Reservoir bank landslide early warning method based on dynamics and deformation indexes
Through the three-element hierarchical early warning method of displacement, inclination angle and natural frequency indicators, the problems of early warning accuracy and timeliness in the step deformation mode of the landslide in the bank, shore, and achieve higher early warning accuracy and early warning capabilities.
Patent Information
- Application Number
- CN202411015070.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The step deformation mode of the existing technology is difficult to accurately warn of the landslide in the reservoir, resulting in low accuracy and poor timeliness, which cannot be applied to early warnings.
The three-element hierarchical early warning method is constructed through displacement, inclination angle and natural frequency indicators. Real-time data is obtained using GNSS sensor, MEMS acceleration sensor and piezoelectric acceleration sensor, data preprocessing and spectrum conversion, and the displacement tangent angle and inclination angle tangent angle are calculated. and natural frequency to realize three-element hierarchical early warning.
It improves the accuracy and timeliness of early warnings on the shore landslide, is suitable for early warnings, provides a more reasonable distribution of early warning levels, and is suitable for temporary slip warnings and risk warnings of traction landslides on the shore.
Smart Images

Figure CN118968706A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rock and soil disaster monitoring, and in particular to a reservoir bank landslide early warning method based on dynamics and deformation indicators. Background Art
[0002] The rapid development of China's hydropower energy base has brought huge economic benefits to society, but the stability of its reservoir slopes under the frequent fluctuations of water levels also hides huge safety hazards. Under the action of hydrodynamics, the reservoir bank slopes generally have the problem of new and resurrected landslides in the accumulation layer, and the secondary disasters of surge waves induced by landslides entering the water will cause casualties and property losses.
[0003] The gradual development of reservoir landslide from initiation to instability is a dynamic evolution process, which is mainly affected by rainfall, periodic changes in reservoir water level and earthquakes, resulting in the reduction of landslide soil strength, changes in gravity field and seepage field, which in turn leads to the breakdown of the balance between landslide resistance and sliding force, and finally the landslide slides and gradually develops into a landslide disaster. Landslide movement is usually divided into initial deformation stage, uniform deformation stage, accelerated deformation stage and accelerated deformation stage, and landslide warning is carried out based on this. For reservoir bank landslides, it may be difficult to clearly divide the initial deceleration deformation stage, uniform deformation stage, accelerated deformation stage and pre-slip stage, but it presents a step-like deformation mode with alternating acceleration change stage and uniform change stage. For step-deformation reservoir bank traction landslides, the displacement warning based on the traditional deformation stage has low accuracy, and the decomposition of the periodic term and trend term of the step landslide displacement often requires the use of neural network and other methods, which are more complicated to calculate and have poor timeliness in actual landslide monitoring. These methods are not suitable for early warning. Summary of the invention
[0004] In order to solve the above problems in the prior art, the present invention provides a reservoir bank landslide early warning method based on dynamics and deformation indicators. The invention constructs a three-element graded early warning method for reservoir bank landslides through two deformation indicators, displacement and tilt angle, and natural frequency dynamic indicators, which realizes the pre-slip early warning and risk early warning of reservoir bank landslides, improves the accuracy and timeliness of early warning, and is more suitable for early warning. To achieve the above purpose, the technical solution is as follows:
[0005] The present invention provides a reservoir bank landslide early warning method based on dynamics and deformation indicators, the method comprising the following steps:
[0006] S1. Deploy displacement monitoring equipment, inclinometers and vibration pickups on the landslide;
[0007] S2. Obtaining real-time displacement monitoring data according to the displacement monitoring device,
[0008] According to the inclinometer, real-time tilt angle data is obtained.
[0009] According to the vibration pickup, real-time vibration data is obtained;
[0010] S3, according to the displacement monitoring data, the tilt angle data and the vibration data, using a data preprocessing model to obtain preprocessed displacement monitoring data, preprocessed tilt angle data and preprocessed vibration data;
[0011] S4, according to the pre-processed displacement monitoring data, using an improved displacement tangent angle calculation method to obtain a displacement tangent angle,
[0012] According to the pre-processed inclination angle data, the inclination angle tangent angle is obtained by using the calculation method of the inclination angle tangent angle.
[0013] According to the pre-processed vibration data, an improved Welch algorithm is used to perform spectrum conversion to obtain a natural frequency;
[0014] S5. According to the displacement tangent angle, the inclination angle tangent angle and the natural frequency, a three-element graded warning level result is obtained by using a warning level calculation method.
[0015] Optionally, the displacement monitoring device includes a GNSS sensor and a tensile displacement meter, the inclinometer includes a MEMS acceleration sensor, and the vibration pickup includes a MEMS acceleration sensor and a piezoelectric acceleration sensor.
[0016] Optionally, obtaining real-time displacement monitoring data according to the displacement monitoring device in S2 includes:
[0017] The component of the gravity acceleration vector in the XYZ three-axis coordinate system inside the MEMS acceleration sensor is captured in real time by the MEMS acceleration sensor. The method for calculating the tilt angle of the MEMS acceleration sensor includes:
[0018]
[0019]
[0020] Where α is the change in the slope angle of the landslide; is the acceleration vector at the initial moment; X0 is the acceleration value in the X0 axis direction collected by the MEMS acceleration sensor at the initial moment; Y0 is the acceleration value in the Y0 axis direction collected by the MEMS acceleration sensor at the initial moment; Z0 is the acceleration value in the Z0 axis direction collected by the MEMS acceleration sensor at the initial moment; is the acceleration vector at the current moment; X1 is the acceleration value of the X1 axis collected by the MEMS acceleration sensor at the current moment; Y1 is the acceleration value of the Y1 axis collected by the MEMS acceleration sensor at the current moment; Z1 is the acceleration value of the Z1 axis collected by the MEMS acceleration sensor at the current moment.
[0021] Optionally, the data preprocessing method includes: smoothing of displacement data, denoising of tilt angle, Fourier transform of the vibration pickup, and peak value picking.
[0022] Optionally, the improved calculation method of the displacement tangent angle in S4 includes:
[0023]
[0024] In the formula, α i To improve the displacement tangent angle; v * is the displacement change rate of the step-type deformation landslide in the displacement accumulation stage; t i is the time at time i; S i t i Displacement of time.
[0025] Optionally, the calculation method of the inclination angle tangent angle in S4 includes:
[0026]
[0027] In the formula, β i A is the inclination angle tangent angle; i is the tilt angle at a certain moment; t i is the time at moment i; It is the rate of change of the inclination angle during the deformation accumulation stage of a step landslide.
[0028] Optionally, in S4, according to the preprocessed vibration data, an improved Welch algorithm is used to perform a spectrum conversion method to obtain a natural frequency, including:
[0029] S41, collecting vibration data of appropriate length and dividing it into multiple segments to obtain multiple data segments with the same number of data, the vibration data calculation formula of the data segment includes:
[0030] x i (n)=x(n+iM-M),0≤n≤M,1≤i≤L,n=0,1,…,N-1
[0031] In the formula, x i (n) is the vibration data of length N, L is the number of vibration data segments, M is the number of vibration data segments, i is the number of vibration data segments, and x(n+iM-M) is the value numbered (n+iM-M) in the i-th segment;
[0032] S42, according to the data of all the data segments, obtaining the central amplitude of each segment of vibration data and the central amplitude of all the vibration data, wherein the method comprises:
[0033]
[0034] In the formula, is the average value of all vibration data, A i (n) is the center amplitude of the i-th segment of vibration data, L is the number of vibration data segments, M is the number of vibration data in each segment, and i is the number of vibration data segments;
[0035] S43, comparing the center amplitude of each segment with the center amplitude average value, removing the data segments with too large center amplitude differences, and obtaining valid data segments, wherein the vibration data calculation formula of the valid data segments includes:
[0036]
[0037] In the formula, The length is L * Effective vibration data, L * is the number of valid vibration data segments, M is the number of vibration data in each segment, i is the number of vibration data segments, and x(n+iM-M) is the value numbered (n+iM-M) in the i-th segment;
[0038] S44, according to the following formula 9 and the vibration data of the valid data segment, obtain a period diagram of the vibration data of the valid data segment,
[0039]
[0040] In the formula, I i (ω) is the periodogram of the i-th segment of vibration data, w(n) is a suitable window function, U is the normalization factor, The length is L * The effective vibration data, M is the number of vibration data in each segment;
[0041] S45, the periodograms of each segment are approximately regarded as being unrelated to each other, and the frequency spectrum of each segment is obtained by calculating the power spectrum estimation, including:
[0042]
[0043] In the formula, F xx (e jω ) is the frequency spectrum of the vibration data, P xx (e jω ) is the power spectrum of the vibration data, I i (ω) is the periodogram of the i-th segment vibration data, L* is the number of valid vibration data segments;
[0044] S46, obtaining a frequency spectrum of each segment according to the frequency spectrum of each segment, and obtaining a frequency value with a maximum peak value of each segment by judging the peak value of the frequency spectrum of each segment, which is the natural frequency value of the landslide.
[0045] Optionally, in S5, obtaining a three-element graded warning level result according to the displacement tangent angle, the inclination angle tangent angle and the natural frequency by a warning level calculation method comprises the following steps:
[0046] S51. The landslide warning level is divided into five levels: Level I, Level II, Level III, Level IV and Level V;
[0047] S52, obtaining a displacement warning level according to the classification of the displacement tangent angle warning level;
[0048] S53, obtaining a warning level of the tilt angle according to the classification of the tilt angle tangent angle warning level;
[0049] S54, obtaining a warning level of the natural frequency according to the early warning method of the natural frequency;
[0050] S55. For any given time point, according to the warning level of the displacement, the warning level of the tilt angle and the warning level of the natural frequency, a final warning result is obtained through a warning level comparison model.
[0051] Optionally, the calculation method of the warning level comparison model includes:
[0052] D t =max(D(α),D(β),D(F)) (13)
[0053] Where D t is the three-factor classification warning level; D(α) is the displacement tangent angle warning level; D(β) is the tilt angle tangent angle warning level; D(F) is the warning level based on the natural frequency.
[0054] Compared with the prior art, the technical solution of the present invention has at least the following beneficial effects:
[0055] On the one hand, the above scheme proposes an early warning method of displacement tangent angle and inclination tangent angle in the displacement accumulation stage of step-type deformation landslide through the step-type destruction characteristics of reservoir bank landslide under the condition of cyclic fluctuation of water level, which is convenient for the pre-slip warning and risk warning of reservoir bank landslide; on the other hand, the natural frequency of reservoir bank landslide obtained by natural frequency reaction of the structural attribute characteristics of the landslide itself and based on the improved Welch method is more suitable for early warning; finally, a three-element graded warning method based on displacement, inclination tangent angle and natural frequency suitable for reservoir bank traction landslide is proposed, and its warning level distribution is more reasonable, and the warning accuracy is higher and the timeliness is faster. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0057] Figure 1 It is a schematic diagram of the process of the present invention
[0058] Figure 2 This is a characteristic diagram of displacement change of reservoir bank landslide in step-like failure under water level fluctuation in an embodiment of the present invention.
[0059] Figure 3 This is a characteristic diagram of the change in the tilt angle of the reservoir bank landslide under the water level cycle fluctuation of the embodiment of the present invention
[0060] Figure 4 This is a diagram showing the early warning levels of the displacement tangent angle and the tilt angle of the step-type landslide according to an embodiment of the present invention.
[0061] Figure 5 This is a flow chart of an early warning method for reservoir bank landslide based on natural frequency according to an embodiment of the present invention.
[0062] Figure 6 1. The three-element classification early warning method for bank landslide of the embodiment of the present invention is shown in FIG.
[0063] Figure 7 This is a schematic diagram of the actual effect of the three-element classification early warning method for reservoir bank landslide according to an embodiment of the present invention.
[0064] Figure 8 Schematic diagram of the process of spectrum conversion by the improved Welch algorithm of the embodiment of the present invention
[0065] Fig. 9 It is a flow chart of a method for calculating a warning level according to an embodiment of the present invention. DETAILED DESCRIPTION
[0066] The technical solution of the present invention is described below in conjunction with the accompanying drawings.
[0067] In the embodiments of the present invention, words such as "exemplarily" and "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "example" in the present invention should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of the word "example" is intended to present the concept in a specific way. In addition, in the embodiments of the present invention, the meaning expressed by "and / or" can be both, or it can be either of the two.
[0068] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, a detailed description will be given below with reference to the accompanying drawings and specific embodiments.
[0069] like Figures 1 to 9 As shown, the present invention provides a reservoir bank landslide early warning method based on dynamics and deformation indicators, the early warning method comprising the following steps:
[0070] S1. Deploy displacement monitoring equipment, inclinometers and vibration pickups on the landslide;
[0071] Specifically, the displacement monitoring device includes a GNSS sensor and a tensile displacement meter, the inclinometer includes a MEMS acceleration sensor, and the vibration pickup includes a MEMS acceleration sensor and a piezoelectric acceleration sensor.
[0072] S2. Obtaining real-time displacement monitoring data according to the displacement monitoring device,
[0073] According to the inclinometer, real-time tilt angle data is obtained.
[0074] According to the vibration pickup, real-time vibration data is obtained;
[0075] Specifically, the displacement monitoring device obtains real-time displacement monitoring data, including:
[0076] The component of the gravity acceleration vector in the XYZ three-axis coordinate system inside the MEMS acceleration sensor is captured in real time by the MEMS acceleration sensor. The method for calculating the tilt angle of the MEMS acceleration sensor includes:
[0077]
[0078] Where α is the change in the slope angle of the landslide; is the acceleration vector at the initial moment; X0 is the acceleration value in the X0 axis direction collected by the MEMS acceleration sensor at the initial moment; Y0 is the acceleration value in the Y0 axis direction collected by the MEMS acceleration sensor at the initial moment; Z0 is the acceleration value in the Z0 axis direction collected by the MEMS acceleration sensor at the initial moment; is the acceleration vector at the current moment; X1 is the acceleration value of the X1 axis collected by the MEMS acceleration sensor at the current moment; Y1 is the acceleration value of the Y1 axis collected by the MEMS acceleration sensor at the current moment; Z1 is the acceleration value of the Z1 axis collected by the MEMS acceleration sensor at the current moment.
[0079] S3, according to the displacement monitoring data, the tilt angle data and the vibration data, using a data preprocessing model to obtain preprocessed displacement monitoring data, preprocessed tilt angle data and preprocessed vibration data;
[0080] Specifically, the data preprocessing method includes: smoothing of displacement data, denoising of tilt angle, Fourier transformation of vibration pickup, and peak value picking.
[0081] The displacement data is smoothed using non-parametric regression analysis methods - local weighted regression smoothing method and local weighted regression smoothing method. The non-parametric regression analysis method - local weighted regression smoothing method can eliminate the impact of the main low-frequency noise at the landslide site on the displacement equipment and retain the main trend of the displacement data. The local weighted regression smoothing method adjusts the bandwidth parameters of the time series data to balance the smoothness of the fitting and the sensitivity to data changes when there is no preset data following a specific distribution form.
[0082] The tilt angle denoising adopts the wavelet decomposition denoising method. The wavelet decomposition denoising method realizes the interference of high-frequency noise on the tilt angle by resetting the low-energy sub-band coefficients to zero and retains the important local characteristics of the tilt angle data. At the same time, the tilt angle signal is decomposed into multiple sub-bands of different frequencies, and the noise distribution is judged according to the energy distribution of each sub-band, and then the signal within the sub-band range is processed by thresholding to achieve the denoising purpose.
[0083] S4, according to the pre-processed displacement monitoring data, using an improved displacement tangent angle calculation method to obtain a displacement tangent angle,
[0084] According to the pre-processed inclination angle data, the inclination angle tangent angle is obtained by using the calculation method of the inclination angle tangent angle.
[0085] According to the pre-processed vibration data, an improved Welch algorithm is used to perform spectrum conversion to obtain a natural frequency;
[0086] Specifically, the improved displacement tangent angle calculation method includes:
[0087]
[0088] In the formula, α i To improve the displacement tangent angle; v * is the displacement change rate of the step-type deformation landslide in the displacement accumulation stage; t i is the time at time i; S i t i Displacement of time.
[0089] Before the landslide becomes unstable, the displacement and displacement change rate caused by the fluctuation of water level are highly regular. The amplitude and rate of each step-like displacement change are relatively consistent. Each step-change stage is called the displacement accumulation stage.
[0090] like Figure 2 As shown in the figure, for a step-type landslide affected by the reservoir water level, each water level fluctuation will lead to the development of landslide cracks and increased displacement. When the displacement accumulates to a critical value, the tensile cracks deepen and the remaining anti-sliding force drops to a critical point. At this time, if the landslide continues to be affected by water level changes or other external factors, the displacement may suddenly accelerate and enter the accelerated deformation stage.
[0091] Specifically, the calculation method of the inclination angle tangent angle includes:
[0092]
[0093] In the formula, β i A is the inclination angle tangent angle; i is the tilt angle at a certain moment; t i is the time at moment i; It is the rate of change of the inclination angle during the deformation accumulation stage of a step landslide.
[0094] like Figure 3 As shown in the figure, for step-type landslides affected by reservoir water level, the tilt angle and displacement are both deformation indicators, both of which increase in a step-like manner with the fluctuation of reservoir water level, and both are suitable for landslide early warning. The displacement tangent angle early warning method is also applicable to the tilt angle indicator.
[0095] Specifically, Figure 8 As shown, in S4, according to the pre-processed vibration data, an improved Welch algorithm is used to perform spectrum conversion to obtain the natural frequency, including:
[0096] S41, collecting vibration data of appropriate length and dividing it into multiple segments to obtain multiple data segments with the same number of data, the vibration data calculation formula of the data segment includes:
[0097] x i(n)=x(n+iM-M),0≤n≤M,1≤i≤L,n=0,1,…,N-1
[0098] In the formula, x i (n) is the vibration data of length N, L is the number of vibration data segments, M is the number of vibration data segments, i is the number of vibration data segments, and x(n+iM-M) is the value numbered (n+iM-M) in the i-th segment;
[0099] S42, according to the data of all the data segments, obtaining the central amplitude of each segment of vibration data and the central amplitude of all the vibration data, wherein the method comprises:
[0100]
[0101] In the formula, is the average value of all vibration data, A i (n) is the center amplitude of the i-th segment of vibration data, L is the number of vibration data segments, M is the number of vibration data in each segment, and i is the number of vibration data segments;
[0102] S43, comparing the center amplitude of each segment with the center amplitude average value, removing the data segments with too large center amplitude differences, and obtaining valid data segments, wherein the vibration data calculation formula of the valid data segments includes:
[0103]
[0104] In the formula, is the effective vibration data with a length of L*, L* is the number of effective vibration data segments, M is the number of vibration data segments, i is the number of vibration data segments, and x(n+iM-M) is the value numbered (n+iM-M) in the i-th segment;
[0105] S44, according to the following formula 9 and the vibration data of the valid data segment, obtain a period diagram of the vibration data of the valid data segment,
[0106]
[0107] In the formula, I i (ω) is the periodogram of the i-th segment of vibration data, w(n) is a suitable window function, U is the normalization factor, The length is L * The effective vibration data, M is the number of vibration data in each segment;
[0108] S45, the periodograms of each segment are approximately regarded as being unrelated to each other, and the frequency spectrum of each segment is obtained by calculating the power spectrum estimation, including:
[0109]
[0110] In the formula, F xx (e jω ) is the frequency spectrum of the vibration data, P xx (e jω ) is the power spectrum of the vibration data, I i (ω) is the periodogram of the i-th segment vibration data, L * is the number of valid vibration data segments;
[0111] S46, obtaining a frequency spectrum of each segment according to the frequency spectrum of each segment, and obtaining a frequency value with a maximum peak value of each segment by judging the peak value of the frequency spectrum of each segment, which is the natural frequency value of the landslide.
[0112] The vibration data obtained at a sampling frequency of 500 Hz, when divided into 2 minutes, 5 minutes, 10 minutes and 20 minutes, the vibration spectrum obtained according to the improved Welch algorithm has an obvious peak. When the vibration data at the reservoir bank landslide site is sampled at a frequency of 500 Hz, the duration should not be less than 2 minutes.
[0113] S5. According to the displacement tangent angle, the inclination angle tangent angle and the natural frequency, a three-element graded warning level result is obtained by using a warning level calculation method.
[0114] Specifically, Fig. 9 As shown, in S5, according to the displacement tangent angle, the inclination angle tangent angle and the natural frequency, a three-element graded warning level result is obtained by a warning level calculation method, including the following steps:
[0115] S51. The landslide warning level is divided into five levels: Level I, Level II, Level III, Level IV and Level V;
[0116] like Figure 6 to Figure 7 As shown in the figure, level I (red), level II (orange), level III (yellow), level IV (blue) and level V (green) correspond to the alarm level, alert level, warning level, attention level and safety level, respectively, representing the decreasing sequence of landslide risk. Among them, level I warning represents the highest risk level.
[0117] Level I alarm: There is a high possibility of landslide, various short-term precursor characteristics are obvious, and the probability of occurrence within a few hours or days is very high.
[0118] Level II warning: There is a high possibility of landslide, with certain macro-precursor characteristics, and a high probability of occurring within a few days or weeks.
[0119] Level III Warning: There is a high possibility of landslide, with certain deformation characteristics, and a high probability of occurring within weeks or months.
[0120] Level IV Warning Level: The possibility of landslide is small, there are certain deformation characteristics, and the possibility of occurrence within one year is not high.
[0121] Safety level V: The possibility of landslide is very small and there is no obvious deformation.
[0122] S52, obtaining a displacement warning level according to the classification of the displacement tangent angle warning level;
[0123] The displacement tangent angle warning level is divided into five levels from small to large according to the unequally spaced angles.
[0124] S53, obtaining a warning level of the tilt angle according to the classification of the tilt angle tangent angle warning level;
[0125] The basis for the warning level of the tilt angle tangent angle is the same as the basis for the warning level of the improved displacement tangent angle.
[0126] like Figure 4 As shown in the figure, when the warning level angle of the improved displacement tangent angle and the tilt angle is less than 20°, the landslide warning is at the safety level, and when it is greater than 85°, it is at the alarm level. Since the warning level angle interval is only 5°, it is difficult for the II level warning level to appear in the actual landslide, and it usually rises sharply from the V level safety level to the I level alarm level, which is not suitable for the step-by-step warning of the reservoir bank landslide.
[0127] S54, obtaining a warning level of the natural frequency according to the early warning method of the natural frequency;
[0128] like Figure 5 As shown in the figure, when the change of the natural frequency value reaches 2Hz or the natural order increases, the warning level can be judged to have reached the Level II warning level.
[0129] S55. For any given time point, according to the warning level of the displacement, the warning level of the tilt angle and the warning level of the natural frequency, a final warning result is obtained through a warning level comparison model.
[0130] The calculation method of the warning level comparison model includes:
[0131] D t =max(D(α),D(β),D(F)) (13)
[0132] Where D t is the three-factor classification warning level; D(α) is the displacement tangent angle warning level; D(β) is the tilt angle tangent angle warning level; D(F) is the warning level based on the natural frequency.
[0133] The present invention provides a reservoir bank landslide early warning method based on dynamics and deformation indicators. The invention constructs a three-element graded early warning method for reservoir bank landslides through two deformation indicators, namely displacement and inclination angle, and natural frequency dynamic indicators, thereby realizing the pre-slip early warning and risk early warning of reservoir bank landslides, improving the accuracy and timeliness of the early warning, and being more suitable for early warning.
[0134] It is to be understood that the present invention is described by the above embodiments and should not be construed as limiting the embodiments of the present invention and the scope of the present invention. It is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.
Claims
1. A reservoir bank landslide early warning method based on dynamics and deformation indicators, characterized in that: The method comprises the following steps: S1. Deploy displacement monitoring equipment, inclinometers and vibration pickups on the landslide; S2. Obtaining real-time displacement monitoring data according to the displacement monitoring device, According to the inclinometer, real-time tilt angle data is obtained. According to the vibration pickup, real-time vibration data is obtained; S3, according to the displacement monitoring data, the tilt angle data and the vibration data, using a data preprocessing model to obtain preprocessed displacement monitoring data, preprocessed tilt angle data and preprocessed vibration data; S4. According to the pre-processed displacement monitoring data, an improved displacement tangent angle calculation method is used to obtain a displacement tangent angle. According to the pre-processed tilt angle data, the tilt angle tangent angle is obtained by using the tilt angle tangent angle calculation method. According to the pre-processed vibration data, an improved Welch algorithm is used to perform spectrum conversion to obtain a natural frequency; S5. According to the displacement tangent angle, the inclination angle tangent angle and the natural frequency, a three-element graded warning level result is obtained by using a warning level calculation method.
2. The reservoir bank landslide early warning method based on dynamics and deformation indicators according to claim 1 is characterized in that: The displacement monitoring device includes a GNSS sensor and a tensile displacement meter, the inclinometer includes a MEMS acceleration sensor, and the vibration pickup includes a MEMS acceleration sensor and a piezoelectric acceleration sensor.
3. The reservoir bank landslide early warning method based on dynamics and deformation indicators according to claim 2 is characterized in that: The step S2 of obtaining real-time displacement monitoring data according to the displacement monitoring device includes: The component of the gravity acceleration vector in the XYZ three-axis coordinate system inside the MEMS acceleration sensor is captured in real time by the MEMS acceleration sensor. The method for calculating the tilt angle of the MEMS acceleration sensor includes: Where α is the change in the slope angle of the landslide; is the acceleration vector at the initial moment; X0 is the acceleration value in the X0 axis direction collected by the MEMS acceleration sensor at the initial moment; Y0 is the acceleration value in the Y0 axis direction collected by the MEMS acceleration sensor at the initial moment; Z0 is the acceleration value in the Z0 axis direction collected by the MEMS acceleration sensor at the initial moment; is the acceleration vector at the current moment; X1 is the acceleration value of the X1 axis collected by the MEMS acceleration sensor at the current moment; Y1 is the acceleration value of the Y1 axis collected by the MEMS acceleration sensor at the current moment; Z1 is the acceleration value of the Z1 axis collected by the MEMS acceleration sensor at the current moment.
4. The reservoir bank landslide early warning method based on dynamics and deformation indicators according to claim 1 is characterized in that: The data preprocessing method includes: smoothing of displacement data, denoising of tilt angle, Fourier transformation of vibration pickup and peak value picking.
5. The reservoir bank landslide early warning method based on dynamics and deformation indicators according to claim 1 is characterized in that: The improved calculation method of the displacement tangent angle in S4 includes: In the formula, α i To improve the displacement tangent angle; v * is the displacement change rate of the step-type deformation landslide in the displacement accumulation stage; t i is the time at time i; S i t i Displacement of time.
6. The reservoir bank landslide early warning method based on dynamics and deformation indicators according to claim 1 is characterized in that: The calculation method of the inclination angle tangent angle in S4 includes: In the formula, β i A is the inclination angle tangent angle; i is the tilt angle at a certain moment; t i is the time at moment i; It is the rate of change of the tilt angle during the deformation accumulation stage of a step landslide.
7. The reservoir bank landslide early warning method based on dynamics and deformation indicators according to claim 1 is characterized in that: In S4, according to the pre-processed vibration data, an improved Welch algorithm is used to perform spectrum conversion to obtain the natural frequency, including: S41, collecting vibration data of appropriate length and dividing it into multiple segments to obtain multiple data segments with the same number of data, the vibration data calculation formula of the data segment includes: x i (n)=x(n+iM-M),0≤n≤M,1≤i≤L,n=0,1,…,N-1 In the formula, x i (n) is the vibration data of length N, L is the number of vibration data segments, M is the number of vibration data segments, i is the number of vibration data segments, and x(n+iM-M) is the value numbered (n+iM-M) in the i-th segment; S42, according to the data of all the data segments, obtaining the central amplitude of each segment of vibration data and the central amplitude of all the vibration data, wherein the method comprises: In the formula, is the average value of all vibration data, A i (n) is the center amplitude of the i-th segment of vibration data, L is the number of vibration data segments, M is the number of vibration data in each segment, and i is the number of vibration data segments; S43, comparing the center amplitude of each segment with the center amplitude average value, removing the data segments with too large center amplitude differences, and obtaining valid data segments, wherein the vibration data calculation formula of the valid data segments includes: In the formula, The length is L * Effective vibration data, L * is the number of valid vibration data segments, M is the number of vibration data in each segment, i is the number of vibration data segments, and x(n+iM-M) is the value numbered (n+iM-M) in the i-th segment; S44, according to the following formula 9 and the vibration data of the valid data segment, obtain a period diagram of the vibration data of the valid data segment, In the formula, I i (ω) is the periodogram of the i-th segment of vibration data, w(n) is a suitable window function, U is the normalization factor, The length is L * The effective vibration data, M is the number of vibration data in each segment; S45, the periodograms of each segment are approximately regarded as being unrelated to each other, and the frequency spectrum of each segment is obtained by calculating the power spectrum estimation, including: In the formula, F xx (e jω ) is the frequency spectrum of the vibration data, P xx (e jω ) is the power spectrum of the vibration data, I i (ω) is the periodogram of the i-th segment vibration data, L * is the number of valid vibration data segments; S46, obtaining a frequency spectrum of each segment according to the frequency spectrum of each segment, and obtaining a frequency value with a maximum peak value of each segment by judging the peak value of the frequency spectrum of each segment, which is the natural frequency value of the landslide.
8. The reservoir bank landslide early warning method based on dynamics and deformation indicators according to claim 1 is characterized in that: In S5, according to the displacement tangent angle, the inclination angle tangent angle and the natural frequency, a three-element graded warning level result is obtained by a warning level calculation method, including the following steps: S51. The landslide warning level is divided into five levels: Level I, Level II, Level III, Level IV and Level V; S52, obtaining a displacement warning level according to the classification of the displacement tangent angle warning level; S53, obtaining a warning level of the tilt angle according to the classification of the tilt angle tangent angle warning level; S54, obtaining a warning level of the natural frequency according to the early warning method of the natural frequency; S55. For any given time point, according to the warning level of the displacement, the warning level of the tilt angle and the warning level of the natural frequency, a final warning result is obtained through a warning level comparison model.
9. The reservoir bank landslide early warning method based on dynamics and deformation indicators according to claim 8 is characterized in that: The calculation method of the warning level comparison model includes: D t =max(D(α),D(β),D(F)) (13) Where D t is the three-factor classification warning level; D(α) is the displacement tangent angle warning level; D(β) is the tilt angle tangent angle warning level; D(F) is the warning level based on the natural frequency.
Citation Information
Patent Citations
Slope geological disaster monitoring method, device, equipment and medium
CN116052399A
Environment micro-vibration evaluation method for high-precision scientific device and storage medium
CN116257720A
Improved landslide tangent angle algorithm-based collapse and landslide disaster early warning method and system
CN117854232A
Landslide monitoring and early warning method and system based on sensor group, and storage medium
CN118135769A
Disaster Warning System and Method based on Vibration-type accelerometer and Displacement measurement system
KR1020170052271A
Cited By
Video GNSS micro-core pile intelligent monitoring method and system
CN120652495A
Comprehensive monitoring and early warning method and system for tunnel surrounding rock block collapse based on MEMS sensing
CN121878035A
Tunnel surrounding rock block collapse comprehensive monitoring and early warning method and system based on mems sensor
CN121878035B