Online profile control and displacement control system and method for offshore oilfield
Through the online adjustment and driving system, the liquid dispensing tank, liquid storage tank and high-pressure plunger pump can be used to achieve continuous injection and concentration adjustment of medicine liquid or water, which solves the problems of large construction displacement and rising well pressure in the existing technology, ensuring that The improvement of deep adjustment and driving effect and recovery rate are achieved.
Patent Information
- Application Number
- CN202411069675.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction process, the existing technology of adjusting and driving adjustment requires frequent stopping of water injection wells for injection of chemicals, resulting in large construction displacement and rapid pressure increase, making it difficult to achieve deep driving adjustment and driving adjustment, and the concentration of the chemicals is difficult to control, which can easily cause blockage in the well area. , affects the effect of adjusting the anatomy and driving.
A system for online regulation and drive control of offshore oil fields has been designed. Through components such as liquid dispensing tanks, liquid storage tanks and high-pressure plunger pumps, the online injection and concentration adjustment of the drug liquid or water is realized, avoiding repeated well opening operations and ensuring the drug liquid. Continuous injection and adjustment of concentration to reduce construction displacement and prevent the well pressure from rising.
The online injection and concentration adjustment of the medicine liquid or water is realized, which avoids the drug liquid from being cut off, reduces construction displacement, prevents the well pressure from rising, ensures the deep adjustment and driving effect, avoids blockage in the well area, and improves the recovery rate. .
Smart Images

Figure CN118979722A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of oilfield profile control and flooding control, and in particular to an offshore oilfield online profile control and flooding control system and method. Background Art
[0002] Profile control and flooding are effective measures for stabilizing oil and controlling water in the process of oilfield development. By squeezing different system strengths of reagents into the formation, blocking the dominant water flow channel, adjusting the water drive direction, and expanding the volume of water injection, the purpose of improving the recovery rate is achieved. In the implementation of profile control or flooding technology, the method of directly pumping the reagent into the well at the water injection wellhead is often used. This method cannot be injected online. It is necessary to stop the water injection of the water injection well, inject the reagent at the wellhead, and then open the well for water injection, or perform segment injection, that is, inject a section of reagent, inject a section of water, inject another section of reagent, and then inject water. In this way, the construction displacement is often large, which may cause the pressure of the water injection well to rise too fast, and the purpose of deep profile control and flooding cannot be achieved. In addition, the concentration of the reagent is not easy to control during the construction process, which may easily cause the near-well area of the water injection well to be blocked, affecting the effect of profile control and flooding. Summary of the invention
[0003] The present invention provides an offshore oilfield online profile control and displacement control system, which transports liquid medicine or water for profile control and displacement control to a water injection well through the same water injection pipeline, thereby avoiding repeated well opening operations, achieving uninterrupted online injection of liquid medicine or water, and adjusting the concentration of the liquid medicine by controlling the amount of liquid medicine and water entering the water injection pipeline.
[0004] In order to achieve these purposes and other advantages according to the present invention, an offshore oil field online profile control and flooding control system is provided, comprising:
[0005] A liquid dispensing tank, which has a water inlet on the top and a liquid outlet on the bottom, and a liquid outlet control valve is provided at the liquid outlet;
[0006] A liquid storage tank is arranged below the liquid dispensing tank and its top is connected to the liquid outlet through a connecting pipe, and the bottom of the liquid storage tank is connected to the water injection pipeline through a liquid delivery pipeline, and a high-pressure plunger pump is arranged on the liquid delivery pipeline;
[0007] A water supply device is connected to the water inlet through a first water supply pipeline and to the water injection pipeline through a second water supply pipeline. The water injection pipeline is also connected to a water injection well. A first control valve is provided on the first water supply pipeline and a second control valve is provided on the second water supply pipeline.
[0008] Preferably, in the offshore oilfield online profile control and drive control system, the water supply device includes: a water supply pipeline, one end of which is connected to the water source, and the other end is connected to the first water supply pipeline and the second water supply pipeline through a three-way pipe, and the water supply pipeline is provided with a filter and a water supply pump.
[0009] Preferably, in the offshore oilfield online profile control and drive control system, a plurality of storage boxes connected thereto are arranged on the top of the liquid distribution tank, a feed port is arranged on the top of the storage box, the bottom of the storage box is open, the side wall of the bottom of the storage box is bent in a two-step shape, a moving port is arranged on the side wall of the second step, a moving plate is movably inserted at the moving port and slides tangent to the bottom of the side wall of the first step to block or open the opening at the bottom of the storage box, a rack is arranged on the side edge of the moving plate located outside the storage box, a plurality of drive motors are arranged on the top of the liquid distribution tank, a gear is arranged on the output shaft of the drive motor, and the gear is meshed with its corresponding rack.
[0010] Preferably, in the offshore oil field online profile control and drive control system, a vertical connecting plate is provided on the side wall of the second step, a vertical supporting plate located below the side wall of the first step is provided on the connecting plate, and the movable plate is movably inserted between the supporting plate and the side wall of the first step.
[0011] Preferably, in the offshore oilfield online profile control and drive control system, a stirring rod is rotatably arranged in the liquid preparation tank, a plurality of mixing blades are arranged on the stirring rod, the top of the stirring rod is connected to the output shaft of the stirring motor at the top of the liquid preparation tank, and the bottom of the stirring rod extends to the liquid outlet and a spiral groove is arranged on its periphery.
[0012] Preferably, in the offshore oilfield online profile control and flooding control system, a stirring device is provided on the water injection pipeline, and the stirring device comprises:
[0013] A support pipe, which is connected to the water injection pipeline, and a side wall of the support pipe is configured to be an openable pipe wall;
[0014] The support rod is detachably arranged on the inner side of the openable tube wall and is coaxial with the support tube. A plurality of support rings are rotatably arranged on the support rod. A plurality of stirring blades are arranged on the support ring. The stirring blades on two adjacent support rings rotate in opposite directions.
[0015] Preferably, in the offshore oil field online profile control and drive control system, connecting rods vertically connected thereto are provided at both ends of the support rod, a pair of slots are provided on the openable pipe wall, and a pair of arc-shaped slides are provided on the inner side wall of the support pipe corresponding to the openable pipe wall, and one end of the connecting rod is inserted in the corresponding slot, and the other end is movably inserted in the corresponding arc-shaped slide.
[0016] Preferably, in the offshore oilfield online profile control and displacement control system, an emulsion breaker is provided on the liquid storage tank and the liquid delivery pipeline of the high-pressure plunger pump.
[0017] Preferably, the offshore oilfield online profile control and flooding control system further comprises:
[0018] A PLC control unit, which is communicatively connected with the liquid outlet control valve, the high-pressure plunger pump, the first control valve, and the second control valve;
[0019] A remote control module is communicatively connected with the PLC control unit.
[0020] The present invention also provides a method for performing profile control and flooding control using an offshore oil field online profile control and flooding control system, comprising the following steps:
[0021] Step 1: Open the first control valve, and the water supply device delivers the water for preparing the liquid medicine into the liquid preparation tank containing the liquid medicine or the medicine through the first water supply pipeline to prepare the liquid medicine, and then close the first control valve;
[0022] Step 2: Open the liquid outlet control valve to transfer part of the liquid prepared in the liquid preparation tank to the liquid storage tank through the liquid delivery pipeline until the liquid storage tank is full, and then close the liquid outlet control valve;
[0023] Step 3: According to the requirements of profile control and flooding control for liquid concentration, choose to open the second control valve and high-pressure plunger pump. The water supply device will deliver water to the water injection pipeline through the second water delivery pipeline. At the same time, the liquid in the storage tank will flow to the water injection pipeline through the liquid delivery pipeline and mix with the water to adjust the liquid concentration before entering the water injection well for profile control and flooding control.
[0024] The present invention at least includes the following beneficial effects: in the present invention, a water inlet is arranged on the top of the liquid dispensing tank, a liquid outlet is arranged on the bottom, a liquid outlet control valve is arranged at the liquid outlet, a liquid storage tank is arranged below the liquid dispensing tank and its top is connected with the liquid outlet through a connecting pipe, the bottom of the liquid storage tank is connected with the water injection pipeline through a liquid delivery pipeline, a high-pressure plunger pump is arranged on the liquid delivery pipeline, a water supply device is connected with the water inlet through a first water delivery pipeline, and is connected with the water injection pipeline through a second water delivery pipeline, and the water injection pipeline is also connected with a water injection well, A first control valve is provided on the first water supply pipeline, and a second control valve is provided on the second water supply pipeline. When performing profile control and drive control operations, the liquid medicine is first prepared through the liquid preparation tank, and the first control valve is opened. The water supply device uses the first water supply pipeline to send the prepared liquid water into the liquid preparation tank filled with liquid medicine or reagent to prepare the liquid medicine, and then close the first control valve; then open the liquid outlet control valve to transport part of the prepared liquid medicine in the liquid preparation tank through the liquid delivery pipeline to the liquid storage tank until the liquid storage tank is full, and then close the liquid outlet control valve; finally Then, according to the demand for liquid medicine concentration for profile adjustment and flooding, the second control valve and the high-pressure plunger pump are opened, and the water supply device sends water to the water injection pipeline through the second water delivery pipeline. At the same time, the liquid medicine in the liquid storage tank flows to the water injection pipeline through the liquid delivery pipeline and is mixed with water to adjust the liquid medicine concentration before entering the water injection well for profile adjustment and flooding. The present invention configures liquid medicine for profile adjustment and flooding through a liquid preparation tank, and stores the configured liquid medicine in the liquid storage tank through a connecting pipe. When all the liquid medicine in the liquid preparation tank is stored in the liquid storage tank, it can be configured again through the liquid preparation tank without affecting the use of the liquid medicine, and effectively avoids the situation of drug shortage. By controlling the first control valve and the high-pressure plunger pump, the concentration of the liquid medicine that finally flows into the water injection well through the water injection pipeline can be flexibly adjusted, which can meet the use requirements of liquid medicines of different concentrations, effectively prevent the blockage of the near-well area of the water injection well, and ensure the effect of profile adjustment and flooding. In addition, the method controls the injection of liquid medicine online at all times without repeated well opening, which can effectively reduce the construction displacement, prevent the pressure of the water injection well from rising too fast, and can perform deep profile adjustment and flooding.
[0025] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the overall structure of an online profile control and flooding control system for offshore oil fields in one of the technical solutions of the present invention;
[0027] Figure 2 It is a schematic cross-sectional structure diagram of a storage tank in one of the technical solutions of the present invention;
[0028] Figure 3 This is a schematic diagram of the internal structure of a support tube in one of the technical solutions of the present invention;
[0029] Figure 4It is a schematic diagram of the overall structure of an online profile control and flooding control system for offshore oil fields in another technical solution of the present invention;
[0030] Among them, 1-injection well, 2-injection pipeline, 3-agitation device, 4-second flow meter, 5-second control valve, 6-second water supply pipeline, 7-water supply pump, 8-filter, 9-water supply pipeline, 10-first control valve, 11-first flow meter, 12-first water supply pipeline, 13-liquid outlet, 14-liquid distribution tank, 15-storage tank, 16-stirring motor, 17-mixing fan blade, 18-stirring rod, 19-liquid outlet control valve, 20-liquid storage tank, 21-emulsifier, 22-liquid supply pipeline, 23-high-pressure plunger pump, 24-side wall of the first step, 25-side wall of the second step, 26-support Support plate, 27-connecting plate, 28-moving port, 29-moving plate, 30-gear, 31-driving motor, 32-slot, 33-connecting rod, 34-support ring, 35-stirring fan blade, 36-support rod, 37-openable pipe wall, 38-arc slide, 39-support pipe, 40-hoop, 46, 47, 50, 52, 53, 55, 57, 60, 62, 64-safety valve, 48-cross-linking agent storage tank, 49, 63-metering pump, 51-jelly reaction tank, 54, 59-third flow meter, 56-buffer tank, 58-colloid mill, 61-rotor pump, 65-maturation tank. DETAILED DESCRIPTION
[0031] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0032] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.
[0033] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials can be obtained from commercial sources unless otherwise specified; in the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "set" should be understood in a broad sense, for example, they can be fixedly connected, set, or detachably connected, set, or connected and set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood in specific circumstances. The orientation or position relationship indicated by the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention.
[0034] like Figure 1 , Figure 2 , Figure 4 As shown, the present invention provides an offshore oil field online profile control and flooding control system, comprising:
[0035] A liquid dispensing tank 14 is provided with a water inlet at the top and a liquid outlet 13 at the bottom, wherein a liquid outlet control valve 19 is provided at the liquid outlet 13;
[0036] A liquid storage tank 20 is disposed below the liquid dispensing tank 14 and its top is connected to the liquid outlet 13 via a connecting pipe, and the bottom of the liquid storage tank 20 is connected to the water injection pipeline 2 via a liquid delivery pipeline 22, and a high-pressure plunger pump 23 is disposed on the liquid delivery pipeline 22;
[0037] The water supply device is connected to the water inlet through a first water supply pipeline 12 and to the water injection pipeline 2 through a second water supply pipeline 6. The water injection pipeline 2 is also connected to the water injection well 1. The first water supply pipeline 12 is provided with a first control valve 10, and the second water supply pipeline 6 is provided with a second control valve 5.
[0038] The offshore oilfield online profile control and flooding control system provided by the technical solution mainly consists of a liquid preparation tank 14 for preparing liquid medicine, a liquid storage tank 20 for storing liquid medicine, and a water supply device. A water inlet is arranged on the top of the liquid preparation tank 14, and the water inlet is connected with the water supply device through a first water supply pipeline 12. The water supply device delivers the water for preparing liquid medicine to the liquid preparation tank 14 through the first water supply pipeline 12 and the water inlet. A liquid outlet 13 is arranged at the bottom of the liquid preparation tank 14, and the liquid outlet 13 is connected with the top of the liquid storage tank 20 through a connecting pipe. The liquid storage tank 20 is located below the liquid preparation tank 14, so that the liquid medicine in the liquid preparation tank 14 can enter the liquid storage tank 20 through the connecting pipe by its own gravity. A liquid outlet control valve 19 for controlling the flow of the liquid out of the liquid distribution tank 14 is provided at the liquid outlet 13. The bottom of the liquid storage tank 20 is connected to the water injection pipeline 2 through a liquid delivery pipeline 22. A high-pressure plunger pump 23 for controlling the passage of the liquid is provided on the liquid delivery pipeline 22. The water supply device is also connected to the water injection pipeline 2 through a second water delivery pipeline 6. The water injection pipeline 2 is connected to the water injection well 1. The liquid in the liquid storage tank 20 and the water used to dilute the liquid are collected and mixed in the water injection pipeline 2 and then flow to the water injection well 1 for profile adjustment and drive adjustment. The first control valve 10 and the second control valve 5 for controlling the water flow size are respectively provided on the first water delivery pipeline 12 and the second water delivery pipeline 6.
[0039] In the technical solution, a first flow meter 11 is provided on the first water supply pipeline 12, and a second flow meter 4 is provided on the second water supply pipeline 6, so as to facilitate the first control valve 10 and the second control valve 5 to adjust the water flow; the water injection pipeline 2 can be connected with the liquid supply pipeline 22 and the second water supply pipeline 6 through a three-way pipe; pressure gauges are provided on the liquid dispensing tank 14, the liquid storage tank 20, the liquid supply pipeline 22, the first water supply pipeline 12, the second water supply pipeline 6, and the water injection pipeline 2; liquid level sensors and pressure relief valves are provided on the liquid dispensing tank 14 and the liquid storage tank 20 to monitor and adjust the pressure of various parts to avoid safety accidents; the liquid level sensor is used to detect the amount of medicinal liquid in the liquid dispensing tank 14 and the liquid storage tank 20, so as to facilitate timely liquid dispensing and replenishment.
[0040] The method for using the online profile control and displacement control system for offshore oil fields provided by the technical solution is as follows: first, the liquid medicine is prepared through the liquid preparation tank 14, the first control valve 10 is opened, and the water supply device sends the water for preparing the liquid medicine into the liquid preparation tank 14 filled with liquid medicine or reagent through the first water supply pipeline 12 to prepare the liquid medicine, and then the first control valve 10 is closed; then the liquid outlet control valve 19 is opened to transport part of the liquid medicine prepared in the liquid preparation tank 14 to the liquid storage tank 20 through the liquid delivery pipeline 22 until the liquid storage tank 20 is full, and the liquid outlet control valve 19 is closed; finally, according to the requirements of the profile control and displacement for the concentration of the liquid medicine, the second control valve 5 and the high-pressure plunger pump 23 are opened, and the water supply device sends the water to the water injection pipeline 2 through the second water delivery pipeline 6, and at the same time, the liquid medicine in the liquid storage tank 20 flows to the water injection pipeline 2 through the liquid delivery pipeline 22 and is mixed with the water to adjust the concentration of the liquid medicine, and then enters the water injection well 1 for profile control and displacement control.
[0041] The present invention at least has the following beneficial effects: a water inlet is arranged at the top of the liquid dispensing tank 14, a liquid outlet 13 is arranged at the bottom, a liquid outlet control valve 19 is arranged at the liquid outlet 13, a liquid storage tank 20 is arranged below the liquid dispensing tank 14 and its top is connected with the liquid outlet 13 through a connecting pipe, the bottom of the liquid storage tank 20 is connected with the water injection pipeline 2 through a liquid delivery pipeline 22, a high-pressure plunger pump 23 is arranged on the liquid delivery pipeline 22, a water supply device is connected with the water inlet through the first water delivery pipeline 12, and is connected with the water injection pipeline 2 through the second water delivery pipeline 13. The pipeline 6 is connected with the water injection pipeline 2, and the water injection pipeline 2 is also connected with the water injection well 1. The first control valve 10 is provided on the first water supply pipeline 12, and the second control valve 5 is provided on the second water supply pipeline 6. The liquid for adjusting the profile and driving is configured through the liquid preparation tank 14, and the configured liquid is stored in the liquid storage tank 20 through the connecting pipe. When all the liquid in the liquid preparation tank 14 is stored in the liquid storage tank 20, it can be configured again through the liquid preparation tank 14 without affecting the use of the liquid, effectively avoiding the situation of drug shortage;
[0042] By controlling the first control valve 10 and the high-pressure plunger pump 23, the concentration of the liquid medicine that finally flows into the water injection well 1 through the water injection pipeline 2 can be flexibly adjusted, which can meet the use requirements of liquid medicines of different concentrations, effectively prevent the blockage of the near-well area of the water injection well 1, and ensure the effect of profile adjustment and flooding. In addition, this method controls the injection of liquid medicine or water online at all times, and does not require repeated well opening, which can effectively reduce the construction displacement, prevent the pressure of the water injection well 1 from rising too fast, and can perform deep profile adjustment and flooding;
[0043] The same water supply device supplies water to the liquid preparation tank 14 and the water injection well 1, reducing the use of equipment and saving the space occupied by the equipment; a liquid outlet control valve 19 is provided at the liquid outlet 13 to prevent the liquid from flowing to the liquid storage tank 20 during the liquid preparation in the liquid preparation tank 14.
[0044] In another technical solution, Figure 1 , Figure 4 As shown, in the offshore oilfield online profile control and flooding control system, the water supply device includes: a water supply pipeline 9, one end of which is connected to the water source, and the other end is connected to the first water supply pipeline 12 and the second water supply pipeline 6 through a tee pipe, and a filter 8 and a water supply pump 7 are arranged on the water supply pipeline 9. The filter 8 is used to filter impurities in the incoming water, and the water supply pump 7 provides water flow power; the water source can be seawater or its treatment water, etc.
[0045] In another technical solution, Figure 1 , Figure 2 , Figure 4As shown, in the offshore oilfield online profile control and drive control system, a plurality of storage boxes 15 connected thereto are arranged on the top of the liquid distribution tank 14, a feed port is arranged on the top of the storage box 15, the bottom of the storage box 15 is open, the bottom side wall of the storage box 15 is bent in a two-step shape, a moving port 28 is arranged on the side wall of the second step, a moving plate 29 movably inserted at the moving port 28 is slidably tangent to the bottom of the side wall of the first step to block or open the bottom opening of the storage box 15, a rack is arranged on the side edge of the moving plate 29 located outside the storage box, a plurality of drive motors 31 are arranged on the top of the liquid distribution tank 14, a gear 30 is arranged on the output shaft of the drive motor 31, and the gear 30 is meshed with its corresponding rack. A sealing plug is provided at the feed port; the driving motor 31 drives the gear 30 to rotate and then drives the rack and the movable plate 29 to move, so as to seal or open the bottom opening of the storage box 15; the bottom side wall of the storage box 15 is bent into a two-step shape, and the movable plate 29 is located below the first step, so as to prevent the movable plate 29 from pushing and rubbing the medicine or liquid medicine adhering to the side wall of the storage box 15 and affecting the sealing effect during the movement.
[0046] In another technical solution, Figure 2 As shown, in the offshore oilfield online profile control and flooding control system, a vertical connecting plate 27 is provided on the side wall of the second step, a vertical supporting plate 26 located below the side wall of the first step is provided on the connecting plate 27, and the movable plate 29 is movably inserted between the supporting plate 26 and the side wall of the first step. A gap is left between the side wall of the second step and the supporting plate 26 to provide space for the medicine or liquid medicine adhering to the edge of the movable plate 29 to move downward; the supporting plate 26 is used to further support the movable plate 29 to prevent its position from shifting.
[0047] In another technical solution, Figure 1 , Figure 4 As shown, in the offshore oilfield online profile control and displacement control system, a stirring rod 18 is rotatably arranged in the liquid preparation tank 14, and a plurality of mixing blades 17 are arranged on the stirring rod 18. The top of the stirring rod 18 is connected to the output shaft of the stirring motor 16 at the top of the liquid preparation tank 14, and the bottom of the stirring rod 18 extends to the liquid outlet 13 and a spiral groove is arranged on its periphery. The stirring motor 16 drives the stirring rod 18 to rotate and drives the mixing blades 17 to rotate to stir the liquid in the liquid preparation tank 14 to fully mix it; when preparing liquid, the liquid outlet 13 is closed, and the spiral groove helps to stir the liquid at the liquid outlet 13, and when the liquid outlet 13 is opened, the spiral groove helps to accelerate the discharge of the liquid.
[0048] In another technical solution, Figure 1 , Figure 3 , Figure 4As shown, in the offshore oil field online profile control and flooding control system, the water injection pipeline 2 is provided with a stirring device 3, and the stirring device 3 includes:
[0049] A support pipe 39, which is connected to the water injection pipeline 2, and a part of the side wall of the support pipe 39 is configured to be an openable pipe wall 37;
[0050] The support rod 36 is detachably arranged inside the openable tube wall 37 and coaxial with the support tube 39. A plurality of support rings 34 are rotatably arranged on the support rod 36. A plurality of stirring blades 35 are arranged on the support ring 34. The stirring blades 35 on two adjacent support rings 34 rotate in opposite directions. A plurality of hoop rings 40 are movably sleeved on the support tube 39. The openable tube wall 37 can be locked closed or opened by adjusting the locking degree and position of the hoop rings 40. A sealing gasket is arranged at the joint between the openable tube wall and the support tube wall; the openable tube wall 37 facilitates the disassembly, assembly and replacement of the support rod 36; when the liquid passes through, it impacts the stirring blades 35, causing the stirring blades 35 on the two adjacent support rings 34 to rotate in opposite phases, thereby improving the mixing speed and effect of the liquid.
[0051] In another technical solution, Figure 3 As shown, in the offshore oilfield online profile control and drive control system, the two ends of the support rod 36 are provided with connecting rods 33 vertically connected thereto, the openable pipe wall 37 is provided with a pair of slots 32, and the inner wall of the support pipe 39 corresponding to the openable pipe wall 37 is provided with a pair of arc-shaped slideways 38, and one end of the connecting rod 33 is inserted into the corresponding slot 32, and the other end is movably inserted into the corresponding arc-shaped slideway 38. The slot 32 and the arc-shaped slideway 38 are both used to limit the position of the connecting rod 33, thereby limiting the position of the support rod 36.
[0052] In another technical solution, Figure 1 , Figure 4 As shown, in the offshore oilfield online profile control and displacement control system, the liquid storage tank 20 and the liquid delivery pipeline 22 of the high-pressure plunger pump 23 are provided with an emulsion breaker 21 to process the liquid medicine, especially the emulsion, so that its effective substances are fully released.
[0053] In another technical solution, the offshore oilfield online profile control and flooding control system further includes:
[0054] A PLC control unit, which is communicatively connected with the liquid outlet control valve, the high-pressure plunger pump, the first control valve, and the second control valve;
[0055] The remote control module is connected to the PLC control unit. The PLC control unit is used to collect the working status information data of the liquid outlet control valve, the high-pressure plunger pump, the first control valve, and the second control valve, and control the working mode of each device according to the preset control program / instruction; the remote control module transmits the monitoring data, control instructions and other information to the platform control room and the remote client through the existing network and wireless network, thereby realizing remote real-time monitoring and control of the operating conditions, and truly realizing unattended on-site operation.
[0056] The PLC control unit is also communicatively connected with the first flow meter, the second flow meter, the water supply pump, the stirring motor, the drive motor, each pressure gauge, each pressure relief valve, and each liquid level sensor, and is used to collect working status information data of the first flow meter, the second flow meter, the water supply pump, the stirring motor, the drive motor, each pressure gauge, each pressure relief valve, and each liquid level sensor, and control the working mode of each device according to a preset control program / instruction.
[0057] In another technical solution, Figure 4 As shown, the offshore oilfield online profile control and displacement control system also includes: a continuous online production and injection integrated device for gel dispersion, which includes:
[0058] A maturation tank 65, whose liquid inlet is connected to the first water supply pipeline 12;
[0059] The gel reaction tank 51, its liquid inlet and the liquid outlet of the ripening tank 65;
[0060] A cross-linking agent storage tank 48, whose liquid outlet is connected to the liquid inlet of the gel reaction tank 51;
[0061] The colloid mill 58 has a feed port connected to the liquid outlet of the gel reaction tank 51 through a rotor pump 61, and a water inlet connected to the first water supply pipeline 12;
[0062] The buffer tank 56 has a liquid inlet connected to the discharge port of the colloid mill 58 , and a liquid outlet connected to the liquid delivery pipeline 22 connecting the high-pressure plunger pump and the liquid storage tank 20 .
[0063] Metering pumps 63 and 49 are provided on the pipeline between the aging tank 65 and the jelly reaction tank 51, and on the pipeline between the jelly reaction tank 51 and the cross-linking agent storage tank 48;
[0064] The pipeline between the colloid mill 58 and the first water supply pipeline 12 and the pipeline between the rotor pump 61 and the feed port of the colloid mill 58 are both provided with third flow meters 54 and 59;
[0065] Safety valves 52, 64, 50, 62, 60, 57, 47, 46, 55, and 53 are connected between the aging tank 65 and the jelly reaction tank 51, between the jelly reaction tank 51 and the cross-linking agent storage tank 48, between the jelly reaction tank 51 and the rotor pump 61, between the rotor pump 61 and the colloid mill 58, between the colloid mill 58 and the buffer tank 56, between the buffer tank 56 and the high-pressure plunger pump 23, between the high-pressure plunger pump 23 and the liquid storage tank 20, between the colloid mill and the first water supply pipeline 12, and between the aging tank 65 and the first water supply pipeline 12.
[0066] The integrated device for continuous online production and injection of gel dispersion of the present technical solution comprises a high-pressure plunger pump 23, a maturation tank 65, a cross-linking agent storage tank 48, a gel reaction tank 51, a colloid mill 58, and a buffer tank 56. The liquid inlet of the maturation tank 65 is connected to the first water supply pipeline 12, the liquid outlet of the maturation tank 65 is connected to the liquid inlet of the gel reaction tank 51, the liquid inlet of the gel reaction tank 51 is also connected to the cross-linking agent storage tank 48, the liquid outlet of the gel reaction tank 51 is connected to the feed inlet of the colloid mill 58 through the rotor pump 61, the water inlet of the colloid mill 58 is connected to the first water supply pipeline 12 through a water supply pipeline, the discharge port of the colloid mill 58 is connected to the liquid inlet of the buffer tank 56, and the liquid outlet of the buffer tank 56 is connected to the liquid supply pipeline 22 connected between the high-pressure plunger pump 23 and the liquid storage tank 20. Metering pumps 63 and 49 are provided on the pipeline between the aging tank 65 and the gel reaction tank 51, and on the pipeline between the gel reaction tank 51 and the cross-linking agent storage tank 48. The metering pumps 63 and 49 deliver the aging polymer solution and the cross-linking agent to the gel reaction tank 51 in a specific ratio to achieve the purpose of metering and delivery. The third flowmeter 54 and 59 are provided on the pipeline between the colloid mill 58 and the first water supply pipeline 12, and on the pipeline between the rotor pump 61 and the feed port of the colloid mill 58. The third flowmeter 54 and 59 are used to measure the feed flow rate so that the gel in the colloid mill 58 and water are mixed in a required ratio. Safety valves 52, 64, 50, 62, 60, 57, 47, 46, 55, 53 are connected between the aging tank 65 and the gel reaction tank 51, between the gel reaction tank 51 and the cross-linking agent storage tank 48, between the gel reaction tank 51 and the rotor pump 61, between the rotor pump 61 and the colloid mill 58, between the colloid mill 58 and the buffer tank 56, between the buffer tank 56 and the high-pressure plunger pump 23, between the high-pressure plunger pump 23 and the liquid storage tank 20, between the colloid mill 58 and the first water supply pipeline 12, and between the aging tank 65 and the first water supply pipeline 12. The safety valve can ensure that the polymer solution aging, gel reaction, gel dispersion production and online injection are carried out synchronously, orderly and continuously. The switches of the safety valve, metering pump, gel reaction tank, colloid mill and rotor pump in the present technical solution are all connected to the PLC control unit for communication. The PLC control unit controls the operation of each safety valve, metering pump, gel reaction tank, colloid mill and rotor pump according to the specified control to meet the on-off requirements of each passage.
[0067] When the integrated device for continuous online production and injection of gel dispersion of the present technical solution is used alone, the first control valve 10, the second control valve 5 and the safety valve 46 are in a closed state; first, the non-ionic polyacrylamide is added to the aging tank 65, and water is added to the aging tank 65 through the water supply pipeline 9, the first water supply pipeline 12, the third flow meter 54 and the safety valve 53 by the water supply pump, and stirred and aged to obtain a non-ionic polyacrylamide solution; secondly, the non-ionic polyacrylamide solution is transported to the gel reaction tank 51 by the metering pump 63, and the zirconium acetate solution in the cross-linking agent storage tank is transported to the gel reaction tank 51 by the metering pump 49. The nonionic polyacrylamide solution and the zirconium acetate solution are transported from the reaction tank 51, and the metering pumps 63 and 49 control the nonionic polyacrylamide solution and the zirconium acetate solution to flow into the gel reaction tank 51 according to the required mass ratio. The gel system is obtained after being stirred and mixed in the gel reaction tank 51. Furthermore, the rotor pump 61 sucks the gel system in the gel reaction tank 51 into the colloid mill 58 through the third flow meter 59, and at the same time, the water pipeline injects a certain amount of water into the colloid mill 58 through the third flow meter 54, and the gel dispersion is obtained by grinding the colloid mill 58. The gel dispersion enters the buffer tank 56; finally, the high-pressure plunger pump 23 outputs the gel dispersion in the buffer tank 56 and pumps it into the water injection well 1 for profile adjustment and drive adjustment. When the gel dispersion is pumped into the water injection well 1, the preparation of the gel dispersion can be carried out at the same time.
[0068] When the concentration of the injected gel dispersion needs to be adjusted, the PLC control unit sends out instructions to control the safety valve 47, the high-pressure plunger pump 23, the water supply pump 7, and the second control valve 5 to open simultaneously, and the regulating water and the gel dispersion are collected in the water injection pipeline 2 and mixed under the action of the stirring device 3 to obtain the required concentration, and then injected into the water injection well 1 for profile adjustment and drive adjustment. After the operation is completed, the safety valve 47, the high-pressure plunger pump 23, the water supply pump 7, and the second control valve 5 are closed simultaneously;
[0069] The integrated device for continuous online production and injection of gel dispersion of the technical solution can realize the integration of production and injection of gel dispersion. While the gel dispersion is pumped into the injection well, the preparation of the gel system and the gel dispersion is carried out simultaneously. The production and injection of the gel dispersion are carried out continuously online, that is, production and injection are carried out simultaneously, which greatly shortens the production and injection time of the gel dispersion, can meet the needs of large-dose continuous profile adjustment and flooding of multiple well groups or blocks, and reduces the labor intensity of workers and improves the working environment of construction personnel.
[0070] The present invention also provides a profile control and displacement control method using an offshore oil field online profile control and displacement control system, comprising the following steps:
[0071] Step 1: Open the first control valve 10, and the water supply device delivers the water for preparing the liquid to the liquid preparation tank 14 containing the concentrated liquid medicine or the medicine through the first water supply pipeline 12 to prepare the liquid medicine, and then close the first control valve 10;
[0072] Step 2: Open the liquid outlet control valve 19 to deliver part of the liquid prepared in the liquid preparation tank 14 to the liquid storage tank 14 through the liquid delivery pipeline 22 until the liquid storage tank 14 is full, and then close the liquid outlet control valve 19;
[0073] Step 3: According to the requirements of profile control and flooding for the concentration of the drug solution, the second control valve 5 and the high-pressure plunger pump 23 are opened, and the water supply device delivers water to the water injection pipeline 2 through the second water supply pipeline 6. At the same time, the drug solution in the liquid storage tank 14 flows to the water injection pipeline 2 through the liquid supply pipeline 22 and is mixed with the water to adjust the concentration of the drug solution before entering the water injection well 1 for profile control and flooding.
[0074] The following embodiments are provided according to the offshore oil field online profile control and displacement control system and profile control and displacement control method of the present invention:
[0075] A profile control and displacement control method using an offshore oil field online profile control and displacement control system comprises the following steps:
[0076] Step 1: The PLC control unit sends a command, the water supply pump 7 starts, the first control valve 10 opens, the drive motor 31 starts, and the stirring motor 16 starts, so that the water from the water source flows to the liquid preparation tank 14 through the water supply pipeline 9 and the first water delivery pipeline 12 until the water volume is sufficient for preparation of medicines. Then, the first control valve 10 and the water supply pump 7 are closed, and at the same time, the moving plate 29 moves to open the bottom of the storage tank 15 as needed to make the concentrated liquid or medicine in the storage tank 15 flow into the liquid preparation tank 14. The stirring rod 18 drives the mixing fan blades 17 to stir and prepare the liquid medicine. After the liquid medicine preparation is completed, the drive motor 31 is turned off;
[0077] Step 2: The PLC control unit sends a command, the liquid outlet control valve 19 opens, the Chinese medicine liquid in the liquid preparation tank 14 flows into the liquid storage tank 20 through the connecting pipe until the liquid storage tank 20 is full, and the stirring motor 16 is turned off;
[0078] Step 3: According to the requirements of profile control and flooding control for liquid concentration, when only liquid injection is needed, the PLC control unit issues a command to control the high-pressure plunger pump 23 to start, so that the liquid in the liquid storage tank 20 flows to the water injection well 1 through the liquid delivery pipeline 22 and the water injection pipeline 2 for profile control and flooding. After the operation is completed, the high-pressure plunger pump 23 is turned off, and at the same time, the liquid in the liquid distribution tank 14 continuously flows to the liquid storage tank 20 for replenishment; when only water injection is needed, the PLC control unit issues a command to control the water supply pump 7 and the second control valve 5 to start, so that the water from the water source flows to the water injection well 1 through the water supply pipeline 9, the second water delivery pipeline 6, and the water injection pipeline 2 for profile control and flooding, and the operation is completed. After that, the water supply pump 7 and the second control valve 5 are closed; when it is necessary to adjust the concentration of the injected liquid, the PLC control unit issues an instruction to control the high-pressure plunger pump 23, the water supply pump 7, and the second control valve 5 to open at the same time, and the regulating water and the liquid are collected in the water injection pipeline 2 and mixed under the action of the stirring device 3 to obtain the required concentration of liquid, and then injected into the injection well 1 for profile adjustment and drive adjustment. After the operation is completed, the high-pressure plunger pump 23, the water supply pump 7, and the second control valve 5 are closed at the same time; when the PLC control unit receives the low liquid level signal transmitted by the liquid level sensor at the liquid outlet of the liquid preparation tank 14, it issues an instruction to control the liquid outlet control valve 19 to close, and repeats the liquid configuration process of step one.
[0079] The number of devices and processing scales described here are used to simplify the description of the present invention. Applications, modifications and variations of the present invention will be obvious to those skilled in the art.
[0080] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. Offshore oil field online profile control and flooding control system, characterized by: include: A liquid dispensing tank, which has a water inlet on the top and a liquid outlet on the bottom, and a liquid outlet control valve is provided at the liquid outlet; A liquid storage tank is arranged below the liquid dispensing tank and its top is connected to the liquid outlet through a connecting pipe, and the bottom of the liquid storage tank is connected to the water injection pipeline through a liquid delivery pipeline, and a high-pressure plunger pump is arranged on the liquid delivery pipeline; A water supply device is connected to the water inlet through a first water supply pipeline and to the water injection pipeline through a second water supply pipeline. The water injection pipeline is also connected to a water injection well. A first control valve is provided on the first water supply pipeline and a second control valve is provided on the second water supply pipeline.
2. The offshore oilfield online profile control and flooding control system according to claim 1, characterized in that: The water supply device comprises: a water supply pipeline, one end of which is connected to a water source, and the other end of which is connected to the first water supply pipeline and the second water supply pipeline through a three-way pipe. The water supply pipeline is provided with a filter and a water supply pump.
3. The offshore oilfield online profile control and flooding control system according to claim 1, characterized in that: The top of the liquid dispensing tank is provided with a plurality of storage boxes connected thereto, a feed port is provided on the top of the storage box, the bottom of the storage box is open, the side wall of the bottom of the storage box is bent in a two-step shape, a moving port is provided on the side wall of the second step, a moving plate is slidably inserted at the moving port at the bottom of the first step side wall to block or open the opening at the bottom of the storage box, a rack is provided on the side edge of the moving plate located outside the storage box, a plurality of driving motors are provided on the top of the liquid dispensing tank, a gear is provided on the output shaft of the driving motor, and the gear is meshed with its corresponding rack.
4. The offshore oilfield online profile control and flooding control system according to claim 3, characterized in that: A vertical connecting plate is arranged on the side wall of the second step, a vertical supporting plate located below the side wall of the first step is arranged on the connecting plate, and the movable plate is movably inserted between the supporting plate and the side wall of the first step.
5. The offshore oilfield online profile control and flooding control system according to claim 1, characterized in that: A stirring rod is rotatably arranged in the liquid dispensing tank, and a plurality of mixing blades are arranged on the stirring rod. The top of the stirring rod is connected to the output shaft of the stirring motor at the top of the liquid dispensing tank, and the bottom of the stirring rod extends to the liquid outlet and a spiral groove is arranged on its periphery.
6. The offshore oilfield online profile control and flooding control system according to claim 1, characterized in that: The water injection pipeline is provided with a stirring device, and the stirring device comprises: A support pipe, which is connected to the water injection pipeline, and a side wall of the support pipe is configured to be an openable pipe wall; The support rod is detachably arranged on the inner side of the openable tube wall and is coaxial with the support tube. A plurality of support rings are rotatably arranged on the support rod. A plurality of stirring blades are arranged on the support ring. The stirring blades on two adjacent support rings rotate in opposite directions.
7. The offshore oilfield online profile control and flooding control system according to claim 6, characterized in that: Connecting rods vertically connected thereto are provided at both ends of the support rod, a pair of slots are provided on the openable tube wall, a pair of arc-shaped slides are provided on the inner side wall of the support tube corresponding to the openable tube wall, one end of the connecting rod is inserted in the corresponding slot, and the other end is movably inserted in the corresponding arc-shaped slide.
8. The offshore oilfield online profile control and flooding control system according to claim 1, characterized in that: Demulsifiers are arranged on the liquid storage tank and the liquid delivery pipeline of the high-pressure plunger pump.
9. The offshore oilfield online profile control and flooding control system according to claim 1, characterized in that: Also includes: A PLC control unit, which is communicatively connected with the liquid outlet control valve, the high-pressure plunger pump, the first control valve, and the second control valve; A remote control module is communicatively connected with the PLC control unit.
10. A profile control and displacement control method using the offshore oil field online profile control and displacement control system according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: Open the first control valve, and the water supply device delivers the water for preparing the liquid medicine into the liquid preparation tank containing the liquid medicine or the medicine through the first water supply pipeline to prepare the liquid medicine, and then close the first control valve; Step 2: Open the liquid outlet control valve to transfer part of the liquid prepared in the liquid preparation tank to the liquid storage tank through the liquid delivery pipeline until the liquid storage tank is full, and then close the liquid outlet control valve; Step 3: According to the requirements of profile control and flooding control for liquid concentration, choose to open the second control valve and high-pressure plunger pump. The water supply device will deliver water to the water injection pipeline through the second water delivery pipeline. At the same time, the liquid in the storage tank will flow to the water injection pipeline through the liquid delivery pipeline and mix with the water to adjust the liquid concentration before entering the water injection well for profile control and flooding control.
