Control regulation evaluation method and device, and electronic equipment

By acquiring and analyzing regulatory planning assessment data, the applicability of planning results, the applicability of adjustment rules, and the current implementation status are assessed. This solves the problem that existing technologies cannot effectively monitor and provide early warnings, and enables rapid and effective identification of problems and timely early warnings in regulatory planning assessments.

CN118966815AActive Publication Date: 2024-11-15LAY-OUT PLANNING CONSULTANTS CO LTD

Patent Information

Application Number
CN202410923900.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-15
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

Existing urban planning assessment methods are unable to effectively monitor and provide early warnings, resulting in planning assessments often being done merely to fulfill procedures, failing to identify problems in a timely manner and propose adjustment suggestions.

Method used

By acquiring multiple planning implementation data related to the target control plan during the assessment period, including historical approved control plan results data, current approved control plan results data, control plan adjustment record data, current urban operation data, and control plan external environment change data, the applicability of planning results, applicability of adjustment rules, and current implementation status are assessed, planning assessment results are generated, and the overall assessment results are determined.

Benefits of technology

It enables rapid evaluation of control plans, identifies problems within the evaluation period, provides timely warnings, offers effective suggestions for the preparation, approval, and implementation of control plans, and improves the effectiveness of evaluation results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966815A_ABST
    Figure CN118966815A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of urban physical examination evaluation, and provides a control and regulation evaluation method and device and electronic equipment, and the method comprises the steps: obtaining a plurality of planning implementation data related to a target control and regulation in an evaluation time period, and carrying out the evaluation of at least one dimension of the target control and regulation in the evaluation time period according to the plurality of planning implementation data, and obtaining at least one planning evaluation result, and according to the at least one planning evaluation result, determining an overall evaluation result of the target control and regulation in the evaluation period. According to the invention, the technical problem that effective monitoring and early warning cannot be carried out in the existing planning evaluation method can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of urban physical examination and evaluation, and in particular, relates to an evaluation method and device for control planning, and electronic equipment. Background Art

[0002] With the comprehensive transformation of urban planning towards implementation, the control detailed planning system has become more perfect. The closed-loop operation from preparation, approval and implementation to monitoring, evaluation and maintenance is more conducive to the effective implementation of urban planning.

[0003] Among them, "monitoring and evaluation" is a key link. Monitoring and evaluation is to evaluate urban planning by obtaining relevant data and information during the preparation, approval and implementation of the urban control plan, and to make adjustment suggestions to the planning preparation, approval and implementation links, and then carry out maintenance and operation.

[0004] The current "monitoring and evaluation" is still mainly aimed at the demonstration of the necessity of a single control plan modification project, and has not formed a normalized and proactive evaluation. In addition, the evaluation content of the existing "monitoring and evaluation" is relatively complex and does not fully match the effectiveness of the evaluation results, resulting in the evaluation of the plan often being done to cope with the procedures and failing to effectively monitor and warn. Summary of the invention

[0005] The embodiments of the present application provide a control planning evaluation method and device, and electronic equipment, which can solve the technical problem that the existing planning evaluation methods cannot perform effective monitoring and early warning.

[0006] In a first aspect, an embodiment of the present application provides a method for evaluating a control plan, including:

[0007] Obtain multiple planning implementation data related to the target control plan during the evaluation period;

[0008] According to the plurality of planning implementation data, the target control plan is evaluated in at least one dimension during the evaluation period to obtain at least one planning evaluation result;

[0009] According to at least one of the planning evaluation results, an overall evaluation result of the target control plan in the evaluation period is determined.

[0010] In a possible implementation manner of the first aspect, obtaining a plurality of planning implementation data related to the target control plan within the evaluation period includes:

[0011] Determine the regulatory planning assessment database pre-built based on the target area;

[0012] From the control plan evaluation database, obtain multiple control plan data related to the target control plan within the evaluation period; the multiple control plan data include: historical approved control plan results data, currently approved control plan results data, control plan adjustment record data, city status operation data and control plan external environment change data, wherein the historical approved control plan results data are the approved control plan data of the target area at the start time of the evaluation period, the currently approved control plan results data are the approved control plan data of the target area at the end time of the evaluation period, the control plan adjustment record data are the control plan adjustment data of the target area within the evaluation period, the city status operation data are the city operation data of the target area at the end time of the evaluation period, and the control plan external environment change data are the external environment change data of the target area within the evaluation period.

[0013] In a possible implementation manner of the first aspect, the at least one dimension includes: planning results, adjustment rules, and implementation status; and the evaluating the target control plan in the evaluation period in at least one dimension according to the plurality of planning implementation data to obtain at least one planning evaluation result includes at least one of the following steps:

[0014] Based on the external environment change data of the control plan and the currently approved control plan achievement data, assess whether the planning achievement of the target control plan is applicable, and obtain the planning achievement assessment result of the target control plan in the target area within the assessment period;

[0015] According to the control plan adjustment record data, the historical approved control plan achievement data and the currently approved control plan achievement data, whether the adjustment rule of the target control plan is applicable is evaluated to obtain the adjustment rule evaluation result of the target control plan in the target area within the evaluation period;

[0016] The implementation status of the target control plan is evaluated based on the current urban operation data, and an evaluation result of the implementation status of the target control plan in the target area during the evaluation period is obtained.

[0017] In a possible implementation of the first aspect, the evaluating whether the planning results of the target control plan are applicable according to the control plan external environment change data and the currently approved control plan results data, and obtaining the planning results evaluation result of the target control plan in the target area during the evaluation period includes:

[0018] Translating the control plan external environment change data to obtain planning achievement evaluation rules, wherein the planning achievement evaluation rules include evaluation rules for conflicting plots and evaluation rules for conflicting units;

[0019] According to the plot result data in the currently approved control planning result data and the assessment rules of the conflicting plots, assess whether each plot in the target area has a conflict, and obtain a conflict assessment result for each plot;

[0020] Calculate the unit conflict degree corresponding to each of the units in the target area according to the unit result data in the currently approved control planning result data and the evaluation rules of the conflicting units, as well as the conflict evaluation results of all the plots included in each unit;

[0021] According to the unit conflict degrees corresponding to the units, evaluating whether the planning achievements of the units are applicable, and obtaining the planning achievement evaluation results of the units;

[0022] According to the planning achievement evaluation results of all the units in the target area, the planning achievement evaluation results of the target control plan in the target area within the evaluation period are determined.

[0023] In a possible implementation of the first aspect, the unit conflict degree corresponding to each of the units in the target area is calculated based on the unit achievement data in the currently approved control planning achievement data and the evaluation rule of the conflicting unit, and the conflict evaluation results of all the plots included in each unit, including:

[0024] Determining a plurality of evaluation factors of the conflict unit according to the evaluation rule of the conflict unit;

[0025] According to each of the evaluation factors of the conflicting units, evaluating whether each of the units in the target area conflicts, and obtaining a conflict evaluation result of each of the units under each of the evaluation factors;

[0026] Calculating the number of conflicts of each unit according to the conflict evaluation results of each unit under each evaluation factor;

[0027] Calculate the average number of unit conflicts according to the number of conflicts of all the units in the target area;

[0028] The unit conflict degree of each unit in the target area is calculated according to the conflict times of each unit, the average value of the unit conflict times and the conflict assessment results of all the plots in the target area.

[0029] In a possible implementation manner of the first aspect, evaluating whether the adjustment rule of the target control plan is applicable according to the control plan adjustment record data, the historical approved control plan achievement data, and the currently approved control plan achievement data, and obtaining an adjustment rule evaluation result of the target control plan in the target area during the evaluation period includes:

[0030] According to the control plan adjustment record data, respectively counting the adjustment indexes of the adjustment type, adjustment reason and adjustment content of the target control plan, and obtaining the index value of the adjustment type, adjustment reason and adjustment content of the target control plan;

[0031] Evaluate whether the adjustment process of the target control plan is applicable according to the index value of the adjustment type, the index value of the adjustment reason and the index value of the adjustment content of the target control plan, and obtain an evaluation result of the adjustment process of the target control plan in the target area within the evaluation period;

[0032] According to the historical indicator values ​​in the historical approved control plan achievement data and the current indicator values ​​in the currently approved control plan achievement data, statistically analyzing the adjustment information of the target control plan within the evaluation period;

[0033] According to the total indicator setting value in the master plan and the adjustment information of the target control plan in the evaluation period, whether the indicator adjustment direction of the target control plan is reasonable is evaluated to obtain the indicator adjustment direction evaluation result of the target control plan in the target area in the evaluation period;

[0034] According to the adjustment process evaluation result of the target control regulation in the target area during the evaluation period and the indicator adjustment direction evaluation result, it is evaluated whether the adjustment rule of the target control regulation in the evaluation period is applicable, and the adjustment rule evaluation result of the target control regulation in the target area during the evaluation period is obtained.

[0035] In a possible implementation manner of the first aspect, evaluating the implementation status of the control plan according to the current urban operation data to obtain an evaluation result of the implementation status of the target control plan in the target area during the evaluation period includes:

[0036] Based on a pre-constructed standard indicator library for each unit in the target area, standard indicators of a plurality of unit development indicators corresponding to each unit are obtained, wherein the unit development indicator is a development indicator of the unit established by the control plan;

[0037] According to the current operation data of the city, the index values ​​of the multiple unit development indicators currently corresponding to each of the units are counted to obtain the current statistical values ​​of the multiple unit development indicators corresponding to each of the units;

[0038] According to the current statistical values ​​of the multiple unit development indicators corresponding to each of the units and the standard indicators of the multiple unit development indicators, the implementation status of each of the units in the target area is evaluated to obtain the evaluation result of the implementation status of the target control plan in the target area during the evaluation period.

[0039] In a possible implementation manner of the first aspect, the implementation status of each of the units in the target area is evaluated according to the current statistical values ​​of the multiple unit development indicators corresponding to each of the units and the standard indicators of the multiple unit development indicators, and the evaluation result of the implementation status of the target control plan in the target area during the evaluation period is obtained, including:

[0040] According to the current statistical values ​​of the multiple unit development indicators corresponding to the unit and the standard indicators of the multiple unit development indicators corresponding to the unit, respectively, the deviations of the multiple unit development indicators corresponding to the unit are calculated to obtain the deviation values ​​of the multiple unit development indicators corresponding to the unit;

[0041] According to the deviation values ​​of the plurality of unit development indicators corresponding to the unit, evaluating whether the implementation status of the unit is abnormal, and obtaining an implementation status evaluation result of the unit;

[0042] According to the implementation status assessment results of all the units in the target area, the implementation status assessment result of the target control regulation in the target area within the assessment period is determined.

[0043] In a second aspect, an embodiment of the present application provides an evaluation device for control planning, including:

[0044] A data acquisition module is used to acquire multiple planning implementation data related to the target control plan within the evaluation period;

[0045] A planning evaluation module, configured to evaluate the target control plan in at least one dimension during the evaluation period according to the plurality of planning implementation data, and obtain at least one planning evaluation result;

[0046] An evaluation summary module is used to determine the overall evaluation result of the target control plan in the evaluation period according to at least one of the planning evaluation results.

[0047] In a third aspect, an embodiment of the present application provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements any of the above-described methods when executing the computer program.

[0048] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, it implements any of the methods described above.

[0049] In a fifth aspect, an embodiment of the present application provides a computer program product, which, when executed on a terminal device, enables the terminal device to execute any of the methods described above.

[0050] Compared with the prior art, the embodiments of the present application have the following beneficial effects: by acquiring multiple planning implementation data related to the target control plan during the evaluation period, and evaluating the target control plan in at least one dimension during the evaluation period based on the acquired multiple planning implementation data, at least one planning evaluation result is obtained, and the relevant planning implementation data can be quickly acquired according to the dimension to be evaluated, and the planning implementation data during the evaluation period can be quickly evaluated to generate a planning evaluation result; based on the obtained planning evaluation result, the overall evaluation result of the target control plan during the evaluation period is determined, so that the effectiveness of the overall evaluation result of the target control plan is improved, the evaluation of the target control plan is realized, the problems existing in the target control plan in this dimension during the evaluation period are identified, and early warnings are issued in a timely manner, and suggestions are made for the subsequent preparation, approval and implementation of the target control plan, thereby solving the technical problem that monitoring and early warning cannot be performed in the existing planning evaluation methods. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0052] Figure 1 It is a flowchart of a control planning evaluation method provided in one embodiment of the present application;

[0053] Figure 2 It is a structural diagram of a control plan evaluation provided by another embodiment of the present application;

[0054] Figure 3 is a schematic diagram of an evaluation result of a control plan evaluation provided by another embodiment of the present application;

[0055] Figure 4 It is a structural schematic diagram of a control planning evaluation device provided in one embodiment of the present application. DETAILED DESCRIPTION

[0056] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0057] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0058] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0059] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0060] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0061] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0062] The main purpose of the control plan is to carry out detailed planning and control of the use nature, development intensity, spatial layout and environmental quality of multiple control plots in local areas of the city or multiple control units under the guidance of the city's master plan, so as to ensure the implementation of the master plan and safeguard the construction and development of the city.

[0063] This application embodiment provides a method for evaluating a control plan, see Figure 1 , Figure 1 This is a flow chart of a control planning evaluation method provided in an embodiment of the present application, including:

[0064] Step S11, obtaining multiple planning implementation data related to the target control plan within the evaluation period;

[0065] Step S12, evaluating the target control plan in at least one dimension during the evaluation period according to the plurality of planning implementation data, and obtaining at least one planning evaluation result;

[0066] Step S13: determining the overall evaluation result of the target control plan in the evaluation period according to at least one planning evaluation result.

[0067] Specifically, multiple planning implementation data related to the target control plan within the evaluation period are obtained from the control plan evaluation database, where the evaluation period is the time period for evaluating the target control plan. The target control plan can be the specific implementation of land, resources, etc. in the target area to be evaluated. The target area can be a city, a township, a county or a district, etc.

[0068] The control plan assessment database includes all data generated during the preparation, adjustment, approval and implementation of the master plan and control plan, as well as the urban operation data at multiple time points in the target area. The multiple planning implementation data related to the target control plan during the assessment period include: the planning implementation data related to the target control plan generated during the period from the start time of the assessment period to the end time of the assessment period.

[0069] In an optional example, multiple planning implementation data related to the target control plan in 2014 are obtained, the evaluation period is 2014, the start time of the evaluation period is January 1, 2014, and the end time of the evaluation period is December 31, 2014.

[0070] It should be noted that the evaluation period can be set according to specific evaluation requirements, and the time span can be quarterly, annual, two years, five years, etc. This embodiment does not specifically limit the evaluation period.

[0071] Specifically, the evaluation of at least one dimension of the target control plan within the above-mentioned evaluation period may include one or more of the following: evaluation of the applicability of planning results, evaluation of the applicability of adjustment rules, and evaluation of the current status of unit implementation.

[0072] According to the multiple planning implementation data obtained above, the target control plan is evaluated in at least one dimension during the evaluation period to obtain one or more planning evaluation results. The planning evaluation results may be one or more of whether the planning results generated during the evaluation period are applicable, whether the adjustment rules are applicable, whether there are problems with the implementation status, etc.

[0073] When the target control plan is evaluated in one dimension during the evaluation period, a planning evaluation result of the target control plan is obtained. When multiple dimensions are evaluated based on the target control plan during the evaluation period, multiple planning evaluation results of the target control plan are obtained. Based on one or more planning evaluation results of the target control plan, the overall evaluation result of the target control plan during the evaluation period is determined.

[0074] According to the overall evaluation results of the above-mentioned target control plan during the evaluation period, an evaluation report of the control plan can be generated to optimize the preparation, approval, implementation and other processes of the target control plan. For example, when evaluating the applicability of planning results, problems in the planning results can be identified. For example: applicable approved control plan results data and inapplicable approved control plan results data, and based on the inapplicable approved control plan results data, the adjustment needs of the target control plan can be prompted.

[0075] It can be understood that the technical solution provided in this embodiment obtains multiple planning implementation data related to the target control plan during the evaluation period, and evaluates at least one dimension based on the target control plan during the evaluation period according to the obtained multiple planning implementation data to obtain at least one planning evaluation result. It can quickly obtain relevant planning implementation data according to the data of the dimension that needs to be evaluated, quickly evaluate the dimension within the evaluation period, generate planning evaluation results, and determine the overall evaluation results of the target control plan during the evaluation period based on the obtained planning evaluation results, so as to improve the effectiveness of the overall evaluation results of the target control plan, realize the evaluation of the target control plan, identify the problems existing in the target control plan under this dimension during the evaluation period, and make timely warnings, and make suggestions for the subsequent preparation, approval and implementation of the target control plan, thereby solving the technical problem that the existing urban planning evaluation methods cannot carry out effective monitoring and early warning.

[0076] In a possible implementation, in step S11, a plurality of planning implementation data related to the target control plan within the evaluation period is obtained, including:

[0077] Determine the regulatory planning assessment database pre-built based on the target area;

[0078] From the control plan evaluation database, multiple planning implementation data related to the target control plan within the evaluation period are obtained; the multiple planning implementation data include: historically approved control plan results data, currently approved control plan results data, control plan adjustment record data, urban current operation data and control plan external environment change data, among which the historically approved control plan results data are the approved control plan data of the target area at the start time of the evaluation period, the currently approved control plan results data are the approved control plan data of the target area at the end time of the evaluation period, the control plan adjustment record data are the control plan adjustment data of the target area within the evaluation period, the urban current operation data are the urban operation data of the target area at the end time of the evaluation period, and the control plan external environment change data are the external environment change data of the target area within the evaluation period.

[0079] Specifically, multiple planning implementation data related to the target control plan during the evaluation period are obtained, including:

[0080] Determine the control planning evaluation database pre-built based on the target area. The control planning evaluation database is built based on the target area. The control planning evaluation database includes approved control planning results data, control planning adjustment record data, urban operation data, and control planning external environment change data.

[0081] Among them, the approved control planning results data are the approved control planning data in the target area, which can be called from the basic information platform or obtained from the control planning results GIS (geographic information system) database. This embodiment does not specifically limit the method of data acquisition. The approved control planning results data include control planning unit layers, map layers, road network and public welfare facilities layers, etc.

[0082] The control planning unit layer includes the unit achievement data of multiple units in the target area. The unit achievement data of a unit includes quantitative indicators such as the planned geographical boundaries, total population, total construction volume, and total supporting facilities of the unit, which are used to guide construction activities within the unit.

[0083] The land use map layer includes the land plot results data of multiple plots in the target area. The land plot results data of a plot includes the planned geographical boundaries, land use nature, compatibility, volume ratio, building density, green area ratio and other information of the plot.

[0084] The road network includes the results data of the planned roads in the target area, including information such as road position, grade, and red line width.

[0085] The public welfare facility point layer includes the achievement data of the public service facilities planned in the target area, such as the location, scale, and population served by different types of public welfare facilities such as education, medical care, culture, and sports.

[0086] The control plan adjustment record data is the control plan adjustment data of the target area, including the control plan adjustment file data of each project. The control plan adjustment record data can be retrieved from the information system. The control plan adjustment data includes the adjustment type, adjustment reason, adjustment content, adjustment distribution, before and after adjustment comparison chart, adjustment duration and other information of each adjustment in each adjustment project.

[0087] Among them, the adjustment types can be divided into revisions, partial adjustments, technical corrections and other adjustment categories. The reasons for the adjustment can be divided into changes in the superior plan, connection with special plans, the impact of major construction projects, the need for the implementation of public welfare projects, the need for the implementation of industrial projects, the need for the implementation of commercial projects, and the need to update after evaluation. The adjustment content can be divided into content categories such as plot boundaries, land use nature, plot volume ratio, and other plot indicators, and can be further subdivided according to the actual high-frequency situations in the local area. For example, the adjustment of land use nature is subdivided into industrial to residential, industrial to commercial, and other land use nature adjustments. The adjustment distribution is information such as the spatial location of the adjustment project. The adjustment duration indicates the total time it takes for an adjustment project to be filed in the database after approval, as well as the time spent in each sub-link.

[0088] Urban operation data refers to the operation data of the target area at a certain point in time. The operation data can be obtained from open resources on the Internet, and after cleaning and integrating these operation data, the urban operation data can be obtained. For target areas with complete data, the urban operation data can be obtained from the basic information platform of the target area. Urban operation data includes: actual population data at the unit / community granularity, actual land use data, actual building volume data, actual road network data, actual public welfare facility location data, actual economic census data, etc.

[0089] The control plan external environment change data is the external environment change data of the target area, including: superior planning (generally master planning), special planning results vector data, the city's recent or annual construction project library, land use policies, new provisions of norms and standards, infrastructure project implementation lines and other information. Among them, the superior planning and special planning results vector data can be called from the spatial basic information platform of the target area, and the city's recent or annual construction project library, land use policies, new provisions of norms and standards, and infrastructure project implementation lines can be obtained from shared information.

[0090] From the regulatory planning evaluation database, obtain multiple planning implementation data related to the target regulatory planning during the evaluation period. Figure 3 , Figure 3 This is a schematic diagram of an evaluation result of a control plan provided by another embodiment of the present application. Multiple planning implementation data related to the target control plan during the evaluation period include: historical approved control plan results data (attached Figure 3 P1 in the current approved control planning results data (attached Figure 3P2 in the regulation), control regulation adjustment record data (attached Figure 3 T12 in the city), current urban operation data (attached Figure 3 X2 in the control plan) and external environment change data (attached Figure 3 W12 in the .

[0091] The evaluation period is the period from the start time to the end time of the evaluation. The above-mentioned historical approved control planning results data are the approved control planning data of the target area at the start time of the evaluation period; the current approved control planning results data are the approved control planning data of the target area at the end time of the evaluation period.

[0092] The control plan adjustment record data is the control plan adjustment data of the target area during the evaluation period; the urban current operation data is the urban operation data of the target area at the end time of the evaluation period; the control plan external environment change data is the external environment change data of the target area during the evaluation period.

[0093] In a possible implementation, in step S12, at least one dimension includes: planning results, adjustment rules, and implementation status; and based on a plurality of planning implementation data, evaluating the target control plan in at least one dimension during the evaluation period to obtain at least one planning evaluation result includes at least one of the following steps:

[0094] Step S121, based on the external environment change data of the control plan and the currently approved control plan achievement data, evaluate whether the planning achievement of the target control plan is applicable, and obtain the planning achievement evaluation result of the target control plan in the target area within the evaluation period;

[0095] Step S122, evaluating whether the adjustment rules of the target control plan are applicable based on the control plan adjustment record data, the historical approved control plan results data, and the currently approved control plan results data, and obtaining the adjustment rule evaluation results of the target control plan in the target area within the evaluation period;

[0096] Step S123, evaluating the implementation status of the target control plan based on the current urban operation data, and obtaining the evaluation result of the implementation status of the target control plan in the target area within the evaluation period.

[0097] Specifically, at least one dimension includes: one or more of planning results, adjustment rules, and implementation status.

[0098] When evaluating at least one dimension generated within the evaluation period based on the target control plan according to the plurality of planning implementation data to obtain at least one planning evaluation result, one or more of the following steps are included:

[0099] refer to Figure 2 , Figure 2This is a schematic diagram of the structure of a control plan evaluation provided by another embodiment of the present application, including the preparation stage, the approval stage, the implementation stage and the evaluation stage. In the evaluation stage, reference Figure 3 When evaluating the planning results generated based on the target control plan during the evaluation period, the planning results of the target control plan are evaluated based on the external environment change data of the control plan and the currently approved control plan results data. The evaluation identifies the inapplicable planning results and applicable planning results in the currently approved control plan results data, and obtains the planning results evaluation results of the target control plan in the target area during the evaluation period. The planning results evaluation results include the unit conflict degree and conflicting plots of each unit in the target area. Based on the inapplicable planning results and the applicable planning results, the problems existing in the control plan can be fed back to prompt the need for adjustment.

[0100] In the evaluation phase, when evaluating the adjustment rules generated based on the target control plan during the evaluation period, according to the control plan adjustment record data, the historical approved control plan results data and the current approved control plan results data, by evaluating whether the operation process and results of the target control plan under the current management rules meet the expected goals and development needs of the rule formulation, evaluate whether the adjustment rules of the target control plan are applicable, identify inapplicable adjustment rules and applicable adjustment rules, and obtain the adjustment rule evaluation results of the target control plan in the target area during the evaluation period. The adjustment rule evaluation results may include an adjustment summary report and a cumulative adjustment change report. According to the inapplicable adjustment rules and applicable adjustment rules, the most common adjustment situations and adjustment duration of the target control plan during the adjustment process are found, and it is judged whether the adjustment rules are applicable and whether the review and approval of the control plan needs to be optimized.

[0101] In the evaluation phase, when evaluating the implementation status generated based on the target control plan during the evaluation period, the implementation status of the target control plan is evaluated by analyzing the status indicators of each unit in the target area according to the current urban operation data, evaluating whether the implementation of each status indicator of each unit is abnormal, determining the problems of each unit, and issuing an early warning to obtain the evaluation results of the implementation status of the target control plan in the target area during the evaluation period. The implementation status evaluation results include problem warnings for each unit. When the implementation status of a unit is abnormal, an early warning is issued to prompt the user to take implementation actions. According to the implementation status of the unit with the abnormality, feedback is given on the actions that need to be implemented in the plan, thereby improving the current problems in the target area.

[0102] It should be noted that one or more of the current control plan implementation data may be evaluated as needed, and this embodiment does not specifically limit this.

[0103] In a possible implementation, in step S121, the applicability of the planning results of the target control plan is evaluated based on the external environment change data of the control plan and the currently approved control plan results data, and the planning results evaluation results of the target control plan in the target area within the evaluation period are obtained, including:

[0104] Step S1211, translating the control plan external environment change data to obtain planning achievement evaluation rules, which include evaluation rules for conflicting plots and evaluation rules for conflicting units;

[0105] Step S1212, based on the plot result data in the currently approved control planning result data and the assessment rules for conflicting plots, assess whether each plot in the target area has a conflict, and obtain a conflict assessment result for each plot;

[0106] Step S1213, calculating the unit conflict degree corresponding to each unit in the target area according to the unit result data in the currently approved control plan result data and the evaluation rules of the conflicting units, as well as the conflict evaluation results of all the plots included in each unit;

[0107] Step S1214, evaluating whether the planning results of each unit are applicable according to the unit conflict degree corresponding to each unit, and obtaining the planning results evaluation results of each unit;

[0108] Step S1215, determining the planning achievement evaluation result of the target control plan in the target area within the evaluation period according to the planning achievement evaluation results of all units in the target area.

[0109] Specifically, based on the external environment change data of the control plan and the currently approved control plan results data, the applicability of the planning results of the target control plan is evaluated, and the planning results of the target control plan in the target area within the evaluation period are obtained, including:

[0110] The external environment change data of the control plan is translated to obtain the planning results evaluation rules. Among them, the planning results evaluation rules represent the evaluation rules of various indicators of planning results, including the evaluation rules of conflicting plots and the evaluation rules of conflicting units. The evaluation rules of conflicting plots represent various rules for evaluating whether a plot conflicts. The evaluation rules of conflicting units represent various rules for evaluating whether a unit conflicts.

[0111] In an optional example, the data on changes in the external environment of the control plan may be a master plan, in which a series of control requirements such as control lines, unit conduction indicators and special facilities are formulated. Among them, the control requirements of the control line are translated into the evaluation rule that "the control plan plots of a certain type of land use nature that intersects with the control line are set as conflicting plots". The control requirements of the unit conduction indicators are converted into the evaluation rule that "the sum of all the plot-related indicators within the unit exceeds the standard value of the unit conduction indicator, and it is marked as a conflicting unit". The control requirements of special facilities are translated into corresponding evaluation rules according to different conduction requirements such as "fixed point, fixed line, and fixed boundary", through buffer zones, or strict comparison methods.

[0112] Specifically, the currently approved control planning results data include the plot results data of each plot in the target area, such as: land use, traffic lines, facilities point layers, etc. The assessment rules for conflicting plots mainly include the assessment rules for plot depth, such as the plot conflict assessment standards for various control requirements, including: whether it complies with the control line, whether the special facilities clearly defined and transmitted by the master plan or special plan are implemented, whether it complies with the intensity zoning, whether the recent project red line is implemented, whether it complies with the minimum requirements for the floor area ratio of industrial land, and whether it connects with the latest implementation line of transportation and water conservancy facilities.

[0113] According to the assessment rules for conflicting plots, the plot results data of each plot in the currently approved control planning results data are judged to determine whether the plot results data of the plot meets the plot conflict assessment standards of various management and control requirements. When it is determined that the plot results data of the plot meets the plot conflict assessment standards of the management and control requirements, it is determined that a conflict occurs in the plot, and the conflict assessment result of the plot is a conflict plot; when it is determined that the plot results data of the plot does not meet the plot conflict assessment standards of the management and control requirements, it is determined that no conflict occurs in the plot, and the conflict assessment result of the plot is not a conflict plot, thereby obtaining the conflict assessment results of each plot.

[0114] The currently approved control planning results data include the unit results data of each unit in the target area. The assessment rules for conflicting units mainly include the assessment rules that cannot be implemented to the depth of the plots within the unit, such as the unit conflict assessment standards for various control requirements, including: whether the sum of the indicators of the plots within the unit exceeds the unit transmission indicators, whether the land use ratio within the unit is connected with the general planning and zoning control requirements, whether the direction and width of the linear facilities within the unit meet the requirements of the overall plan or special plan, whether the point facilities of fixed-point transmission are implemented within the unit, etc.

[0115] According to the unit result data and conflict unit evaluation rules in the currently approved control planning result data, as well as the conflict evaluation results of all plots included in each unit, the unit result data of each unit in the currently approved control planning result data is judged to determine whether the unit result data of the unit conflicts. Each time a conflict is evaluated for the unit, the unit is marked as a conflict unit once, and finally the total number of times the unit is marked as a conflict unit is obtained as the number of conflicts of the unit, thereby calculating the unit conflict degree corresponding to the unit. According to the same method, the unit conflict degree corresponding to each unit in the target area is calculated.

[0116] According to the unit conflict degree corresponding to each unit in the target area, the applicability of the planning results of each unit is evaluated to obtain the planning results evaluation results of each unit. When the unit conflict degree is 0, the planning results evaluation results of the unit are determined to be applicable; when the unit conflict degree is greater than 0, the planning results evaluation results of the unit are determined to be inapplicable.

[0117] According to the planning achievement evaluation results of all units in the target area, the planning achievement evaluation results of the target control plan in the target area during the evaluation period are determined.

[0118] According to the unit conflict degrees corresponding to all units, and in accordance with the principle of "the greater the unit conflict degree, the greater the inapplicability", the distribution areas and indicators of the least suitable unit or units are determined, so as to revise or adjust the control regulations of these least suitable units or units.

[0119] It is understandable that when the conflicting plot is not in the least applicable unit, local adjustments to the control plan can be made as needed based on the plot information of the conflicting plot to reduce the degree of conflict in the control plan of the unit.

[0120] In a possible implementation, in step S1213, the unit conflict degree corresponding to each unit in the target area is calculated based on the unit result data in the currently approved control planning result data and the evaluation rules of the conflicting units, as well as the conflict evaluation results of all the plots included in each unit, including:

[0121] According to the evaluation rules of the conflict unit, multiple evaluation factors of the conflict unit are determined;

[0122] According to each evaluation factor of the conflict unit, each unit in the target area is evaluated to see whether there is a conflict, and the conflict evaluation result of each unit under each evaluation factor is obtained;

[0123] According to the conflict evaluation results of each unit under each evaluation factor, the number of conflicts of each unit is calculated;

[0124] According to the conflict times of all units in the target area, the average number of unit conflicts is calculated;

[0125] The unit conflict degree of each unit in the target area is calculated based on the number of conflicts of each unit, the average number of unit conflicts and the conflict assessment results of the plots in the target area.

[0126] Specifically, according to the unit result data and the evaluation rules of the conflicting units in the currently approved control planning result data, as well as the conflict evaluation results of all the plots included in each unit, the unit conflict degree corresponding to each unit in the target area is calculated, including:

[0127] According to the assessment rules of the conflict unit, multiple assessment factors of the conflict unit are determined, such as: unit conduction index, land use ratio, direction and width of linear facilities within the unit, point facilities for fixed-point conduction, etc.

[0128] For any unit in the target area, based on any evaluation factor, evaluate whether the unit has a conflict, and obtain the conflict evaluation result of the unit under the evaluation factor as conflict or no conflict. When the conflict evaluation result of the unit under the evaluation factor is conflict, the unit is marked as a conflict unit once, and the unit has a conflict once. Based on all evaluation factors, evaluate whether the unit has a conflict, and finally obtain the total number of times the unit is marked as a conflict unit as the number of times the unit has a conflict. The number of times the unit has a conflict is counted, and the number of conflicts of the unit is calculated.

[0129] According to the conflict times of all units in the target area, the average number of unit conflicts in the target area is calculated.

[0130] Since each unit includes one or more plots, for any unit i in the target area, according to the conflict times of the unit, the average conflict times of the unit and the conflict assessment results of the plots in the target area, the unit conflict degree C of the unit i in the target area is calculated according to the following formula: i :

[0131]

[0132] Among them, SC i represents the total area of ​​conflicting plots in unit i, S i represents the area of ​​unit i, FC i represents the number of conflicts in unit i, Represents the average number of unit conflicts in the target area.

[0133] In a possible implementation, in step S122, whether the adjustment rule of the target control plan is applicable is evaluated based on the control plan adjustment record data, the historical approved control plan result data, and the currently approved control plan result data, and the adjustment rule evaluation result of the target control plan in the target area within the evaluation period is obtained, including:

[0134] According to the control plan adjustment record data, the adjustment indexes of the adjustment type, adjustment reason and adjustment content of the target control plan are respectively counted to obtain the index value of the adjustment type, the index value of the adjustment reason and the index value of the adjustment content of the target control plan;

[0135] According to the index value of the adjustment type of the target control plan, the index value of the adjustment reason and the index value of the adjustment content, the applicability of the adjustment process of the target control plan is evaluated, and the adjustment process evaluation result of the target control plan in the target area within the evaluation period is obtained;

[0136] According to the historical index values ​​in the historical approved control plan results data and the current index values ​​in the currently approved control plan results data, the adjustment information of the target control plan within the evaluation period is counted;

[0137] According to the total indicator setting value in the master plan and the adjustment information of the target control plan during the evaluation period, the rationality of the indicator adjustment direction of the target control plan is evaluated, and the evaluation result of the indicator adjustment direction of the target control plan in the target area during the evaluation period is obtained;

[0138] According to the adjustment process evaluation results of the target control regulation in the target area during the evaluation period and the indicator adjustment direction evaluation results, it is evaluated whether the adjustment rules of the target control regulation during the evaluation period are applicable, and the adjustment rule evaluation results of the target control regulation in the target area during the evaluation period are obtained.

[0139] Specifically, based on the control plan adjustment record data, the historical approved control plan results data and the currently approved control plan results data, the applicability of the adjustment rules of the target control plan is evaluated, and the adjustment rule evaluation results of the target control plan in the target area during the evaluation period are obtained, including:

[0140] The control plan adjustment record data includes the adjustment type, adjustment reason and adjustment content of each control plan adjustment, as well as the adjustment duration of each adjustment. The adjustment frequency and adjustment time are used as adjustment indicators. According to the adjustment types of all control plan adjustments and the adjustment duration of each adjustment, the number of adjustments and adjustment duration of each adjustment category of the adjustment type are counted respectively. According to the number of adjustments and adjustment duration, the adjustment time and adjustment frequency of each adjustment category are calculated as the index value of the adjustment indicator of each adjustment category.

[0141] According to the reasons for all control plan adjustments and the duration of each adjustment, the number of adjustments and the duration of each reason category are counted respectively. Based on the number of adjustments and the duration of adjustments, the adjustment timeliness and frequency of each reason category are calculated as the indicator value of the adjustment indicator of each reason category.

[0142] According to the adjustment contents of all control plans and the adjustment duration of each adjustment, the number of adjustments and the adjustment duration of each content category of the adjustment contents are counted respectively. According to the number of adjustments and the adjustment duration, the adjustment timeliness and adjustment frequency of each content category are calculated as the indicator value of the adjustment indicator of each content category.

[0143] According to various combinations of adjustment reasons and adjustment contents, the number of adjustments and adjustment duration under various combinations of adjustment reasons and adjustment contents are counted respectively; based on the number of adjustments and adjustment duration, the adjustment timeliness and adjustment frequency for each combination of adjustment reasons and contents are calculated as the indicator value of the adjustment indicator for each combination of adjustment reasons and contents.

[0144] Among them, the adjustment frequency refers to the number of times each adjustment category, each reason category or each content category occurs within the evaluation period, and the adjustment timeliness refers to the average, maximum or minimum value of the adjustment duration of each adjustment category, each reason category or each content category within the evaluation period.

[0145] According to the index values ​​of the adjustment indicators of each adjustment category of the target control plan, the index values ​​of the adjustment indicators of each cause category, and the index values ​​of the adjustment indicators of each content category, a combined analysis is performed to determine the common adjustment categories, cause categories, and / or content categories in the adjustment process of the target control plan, as well as the index values ​​of the adjustment indicators of the common adjustment categories, cause categories, and / or content categories. According to the index values ​​of the adjustment indicators of the common adjustment categories, cause categories, and / or content categories, an assessment is made on whether the adjustment process is applicable, and the assessment results of the adjustment process of the target control plan in the target area during the assessment period are obtained. For the inapplicable adjustment process, a prompt message is issued to remind the user to make improvements.

[0146] In an optional example, the most frequently adjusted type is the adjustment of the floor area ratio and various specific indicators of industrial land required for the implementation of industrial projects. If the adjustment time required for the implementation of industrial projects is higher than the time threshold that is conducive to the implementation of the project (for example, 2 months), it can be considered that there is a problem with the adjustment rule and it conflicts with the needs of urban development. Based on the existing problems, users can be reminded to adjust and optimize the approval process required for the implementation of industrial projects.

[0147] It is understandable that if Figure 3As shown in the figure, the adjustment process evaluation results of the target control plan in the target area during the evaluation period can generate an adjustment summary report, which displays the adjustment frequency and adjustment timeliness of different adjustment categories of adjustment types, the adjustment frequency and adjustment timeliness of different cause categories of adjustment reasons, the adjustment frequency and adjustment timeliness of different content categories of adjustment contents, and the adjustment frequency and adjustment timeliness of typical combinations of adjustment reasons and adjustment contents, as well as the spatial distribution of the scope of adjustment projects in the form of statistical charts such as pie charts. The adjustment summary report can include the most common types, causes, contents, characteristics, timeliness, and frequency of the operation process of the control plan adjustment, thereby assisting in revealing the problems existing in the adjustment operation.

[0148] Specifically, statistical analysis is performed based on the approved control planning results data and the land use layer (in addition to land type and building volume, the control planning population can also be reversely counted), facility point layer and traffic network layer in the currently approved control planning results data to obtain the historical indicator values ​​in the historical approved control planning results data and the currently approved control planning results data.

[0149] Based on the historical indicator values ​​in the historical approved control planning results data and the current indicator values ​​in the currently approved control planning results data, a statistical analysis is conducted on the adjustment information of the target control planning during the evaluation period to obtain the land use structure adjustment information, building volume structure adjustment information, public welfare facilities adjustment information, and road network density adjustment information.

[0150] Since the general plan contains total indicator setting values, the total indicator setting values ​​include the total indicator setting values ​​of land use structure, the total indicator setting values ​​of building volume structure, the total indicator setting values ​​of public welfare facilities, and the total indicator setting values ​​of road network density, the total indicator setting values ​​of land use structure, the total indicator setting values ​​of building volume structure, the total indicator setting values ​​of public welfare facilities, and the total indicator setting values ​​of road network density in the general plan are compared one by one with the land use structure adjustment information, building volume structure adjustment information, public welfare facility adjustment information, and road network density adjustment information of the target control plan during the assessment period.

[0151] By comparing the total land use structure index setting values ​​in the master plan with the land use structure adjustment information in the control plan during the assessment period, it is evaluated whether the adjustment direction of the land use structure deviates from the development needs, and the adjustments in the land use structure that deviate from the development needs are identified to obtain the assessment results of the adjustment direction of the land use structure.

[0152] By comparing the set values ​​of the total building volume structure indicators in the master plan with the building volume structure adjustment information in the control plan during the assessment period, it is evaluated whether the adjustment direction of the building volume structure deviates from the development needs, and the adjustments in the building volume structure that deviate from the development needs are identified to obtain the assessment results of the adjustment direction of the building volume structure.

[0153] By comparing the total indicator setting values ​​of public welfare facilities in the master plan and the public welfare facility adjustment information in the control plan during the assessment period, it is evaluated whether the adjustment direction of public welfare facilities deviates from development needs, and the adjustments in the adjustment direction of public welfare facilities that deviate from development needs are identified to obtain the assessment results of the adjustment direction of public welfare facilities.

[0154] By comparing the set value of the total road network density index in the master plan and the road network density adjustment information in the control plan during the evaluation period, it is evaluated whether the adjustment direction of the road network density deviates from the development needs, and the adjustments in the road network density that deviate from the development needs are identified to obtain the evaluation results of the adjustment direction of the road network density.

[0155] Based on the evaluation results of the adjustment direction of the land use structure, the building volume structure, the public welfare facilities and the road network density, the overall evaluation results of the adjustment direction of the control planning indicators in the target area during the evaluation period are obtained.

[0156] According to the adjustment process evaluation results of the target control plan in the target area during the evaluation period and the overall evaluation results of the indicator adjustment direction, the problems or omissions in the current adjustment rules can be identified, and the adjustment rule evaluation results of the target control plan in the target area during the evaluation period can be obtained.

[0157] In an optional example, the master plan often puts forward specific indicators and requirements for the total amount of a certain type of land, the proportion of a certain type of construction land, a certain type of construction land per capita (such as park green space), a certain type of building per capita (such as residential building area, commercial building area), per capita facilities (such as school places per thousand people), service radius coverage of facilities, road network density, etc., based on the development needs of the target area. For example, the master plan requires that the proportion of industrial land should not be less than 30%, but if the proportion of industrial land in the historical approved control planning results data is 25%, and the proportion of industrial land in the current approved control planning results data is further reduced to 20%, it can be considered that the adjustment direction of industrial land during the evaluation period deviates from the needs of urban development.

[0158] It can be understood that by identifying adjustments in the adjustment rules that deviate from development needs, a cumulative adjustment change report of the target control plan during the evaluation period can be output. The report can include a comparison chart of the historical approved control plan results data of each adjustment, the current approved control plan results data, and the total indicator setting values ​​of the master plan, and will issue early warnings for situations where there is a continuous deviation from the total indicator setting values, prompting users that there is an abnormality in the adjustment direction and reminding users to take measures to adjust the deviation.

[0159] In a possible implementation, in step S123, the implementation status of the control plan is evaluated based on the current urban operation data, and the evaluation result of the implementation status of the target control plan in the target area during the evaluation period is obtained, including:

[0160] Step S1231, based on the pre-constructed standard indicator library for each unit in the target area, obtain standard indicators of multiple unit development indicators corresponding to each unit, where the unit development indicator is the development indicator of the unit established by the control plan;

[0161] Step S1232, according to the current urban operation data, the index values ​​of the multiple unit development indicators currently corresponding to each unit are counted to obtain the current statistical values ​​of the multiple unit development indicators corresponding to each unit;

[0162] Step S1233, based on the current statistical values ​​of multiple unit development indicators corresponding to each unit and the standard indicators of multiple unit development indicators, the implementation status of each unit in the target area is evaluated to obtain the implementation status evaluation result of the target control plan in the target area during the evaluation period.

[0163] Specifically, the implementation status of the control plan is evaluated based on the current urban operation data, and the implementation status evaluation results of the target control plan in the target area during the evaluation period are obtained, including:

[0164] For each unit within the target area, the current status of the unit also needs to be monitored in order to promptly discover problems in the target control plan and issue early warnings.

[0165] A standard indicator library for each unit in the target area is pre-built, and the standard indicator library includes multiple indicators, such as unit development indicators of each unit, and standard indicators of the multiple indicators. The standard indicator of an indicator is the target value, standard specification value or average value of the indicator in the target area.

[0166] The unit development indicators of each unit can be set in combination with the basic data of the city, and are generally composed of general indicators and characteristic indicators specially established in the control plan of each unit. General indicators are indicators that aim to characterize the ideal state level of unit space development, including: reasonable functional organization (such as commuting time, etc.), perfect service functions (such as degree satisfaction rate, per capita public welfare land indicators, public welfare facility service radius coverage rate, 15-minute living circle facility perfection, etc.), infrastructure support (such as road network density, road traffic congestion index), economic efficiency (such as industrial land per capita added value, etc.), and other indicators. Spatial quality indicators (such as green coverage rate, streetscape quality evaluation, etc.) can also be added. Characteristic indicators are proposed by the control plan of each unit based on the characteristics of the unit, such as business district vitality, job-housing balance index, etc.

[0167] From the standard indicator library of each unit in the target area, standard indicators of multiple unit development indicators corresponding to each unit are obtained.

[0168] For any unit in the target area, the indicator values ​​of multiple unit development indicators currently corresponding to the unit are counted according to the current urban operation data to obtain the current statistical values ​​of multiple unit development indicators corresponding to the unit. Among them, the current statistical value of the unit development indicator is the statistical value of the unit development indicator at the end time of the evaluation period.

[0169] In an optional example, the current statistical values ​​of multiple unit development indicators can be obtained or calculated from multiple channels based on the current urban operation data. For example: the statistical value of commuting time can be obtained from the Internet; the statistical value of the work-residence balance index can be calculated based on the proportion of employed people living in the area, or based on the residential population / employed population in the unit, based on the support of big data; the statistical values ​​of service function improvement indicators such as degree satisfaction rate can be calculated through fine-grained population big data and population grid data, as well as the data of completed facilities verified by planning; the statistical value of infrastructure can be obtained using road big data; the statistical value of economic efficiency indicators can be obtained by fusion of current land use data, enterprise data, and enterprise location big data; the statistical value of spatial quality indicators can be calculated through big data publicly available on the Internet. It is also possible to make full use of open network data to roughly replace the statistical values ​​of relevant indicators. For example, the statistical value of the completeness of facilities in a 15-minute living circle can be obtained by crawling the residential areas and facility POIs (Point of Interest) on the Internet, and then calculating the richness of various types of facilities available in the isochronous circle of each residential area with the residential area as the center point and the 15-minute walking isochronous circle as the range, and then integrating them to form the statistical value of the overall indicator of the completeness of facilities in the unit living circle.

[0170] Specifically, for any unit in the target area, the current statistical values ​​of multiple unit development indicators of the unit are compared with the standard indicators of multiple unit development indicators corresponding to the unit, and the implementation status of the unit is evaluated to evaluate whether the various indicators of the unit deviate from the standard indicators. When the indicators of the unit deviate from the standard indicators, a warning is issued in time to prompt the user to take measures to improve the indicators of the unit. After evaluating the implementation status of all units, the evaluation results of the implementation status of the target control plan in the target area during the evaluation period are obtained.

[0171] It should be noted that when evaluating the implementation status of a unit, data on projects that have been approved but not yet constructed can also be added and added to the current planning results data of the unit through a prediction model (inputting project locations, project categories, and project construction time periods, and outputting the expected new population and new facilities for the unit in the next one to many years), in order to predict the statistical values ​​of the indicators for the unit in the next one to many years. This can then allow the unit's indicators to be evaluated in advance, and any indicators that deviate from the standard indicators can be identified, with early warnings issued to facilitate users to take measures in advance and build projects in the unit in advance, effectively avoiding abnormal situations in the unit.

[0172] In a possible implementation, step S1233 evaluates the implementation status of each unit in the target area according to the current statistical values ​​of the multiple unit development indicators corresponding to each unit and the standard indicators of the multiple unit development indicators, and obtains the implementation status evaluation result of the target control plan in the target area during the evaluation period, including:

[0173] According to the current statistical values ​​of the multiple unit development indicators corresponding to the unit and the standard indicators of the multiple unit development indicators corresponding to the unit, the deviations of the multiple unit development indicators corresponding to the unit are calculated respectively to obtain the deviation values ​​of the multiple unit development indicators corresponding to the unit;

[0174] According to the deviation values ​​of multiple unit development indicators corresponding to the unit, whether the implementation status of the unit is abnormal is evaluated to obtain the evaluation result of the implementation status of the unit;

[0175] Based on the implementation status assessment results of all units in the target area, the implementation status assessment results of the target control plan in the target area during the assessment period are determined.

[0176] Specifically, according to the current statistical values ​​of multiple unit development indicators corresponding to each unit and the standard indicators of multiple unit development indicators, the implementation status of each unit in the target area is evaluated, and the evaluation results of the implementation status of the target control plan in the target area during the evaluation period are obtained, including:

[0177] For any unit development indicator corresponding to any unit, the current statistical value of the unit development indicator corresponding to the unit is compared with the standard indicator of the unit development indicator corresponding to the unit, and the deviation of the unit development indicator corresponding to the unit is calculated to obtain the deviation value of the unit development indicator corresponding to the unit. For all unit development indicators of the unit, the deviation value of the corresponding unit development indicator is calculated.

[0178] It should be noted that the standard indicators of the unit development indicators may include the target value, standard value and average value of the unit development indicators, the target value is the target value of the unit development indicator set by the unit control plan, the standard value is the value of the unit development indicator in the technical specification, and the average value is the average value of the unit development indicator in the entire target area. The deviation of the unit development indicator corresponding to the unit can be calculated based on any one or more of the target value, standard value and average value of the unit development indicator, and this embodiment does not specifically limit this.

[0179] According to the deviation values ​​of multiple unit development indicators corresponding to the unit, the implementation status of the unit is evaluated to see if there is any abnormality. When the deviation value of one or more indicators among the multiple unit development indicators is greater than the preset threshold, the implementation status of the unit is judged to be abnormal, and the evaluation result of the implementation status of the unit is abnormal, and an early warning is issued. When the deviation values ​​of all indicators in the transmitted control indicators and all unit development indicators corresponding to the unit are not greater than the preset threshold, it is judged that there is no abnormality in the implementation status of the unit, and the evaluation result of the implementation status of the unit is no abnormality.

[0180] According to the implementation status assessment results of each unit in the target area, the implementation status assessment results of the target control plan in the target area during the assessment period are determined, so as to prompt users to take implementation actions, maintain or build new projects, and remind users to take implementation actions in the implementation process of the control plan.

[0181] Furthermore, if the statistical values ​​of the unit development indicators at the starting point of the assessment are included in the comparison, the improvement of the unit space quality during the assessment period can be analyzed to help evaluate the effectiveness of the implementation of the control plan.

[0182] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0183] Corresponding to the method of the above embodiment, Figure 4 A schematic diagram of the structure of a control planning evaluation device provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.

[0184] Reference Figure 4 , the device comprises:

[0185] The data acquisition module 21 is used to acquire a plurality of planning implementation data related to the target control plan within the evaluation period;

[0186] A planning evaluation module 22 is used to evaluate the target control plan in at least one dimension during the evaluation period according to the plurality of planning implementation data, and obtain at least one planning evaluation result;

[0187] The evaluation summary module 23 is used to determine the overall evaluation result of the target control plan in the evaluation period according to at least one planning evaluation result.

[0188] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0189] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0190] An embodiment of the present application also provides an electronic device, which includes: at least one processor, a memory, and a computer program stored in the memory and executable on at least one processor, wherein the processor implements the steps of any of the above-mentioned method embodiments when executing the computer program.

[0191] The embodiment of the present application further provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0192] An embodiment of the present application provides a computer program product. When the computer program product runs on a mobile terminal, the mobile terminal can implement the steps in the above-mentioned method embodiments when executing the computer program product.

[0193] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the camera / terminal device, a recording medium, a computer memory, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), an electric carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.

[0194] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0195] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0196] In the embodiments provided in the present application, it should be understood that the disclosed devices / network equipment and methods can be implemented in other ways. For example, the device / network equipment embodiments described above are only schematic. For example, the division of modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0197] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0198] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for evaluating control regulations, characterized in that: include: Obtain multiple planning implementation data related to the target control plan during the evaluation period; According to the plurality of planning implementation data, the target control plan is evaluated in at least one dimension during the evaluation period to obtain at least one planning evaluation result; An overall evaluation result of the target control plan in the evaluation period is determined according to at least one of the planning evaluation results.

2. The control regulation evaluation method according to claim 1, characterized in that: The acquisition of multiple planning implementation data related to the target control plan during the evaluation period includes: Determine the regulatory planning assessment database pre-built based on the target area; From the control plan evaluation database, obtain multiple planning implementation data related to the target control plan within the evaluation period; the multiple planning implementation data include: historical approved control plan results data, currently approved control plan results data, control plan adjustment record data, urban current operation data and control plan external environment change data, wherein the historical approved control plan results data are the approved control plan data of the target area at the start time of the evaluation period, the currently approved control plan results data are the approved control plan data of the target area at the end time of the evaluation period, the control plan adjustment record data are the control plan adjustment data of the target area within the evaluation period, the urban current operation data are the urban operation data of the target area at the end time of the evaluation period, and the control plan external environment change data are the external environment change data of the target area within the evaluation period.

3. The control regulation evaluation method according to claim 2, characterized in that: The at least one dimension includes: planning results, adjustment rules, and implementation status; the evaluating the target control plan in at least one dimension during the evaluation period according to the plurality of planning implementation data to obtain at least one planning evaluation result includes at least one of the following steps: Based on the external environment change data of the control plan and the currently approved control plan achievement data, assess whether the planning achievement of the target control plan is applicable, and obtain the planning achievement assessment result of the target control plan in the target area within the assessment period; According to the control plan adjustment record data, the historical approved control plan achievement data and the currently approved control plan achievement data, whether the adjustment rule of the target control plan is applicable is evaluated to obtain the adjustment rule evaluation result of the target control plan in the target area within the evaluation period; The implementation status of the target control plan is evaluated according to the current urban operation data, and an evaluation result of the implementation status of the target control plan in the target area during the evaluation period is obtained.

4. The control regulation evaluation method according to claim 3, characterized in that: The evaluation of whether the planning results of the target control plan are applicable is performed based on the external environment change data of the control plan and the currently approved control plan results data, and the planning results evaluation results of the target control plan in the target area within the evaluation period are obtained, including: Translating the control plan external environment change data to obtain planning achievement evaluation rules, wherein the planning achievement evaluation rules include evaluation rules for conflicting plots and evaluation rules for conflicting units; According to the plot result data in the currently approved control planning result data and the assessment rules of the conflicting plots, assess whether each plot in the target area has a conflict, and obtain a conflict assessment result for each plot; Calculate the unit conflict degree corresponding to each of the units in the target area according to the unit result data in the currently approved control planning result data and the evaluation rules of the conflicting units, as well as the conflict evaluation results of all the plots included in each unit; According to the unit conflict degrees corresponding to the units, evaluating whether the planning achievements of the units are applicable, and obtaining the planning achievement evaluation results of the units; According to the planning achievement evaluation results of all the units in the target area, the planning achievement evaluation results of the target control plan in the target area within the evaluation period are determined.

5. The control regulation evaluation method according to claim 4, characterized in that: The unit conflict degree corresponding to each of the units in the target area is calculated based on the unit result data in the currently approved control planning result data and the evaluation rules of the conflicting units, as well as the conflict evaluation results of all the plots included in each unit, including: Determining a plurality of evaluation factors of the conflict unit according to the evaluation rule of the conflict unit; According to each of the evaluation factors of the conflicting units, evaluating whether each of the units in the target area conflicts, and obtaining a conflict evaluation result of each of the units under each of the evaluation factors; Calculating the number of conflicts of each unit according to the conflict evaluation results of each unit under each evaluation factor; Calculate the average number of unit conflicts according to the number of conflicts of all the units in the target area; The unit conflict degree of each unit in the target area is calculated according to the conflict times of each unit, the average value of the unit conflict times and the conflict assessment results of all the plots in the target area.

6. The control regulation evaluation method according to claim 3, characterized in that: The step of evaluating whether the adjustment rule of the target control plan is applicable according to the control plan adjustment record data, the historical approved control plan achievement data, and the currently approved control plan achievement data, and obtaining the adjustment rule evaluation result of the target control plan in the target area within the evaluation period includes: According to the control plan adjustment record data, respectively counting the adjustment indexes of the adjustment type, adjustment reason and adjustment content of the target control plan, and obtaining the index value of the adjustment type, adjustment reason and adjustment content of the target control plan; Evaluate whether the adjustment process of the target control plan is applicable according to the index value of the adjustment type, the index value of the adjustment reason and the index value of the adjustment content of the target control plan, and obtain an evaluation result of the adjustment process of the target control plan in the target area within the evaluation period; According to the historical indicator values ​​in the historical approved control plan achievement data and the current indicator values ​​in the currently approved control plan achievement data, statistically analyzing the adjustment information of the target control plan within the evaluation period; According to the total indicator setting value in the master plan and the adjustment information of the target control plan in the evaluation period, whether the indicator adjustment direction of the target control plan is reasonable is evaluated to obtain the indicator adjustment direction evaluation result of the target control plan in the target area in the evaluation period; According to the adjustment process evaluation result of the target control regulation in the target area during the evaluation period and the indicator adjustment direction evaluation result, it is evaluated whether the adjustment rule of the target control regulation in the evaluation period is applicable, and the adjustment rule evaluation result of the target control regulation in the target area during the evaluation period is obtained.

7. The control regulation evaluation method according to claim 3, characterized in that: The step of evaluating the implementation status of the control plan based on the current urban operation data to obtain the implementation status evaluation result of the target control plan in the target area during the evaluation period includes: Based on a pre-constructed standard indicator library for each unit in the target area, standard indicators of a plurality of unit development indicators corresponding to each unit are obtained, wherein the unit development indicator is a development indicator of the unit established by the control plan; According to the current operation data of the city, the index values ​​of the multiple unit development indicators currently corresponding to each of the units are counted to obtain the current statistical values ​​of the multiple unit development indicators corresponding to each of the units; According to the current statistical values ​​of the multiple unit development indicators corresponding to each of the units and the standard indicators of the multiple unit development indicators, the implementation status of each of the units in the target area is evaluated to obtain the evaluation result of the implementation status of the target control plan in the target area during the evaluation period.

8. The control regulation evaluation method according to claim 7, characterized in that: The implementation status of each of the units in the target area is evaluated according to the current statistical values ​​of the multiple unit development indicators corresponding to each of the units and the standard indicators of the multiple unit development indicators, and the implementation status evaluation result of the target control plan in the target area during the evaluation period is obtained, including: According to the current statistical values ​​of the multiple unit development indicators corresponding to the unit and the standard indicators of the multiple unit development indicators corresponding to the unit, respectively, the deviations of the multiple unit development indicators corresponding to the unit are calculated to obtain the deviation values ​​of the multiple unit development indicators corresponding to the unit; According to the deviation values ​​of the plurality of unit development indicators corresponding to the unit, evaluating whether the implementation status of the unit is abnormal, and obtaining an implementation status evaluation result of the unit; According to the implementation status assessment results of all the units in the target area, the implementation status assessment result of the target control regulation in the target area within the assessment period is determined.

9. A control regulation evaluation device, characterized in that: include: A data acquisition module is used to acquire multiple planning implementation data related to the target control plan within the evaluation period; A planning evaluation module, configured to evaluate the target control plan in at least one dimension during the evaluation period according to the plurality of planning implementation data, and obtain at least one planning evaluation result; An evaluation summary module is used to determine the overall evaluation result of the target control plan in the evaluation period according to at least one of the planning evaluation results.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 8 is implemented.

Citation Information

Patent Citations

  • Method for evaluating spatial planning rationality of waterfront area

    CN108647880A

  • Urban planning implementation effect analysis and evaluation method

    CN111222661A

  • Land scale territorial space development and protection cross-regional collaborative trade-off method

    CN115759618A

  • Control planning device, control planning system, control planning method, and recording medium