Maintenance resource global configuration optimization method oriented to cross-domain multi-stage guarantee network

By optimizing resource allocation based on topological structure and traffic time in avionics equipment maintenance resource management, the problem of insufficient resource allocation automation in avionics equipment maintenance resource management is solved, the optimization of resource allocation is achieved, and maintenance is reduced Time and cost improve user satisfaction.

CN118967089APending Publication Date: 2024-11-1510TH RES INST OF CETC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410935524.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The lack of unified tools for maintenance resource management of avionics equipment in multiple war zones and multiple platforms, resulting in a lack of automation in resource allocation and long troubleshooting cycles, which affects task execution and customer satisfaction.

Method used

A global configuration optimization method for maintenance resources for cross-domain multi-level guarantee networks is proposed. Through mathematical models based on topological structure, distance and traffic time, the resource inventory configuration is optimized, the resource transfer system model is constructed, and the optimal resource resource is calculated at each site. Configure to ensure optimal resource scheduling time cost.

Benefits of technology

It has achieved optimization of resource allocation of avionics equipment, reduced resource deficiencies, reduced maintenance time, reasonably controlled the total inventory, and improved operation and maintenance efficiency and user satisfaction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967089A_ABST
    Figure CN118967089A_ABST
Patent Text Reader

Abstract

The invention provides a maintenance resource global configuration optimization method for a cross-domain multi-stage guarantee network, and the method comprises the steps: proposing a maintenance resource inventory optimization mathematical problem based on the relation between a topological structure of the guarantee network and stations, the distance and the traffic time; input and output parameters for optimizing mathematical problems are determined; constructing a maintenance resource transfer system model equation based on the input parameters, and giving a mathematical expression of the output parameters; when the computing system has one resource, the resource should be configured at which site; and repeating the calculation, confirming the optimal site of the kth resource at the (k-1) th resource after the allocation is finished until the total number of the resources reaches a system input value, ending the allocation, then giving an image that the total delay delivery volume is reduced along with the increase of the total number of the inventory, and confirming the optimal total number of the inventory. According to the method, the number of the maintenance resources among the stations can be allocated based on the guarantee network, and on the premise that faults occur randomly, the optimal total time and cost of resource scheduling of the whole guarantee network are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of avionics equipment, and in particular to a maintenance resource global configuration optimization method for a cross-domain multi-level support network. Background Art

[0002] The spatial distribution of aviation integrated electronic equipment spans multiple theaters, operation and maintenance centers, and sub-centers. It has the characteristics of multiple platforms, multiple systems, and multiple levels across theaters. Currently, there is a lack of unified maintenance resource management tools in the business. There is no theoretical and tool support for how many resources should be placed at each site. The resource allocation process is mainly based on telephone communication with support personnel, and resources are often allocated when they are needed. The entire resource allocation process lacks automated tools and data support, and the troubleshooting cycle is very long, which may affect the execution of equipment missions and seriously affect customer reputation. Summary of the invention

[0003] The present invention aims to provide a global configuration optimization method for maintenance resources of a cross-domain multi-level security network, so as to solve the problem of how to achieve the best resource configuration between different sites.

[0004] The present invention provides a maintenance resource global configuration optimization method for a cross-domain multi-level security network, comprising the following steps:

[0005] S1, based on the topological structure of the support network and the relationship, distance and travel time between sites, proposes a mathematical problem of optimizing the maintenance resource inventory;

[0006] S2, clarify the input and output parameters of the mathematical problem of maintenance resource inventory optimization;

[0007] S3, based on the input parameters of the maintenance resource inventory optimization mathematical problem, construct the maintenance resource transfer system model equation and give the mathematical expression of the output parameters;

[0008] S4, using the maintenance resource transfer system model equation and the mathematical expression of the output parameters, calculate which site the resource should be deployed at when the system is at 1 resource;

[0009] S5, repeat step S4 to confirm the optimal site of the kth resource after the k-1th resource is configured, until the total number of resources reaches the system input value, and the configuration is completed;

[0010] S6, after the configuration is completed, an image is given showing that the total backorder quantity decreases as the total inventory increases, and the optimal total inventory is confirmed.

[0011] Further, step S1 includes:

[0012] Before proposing the mathematical problem of optimizing the inventory of maintenance resources, we first need to clarify the resource scheduling model between the avionics product resource outlets, the operation and maintenance center, and the supplier: when a fault occurs at an avionics product resource outlet, resource demand is generated, and the faulty parts need to be sent to the operation and maintenance center for inspection. If the outlet has resources on its own, it can be self-sufficient; if the resources are insufficient, it will request resources from the operation and maintenance center; the operation and maintenance center receives the faulty parts from the outlets for fault detection: if the detection result is no fault, the resources are directly returned to the outlet; if the detection result is a fault, the faulty parts are returned to the outlet after being repaired by the operation and maintenance center; after the operation and maintenance center receives the resource application from the outlet If the operation and maintenance center has sufficient resources, it will provide one resource to the outlet; if the operation and maintenance center has insufficient resources, it will apply for resources from the supplier and send all the results of fault detection to the supplier. When the outlet resources are insufficient and the operation and maintenance center has sufficient resources, the operation and maintenance center receives the faulty parts from the outlets for fault detection: if the detection result is no fault, the resources are returned to the operation and maintenance center; if the detection result is a fault, the faulty parts are returned to the operation and maintenance center after being repaired by the operation and maintenance center; after the supplier receives the resource application from the operation and maintenance center, if the supplier has sufficient resources, it will provide one resource to the operation and maintenance center; if the supplier has insufficient resources, the resource demand cannot be met temporarily.

[0013] The mathematical problem of maintenance resource inventory optimization is to allocate the number of resources between each site based on the topological structure of the security network and the relationship, distance and travel time between sites when the number of resources is certain, and to ensure the optimal overall time cost of resource scheduling of the entire security network under the premise of random failures.

[0014] Further, in step S2:

[0015] The input parameters of the maintenance resource inventory optimization mathematical problem include: the total resource inventory s, the number of resource requirements per unit time d i , the fault detection probability p f 、Time consumed for repairing faulty parts T m , the time it takes for resources to be transported from the operation and maintenance center to the outlets T si , the time T for resources to be transported from suppliers to the operation and maintenance center fi , The transportation time T of the faulty parts from the outlet to the operation and maintenance center fi , The time it takes for the faulty parts to be transported from the operation and maintenance center to the supplier T ft .

[0016] The output parameters of the maintenance resource inventory optimization mathematical problem include: the number of network resources s i , the number of resources in the operation and maintenance center t , Number of supplier resources u , the probability that the network point can provide resources P i , the operation and maintenance center can provide resource probability Pt , the probability that the supplier can provide resources P u , total backorder quantity S BO .

[0017] Further, step S3 includes:

[0018] According to the input parameters of the mathematical problem of maintenance resource inventory optimization, the resource transfer system model equation is constructed. First, the mathematical expression of the resource demand of the operation and maintenance center and the supplier per unit time is given; then the average repair time of the faulty parts detected in the operation and maintenance center is given; then the mathematical expressions of the resources that the outlets deserve, the resources that the operation and maintenance center deserves, and the resources that the supplier deserves are given; finally, the maintenance resource transfer system model equation of the outlets, operation and maintenance center, and suppliers is constructed, and the mathematical expression of the total deferred delivery quantity is given.

[0019] Furthermore, the mathematical expression of the resource demand quantity generated by the operation and maintenance center and the supplier per unit time is:

[0020] The number of network resources is s i (i=1,2,...,n); the number of resource demands generated by the network point per unit time is d i ; After the resource demand is generated, the probability that the network point can provide resources is P i , the probability that a node cannot provide resources is 1-P i ;

[0021] The number of resources in the operation and maintenance center is s t ; The number of resource requirements generated by the operation and maintenance center per unit time d t for:

[0022]

[0023] When resource demand from outlets is generated, the probability that the operation and maintenance center can provide resources is P t , the probability of not being able to provide resources is 1-P t ;

[0024] The number of supplier resources is s u ; The number of resource requirements generated by the supplier per unit time d u for:

[0025] d u =(1-P t )d t (2)

[0026] Furthermore, the average repair time of the faulty parts is T M The mathematical expression is:

[0027] T M =P f Tm (3)

[0028] Among them, after the fault detection of the faulty part in the operation and maintenance center, the probability of failure is P f ; Time consumed for repairing faulty parts T m And restored like new.

[0029] Furthermore, the mathematical expressions for the resources that outlets deserve, the resources that operation and maintenance centers deserve, and the resources that suppliers deserve are calculated as follows:

[0030] Considering outlets, operation and maintenance centers, and suppliers as sites, under the inventory counting strategy of (s-1,s), each site satisfies the inventory balance equation:

[0031] s=s OH +s DI -s BO (4)

[0032] Where: s is the initial inventory of the site; s OH is the available inventory at the site; DI is the amount of resources that the site deserves; BO is the total backorder quantity for the site;

[0033] When a resource demand is generated, the site's s DI If the site has available inventory, then the site's s OH minus one; if the site has no available inventory, the site's s BO The value increases by one; when the system is in steady state, the available inventory s at each site OH Total backorders BO They will not coexist;

[0034] The amount of resources that the outlets deserve The amount of resources shipped to the outlets The number of delayed deliveries of resources generated by the operation and maintenance center to the outlets Composition; the amount of resources that the outlets deserve Calculated by the following formula:

[0035]

[0036] The number of resources that the operation and maintenance center deserves It consists of 4 items: the number of faulty parts being repaired by the operation and maintenance center The number of resources shipped to the operation and maintenance center and the number of defective parts The number of resource backorders generated by suppliers to the operation and maintenance center The number of resources that the operation and maintenance center deserves Calculated by the following formula:

[0037]

[0038] The amount of resources that the supplier is entitled to Number of faulty parts being repaired by the supplier and the number of defective parts shipped to suppliers Composition; the amount of resources that suppliers deserve Calculated by the following formula:

[0039]

[0040] Furthermore, the resource transfer system model of outlets, operation and maintenance centers, and suppliers is constructed as follows:

[0041] According to the assumptions and Palm's theorem, the backorder quantity of resources in steady state is written as:

[0042]

[0043] After a site receives a resource request, the probability that it can meet the request is:

[0044]

[0045] Expanding the above formula, we get the resource transfer system model equation of n sites, operation and maintenance centers, and suppliers:

[0046]

[0047]

[0048] The total resource backorders for the system are:

[0049]

[0050] Further, step S4 includes:

[0051] First, calculate when a resource is configured at the node numbered 1, that is, s1 = 1, s i (i=2,3,...,n)=s t =s u =0, the total backorder quantity of the system;

[0052] The total backorder quantity for the system is calculated as follows:

[0053]

[0054] T M =P f T m (33)

[0055]

[0056] Among them, These two sets of parameters are unknown and nested with each other, and need to be solved iteratively. The method is as follows: First, set Substituting the initial value of into equation (36)(37)(38) we can solve Then Assuming that the parameter is unknown, Substitute the value of into (30)(31)(32)(33)(34)(35) and solve for the new The new Compared with the initial value, if the difference between the two is less than the error tolerance, the output and Otherwise, make the new As the initial value, repeat the above steps; solve and Then, substitute into equations (28) and (29) to calculate the total delayed delivery quantity of the system.

[0057] Further, step S5 includes:

[0058] The same calculation method as step S4 is used to calculate the site where the second resource should be allocated; the method is to calculate the total deferred order quantity of the second resource in the system after the first resource is allocated, and determine the site where the second resource should be allocated by comparing the total deferred order quantity of the system;

[0059] This process continues in this way until all resources are allocated to the most appropriate site, that is, the total number of resources reaches the system input value, and the configuration is completed.

[0060] Furthermore, in step S6, an image is given showing that the total deferred order quantity decreases as the total inventory increases, and the number of resources at each site under each total inventory is given; if the final total deferred order quantity is less than the expected value of inventory optimization, it means that the total inventory is too much and money can be saved by reducing the inventory quantity.

[0061] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0062] The present invention can optimize the resource allocation of avionics equipment network points, allocate the number of resources between each site based on the topological structure of the support network and the relationship, distance, travel time, etc. between sites, and ensure the optimal resource allocation of the entire support network under the premise of random failures, reduce resource loss during maintenance, reduce resource scheduling time during maintenance, reasonably control the total resource inventory, promote a reasonable balance between operation and maintenance efficiency and operation and maintenance costs, ensure the successful execution of tasks, and further improve user satisfaction with equipment operation and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0064] Figure 1 The present invention is a flowchart of a maintenance resource global configuration optimization method for a cross-domain multi-level security network in an embodiment of the present invention.

[0065] Figure 2 4 is a topological structure diagram between sites in an embodiment of the present invention. DETAILED DESCRIPTION

[0066] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0067] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] Example

[0069] like Figure 1 , Figure 2 As shown, this embodiment proposes a global configuration optimization method for maintenance resources for a cross-domain multi-level security network, including the following steps:

[0070] S1, based on the topological structure of the support network and the relationship, distance and travel time between sites, proposes a mathematical problem of optimizing the maintenance resource inventory;

[0071] Before proposing the mathematical problem of optimizing the inventory of maintenance resources, we first need to clarify the resource scheduling model between the avionics product resource outlets, the operation and maintenance center, and the supplier: when a fault occurs at an avionics product resource outlet, resource demand is generated, and the faulty parts need to be sent to the operation and maintenance center for inspection. If the outlet has resources on its own, it can be self-sufficient; if the resources are insufficient, it will request resources from the operation and maintenance center; the operation and maintenance center receives the faulty parts from the outlets for fault detection: if the detection result is no fault, the resources are directly returned to the outlet; if the detection result is a fault, the faulty parts are returned to the outlet after being repaired by the operation and maintenance center; after the operation and maintenance center receives the resource application from the outlet If the operation and maintenance center has sufficient resources, it will provide one resource to the outlet; if the operation and maintenance center has insufficient resources, it will apply for resources from the supplier and send all the results of fault detection to the supplier; when the outlet resources are insufficient and the operation and maintenance center resources are sufficient, the operation and maintenance center receives the faulty parts from the outlets for fault detection: if the detection result is no fault, the resources are returned to the operation and maintenance center; if the detection result is a fault, the faulty parts are returned to the operation and maintenance center after being repaired by the operation and maintenance center; after the supplier receives the resource application from the operation and maintenance center, if the supplier resources are sufficient, it will provide a resource to the operation and maintenance center; if the supplier resources are insufficient, the resource demand cannot be met temporarily.

[0072] The mathematical problem of maintenance resource inventory optimization is to allocate the number of resources between each site based on the topological structure of the security network and the relationship, distance and travel time between sites when the number of resources is certain, and to ensure the optimal overall time cost of resource scheduling of the entire security network under the premise of random failures.

[0073] S2, clarify the input and output parameters of the mathematical problem of maintenance resource inventory optimization;

[0074] The input parameters of the maintenance resource inventory optimization mathematical problem include: the total resource inventory s, the number of resource requirements per unit time d i , the fault detection probability p f 、Time consumed for repairing faulty parts T m , the time it takes for resources to be transported from the operation and maintenance center to the outlets T si , the time T for resources to be transported from suppliers to the operation and maintenance center fi , The transportation time T of the faulty parts from the outlet to the operation and maintenance center fi , The time it takes for the faulty parts to be transported from the operation and maintenance center to the supplier T ft .

[0075] The output parameters of the maintenance resource inventory optimization mathematical problem include: the number of network resources s i , the number of resources in the operation and maintenance center t , Number of supplier resources u , the probability that the network point can provide resources P i, the operation and maintenance center can provide resource probability P t , the probability that the supplier can provide resources P u , total backorder quantity S BO .

[0076] S3, based on the input parameters of the maintenance resource inventory optimization mathematical problem, construct the maintenance resource transfer system model equation and give the mathematical expression of the output parameters;

[0077] According to the input parameters of the mathematical problem of maintenance resource inventory optimization, the resource transfer system model equation is constructed. First, the mathematical expression of the resource demand of the operation and maintenance center and the supplier per unit time is given; then the average repair time of the faulty parts detected in the operation and maintenance center is given; then the mathematical expressions of the resources that the outlets deserve, the resources that the operation and maintenance center deserves, and the resources that the supplier deserves are given. Finally, the maintenance resource transfer system model equation of the outlets, operation and maintenance centers and suppliers is constructed, and the mathematical expression of the total deferred delivery quantity is given.

[0078] Furthermore, the mathematical expression for the number of resource requirements generated by the operation and maintenance center and the supplier per unit time is:

[0079] The number of network resources is s i (i=1,2,...,n). The number of resource demands generated by the network point per unit time is d i After resource demand is generated, the probability that the network node can provide resources is P i , the probability that a node cannot provide resources is 1-P i .

[0080] The number of resources in the operation and maintenance center is s t The number of resource requirements generated by the operation and maintenance center per unit time d t for:

[0081]

[0082] When resource demand from outlets is generated, the probability that the operation and maintenance center can provide resources is P t , the probability of not being able to provide resources is 1-P t .

[0083] The number of supplier resources is s u The number of resource requirements generated by the supplier per unit time d u for:

[0084] d u =(1-P t )d t (2)

[0085] Furthermore, the mathematical expression of the average repair time of faulty parts is:

[0086] After the faulty part is detected in the operation and maintenance center, the probability of failure is P f . Time consumed for repairing faulty parts T m And it is repaired like new, so the average repair time of faulty parts is T M for:

[0087] T M =P f T m (3)

[0088] Furthermore, the mathematical expressions for the resources that outlets deserve, the resources that operation and maintenance centers deserve, and the resources that suppliers deserve are calculated as follows:

[0089] Considering outlets, operation and maintenance centers, and suppliers as sites, under the inventory counting strategy of (s-1,s), each site satisfies the inventory balance equation:

[0090] s=s OH +s DI -s BO (4)

[0091] Where: s is the initial inventory of the site; s OH is the available inventory at the site; DI is the amount of resources that the site deserves; BO is the total backorder quantity for the site.

[0092] When a resource demand is generated, the site's s DI If the site has available inventory, then the site's s OH minus one; if the site has no available inventory, the site's s BO When the system is in steady state, the available inventory s at each site OH Total backorders BO Will not coexist.

[0093] The amount of resources that the outlets deserve The amount of resources shipped to the outlets The number of delayed deliveries of resources generated by the operation and maintenance center to the outlets The amount of resources that a network point deserves Calculated by the following formula:

[0094]

[0095] The number of resources that the operation and maintenance center deserves It consists of 4 items: the number of faulty parts being repaired by the operation and maintenance center The number of resources shipped to the operation and maintenance center and the number of defective parts The number of resource backorders generated by suppliers to the operation and maintenance center The number of resources that the operation and maintenance center deserves Calculated by the following formula:

[0096]

[0097] The amount of resources that the supplier is entitled to Number of faulty parts being repaired by the supplier and the number of defective parts shipped to suppliers The amount of resources that the supplier deserves Calculated by the following formula:

[0098]

[0099] The resource transfer system model of outlets, operation and maintenance centers and suppliers is constructed as follows:

[0100] According to the assumptions and Palm's theorem, the backorder quantity of resources in steady state can be written as:

[0101]

[0102] After a site receives a resource request, the probability that it can meet the request is:

[0103]

[0104] Expanding the above formula, we get the resource transfer system model equation of n sites, operation and maintenance centers, and suppliers:

[0105]

[0106]

[0107] The total resource backorders for the system are:

[0108]

[0109] S4, using the maintenance resource transfer system model equation and the mathematical expression of the output parameters, calculate which site the resource should be deployed at when the system is at 1 resource;

[0110] First, calculate the time when a resource is configured at the node numbered 1 (i.e., s1 = 1, s i (i=2,3,...,n)=s t =s u =0), the total backorder quantity in the system.

[0111] The total backorder quantity for the system is calculated as follows:

[0112]

[0113]

[0114] T M =P f T m (33)

[0115]

[0116] Among them, These two sets of parameters are unknown and nested with each other, and need to be solved iteratively. The method is as follows:

[0117] First set Substituting the initial value of into equation (36)(37)(38) we can solve Then Assuming that the parameter is unknown, Substitute the value of into (30)(31)(32)(33)(34)(35) and solve for the new The new Compared with the initial value, if the difference between the two is less than the error tolerance, the output and Otherwise, make the new Repeat the above steps for the initial value.

[0118] Solve and Then, substitute into equations (28) and (29) to calculate the total delayed delivery quantity of the system.

[0119] S5, repeat step S4 to confirm the optimal site of the kth resource after the k-1th resource is configured, until the total number of resources reaches the system input value, and the configuration is completed;

[0120] The same calculation method as step S4 is used to calculate the site where the second resource should be allocated; the method is to calculate the total deferred order quantity of the second resource in the system after the first resource is allocated, and determine the site where the second resource should be allocated by comparing the total deferred order quantity of the system;

[0121] This process continues in this way until all resources are allocated to the most appropriate site, that is, the total number of resources reaches the system input value, and the configuration is completed.

[0122] S6, after the configuration is completed, an image is given showing that the total backorder quantity decreases as the total inventory increases, and the optimal total inventory is confirmed.

[0123] The total backorder quantity decreases as the total inventory increases, and the resource quantity of each site under each total inventory can be given. If the final total backorder quantity is less than the expected value of inventory optimization, it means that the total inventory is too much, and the inventory quantity can be appropriately reduced to save money.

[0124] The above-mentioned global configuration optimization method for maintenance resources for cross-domain multi-level support networks can be applied to multiple fields. The present invention can optimize the resource configuration of avionics equipment outlets, allocate the number of resources between each site based on the topological structure of the support network and the relationship, distance, and transportation time between sites, and ensure the optimal resource configuration of the entire support network under the premise of random failures, reduce the lack of resources during the maintenance process, reduce the resource scheduling time during the maintenance time, reasonably control the total resource inventory, promote the reasonable balance between operation and maintenance efficiency and operation and maintenance costs, ensure the successful execution of tasks, and further improve users' satisfaction with equipment operation and maintenance.

[0125] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A global configuration optimization method for maintenance resources in a cross-domain multi-level support network, characterized in that: The steps include: S1, based on the topological structure of the support network and the relationship, distance and travel time between sites, proposes a mathematical problem of optimizing the maintenance resource inventory; S2, clarify the input and output parameters of the mathematical problem of maintenance resource inventory optimization; S3, based on the input parameters of the maintenance resource inventory optimization mathematical problem, construct the maintenance resource transfer system model equation and give the mathematical expression of the output parameters; S4, using the maintenance resource transfer system model equation and the mathematical expression of the output parameters, calculate which site the resource should be deployed at when the system is at 1 resource; S5, repeat step S4 to confirm the optimal site for the kth resource after the k-1th resource is configured, until the total number of resources reaches the system input value, and the configuration is completed; S6, after the configuration is completed, an image is given showing that the total backorder quantity decreases as the total inventory increases, and the optimal total inventory is confirmed.

2. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 1 is characterized in that: Step S1 includes: Before proposing the mathematical problem of optimizing the inventory of maintenance resources, we first need to clarify the resource scheduling model between the avionics product resource outlets, the operation and maintenance center, and the supplier: when a fault occurs at an avionics product resource outlet, resource demand is generated, and the faulty parts need to be sent to the operation and maintenance center for inspection. If the outlet has resources on its own, it can be self-sufficient; if the resources are insufficient, it will request resources from the operation and maintenance center; the operation and maintenance center receives the faulty parts from the outlets for fault detection: if the detection result is no fault, the resources are directly returned to the outlet; if the detection result is a fault, the faulty parts are returned to the outlet after being repaired by the operation and maintenance center; after the operation and maintenance center receives the resource application from the outlet If the operation and maintenance center has sufficient resources, it will provide one resource to the outlet; if the operation and maintenance center has insufficient resources, it will apply for resources from the supplier and send all the results of fault detection to the supplier. When the outlet resources are insufficient and the operation and maintenance center has sufficient resources, the operation and maintenance center receives the faulty parts from the outlets for fault detection: if the detection result is no fault, the resources are returned to the operation and maintenance center; if the detection result is a fault, the faulty parts are returned to the operation and maintenance center after being repaired by the operation and maintenance center; after the supplier receives the resource application from the operation and maintenance center, if the supplier has sufficient resources, it will provide one resource to the operation and maintenance center; if the supplier has insufficient resources, the resource demand cannot be met temporarily. The mathematical problem of maintenance resource inventory optimization is to allocate the number of resources between each site based on the topological structure of the security network and the relationship, distance and travel time between sites when the number of resources is certain, and to ensure the optimal overall time cost of resource scheduling of the entire security network under the premise of random failures.

3. The maintenance resource global configuration optimization method for a cross-domain multi-level support network according to claim 1 is characterized in that: In step S2: The input parameters of the maintenance resource inventory optimization mathematical problem include: the total resource inventory s, the number of resource requirements per unit time d i , the faulty part detection is the fault probability p f 、Time consumed for repairing faulty parts T m , the time it takes for resources to be transported from the operation and maintenance center to the outlets T si , the time T for resources to be transported from suppliers to the operation and maintenance center fi , The transportation time T of the faulty parts from the outlet to the operation and maintenance center fi , The time it takes for the faulty parts to be transported from the operation and maintenance center to the supplier T ft . The output parameters of the maintenance resource inventory optimization mathematical problem include: the number of network resources s i , the number of resources in the operation and maintenance center t 、Number of supplier resources u , the probability that the network point can provide resources P i , the operation and maintenance center can provide resources with probability P t , the probability that the supplier can provide resources P u , total backorder quantity S BO .

4. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 3 is characterized in that: Step S3 includes: According to the input parameters of the mathematical problem of maintenance resource inventory optimization, the resource transfer system model equation is constructed. First, the mathematical expression of the resource demand of the operation and maintenance center and the supplier per unit time is given; then the average repair time of the faulty parts detected in the operation and maintenance center is given; then the mathematical expressions of the resources that the outlets deserve, the resources that the operation and maintenance center deserves, and the resources that the supplier deserves are given; finally, the maintenance resource transfer system model equation of the outlets, operation and maintenance center, and suppliers is constructed, and the mathematical expression of the total deferred delivery quantity is given.

5. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 4 is characterized in that: The mathematical expression for the number of resource requirements generated by the operation and maintenance center and suppliers per unit time is: The number of network resources is s i (i=1,2,...,n); the number of resource demands generated by the network point per unit time is d i ; After the resource demand is generated, the probability that the network point can provide resources is P i , the probability that a node cannot provide resources is 1-P i ; The number of resources in the operation and maintenance center is s t ; The number of resource requirements generated by the operation and maintenance center per unit time d t for: When resource demand from outlets is generated, the probability that the operation and maintenance center can provide resources is P t , the probability of not being able to provide resources is 1-P t ; The number of supplier resources is s u ; The number of resource requirements generated by the supplier per unit time d u for: d u =(1-P t )d t (2)。 6. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 5, characterized in that: Average repair time of faulty parts T M The mathematical expression is: T M =P f T m (3) Among them, after the fault detection of the faulty part in the operation and maintenance center, the probability of failure is P f ; Time consumed for repairing faulty parts T m And restored like new.

7. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 6, characterized in that: The mathematical expressions for the resources that outlets deserve, the resources that operation and maintenance centers deserve, and the resources that suppliers deserve are calculated as follows: Considering outlets, operation and maintenance centers, and suppliers as sites, under the inventory counting strategy of (s-1,s), each site satisfies the inventory balance equation: s=s OH +s DI -s BO (4) Where: s is the initial inventory of the site; s OH is the available inventory at the site; DI is the amount of resources that the site deserves; BO is the total backorder quantity for the site; When a resource demand is generated, the site's s DI If the site has available inventory, then the site's s OH minus one; If the site has no available inventory, the site's BO The value increases by one; when the system is in steady state, the available inventory s at each site OH Total backorders BO They will not coexist; The amount of resources that the outlets deserve The amount of resources shipped to the outlets The number of delayed deliveries of resources generated by the operation and maintenance center to the outlets Composition; the amount of resources that the outlets deserve Calculated by the following formula: The amount of resources that the operation and maintenance center deserves It consists of 4 items: the number of faulty parts being repaired by the operation and maintenance center The number of resources shipped to the operation and maintenance center and the number of faulty parts The number of resource backorders generated by suppliers to the operation and maintenance center The number of resources that the operation and maintenance center deserves Calculated by the following formula: The amount of resources that the supplier is entitled to Number of faulty parts being repaired by the supplier and the number of defective parts shipped to suppliers Composition; the amount of resources that suppliers deserve Calculated by the following formula:

8. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 7, characterized in that: The resource transfer system model of outlets, operation and maintenance centers and suppliers is constructed as follows: According to the assumptions and Palm's theorem, the backorder quantity of resources in steady state is written as: After a site receives a resource request, the probability that it can meet the request is: Expanding the above formula, we get the resource transfer system model equation of n sites, operation and maintenance centers, and suppliers: The total resource backorders for the system are:

9. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 8, characterized in that: Step S4 includes: First, calculate when a resource is configured at the node numbered 1, that is, s1 = 1, s i (i=2,3,...,n)=s t =s u =0, the total backorder quantity of the system; The total backorder quantity for the system is calculated as follows: T M =P f T m (33) Among them, These two sets of parameters are unknown and nested with each other, and need to be solved iteratively. The method is as follows: First, set Substituting the initial value of into equation (36)(37)(38) we can solve Then Assuming that the parameter is unknown, Substitute the value of into (30)(31)(32)(33)(34)(35) and solve for the new The new Compared with the initial value, if the difference between the two is less than the error tolerance, the output and Otherwise, make the new As the initial value, repeat the above steps; solve and Then, substitute into equations (28) and (29) to calculate the total delayed delivery quantity of the system.

10. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 1, characterized in that: Step S5 includes: The same calculation method as step S4 is used to calculate the site where the second resource should be allocated; the method is to calculate the total deferred order quantity of the second resource in the system after the first resource is allocated, and determine the site where the second resource should be allocated by comparing the total deferred order quantity of the system; This process continues in this way until all resources are allocated to the most appropriate site, that is, the total number of resources reaches the system input value, and the configuration is completed.

11. The method for optimizing global configuration of maintenance resources for a cross-domain multi-level support network according to claim 1, characterized in that: In step S6, an image is given showing that the total deferred order quantity decreases as the total inventory increases, and the number of resources at each site under each total inventory is given; if the final total deferred order quantity is less than the expected value of inventory optimization, it means that the total inventory is too much and money can be saved by reducing the inventory quantity.