The water drop test is mainly applicable to hydrogeological monitoring holes, pressure gauge holes and vertical and inclined water curtain holes. If the dissipation period of the pressure-fall test is less than 2 minutes, and the wellhead pressure is lower than the design pressure at the maximum pump flow rate of the Xinlvrong test, the water drop test should be performed instead.
[0089] The water drop test is to continuously inject water into the specified test section in the borehole until the water level reaches the pipe mouth, then stop the water injection and observe the relationship between the test head drop rate and time, thereby evaluating the permeability of the rock mass.
[0090] The specific test process of the water drop test is as follows:
[0091] a) Test section isolation: Determine the plug diameter and water supply pipe length according to the hole diameter and test section location. After the plug is installed at the designed depth, the plug water-stopping effect should be checked. If there is water bypassing the plug, it should be handled.
[0092] b) Determination of static groundwater level: Before the test, the groundwater level in the test hole section should be observed every 5 minutes. When the water level fluctuation for three consecutive readings is less than 1 cm / minute, the observation can be stopped.
[0093] c) Inject water into the borehole (orifice section) or the water injection pipe to the orifice height, and then start observing the water level. The frequency of water level observation is the same as the pressure monitoring frequency during the water pressure-dissipation test. Record once every 0.25 minutes in the first 1-2 minutes; record once every 0.5 minutes in the 2-7 minutes; record once every 1 minute in the 7-30 minutes; record once every 2 minutes in the 30-60 minutes; record once every 5 minutes in the 60-120 minutes. The water level observation time shall not be less than 2 hours, and the water level fluctuation amplitude of 3 consecutive readings is less than 1cm / minute, then the observation can be stopped.
[0094] d) The test data shall be uniformly recorded in the “Drop Water Test Record Sheet” in Appendix D.
[0095] A.4 Pulse test
[0096] When the injection flow rate of the pressure-in-fall test is close to zero during the water injection period, or the wellhead pressure of the Xinlvrong test is pressurized to the second-stage design pressure and the pump volume is close to zero, a pulse test is performed instead.
[0097] The pulse test is a permeation test in which the pressure changes with time after instantaneous pressurization and sealing. The test time is short and the test process is as follows:
[0098] a) Test section isolation: Determine the plug diameter and the length of the pressure pipe according to the hole diameter and test section location. After the plug is installed at the specified depth, measure the water level inside and outside the pipe and check the water-stopping effect of the plug. If there is water backflow around the plug, it should be handled.
[0099] b) Determine the hydrostatic pressure: Open the water inlet valve and the exhaust valve to supply water until the exhaust valve discharges water, in order to remove the air in the hole. Then close the water inlet valve and the exhaust valve, and read the hydrostatic pressure after 24 hours.
[0100] c) Determine the test pressure based on the buried depth of the test section.
[0101] d) Start the test, increase the pressure to the test pressure and maintain it for at least 2 minutes, stop the pump, and observe the pressure dissipation in the pressurized water pipe. Record the pressure in the pressurized water pipe every 0.25 minutes during the 1-2 minute period; record the pressure in the pressurized water pipe every 0.5 minutes during the 2-7 minute period; record the pressure in the pressurized water pipe every 1 minute during the 7-30 minute period; record the pressure in the pressurized water pipe every 2 minutes during the 30-60 minute period; record the pressure in the pressurized water pipe every 5 minutes during the 60-80 minute period. The condition for ending the observation is that the observation lasts for 80 minutes or the pressure in the pressurized water pipe dissipates to zero.
[0102] e) The test data shall be uniformly recorded in the “Pulse Test Record Sheet” in Appendix D.
[0103] After various hydrological tests were completed, the large-scale fluid analysis software Saphir was used to fit the water supply flow data during the test, the pressure data during the dissipation period, and the time history data to obtain the rock permeability coefficient of each hydrological borehole and complete the permeability zoning of the underground water-sealed caverns in the inland area.
[0104] S120, establishing a model for the groundwater seepage field in the target area based on the hydrogeological parameters, and determining independent hydrogeological units in the target area based on the model, wherein the replenishment and consumption of groundwater in the independent hydrogeological units are in a balanced state.
[0105] First, a hydrogeological conceptual model is established for the target area based on the hydrogeological parameters, and the hydrogeological conceptual model includes:
[0106] The geological materials constituting the model are heterogeneous and anisotropic;
[0107] The upper boundary of the model is the precipitation recharge, evaporation and well spring discharge boundary, and the lower boundary is the non-flow boundary;
[0108] Underground caverns and water curtains are generalized as fixed head boundaries.
[0109] According to the hydrogeological conceptual model, the mathematical model can be written as follows:
[0110]
[0111] in:
[0112] μ=μ e / M
[0113] H0=H(x,y,z,0),(x,y,z)∈Ω
[0114]
[0115] H1=H(x,y,z,t),(x,y,z)∈B2
[0116] Where: x, y, z are the distances in three directions of space, m; t is time, unit: day; k is a constant; K xx , K yy , K zz are the permeability coefficients in the x, y, and z directions, in meters per day; μ is the elastic water release coefficient, in meters -1 ;μ eis the water supply degree; M is the thickness of the aquifer, unit: meter; n is the normal direction outside the boundary; H is the total head, including pressure head and position head; H0 is the initial groundwater level, unit: meter; H1 is the cave or water curtain water level, unit: meter; W is the source and sink term, including evaporation, rainfall infiltration recharge, well pumping and spring discharge, etc., unit: meter 3 / day; Ω is the groundwater seepage area; B1 is the first-class boundary, indicating the location of the cavern and the water curtain, unit: meter; B2 is the second-class boundary, indicating the flow boundary; q(x, y, z, t) is the flow at different locations and times of the boundary, outflow is positive, inflow is negative, meter 3 / sky.
[0117] Then the finite element model is obtained based on the mathematical model.
[0118] In order to analyze the regional permeability differences and the seepage laws of groundwater in different directions, the present invention conducts a pure flow analysis of groundwater without considering fluid-solid coupling. Rock masses with different weathering degrees are generalized into homogeneous bodies and given different permeability coefficients. In the groundwater sealing cave project in a certain inland mountainous area, the upper boundary of the model is taken from the original topographic line of the reservoir surface, and the rainfall infiltration is considered and generalized to the second type of boundary condition. The lower boundary elevation is 1435 meters (150 meters below the bottom plate of the cave tank), which is generalized as a non-flowing boundary. The left and right boundaries of the reservoir area are the boundary lines of deep river valleys in different directions on all sides, which are generalized as fixed head boundaries. Figure 2 This is a partial display of the finite element model of an underground water-sealed cave project in an inland mountainous area.
[0119] Then, based on the hydrogeological data, a stable groundwater level area with groundwater level fluctuation within a preset range is enclosed in the target area.
[0120] In the underground water-sealed cave project in an inland mountain area, a relatively independent hydrogeological unit was identified around the site by analyzing the regional hydrogeological map of the underground water-sealed cave reservoir in the inland area and combining the topography and groundwater level around the reservoir area. Figure 3 As shown in the figure (where the arrow points to the circle, it is the relatively independent hydrogeological unit), the groundwater in the hydrogeological unit is basically in a balanced state, and the recharge is mainly vertical recharge from atmospheric precipitation, and also includes recharge from surface runoff in the field and infiltration recharge from farmland irrigation, and the discharge is mainly evaporation and lateral runoff. In the absence of large-scale exploitation of groundwater, it is basically not affected by external hydraulic forces.
[0121] Based on the finite element model, independent hydrogeological units are trapped from the groundwater level stable area.
[0122] The present invention simulates the regional hydrological conditions around the reservoir area through the finite element analysis software FEFLOW, such as Figure 4As shown, in the underground water-sealed cave project in a certain inland mountain area, the north-south boundaries of the relatively independent hydrogeological unit are simulated by taking sections 1 and 2. Section 1 is 11 kilometers away from the reservoir area, with a lowest water level of 1130m, and section 2 is 6.78 kilometers away from the reservoir area, with a lowest water level of 1719m. Sections 3 and 4 are simulated for the east-west boundaries. Section 3 is 6.32 kilometers away from the reservoir area, with a lowest water level of 1404m, and section 4 is 7.32 kilometers away from the reservoir area, with a lowest water level of 1392m. Figure 3 shown.
[0123] The FEFLOW numerical model was established with profiles 1 and 2 as the north and south boundaries of the model respectively. The upper boundary of the model was set to the phreatic level according to the terrain file of Google Earth, the bottom of the oil storage cavern was set to a constant head of 1585 m, and the permeability coefficient was set according to the survey report. The numerical simulation diagram of the hydraulic equipotential lines of profiles 1 and 2 is shown in Figure 2. Figure 5 shown.
[0124] Depend on Figure 5 From the hydraulic equipotential lines in the figure, we can see that there is an obvious precipitation funnel on both the north and south sides of the reservoir area. The overall water level slowly drops to a certain level and then slowly rises. By cutting two sections on the north and south sides of the reservoir area, the section line runs through the lowest point water level of the precipitation funnel on the east and west sides to find out the detailed water level fluctuations on the north and south sides of the reservoir area. For details, see Figure 6 .
[0125] Combination Figure 5 and Figure 6 It can be seen that the lowest point of the precipitation funnel on the south side of the reservoir is about 1805m, about 0.95km away from the reservoir area, and the lowest point of the precipitation funnel on the north side of the reservoir area is about 1720m, about 0.7km away from the reservoir area.
[0126] Then, profiles 3 and 4 were used as the east and west boundaries of the model, respectively, to establish the FEFLOW numerical model. The upper boundary of the model was set to the phreatic water level according to the natural terrain parameters of Google Earth, the bottom of the oil storage cavern was set to a constant head of 1585 m, and the permeability coefficient was set with reference to the survey report. The numerical simulation diagram of the hydraulic equipotential lines of profiles 3 and 4 is shown in Figure 2. Figure 7 shown.
[0127] Depend on Figure 7 From the hydraulic equipotential lines in the figure, it can be seen that there is an obvious precipitation funnel on both the east and west sides of the reservoir area. The overall water level slowly drops to a certain water level and then slowly rises. By intercepting two sections on the east and west sides of the reservoir area, the section line runs through the lowest water level of the precipitation funnel on the left and right sides to find out the detailed water level fluctuations on the east and west sides of the reservoir area. For details, see Figure 8 .
[0128] Combination Figure 7 and Figure 8It can be seen that the lowest point of the precipitation funnel on the east side of the reservoir is about 1680m, about 0.5km away from the reservoir area, and the lowest point of the precipitation funnel on the west side of the reservoir area is about 1800m, about 0.7km away from the reservoir area.
[0129] The independent hydrogeological unit can be obtained by enclosing the low points of the precipitation funnels on the east, west, south and north sides, and the lowest points of the four precipitation funnels are used as the lowest groundwater level of the independent hydrogeological unit. The replenishment and consumption of groundwater in the independent hydrogeological unit are in a balanced state, and the groundwater level is stable. The groundwater sealing cave project can be constructed in this independent hydrogeological unit.
[0130] Therefore, in the underground water sealing cave project in a certain inland mountain area, the independent hydrogeological unit is: the water level low point on the east side is 1680m, located about 0.5km outside the reservoir area; the water level low point on the south side is about 1805m, located about 0.95km outside the reservoir area; the water level low point on the west side is about 1800m, located about 0.7km outside the reservoir area; the water level low point on the north side is 1720m, located about 0.7km outside the reservoir area.
[0131] S130, obtaining the groundwater level fluctuation value in the independent hydrogeological unit, simulating the lowest groundwater level in the independent hydrogeological unit based on the model, and determining the design water level of the groundwater sealing cave constructed in the independent hydrogeological unit based on the lowest groundwater level and the groundwater level fluctuation value.
[0132] If the groundwater level fluctuation value is less than 5m, and the average permeability coefficient of the reservoir rock mass is lower than 0.1Lu, the design water level of the underground water-sealed cavern in the inland area = the lowest groundwater level determined by numerical simulation - groundwater level fluctuation value - design safety margin (5m);
[0133] If the groundwater level fluctuation value is greater than 5m, and the average permeability coefficient of the reservoir rock mass is lower than 0.1Lu, the design water level of the underground water-sealed cavern in the inland area = the lowest groundwater level determined by numerical simulation - groundwater level fluctuation value - design safety margin (10m);
[0134] If the groundwater level fluctuation value is greater than 5m and the average permeability coefficient of the reservoir rock mass is higher than 0.1Lu, the design water level of the inland underground water-sealed cavern reservoir = the lowest groundwater level determined by numerical simulation - groundwater level fluctuation value - design safety margin (15m).
[0135] Specifically, a hole is drilled at the lowest point of the groundwater level in the independent hydrogeological unit, the groundwater level in the hole is observed over a long period of time, and the water level fluctuation is obtained.
[0136] In the underground water sealing cave project in an inland mountain area, borehole YZK3 has been continuously monitored since November 2012. The borehole is located on the outside of the mountain valley. The water level in the borehole is the lowest underground water level in the reservoir area. The annual water level of the borehole is between 1729.9 and 1732 meters, and the water level fluctuation is 1.9 meters. The stability of the underground water level is relatively good.
[0137] The water level monitoring picture of the YZK3 borehole in the mountain valley is as follows Fig. 9 .
[0138] For example, in S120, the lowest groundwater level of the independent hydrogeological unit simulated by the finite element model is 1680m, therefore:
[0139] Design water level of underground water-sealed cavern = 1680-1.9-5 = 1673.1 (m)
[0140] Based on the erosion base elevation of the micro-hydrogeological unit where the site is located and the long-term monitoring data of the hydrological boreholes, taking into account the groundwater level fluctuations, and combined with the poor geological conditions in the reservoir area and the underground engineering design, the design water level of the implementation case of the present invention was finally determined to be 1673.1m.
[0141] To sum up, the method for determining the design water level of groundwater seal caverns in inland areas provided by the present embodiment is to determine the independent hydrogeological units of the target area by modeling the target area, and then determine the design water level of the groundwater seal caverns constructed in the independent hydrogeological units according to the lowest groundwater level and water level fluctuation value in the independent hydrogeological units. Because the groundwater seepage field in the independent hydrogeological units is stable, a relatively stable lowest groundwater level can be obtained, and the design water level of the groundwater seal caverns obtained in this way is also relatively stable, thereby meeting the needs of building underground water seal caverns in inland mountainous areas. The method has high precision, strong reliability and a wide range of applicability.
[0142] It should be understood that the above specific embodiments of the present disclosure are only used to illustrate or explain the principles of the present disclosure, and do not constitute a limitation of the present disclosure. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present disclosure should be included in the protection scope of the present disclosure. In addition, the claims attached to the present disclosure are intended to cover all changes and modifications that fall within the scope and boundaries of the attached claims, or the equivalent forms of such scope and boundaries.
Claims
1. A method for determining the design water level of an underground water-sealed cave in an inland area, characterized in that: include: Obtaining hydrogeological parameters of the target area based on observation and water pressure test, wherein the water pressure test is a combination of one or more of the following: pressure-fallback test, new Lvrong test, pulse test and water drop test; Establishing a model for the groundwater seepage field in the target area based on the hydrogeological parameters, and determining independent hydrogeological units in the target area based on the model, wherein the replenishment and consumption of groundwater in the independent hydrogeological units are in a balanced state; The groundwater level fluctuation value in the independent hydrogeological unit is obtained, the lowest groundwater level in the independent hydrogeological unit is simulated based on the model, and the design water level of the groundwater sealing cave constructed in the independent hydrogeological unit is determined based on the lowest groundwater level and the groundwater level fluctuation value.
2. The method according to claim 1, characterized in that The hydrogeological parameters of the target area obtained based on water pressure test include: performing the push-in-and-pull-back experiment on the target area; When the pressure in the press-in-retract test cannot reach the preset pressure, a new Lu Rong test is performed instead; If the injection flow rate of the pressure-reduction test is less than the preset value during the water injection period, or if the pumping volume of the Xinlvrong test is less than the preset value when the wellhead pressure is pressurized to the second-stage design pressure, a pulse test shall be performed instead; If the dissipation period of the injection-retraction test is less than 2 minutes, or if the wellhead pressure is lower than the design pressure when the maximum pump flow rate is reached in the Xinlvrong test, a water drop test shall be performed instead.
3. The method according to claim 1, characterized in that The establishing of a model for the groundwater seepage field in the target area based on the hydrogeological parameters comprises: Based on the hydrogeological conceptual model, a mathematical model of groundwater seepage field is established for the target area using the hydrogeological parameters; A finite element model of groundwater seepage field in the target area is obtained based on the mathematical model.
4. The method according to claim 3, characterized in that: The hydrogeological conceptual model refers to: The geological materials constituting the model are heterogeneous and anisotropic; The upper boundary of the model is the precipitation recharge, evaporation and well spring discharge boundary, and the lower boundary is the non-flow boundary; Underground caverns and water curtains are generalized as fixed head boundaries.
5. The method according to claim 3, characterized in that: The mathematical model of groundwater seepage field refers to: Among them: x, y, z are the distances in three directions of space, t is time, K xx , K yy , K zz are the permeability coefficients in the x, y, and z main directions respectively, μ is the elastic water release coefficient, W is the source and sink term, including evaporation, rainfall infiltration recharge, well pumping and spring discharge, etc., and H is the total head, including pressure head and position head.
6. The method according to claim 1, characterized in that Before determining the independent hydrogeological units in the target area based on the model, the method further includes: Based on the hydrogeological data, a stable groundwater level area with groundwater level fluctuation within a preset range is enclosed in the target area.
7. The method according to claim 1, characterized in that Determining the independent hydrogeological units in the target area based on the model includes: In an area where the groundwater level in the target area is stable, multiple sections are selected according to geomorphic features, the multiple sections form a closed figure, and hydraulic equipotential lines of the sections are calculated based on the finite element model; Determine whether there is a precipitation funnel structure in the hydraulic equipotential lines, wherein the precipitation funnel structure refers to a structure in which the overall water level slowly drops to a certain water level and then slowly rises; The hydrogeological unit formed by the cross-sectional position corresponding to the lowest water level of each precipitation funnel structure is an independent hydrogeological unit in the target area.
8. The method according to claim 1, characterized in that The obtaining of the groundwater level fluctuation value in the independent hydrogeological unit comprises: A hole is drilled at the lowest point of the groundwater level in the independent hydrogeological unit, the groundwater level in the hole is observed over a long period of time, and the water level fluctuation is obtained.
9. The method according to claim 1, characterized in that: The determining of the design water level of the underground water seal cave constructed in the independent hydrogeological unit based on the lowest underground water level and the underground water level fluctuation value comprises: The design water level = the lowest groundwater level - the groundwater level fluctuation value - the preset safety margin.
10. The method according to claim 9, characterized in that Also includes: When the groundwater level fluctuation value is less than 5 meters and the average permeability coefficient of the reservoir rock mass is lower than 0.1Lu, the preset safety margin is 5 meters; When the groundwater level fluctuation value is greater than 5 meters and the average permeability coefficient of the reservoir rock mass is lower than 0.1Lu, the preset safety margin is 10 meters; When the groundwater level fluctuation value is greater than 5m and the average permeability coefficient of the reservoir rock mass is higher than 0.1Lu, the preset safety margin is 15 meters.