Suspended ceiling non-coplanar bent plate mounting structure and mounting method
By adopting the design of bent plate structure and hook-shaped pendant in the ceiling, combined with the barrier function of elastic parts and keels, the efficient installation of ceiling panels is achieved, solving the installation efficiency and quality problems, and improving the installation fluency and convenience of the installation .
Patent Information
- Application Number
- CN202411118435.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the installation of the ceiling, sufficient operating space is required for the installation of the high-position plate, connecting plate and low-position plate parts, resulting in assembly deviations and affecting the installation efficiency and quality.
The bending plate structure is adopted, and the hook-shaped hanging parts are formed through horizontal and vertical members, and the keel is mounted as a whole. The barrier effect of elastic parts and keels is used to achieve stable installation of the bending plate, and the installation is improved through the insertion rod and lock parts. Disassembly efficiency.
It improves the installation efficiency and quality of the suspended ceiling, ensures accurate positioning and stable connection of the plates, simplifies the installation process, and enhances the installation fluency and convenience.
Smart Images

Figure CN118979583A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of interior decoration, and in particular to an installation structure and an installation method of a dropped ceiling bent plate. Background Art
[0002] Split-level ceiling is a new type of ceiling and a new industry. The main application of this ceiling design is to enhance the sense of space in house decoration and improve the overall aesthetic taste of the room.
[0003] In the related art, the staggered part of the suspended ceiling is mainly composed of a high plate, a connecting plate and a low plate connected in sequence. All three are hung on the keel at the inner wall of the roof through steel structure hangers and assembled with each other to form a staggered suspended ceiling structure.
[0004] With regard to the above-mentioned related technologies, the following defects exist: when installing the high-position panels, connecting panels and low-position panels, they are all installed by hooking, which requires sufficient operating space. The panels that have been in place will compress the installation space of subsequent panels, making positioning difficult and prone to assembly deviations, which will affect the installation efficiency and quality of the suspended ceiling. Therefore, there is still room for improvement. Summary of the invention
[0005] In order to improve the installation efficiency and quality of the suspended ceiling, the present application provides a suspended ceiling stepped bent plate installation structure and an installation method.
[0006] The present application provides a ceiling step-down bending plate installation structure and installation method using the following technical solutions: The two cams are connected by a spring, and the ...
[0007] By adopting the above technical scheme, two horizontal plates distributed up and down are connected on both sides of the connecting plate to form a bending plate, and the bending plate is installed as a whole. At the same time, horizontal components and vertical components are used to form a hook-shaped hanger to cooperate with the keel to hang the bending plate in place. Since the horizontal component can rotate relative to the vertical component, when the horizontal component is blocked by the keel, it can swing under the squeezing action of the keel to avoid the keel. Driven by the elastic component, it can be restored to a horizontal state and horizontally arranged above the keel. By lowering the bending plate, the hook-shaped hanger formed by the vertical component and the horizontal component is hooked on the keel, thereby completing the installation of the bending plate. The overall installation of the bending plate is beneficial to improving the installation efficiency and quality of the suspended ceiling.
[0008] Preferably, one end of the horizontal member away from the vertical member is hook-shaped, and the hook portion of the horizontal member is used for hooking with the keel.
[0009] By adopting the above technical solution, the hook portion of the horizontal member is hooked to the keel, which is beneficial to improving the connection stability between the bent plate and the keel.
[0010] Preferably, the vertical member is provided with a receiving groove along the horizontal direction, and when the vertical member and the horizontal member are in a folded state, the hook portion of the horizontal member is received in the receiving groove.
[0011] By adopting the above technical solution, a receiving groove is opened on one side of the vertical component. When the bending plate is installed, the horizontal component is squeezed by the keel and folded toward the vertical component. The receiving groove provides a receiving space for the hook of the horizontal component, so that the downward swing angle of the vertical rod is larger, which is conducive to the horizontal component to smoothly pass over the keel, thereby improving the smoothness of installation.
[0012] Preferably, the accommodating groove extends along the length direction of the vertical member, and when the vertical member and the horizontal member are in a folded state, the horizontal member is accommodated in the accommodating groove.
[0013] By adopting the above technical solution, when installing the bending plate, the horizontal component is squeezed by the keel and folded toward the vertical component. The accommodating groove provides an accommodating space for the entire horizontal component so that during the installation of the bending plate, the vertical component can slide in line with the keel, which is conducive to improving the smoothness of installation.
[0014] Preferably, a vertical slot is provided on the upper surface of the horizontal plate, the lower end of the vertical member is inserted into the vertical slot, a locking piece is provided between the vertical member and the horizontal plate, and the vertical member is detachably connected to the horizontal plate via the locking piece.
[0015] By adopting the above technical solution, the vertical slot has a positioning effect on the vertical component, and adopts a plug-in method and is locked by a locking piece to achieve the purpose of detachable connection, which is beneficial to improving the assembly efficiency of the bending plate and the vertical component.
[0016] Preferably, a horizontal slot is provided on one side of the horizontal plate, and the horizontal slot is connected to the vertical slot. A connecting slot is provided horizontally through the lower end of the vertical member. When the vertical member is inserted into the vertical slot, the connecting slot is aligned with the horizontal slot. The locking element is an insertion rod, and the insertion rod passes through the horizontal slot and the connecting slot in sequence to detachably connect the vertical member to the horizontal plate.
[0017] By adopting the above technical solution, an insertion rod is used as a locking piece, and the rod is passed through the horizontal slot on the side of the horizontal plate and the connecting slot of the vertical member in sequence, so that the vertical member is locked on the horizontal plate. The locking is performed by plugging in, which facilitates the assembly and disassembly efficiency of the vertical member and the bent plate, and facilitates the replacement of the bent plate.
[0018] Preferably, a pull ring is provided at one end of the insertion rod close to the opening of the horizontal slot.
[0019] By adopting the above technical solution, the pull ring provides a force point for the installer. When replacing the bending plate, the installer can pull out the wiper rod by pulling the pull ring, which is conducive to improving the convenience of disassembly and assembly of the bending plate installation structure.
[0020] A method for installing a ceiling step-down bending plate installation structure comprises the following steps: S1: Assembling the bent plate structure: inserting a number of vertical components into the corresponding vertical slots of the horizontal plate one by one, and passing the insertion rods through the horizontal slots and the connecting slots in sequence, and installing the vertical components on the horizontal plate; S2: Installing the bending plate structure: When installing the bending plate, move the bending plate upward toward the keel position. The keel is located directly above the horizontal member. The horizontal member contacts the lower surface of the keel while following the bending plate to move upward synchronously. The horizontal member swings downward toward the vertical member under the blocking effect of the keel, and the horizontal member and the vertical member are folded. The horizontal member slides over the side of the keel. When the position of the horizontal member is higher than the keel, the horizontal member restores to a horizontal state under the elastic force of the elastic member and is horizontally arranged above the keel. Then the bending plate is lowered. The bending plate is hooked on the keel through a hook-shaped hanger formed by the vertical member and the horizontal member.
[0021] By adopting the above technical scheme, the integrally installed bending plate can swing under the squeezing action of the keel when the horizontal component is obstructed by the keel, thereby avoiding the keel. Driven by the elastic member, it can be restored to a horizontal state and horizontally arranged above the keel. By lowering the bending plate, the hook-shaped hanger formed by the vertical component and the horizontal component is hooked on the keel, thereby completing the installation of the bending plate, which is beneficial to improving the installation efficiency and quality of the suspended ceiling.
[0022] Preferably, in S1, an assembly rack is used to assemble the bent plate structure, the assembly rack includes a base and a lifting seat arranged on the base, and a pushing mechanism is arranged on the base and the lifting seat; when assembling the bent plate structure, the horizontal plate located at the bottom is placed horizontally on the upper surface of the base, and the horizontal plate located at the top is placed horizontally on the upper surface of the lifting seat, and after the vertical member is inserted into the corresponding vertical slot, the insertion rod passes through the horizontal slot and the connecting groove of the vertical member in sequence under the pushing action of the pushing mechanism.
[0023] By adopting the above technical solution, the two horizontal plates of the bending plate are kept stable under the support of the base and the lifting seat respectively, and the plugging of the plug rods is completed by using the pushing mechanism, which is beneficial to improving the assembly efficiency of the bending plate.
[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. The bending plate is formed by connecting the connecting plate and two horizontal plates, and the hook-shaped hanger is formed by the horizontal member and the vertical member to cooperate with the keel to hang the bending plate in place as a whole. During the installation process, when the horizontal member is blocked by the keel, it can swing under the squeezing action of the keel to avoid the keel. Driven by the elastic member, it can be restored to a horizontal state and horizontally arranged above the keel. By lowering the bending plate, the hook-shaped hanger formed by the vertical member and the horizontal member is hooked on the keel, thereby completing the installation of the bending plate, which is conducive to improving the installation efficiency and quality of the suspended ceiling; 2. By using a plug rod as a locking piece, the rod passes through the horizontal slot on the side of the horizontal plate and the connecting slot of the vertical member in sequence, so as to lock the vertical member on the horizontal plate. The plug-in method is used for locking, so as to facilitate the assembly and disassembly efficiency of the vertical member and the bent plate, and to facilitate the replacement of the bent plate; 3. By using the assembly frame to assemble the bent plate, the two horizontal plates of the bent plate are kept stable under the support of the base and the lifting seat respectively, and the plug-in work of the plug rod is completed by the push mechanism, which is beneficial to improve the assembly efficiency of the bent plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a schematic diagram of the state of a ceiling step-down bending plate installation structure after installation is completed in an embodiment of the present application.
[0026] Figure 2 It is a schematic diagram of the connection between vertical components and horizontal components in a ceiling step-down bending plate installation structure in an embodiment of the present application.
[0027] Figure 3 It is an exploded schematic diagram of a ceiling stepped bending plate installation structure according to an embodiment of the present application.
[0028] Figure 4It is a structural schematic diagram of an insertion rod in a ceiling step-down bending plate installation structure according to an embodiment of the present application.
[0029] Figure 5 It is a schematic diagram of the state in which horizontal components and vertical components are folded during the installation of a ceiling step-down bending plate installation structure in an embodiment of the present application.
[0030] Figure 6 It is a schematic diagram of the state when a bending plate is assembled using an assembly rack in an installation method of a ceiling step-down bending plate installation structure according to an embodiment of the present application.
[0031] Explanation of the accompanying drawings: 1. hanging rod; 2. keel; 3. bending plate; 31. horizontal plate; 311. vertical slot; 312. horizontal slot; 32. connecting plate; 4. hook-shaped hanger; 41. vertical member; 411. accommodating slot; 412. elastic member; 413. connecting slot; 42. horizontal member; 5. insertion rod; 51. pull ring; 6. base; 7. vertical cylinder; 8. lifting seat; 9. horizontal cylinder. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-6 This application is described in further detail.
[0033] The present application embodiment discloses a ceiling step-down bending plate installation structure, referring to Figure 1 and Figure 2 , including a connecting plate 32 and two horizontal plates 31 respectively fixed at the upper and lower ends of the connecting plate 32, and the angle between the horizontal plate 31 and the connecting plate 32 is a right angle. The two horizontal connecting plates 32 are respectively placed on both sides of the connecting plate 32, and the two horizontal plates 31 are connected to the connecting plate 32 to form a bending plate 3. Among them, a vertical component 41 is vertically installed at the middle position of the upper surface of the two horizontal plates 31, and the upper end of the vertical component 41 is rotatably connected to the horizontal component 42. An elastic member 412 is arranged between the vertical component 41 and the horizontal component 42. The rotating shaft of the horizontal component 42 is parallel to the horizontal plate 31, and the vertical component 41 and the horizontal component 42 constitute a hook-shaped hanger 4. The hook-shaped hanger 4 is used to hook with the keel 2 used in conjunction with the bending plate 3. The hook-shaped hangers 4 of the two horizontal plates 31 correspond to the two keels 2 respectively, and the two keels 2 are longitudinally suspended below the inner wall of the roof through the hanging rod 1, one high and one low.
[0034] When installing the bending plate 3, the horizontal member 42 moves up synchronously with the bending plate 3, the keel 2 is located in the moving path of the horizontal member 42, and the horizontal member 42 swings down toward the vertical member under the blocking effect of the keel 2, so that the horizontal member 42 and the vertical member 41 are folded. When the horizontal member 42 passes over the keel 2 from the side, the horizontal member 42 returns to a horizontal state under the elastic force of the elastic member 412 and is horizontally arranged above the keel 2, and the bending plate 3 is hooked on the keel 2 through the hook-shaped hanging member 4 formed by the vertical member 41 and the horizontal member 42. Thus, the installation of the bending plate 3 is completed, and the use of the integral installation of the bending plate 3 is conducive to improving the installation efficiency and installation quality of the suspended ceiling.
[0035] Specifically, the vertical member 41 is provided with a receiving groove 411 in the horizontal direction, and the receiving groove 411 extends in the length direction of the vertical member 41. The rotation axis of the horizontal member 42 is located at the upper position in the receiving groove 411, and the end of the horizontal member 42 away from the vertical member 41 is hook-shaped. The elastic member 412 is specifically a torsion spring, which is installed at the rotation axis. Under the elastic action of the torsion spring, the upper surface of the horizontal member 42 abuts against the inner top wall of the receiving groove 411. At this time, the horizontal member 42 is in an initial state, the horizontal member 42 and the vertical member 41 are perpendicular to each other, and the hook of the horizontal member 42 is set downward.
[0036] When the vertical member 41 and the horizontal member 42 are in the folded state, the torsion spring is twisted, and the hook portion of the horizontal member 42 passes through the receiving groove 411 and is received in the receiving groove 411, and the entire horizontal member 42 is received in the receiving groove 411. The receiving groove 411 provides a receiving space for the hook portion of the horizontal member 42, so that the downward swing angle of the vertical rod is larger, which is conducive to the horizontal member 42 to smoothly pass over the keel 2, thereby improving the smoothness of installation.
[0037] Reference Figure 3 In this embodiment, a vertical slot 311 is provided on the upper surface of the horizontal plate 31, and the lower end of the vertical member 41 is inserted into the vertical slot 311, and the vertical slot 311 has a positioning effect on the vertical member 41. A locking piece is provided between the vertical member 41 and the horizontal plate 31, and the vertical member 41 is detachably connected to the horizontal plate 31 through the locking piece. Specifically, a horizontal slot 312 is horizontally provided on one side of the horizontal plate 31, and the horizontal slot 312 is connected to the vertical slot 311. A connecting groove 413 is horizontally provided through the lower end of the vertical member 41, and when the lower end of the vertical member 41 is inserted into the vertical slot 311, the connecting groove 413 is aligned with the horizontal slot 312. The locking piece is a plug rod 5, and the plug rod 5 detachably connects the vertical member 41 to the horizontal plate 31 by passing through the horizontal slot 312 and the connecting slot 413 in sequence. The locking is performed by plugging, so that the vertical member 41 and the bending plate 3 can be assembled and disassembled efficiently, and the bending plate 3 can be replaced easily.
[0038] Reference Figure 4In order to facilitate the installation personnel to disassemble the bending plate 3, a pull ring 51 is hinged at one end of the insertion rod 5 close to the opening of the horizontal slot 312. When replacing the bending plate 3, the installer can pull out the wiping rod by pulling the pull ring 51, which is conducive to improving the convenience of disassembly and assembly of the installation structure of the bending plate 3.
[0039] The present application also discloses a method for installing a ceiling step-down bending plate installation structure. Figure 5 and Figure 6 , including the following steps: S1: Assembling the bending plate structure: The assembly rack is used to assemble the bending plate 3 structure, wherein the assembly rack includes a base 6 and a lifting seat 8 arranged on the base 6, and the base 6 is equipped with rollers and can be moved. The lifting seat 8 is lifted and lowered by a vertical cylinder 7, and the height of the lifting seat 8 can be adjusted according to the height difference between the two horizontal plates 31 in the bending plate 3. When assembling the bending plate 3 structure, the horizontal plate 31 located at the bottom is horizontally placed on the upper surface of the base 6, and the horizontal plate 31 located at the top is horizontally placed on the upper surface of the lifting seat 8, so that the bending plate 3 remains stable under the support of the base 6 and the lifting seat 8.
[0040] In addition, a pushing mechanism is installed on the base 6 and the lifting seat 8, and the pushing mechanism is specifically a horizontal cylinder 9. When the bending plate 3 is in place on the assembly frame, the horizontal cylinder 9 is directly opposite to the opening position of the horizontal slot 312. After the installer inserts a number of vertical components 41 into the corresponding vertical slots 311 in sequence, the insert rod 5 is horizontally placed in the bracket between the horizontal cylinder 9 and the horizontal plate 31. The bracket is used to position the insert rod 5, and the bracket is not shown in the figure. By starting the horizontal cylinder 9, the insert rod 5 passes through the horizontal slot 312 and the connecting groove 413 of the vertical component 41 in sequence under the pushing action of the cylinder. Thereby, the vertical component 41 is installed on the horizontal plate 31.
[0041] S2: Installing the bending plate structure: When installing the bending plate 3, move the bending plate 3 upward toward the position of the keel 2. The keel 2 is located directly above the horizontal member 42. The horizontal member 42 contacts the lower surface of the keel 2 while following the bending plate 3 to move upward synchronously. The horizontal member 42 swings downward toward the vertical member 41 under the blocking effect of the keel 2. The horizontal member 42 and the vertical member 41 are folded. The horizontal member 42 is completely received in the accommodating groove 411. The vertical members 41 on the two horizontal plates 31 slide over the inner side surfaces of the corresponding keels 2 at the same time. At this time, the vertical members 41 of the two horizontal plates 31 are both located on the side of the two keels 2 that are close to each other, thereby limiting the left and right movement of the bending plate 3, which is conducive to the precise installation of the bending plate 3.
[0042] When the position of the horizontal member 42 is higher than the keel 2, the horizontal member 42 returns to a horizontal state under the elastic force of the torsion spring and is horizontally arranged above the keel 2, and then the bending plate 3 is lowered, and the hook of the horizontal hook is hooked on the corresponding keel 2, so that the bending plate 3 is hooked on the keel 2 through the hook-shaped hanging member 4 formed by the vertical member 41 and the horizontal member 42. Thus, the installation of the bending plate 3 is completed, which is conducive to improving the installation efficiency and quality of the suspended ceiling.
[0043] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A ceiling step-down bending plate installation structure, characterized in that: The invention comprises a connecting plate (32) and two horizontal plates (31) respectively arranged at the upper and lower ends of the connecting plate (32), the two horizontal connecting plates (32) are respectively arranged on both sides of the connecting plate (32), the two horizontal plates (31) and the connecting plate (32) are connected to form a bending plate (3), the upper surfaces of the two horizontal plates (31) are vertically provided with vertical components (41), the upper ends of the vertical components (41) are rotatably connected with the horizontal components (42), an elastic member (412) is arranged between the vertical component (41) and the horizontal component (42), the rotating shaft of the horizontal component (42) is parallel to the horizontal plate (31), the vertical component (41) and the horizontal component (42) form a hook-shaped hanging member (4), and the hook The hook-shaped hanging piece (4) is used to hook with the keel (2) used in conjunction with the bending plate (3); when the bending plate (3) is installed, the horizontal member (42) moves up synchronously with the bending plate (3), the keel (2) is located in the moving path of the horizontal member (42), the horizontal member (42) swings down under the blocking effect of the keel (2), and the horizontal member (42) and the vertical member (41) are folded; when the horizontal member (42) passes over the keel (2), the horizontal member (42) returns to a horizontal state under the elastic force of the elastic member (412) and is horizontally arranged above the keel (2), and the bending plate (3) is hooked on the keel (2) through the hook-shaped hanging piece (4) formed by the vertical member (41) and the horizontal member (42).
2. A ceiling step-down bending plate installation structure according to claim 1, characterized in that: One end of the horizontal member (42) away from the vertical member (41) is hook-shaped, and the hook portion of the horizontal member (42) is used to be hooked with the keel (2).
3. A ceiling step-down bending plate installation structure according to claim 2, characterized in that: The vertical component (41) is provided with a receiving groove (411) along the horizontal direction. When the vertical component (41) and the horizontal component (42) are in a folded state, the hook portion of the horizontal component (42) is received in the receiving groove (411).
4. The ceiling step-down bending plate installation structure according to claim 2 is characterized in that: The accommodating groove (411) extends along the length direction of the vertical component (41); when the vertical component (41) and the horizontal component (42) are in a folded state, the horizontal component (42) is accommodated in the accommodating groove (411).
5. The ceiling step-down bending plate installation structure according to claim 1 is characterized in that: A vertical slot (311) is provided on the upper surface of the horizontal plate (31), and the lower end of the vertical member (41) is inserted into the vertical slot (311). A locking member is provided between the vertical member (41) and the horizontal plate (31), and the vertical member (41) is detachably connected to the horizontal plate (31) via the locking member.
6. A ceiling step-down bending plate installation structure according to claim 5, characterized in that: A horizontal slot (312) is provided on one side of the horizontal plate (31), and the horizontal slot (312) is communicated with the vertical slot (311). A connecting slot (413) is provided horizontally through the lower end of the vertical member (41). When the vertical member (41) is inserted into the vertical slot (311), the connecting slot (413) is aligned with the horizontal slot (312). The locking element is an insertion rod (5), and the insertion rod (5) passes through the horizontal slot (312) and the connecting slot (413) in sequence, so as to detachably connect the vertical member (41) to the horizontal plate (31).
7. The ceiling step-down bending plate installation structure according to claim 6 is characterized in that: A pull ring (51) is provided at one end of the insertion rod (5) close to the opening of the horizontal slot (312).
8. A method for installing the ceiling step-down bending plate installation structure according to claim 6, characterized in that: The following steps are involved: S1: Assembling the bending plate (3) structure: inserting a plurality of vertical components (41) into the corresponding vertical slots (311) of the horizontal plate (31) one by one, and inserting the insertion rod (5) through the horizontal slots (312) and the connecting slots (413) in sequence, and installing the vertical components (41) on the horizontal plate (31); S2: Installation of the bending plate (3) structure: When installing the bending plate (3), the bending plate (3) is moved upward toward the position of the keel (2), and the keel (2) is located directly above the horizontal member (42). The horizontal member (42) contacts the lower surface of the keel (2) while following the bending plate (3) to move upward synchronously. The horizontal member (42) is swung downward toward the vertical member (41) under the blocking effect of the keel (2), and the horizontal member (42) and the vertical member (41) are folded; the horizontal member (42) slides over the side of the keel (2), and when the position of the horizontal member (42) is higher than the keel (2), the horizontal member (42) is restored to a horizontal state under the elastic force of the elastic member (412) and is horizontally arranged above the keel (2), and then the bending plate (3) is lowered, and the bending plate (3) is hooked on the keel (2) through the hook-shaped hanging member (4) formed by the vertical member (41) and the horizontal member (42).
9. The method for installing the ceiling step-down bending plate installation structure according to claim 8, characterized in that: In the above S1, an assembly rack is used to assemble the bending plate (3) structure, the assembly rack comprising a base (6) and a lifting seat (8) arranged on the base (6), and a pushing mechanism is arranged on the base (6) and the lifting seat (8); when assembling the bending plate (3) structure, the horizontal plate (31) located at the bottom is horizontally placed on the upper surface of the base (6), and the horizontal plate (31) located at the top is horizontally placed on the upper surface of the lifting seat (8), and after the vertical member (41) is inserted into the corresponding vertical slot (311), the insertion rod (5) passes through the horizontal slot (312) and the connecting slot (413) of the vertical member (41) in sequence under the pushing action of the pushing mechanism.
