Rapid furnace condition recovery method after planned overhaul of blast furnace

By calculating and de-release of air rest materials in stages, and controlling the furnace temperature and re-refrigeration operation, the problem of the long recovery time of the furnace condition after the planned maintenance of the blast furnace is solved, and the furnace condition is quickly restored and the cost is reduced.

CN118979130APending Publication Date: 2024-11-19NANJING IRON & STEEL CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410987530.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The recovery time of the furnace condition after the blast furnace is planned to be repaired is too long, which affects the use efficiency, wastes energy and increases costs.

Method used

By calculating the rest air mass and dividing it into three sections, controlling the furnace's mild re-winding process, selecting appropriate iron outlets to output iron, and optimizing the re-winding operation to shorten the recovery time.

Benefits of technology

Recovering normal production conditions within 32 hours, reducing fuel consumption and labor costs, and achieving rapid recovery of furnace conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979130A_ABST
    Figure CN118979130A_ABST
Patent Text Reader

Abstract

The invention discloses a rapid furnace condition recovery method after planned overhaul of a blast furnace. The rapid furnace condition recovery method comprises the following steps: 1) calculating a damping-down material according to damping-down time; (2) the damping-down material is lowered to a predicted position before damping-down; (3) controlling the air adding rhythm by reblowing; and (4) selecting a normally-plugged iron notch to discharge iron. The blast furnace production can be recovered to the normal production condition in a short time, the recovery time is short, the consumed manpower and material resources are few, and the cost is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of planned maintenance of blast furnaces, and in particular to a method for quickly restoring furnace conditions after planned maintenance of a blast furnace. Background Art

[0002] The maintenance cycle of blast furnaces is basically maintained at a planned maintenance every March or April. After each planned maintenance, the blast furnace condition has a period of recovery. Some steel mills need to spend 3-4 days to restore the furnace condition, and some steel mills need to spend about 16 hours to restore the furnace condition. Too long recovery time affects the efficiency of blast furnace use, wastes energy, and increases costs.

[0003] Therefore, it is necessary to develop a new method for quickly restoring the blast furnace condition after planned maintenance to shorten the time for restoring the blast furnace condition after planned maintenance. Summary of the invention

[0004] Purpose of the invention: In view of the shortcomings and defects of the prior art, the present invention provides a method for quickly restoring the furnace condition after a planned maintenance of a blast furnace, which can restore the blast furnace production to normal production conditions in a short time, with short recovery time, less manpower and material resources consumed, and low cost.

[0005] Technical solution: A method for rapidly restoring a blast furnace after a planned overhaul of the present invention comprises the following steps:

[0006] 1) Calculate the wind-break material according to the wind-break time;

[0007] 2) Place the wind-breaking material at the expected location before the wind breaks;

[0008] 3) Re-winding controls the rhythm of adding air;

[0009] 4) Select the iron mouth with normal blockage to tap the iron.

[0010] Wherein, when calculating the wind-off material in the step 1), the coke added to the wind-off material is determined according to the wind-off time. Wind-off within 32 hours is calculated as 1.5 t / h of coke added per hour.

[0011] The wind-break material is divided into three sections, namely, the first wind-break material section, the second wind-break material section and the normal material section.

[0012] Wherein, the wind stop is carried out within 32 hours, coke is added to the first section and the second section of the wind stop material, and the amount of coke added is controlled according to the ore reduction of the wind stop material. The ore reduction of the first section of the wind stop material for 12h-24h is controlled at 3%-5%, and the ore reduction of the first section of the wind stop material for 24h-32h is controlled at 5%-9%, and the remaining coke is added to the second section of the wind stop material.

[0013] Among them, the alkalinity of the wind-off material is estimated according to the furnace temperature to make the ingredients, and the alkalinity of the first section of the wind-off material and the second section of the wind-off material is controlled to be 0.1 lower than the normal alkalinity.

[0014] Among them, in the step 2), the position of the blast-off material is based on the blast-off time, with the first section of the blast-off material being located at the lower part of the furnace body, the second section of the blast-off material being located at the middle part of the furnace body, and the third section being the normal material section.

[0015] Wherein, in the step 3), the furnace temperature of the air-off furnace is controlled at 0.4%-0.5%, and when the air-off furnace reaches the air-off position, the furnace temperature of the air-replenishing furnace is controlled within 0.65%.

[0016] Among them, in the step 4), the re-air is selected according to the requirements when the tapping iron outlet is tapped, and the normal air volume is selected to block the outlet to avoid incomplete discharge of slag and iron after the re-air, which affects the furnace condition recovery process.

[0017] Among them, in the step 3), the blast furnace is restored without external influence: after the coal gas is introduced, the first air is added to 45% of the total air, and the appropriate top pressure is matched. After the equal pressure relationship is stable, continue to add air for 300m 3 / min, at this time, the control is unexpected, the pressure is stable and coal injection begins. After the coal is injected, the pressure-volume relationship is stable and air is added for 200m 3 / min once, until the air volume reaches 70% of the full air volume, and then start laying the materials according to the top temperature and pressure conditions. After a batch of materials is laid, continue to add air and enrich oxygen when the pressure-volume relationship is stable. When the air volume reaches 85%, start laying the materials according to the conditions.

[0018] Among them, the pressure-volume relationship is stable, and the re-airing 50 minutes requires the iron mouth to be opened in front of the furnace to tap iron. After the iron mouth is opened to release slag, air and oxygen are gradually added to the normal air volume, and the furnace condition is restored.

[0019] Beneficial effects: Compared with the prior art, the present invention has the following significant advantages: the present invention only needs 2-3 hours to restore the air volume and oxygen content to normal furnace conditions during planned maintenance within 32 hours, the full tuyere is restored, the recovery time is short, the furnace temperature is suitable, the slag and iron have sufficient physical heat, and waste and consumption are small. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the present invention;

[0021] Figure 2 It is a diagram of the implementation of the present invention;

[0022] In the figure, 1 is the normal material section; 2 is the first section of the wind-free material; and 3 is the second section of the wind-free material. DETAILED DESCRIPTION

[0023] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and specific implementation methods.

[0024] The rapid restoration of furnace conditions by planned maintenance of blast furnace is an operation technology and an operation method. This technology requires support and cooperation from multiple links, and mainly consists of the following four aspects:

[0025] 1. Blast furnace blast material is the key to quickly restore the furnace condition. How to calculate the blast material and lay it down properly is the basis.

[0026] 2. Furnace temperature is one of the important factors for the rapid recovery of blast furnace conditions.

[0027] 3. Iron tapping after re-airing is an important link in the rapid recovery of furnace conditions.

[0028] 4. The foreman’s operating skills are also an important part of the operation.

[0029] The key points of planned maintenance and rapid restoration of furnace conditions are as follows:

[0030] 1. Calculation of wind-fall material and location of wind-fall material:

[0031] Calculation of windage:

[0032] The coking rate for wind-break materials depends on the wind-break time. For wind-breaks within 32 hours, the coking rate is calculated at 1.5t / h per hour. (Except for abnormal situations, such as water leakage, etc.)

[0033] The wind-stop material is divided into three sections, and the wind is usually stopped within 32 hours. Basically, coke is added in the first and second sections. The amount of coke added is controlled according to the ore reduction of the wind-stop material. Usually, the ore reduction in the first section for 12h-24h is controlled at 3%-5%, and the ore reduction in the first section for 24h-32h is controlled at 5%-9%. The remaining coke is added in the second section.

[0034] Alkalinity of rest air material: prepare the materials according to the estimated furnace temperature in accordance with the situation. Usually the alkalinity of the first and second stages is controlled at about 0.1 lower than the normal alkalinity.

[0035] Position of wind-off material: According to the wind-off time, the first section of wind-off material is usually placed at the bottom of the furnace body, and the second section is placed in the middle of the furnace body. The third section is normal material.

[0036] 2. Rest and recovery air furnace temperature control:

[0037] It is required that the furnace temperature during air shut-off be controlled at around 0.4%-0.5% to facilitate recovery of furnace conditions.

[0038] According to the wind-off arrival position, the re-air furnace temperature is controlled within 0.65%.

[0039] Furnace temperatures that are too low or too high will affect the furnace recovery process.

[0040] 3. Iron tapping control before furnace

[0041] When re-airing, according to the requirements, when selecting the tapping point for iron tapping, choose to tap iron at the tapping point when the tapping point is blocked with normal air volume, so as to avoid incomplete discharge of slag and iron after re-airing, which will affect the recovery process of furnace condition.

[0042] 4. Blast furnace re-air operation

[0043] After the blast furnace is restored to air, it is important to ensure that the surrounding environment does not affect the restoration of air, and to avoid prolonged slow air flow or secondary air stoppage due to external conditions. The quality of maintenance is very important.

[0044] Blast furnace re-airing without external influence:

[0045] Re-air operation: After the gas is introduced, add air to 45% of the full air for the first time, match the appropriate top pressure, and continue to add air for 300m after the pressure relationship is stable. 3 / min, at this time, the control is unexpected, the pressure is stable and coal injection begins. After the coal is injected, the pressure-volume relationship is stable and air is added for 200m 3 / min once, until the air volume reaches about 70% of the full air volume, and then start to distribute materials according to the top temperature and pressure. After a batch of materials is distributed, the pressure-volume relationship is stable and air and oxygen enrichment are continued. When the air volume reaches 85%, distribution is started according to the situation. The pressure-volume relationship is stable, and the furnace is required to open the taphole for tapping after about 50 minutes of re-airing. After the taphole is opened and slag is released, gradually add air and oxygen to the normal air volume, and the furnace condition is restored and the process is over.

[0046] According to calculations, each recovery reduces the fuel ratio by 20kg / t, with a daily output of 5,200 tons, saving an estimated 20,000 yuan in manpower and material costs. The fuel saving ratio is 2.7 yuan / tFe. Cost reduction achieved by one overhaul recovery: 2.7*20*5200+20,000=300,800 yuan. Cost reduction by three overhauls a year: 300,800*3=902,400 yuan. Through practice, it has been extended to 5 blast furnaces of Nangang enterprises to achieve cost reduction: 902,400*5=4,512,000 yuan.

Claims

1. A method for rapidly restoring a blast furnace after a planned maintenance, characterized in that: The steps include: 1) Calculate the wind-break material according to the wind-break time; 2) Place the wind-breaking material at the expected location before the wind breaks; 3) Re-winding controls the rhythm of adding air; 4) Select the iron mouth with normal blockage to tap the iron.

2. The method for rapidly restoring the blast furnace condition after planned maintenance according to claim 1, characterized in that: When calculating the wind-off material in the step 1), the coke added to the wind-off material is determined according to the wind-off time. Wind-off within 32 hours is calculated as 1.5t / h of coke added per hour.

3. The method for rapidly restoring the blast furnace condition after planned maintenance according to claim 2, characterized in that: The wind-off material is divided into three sections, namely, the first wind-off material section (2), the second wind-off material section (3) and the normal material section (1).

4. The method for rapidly restoring the blast furnace condition after planned maintenance according to claim 3 is characterized in that: The wind stop is carried out within 32 hours, and coke is added to the first section (2) and the second section (3) of the wind stop material. The amount of coke added is controlled according to the amount of ore reduction in the wind stop material. The ore reduction in the first section (2) of the wind stop for 12h-24h is controlled at 3%-5%, and the ore reduction in the first section (2) of the wind stop for 24h-32h is controlled at 5%-9%. The remaining coke is added to the second section (3) of the wind stop material.

5. The method for rapidly restoring the blast furnace condition after planned maintenance according to claim 4, characterized in that: The alkalinity of the wind-off material is estimated according to the furnace temperature to prepare the material, and the alkalinity of the first section (2) of the wind-off material and the second section (3) of the wind-off material is controlled to be 0.1 lower than the normal alkalinity.

6. The method for rapidly restoring the blast furnace condition after planned maintenance according to claim 1, characterized in that: In the step 2), the position of the blast-off material is determined according to the blast-off time, with the first section (2) of the blast-off material being located at the lower part of the furnace body, the second section (3) of the blast-off material being located at the middle part of the furnace body, and the third section being the normal material section (1).

7. The method for rapidly restoring the blast furnace condition after planned maintenance according to claim 1, characterized in that: In the step 3), the temperature of the furnace with the air stopped is controlled at 0.4%-0.5%, and when the air is stopped at the position, the temperature of the furnace with the air restored is controlled within 0.65%.

8. The method for rapidly restoring a blast furnace after a planned maintenance according to claim 1, characterized in that: In the step 4), the re-air is selected according to the requirements when the tapping hole is tapped, and the normal air volume is selected to block the hole to avoid incomplete discharge of slag and iron after the re-air, which affects the recovery process of the furnace condition.

9. The method for rapidly restoring a blast furnace after a planned maintenance according to claim 1, characterized in that: In the step 3) of the blast furnace re-airing without external influence: after the coal gas is introduced, the first air addition is added to 45% of the total air, matching the appropriate top pressure, and after the equal pressure relationship is stable, continue to add air for 300m 3 / min, at this time, the control is unexpected, the pressure is stable and coal injection begins. After the coal is injected, the pressure-volume relationship is stable and air is added for 200m 3 / min once, until the air volume reaches 70% of the full air volume, and then start laying the materials according to the top temperature and pressure conditions. After a batch of materials is laid, continue to add air and enrich oxygen when the pressure-volume relationship is stable. When the air volume reaches 85%, start laying the materials according to the conditions.

10. The method for rapidly restoring the blast furnace condition after planned maintenance according to claim 9, characterized in that: The pressure-volume relationship is stable. The re-airing requires that the iron mouth in front of the furnace be opened to tap iron for 50 minutes. After the iron mouth is opened to tap slag, air and oxygen are gradually added to the normal air volume to restore the furnace condition.

Citation Information

Cited By

  • Method for rapidly recovering furnace condition of large blast furnace after regular repair under low-grade condition