Assembled portable hydraulic jumbolter
By designing the guide and stability mechanism in the hydraulic anchor drilling rig, the problems of loading and unloading of the hoops and poor stability of the guide frame are solved, and the rapid fixing and stability of the guide frame is achieved, adapting to the drilling needs of different rock heights and improving the improvement of the guide frame. Drilling efficiency and construction safety.
Patent Information
- Application Number
- CN202410889917.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-11-19
AI Technical Summary
The existing hydraulic anchor drilling rigs are troublesome to hold the hoop during the upward drilling process, which affects the drilling efficiency. When the guide bracket is placed on the ground, the top cannot be contacted with the rock mass, and the stability is poor.
A lightweight hydraulic anchor drill rig that can be assembled is designed, including mounting frame, handle, thread, guide mechanism and stabilization mechanism, to improve the stability of the guide frame through the guide mechanism, and realize the guide frame through the extension mechanism and the positioning mechanism. Flexible splicing and stable support.
The guide frame is fast and conveniently fixed and stable, which improves drilling efficiency, and can be automatically adjusted according to the height of different rock masses to ensure that the guide frame is in close contact with the rock masses, and ensures construction safety and structural stability.
Smart Images

Figure CN118979704A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of hydraulic anchor drilling rigs, in particular to an assembleable lightweight hydraulic anchor drilling rig. Background Art
[0002] Hydraulic anchor drilling rig is a drilling equipment driven by hydraulic technology. It is widely used in mining, tunnel construction, underground engineering and various infrastructure construction. It is mainly used for drilling anchor holes in rocks or soil layers to install anchors to support and reinforce surrounding rocks to ensure construction safety and structural stability.
[0003] In the existing hydraulic anchor drilling rig, during the upward drilling process, the worker holds the handle to make the drill bit drill upward stably. When the rock to be drilled is high, a clamp is used to connect the drilling rig to the guide frame for upward drilling. However, the clamp is troublesome to load and unload, which affects the drilling efficiency. When the guide frame is placed on the ground, the top cannot be guaranteed to contact the rock, and the placement stability is poor, which easily affects the guidance of the drilling rig.
[0004] Therefore, a portable hydraulic anchor drilling rig has been developed that can be quickly and conveniently fixed on a guide frame and can improve the stability of the guide frame during upward drilling. Summary of the invention
[0005] In order to overcome the shortcomings of the existing hydraulic anchor drilling rig, that is, when guided by a guide frame, it is troublesome to load and unload the clamp, which affects the drilling efficiency, and that when the guide frame is placed on the ground, the top cannot be guaranteed to be in contact with the rock mass, resulting in poor placement stability, the present invention provides a assembleable lightweight hydraulic anchor drilling rig that can be quickly and conveniently fixed on the guide frame and can improve the stability of the guide frame during upward drilling.
[0006] The technical solution is as follows: a portable hydraulic anchor drill rig that can be assembled, including a mounting frame, a handle, a thread, a hydraulic anchor drill rig, a guide mechanism and a stabilizing mechanism. The front side of the mounting frame is rotatably connected to the handle, the rear side of the mounting frame is connected to the hydraulic anchor drill rig, the upper side of the hydraulic anchor drill rig is rotatably provided with a thread, the mounting frame is provided with a guide mechanism that can guide the hydraulic anchor drill rig, and the guide mechanism is provided with a stabilizing mechanism that can improve the guiding stability.
[0007] Optionally, a rubber pad is provided on the handle.
[0008] Optionally, a placement frame is provided on the upper portion of the hydraulic anchor drilling rig.
[0009] Optionally, the threaded buckle is provided with threads.
[0010] Optionally, the guide mechanism includes an alignment member, an alignment frame, a sliding clamping member, a first spring, a guide frame, a docking member and a support frame. The mounting frame is connected to the alignment member at the rear side, the alignment member is clamped on the alignment member, the left and right sides of the alignment frame are slidably connected to the sliding clamping member, and the sliding clamping member is connected to the alignment frame with two upper and lower first springs. The rear of the alignment frame is slidably detachably connected to the guide frame, the upper part of the guide frame is detachably connected to the docking member by bolts, the upper part of the docking member is also detachably connected to the guide frame by bolts, and the lower part of the guide frame on the lower side is detachably connected to the support frame by bolts. The frame is placed on the ground, and the guide frame is spliced by docking pieces and bolts according to the height of the rock mass, and then the guide frame at the bottom is spliced with the support frame by bolts. After the splicing is completed, the support frame is placed on the ground, and then the sliding clamping piece is pulled backward, the first spring is squeezed and contracted, and the alignment frame is pushed into the alignment piece, and then the sliding clamping piece is released, and the first spring rebounds, so that the sliding clamping piece moves to the docking point between the alignment piece and the alignment frame, so that the alignment piece and the alignment frame are fixed, and the hydraulic anchor drilling rig drives the alignment piece to move while drilling, so that the alignment frame moves on the guide frame.
[0011] Optionally, the diameter of the docking piece is smaller than that of the guide frame.
[0012] Optionally, the stabilizing mechanism includes a second fixed frame, a second rotating frame, a pushing frame, a sliding connection piece, a guide rod, a sliding frame, a sliding sleeve and a third spring, the upper side of the upper guide frame is connected to the second fixed frame, the outer side of the second fixed frame is rotatably connected to a plurality of second rotating frames, the upper part of the second rotating frame is rotatably connected to the pushing frame, the lower part of the pushing frame is rotatably connected to the sliding connection piece, the lower side of the second fixed frame is connected to a plurality of guide rods, the outer side of the upper part of the upper guide frame is slidably connected to the sliding frame, the outer side of the sliding frame is connected to a plurality of sliding sleeves, and the guide rods are connected to adjacent sliding The sleeve is slidably connected, and the sliding connecting parts are slidably connected to the adjacent sliding sleeves. A third spring is connected between the sliding connecting parts and the sliding frame. When the positioning frame moves upward to the sliding frame, the sliding frame is pushed to move upward, and then the sliding sleeve is pushed to move upward along the guide rod. The sliding connecting part is moved upward by the force of the third spring, so that the pushing frame rotates, and the second rotating frame is pushed to rotate upward and contact the rock mass. When the sliding frame continues to move upward, the sliding connecting part moves downward relative to the sliding sleeve, and the third spring is squeezed and contracted, so that the second rotating frame is close to the rock mass.
[0013] Optionally, an extension mechanism is also included, the extension mechanism includes a connecting ring, a first fixed frame, a first rotating frame, a mounting ring and a locking column. The connecting ring is connected to the outer side of the lower part of the hydraulic anchor drilling rig, and multiple first fixed frames are connected to the outer side of the connecting ring. The first fixed frame is rotatably connected to the first rotating frame. The mounting ring is located on the outer side of the upper part of the hydraulic anchor drilling rig, and multiple locking columns are connected to the inner side of the mounting ring. The upper part of the first rotating frame is locked with adjacent locking columns. When the height of the rock mass to be drilled is high, the mounting ring is rotated to disengage the locking column from the first rotating frame, and then the first rotating frame is rotated downward to be perpendicular to the ground, and then the mounting ring is slid downward to the bottom of the first rotating frame, and then the mounting ring is rotated to make the locking column re-engaged with the first rotating frame, and the hydraulic anchor drilling rig is raised by supporting it on the ground through the mounting ring.
[0014] Optionally, the positioning columns are all arc-shaped.
[0015] Optionally, a locking mechanism is also included, which includes a sliding rod, a latch and a second spring. The upper part of the first rotating frame is slidably connected to the sliding rod, and the upper side of the sliding rod is connected to the latch. The latch is engaged with adjacent locking columns, and the second spring is connected between the sliding rod and the connected first rotating frame. When the first rotating frame is engaged with the locking column, the sliding rod is pulled inward to move and contract, and the second spring is squeezed and contracted. After the first rotating frame is engaged with the locking column, the sliding rod is released and the second spring rebounds, so that the latch is engaged with the locking column.
[0016] The beneficial effects of the present invention are as follows: 1. The present invention pushes the alignment frame into the alignment part, then releases the sliding clamping part, and the first spring rebounds, so that the sliding clamping part moves to the docking point between the alignment part and the alignment frame, so that the mounting frame can be quickly and conveniently fixed on the guide frame; the alignment frame moves upward to push the sliding frame upward, and then pushes the sliding sleeve upward, so that the sliding connecting part moves upward, so that the pushing frame rotates, and pushes the second rotating frame to rotate upward and contact the rock mass, so as to improve the stability of the guide frame.
[0017] 2. The present invention rotates the first rotating frame downward to be perpendicular to the ground, then slides the mounting ring downward to the bottom of the first rotating frame, and then rotates the mounting ring to re-engage the positioning column with the first rotating frame. The mounting ring is supported on the ground to raise the hydraulic anchor drill rig, thereby extending the length of the hydraulic anchor drill rig to meet the drilling needs of rock masses of different heights.
[0018] 3. After the first rotating frame is engaged with the locking column, the sliding rod is released and the second spring rebounds, so that the latch pin is engaged with the locking column, thereby ensuring the stability of the first rotating frame and preventing the first rotating frame from tilting. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.
[0020] Figure 2 It is a partial three-dimensional structural schematic diagram of the present invention.
[0021] Figure 3 It is a schematic diagram of the three-dimensional structure of the extension mechanism of the present invention.
[0022] Figure 4 It is a schematic diagram of a first partial three-dimensional structure of the extension mechanism of the present invention.
[0023] Figure 5 It is a schematic diagram of a second partial three-dimensional structure of the extension mechanism of the present invention.
[0024] Figure 6 It is a schematic diagram of the first three-dimensional structure of the guide mechanism of the present invention.
[0025] Figure 7 It is a schematic diagram of the second three-dimensional structure of the guide mechanism of the present invention.
[0026] Figure 8 It is an exploded view of a first partial three-dimensional structure of the guide mechanism of the present invention.
[0027] Fig. 9 It is an exploded view of the second partial three-dimensional structure of the guide mechanism of the present invention.
[0028] Fig.10 It is a three-dimensional structural schematic diagram of the locking mechanism of the present invention.
[0029] Fig.11 It is a schematic diagram of the first three-dimensional structure of the stabilizing mechanism of the present invention.
[0030] Fig.12 It is a schematic diagram of a second three-dimensional structure of the stabilizing mechanism of the present invention.
[0031] Fig.13 It is a partial three-dimensional structural schematic diagram of the stabilizing mechanism of the present invention.
[0032] Markings in the accompanying drawings: 1_mounting frame, 2_handle, 3_thread, 4_hydraulic anchor drilling rig, 5_extension mechanism, 50_connecting ring, 51_first fixed frame, 52_first rotating frame, 53_mounting ring, 54_locking column, 6_guide mechanism, 60_alignment member, 61_alignment frame, 62_sliding clamping member, 63_first spring, 64_guide frame, 65_docking member, 66_support frame, 7_locking mechanism, 70_sliding rod, 71_latch, 72_second spring, 8_stabilizing mechanism, 80_second fixed frame, 81_second rotating frame, 82_pushing frame, 83_sliding connecting member, 84_guide rod, 85_sliding frame, 86_sliding sleeve, 87_third spring. DETAILED DESCRIPTION
[0033] The following descriptions are merely preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention.
[0034] A portable hydraulic anchor drilling rig, such as Figure 1 and Figure 2 As shown, it includes a mounting frame 1, a handle 2, a thread 3, a hydraulic anchor drill 4, a guide mechanism 6 and a stabilizing mechanism 8. The mounting frame 1 is rotatably connected to the handle 2 on the front side, and a rubber pad is provided on the handle 2 for easy gripping. The rear part of the mounting frame 1 is connected to the hydraulic anchor drill 4, and a placement frame is provided on the upper part of the hydraulic anchor drill 4 for easy placement on the ground. A thread 3 is rotatably provided on the upper side of the hydraulic anchor drill 4, and a thread is provided on the thread 3 for easy installation of a drill rod. The mounting frame 1 is provided with a guide mechanism 6, and the guide mechanism 6 is provided with a stabilizing mechanism 8.
[0035] like Figure 1 , Figure 6 , Figure 7 , Figure 8 and Fig. 9 As shown, the guide mechanism 6 includes an alignment member 60, an alignment frame 61, a sliding clamping member 62, a first spring 63, a guide frame 64, a docking member 65 and a support frame 66. The rear side of the mounting frame 1 is connected to the alignment member 60, and the alignment frame 61 is clamped on the alignment member 60. The left and right sides of the alignment frame 61 are slidably connected with the sliding clamping members 62. The sliding clamping members 62 are connected to the alignment frame 61 with two upper and lower first springs 63. The rear part of the alignment frame 61 is slidably detachably connected to the guide frame 64, and the upper part of the guide frame 64 is detachably connected to the docking member 65 by bolts. The diameter of the docking member 65 is smaller than that of the guide frame 64, which is convenient for splicing the guide frame 64. The upper part of the docking member 65 is also detachably connected to the guide frame 64 by bolts, and the lower part of the lower guide frame 64 is detachably connected to the support frame 66 by bolts, and the support frame 66 is placed on the ground.
[0036] like Figure 1 , Fig.11 , Fig.12 and Fig.13As shown, the stabilizing mechanism 8 includes a second fixed frame 80, a second rotating frame 81, a pushing frame 82, a sliding connection member 83, a guide rod 84, a sliding frame 85, a sliding sleeve 86 and a third spring 87. The upper side of the upper guide frame 64 is connected to the second fixed frame 80, and the outer side of the second fixed frame 80 is rotatably connected to four second rotating frames 81, the upper part of the second rotating frame 81 is rotatably connected to the pushing frame 82, and the lower part of the pushing frame 82 is rotatably connected to the sliding connection member 83, the lower side of the second fixed frame 80 is connected to four guide rods 84, the upper outer side of the upper guide frame 64 is slidably connected to the sliding frame 85, and the outer side of the sliding frame 85 is connected to four sliding sleeves 86, the guide rods 84 are slidably connected to the adjacent sliding sleeves 86, the sliding connection members 83 are slidably connected to the adjacent sliding sleeves 86, and the third spring 87 is connected between the sliding connection members 83 and the sliding frame 85.
[0037] When using the present invention, first place the hydraulic anchor drill 4 in the drilling area, and then install the corresponding type of drill rod on the thread 3 according to the drilling requirements. After installation, the worker grasps the handle 2 and then starts the hydraulic anchor drill 4, so that the drill rod drills the rock upward. When the rock to be drilled is high and the worker cannot hold the handle 2, the guide frame 64 can be spliced by the docking piece 65 and bolts according to the height of the rock, and then the lowermost guide frame 64 and the support frame 66 are connected by bolts. After the splicing is completed, the support frame 66 is placed on the ground, and then the sliding clamping member 62 is pulled backward, the first spring 63 is squeezed and contracted, and the alignment frame 61 is pushed into the alignment member 60, and then the sliding clamping member 62 is released, and the first spring 63 rebounds, so that the sliding clamping member 62 moves to the docking position of the alignment member 60 and the alignment frame 61, so that the alignment member 60 and the alignment frame 61 are fixed, thereby playing the role of being able to quickly and conveniently fix the mounting frame 1 on the guide frame 64, the hydraulic anchor drilling rig When drilling, the alignment member 60 is driven to move, so that the alignment frame 61 moves on the guide frame 64, thereby guiding the hydraulic anchor drill 4. When the alignment frame 61 moves upward to the sliding frame 85, it pushes the sliding frame 85 to move upward, and then pushes the sliding sleeve 86 to move upward along the guide rod 84. The sliding connection member 83 is moved upward by the force of the third spring 87, so that the pushing frame 82 rotates, and the second rotating frame 81 is pushed to rotate upward and contact the rock mass. When the sliding frame 85 continues to move upward, the sliding connection member 83 moves downward relative to the sliding sleeve 86, and the third spring 87 is squeezed and contracted, so that the second rotating frame 81 is close to the rock mass, thereby improving the stability of the guide frame 64 during the upward drilling process. After drilling is completed, the sliding frame 85 is reset, and the third spring 87 rebounds, so that the sliding connection member 83 is reset. When the hydraulic anchor drill 4 needs to be placed on the ground, the placement frame contacts the ground, so that the hydraulic anchor drill 4 is stably placed on the ground.
[0038] like Figure 1 , Figure 3 , Figure 4 and Figure 5 As shown, an extension mechanism 5 is also included, and the extension mechanism 5 includes a connecting ring 50, a first fixed frame 51, a first rotating frame 52, a mounting ring 53 and a locking column 54. The connecting ring 50 is connected to the outer side of the lower part of the hydraulic anchor drilling rig 4, and six first fixed frames 51 are connected to the outer side of the connecting ring 50. The first fixed frames 51 are rotatably connected to the first rotating frames 52. The mounting ring 53 is located on the outer side of the upper part of the hydraulic anchor drilling rig 4, and six locking columns 54 are connected to the inner side of the mounting ring 53. The locking columns 54 are all arc-shaped, which is convenient for fixing the first fixed frame 51. The upper part of the first rotating frame 52 is snap-fitted with the adjacent locking columns 54.
[0039] By using the extension mechanism 5 of the device, the length of the hydraulic anchor drill 4 can be extended. When the height of the rock mass to be drilled is relatively high, the mounting ring 53 is rotated to disengage the positioning column 54 from the first rotating frame 52, and then the first rotating frame 52 is rotated downward to be perpendicular to the ground. Thereafter, the mounting ring 53 is slid downward to the bottom of the first rotating frame 52, and then the mounting ring 53 is rotated again to re-engage the positioning column 54 with the first rotating frame 52. The hydraulic anchor drill 4 is raised by being supported on the ground by the mounting ring 53, thereby extending the length of the hydraulic anchor drill 4 and meeting the drilling requirements of rock masses of different heights.
[0040] like Figure 1 and Fig.10 As shown, it also includes a locking mechanism 7, which includes a sliding rod 70, a latch 71 and a second spring 72. The upper part of the first rotating frame 52 is slidably connected to the sliding rod 70, and the upper side of the sliding rod 70 is connected to the latch 71. The latch 71 is engaged with the adjacent locking column 54, and the second spring 72 is connected between the sliding rod 70 and the connected first rotating frame 52.
[0041] The use of the locking mechanism 7 of the present device can ensure the stability of the first rotating frame 52. When the first rotating frame 52 is engaged with the locking column 54, the sliding rod 70 is pulled to move inward and contract, and the second spring 72 is squeezed and contracted. After the first rotating frame 52 is engaged with the locking column 54, the sliding rod 70 is released, and the second spring 72 rebounds, so that the pin 71 is engaged with the locking column 54, thereby ensuring the stability of the first rotating frame 52 and preventing the first rotating frame 52 from tilting.
[0042] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A portable hydraulic anchor drilling rig, characterized in that: The invention comprises a mounting frame (1), a handle (2), a thread (3), a hydraulic anchor drill (4), a guide mechanism (6) and a stabilizing mechanism (8); the front side of the mounting frame (1) is rotatably connected to the handle (2); the rear side of the mounting frame (1) is connected to the hydraulic anchor drill (4); the upper side of the hydraulic anchor drill (4) is rotatably provided with a thread (3); the mounting frame (1) is provided with a guide mechanism (6) capable of guiding the hydraulic anchor drill (4); and the guide mechanism (6) is provided with a stabilizing mechanism (8) capable of improving the guiding stability.
2. The portable hydraulic anchor drilling rig according to claim 1, characterized in that: A rubber pad is provided on the handle (2).
3. The portable hydraulic anchor drilling rig according to claim 1, characterized in that: A placing frame is arranged on the upper part of the hydraulic anchor drilling machine (4).
4. The portable hydraulic anchor drilling rig according to claim 1, characterized in that: The threaded buckle (3) is provided with threads.
5. The portable hydraulic anchor drilling rig according to claim 1, characterized in that: The guide mechanism (6) comprises a positioning member (60), a positioning frame (61), a sliding clamping member (62), a first spring (63), a guide frame (64), a docking member (65) and a support frame (66). The mounting frame (1) is connected to the positioning member (60) at the rear side, the positioning member (60) is clamped with the positioning frame (61), the left and right sides of the positioning frame (61) are both slidably connected with the sliding clamping member (62), and the sliding clamping member (62) and the positioning frame (61) are connected with two upper and lower first springs (63), the rear part of the positioning frame (61) is slidably detachably connected with the guide frame (64), the upper part of the guide frame (64) is detachably connected with the docking member (65) by bolts, the upper part of the docking member (65) is also detachably connected with the guide frame (64) by bolts, and the lower part of the guide frame (64) is detachably connected with the support frame (66) by bolts. 6), the support frame (66) is placed on the ground, and the guide frame (64) is spliced by the docking piece (65) and bolts according to the height of the rock mass, and then the guide frame (64) at the lower side is spliced with the support frame (66) by bolts. After the splicing is completed, the support frame (66) is placed on the ground, and then the sliding clamping piece (62) is pulled to move backward, and the first spring (63) is squeezed and contracted, pushing the alignment frame (61) into the alignment member (60), and then the sliding clamping piece (62) is released, and the first spring (63) rebounds, so that the sliding clamping piece (62) moves to the docking position of the alignment member (60) and the alignment frame (61), so that the alignment member (60) and the alignment frame (61) are fixed, and the hydraulic anchor drilling rig (4) drives the alignment member (60) to move while drilling, so that the alignment frame (61) moves on the guide frame (64).
6. The portable hydraulic anchor drilling rig according to claim 5, characterized in that: The diameter of the docking member (65) is smaller than that of the guide frame (64).
7. The portable hydraulic anchor drilling rig according to claim 5, characterized in that: The stabilizing mechanism (8) comprises a second fixed frame (80), a second rotating frame (81), a pushing frame (82), a sliding connection member (83), a guide rod (84), a sliding frame (85), a sliding sleeve (86) and a third spring (87); the upper side of the upper guide frame (64) is connected to the second fixed frame (80); the outer side of the second fixed frame (80) is rotatably connected to a plurality of second rotating frames (81); the upper part of the second rotating frame (81) is rotatably connected to the pushing frame (82); the lower part of the pushing frame (82) is rotatably connected to the sliding connection member (83); the lower side of the second fixed frame (80) is connected to a plurality of guide rods (84); the outer side of the upper part of the upper guide frame (64) is slidably connected to the sliding frame (85); the outer side of the sliding frame (85) is connected to a plurality of sliding sleeves (86); the guide rods (84) are The sliding connection pieces (83) are slidably connected to the adjacent sliding sleeves (86), and the sliding connection pieces (83) are slidably connected to the adjacent sliding sleeves (86). A third spring (87) is connected between the sliding connection pieces (83) and the sliding frame (85). When the alignment frame (61) moves upward to the sliding frame (85), the sliding frame (85) is pushed upward, thereby pushing the sliding sleeve (86) to move upward along the guide rod (84). The sliding connection piece (83) is moved upward by the action force of the third spring (87), so that the pushing frame (82) rotates, and the second rotating frame (81) is pushed to rotate upward and contact the rock mass. When the sliding frame (85) continues to move upward, the sliding connection piece (83) moves downward relative to the sliding sleeve (86), and the third spring (87) is squeezed and contracted, so that the second rotating frame (81) is closely attached to the rock mass.
8. The portable hydraulic anchor drilling rig according to claim 7, characterized in that: The hydraulic anchor drill (4) also includes an extension mechanism (5), which includes a connecting ring (50), a first fixed frame (51), a first rotating frame (52), a mounting ring (53) and a locking column (54). The outer side of the lower part of the hydraulic anchor drill (4) is connected to the connecting ring (50), the outer side of the connecting ring (50) is connected to a plurality of first fixed frames (51), the first fixed frames (51) are all rotatably connected to the first rotating frames (52), the mounting ring (53) is located on the outer side of the upper part of the hydraulic anchor drill (4), and the inner side of the mounting ring (53) is connected to a plurality of locking columns (54). The upper part of the first rotating frame (52) is engaged with the adjacent locking columns (54). When the height of the rock mass to be drilled is relatively high, the mounting ring (53) is rotated to make the locking columns (54) detach from the first rotating frame (52), and then the first rotating frame (52) is rotated downward to be vertical to the ground. Then, the mounting ring (53) is slid downward to the bottom of the first rotating frame (52), and then the mounting ring (53) is rotated again to make the locking columns (54) engage with the first rotating frame (52) again. The hydraulic anchor drilling rig (4) is raised by being supported on the ground by the mounting ring (53).
9. The portable hydraulic anchor drilling rig according to claim 8, characterized in that: The positioning posts (54) are all arc-shaped.
10. The portable hydraulic anchor drilling rig according to claim 8, characterized in that: The locking mechanism (7) also includes a sliding rod (70), a latch (71) and a second spring (72). The upper part of the first rotating frame (52) is slidably connected to the sliding rod (70). The upper side of the sliding rod (70) is connected to the latch (71). The latch (71) is engaged with the adjacent locking column (54). The second spring (72) is connected between the sliding rod (70) and the connected first rotating frame (52). When the first rotating frame (52) is engaged with the locking column (54), the sliding rod (70) is pulled inward to move and shrink, and the second spring (72) is squeezed and shrunk. After the first rotating frame (52) is engaged with the locking column (54), the sliding rod (70) is released, and the second spring (72) rebounds, so that the latch (71) is engaged with the locking column (54).