Water resource planning method based on interactive two-stage interval fuzzy programming model
Through an interactive two-stage interval fuzzy planning model, combining multiple planning models to deal with multiple uncertainties in water resource management, the complexity problem in water resource planning is solved, and stable decision-making space and higher water resource management are provided. benefit.
Patent Information
- Application Number
- CN202411097931.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-15
AI Technical Summary
In water resource management, water resource planning is complex under multiple uncertainties, and it is difficult to effectively solve the interaction between regional water distribution and socio-economic factors, resulting in the challenge of the effectiveness and scientific nature of decision-making.
Using an interactive two-stage interval fuzzy planning model, combining two-stage stochastic planning model, interactive fuzzy planning model and interval linear planning model, the optimization model is transformed into a deterministic upper and lower limit sub-model by introducing decision variables, and the solution is found. Obtain an optimized allocation plan for water resources, deal with multiple uncertainties, and achieve effective links between policy scenarios and economic indicators.
A flexible interval configuration scheme was generated, providing greater decision-making space, helping decision makers to balance goal satisfaction and constraint feasibility, improve the stability and system economy of water resource management, and solve the problem of water use. Issues of uncertainty in allocation situations.
Smart Images

Figure CN118966701A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of water resource management, and in particular to a water resource planning method based on an interactive two-stage interval fuzzy programming model. Background Art
[0002] In water resources management, there are many uncertainties in the optimal use of water resources, such as the uneven distribution of water resources in different regions and industries, and socio-economic factors such as water use benefits, which all have great uncertainty. These uncertain parameters and their interactions will further increase the complexity of water resources management. In addition, the interaction between parameters creates a huge complexity of the system, which also brings great challenges to the effectiveness and scientificity of comprehensive water resources management decisions. Therefore, how to solve the problem of water resources planning under multiple uncertainties is an urgent problem that technicians in this field need to solve. Summary of the invention
[0003] Based on this, it is necessary to provide a water resources planning method based on an interactive two-stage interval fuzzy programming model to solve the water resources planning problem under multiple uncertainties in the background technology.
[0004] A water resources planning method based on an interactive two-stage interval fuzzy programming model comprises the following steps:
[0005] Taking the maximization of regional water use comprehensive benefits as the objective function, and taking the surface water diversion and regulation water volume constraints, groundwater usage constraints, recycled water supply capacity constraints, surface water stage supply capacity constraints, groundwater stage supply capacity constraints, supply stage constraints, and technical and non-negative constraints as constraints, an optimization model is established;
[0006] According to the interval interactive fuzzy programming algorithm, the optimization model is converted into a deterministic upper limit sub-model and a lower limit sub-model by introducing decision variables, and the upper limit sub-model and the lower limit sub-model are solved respectively to obtain solution results corresponding to the upper limit sub-model and the lower limit sub-model;
[0007] A water resource optimization configuration scheme is determined according to the solution results corresponding to the upper limit sub-model and the lower limit sub-model.
[0008] The present invention combines a two-stage stochastic programming model (TSP), an interactive fuzzy programming model (IFP) and an interval linear programming model (ILP) to generate an interactive two-stage interval fuzzy programming model (ITFSP), i.e., an optimization model. The ITFSP model can effectively handle multiple uncertainty problems expressed as probability distributions, intervals and fuzzy sets, and can achieve an effective link between policy scenarios and economic indicators, while effectively evaluating the compromise between system economy and stability, and ultimately obtaining a more stable solution.
[0009] Specifically, the ITFSP model obtains a series of solution sets under different membership degrees. The generated interval configuration scheme is more flexible and can provide decision makers with a larger decision space to make better decisions. Fuzzy comprehensive decision-making is used to aggregate the satisfaction and membership degree under each membership degree α feasible solution, so that decision makers can measure the balance between target satisfaction and constraint feasibility. At the same time, the ITFSP model can obtain interval solutions, which can provide a stable and feasible decision space for decision makers, and provide suggestions for regional integrated water resources management through scenario policy analysis.
[0010] The present invention applies the ITFSP model to the regional water resources management configuration system. The main goal considered is to identify an optimal policy so that under given constraints and objectives, by allocating limited water resources to multiple regions, the benefits of the regional water resources management configuration system can be maximized while ensuring water supply, thereby effectively solving the problem of uncertain water allocation in regional water resources configuration. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0012] Figure 1 A flowchart of a water resources planning method based on an interactive two-stage interval fuzzy programming model in one embodiment;
[0013] Figure 2 is a system benefit diagram of the upper limit sub-model and the lower limit sub-model under different membership degrees α in one embodiment;
[0014] Figure 3 It represents the fuzzy decision boundary interval of system benefits under different membership α levels;
[0015] Figure 4 This is the allocation plan diagram of agricultural water resources in each region under the optimal membership degree;
[0016] Figure 5 This is the allocation plan diagram of municipal water resources in each region under the optimal membership degree;
[0017] Figure 6 This is the allocation plan diagram of industrial water resources in each region under the optimal membership degree;
[0018] Figure 7 This is the allocation plan diagram of comprehensive water resources in various regions under the optimal membership degree. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0021] In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, "and / or" in the full text includes three solutions. Taking A and / or B as an example, it includes technical solution A, technical solution B, and technical solution that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0022] Among many uncertainty optimization methods, the two-stage stochastic programming model (TSP) has been used many times in the field of agricultural water resources management. The TSP model can not only handle random uncertainties, but also take recourse. That is, after a random event occurs, corrective measures are taken to adjust and modify the decision-making goals preset in the first stage. Therefore, TSP can also be used to effectively analyze relevant forecasting policy scenarios. However, in many practical problems, the information quality of the parameters cannot meet the requirements of expressing them as probability distribution functions. At the same time, TSP is also difficult to handle large-scale models containing multiple random variables, and it is also difficult to handle other forms of uncertainty.
[0023] As a type of fuzzy mathematical programming, the interactive fuzzy programming model (IFP) can not only handle uncertainty expressed as fuzzy sets, but also allow decision makers to express their choices in linguistic terms throughout the decision-making process. It can also deeply analyze the trade-off between goals and risks by solving the constraint satisfaction (i.e., the risk of violating the constraint) under different membership degrees. However, the main limitation of IFP is that it is difficult to reflect other forms of uncertainty in non-fuzzy decision spaces.
[0024] Interval linear programming (ILP) is another method that can effectively handle uncertainty. Compared with probability distribution information, interval information is easier to obtain, and the solution method of the interval model is simpler. However, the main limitation of ILP is that it cannot handle uncertainty expressed as probability distribution, nor can it express the risk of violating constraints to support decision makers in analyzing the trade-off between economic benefits and system risks. In summary, the above three methods have their own advantages and disadvantages, and at the same time they also reflect the characteristics of being able to complement each other. Coupling them together can better handle the problem of multiple uncertainties.
[0025] Based on this, reference Figure 1 The present application provides a water resources planning method based on an interactive two-stage interval fuzzy programming model, the method comprising the following steps:
[0026] A water resources planning method based on an interactive two-stage interval fuzzy programming model, characterized by comprising the following steps:
[0027] S1. Taking the maximization of regional water use comprehensive benefits as the objective function, and taking the surface water diversion and regulation water volume constraints, groundwater use volume constraints, recycled water supply capacity constraints, surface water stage supply capacity constraints, groundwater stage supply capacity constraints, supply stage constraints, and technical and non-negative constraints as constraints, an optimization model is established;
[0028] S2. According to the interval interactive fuzzy programming algorithm, the optimization model is converted into a deterministic upper limit sub-model and a lower limit sub-model by introducing decision variables, and the upper limit sub-model and the lower limit sub-model are solved respectively to obtain the solution results corresponding to the upper limit sub-model and the lower limit sub-model;
[0029] S3. Determine the optimal water resource allocation plan based on the solution results corresponding to the upper limit sub-model and the lower limit sub-model.
[0030] The present invention combines a two-stage stochastic programming model (TSP), an interactive fuzzy programming model (IFP) and an interval linear programming model (ILP) to generate an interactive two-stage interval fuzzy programming model (ITFSP), i.e., an optimization model. The ITFSP model can effectively handle multiple uncertainty problems expressed as probability distributions, intervals and fuzzy sets, and can achieve an effective link between policy scenarios and economic indicators, while effectively evaluating the compromise between system economy and stability, and ultimately obtaining a more stable solution.
[0031] Specifically, the ITFSP model obtains a series of solution sets under different membership degrees. The generated interval configuration scheme is more flexible and can provide decision makers with a larger decision space to make better decisions. Fuzzy comprehensive decision-making is used to aggregate the satisfaction and membership degree under each membership degree α feasible solution, so that decision makers can measure the balance between target satisfaction and constraint feasibility. At the same time, the ITFSP model can obtain interval solutions, which can provide a stable and feasible decision space for decision makers, and provide suggestions for regional integrated water resources management through scenario policy analysis.
[0032] The present invention applies the ITFSP model to the regional water resources management configuration system. The main goal considered is to identify an optimal policy so that under given constraints and objectives, by allocating limited water resources to multiple regions, the benefits of the regional water resources management configuration system can be maximized while ensuring water supply, thereby effectively solving the problem of uncertain water allocation in regional water resources configuration.
[0033] In one embodiment, the objective function is as follows:
[0034] Maximize f ± =f1 ± +f2 ± +f3 ± -f4 ± -f5 ± -f6 ±
[0035] Among them, f ± represents the system benefit; f1 ±represents the system revenue of industrial water use (specifically refers to the system revenue when the industrial water demand is met); f2 ± represents the benefits of the agricultural water use system (specifically, the benefits of the system when the agricultural water demand is met); f3 ± represents the revenue of the municipal water system (specifically, the system revenue when the municipal water demand is met); f4 ± Indicates the cost of industrial water supply system (specifically industrial water supply cost and industrial sewage treatment cost); f5 ± represents the cost of agricultural water supply system (specifically the cost of agricultural water supply and the water shortage loss caused by unsatisfied agricultural demand); f6 ± It represents the cost of municipal water supply system (specifically the cost of municipal domestic sewage treatment and municipal water supply);
[0036]
[0037] represents the industrial water supply of surface water source to region j (j=1 represents zone 1; j=2 represents zone 2; j=3 represents zone 3; j=4 represents zone 4; j=5 represents zone 5) in planning period i (i=1 represents planning period 1, i=2 represents planning period 2, and i=3 represents planning period 3), m 3 ;
[0038] represents the industrial water supply of groundwater source i to region j during the planning period, m 3 ;
[0039] represents the industrial water supply of recycled water source i to region j during the planning period, m 3 ;
[0040] Indicates the unit income of meeting the industrial water supply target, ¥ / m 3 ;
[0041]
[0042] represents the agricultural water supply of surface water source i to region j during the planning period, m 3 ; represents the agricultural water supply of groundwater source i to region j during the planning period, m 3 ; represents the agricultural water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the unit benefit of meeting the agricultural water supply target, ¥ / m 3 ;
[0043]
[0044] represents the municipal water supply of surface water source to region j during planning period i, m 3 ; represents the municipal water supply of groundwater source i to region j during the planning period, m 3 ; represents the municipal water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the unit benefit of meeting the municipal water supply target, ¥ / m 3 ;
[0045]
[0046] Indicates the surface water supply cost for industrial water use, ¥ / m 3 ;
[0047] Indicates the groundwater supply cost for industrial water use, ¥ / m 3 ;
[0048] Indicates the cost of industrial water reuse and supply, ¥ / m 3 ;
[0049] Indicates the unit cost of industrial wastewater treatment, ¥ / m 3 ;
[0050] It indicates the proportion of wastewater generated by water use by industrial units, %;
[0051]
[0052] Indicates the cost of surface water supply for agricultural use, ¥ / m 3 ;
[0053] Indicates the groundwater supply cost for agricultural water use, ¥ / m 3 ;
[0054] Indicates the cost of water supply for agricultural reuse water, ¥ / m 3 ;
[0055] Indicates the unit cost of industrial wastewater treatment, ¥ / m 3 ;
[0056] represents the shortage of agricultural surface water use target, m 3 ;
[0057] Represents the shortage of agricultural groundwater use target, m 3 ;
[0058] represents the shortfall of the agricultural reuse water target, m 3 ;
[0059]
[0060] Surface water supply costs for municipal water demand, ¥ / m 3 ;
[0061] The cost of groundwater supply for municipal water demand, ¥ / m 3 ;
[0062] Represents the cost of recycled water supply for municipal water demand, ¥ / m 3 ;
[0063] Indicates the unit municipal sewage treatment cost, ¥ / m 3 ;
[0064] Indicates the proportion of wastewater generated by water use by municipal units, %.
[0065] In one embodiment, the water volume constraints of surface water diversion are as follows:
[0066]
[0067] Indicates the adjustable water volume of surface water diversion, m 3 ;
[0068] The groundwater usage constraint specifically means that the groundwater extraction volume cannot exceed the groundwater resources. The groundwater usage constraint is as follows:
[0069]
[0070] represents the amount of groundwater that can be exploited under water resource constraints, m 3 ;
[0071] Regarding the constraints on the reused water supply capacity, with the acceleration of urbanization and industrialization, urban sewage and industrial wastewater continue to increase, and urban sewage and industrial wastewater are included in the unified allocation and management of water resources. Due to the limitations of sewage treatment technology and the characteristics of local water quality, the recycled water of municipal sewage and industrial wastewater is mainly used to support industrial water demand. Therefore, the supply target of reused water should not be greater than the maximum reused water supply capacity. The reused water supply capacity constraints are as follows:
[0072]
[0073] represents the reuse water supply capacity constraint, m 3 ;
[0074] Regarding the stage supply capacity constraints of surface water, due to the influence of the transfer capacity of pipelines, ditches and waterways, the allocation of water resources cannot exceed the stage transfer capacity of transportation facilities for surface water. The stage supply capacity constraints of surface water are as follows:
[0075]
[0076] It represents the water diversion and transfer efficiency of surface water use, %;
[0077] represents the surface water transfer capacity, m 3 ;
[0078] Regarding the phased supply capacity constraints of groundwater, since the transfer and water extraction capacity of the pumping station determines the supply of groundwater to each region, the groundwater distribution capacity will not exceed the maximum transfer capacity. The phased supply capacity constraints of groundwater are as follows:
[0079]
[0080] It represents the adoption and transfer efficiency of groundwater use, %;
[0081] represents the groundwater transport capacity, m 3 ;
[0082] Regarding the phased supply constraints, in order to ensure water supply safety, the phased water supply volume shall not be less than the user's minimum guaranteed supply. The phased supply constraints are as follows:
[0083]
[0084] Respectively represent the minimum and maximum industrial water supply in the sub-region at each stage, m 3 ;
[0085] Respectively represent the minimum and maximum agricultural water supply in the sub-region at each stage, m 3 ;
[0086] Respectively represent the minimum and maximum municipal water supply in the sub-region at each stage, m 3 ;
[0087] The techniques and non-negative constraints are as follows:
[0088]
[0089] It is important to note that the water supply targets for all different water sources (e.g. ) are all first-stage decision variables. The actual water supply does not reach the target water shortage (e.g. ) are all second-stage decision variables.
[0090] That is to say, the water supply from multiple water sources in the future planning period is predicted first. This advance decision is risky due to the uncertainty of the future. If the actual water supply cannot meet the demand target, other measures must be taken, such as transferring water from external sources or reducing production, which also leads to additional economic investment or penalties. The decision in the second stage minimizes the unreasonable losses in the first stage by dealing with uncertain events, thereby optimizing the water supply.
[0091] Specifically, the water resource supply parameters (e.g. ) are in interval form, and the superscripts + and - respectively represent the upper and lower limits of the interval number. By introducing decision variables, the ITFSP model is transformed into a deterministic upper limit sub-model and a lower limit sub-model. The upper limit sub-model and the lower limit sub-model are solved respectively to obtain the corresponding solution results of the upper limit sub-model and the lower limit sub-model. Since the objective function is to maximize the comprehensive benefit of water use, it is necessary to first perform the upper limit sub-model f + Computing to expand the decision space.
[0092] In one embodiment, the upper limit sub-model is as follows:
[0093]
[0094] Among them, f + Indicates the upper limit of system benefits; f1 + Indicates the upper limit of the industrial water system revenue; f2 + represents the upper limit of the benefits of the agricultural water system; f3 + Indicates the upper limit of the revenue of the municipal water system; f4 - Indicates the lower limit of the cost of industrial water supply system; f5 -Indicates the lower limit of agricultural water supply system cost; f6 - represents the lower limit of the cost of municipal water supply system;
[0095]
[0096] represents the upper limit of industrial water supply of surface water source to region j (j=1 represents zone 1; j=2 represents zone 2; j=3 represents zone 3; j=4 represents zone 4; j=5 represents zone 5) in planning period i (i=1 represents planning period 1, i=2 represents planning period 2, i=3 represents planning period 3), m 3 ;
[0097] represents the upper limit of industrial water supply from groundwater source i to region j during planning period, m 3 ; represents the upper limit of industrial water supply from recycled water source i to region j during planning period, m 3 ; Indicates the upper limit of unit revenue required to meet the industrial water supply target, ¥ / m 3 ;
[0098]
[0099] represents the upper limit of agricultural water supply from surface water sources to region j during planning period i, m 3 ; represents the upper limit of the agricultural water supply of groundwater source i to region j during the planning period, m 3 ; represents the upper limit of the agricultural water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the upper limit of the unit benefit required to meet the agricultural water supply target, ¥ / m 3 ;
[0100]
[0101] represents the upper limit of the municipal water supply from surface water source i to region j during the planning period, m 3 ; represents the upper limit of the municipal water supply from groundwater source i to region j during the planning period, m 3 ; represents the upper limit of the municipal water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the upper limit of unit revenue required to meet the municipal water supply target, ¥ / m 3 ;
[0102]
[0103] Indicates the lower limit of the surface water supply cost for industrial use, ¥ / m 3 ;
[0104] Indicates the lower limit of groundwater supply cost for industrial water use, ¥ / m 3 ;
[0105] Indicates the lower limit of the cost of industrial reuse water supply, ¥ / m 3 ;
[0106] Indicates the lower limit of unit industrial wastewater treatment cost, ¥ / m 3 ;
[0107] It indicates the lower limit of the proportion of wastewater generated by water use by industrial units, %;
[0108]
[0109] The lower limit of the surface water supply cost for agricultural use, ¥ / m 3 ;
[0110] The lower limit of groundwater supply cost for agricultural use, ¥ / m 3 ;
[0111] Indicates the lower limit of the cost of water supply for agricultural reuse water, ¥ / m 3 ;
[0112] Indicates the lower limit of unit industrial wastewater treatment cost, ¥ / m 3 ;
[0113] The lower limit of the shortage of agricultural surface water use target, m 3 ;
[0114] The lower limit of the shortage of agricultural groundwater use target, m 3 ;
[0115] The lower limit of the shortage of agricultural reuse water target, m 3 ;
[0116]
[0117] The lower limit of the surface water supply cost for municipal water demand, ¥ / m 3 ; The lower limit of groundwater supply cost for municipal water demand, ¥ / m 3 ; The lower limit of the cost of recycled water supply for municipal water demand, ¥ / m 3 ; Indicates the lower limit of the unit municipal sewage treatment cost, ¥ / m 3 ;
[0118] It indicates the lower limit of the proportion of wastewater generated by water use by municipal units, %;
[0119] In one embodiment, the constraints corresponding to the upper limit sub-model are as follows:
[0120] The water volume constraints for surface water diversion are as follows:
[0121]
[0122] Indicates the upper limit of the adjustable water volume of surface water diversion, m 3 ;
[0123] The groundwater usage constraints are as follows:
[0124]
[0125] represents the upper limit of groundwater exploitation under water resource constraints, m 3 ; The recycled water supply capacity constraints are as follows:
[0126]
[0127] Represents the upper limit of the reuse water supply capacity constraint, m 3 ;
[0128] The supply capacity constraints of surface water are as follows:
[0129]
[0130] It indicates the lower limit of the water diversion and transfer efficiency of surface water use, %;
[0131] Indicates the upper limit of surface water transfer capacity, m 3 ;
[0132] The phased supply capacity constraints of groundwater are as follows:
[0133]
[0134] It represents the lower limit of the transfer efficiency of groundwater use, %;
[0135] Indicates the upper limit of groundwater transport capacity, m 3 ;
[0136] The supply constraints are as follows:
[0137]
[0138] They represent the lower limit and upper limit of the minimum and maximum industrial water supply in the sub-regions at different stages, respectively. 3 ;
[0139] They represent the lower limit and upper limit of the minimum and maximum agricultural water supply in the sub-region at each stage, respectively. 3 ;
[0140] They represent the lower limit and upper limit of the minimum and maximum municipal water supply in the sub-region at each stage, respectively. 3 ;
[0141] The techniques and non-negative constraints are as follows:
[0142]
[0143] Upper limit submodel f + The solution steps include:
[0144] S21. Get the upper limit sub-model f + Feasible solutions at each membership degree α;
[0145] S22. According to the upper limit sub-model f + The feasible solution under each membership degree α is calculated by calculating the upper limit submodel f + Fuzzy target satisfaction at each membership degree α;
[0146] S23. According to the upper limit sub-model f + The fuzzy target satisfaction under each membership degree α is calculated by upper limit sub-model f + The fuzzy target membership at each membership α.
[0147] Specifically, Figure 2 As shown, Figure 2 is a system benefit diagram of the upper limit sub-model and the lower limit sub-model under different membership degrees α in an embodiment, wherein for the upper limit sub-model f+ For example, the maximum value of the upper limit target is 477, the minimum value is 403, the tolerance threshold is 74, and the value unit is ×10 9 Element, after obtaining the upper limit submodel f + After solving the problem under different membership degrees α, the decision maker specifies a maximum target G and its tolerance threshold G. If z ≥ G, then the decision maker can be completely satisfied. On the contrary, if Then satisfaction is invalid.
[0148] Therefore, the upper limit submodel f + The calculation formula of fuzzy target satisfaction under each feasible solution of membership degree α is as follows:
[0149]
[0150] In step S23, the fuzzy target membership of the upper limit sub-model = membership × fuzzy target satisfaction of the upper limit sub-model. Therefore, after obtaining the upper limit sub-model f + After the fuzzy target satisfaction is obtained under each feasible solution of membership degree α, according to the membership degree α and the upper limit sub-model f + The fuzzy target satisfaction under each feasible solution of membership degree α, combined with the upper limit sub-model f + The upper limit sub-model f can be calculated by using the fuzzy target membership calculation formula + The fuzzy target membership at each membership α.
[0151] In one embodiment, the lower limit sub-model is as follows:
[0152] Maximize f - =f1 - +f2 - +f3 - -f4 + -f5 + -f6 +
[0153] Among them, f - Indicates the lower limit of system benefits; f1 - Indicates the lower limit of the benefits of the industrial water system; f2 - represents the lower limit of the benefits of the agricultural water system; f3 - Indicates the lower limit of the municipal water system revenue; f4 + Indicates the upper limit of the cost of industrial water supply system; f5 + Indicates the upper limit of the cost of agricultural water supply system; f6 + represents the upper limit of the municipal water system expenditure;
[0154]
[0155] represents the lower limit of industrial water supply of surface water source to region j (j=1 represents zone 1; j=2 represents zone 2; j=3 represents zone 3; j=4 represents zone 4; j=5 represents zone 5) in planning period i (i=1 represents planning period 1, i=2 represents planning period 2, i=3 represents planning period 3), m 3 ;
[0156] represents the lower limit of industrial water supply from groundwater source i to region j during planning period, m 3 ; represents the lower limit of industrial water supply from recycled water source i to region j during planning period, m 3 ;
[0157] Indicates the lower limit of unit revenue for meeting industrial water supply targets, ¥ / m 3 ;
[0158]
[0159] represents the lower limit of agricultural water supply from surface water sources to region j during planning period i, m 3 ; represents the lower limit of agricultural water supply from groundwater source i to region j during planning period, m 3 ; represents the lower limit of agricultural water supply from recycled water source i to region j during planning period, m 3 ; Indicates the lower limit of unit benefit for meeting the agricultural water supply target, ¥ / m 3 ;
[0160]
[0161] represents the lower limit of the municipal water supply from surface water source i to region j during the planning period, m 3 ; represents the lower limit of the municipal water supply of groundwater source i to region j during the planning period, m 3 ; represents the lower limit of municipal water supply from recycled water source i to region j during planning period, m 3 ; It represents the lower limit of unit revenue required to meet the municipal water supply target, ¥ / m 3 ;
[0162]
[0163] Indicates the upper limit of the surface water supply cost for industrial use, ¥ / m 3 ;
[0164] Indicates the upper limit of groundwater supply cost for industrial water use, ¥ / m 3 ;
[0165] Indicates the upper limit of the cost of industrial reuse water supply, ¥ / m 3 ;
[0166] Indicates the upper limit of unit industrial wastewater treatment cost, ¥ / m 3 ;
[0167] It indicates the upper limit of the proportion of wastewater generated by water use by industrial units, %;
[0168]
[0169] Indicates the upper limit of surface water supply cost for agricultural use, ¥ / m 3 ;
[0170] Indicates the upper limit of groundwater supply cost for agricultural use, ¥ / m 3 ;
[0171] Indicates the upper limit of the cost of water supply for agricultural reuse water, ¥ / m 3 ;
[0172] Indicates the upper limit of unit industrial wastewater treatment cost, ¥ / m 3 ;
[0173] Indicates the upper limit of the shortage of agricultural surface water use target, m 3 ;
[0174] Indicates the upper limit of the shortage of agricultural groundwater use target, m 3 ;
[0175] The upper limit of the shortage of agricultural reuse water target, m 3 ;
[0176]
[0177] The upper limit of the surface water supply cost for municipal water demand, ¥ / m 3 ;
[0178] The upper limit of groundwater supply cost for municipal water demand, ¥ / m 3 ;
[0179] Indicates the upper limit of the cost of recycled water supply for municipal water demand, ¥ / m 3 ;
[0180] Indicates the upper limit of the unit municipal sewage treatment cost, ¥ / m 3 ;
[0181] It represents the upper limit of the proportion of wastewater generated by water use by municipal units, %;
[0182] In one embodiment, the constraints corresponding to the lower limit sub-model are as follows:
[0183] The water volume constraints for surface water diversion are as follows:
[0184]
[0185] Indicates the lower limit of the amount of water that can be diverted from surface water, m 3 ;
[0186] The groundwater usage constraints are as follows:
[0187]
[0188] represents the lower limit of groundwater exploitation under water resource constraints, m 3 ;
[0189] The recycled water supply capacity constraints are as follows:
[0190]
[0191] Represents the lower limit of the reuse water supply capacity constraint, m 3 ;
[0192] The supply capacity constraints of surface water are as follows:
[0193]
[0194] It represents the upper limit of the water diversion and transfer efficiency of surface water use, %;
[0195] Represents the lower limit of surface water transfer capacity, m 3 ;
[0196] The phased supply capacity constraints of groundwater are as follows:
[0197]
[0198] It represents the upper limit of the transfer efficiency of groundwater use, %;
[0199] Represents the lower limit of groundwater transport capacity, m 3 ;
[0200] The supply constraints are as follows:
[0201]
[0202] They represent the upper limit of the minimum and lower limits of the maximum industrial water supply in the sub-region at each stage, m 3 ;
[0203] They represent the upper limit of the minimum and lower limits of the maximum agricultural water supply in the sub-region at each stage, m 3 ;
[0204] They represent the upper limit of the minimum and lower limits of the maximum municipal water supply in the sub-region at each stage, m 3 ;
[0205] The techniques and non-negative constraints are as follows:
[0206]
[0207] Specifically in this embodiment, the lower limit submodel f - The solution of follows the same principle as that of solving the upper limit submodel f + The same interactive process, the lower limit submodel f - The solution steps include:
[0208] S24. Get the lower limit sub-model f - Feasible solutions at each membership degree α;
[0209] S25. According to the lower limit submodel f - The feasible solution under each membership degree α is calculated as the lower bound submodel f - Fuzzy target satisfaction at each membership degree α;
[0210] S26. According to the lower limit submodel f - The fuzzy target satisfaction under each membership degree α is calculated by calculating the lower limit sub-model f - The fuzzy target membership at each membership α.
[0211] Specifically, the same upper bound sub-model f + , for the lower limit submodel f - For example, after obtaining the lower limit submodel f - After the solution set under different membership degrees α, the decision maker also specifies a maximum target G and its tolerance threshold G, Figure 2 For the lower limit submodel f - For example, the maximum value of the lower limit target is 294, the minimum value is 252, the tolerance threshold is 42, and the value unit is ×10 9 Yuan, lower limit submodel f - The calculation formula of fuzzy target satisfaction under each feasible solution of membership degree α is as follows:
[0212]
[0213] In step S26, the fuzzy target membership of the lower limit sub-model = membership × fuzzy target satisfaction of the lower limit sub-model. Therefore, after obtaining the lower limit sub-model f - After the fuzzy target satisfaction under each feasible solution of membership degree α, according to the membership degree α and the lower limit sub-model f - The fuzzy target satisfaction under each feasible solution of membership degree α, combined with the lower limit sub-model f - The fuzzy target membership calculation formula can be used to calculate the lower limit sub-model f - The fuzzy target membership at each membership α.
[0214] Furthermore, the step S2 of solving the upper limit sub-model and the lower limit sub-model respectively to obtain the solution results corresponding to the upper limit sub-model and the lower limit sub-model further includes:
[0215] S27. Calculate the upper limit submodel f + With the lower limit submodel f - The average and deviation of the fuzzy target membership under each membership degree α are used to obtain the upper limit sub-model f + , lower limit submodel f - The balance between constraint feasibility and fuzzy goal satisfaction at each membership degree α.
[0216] It should be pointed out that the constraint feasibility refers to the fuzzy target membership. For ease of understanding, the upper limit submodel f is defined as + The fuzzy target membership under each membership degree α is A, and the lower limit submodel f is defined - The fuzzy target membership under each membership degree α is B, and the upper limit submodel f + With the lower limit submodel f -The average value of the fuzzy target membership under each membership degree α is X, and the upper limit submodel f + With the lower limit submodel f - The deviation Y of the fuzzy target membership at each membership α, where: Y=|AX|=|BXTable 1 Fuzzy decision membership of the optimization model under the feasible solution of each membership degree α
[0217]
[0218] Specifically, refer to Table 1, which shows the fuzzy decision membership of the optimization model under each feasible solution of the membership α. By solving the above optimization model, the results under different membership α are obtained. When the membership α is lower, the risk of violating the constraint is higher. Among the 11 different semantic scales from 0 to 1 with an interval of 0.1, it is assumed that 0.4 is the minimum constraint feasibility acceptable to the decision maker. Therefore, for robust decision-making, 7 discrete values of membership α are selected to analyze the constraint feasibility, namely {0.4, 0.5, 0.6, 0.7, 0.8, 0.9, 1}. The objective function value at each level of membership α is expressed as a boundary fuzzy interval, which is due to the uncertainty of the input parameters and the complexity of the interaction between the parameters. For example, when α = 0.5, the lower limit of the system benefit f - Represented as a triangular fuzzy set, it is (273.88, 281.67, 289.46)×10 9 Yuan, similarly, the upper limit of system revenue f + Expressed in the form of a triangular fuzzy set, it is (445.47, 456.23, 466.84)×10 9 Therefore, the fuzzy boundary interval reflects the dual uncertainty of information. Figure 2 It can be seen that when α = 1, the system achieves the minimum benefit, and when α = 0.4, the system achieves the maximum benefit. The results show that the system benefit decreases with the increase of the membership level α. The cost of achieving a higher constraint feasibility is the reduction of system benefit. Therefore, this also reflects the trade-off between system benefit and constraint violation risk. A higher constraint feasibility corresponds to a lower objective function value. On the contrary, a lower constraint feasibility will ensure a higher objective function value.
[0219] Decision makers need to find a balance between two conflicting goals (i.e., goal satisfaction and constraint feasibility). Figure 3Represents the fuzzy decision boundary interval of the system benefit under different membership α levels. In the process of trying to identify the balance between constraint feasibility and target satisfaction, fuzzy decision is used to aggregate the constraint feasibility and target satisfaction under each membership α feasible solution. Therefore, fuzzy decision also represents a compromise between constraint feasibility and target satisfaction. In order to obtain a recommendation for the final decision, the average and deviation of the upper and lower limit membership in the fuzzy decision are solved for each membership α feasible solution. The fuzzy decision with the highest average fuzziness is the optimal decision. Figure 3 It can be seen that when α is 0.5, the feasible solution has the highest target membership interval, specifically [0.3535, 0.3595], and the deviation is small, which is the optimal decision choice.
[0220] Figure 4 This is the allocation plan diagram of agricultural water resources in various regions under the optimal membership degree. Figure 5 This is the allocation plan diagram of municipal water resources in each region under the optimal membership degree. Figure 6 This is the allocation diagram of industrial water resources in each region under the optimal membership degree. Figure 7 is the distribution plan diagram of comprehensive water resources in each region under the optimal membership degree. Figures 4 to 7 In the figure, t represents the planning period and d represents the sub-region. It can be seen from the figure that most decision variables are expressed in the form of intervals. These interval allocation schemes are caused by uncertain input parameters and the complex interactions between these uncertain input parameters. In general, agriculture and industry are industries with large water consumption, and the upper and lower limits of agricultural water use intervals are relatively small. In the future planning period, agricultural water supply is on a downward trend, industrial water supply is on an upward trend, and municipal water consumption remains basically stable. At the same time, the total regional water consumption is also reduced due to the reduction in agricultural water supply.
[0221] In summary, fuzzy comprehensive decision-making is used to aggregate the satisfaction and membership under each feasible solution of membership degree α, so that decision makers can weigh the balance between target satisfaction and constraint feasibility. The optimization model can obtain interval solutions, thereby providing a stable and feasible decision space for decision makers, and providing recommendations for regional integrated water resources management through scenario policy analysis.
[0222] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. All equivalent structural changes made using the contents of the present invention's specification and drawings, or directly / indirectly applied in other related technical fields, are included in the patent protection scope of the present invention.
Claims
1. A water resources planning method based on an interactive two-stage interval fuzzy programming model, characterized in that: The following steps are involved: Taking the maximization of regional water use comprehensive benefits as the objective function, and taking the surface water diversion and regulation water volume constraints, groundwater usage constraints, recycled water supply capacity constraints, surface water stage supply capacity constraints, groundwater stage supply capacity constraints, supply stage constraints, and technical and non-negative constraints as constraints, an optimization model is established; According to the interval interactive fuzzy programming algorithm, the optimization model is converted into a deterministic upper limit sub-model and a lower limit sub-model by introducing decision variables, and the upper limit sub-model and the lower limit sub-model are solved respectively to obtain solution results corresponding to the upper limit sub-model and the lower limit sub-model; A water resource optimization configuration scheme is determined according to the solution results corresponding to the upper limit sub-model and the lower limit sub-model.
2. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 1 is characterized in that: The objective function is as follows: Maximize f ± =f1 ± +f2 ± +f3 ± -f4 ± -f5 ± -f6 ± Among them, f ± represents the system benefit; f1 ± It represents the benefits of industrial water system; Indicates the benefits of agricultural water systems; It represents the revenue of municipal water system; represents the cost of industrial water supply system; represents the cost of agricultural water supply systems; represents the municipal water system cost; represents the industrial water supply of surface water source to region j during planning period i, m 3 ; represents the industrial water supply of groundwater source i to region j during the planning period, m 3 ; represents the industrial water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the unit income of meeting the industrial water supply target, ¥ / m 3 ; represents the agricultural water supply of surface water source i to region j during the planning period, m 3 ; represents the agricultural water supply of groundwater source i to region j during the planning period, m 3 ; represents the agricultural water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the unit benefit of meeting the agricultural water supply target, ¥ / m 3 ; represents the municipal water supply of surface water source to region j during planning period i, m 3 ; represents the municipal water supply of groundwater source i to region j during the planning period, m 3 ; represents the municipal water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the unit benefit of meeting the municipal water supply target, ¥ / m 3 ; Indicates the surface water supply cost for industrial water use, ¥ / m 3 ; Indicates the groundwater supply cost for industrial water use, ¥ / m 3 ; Indicates the cost of industrial water reuse and supply, ¥ / m 3 ; Indicates the unit cost of industrial wastewater treatment, ¥ / m 3 ; It indicates the proportion of wastewater generated by water use by industrial units, %; Indicates the cost of surface water supply for agricultural use, ¥ / m 3 ; Indicates the groundwater supply cost for agricultural water use, ¥ / m 3 ; Indicates the cost of water supply for agricultural reuse water, ¥ / m 3 ; Indicates the unit cost of industrial wastewater treatment, ¥ / m 3 ; represents the shortage of agricultural surface water use target, m 3 ; Represents the shortage of agricultural groundwater use target, m 3 ; represents the shortfall of the agricultural reuse water target, m 3 ; Surface water supply costs for municipal water demand, ¥ / m 3 ; The cost of groundwater supply for municipal water demand, ¥ / m 3 ; Represents the cost of recycled water supply for municipal water demand, ¥ / m 3 ; Indicates the unit municipal sewage treatment cost, ¥ / m 3 ; Indicates the proportion of wastewater generated by water use by municipal units, %.
3. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 1 is characterized in that: The water volume constraints of surface water diversion are as follows: Indicates the adjustable water volume of surface water diversion, m 3 ; The groundwater usage constraints are as follows: represents the amount of groundwater that can be exploited under water resource constraints, m 3 ; The reuse water supply capacity constraints are as follows: represents the reuse water supply capacity constraint, m 3 ; The surface water stage supply capacity constraints are as follows: It represents the water diversion and transfer efficiency of surface water use, %; represents the surface water transfer capacity, m 3 ; The phased groundwater supply capacity constraints are as follows: It represents the transfer efficiency of groundwater use, %; represents the groundwater transport capacity, m 3 ; The supply phase constraints are as follows: Respectively represent the minimum and maximum industrial water supply in the sub-region at each stage, m 3 ; Respectively represent the minimum and maximum agricultural water supply in the sub-region at each stage, m 3 ; Respectively represent the minimum and maximum municipal water supply in the sub-region at each stage, m 3 ; The technique and non-negativity constraints are as follows:
4. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 1 is characterized in that: The steps of solving the upper limit sub-model include: Obtaining a feasible solution of the upper limit submodel at each membership degree α; According to the feasible solution of the upper limit sub-model at each membership degree α, calculating the fuzzy target satisfaction of the upper limit sub-model at each membership degree α; According to the fuzzy target satisfaction degree of the upper limit sub-model at each membership degree α, the fuzzy target membership degree of the upper limit sub-model at each membership degree α is calculated.
5. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 4 is characterized in that: The steps of solving the lower limit submodel include: Obtaining a feasible solution of the lower limit submodel at each membership degree α; According to the feasible solution of the lower limit sub-model at each membership degree α, calculating the fuzzy target satisfaction of the lower limit sub-model at each membership degree α; According to the fuzzy target satisfaction degree of the lower limit sub-model at each membership degree α, the fuzzy target membership degree of the lower limit sub-model at each membership degree α is calculated.
6. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 5 is characterized in that: The step of solving the upper limit sub-model and the lower limit sub-model respectively to obtain solution results corresponding to the upper limit sub-model and the lower limit sub-model further includes: The average and deviation of the fuzzy target membership of the upper limit submodel and the lower limit submodel at each membership degree α are calculated to obtain the balance between the constraint feasibility and the fuzzy target satisfaction of the upper limit submodel and the lower limit submodel at each membership degree α.
7. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 1 is characterized in that: The upper limit sub-model is specifically as follows: Maximize f + =f1 + +f2 + +f3 + -f4 - -f5 - -f6 - Among them, f + Indicates the upper limit of system benefits; f1 + Indicates the upper limit of the industrial water system revenue; f2 + represents the upper limit of the benefits of the agricultural water system; f3 + Indicates the upper limit of the revenue of the municipal water system; f4 - Indicates the lower limit of the cost of industrial water supply system; f5 - Indicates the lower limit of agricultural water supply system cost; f6 - represents the lower limit of the cost of municipal water supply system; represents the upper limit of industrial water supply from surface water sources to region j during planning period i, m 3 ; represents the upper limit of industrial water supply from groundwater source i to region j during planning period, m 3 ; represents the upper limit of industrial water supply from recycled water source i to region j during planning period, m 3 ; Indicates the upper limit of unit revenue required to meet the industrial water supply target, ¥ / m 3 ; represents the upper limit of agricultural water supply from surface water sources to region j during planning period i, m 3 ; represents the upper limit of the agricultural water supply of groundwater source i to region j during the planning period, m 3 ; represents the upper limit of the agricultural water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the upper limit of the unit benefit required to meet the agricultural water supply target, ¥ / m 3 ; represents the upper limit of the municipal water supply from surface water source i to region j during the planning period, m 3 ; represents the upper limit of the municipal water supply from groundwater source i to region j during the planning period, m 3 ; represents the upper limit of the municipal water supply of recycled water source i to region j during the planning period, m 3 ; Indicates the upper limit of unit revenue required to meet the municipal water supply target, ¥ / m 3 ; Indicates the lower limit of the surface water supply cost for industrial use, ¥ / m 3 ; Indicates the lower limit of groundwater supply cost for industrial water use, ¥ / m 3 ; Indicates the lower limit of the cost of industrial reuse water supply, ¥ / m 3 ; Indicates the lower limit of unit industrial wastewater treatment cost, ¥ / m 3 ; It indicates the lower limit of the proportion of wastewater generated by water use by industrial units, %; The lower limit of the surface water supply cost for agricultural use, ¥ / m 3 ; The lower limit of groundwater supply cost for agricultural use, ¥ / m 3 ; Indicates the lower limit of the cost of water supply for agricultural reuse water, ¥ / m 3 ; Indicates the lower limit of unit industrial wastewater treatment cost, ¥ / m 3 ; The lower limit of the shortage of agricultural surface water use target, m 3 ; The lower limit of the shortage of agricultural groundwater use target, m 3 ; The lower limit of the shortage of agricultural reuse water target, m 3 ; The lower limit of the surface water supply cost for municipal water demand, ¥ / m 3 ; The lower limit of groundwater supply cost for municipal water demand, ¥ / m 3 ; The lower limit of the cost of recycled water supply for municipal water demand, ¥ / m 3 ; Indicates the lower limit of the unit municipal sewage treatment cost, ¥ / m 3 ; It represents the lower limit of the proportion of wastewater generated by water use by municipal units, in %.
8. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 1 is characterized in that: The constraints corresponding to the upper limit sub-model are as follows: The water volume constraints of surface water diversion are as follows: Indicates the upper limit of the adjustable water volume of surface water diversion, m 3 ; The groundwater usage constraints are as follows: represents the upper limit of groundwater exploitation under water resource constraints, m 3 ; The reuse water supply capacity constraints are as follows: Represents the upper limit of the reuse water supply capacity constraint, m 3 ; The surface water stage supply capacity constraints are as follows: It indicates the lower limit of the water diversion and transfer efficiency of surface water use, %; Indicates the upper limit of surface water transfer capacity, m 3 ; The phased groundwater supply capacity constraints are as follows: It represents the lower limit of the transfer efficiency of groundwater use, %; Indicates the upper limit of groundwater transport capacity, m 3 ; The supply phase constraints are as follows: They represent the lower limit and upper limit of the minimum and maximum industrial water supply in the sub-regions at different stages, respectively. 3 ; They represent the lower limit and upper limit of the minimum and maximum agricultural water supply in the sub-region at each stage, respectively. 3 ; They represent the lower limit and upper limit of the minimum and maximum municipal water supply in the sub-region at each stage, respectively. 3 ; The technique and non-negativity constraints are as follows:
9. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 1 is characterized in that: The lower limit sub-model is as follows: Among them, f - Indicates the lower limit of system benefits; f1 - Indicates the lower limit of the benefits of the industrial water system; f2 - represents the lower limit of the benefits of the agricultural water system; f3 - Indicates the lower limit of the municipal water system revenue; f4 + Indicates the upper limit of the cost of industrial water supply system; f5 + Indicates the upper limit of the cost of agricultural water supply system; f6 + represents the upper limit of the municipal water system expenditure; represents the lower limit of industrial water supply from surface water sources to region j during planning period i, m 3 ; represents the lower limit of industrial water supply from groundwater source i to region j during planning period, m 3 ; represents the lower limit of industrial water supply from recycled water source i to region j during planning period, m 3 ; Indicates the lower limit of unit revenue for meeting industrial water supply targets, ¥ / m 3 ; represents the lower limit of agricultural water supply from surface water sources to region j during planning period i, m 3 ; represents the lower limit of agricultural water supply from groundwater source i to region j during planning period, m 3 ; represents the lower limit of agricultural water supply from recycled water source i to region j during planning period, m 3 ; Indicates the lower limit of unit benefit for meeting the agricultural water supply target, ¥ / m 3 ; represents the lower limit of the municipal water supply from surface water source i to region j during the planning period, m 3 ; represents the lower limit of the municipal water supply of groundwater source i to region j during the planning period, m 3 ; represents the lower limit of municipal water supply from recycled water source i to region j during planning period, m 3 ; It represents the lower limit of unit revenue required to meet the municipal water supply target, ¥ / m 3 ; Indicates the upper limit of the surface water supply cost for industrial use, ¥ / m 3 ; Indicates the upper limit of groundwater supply cost for industrial water use, ¥ / m 3 ; Indicates the upper limit of the cost of industrial reuse water supply, ¥ / m 3 ; Indicates the upper limit of unit industrial wastewater treatment cost, ¥ / m 3 ; It indicates the upper limit of the proportion of wastewater generated by water use by industrial units, %; Indicates the upper limit of surface water supply cost for agricultural use, ¥ / m 3 ; Indicates the upper limit of groundwater supply cost for agricultural use, ¥ / m 3 ; Indicates the upper limit of the cost of water supply for agricultural reuse water, ¥ / m 3 ; Indicates the upper limit of unit industrial wastewater treatment cost, ¥ / m 3 ; Indicates the upper limit of the shortage of agricultural surface water use target, m 3 ; Indicates the upper limit of the shortage of agricultural groundwater use target, m 3 ; The upper limit of the shortage of agricultural reuse water target, m 3 ; The upper limit of the surface water supply cost for municipal water demand, ¥ / m 3 ; The upper limit of groundwater supply cost for municipal water demand, ¥ / m 3 ; Indicates the upper limit of the cost of recycled water supply for municipal water demand, ¥ / m 3 ; Indicates the upper limit of the unit municipal sewage treatment cost, ¥ / m 3 ; Indicates the upper limit of the proportion of wastewater generated by water use by municipal units, in %.
10. The water resources planning method based on the interactive two-stage interval fuzzy programming model according to claim 1 is characterized in that: The constraints corresponding to the lower limit sub-model are as follows: The water volume constraints of surface water diversion are as follows: Indicates the lower limit of the amount of water that can be diverted from surface water, m 3 ; The groundwater usage constraints are as follows: represents the lower limit of groundwater exploitation under water resource constraints, m 3 ; The reuse water supply capacity constraints are as follows: Represents the lower limit of the reuse water supply capacity constraint, m 3 ; The surface water stage supply capacity constraints are as follows: It represents the upper limit of the water diversion and transfer efficiency of surface water use, %; Represents the lower limit of surface water transfer capacity, m 3 ; The phased groundwater supply capacity constraints are as follows: It represents the upper limit of the transfer efficiency of groundwater use, %; Represents the lower limit of groundwater transport capacity, m 3 ; The supply phase constraints are as follows: They represent the upper limit of the minimum and lower limits of the maximum industrial water supply in the sub-region at each stage, m 3 ; They represent the upper limit of the minimum and lower limits of the maximum agricultural water supply in the sub-region at each stage, m 3 ; They represent the upper limit of the minimum and lower limits of the maximum municipal water supply in the sub-region at each stage, m 3 ; The technique and non-negativity constraints are as follows:
Citation Information
Patent Citations
Oil field water resource-oriented uncertainty optimal allocation method
CN106096759A
Fuzzy boundary interval two-stage random water resource management method
CN117522339A
Method for classifying eco-geological environment types based on coal resource exploitation
US20200234170A1
