Concrete pile construction method suitable for underground multi-layer karst cave structure

By using steel cage covers to wrap the hexapristal steel cage in karst areas and filling the caves with hemispherical steel springs, the problems of slurry leakage and hole collapse in karst areas are solved, and the bearing capacity and construction stability of the pile foundation are improved. Efficient concrete pile construction has been achieved.

CN118979493APending Publication Date: 2024-11-19CHINA RAILWAY SEVENTH GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411420006.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

During construction in karst areas, common pile foundations cannot meet the bearing capacity requirements of the building foundation, and due to concealed projects, the construction is difficult and costly, and problems such as slurry leakage, hole collapse, diameter shrinkage, and pile hole skew are prone to problems such as pile hole leakage.

Method used

The hexagonal prism-shaped steel cage is wrapped with a steel cage, and the cylinder is installed on the outside. The hemispherical steel spring is compressed to fill the caves in the pile pit to ensure that there is no leakage of slurry, no collapse of holes, no shrinkage, and no deflection when pouring concrete. Form concrete piles of irregular shapes.

Benefits of technology

It effectively improves the support capacity of pore piles in karst areas, avoids slurry leakage, collapsed holes, shrinkage diameters, and skewed pile holes during construction, and has reasonable design and good use effect, which is of great promotional significance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979493A_ABST
    Figure CN118979493A_ABST
Patent Text Reader

Abstract

The invention discloses a concrete pile construction method suitable for an underground multi-layer karst cave structure, and relates to karst cave concrete pile application. Comprising the following steps that a pile pit penetrating through a karst cave is excavated, a hexagonal-prism-shaped reinforcement cage is manufactured, a traction supporting frame is manufactured at the bottom of the hexagonal-prism-shaped reinforcement cage, a concrete support is manufactured at the bottom of the hexagonal-prism-shaped reinforcement cage, hemispherical spring steel bars are manufactured, the hemispherical spring steel bars are welded to the hexagonal-prism-shaped reinforcement cage, and a reinforcement cage sleeve with a hemispherical sleeve is manufactured; the elastic reinforcement cage is wrapped with a reinforcement cage sleeve, the reinforcement cage sleeve is sleeved with an installation cylinder, the elastic reinforcement cage sleeved with the installation cylinder is put into the installation pit, the installation cylinder is taken down to enable the hemispherical spring to expand and be clamped in the karst cave, and concrete is poured into the elastic reinforcement cage and dried and solidified to be formed; according to the invention, the plurality of hemispherical reinforcing steel bar springs bulge out, and the hemispherical reinforcing steel bar springs with the hemispherical wrapping cloth block the karst cave part in the pile pit, so that the phenomena of slurry leakage, hole collapse, hole shrinkage, pile hole deflection and the like are avoided during concrete pouring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an application of a concrete pile that is convenient for use in a karst cave, and in particular to a concrete pile construction method that is suitable for an underground multi-layer karst cave structure. Background Art

[0002] There are many caves in karst areas, which are unevenly distributed, of different sizes, and also have connectivity. When designing and constructing infrastructure in karst areas, the design requirements are high, the construction is difficult, the period is long, and construction accidents are prone to occur, which greatly increases the design and construction costs. Since the construction in karst areas is a hidden project, the quality standards are difficult to control. In the actual grouting construction process, if the construction is improper, it is easy to have leakage, hole collapse, shrinkage, pile hole deviation and other phenomena. In addition, if you encounter a karst area with complex geological conditions, the commonly used pile foundation cannot meet the bearing capacity requirements and cannot play the role of the pile foundation. Therefore, how to design and construct a foundation project that meets the bearing capacity requirements of the foundation of a building or structure in a karst area is a difficult problem that needs to be solved urgently by designers and construction personnel. Summary of the invention

[0003] In order to overcome the shortcomings of the background technology, the present invention discloses a concrete pile construction method suitable for underground multi-layer karst cave structures, which comprises the following steps: a hexagonal steel cage is wrapped with a steel cage sleeve, and an installation cylinder is sleeved on the outside of the steel cage sleeve to compress a plurality of hemispherical steel springs, and the installation cylinder sleeved with the hexagonal steel cage is put into a pile pit. After the installation cylinder is removed, the plurality of hemispherical steel springs bulge out, and the hemispherical steel springs with the hemispherical wrapping cloth effectively block the karst cave part in the pile pit, thereby avoiding the occurrence of slurry leakage, hole collapse, diameter shrinkage, pile hole deviation and the like when pouring concrete.

[0004] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme: A concrete pile suitable for an underground multi-layer karst cave structure and a construction method thereof, comprising the following steps: Step 1: excavating a pile pit passing through a karst cave: excavating a pile pit in an area where the pile pit needs to be excavated, so that the pile pit passes through one or more karst caves in the underground soil layer; Step 2: Making a hexagonal steel cage: welding a plurality of hexagonal steel rings and a plurality of vertical steel bars to form a hexagonal steel cage of a required length; Step 3: Make a tension support frame at the bottom of the hexagonal steel cage: set a tension steel bar with a hanging ring on the top at the bottom of the hexagonal steel cage, and weld support steel bars between the tension steel bar and the hexagonal steel ring at the bottom of the hexagonal steel cage; Step 4: Make a concrete support at the bottom of the hexagonal steel cage: pour concrete at the bottom of the hexagonal steel cage so that the pulling steel bars and the supporting steel bars are placed inside the concrete, and the concrete wraps the bottom of the hexagonal steel cage to form a vertical cylindrical structure. After the cylindrical concrete base is dry, one end of the cable A is inserted into the hexagonal steel cage along the top of the hexagonal steel cage and fixed to the hanging ring; Step 5: Making hemispherical spring steel bars: using steel bars to make hemispherical steel springs with a spiral structure, wherein the diameter of the hemispherical steel spring is slightly narrower than the width of each face of the hexagonal steel cage; Step 6, welding hemispherical spring steel bars on the hexagonal steel cage: welding a plurality of hemispherical steel springs with spherical surfaces facing outwards on the six faces of the hexagonal steel cage located above the cylindrical concrete base, so that the hexagonal steel cage located above the cylindrical concrete base forms an elastic steel cage; Step 7, making a steel cage sleeve with a hemispherical sleeve: using geotextile to make a cloth sheet for wrapping the hexagonal steel cage, so that after the cloth sheet wraps the hexagonal steel cage located on the top of the cylindrical concrete base, only a small part of the top of the hexagonal steel cage is left unwrapped, using geotextile to make a hemispherical wrapping cloth for covering the hemispherical steel spring, according to the arrangement of the hemispherical steel spring, holes are dug at the corresponding positions of the cloth sheet and the hemispherical wrapping cloth is sewn, so that the cloth sheet and the hemispherical wrapping cloth are combined to form a steel cage sleeve; Step 8: Wrap the elastic steel cage with a steel cage sleeve: Wrap the steel cage sleeve on the elastic steel cage so that each hemispherical wrapping cloth covers the outside of the corresponding hemispherical steel spring, and sew the head and tail seams of the steel cage sleeve; Step 9: Sleeve the installation tube on the outside of the steel cage: make a placement tube slightly larger than the diameter of the steel cage, apply a release agent inside the placement tube, and use the tube cavity provided by the placement tube to sleeve the outside of the steel cage so that multiple hemispherical steel springs are compressed and multiple hemispherical wrapping cloths collapse in the gap between each face of the hexagonal steel cage and the circumscribed circular placement tube; Step 10: Place the elastic steel cage with the installation tube in the installation pit: lift the other end of the cable A and the top of the installation tube, so that the elastic steel cage with the steel cage sleeve and the installation tube are vertically inserted into the pile pit, so that the bottom of the cylindrical concrete base is in contact with the bottom of the pile pit, and the other end of the cable A is fixed to the upper part of the hexagonal steel cage; Step 11, remove the installation tube to expand the hemispherical spring and get stuck in the cave: lift the installation tube, and under the lubrication of the cylindrical concrete base, the dead weight of the elastic steel cage and the release agent applied in the installation tube, the installation tube gradually separates from the elastic steel cage, and multiple hemispherical steel springs covered with hemispherical wrapping cloths begin to expand elastically. Under the restriction of the inner wall of the pile pit, multiple hemispherical steel springs covered with hemispherical wrapping cloths cannot be fully expanded, and the hemispherical wrapping cloths form incompletely expanded wrapping cloths. The hemispherical steel springs press the incompletely expanded wrapping cloths against the pile. On the inner wall of the pit, when encountering a cave in the pile pit, the hemispherical steel spring covered with the hemispherical wrapping cloth can be fully expanded because the cave cannot restrict the hemispherical steel spring covered with the hemispherical wrapping cloth, so that the hemispherical steel spring covered with the hemispherical wrapping cloth located in the cave has a larger expansion area than the hemispherical steel spring covered with the incompletely expanded wrapping cloth not in the cave, resulting in an overall inconsistent outer diameter of the elastic steel cage, which allows the hemispherical steel spring covered with the hemispherical wrapping cloth to be stuck in the cave.

[0005] Step 12, pouring concrete inside the elastic steel cage and solidifying it into shape: Pour concrete inside the elastic steel cage. Under the constraint of the steel cage sleeve, the concrete poured inside the elastic steel cage will not flow out until the elastic steel cage is filled. After solidifying, an irregularly shaped concrete pile is formed.

[0006] The concrete piles suitable for underground multi-layer karst cave structures and the construction method thereof, in step 1, the excavation shape of the pile pit approaches a cylindrical shape.

[0007] The concrete piles suitable for underground multi-layer karst cave structures and the construction method thereof, in step 2, a plurality of vertical steel bars arranged at intervals surround the outside of a plurality of hexagonal steel bar rings arranged at intervals and are arranged at equal intervals.

[0008] The concrete piles suitable for underground multi-layer karst cave structures and the construction method thereof, in step three, the supporting steel bars between the pulling steel bars and the hexagonal steel ring located at the bottom of the hexagonal steel cage are multiple and are arranged around the pulling steel bars.

[0009] The concrete piles suitable for underground multi-layer karst cave structures and the construction method thereof, in step six, a small part of the top of the side wall of the hexagonal prism-shaped steel cage is not welded with a hemispherical steel spring.

[0010] The concrete piles suitable for underground multi-layer karst cave structures and the construction method thereof are provided with a strip connecting cloth at the tail of the cloth piece in step seven, which is used to achieve a sealing effect after the ends of the steel cage are sewn together in step eight.

[0011] The concrete piles suitable for underground multi-layer karst cave structures and the construction method thereof, in step nine, a plurality of through holes are arranged around the side wall of the top of the placement tube, and one end of each cable B having the same number of through holes is fixedly connected to the plurality of through holes respectively.

[0012] The concrete piles and construction method thereof suitable for underground multi-layer karst cave structures, in step 10, when the elastic steel cage with a steel cage sleeve and the placing tube are hoisted into the pile pit, the main force point is at the other end of the cable A, and hoisting the top of the placing tube mainly plays a role in straightening.

[0013] The concrete piles suitable for underground multi-layer karst cave structures and the construction method thereof, after the placement tube is hoisted in step eleven, a plurality of hemispherical steel springs covered with hemispherical wrapping cloths begin to elastically expand, which has the effect of centering the elastic steel cage with the steel cage sleeve.

[0014] The concrete piles and construction method thereof suitable for underground multi-layer karst cave structures, in step 12, when pouring concrete inside the elastic steel cage, use a vibrating tool to fill the concrete as much as possible, so that the steel cage sleeves on the outside of the elastic steel cage can be expanded as much as possible.

[0015] Due to the adoption of the above technical solution, the present invention has the following beneficial effects: The concrete pile construction method suitable for underground multi-layer karst cave structure disclosed by the present invention comprises the following steps: setting a steel cage as a hexagonal prism structure, arranging a plurality of hemispherical steel springs on six surfaces respectively, wrapping the hexagonal prism steel cage with a steel cage sleeve, sleeved an installation tube on the outside of the steel cage sleeve, compressing the plurality of hemispherical steel springs, putting the installation tube sleeved with the hexagonal prism steel cage into a pile pit, removing the installation tube, and causing the plurality of hemispherical steel springs to bulge out. The hemispherical steel springs with the hemispherical wrapping cloth effectively block the karst cave part in the pile pit, and avoiding the occurrence of slurry leakage, hole collapse, diameter shrinkage, pile hole deviation and the like when pouring concrete. The present invention has reasonable design and good use effect, effectively improves the hole pile support in karst areas, and has important promotion significance. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a flow chart of the construction steps of the present invention; Figure 2 It is a structural schematic diagram of construction step 1 of the present invention; Figure 3 It is a schematic diagram of the structure of the hexagonal steel bar ring in the second construction step of the present invention; Figure 4 It is a structural schematic diagram of the construction step 2 of the present invention; Figure 5 It is a structural schematic diagram of construction step three of the present invention; Figure 6This is a schematic diagram of the structure of the hexagonal steel bar ring and the pulling steel bar in the construction step three of the present invention; Figure 7 It is a structural schematic diagram of construction step 4 of the present invention; Figure 8 This is a structural schematic diagram of construction step five of the present invention; Fig. 9 It is a structural schematic diagram of construction step six of the present invention; Fig.10 It is a structural schematic diagram of the construction step six of the present invention from another angle; Fig.11 This is a structural schematic diagram of construction step seven of the present invention; Fig.12 It is a structural schematic diagram of construction step eight of the present invention; Fig.13 It is a structural schematic diagram of placing the tube in the construction step nine of the present invention; Fig.14 This is a structural schematic diagram of construction step nine of the present invention; Fig.15 It is a structural schematic diagram of construction step nine of the present invention from another angle; Fig.16 This is a structural schematic diagram of construction step 10 of the present invention; Fig.17 This is a structural schematic diagram of construction step eleven of the present invention; Fig.18 It is a structural schematic diagram of construction step twelve of the present invention.

[0017] In the figure: 1. soil layer; 2. pile pit; 3. karst cave; 4. hexagonal steel ring; 5. hexagonal steel cage; 6. vertical steel; 7. hanging ring; 8. pulling steel; 9. supporting steel; 10. cable A; 11. cylindrical concrete base; 12. hemispherical steel spring; 13. hemispherical wrapping cloth; 14. cloth piece; 15. strip connecting cloth; 16. perforation; 17. cylinder cavity; 18. placing cylinder; 19. cable B; 20. wrapping cloth that is not fully unfolded; 21. steel cage. DETAILED DESCRIPTION

[0018] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0019] The present invention can be explained in more detail by the following examples, the present invention is not limited to the following examples, and the purpose of disclosing the present invention is to protect all changes and improvements within the scope of the present invention; Combined with Figures 1 to 18 The concrete pile construction method applicable to underground multi-layer karst cave structures comprises the following steps: Step 1: excavating a pile pit passing through a karst cave: excavating a pile pit 2 in an area where the pile pit needs to be excavated, so that the pile pit 2 passes through one or more karst caves 3 in the underground soil layer 1, and the excavation shape of the pile pit 2 is close to a cylindrical shape; Step 2: Making a hexagonal steel cage: welding a plurality of spaced hexagonal steel rings 4 and a plurality of spaced vertical steel bars 6 to form a hexagonal steel cage 5 of a desired length, wherein the plurality of spaced vertical steel bars 6 surround the plurality of spaced hexagonal steel rings 4 and are equidistantly arranged. Step 3, making a pulling support frame at the bottom of the hexagonal steel cage: setting a pulling steel bar 8 with a hanging ring 7 on the top at the bottom of the hexagonal steel cage 5, and welding a supporting steel bar 9 between the pulling steel bar 8 and the hexagonal steel ring 4 at the bottom of the hexagonal steel cage 5, and there are multiple supporting steel bars 9 between the pulling steel bar 8 and the hexagonal steel ring 4 at the bottom of the hexagonal steel cage 5 and they are arranged around the pulling steel bar 8; Step 4: Make a concrete support at the bottom of the hexagonal steel cage: pour concrete at the bottom of the hexagonal steel cage 5 so that the pulling steel bars 8 and the supporting steel bars 9 are placed inside the concrete, and the concrete wraps the bottom of the hexagonal steel cage 5 to form a vertical cylindrical structure. After the cylindrical concrete base 11 is dried, one end of the cable A10 is inserted into the inside of the hexagonal steel cage 5 along the top of the hexagonal steel cage 5 and fixed to the hanging ring 7; Step 5, making hemispherical spring steel bars: using steel bars to make hemispherical steel springs 12 with a spiral structure, the diameter of the hemispherical steel springs 12 is slightly narrower than the width of each face of the hexagonal prism-shaped steel cage 5; Step 6, welding hemispherical spring steel bars on the hexagonal steel cage: a plurality of hemispherical steel springs 12 with spherical surfaces facing outwards are welded at intervals on the six faces of the hexagonal steel cage 5 located above the cylindrical concrete base 11, so that the hexagonal steel cage 5 located above the cylindrical concrete base 11 forms an elastic steel cage, and a small portion of the top of the side wall of the hexagonal steel cage 5 is not welded with the hemispherical steel springs 12; Step 7, making a steel cage sleeve with a hemispherical sleeve: use geotextile to make a cloth piece 14 to wrap the hexagonal steel cage 5, so that after the cloth piece 14 wraps the hexagonal steel cage 5 located on the top of the cylindrical concrete base 11, only a small part of the top of the hexagonal steel cage 5 is left unwrapped, and use geotextile to make a hemispherical wrapping cloth 13 for covering the hemispherical steel spring 12, according to the arrangement of the hemispherical steel spring 12, the corresponding position of the cloth piece 14 is dug and the hemispherical wrapping cloth 13 is sewn, so that the cloth piece 14 and the hemispherical wrapping cloth 13 are combined to form a steel cage sleeve 21, and a strip connecting cloth 15 is provided at the tail of the cloth piece 14, which is used for sealing after the steel cage sleeve 21 is sewn from head to tail in step 8; Step 8: Wrap the elastic steel cage with a steel cage sleeve: Wrap the steel cage sleeve 21 on the elastic steel cage, so that each hemispherical wrapping cloth 13 covers the outside of the corresponding hemispherical steel spring 12, and sew the head and tail seams of the steel cage sleeve 21; Step 9, sleeve the installation tube on the outside of the steel cage: make a placement tube 18 slightly larger than the diameter of the steel cage 21, apply a release agent inside the placement tube 18, and sleeve the placement tube 18 on the outside of the steel cage 21 using the tube cavity 17 provided therein to compress the multiple hemispherical steel springs 12, and collapse the multiple hemispherical wrapping cloths 13 in the gap between each surface of the hexagonal prism-shaped steel cage 5 and the circumscribed circular placement tube 18, and surround the side wall of the top of the placement tube 18 with multiple through holes 16, and each end of the cable B19 having the same number of through holes 16 is fixedly connected to the multiple through holes 16 respectively; Step 10, put the elastic steel cage with the installation tube into the installation pit: lift the other end of the cable A10 and the top of the placement tube 18, so that the elastic steel cage with the steel cage sleeve 21 and the placement tube 18 are vertically inserted into the pile pit 2, so that the bottom of the cylindrical concrete base 11 is in contact with the bottom of the pile pit 2, and the other end of the cable A10 is fixed to the upper part of the hexagonal steel cage 5. When the elastic steel cage with the steel cage sleeve 21 and the placement tube 18 are lifted into the pile pit 2, the main force point is at the other end of the cable A10, and lifting the top of the placement tube 18 mainly plays a role in straightening; Step 11, remove the installation tube to expand the hemispherical spring and get stuck in the cave: lift the placement tube 18, and under the lubrication of the cylindrical concrete base 11, the dead weight of the elastic steel cage and the release agent applied in the placement tube 18, the placement tube 18 gradually separates from the elastic steel cage, and a plurality of hemispherical steel springs 12 covered with hemispherical wrapping cloths 13 begin to elastically expand. Under the restriction of the inner wall of the pile pit 2, a plurality of hemispherical steel springs 12 covered with hemispherical wrapping cloths 13 cannot be fully expanded, and the hemispherical wrapping cloths 13 form an incompletely expanded wrapping cloth 20. The hemispherical steel springs 12 press the incompletely expanded wrapping cloth 20 against the inner wall of the pile pit 2. When encountering the cave 3 in the pile pit 2, the cave 3 cannot be covered with The hemispherical steel spring 12 of the hemispherical wrapping cloth 13 is restricted, so the hemispherical steel spring 12 covered with the hemispherical wrapping cloth 13 can be fully expanded, so that the hemispherical steel spring 12 covered with the hemispherical wrapping cloth 13 located at the karst cave 3 has a larger expansion area than the hemispherical steel spring 12 covered with the wrapping cloth 20 that is not fully expanded and is not located at the karst cave 3, forming an overall inconsistent outer diameter of the elastic steel cage, so that the hemispherical steel spring 12 covered with the hemispherical wrapping cloth 13 is stuck in the karst cave 3. After the placement cylinder 18 is hoisted, the multiple hemispherical steel springs 12 covered with the hemispherical wrapping cloth 13 begin to elastically expand, which has the effect of centering the elastic steel cage with the steel cage sleeve 21. Step 12, pouring concrete inside the elastic steel cage and drying to form: pouring concrete inside the elastic steel cage. Under the constraint of the steel cage sleeve 21, the concrete poured inside the elastic steel cage will not flow out until the elastic steel cage is filled. After drying, an irregular shaped concrete pile is formed. When pouring concrete inside the elastic steel cage, a vibrating tool is used to fill the concrete as much as possible, so that the steel cage sleeve 21 on the outside of the elastic steel cage can be expanded as much as possible.

[0020] Parts of the present invention not described in detail are prior art.

Claims

1. A concrete pile construction method suitable for underground multi-layer karst cave structures, Its characteristics are: The following steps are involved: Step 1: excavating a pile pit passing through a karst cave: excavating a pile pit (2) in an area where the pile pit needs to be excavated, so that the pile pit (2) passes through one or more karst caves (3) in the underground soil layer (1); Step 2: Making a hexagonal steel cage: welding a plurality of spaced hexagonal steel rings (4) and a plurality of spaced vertical steel bars (6) to form a hexagonal steel cage (5) of a desired length; Step 3: Making a tension support frame at the bottom of the hexagonal steel cage: setting a tension steel bar (8) with a hanging ring (7) at the top at the bottom of the hexagonal steel cage (5), and welding a support steel bar (9) between the tension steel bar (8) and the hexagonal steel ring (4) at the bottom of the hexagonal steel cage (5); Step 4: Make a concrete support at the bottom of the hexagonal steel cage: pour concrete at the bottom of the hexagonal steel cage (5) so that the tension steel bars (8) and the support steel bars (9) are placed inside the concrete, and the concrete wraps the bottom of the hexagonal steel cage (5) to form a vertical cylindrical structure. After the cylindrical concrete base (11) is dry, one end of the cable A (10) is inserted into the hexagonal steel cage (5) along the top of the hexagonal steel cage (5) and fixed to the hanging ring (7); Step 5: Making hemispherical spring steel bars: using steel bars to make hemispherical steel springs (12) with a spiral structure, wherein the diameter of the hemispherical steel springs (12) is slightly narrower than the width of each face of the hexagonal steel cage (5); Step 6: Welding hemispherical spring steel bars on the hexagonal steel cage: Welding a plurality of hemispherical steel springs (12) with the spherical surface facing outwards on the six surfaces of the hexagonal steel cage (5) located above the cylindrical concrete base (11) at intervals, so that the hexagonal steel cage (5) located above the cylindrical concrete base (11) forms an elastic steel cage; Step 7, making a steel cage sleeve with a hemispherical sleeve: using geotextile to make a cloth sheet (14) for wrapping the hexagonal steel cage (5), so that after the cloth sheet (14) wraps the hexagonal steel cage (5) located on the top of the cylindrical concrete base (11), only a small part of the top of the hexagonal steel cage (5) is left unwrapped, using geotextile to make a hemispherical wrapping cloth (13) for covering the hemispherical steel spring (12), according to the arrangement of the hemispherical steel spring (12), holes are dug at corresponding positions of the cloth sheet (14) and the hemispherical wrapping cloth (13) is sewn, so that the cloth sheet (14) and the hemispherical wrapping cloth (13) are combined to form a steel cage sleeve (21); Step 8: Wrap the elastic steel cage with a steel cage sleeve: Wrap the steel cage sleeve (21) on the elastic steel cage so that each hemispherical wrapping cloth (13) covers the outside of the corresponding hemispherical steel spring (12), and sew the beginning and end seams of the steel cage sleeve (21); Step 9, sleeve the installation tube on the outside of the steel cage: make a placement tube (18) slightly larger than the diameter of the steel cage (21), apply a release agent inside the placement tube (18), and sleeve the placement tube (18) on the outside of the steel cage (21) using the tube cavity (17) provided therein so that the multiple hemispherical steel springs (12) are compressed and the multiple hemispherical wrapping cloths (13) collapse in the gap between each surface of the hexagonal steel cage (5) and the circumscribed circular placement tube (18); Step 10: Place the elastic steel cage with the installation tube in the installation pit: lift the other end of the cable A (10) and the top of the installation tube (18), so that the elastic steel cage with the steel cage sleeve (21) and the installation tube (18) are vertically inserted into the pile pit (2), so that the bottom of the cylindrical concrete base (11) is in contact with the bottom of the pile pit (2), and the other end of the cable A (10) is fixed to the upper part of the hexagonal steel cage (5); Step 11, remove the installation tube to expand the hemispherical spring and get stuck in the cave: lift the placement tube (18), and under the lubrication of the cylindrical concrete base (11), the deadweight of the elastic steel cage and the release agent applied in the placement tube (18), the placement tube (18) gradually separates from the elastic steel cage, and the plurality of hemispherical steel springs (12) covered with hemispherical wrapping cloths (13) begin to elastically expand. Under the restriction of the inner wall of the pile pit (2), the plurality of hemispherical steel springs (12) covered with hemispherical wrapping cloths (13) cannot be fully expanded, and the hemispherical wrapping cloth (13) forms an incompletely expanded wrapping cloth (20). The hemispherical steel spring (12) presses the incompletely expanded wrapping cloth (20) against the inner wall of the pile pit (2). On the inner wall, when encountering a karst cave (3) in the pile pit (2), since the karst cave (3) cannot restrict the hemispherical steel spring (12) covered with the hemispherical wrapping cloth (13), the hemispherical steel spring (12) covered with the hemispherical wrapping cloth (13) can be fully expanded, so that the hemispherical steel spring (12) covered with the hemispherical wrapping cloth (13) located in the karst cave (3) has a larger expansion area than the hemispherical steel spring (12) covered with the incompletely expanded wrapping cloth (20) not located in the karst cave (3), resulting in an overall inconsistent outer diameter of the elastic steel cage, so that the hemispherical steel spring (12) covered with the hemispherical wrapping cloth (13) is stuck in the karst cave (3); Step 12: Pour concrete into the elastic steel cage and dry it to form: Pour concrete into the elastic steel cage. Under the constraint of the steel cage sleeve (21), the concrete poured into the elastic steel cage will not flow out until the elastic steel cage is filled. After drying, an irregular-shaped concrete pile is formed.

2. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: In step 1, the excavation shape of the pile pit (2) is close to a cylindrical shape.

3. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: In step 2, a plurality of vertical steel bars (6) arranged at intervals are arranged around the outside of a plurality of hexagonal steel bar rings (4) arranged at intervals and are arranged at equal intervals.

4. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: In step 3, the supporting steel bars (9) between the pulling steel bars (8) and the hexagonal steel bar ring (4) located at the bottom of the hexagonal steel bar cage (5) are multiple and are arranged around the pulling steel bars (8).

5. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: In step 6, a small portion of the top of the side wall of the hexagonal prism-shaped steel cage (5) is not welded with the hemispherical steel spring (12).

6. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: In step seven, a strip of connecting cloth (15) is arranged at the tail of the cloth piece (14) to achieve a sealing effect after the steel cage (21) is sewn together from head to tail in step eight.

7. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: In step nine, a plurality of through holes (16) are arranged around the side wall of the top of the placing tube (18), and one end of each cable B (19) having the same number of through holes (16) is fixedly connected to the plurality of through holes (16).

8. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: When the elastic steel cage with the steel cage sleeve (21) and the placing tube (18) are hoisted into the pile pit (2) in step 10, the main force point is at the other end of the cable A (10), and the top of the placing tube (18) is hoisted to play a main role in straightening.

9. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: After the placing cylinder (18) is lifted in step eleven, the plurality of hemispherical steel springs (12) covered with hemispherical wrapping cloths (13) begin to elastically expand, thereby achieving the effect of centering the elastic steel cage covered with the steel cage sleeve (21).

10. The concrete pile construction method applicable to underground multi-layer karst cave structure according to claim 1, Its characteristics are: In step 12, when pouring concrete inside the elastic steel cage, a vibrating tool is used to fill the concrete as compactly as possible, so that the steel cage sleeve (21) covered on the outside of the elastic steel cage can be expanded as much as possible.