Manufacturing process method of front and rear girders of quay crane
During the production process of the front and rear beams of the shore bridge, the method of welding the inner port and then carbon planing and fire correction are adopted, combined with hand-pulled hoists and 7-shaped cardboard positioning technology, the problem of the bearing plate collapse after welding is solved. The welding speed and quality are improved, ensuring the stability and stability of the beam.
Patent Information
- Application Number
- CN202411291104.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-19
AI Technical Summary
During the production process of front and rear beams of the shore bridge, the surface collapse of the rail bearing plate is prone to occur after welding, resulting in uneven welding and insufficient stability.
A process method is adopted, including welding the inner port when the top plate covers, then carbon planing outside, and fire correction to make the rail bearing plate arch towards the top plate surface, combining hand-pulled hoists and vertical 7-shaped cardboard positioning technology, Adjust the positional relationship between the side plate and the bottom plate to form an arch curve to prevent collapse, and calibrate the left and right edge lines through a laser to ensure welding quality.
Effectively prevent the rail bearing plate from collapse after welding, improve the welding speed and quality, and ensure the overall stability and stability of the beam.
Smart Images

Figure CN118977006A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of methods for manufacturing quay crane beams, and in particular to a manufacturing process method for front and rear beams of a quay crane. Background Art
[0002] When preparing the front and rear beams, since the lengths of the front and rear beams are very long, they are usually divided into two parts during production, and then the two parts are welded together. However, during production, when the top plate is on the cover plate and the rear rail plate is welded, collapse is likely to occur.
[0003] In the document CN202311346019, a method for controlling the lateral bending and opening of the rail-bearing beam of the rear beam of the quay crane is disclosed, which includes the following steps: S1, assembling the beam structure of the rear beam of the quay crane; S2, transferring the beam structure of the rear beam of the quay crane to the assembly station for placement, adjusting the level of the beam structure of the rear beam of the quay crane, and measuring and adjusting the straightness and opening of the rail-bearing beam based on the rail-bearing beam, so as to make preliminary preparations for the subsequent lifting of the machine room. The beam is installed as a whole. Since the beam is large as a whole, uneven welding and insufficient stability will occur during installation.
[0004] Therefore, a new technical solution is needed to solve the above technical problems. Summary of the invention
[0005] In order to solve the above problems, the present invention discloses a manufacturing process method for the front and rear beams of a quay crane, which can prevent collapse when welding the rear rail plate, and can improve the welding speed and welding quality of the front and rear beams as a whole.
[0006] The technical solution of the present invention is: a manufacturing process method for front and rear beams of a quay crane, the front and rear beams include a front beam and a rear beam, and the manufacturing process method includes the following steps: About the production of the front beam Step 1: Draw the ground sample line, take the bottom plate surface as the reference plane, take the structure center line as the reference line, and build it on the tire frame; Step 2: The partition is positioned with the center line of the bottom plate, and the left and right sides of the partition are positioned according to the center line, and the partition is spot welded and positioned according to the left and right sides; Step 3: The partition and the bottom plate are tilted, and the inclination of the partition is determined by a plumb bob. After spot welding, it is supported by a tooling; Step 4: Use a hand chain hoist to hook the angle steel at the bottom of the side panel and the edge of the bottom panel, pull the side panel to the side of the partition, and fix it with a vertical "7"-shaped card plate for positioning welding. At this time, the bottom panel is adjusted along the pre-arch curve of the side panel, and a pad is used to raise the bottom of the bottom panel and the tire frame. Repeat the above steps to install the other side panel, use a hand chain hoist to pull the angle steel of the lower side panel, and then spot weld it; Step 5: Weld the welds between the left and right sides and the partition, leaving the upper part unwelded; Step 6: Weld the welds of the bottom plate and the partition; Step 7: Cover the top plate on the upper part of the partition and the upper part of the side plate, and then weld it to the side plate, first weld the inner mouth, then carbon planer the outside, and pyrotechnic correction; Step 8: The diameter of the ear plate hole. The ear plate and the square steel are first grouped together. They are not connected to the partition plate during the assembly stage. After the top plate is installed, the partition plate is inserted into the box body and the reinforcement ribs are installed. The margin of the upper edge of the partition plate is trimmed during the general assembly adjustment. Step 9: Assemble the ear plate parts and heavy parts, machine the ear holes after small assembly, insert the partition panel group after the top plate is assembled, and the angle steel is bulked; Step 10: Install the hinge point of the pulley. In addition to the reaming hole, the hole of the axle plate needs to be machined as a whole assembly, and the remaining holes are bored in the state of parts. The hinge point is welded on all four sides, and the inner ear plate is assembled first. After the top plate is assembled, it is inserted into the box; About the production of rear beam The steps are the same as steps 1-10 for making the front beam.
[0007] Preferably, the center line in step 2 is a straight line located in the middle of the bottom plate and parallel to the long side of the bottom plate. The left and right side lines are provided with a margin from the length edge of the bottom plate for subsequent welding of the side panels. A laser instrument is used to determine whether the left and right side lines meet the requirements of the drawing.
[0008] Preferably, the inclination angle in step 3 is an acute angle less than 30 degrees.
[0009] Preferably, the bottom of the side panel close to the bottom panel in step 4 is provided with an upward arch, and the bottom panel is adjusted according to the arch curve of the bottom of the side panel, and the bottom panel is close to the bottom of the side.
[0010] Preferably, the clamping plate is clamped on the two upper corners of the partition plate, with one side of the clamping plate contacting the side plate and the other side contacting the top plate.
[0011] Preferably, a plurality of tracks parallel to the length direction are provided on the upper surface of the top plate, and the top plate is arched 2-3 mm toward the top plate surface, i.e., reversed, to prevent the support rail plate from collapsing after welding.
[0012] Preferably, the pyrotechnic correction in step 7 causes the rail support plate to arch 2 mm toward the top plate surface, i.e., reverse deformation, to prevent the rail support plate from collapsing after welding.
[0013] Preferably, the lengths of the rail support plates of the front beam are one long and one short, and the lengths of the rail support plates of the rear beam are the same.
[0014] The advantages of the present invention are as follows: 1. The present invention performs the cover plate at the end of the top plate, first welds the inner opening, then carbon planes the outer surface, and performs pyrotechnic correction, so that the rail support plate is arched toward the top plate surface, which can effectively prevent the collapse of the rail support plate when welding.
[0015] 2. The present invention uses a hand chain hoist to hook the lower angle steel of the side plate and the edge of the bottom plate, so that the positional relationship between the side plate angle steel and the edge of the bottom plate can be adjusted at any time, with high flexibility. The bottom of the bottom plate is raised by the top plate, so that an arched curve can be formed on the upper part.
[0016] 3. The present invention uses a vertical 7-shaped card plate for positioning, so that the side edges of the side plates and the partitions can be closely attached to the card plate, so that a vertical position relationship can be maintained in space, thereby being welded and fixed to ensure overall stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the front beam of the present invention; Figure 2 It is a schematic diagram of the structure of the partition plate and the bottom plate of the present invention; Figure 3 It is a schematic structural diagram of the left and right edges of the partition of the present invention; Figure 4 This is a schematic diagram of the structure of step 3 of the present invention; Figure 5 It is a structural schematic diagram of the hand chain hoist and the side plate of the present invention; Figure 6 It is a structural schematic diagram of the card board of the present invention; Figure 7 This is a schematic diagram of the structure of step 5 of the present invention; Figure 8 This is a schematic diagram of the structure of step 6 of the present invention; Fig. 9 It is a structural schematic diagram of step 7 of the present invention; Fig.10 It is a structural schematic diagram of the top plate of the present invention; Fig.11 It is a structural schematic diagram of the side panel of the present invention.
[0018] Among them: 1. Top plate, 1-1. Inner opening, 1-2. Outer opening, 2. Side plate, 3. Bottom plate, 4. Partition plate, 5. Center line, 6. Left and right side lines, 7. Plumb bob, 8. Hoist, 9. Pallet, 10. Weld, 11. Track plate. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0020] like Figure 1 As shown, a manufacturing process method for front and rear beams of a quay crane, the front and rear beams include a front beam and a rear beam, and the manufacturing process method includes the following steps: About the production of the front beam Step 1: Draw the ground sample line, take the bottom plate surface as the reference plane, take the structure center line as the reference line, and build it on the tire frame; like Figure 2-3 As shown, step 2: the partition 4 is positioned with the center line of the bottom plate 3, the left and right side lines 6 of the partition 4 are positioned according to the center line 5, and the partition 4 is spot welded and positioned according to the left and right side lines 6; like Figure 4 As shown, step 3: the partition 4 and the bottom plate 3 are tilted, the inclination of the partition 4 is determined by a plumb bob 7, and after being spot-welded and fixed, a tool is used to support it; like Figure 5-6 As shown, step 4: use the hand chain hoist 8 to hook the lower angle steel of the side plate 2 and the plate edge of the bottom plate 3, pull the side plate 2 to the side position of the partition 4, and use the vertical "7"-shaped card plate 9 to position weld and fix it. At this time, the bottom plate 3 is adjusted along the pre-arch curve of the side plate 2, and a pad is used to raise the lower part of the bottom plate 3 and the tire frame. Repeat the above steps to install the other side plate, use the hand chain hoist to pull the angle steel of the lower side plate, and then fix it by spot welding; like Figure 7 As shown, step 5: weld the welds of the left and right sides and the partition, leaving the upper part unwelded, and the overall welding order is from the middle to both sides; like Figure 8 As shown, step 6: welding the welds of the bottom plate 3 and the partition plate 4; like Fig. 9 As shown, step 7: cover the top plate 1 on the upper part of the partition plate 4 and the upper part of the side plate 2, and then weld it with the side plate 2, first weld the inner mouth, then carbon planer the outer side, and pyrotechnic correction; Step 8: Diameter of ear plate hole. Ear plate and square steel are first grouped together. They are not connected with the partition plate during the assembly stage. After the top plate 1 is installed, the partition plate 4 is inserted into the box body and the reinforcing ribs are installed. The margin on the upper opening of the partition plate 4 is trimmed during the general assembly adjustment. Step 9: Assemble the ear plate parts and heavy parts, machine the ear holes after small assembly, insert the partition panel group after the top plate 1 is assembled, and the angle steel is bulked; Step 10: Install the hinge point of the pulley. In addition to the reaming hole, the hole of the axle plate needs to be machined as a whole assembly, and the remaining holes are bored in the state of parts. The hinge point is welded on all four sides, and the inner ear plate is assembled first. After the top plate is assembled, it is inserted into the box; About the production of rear beam The steps are the same as steps 1-10 for making the front beam.
[0021] The center line 5 in step 2 is a straight line located in the middle of the bottom plate 3 and parallel to the long side of the bottom plate 3. The left and right side lines 6 are provided with a margin from the length direction edge of the bottom plate 3 for subsequent welding of the side panels 2. A laser instrument is used to determine whether the left and right side lines 6 meet the requirements of the drawing.
[0022] The inclination angle in step 3 is an acute angle less than 30 degrees.
[0023] In step 4, the bottom of the side panel 2 close to the bottom panel 3 is provided with an upward arch, and the bottom panel 3 is adjusted according to the arch curve at the bottom of the side panel 2, and the bottom panel 3 is close to the bottom of the side.
[0024] The clamping plate 9 is clamped on the two upper corners of the partition plate 4 , with one side of the clamping plate 9 contacting the side plate 2 and the other side contacting the top plate 1 .
[0025] The upper surface of the top plate 1 is provided with a plurality of tracks parallel to the length direction, and the top plate 1 is arched 2-3mm toward the top plate surface, i.e. reversed, to prevent the track plate 11 from collapsing after welding.
[0026] The pyrotechnic correction in step 7 causes the rail support plate 11 to arch 2 mm toward the top plate surface, i.e., reverse deformation, to prevent the rail support plate from collapsing after welding.
[0027] The lengths of the rail support plates 11 of the front beam are one long and one short, while the lengths of the rail support plates of the rear beam are the same.
[0028] It should be understood by those skilled in the art that the embodiments of the present invention described above and shown in the accompanying drawings are only examples and do not limit the present invention, and the purpose of the present invention has been fully and effectively achieved. The functional and structural principles of the present invention have been demonstrated and explained in the embodiments, and the embodiments of the present invention may be deformed or modified in any way without departing from the principles.
Claims
1. A manufacturing process for front and rear beams of a quay crane, characterized in that: The front and rear beams include a front beam and a rear beam, and the manufacturing process method includes the following steps: About the production of the front beam Step 1: Draw the ground sample line, take the bottom plate surface as the reference plane, take the structure center line as the reference line, and build it on the tire frame; Step 2: The partition is positioned with the center line of the bottom plate, and the left and right sides of the partition are positioned according to the center line, and the partition is spot welded and positioned according to the left and right sides; Step 3: The partition and the bottom plate are tilted, and the inclination of the partition is determined by a plumb bob. After spot welding, it is supported by a tooling; Step 4: Use a hand chain hoist to hook the angle steel at the bottom of the side panel and the edge of the bottom panel, pull the side panel to the side of the partition, and fix it with a vertical "7"-shaped card plate for positioning welding. At this time, the bottom panel is adjusted along the pre-arch curve of the side panel, and a pad is used to raise the bottom of the bottom panel and the tire frame. Repeat the above steps to install the other side panel, use a hand chain hoist to pull the angle steel of the lower side panel, and then spot weld it; Step 5: Weld the welds between the left and right sides and the partition, leaving the upper part unwelded; Step 6: Weld the welds of the bottom plate and the partition; Step 7: Cover the top plate on the upper part of the partition and the upper part of the side plate, and then weld it to the side plate, first weld the inner mouth, then carbon planer the outside, and pyrotechnic correction; Step 8: The diameter of the ear plate hole. The ear plate and the square steel are first grouped together. They are not connected to the partition plate during the assembly stage. After the top plate is installed, the partition plate is inserted into the box body and the reinforcement ribs are installed. The margin of the upper edge of the partition plate is trimmed during the general assembly adjustment. Step 9: Assemble the ear plate parts and heavy parts, machine the ear holes after small assembly, insert the partition panel group after the top plate is assembled, and the angle steel is bulked; Step 10: Install the hinge point of the pulley. In addition to the reaming hole, the hole of the axle plate needs to be machined as a whole assembly, and the remaining holes are bored in the state of parts. The hinge point is welded on all four sides, and the inner ear plate is assembled first. After the top plate is assembled, it is inserted into the box; About the production of rear beam The steps are the same as steps 1-10 for making the front beam.
2. The manufacturing process of the front and rear beams of a quay crane according to claim 1, characterized in that: The center line in step 2 is a straight line located in the middle of the bottom plate and parallel to the long side of the bottom plate. The left and right side lines are provided with a margin from the length direction edge of the bottom plate for subsequent welding of the side panels. A laser instrument is used to determine whether the left and right side lines meet the requirements of the drawing.
3. The manufacturing process of the front and rear beams of a quay crane according to claim 1, characterized in that: The inclination angle in step 3 is an acute angle less than 30 degrees.
4. The manufacturing process of the front and rear beams of a quay crane according to claim 1, characterized in that: The bottom of the side panel close to the bottom panel in step 4 is provided with an upward arch, and the bottom panel is adjusted according to the arch curve at the bottom of the side panel, and the bottom panel is close to the bottom of the side.
5. The manufacturing process of the front and rear beams of a quay crane according to claim 1, characterized in that: The clamping plate is clamped on two upper corners of the partition plate, one side of the clamping plate contacts the side plate, and the other side contacts the top plate.
6. The manufacturing process of the front and rear beams of a quay crane according to claim 1, characterized in that: The upper surface of the top plate is provided with a plurality of tracks parallel to the length direction, and the top plate is arched 2-3mm toward the top plate surface, i.e. reversed, to prevent the track support plate from collapsing after welding.
7. The manufacturing process of the front and rear beams of a quay crane according to claim 1, characterized in that: The pyrotechnic correction in step 7 causes the rail support plate to arch 2 mm toward the top plate surface, i.e., reverse deformation, to prevent the rail support plate from collapsing after welding.
8. The manufacturing process of the front and rear beams of a quay crane according to claim 1, characterized in that: The lengths of the rail support plates of the front beam are one long and one short, and the lengths of the rail support plates of the rear beam are the same.