Method for simulating annual hour-level rapid operation of cascade reversible hydropower station

By transforming the operation simulation model of a cascade reversible hydropower station into a mixed-integer linear programming model, the problem of inaccurate simulation in traditional simulation methods is solved, enabling fast and accurate operation simulation and optimization, and reducing system operating costs.

CN118965803AActive Publication Date: 2024-11-15HUAZHONG UNIV OF SCI & TECH

Patent Information

Application Number
CN202411186539.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-15
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

Traditional simulation methods for the operation of cascade reversible hydropower stations in power systems are difficult to accurately simulate, and cannot effectively consider various complex constraints, resulting in the inability to find the global optimal solution, which increases computational complexity and operating costs.

Method used

The simulation model of the operation of a cascade reversible hydropower station was transformed into a mixed-integer linear programming model by using a first-order Taylor expansion and linearization method of nonlinear functions, and then solved by calling the gurobipy software in Python.

Benefits of technology

It enables rapid and accurate simulation of cascade reversible hydropower stations, optimizes operation strategies, improves energy utilization efficiency, and reduces operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965803A_ABST
    Figure CN118965803A_ABST
Patent Text Reader

Abstract

The invention relates to a cascade reversible hydropower station annual hour-level rapid operation simulation method, which comprises the following steps: S1, according to the operation condition of a reversible hydropower station, considering constraint conditions of output, water head, flow and reservoir capacity, and taking maximization of the total output of the power station as a target function, establishing an operation simulation model of the reversible hydropower station; based on a nonlinear function first-order Taylor expansion and linearization method, a nonlinear part in the operation simulation model is linearized, and the model is simplified into a mixed integer linear programming model; and solving the operation simulation model according to the upstream runoff data and the operation parameters of the reversible hydropower station to obtain an operation simulation result. According to the method, solving is carried out in the form of concise linear programming or mixed integer linear programming, the solving speed and stability are improved, the electric power system operation strategy of the reversible hydropower station is better optimized, the energy utilization efficiency is improved, and the system operation cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of electrical engineering, and more specifically to a method for simulating the rapid operation of a cascade reversible hydropower station at hourly level throughout the year. Background Art

[0002] Reversible hydropower stations are capable of generating electricity and storing energy, and have the ability to regulate grid load, store energy, and balance electricity supply and demand. When optimizing the operation of a power system, accurate and efficient operation simulation of a hydropower station is crucial to the economic operation of the system. In traditional power system medium- and long-term operation simulation methods, since a variety of complex constraints need to be considered during the operation simulation of a hydropower station, such as nonlinear and non-convex optimization problems such as power generation output, head changes, flow restrictions, and reservoir capacity restrictions, it is difficult to ensure that the global optimal solution is found, and the complexity and computational burden of the simulation are increased. Head changes and operation constraints are often ignored, resulting in the inability to accurately simulate the operation and making it difficult to apply in practice. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a method for simulating the rapid operation of a cascade reversible hydropower station at the hourly level throughout the year, which can simulate the operation of the cascade reversible hydropower station more quickly and accurately.

[0004] The technical solution adopted by the present invention to solve the technical problem is: constructing a method for simulating the rapid operation of a cascade reversible hydropower station at the hourly level throughout the year, comprising the following steps:

[0005] S1. Establishment of operation simulation model: According to the operation status of the reversible hydropower station, considering the constraints of output, head, flow and reservoir capacity, and taking the maximization of the total output of the power station as the objective function, an operation simulation model of the reversible hydropower station is established;

[0006] S2. Model linearization: Based on the first-order Taylor expansion and linearization method of nonlinear functions, the bilinear part of the running simulation model is linearized and the model is simplified into a mixed integer linear programming model;

[0007] S3. Model solution: According to the runoff data and operation parameters upstream of the reversible hydropower station, the operation simulation model is solved to obtain the operation simulation results.

[0008] According to the above scheme, in step S1, the conventional cascade power station model formula is as follows:

[0009]

[0010] in, Indicates the total output, Indicates the unit output. represents the total power generation flow, Indicates the power generation flow of the unit, Indicates total increase in reserve. Indicates that the unit is on standby. Indicates total downgrade reserve. Indicates that the unit is downgraded to standby, ρ indicates the density of water, g indicates the acceleration of gravity, η hydro represents the conversion efficiency of conventional cascade power stations. represents the generating head, Indicates the maximum output of the operating range in the vibration zone, H i,t Indicates the water level of the upper reservoir, represents the tailwater height, represents the head loss, Indicates the discharge flow, f HQ It represents the tailwater height-total discharge flow curve, and the subscripts i, x, and t represent the power station, unit, and time number respectively;

[0011] The operating constraint formula of conventional power station units is as follows:

[0012]

[0013] in, Indicates the minimum output of the operating range in the vibration zone. Indicates the minimum output of the operating range in the vibration zone. Indicates the maximum output of the operating range in the vibration zone. Indicates the maximum output of the operating range in the vibration zone. A state variable indicating whether the unit is operating in the vibration zone. The state variable indicating whether the unit is operating in the vibration zone. Indicates the maximum downstream flow rate, represents the maximum power generation flow, f QH Represents the maximum discharge flow-upper reservoir water level curve, H min,i,x Indicates the minimum water head, H max,i,x Indicates the maximum water head;

[0014] The operating model formula of the reversible power station is as follows:

[0015]

[0016]

[0017] in, Represents the total output of the reversible power station, Represents the power generation of the reversible unit, represents the pumping power of the reversible unit, represents the total flow of the reversible power station, represents the power generation flow of the reversible unit, Indicates the pumping flow rate of the reversible unit, Indicates that the reversible power station is always adjusted to standby. Indicates that the generator set is put on standby. Indicates that the pumping unit is on standby. Indicates that the reversible power station is always down-regulated for standby. Indicates that the generator set is downgraded to standby. Indicates that the pumping unit is lowered to standby, η gen It represents the energy conversion efficiency of power generation. represents the generating head, η pump represents the pumping energy conversion efficiency, Indicates the pumping head, Indicates the maximum power output. Indicates the maximum pumping power, H i,t Upstream reservoir water level, H i+1,t represents the water level of the downstream reservoir, It represents the head loss;

[0018] The operating constraints of the reversible power plant are as follows:

[0019]

[0020]

[0021] in, Indicates the minimum power output, Indicates the maximum power output. represents the minimum pumping power, represents the maximum pumping power, The state variable representing the unit working in power generation condition, Indicates the state variable of the unit working in pumping condition, represents the minimum generating head, represents the maximum generating head, Indicates the minimum pumping head, Indicates the maximum pumping head;

[0022] The operation model and constraint formula of the reservoir are as follows:

[0023]

[0024]

[0025] Among them, f HV represents the water level-reservoir capacity curve, Represents the average storage capacity of the reservoir during the period, V i,t represents the reservoir capacity at the beginning of the period, V i,t+1 represents the reservoir capacity at the end of the period, Vmin Represents the minimum storage capacity, V max represents the maximum storage capacity, It represents the total discharge of the reservoir to the lower reservoir, Δt represents the length of the time period, represents natural runoff;

[0026] The formula for optimizing the objective function of maximizing the total output is as follows:

[0027]

[0028] Wherein, T represents the total time period and N represents the total number of power stations.

[0029] According to the above scheme, in step S2, the first-order Taylor expansion linearization formula of the cascade hydropower output function is as follows:

[0030]

[0031] in, Indicates the flow rate of the operating interval on the vibration zone. Indicates the flow rate in the operating interval under the vibration zone;

[0032] The first-order Taylor expansion linearization formula for the reversible unit output function is as follows:

[0033]

[0034] The linearization formulas of tailwater height-total discharge flow curve, maximum discharge flow-upper reservoir water level curve and water level-storage capacity curve are as follows (taking water level-storage capacity curve as an example):

[0035]

[0036] Among them, a and b are unknown coefficients.

[0037] According to the above scheme, in step S3, the model solving process is as follows: the cascade reversible hydropower station operation model obtained by first-order Taylor expansion and linearization of nonlinear functions is a mixed integer linear programming model, which can be solved by calling gurobipy solving software in Python.

[0038] According to the above scheme, the specific process of converting the cascade reversible hydropower station operation model into a mixed integer linear programming model through the first-order Taylor expansion and linearization of nonlinear functions includes the following steps:

[0039] S301. Define non-decision variables in the model according to actual data, including natural runoff, water flow time lag, output, water head, head, upper and lower flow limits, and energy conversion efficiency;

[0040] S302, inputting the objective function and constraint conditions of the model into the solver, and defining the solution parameters, including the number of iterations and tolerance error;

[0041] S303, outputting the model solution result to obtain the operation simulation result of the cascade reversible hydropower station.

[0042] The method for simulating the rapid operation of a cascade reversible hydropower station at the hourly level throughout the year according to the present invention has the following features:

[0043] Beneficial effects:

[0044] 1. The present invention carefully considers all aspects of the operation of the cascade reversible hydropower station, adopts the first-order Taylor expansion and linearization technology based on nonlinear functions to transform the nonlinear problem into a linear problem, and introduces additional variables and constraints to approximate the original nonlinear function, so that the problem can be solved in the form of linear programming or mixed integer linear programming, thereby improving the speed and stability of the solution; using advanced mathematical methods to improve the simulation technology, the operation strategy of the hydropower station can be better optimized, the energy utilization efficiency can be improved, and the operation cost can be reduced;

[0045] 2. In order to improve the accuracy of simulation and the efficiency of solution, the present invention adopts the first-order Taylor expansion and linearization technology based on nonlinear function to transform nonlinear problems into linear problems. There is no need to introduce additional variables and constraints to approximate the original nonlinear function, so that the problem can be solved in the form of concise linear programming or mixed integer linear programming, thereby improving the speed and stability of solution. By balancing the operation of the hydropower station and the difficulty of system solution, the simulation technology is improved by mathematical methods, which can better optimize the operation strategy of the power system including the reversible hydropower station, improve energy utilization efficiency and reduce system operation costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0047] Figure 1 It is a flow chart of the method for simulating the rapid operation of the cascade reversible hydropower station at hourly level throughout the year according to the present invention. DETAILED DESCRIPTION

[0048] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0049] like Figure 1 As shown, the method for simulating the rapid operation of a cascade reversible hydropower station at the hourly level throughout the year of the present invention comprises the following steps:

[0050] S1. Run simulation model establishment

[0051] According to the operation of the reversible hydropower station, considering the constraints such as output, head, flow and reservoir capacity, and taking the maximization of the total output of the power station as the objective function, a reversible hydropower station operation simulation model is established;

[0052] The formula for the conventional cascade power station model is as follows:

[0053]

[0054] in, Indicates the total output, Indicates the unit output. represents the total power generation flow, Indicates the power generation flow of the unit, Indicates total increase in reserve. Indicates that the unit is on standby. Indicates total downgrade reserve. Indicates that the unit is downgraded to standby, ρ indicates the density of water, g indicates the acceleration of gravity, η hydro represents the conversion efficiency of conventional cascade power stations. represents the generating head, Indicates the maximum output of the operating range in the vibration zone, H i,t Indicates the water level of the upper reservoir, represents the tailwater height, represents the head loss, Indicates the discharge flow, f HQ It represents the tailwater height-total discharge flow curve, and the subscripts i, x, and t represent the power station, unit, and time number respectively;

[0055] The operating constraint formula of conventional power station units is as follows:

[0056]

[0057]

[0058] in, Indicates the minimum output of the operating range in the vibration zone. Indicates the minimum output of the operating range in the vibration zone. Indicates the maximum output of the operating range in the vibration zone. Indicates the maximum output of the operating range in the vibration zone. A state variable indicating whether the unit is operating in the vibration zone. The state variable indicating whether the unit is operating in the vibration zone. Indicates the maximum downstream flow rate, represents the maximum power generation flow, f QH Represents the maximum discharge flow-upper reservoir water level curve, H min,i,x Indicates the minimum water head, Hmax,i,x Indicates the maximum water head;

[0059] The operating model formula of the reversible power station is as follows:

[0060]

[0061] in, Represents the total output of the reversible power station, Represents the power generation of the reversible unit, represents the pumping power of the reversible unit, represents the total flow of the reversible power station, represents the power generation flow of the reversible unit, Indicates the pumping flow rate of the reversible unit, Indicates that the reversible power station is always adjusted to standby. Indicates that the generator set is put on standby. Indicates that the pumping unit is on standby. Indicates that the reversible power station is always down-regulated for standby. Indicates that the generator set is downgraded to standby. Indicates that the pumping unit is lowered to standby, η gen It represents the energy conversion efficiency of power generation. represents the generating head, η pump represents the pumping energy conversion efficiency, Indicates the pumping head, Indicates the maximum power output. Indicates the maximum pumping power, H i,t Upstream reservoir water level, H i+1,t represents the water level of the downstream reservoir, It represents the head loss;

[0062] The operating constraints of the reversible power plant are as follows:

[0063]

[0064] in, Indicates the minimum power output, Indicates the maximum power output. represents the minimum pumping power, represents the maximum pumping power, The state variable representing the unit working in power generation condition, Indicates the state variable of the unit working in pumping condition, represents the minimum generating head, represents the maximum generating head, Indicates the minimum pumping head, Indicates the maximum pumping head;

[0065] The operation model and constraint formula of the reservoir are as follows:

[0066]

[0067] V min ≤V i,t ≤V max

[0068]

[0069]

[0070] Among them, f HV represents the water level-reservoir capacity curve, Represents the average storage capacity of the reservoir during the period, V i,t represents the initial reservoir capacity of the time period, V i,t+1 represents the reservoir capacity at the end of the period, V min Represents the minimum storage capacity, V max represents the maximum storage capacity, It represents the total discharge of the reservoir to the lower reservoir, Δt represents the length of the time period, represents natural runoff;

[0071] The formula for optimizing the objective function of maximizing the total output is as follows:

[0072]

[0073] Wherein, T represents the total time period and N represents the total number of power stations.

[0074] S2. Model linearization

[0075] Based on the first-order Taylor expansion and linearization method of nonlinear function, the nonlinear part of the running simulation model is linearized and the model is simplified into a mixed integer linear programming model.

[0076] The first-order Taylor expansion linearization formula of the cascade hydropower output function is as follows:

[0077]

[0078] in, Indicates the flow rate of the operating interval on the vibration zone. Indicates the flow rate in the operating interval under the vibration zone;

[0079] The first-order Taylor expansion linearization formula for the reversible unit output function is as follows:

[0080]

[0081]

[0082] The linearization formulas of tailwater height-total discharge flow curve, maximum discharge flow-upper reservoir water level curve and water level-storage capacity curve are as follows (taking water level-storage capacity curve as an example):

[0083]

[0084] Among them, a and b are unknown coefficients.

[0085] S3. Model solution

[0086] According to the runoff data and operation parameters of the upstream of the reversible hydropower station, the operation simulation model is solved and the operation simulation results are obtained.

[0087] The model solving process is as follows:

[0088] The operation model of the cascade reversible hydropower station through the first-order Taylor expansion and linearization method of nonlinear functions is a mixed integer linear programming model, which can be solved by calling the gurobipy solver in Python. First, the non-decision variables in the model are defined according to the actual data, including step length, natural runoff, water flow time lag, output, head, head, upper and lower limits of flow, energy conversion efficiency, etc., and then the objective function and constraints of the model are input into the solver, and the solution parameters are defined, including the number of iterations, tolerance error, etc., and finally the model solution results are output to obtain the operation simulation results of the cascade reversible hydropower station.

[0089] Example

[0090] The example analysis is carried out with simulated simplified data. The data is shown in Table 1 below:

[0091] Table 1 Data of upstream and downstream conventional hydropower stations

[0092]

[0093]

[0094] According to the model establishment in step S1, the model linearization in step S2, and the model solution in step S3, the results are shown in Table 2 below:

[0095] Table 2 Simulation results

[0096]

[0097]

[0098]

[0099] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.

Claims

1. A method for simulating the rapid operation of a cascade reversible hydropower station at the hourly level throughout the year, characterized in that: The following steps are involved: S1. According to the operation of the reversible hydropower station, considering the constraints of output, head, flow and reservoir capacity, and taking the maximization of the total output of the power station as the objective function, a reversible hydropower station operation simulation model is established; S2. Based on the first-order Taylor expansion and linearization method of nonlinear function, the bilinear part in the running simulation model is linearized and the model is simplified into a mixed integer linear programming model; S3. Solve the operation simulation model according to the runoff data and operation parameters upstream of the reversible hydropower station to obtain the operation simulation results.

2. The method for simulating the rapid operation of a cascade reversible hydropower station at an hourly level throughout the year according to claim 1, characterized in that: In step S1, the conventional cascade power station model formula is as follows: in, Indicates the total output, Indicates the unit output. represents the total power generation flow, Indicates the power generation flow of the unit, Indicates total increase in reserve. Indicates that the unit is on standby. Indicates total downgrade reserve. Indicates that the unit is downgraded to standby, ρ indicates the density of water, g indicates the acceleration of gravity, η hydro It represents the conversion efficiency of conventional cascade power stations. represents the generating head, Indicates the maximum output of the operating range in the vibration zone, H i,t Indicates the water level of the upper reservoir, represents the tailwater height, represents the head loss, Indicates the discharge flow, f HQ It represents the tailwater height-total discharge flow curve, and the subscripts i, x, and t represent the power station, unit, and time number respectively; The operating constraint formula of conventional power station units is as follows: in, Indicates the minimum output of the operating range in the vibration zone. Indicates the minimum output of the operating range in the vibration zone. Indicates the maximum output of the operating range in the vibration zone. Indicates the maximum output of the operating range in the vibration zone. A state variable indicating whether the unit is operating in the vibration zone. The state variable indicating whether the unit is operating in the vibration zone. Indicates the maximum downstream flow rate, represents the maximum power generation flow, f QH Represents the maximum discharge flow-upper reservoir water level curve, H min,i,x Indicates the minimum water head, H max,i,x Indicates the maximum water head; The operating model formula of the reversible power station is as follows: in, Represents the total output of the reversible power station, Represents the power generation of the reversible unit, represents the pumping power of the reversible unit, represents the total flow of the reversible power station, represents the power generation flow of the reversible unit, Indicates the pumping flow rate of the reversible unit, Indicates that the reversible power station is always adjusted to standby. Indicates that the generator set is put on standby. Indicates that the pumping unit is on standby. Indicates that the reversible power station is always down-regulated for standby. Indicates that the generator set is downgraded to standby. Indicates that the pumping unit is lowered to standby, η gen It represents the energy conversion efficiency of power generation. represents the generating head, η pump represents the pumping energy conversion efficiency, Indicates the pumping head, Indicates the maximum power output. Indicates the maximum pumping power, H i,t Upstream reservoir water level, H i+1,t represents the water level of the downstream reservoir, It represents the head loss; The operating constraints of the reversible power plant are as follows: in, Indicates the minimum power output, Indicates the maximum power output. represents the minimum pumping power, represents the maximum pumping power, The state variable representing the unit working in power generation condition, Indicates the state variable of the unit working in pumping condition, represents the minimum generating head, represents the maximum generating head, Indicates the minimum pumping head, Indicates the maximum pumping head; The operation model and constraint formula of the reservoir are as follows: In min ≤V i,t ≤V max Among them, f HV represents the water level-reservoir capacity curve, Represents the average storage capacity of the reservoir during the period, V i,t represents the initial reservoir capacity of the time period, V i,t+1 represents the reservoir capacity at the end of the period, V min Represents the minimum storage capacity, V max represents the maximum storage capacity, It represents the total discharge of the reservoir to the lower reservoir, Δt represents the length of the time period, represents natural runoff; The formula for optimizing the objective function of maximizing the total output is as follows: Wherein, T represents the total time period and N represents the total number of power stations.

3. The method for simulating the rapid operation of a cascade reversible hydropower station at the hourly level throughout the year according to claim 1, characterized in that: In step S2, the first-order Taylor expansion linearization formula of the cascade hydropower output function is as follows: in, Indicates the flow rate of the operating interval on the vibration zone. Indicates the flow rate in the operating interval under the vibration zone; The first-order Taylor expansion linearization formula for the reversible unit output function is as follows: The linearization formulas of tailwater height-total discharge flow curve, maximum discharge flow-upper reservoir water level curve and water level-storage capacity curve are as follows (taking water level-storage capacity curve as an example): Among them, a and b are unknown coefficients.

4. The method for simulating the rapid operation of a cascade reversible hydropower station at the hourly level throughout the year according to claim 1, characterized in that: In the step S3, the model solving process is as follows: the operation model of the cascade reversible hydropower station through the first-order Taylor expansion and linearization of the nonlinear function is a mixed integer linear programming model, which can be solved by calling the gurobipy solving software in Python; 5. The method for simulating the rapid operation of a cascade reversible hydropower station at the hourly level throughout the year according to claim 4, characterized in that: The specific process of converting the cascade reversible hydropower station operation model into a mixed integer linear programming model through the first-order Taylor expansion and linearization of nonlinear functions includes the following steps: S301. Define non-decision variables in the model according to actual data, including natural runoff, water flow time lag, output, water head, head, upper and lower flow limits, and energy conversion efficiency; S302, inputting the objective function and constraint conditions of the model into the solver, and defining the solution parameters, including the number of iterations and tolerance error; S303, outputting the model solution result to obtain the operation simulation result of the cascade reversible hydropower station.

Citation Information

Patent Citations

  • Daily peak regulation operation method for cascade pumped storage power station

    CN116667362A

  • Reservoir level control method based on maximum output of cascade hydropower stations

    CN117610859A

  • Day-ahead optimal scheduling method for cascade multi-main-body hybrid pumped storage power station

    CN118378873A

  • Benefit distribution method under combined dispatching of multi-main-body hybrid pumped storage power stations

    CN118396262A

  • Method and system for ecological operation of total phosphorus export of cascade hydropower station

    US20210201220A1

Cited By

  • Segmented McCormick relaxation-based cascade reversible hydropower station operation simulation method and device

    CN119939862A

  • A Simulation Method and Device for the Operation of Cascade Reversible Hydropower Stations Based on Segmented McCormick Relaxation

    CN119939862B

  • Compressed air self-adaptive cascade closed series pumped storage power station and operation method

    CN120466134A