Roller changing structure and roller changing method of wringing roller

By using a combination structure of hook, wire rope, height adjuster and trolley in the replacement of the drying roller, the problem of disassembly and assembly difficulties caused by the high altitude position and length of the drying roller is solved, and safe and efficient removal and installation are achieved, reducing the The labor intensity of maintenance workers.

CN118978081APending Publication Date: 2024-11-19GUANGZHOU JFE STEEL PLATE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411033275.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The difficulty in replacing the dry rollers in modern hot-dip galvanized production lines is mainly due to the disassembly and lifting difficulties caused by their high altitude position, too long length and the inability to install the roller replacement trolley, which poses safety risks.

Method used

The roller replacement structure is adopted including hooks, wire ropes, height adjusters, shaft head fixtures, counterweights and trolleys. The weight of the squeeze rollers is carried through the trolley, and the height of the shaft head fixture is adjusted by hand hoists to ensure stable clamping and extrusion. Dry rollers and slowly move through the carriage to complete the removal and installation.

Benefits of technology

The drying roller removal and installation at high altitude and limit positions are realized, which reduces the labor intensity of maintenance workers, ensures the safety and flexibility of operation, and solves the problem of drying roller disassembly and assembly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118978081A_ABST
    Figure CN118978081A_ABST
Patent Text Reader

Abstract

The roll changing structure comprises a lifting hook, a steel wire rope and a height adjuster are connected to the lifting hook in a hung mode, a lifting beam is connected to the lower end of the steel wire rope and the lower end of the height adjuster, the height adjuster controls the height of the lifting beam, a shaft head clamp is installed at the right end of the lifting beam, and the shaft head clamp is used for clamping the wringing roll. A balancing weight is installed on the left side of the lower surface of the hanging beam and keeps balance of the hanging beam, the crown block bears the weight of the wringing roller, the crown block can adjust the positions of the hanging beam and the shaft head clamp, the chain block is used for finely adjusting the height of the shaft head clamp, and it is ensured that the shaft head clamp stably clamps the wringing roller. The wringing roller can be smoothly clamped and slowly moved towards the pulling-out direction of the wringing roller by utilizing the crown block, so that the wringing roller mounted at the extreme position is dismounted and hoisted, and a series of problems that the wringing roller is near the edge in the high altitude, a roller replacing trolley cannot be mounted and the dismounting and hoisting distance is not enough are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of squeeze roller replacement, and in particular to a squeeze roller replacement structure and a roller replacement method. Background Art

[0002] The steel plates in modern hot-dip galvanizing production lines must pass through several squeeze rollers to squeeze out the moisture before entering the next process, so the periodic replacement of the squeeze rollers is particularly important.

[0003] In the related art, the squeeze roller is generally installed on a floor more than ten meters high, which makes it difficult to hoist and replace; the installation position of the squeeze roller is far away from the hoisting area (about 3.5 meters), which makes it inconvenient to disassemble and hoist the squeeze roller; the squeeze roller is long (about 3.8 meters), which makes it inconvenient to disassemble and hoist.

[0004] In order to replace the squeezing roller, the equipment in certain positions can replace the squeezing roller through the roller changing trolley. However, due to the special location and the overall length of the roller changing trolley is greater than 3.5 meters, the roller changing trolley cannot be installed; even if the roller changing trolley can be installed, the squeezing roller cannot be pulled out and hoisted, because the squeezing roller is too long and the distance between the 3.5-meter interval area cannot be pulled out and placed; coupled with the high-altitude edge, if the hoisting is forced, there will be safety risks. Summary of the invention

[0005] The object of the present invention is to provide a roller changing structure for a squeeze roller to solve the problems raised in the above background technology.

[0006] To achieve the above object, the present invention provides the following technical solution: a roll changing structure for a squeeze roll, comprising a hook, a steel wire rope and a height adjuster are hung on the hook, a hanging beam is connected to the lower ends of the steel wire rope and the height adjuster, and the height adjuster controls the height of the hanging beam;

[0007] A shaft head clamp is installed at the right end of the hanging beam, and the shaft head clamp is used to clamp the squeeze roller;

[0008] A counterweight is installed on the left side of the lower surface of the hanging beam. The counterweight keeps the hanging beam balanced. The number of counterweights can be increased according to the weight of the squeeze roller to avoid imbalance and disassemble the squeeze roller.

[0009] Furthermore, the upper and lower surfaces of the counterweight block are provided with fixed edges, and a first bolt is inserted into the fixed edge. The first bolt is screwed to the suspension beam. When a counterweight block needs to be added, the installation is completed through the fixed edge on the counterweight block using the first bolt and nut.

[0010] Furthermore, the hook is provided with an anti-slip hook block, and the hook is connected to a crane. The crane is used to hoist the squeeze roller. The crane has a large load-bearing capacity and is easy to operate. Using the crane to hoist the squeeze roller can reduce the labor intensity of maintenance workers.

[0011] Furthermore, the height adjuster is a hand chain hoist, which adopts a multi-point support structure, so that the force on the rotating system is more reasonable, the operation is flexible, and the failure rate is low. When the hand chain hoist is pulled at an angle, no chain jamming or excessive noise will occur.

[0012] The method of using the roller changing structure of the dry roller includes the following steps:

[0013] S1. Remove the peripheral equipment of the squeeze roller and check the quality of the required equipment;

[0014] S2. Hang a wire rope on the hook, and connect the lower end of the wire rope to the lifting lug close to the counterweight;

[0015] S3. Hang a hand chain hoist on the hook, and connect the lower end of the hand chain hoist to another lifting lug;

[0016] S4. Use anti-slip hook blocks to block the hand chain hoist and wire rope to prevent the hand chain hoist, wire rope and hook from slipping;

[0017] S5, control the angle between the wire rope and the hook to be 60°;

[0018] S6. Use the overhead crane to adjust the height of the hook, and pull the hand chain hoist to control the height of the hanging beam, so that the shaft head clamp can be put on the shaft head of the squeeze roller and locked;

[0019] S7. The overhead crane moves in the direction of pulling out the squeeze roller to complete the removal of the squeeze roller.

[0020] Compared with the prior art, the beneficial effects of the present invention are as follows: the weight of the squeeze roller is carried by the overhead crane, the overhead crane can adjust the position of the hanging beam and the shaft head clamp, and the height of the shaft head clamp is fine-tuned using a hand winch to ensure that the shaft head clamp stably clamps the squeeze roller. When in the extreme position, the squeeze roller can be clamped smoothly, and the overhead crane is used to slowly move in the direction of pulling out the squeeze roller, so as to remove and hoist the squeeze roller installed in the extreme position, thereby solving a series of problems such as the squeeze roller being close to the edge at high altitude, the inability to install a roller changing trolley, and insufficient disassembly and hoisting distance. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the squeeze roller after disassembly of the present invention;

[0022] Figure 2 This is a schematic diagram of the squeeze roller of the present invention before disassembly.

[0023] In the figure: 1. squeeze roller; 2. counterweight; 3. lifting beam; 4. lifting lug; 5. shaft head clamp; 6. hook; 7. hand chain hoist; 8. wire rope; 9. fixing ring; 10. second bolt; 11. fixing edge; 12. first bolt; 13. anti-slip hook block; 14. overhead crane. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Example:

[0026] See also Figure 1-2 The present invention provides a technical solution: a roller replacement structure for a squeeze roller, comprising a hook 6, a steel wire rope 8 and a height adjuster are hung on the hook 6, the lower ends of the steel wire rope 8 and the height adjuster are connected to a hanging beam 3, the height adjuster controls the height of the hanging beam 3, and the angle between the steel wire rope 8 and the height adjuster is controlled at 60°, which is more conducive to the disassembly and lifting of the roller, making the lifting safer;

[0027] The right end of the hanging beam 3 is provided with an axle head clamp 5, which is used to clamp the squeeze roller 1 to ensure that the squeeze roller 1 does not fall during the lifting process, making the lifting safer;

[0028] A counterweight block 2 is installed on the left side of the lower surface of the hanging beam 3. The counterweight block 2 maintains the balance of the hanging beam 3. The weight of the counterweight block 2 is about twice the weight of the squeezing roller 1, which is conducive to maintaining the balance of the hanging beam 3.

[0029] In this embodiment, if Figure 1 As shown, the upper and lower surfaces of the counterweight block 2 are provided with a fixed edge 11, and a first bolt 12 is inserted into the fixed edge 11. The first bolt 12 is screwed to the suspension beam 3, and the fixed edge 11 has a hole. When it is necessary to add a counterweight block 2, the upper and lower fixed edges 11 are aligned, and the two counterweight blocks 2 are fixed using the first bolt 12 and the nut.

[0030] In this embodiment, if Figure 1 As shown, the hook 6 is provided with an anti-slip hook block 13 to prevent the hand chain hoist 7 and the wire rope 8 from falling off the hook 6 . The hook 6 is connected to a crane 14 , which transfers the squeeze roller 1 .

[0031] In this embodiment, if Figure 1 and Figure 2 As shown, two lifting ears 4 are welded on the upper surface of the suspension beam 3, and the steel wire rope 8 and the height adjuster are connected to the lifting ears 4. The center distance between the two lifting ears 4 is about 2.5 meters, which is convenient for controlling the angle between the steel wire rope 8 and the height adjuster.

[0032] In this embodiment, if Figure 1 and Figure 2 As shown, the height adjuster is a hand chain hoist 7.

[0033] In this embodiment, if Figure 1 and Figure 2 As shown, the shaft head clamp 5 has a fixing ring 9, a second bolt 10 is inserted into the fixing ring 9, and the second bolt 10 is screwed to the suspension beam 3. The shaft head clamp 5 can be replaced for squeezing rollers 1 of different sizes.

[0034] Specifically, when in use, remove the peripheral equipment of the squeeze roller 1, check the quality of the required equipment, and after the inspection is completed to ensure that there are no safety hazards, hang the wire rope 8 on the hook 6, and the lower end of the wire rope 8 is connected to the lifting ear 4 close to the counterweight block 2. Hang the hand chain hoist 7 on the hook 6, and the lower end of the hand chain hoist 7 is connected to another lifting ear 4. Use the anti-slip hook block 13 to block the hand chain hoist 7 and the wire rope 8 to prevent the hand chain hoist 7 and the wire rope 8 from slipping with the hook 6. The angle between the wire rope 8 and the hook 6 is controlled at 60° It is more conducive to the disassembly and lifting of the squeeze roller 1, making the lifting safer. The overhead crane 14 is used to adjust the height of the hook 6, and then the position of the hanging beam 3 is changed through the wire rope 8 and the hand winch 7. The hanging beam 3 drives the position of the shaft head clamp 5 to change. The hand winch 7 is used to fine-tune the position height of the hanging beam 3 and the shaft head clamp 5 to ensure that the shaft head clamp 5 can be stably sleeved on the end of the squeeze roller 1 and locked. The overhead crane 14 is used to slowly move in the direction of pulling out the squeeze roller 1, so as to dismantle and lift the squeeze roller 1 installed in the extreme position.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A roller changing structure for a squeeze roller, characterized in that: It comprises a hook (6), a steel wire rope (8) and a height adjuster are hung on the hook (6), the lower ends of the steel wire rope (8) and the height adjuster are connected to a hanging beam (3), and the height adjuster controls the height of the hanging beam (3); The right end of the suspension beam (3) is provided with an axle head clamp (5), and the axle head clamp (5) is used to clamp the squeeze roller (1); A counterweight block (2) is installed on the left side of the lower surface of the hanging beam (3), and the counterweight block (2) maintains the balance of the hanging beam (3).

2. The roller replacement structure of a squeeze roller according to claim 1, characterized in that: The upper and lower surfaces of the counterweight block (2) are both provided with fixed edges (11), a first bolt (12) is inserted into the fixed edge (11), and the first bolt (12) is screwed to the suspension beam (3).

3. The roller replacement structure of a squeeze roller according to claim 1, characterized in that: The hook (6) is provided with an anti-slip hook stopper (13), and the hook (6) is connected to a crown block (14).

4. The roller replacement structure of a squeeze roller according to claim 1, characterized in that: Two lifting ears (4) are welded on the upper surface of the lifting beam (3), and the steel wire rope (8) and the height adjuster are connected to the lifting ears (4).

5. The roller replacement structure of a squeeze roller according to claim 1, characterized in that: The height adjuster is a hand chain hoist (7).

6. The roller replacement structure of a squeeze roller according to claim 1, characterized in that: The shaft head clamp (5) is provided with a fixing ring (9), a second bolt (10) is inserted into the fixing ring (9), and the second bolt (10) is screwed to the suspension beam (3).

7. The method for using the roller replacement structure of the squeeze roller is characterized in that: The roller changing structure for a squeeze roller applied to any one of claims 1 to 6, wherein the method for using the roller changing structure for a squeeze roller comprises the following steps: S1. Remove the peripheral equipment of the squeeze roller (1) and check the quality of the required equipment; S2. Hang a steel wire rope (8) on the hook (6), and connect the lower end of the steel wire rope (8) to the lifting lug (4) near the counterweight (2); S3, hang a hand chain hoist (7) on the hook (6), and the lower end of the hand chain hoist (7) is connected to another lifting lug (4); S4, using an anti-slip hook block (13) to block the hand chain hoist (7) and the wire rope (8) to prevent the hand chain hoist (7) and the wire rope (8) from slipping with the hook (6); S5, control the angle between the steel wire rope (8) and the hook (6) to be 60°; S6. Use the overhead crane (14) to adjust the height of the hook (6), and pull the hand chain hoist (7) to control the height of the hanging beam (3), so that the shaft head clamp (5) can be sleeved on the shaft head of the squeeze roller (1) and locked; S7, the overhead crane (14) moves in the direction of pulling out the squeeze roller (1), and the removal of the squeeze roller (1) is completed.