Method for adjusting cooling schedule of sintering circular cooler and related equipment

By setting multiple detection points on the upper part of the ring-cooling machine trolley, testing the hot air and cooling air parameters, calculating the average heat exchange, and adjusting the cooling air distribution, the problems of uneven cooling and large energy consumption in the ring-cooling machine cooling system are solved. It achieves efficient and uniform cooling of sintered ore.

CN118980262APending Publication Date: 2024-11-19SHOUGANG GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411225760.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing ring cooling system is difficult to achieve fine adjustment of cooling air distribution, resulting in uneven cooling, unreasonable cooling rate and large energy consumption, affecting the cooling quality and energy efficiency of sintered ore.

Method used

By setting multiple detection points on the upper part of the ring-cooling machine trolley, continuously test the physical parameters of hot air and cooling air, calculate the average heat exchange, adjust the cooling air distribution of the cooling section and the bellows, and optimize the cooling system, including adjusting the air volume, air temperature and air pressure and increase airflow distribution device in the bellows.

Benefits of technology

The uniformity and efficiency of the cooling process are improved, the cooling energy consumption of sintered ore is reduced, and the cooling quality and energy efficiency are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980262A_ABST
    Figure CN118980262A_ABST
Patent Text Reader

Abstract

The invention discloses a sintering circular cooler cooling schedule adjusting method and related equipment, and relates to the technical field of metallurgy. The method comprises the steps that hot air physical parameters at all detection point positions on the upper portion of a circular cooler trolley and cooling air physical parameters of all circular cooler bellows are obtained; the average heat exchange amount of each circular cooler air box is obtained according to the hot air physical parameters of each detection point position and the cooling air physical parameters of each circular cooler air box, and the heat exchange amount of each cooling section is obtained according to segmentation of the circular cooler air boxes so as to obtain the current circular cooler cooling system; and adjusting the cooling air distribution of each cooling section and each circular cooler air box in the current circular cooler cooling system according to a preset target circular cooler cooling system until the target circular cooler cooling system is realized. According to the method, the accurate cooling system of the circular cooler can be obtained, fine adjustment is conducted, and efficient and low-consumption sinter cooling is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of metallurgical technology, and in particular to a method for adjusting the cooling system of a sintering ring cooler and related equipment. Background Art

[0002] After the sintering process is completed, the sintered ore needs to be cooled. Currently, most steel companies use ring coolers as cooling equipment. Ring coolers are usually divided into several cooling sections, each of which contains one or more wind boxes and a cooling blower.

[0003] The cooling system of the ring cooler is usually adjusted by the cooling air configuration of each cooling section. At present, in the actual production process, it is only necessary to meet the requirements of the final average temperature of the ore. The cooling system setting of each cooling section is often based on subjective experience. It is difficult to obtain the advantages and disadvantages of the current cooling system and make fine and reasonable adjustments to the cooling system. Therefore, it often causes the distribution deviation of the cooling air in some cooling sections and the deviation from the set cooling system, resulting in uneven cooling, unreasonable cooling rate and high cooling energy consumption, which affects the cooling of the sintered ore and increases the energy consumption of the cooling process.

[0004] Currently, no effective solution has been proposed for the above-mentioned problems in the related technologies. Summary of the invention

[0005] A series of simplified concepts are introduced in the Summary of the Invention section, which will be further described in detail in the Detailed Description of the Invention section. The Summary of the Invention section of this application does not mean to attempt to define the key features and essential technical features of the claimed technical solution, nor does it mean to attempt to determine the scope of protection of the claimed technical solution.

[0006] This application specifically includes the following aspects:

[0007] In a first aspect, the present application proposes a method for adjusting the cooling system of a sintering ring cooler, comprising:

[0008] Obtaining the hot air physical parameters at each detection point on the upper part of the ring cooler trolley and the cooling air physical parameters of each ring cooler wind box; the hot air physical parameters include the hot air temperature, pressure and wind speed at each detection point; the cooling air physical parameters include the cooling air temperature and pressure of each ring cooler wind box;

[0009] The average heat exchange capacity of each ring cooler wind box is obtained according to the hot air physical parameters at each detection point and the cooling air physical parameters of each ring cooler wind box, and the heat exchange capacity of each cooling section is obtained according to the ring cooler wind box segmentation to obtain the current ring cooler cooling system;

[0010] According to the preset target cooling system of the ring cooler, the cooling air distribution of each cooling section and each ring cooler wind box in the current cooling system of the ring cooler is adjusted until the target cooling system of the ring cooler is achieved.

[0011] In a feasible implementation manner, obtaining the hot air physical parameters at each detection point on the upper part of the ring cooler trolley includes:

[0012] A plurality of detection points are arranged at preset length intervals on the upper part of the ring cooler trolley;

[0013] The hot air temperature, pressure and wind speed at each detection point are continuously tested as the ring cooler runs for one week.

[0014] In a feasible implementation manner, the detection points on the upper part of the ring cooler trolley are all located on the upper part of the sintered ore layer in the ring cooler trolley.

[0015] In a feasible implementation manner, there are at least three detection points on the upper part of the ring cooler trolley, and all of the detection points are tested simultaneously.

[0016] In a feasible implementation, it also includes:

[0017] According to the hot air temperature, pressure and wind speed at each detection point and the specific heat parameter of air, the hot air heat of each detection point on the upper part of the ring cooling machine trolley is obtained;

[0018] The heat of the cooling air entering each ring cooler wind box section is obtained according to the cooling air temperature and pressure of each ring cooler wind box combined with the specific heat parameter of the air.

[0019] In a feasible implementation, the average heat exchange capacity of each ring cooler bellows is equal to the hot air heat of each detection point on the upper part of the ring cooler trolley corresponding to the position of each ring cooler bellows minus the cooling air heat entering each ring cooler bellows section.

[0020] In a feasible implementation manner, adjusting the cooling air distribution of each cooling section and each ring cooler wind box in the current ring cooler cooling system includes:

[0021] The air volume, air temperature and air pressure of the cooling air in each cooling section are adjusted, or an air flow distribution device is added to the wind box of the ring cooler.

[0022] In a second aspect, the present application proposes a cooling system adjustment system for a sintering ring cooler, comprising:

[0023] A parameter acquisition module is used to obtain the hot air physical parameters at each detection point on the upper part of the ring cooler trolley and the cooling air physical parameters of each ring cooler wind box; the hot air physical parameters include the hot air temperature, pressure and wind speed at each detection point; the cooling air physical parameters include the cooling air temperature and pressure of each ring cooler wind box;

[0024] A cooling system acquisition module, used to obtain the average heat exchange capacity of each ring cooler wind box according to the hot air physical parameters at each detection point and the cooling air physical parameters of each ring cooler wind box, and obtain the heat exchange capacity of each cooling section according to the ring cooler wind box segmentation to obtain the current ring cooler cooling system;

[0025] The cooling system adjustment module is used to adjust the cooling air distribution of each cooling section and each ring cooler wind box in the current ring cooler cooling system according to the preset target ring cooler cooling system until the target ring cooler cooling system is achieved.

[0026] In a third aspect, the present application proposes an electronic device comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor is used to implement the steps of the method for adjusting the cooling system of a sintering ring cooler as described in any one of the first aspects above when executing the computer program stored in the memory.

[0027] In a fourth aspect, the present application further proposes a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for adjusting the cooling system of a sintering ring cooler according to any one of the first aspects is implemented.

[0028] In summary, the cooling system adjustment method and related equipment for a sintering ring cooler proposed in the embodiment of the present application evenly set multiple detection points along the length direction on the upper part of the ring cooler trolley, and continuously test the hot air temperature, pressure and wind speed at each detection point as the ring cooler runs for one week; test the cooling air temperature and pressure of each ring cooler bellows; calculate the average heat exchange capacity of each bellows for each test value of each detection point, and obtain the existing cooling system of the ring cooler; through continuous testing of the ring cooler at multiple detection points along the length direction of the ring cooler trolley, the overall cooling air distribution of the ring cooler in the length direction of the trolley and the running direction can be obtained, avoiding the occurrence of detection leakage points, and at the same time, through the bellows air inlet test and the calculation of the average heat exchange rate, the cooling speed, cooling uniformity and other parameters of each cooling part during the entire cooling process of the ring cooler can be objectively evaluated, and the existing cooling system can be obtained, so that the difference can be compared with the original setting or the cooling system to be optimized, so as to make the next adjustment. According to the set new cooling system, the cooling air distribution of each cooling section and each bellows is optimized. The method for optimizing the cooling air distribution of each cooling section and each bellows is to adjust the parameters such as the air volume, air temperature and air pressure of the cooling air in the cooling section, which is mainly used to adjust the cooling rate of each cooling section. In addition, by adding an air flow distribution device in the bellows of the ring cooler, it can be used to adjust the local cooling uniformity of each cooling section to avoid insufficient cooling in some areas, resulting in the final sintered ore discharge temperature being too high or the overall cooling air volume and energy consumption being too large.

[0029] The cooling system adjustment method and related equipment of the sintering ring cooler proposed in this application, and other advantages, objectives and features of this application will be partially reflected through the following description, and will also be partially understood by technical personnel in this field through research and practice of this application. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present specification. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0031] Figure 1 A schematic diagram of a process for adjusting the cooling system of a sintering ring cooler provided in an embodiment of the present application;

[0032] Figure 2 A schematic diagram of functional modules of a cooling system adjustment system for a sintering ring cooler provided in an embodiment of the present application;

[0033] Figure 3 A schematic diagram of the structure of an electronic device for adjusting the cooling system of a sintering ring cooler provided in an embodiment of the present application. DETAILED DESCRIPTION

[0034] In order to better understand the technical solutions provided by the embodiments of this specification, the technical solutions of the embodiments of this specification are described in detail below through the accompanying drawings and specific embodiments. It should be understood that the embodiments of this specification and the specific features in the embodiments are detailed descriptions of the technical solutions of the embodiments of this specification, rather than limitations on the technical solutions of this specification. In the absence of conflict, the embodiments of this specification and the technical features in the embodiments can be combined with each other.

[0035] In this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or equipment. In the absence of more restrictions, the elements limited by the statement "comprise one..." do not exclude the existence of other identical elements in the process, method, article or equipment including the elements. The term "more than two" includes two or more than two situations.

[0036] See also Figure 1 , which is a schematic diagram of a process for adjusting the cooling system of a sintering ring cooler provided in an embodiment of the present application, and may specifically include:

[0037] S110. Obtain the hot air physical parameters at each detection point on the upper part of the ring cooler trolley and the cooling air physical parameters of each ring cooler bellows; the hot air physical parameters include the hot air temperature, pressure and wind speed at each detection point; the cooling air physical parameters include the cooling air temperature and pressure of each ring cooler bellows.

[0038] Exemplarily, a plurality of detection points are provided on the upper part of the ring cooler trolley, through which parameters such as the temperature, pressure and wind speed of the cooling air in the length direction of the ring cooler trolley can be obtained, and then the cooling heat exchange and uniformity in the length direction of the ring cooler trolley can be compared.

[0039] S120, obtaining the average heat exchange capacity of each ring cooler bellows according to the hot air physical parameters at each detection point and the cooling air physical parameters of each ring cooler bellows, and obtaining the heat exchange capacity of each cooling section according to the ring cooler bellows segmentation to obtain the current ring cooler cooling system.

[0040] Exemplarily, by detecting the parameters of the cooling air entering the detection points above the ring cooler trolley and the ring cooler bellows, and combining parameters such as the specific heat of the air, the heat exchange rate of the cooling air at each detection point can be obtained, thereby obtaining the average heat exchange rate of each bellows and each cooling section containing a different number of bellows, that is, the cooling condition, so that the accurate current cooling system of the ring cooler can be obtained.

[0041] S130, adjusting the cooling air distribution of each cooling section and each ring cooler wind box in the current ring cooler cooling system according to a preset target ring cooler cooling system, until the target ring cooler cooling system is achieved.

[0042] Exemplarily, after obtaining the current ring cooler cooling system, the unreasonable aspects of the current ring cooler cooling system are determined through evaluation and analysis, and a new target ring cooler cooling system is set to optimize the cooling process of each cooling section and each bellows, so as to achieve rapid, uniform and low-energy cooling of sintered ore according to the set cooling system.

[0043] Further, the above steps S110 to S130 are repeated until the set target cooling system of the cooling machine is achieved. After adjustment according to the new target cooling system of the cooling machine, the above method of the present application can be used to test and confirm whether the adjusted target cooling system of the cooling machine is consistent with the setting. If not, the adjustment can be continued until completion.

[0044] In summary, at present, it is difficult to judge whether the cooling system is appropriate during the actual operation of the sintered ore ring cooler, and therefore it is difficult to optimize and adjust it. Accurately grasping the cooling system of the ring cooler and making reasonable optimization can achieve the purpose of reducing the cooling energy consumption of the sintered ore and improving the quality of the sintered ore, which plays an important role in energy conservation and consumption reduction. The cooling system adjustment method of the sintering ring cooler proposed in the embodiment of the present application obtains the hot air parameters after passing through the sintered ore layer in the running direction of the ring cooler through multiple detection points set on the upper part of the ring cooler trolley, and then calculates the average heat exchange rate of each detection point, bellows and cooling section by testing the cooling air parameters of each ring cooler bellows, and obtains the accurate cooling system of the existing ring cooler; through the evaluation and analysis of the existing cooling system, its unreasonableness is determined, and a new cooling system is set to optimize the cooling process of each cooling section and each bellows, so as to achieve rapid, uniform and low-energy cooling of the sintered ore according to the set cooling system.

[0045] In some examples, obtaining the hot air physical parameters at each detection point on the upper part of the ring cooler trolley includes:

[0046] A plurality of detection points are arranged at preset length intervals on the upper part of the ring cooler trolley;

[0047] The hot air temperature, pressure and wind speed at each detection point are continuously tested as the ring cooler runs for one week.

[0048] Exemplarily, a plurality of testing points are evenly arranged along the length direction on the upper part of the ring cooler trolley, and the hot air temperature, pressure and wind speed at each testing point are continuously tested as the ring cooler runs for one cycle.

[0049] In some examples, the positions of the upper detection points of the ring cooler trolley are all located on the upper part of the sintered ore layer in the ring cooler trolley.

[0050] Exemplarily, the upper part of the ring cooler trolley is the space where the cooling air passes through the sintered ore layer, and a plurality of detection points are evenly arranged along the length direction on the upper part of the ring cooler trolley.

[0051] In some examples, there are at least three inspection points on the upper portion of the ring cooler trolley, and all of the inspection points are tested simultaneously.

[0052] Exemplarily, when testing the upper part of the ring cooler trolley, at least 3 test points are set to ensure the comprehensiveness and accuracy of the test. Multiple test points facilitate the evaluation of the overall status of the ring cooler trolley. Testing all test points at the same time helps improve efficiency. Testing at the same time can save time because there is no need to wait for one test point to complete before starting the next one. When all test points use the same test conditions and standards, errors caused by different test times or conditions can be reduced. And simultaneous testing can ensure that the collected data is consistent, which is convenient for comparison and analysis.

[0053] In some examples, this also includes:

[0054] According to the hot air temperature, pressure and wind speed at each detection point and the specific heat parameter of air, the hot air heat of each detection point on the upper part of the ring cooling machine trolley is obtained;

[0055] The heat of the cooling air entering each ring cooler wind box section is obtained according to the cooling air temperature and pressure of each ring cooler wind box combined with the specific heat parameter of the air.

[0056] Exemplarily, the hot air heat quantity of each detection point is obtained by using the hot air temperature, pressure and wind speed at each detection point, in combination with the specific heat and other related physical properties of the air, and using existing heat exchange calculation formulas and principles; the cooling air heat quantity entering each ring cooler bellows section is obtained by using the cooling air temperature and pressure of each ring cooler bellows, in combination with the specific heat and other related physical properties of the air, and using existing heat exchange calculation formulas and principles.

[0057] In some examples, the average heat exchange capacity of each ring cooler bellows is equal to the hot air heat of each detection point on the upper part of the ring cooler trolley corresponding to each ring cooler bellows position minus the cooling air heat entering each ring cooler bellows section.

[0058] Exemplarily, the average heat exchange capacity of each ring cooler bellows may be obtained by subtracting the heat of the cooling air entering each ring cooler bellows section from the heat of the hot air at each detection point.

[0059] In some examples, adjusting the cooling air distribution of each cooling section and each ring cooler wind box in the current ring cooler cooling regime includes:

[0060] The air volume, air temperature and air pressure of the cooling air in each cooling section are adjusted, or an air flow distribution device is added to the wind box of the ring cooler.

[0061] Exemplarily, the method for optimizing the cooling air distribution of each cooling section and each bellows may be to adjust the parameters such as the air volume, air temperature and air pressure of the cooling air to adjust the air inlet parameters of each cooling section, or to add an air flow distribution device in the bellows to adjust the air flow distribution of each bellows in each cooling section, thereby optimizing the cooling process of the sintered ore above each bellows.

[0062] In summary, a method for adjusting the cooling system of a sintering ring cooler is provided in an embodiment of the present invention. A plurality of detection points are evenly arranged along the length direction on the upper part of the ring cooler trolley, and the hot air temperature, pressure and wind speed at each detection point are continuously tested as the ring cooler runs for one cycle; the cooling air temperature and pressure of each ring cooler bellows are tested; the average heat exchange capacity of each bellows is calculated for each test value of each detection point, and the existing cooling system of the ring cooler is obtained; by continuously testing the ring cooler at a plurality of detection points along the length direction of the ring cooler trolley, the entire cooling air distribution of the ring cooler in the length direction of the trolley and the running direction can be obtained, and the occurrence of detection leakage points can be avoided. At the same time, through the bellows air inlet test and the calculation of the average heat exchange capacity, the parameters such as cooling speed and cooling uniformity of each cooling part in the entire cooling process of the ring cooler can be objectively evaluated, and the existing cooling system can be obtained, so as to compare the difference with the original setting or the cooling system to be optimized, and then make the next adjustment. The cooling air distribution of each cooling section and each bellows is optimized according to the set new cooling system. The method for optimizing the cooling air distribution of each cooling section and each bellows is to adjust the parameters such as the air volume, air temperature and air pressure of the cooling air in the cooling section, which is mainly used to adjust the cooling rate of each cooling section. In addition, by adding an air flow distribution device in the bellows of the ring cooler, it can be used to adjust the local cooling uniformity of each cooling section to avoid insufficient cooling in some areas, resulting in excessively high final sintered ore discharge temperature or excessive overall cooling air volume and energy consumption.

[0063] The technical solution of the present application is further described in detail below through specific embodiments.

[0064] In this specific embodiment, the following steps are performed:

[0065] Step 1: At a 580m 2Three testing points are evenly arranged along the length of the upper part of the ring cooler trolley. The temperature, pressure and wind speed of each testing point are continuously tested as the ring cooler runs for one week.

[0066] Step 2, testing the air inlet temperature and pressure of each ring cooler wind box;

[0067] Step 3: Calculate the average heat exchange capacity of each wind box for each test result of each detection point, and obtain the heat exchange capacity of each cooling section according to the wind box segmentation, and obtain the existing cooling system of the ring cooler, as shown in Table 1 below;

[0068]

[0069] Table 1

[0070] Step 4: By analyzing the existing cooling system of the ring cooler, it is found that: 2 The ring cooler has a total of 24 bellows corresponding to 6 cooling sections, 1 circulating fan and 6 cooling blowers. During normal production, 1 circulating fan and 4 cooling blowers are turned on. At the same time, the heat exchange of bellows No. 1 and No. 2 in cooling section 1 is too low, and the heat exchange of bellows No. 8 in cooling section 2 is also low. The cooling system is unreasonable. In order to reduce the power consumption of the cooling process, the 4th to 6th blowers were stopped alternately according to experience. However, each method caused the sinter discharge temperature to increase significantly, and it was impossible to ensure that the sinter discharge temperature was within the safety standard range. Finally, it had to return to the original method. Due to the failure to accurately understand the existing cooling system, targeted adjustments could not be made, and energy saving and consumption reduction in the cooling process could not be achieved.

[0071] Therefore, a new cooling system was set up on the basis of the original cooling system, that is, to increase the heat exchange capacity of bellows No. 1, 2 and 8, and at the same time to close the last cooling blower in the cooling section. An adjustment plan was formulated based on the test results: an air volume distribution device was added to the bellows in cooling section 1 to guide the cooling air flow to bellows No. 1 and No. 2, and at the same time, the total air volume of cooling section 1 was increased by adjusting the air inlet valve; an air volume distribution device was added to the bellows in cooling section 2 to guide the cooling air flow to bellows No. 8; and the cooling blower corresponding to cooling section 6 was closed.

[0072] Step 5. After the transformation is completed, repeat steps 1 to 4 to obtain a new cooling system, as shown in Table 2 below. After analysis, under the condition that the sintered ore discharge temperature is basically the same, one cooling blower is reduced, the optimization goal is achieved, and the optimization adjustment of the cooling system of the ring cooler is completed, thereby reducing energy consumption on the basis of effective cooling.

[0073]

[0074]

[0075] Table 2

[0076] In summary, from the results in Table 1 and Table 2 above, it can be seen that the method of the present application can accurately grasp the cooling system and optimize and adjust it in a targeted manner compared to the traditional method, and finally optimize some problematic cooling sections, achieve the improvement of cooling efficiency, reduce the use of one cooling blower, and reduce the energy consumption of the cooling process. The method provided by the embodiment of the present invention can not only grasp the heat exchange distribution in the running direction of the ring cooler, but also grasp the heat distribution in the length direction of the ring cooler trolley, and obtain the accurate existing ring cooler cooling system, and can analyze and formulate optimization plans in a targeted manner; by adjusting the air volume, air temperature and air pressure of the cooling air in the cooling section, the cooling air distribution of each cooling section and the bellows can be optimized, and by adding an airflow distribution device in the bellows, the cooling of each bellows can be finely adjusted, and the cooling system of the ring cooler can be finely and accurately adjusted; by optimizing the cooling system of the ring cooler, accurate adjustment and verification according to the set system can be achieved, and the sintered ore can be cooled at a lower energy consumption.

[0077] It should be noted that the above embodiments are only the best examples and are not limitations on the implementation methods of the present application.

[0078] Furthermore, the present application also proposes a sintering ring cooler cooling system adjustment system, which is applied to any of the above-mentioned sintering ring cooler cooling system adjustment methods. Figure 2 As shown, this is a functional module schematic diagram of a sintering ring cooler cooling system adjustment system proposed in this application, including:

[0079] The parameter acquisition module 21 is used to obtain the hot air physical parameters at each detection point on the upper part of the ring cooler trolley and the cooling air physical parameters of each ring cooler wind box; the hot air physical parameters include the hot air temperature, pressure and wind speed at each detection point; the cooling air physical parameters include the cooling air temperature and pressure of each ring cooler wind box;

[0080] A cooling system acquisition module 22 is used to obtain the average heat exchange capacity of each ring cooler wind box according to the hot air physical parameters at each detection point and the cooling air physical parameters of each ring cooler wind box, and obtain the heat exchange capacity of each cooling section according to the ring cooler wind box segmentation to obtain the current ring cooler cooling system;

[0081] The cooling system adjustment module 23 is used to adjust the cooling air distribution of each cooling section and each ring cooler wind box in the current ring cooler cooling system according to the preset target ring cooler cooling system until the target ring cooler cooling system is achieved.

[0082] like Figure 3As shown, an embodiment of the present application also provides an electronic device 300, including a processor 310, a memory 320, and a computer program 321 stored in the memory 320 and executable on the processor, and when the processor 310 executes the computer program 321, the steps of any method for adjusting the cooling system of the sintering ring cooler are implemented.

[0083] Since the electronic device introduced in this embodiment is a device used to implement a method for adjusting the cooling system of a sintering ring cooler in the embodiment of the present application, based on the method introduced in the embodiment of the present application, technical personnel in this field can understand the specific implementation mode of the electronic device of this embodiment and its various variations. Therefore, how the electronic device implements the method in the embodiment of the present application will not be described in detail here. As long as the equipment used by technical personnel in this field to implement the method in the embodiment of the present application falls within the scope of protection of this application.

[0084] In the specific implementation process, when the computer program 321 is executed by the processor, it can achieve Figure 1 Any implementation manner in the corresponding embodiments.

[0085] It should be noted that in the above embodiments, the description of each embodiment has its own emphasis, and for parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0086] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-readable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-readable program code.

[0087] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded computer, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0088] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0089] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0090] The embodiment of the present application also provides a computer program product, which includes computer software instructions. When the computer software instructions are executed on a processing device, the processing device executes the process of the method for adjusting the cooling system of a sintering ring cooler.

[0091] The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on the computer, the process or function according to the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from a website site, a computer, a server or a data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (digital subscriber line, DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, server or data center. The computer-readable storage medium can be any available medium that a computer can store or a data storage device such as a server or a data center that includes one or more available media integration. The available medium can be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid state drive (SSD)), etc.

[0092] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0093] In the several embodiments provided in the present application, it should be understood that the disclosed devices, apparatuses and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules is only a logical function division, and there may be other division methods in actual implementation, such as multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or modules, which can be electrical, mechanical or other forms.

[0094] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, that is, they may be located in one place or distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0095] In addition, each functional module in each embodiment of the present application can be integrated into a processing module, or each module can exist physically separately, or two or more modules can be integrated into one module. The above integrated modules can be implemented in the form of hardware or software functional modules.

[0096] If the integrated module is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program codes.

[0097] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

[0098] Although the preferred embodiments of this specification have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of this specification.

[0099] Obviously, those skilled in the art can make various changes and modifications to this specification without departing from the spirit and scope of this specification. Thus, if these modifications and variations of this specification fall within the scope of the claims of this specification and their equivalents, this specification is also intended to include these modifications and variations.

Claims

1. A method for adjusting the cooling system of a sintering ring cooler, characterized in that: include: Obtain the hot air physical parameters at each detection point on the upper part of the ring cooler trolley and the cooling air physical parameters of each ring cooler wind box; The hot air physical parameters include the hot air temperature, pressure and wind speed at each detection point; the cooling air physical parameters include the cooling air temperature and pressure of each ring cooler wind box; The average heat exchange capacity of each ring cooler wind box is obtained according to the hot air physical parameters at each detection point and the cooling air physical parameters of each ring cooler wind box, and the heat exchange capacity of each cooling section is obtained according to the ring cooler wind box segmentation to obtain the current ring cooler cooling system; According to the preset target cooling system of the ring cooler, the cooling air distribution of each cooling section and each ring cooler wind box in the current cooling system of the ring cooler is adjusted until the target cooling system of the ring cooler is achieved.

2. The method for adjusting the cooling system of a sintering ring cooler according to claim 1, characterized in that: Obtaining the hot air physical parameters at each detection point on the upper part of the ring cooler trolley includes: A plurality of detection points are arranged at preset length intervals on the upper part of the ring cooler trolley; The hot air temperature, pressure and wind speed at each detection point are continuously tested as the ring cooler runs for one week.

3. The method for adjusting the cooling system of a sintering ring cooler according to claim 2, characterized in that: The positions of the upper detection points of the ring cooler trolley are all located on the upper part of the sintered ore layer in the ring cooler trolley.

4. The method for adjusting the cooling system of a sintering ring cooler according to claim 3, characterized in that: There are at least three detection points on the upper part of the ring cooler trolley, and all the detection points are tested simultaneously.

5. The method for adjusting the cooling system of a sintering ring cooler according to claim 1, characterized in that: Also includes: According to the hot air temperature, pressure and wind speed at each detection point and the specific heat parameter of air, the hot air heat of each detection point on the upper part of the ring cooling machine trolley is obtained; The heat of the cooling air entering each ring cooler wind box section is obtained according to the cooling air temperature and pressure of each ring cooler wind box combined with the specific heat parameter of the air.

6. The method for adjusting the cooling system of a sintering ring cooler according to claim 5, characterized in that: The average heat exchange amount of each ring cooler wind box is equal to the hot air heat of each detection point on the upper part of the ring cooler trolley corresponding to the position of each ring cooler wind box minus the cooling air heat entering each ring cooler wind box section.

7. The method for adjusting the cooling system of a sintering ring cooler according to claim 1, characterized in that: Adjusting the cooling air distribution of each cooling section and each ring cooler wind box in the current ring cooler cooling system includes: The air volume, air temperature and air pressure of the cooling air in each cooling section are adjusted, or an air flow distribution device is added to the wind box of the ring cooler.

8. A cooling system adjustment system for a sintering ring cooler, characterized in that: include: The parameter acquisition module is used to obtain the physical parameters of the hot air at each detection point on the upper part of the ring cooler trolley and the physical parameters of the cooling air of each ring cooler wind box; The hot air physical parameters include the hot air temperature, pressure and wind speed at each detection point; the cooling air physical parameters include the cooling air temperature and pressure of each ring cooler wind box; A cooling system acquisition module, used to obtain the average heat exchange capacity of each ring cooler wind box according to the hot air physical parameters at each detection point and the cooling air physical parameters of each ring cooler wind box, and obtain the heat exchange capacity of each cooling section according to the ring cooler wind box segmentation to obtain the current ring cooler cooling system; The cooling system adjustment module is used to adjust the cooling air distribution of each cooling section and each ring cooler wind box in the current ring cooler cooling system according to the preset target ring cooler cooling system until the target ring cooler cooling system is achieved.

9. An electronic device, comprising: A memory and a processor, wherein the processor is used to implement the steps of the method for adjusting the cooling system of a sintering ring cooler as described in any one of claims 1 to 7 when executing the computer program stored in the memory.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method for adjusting the cooling system of a sintering ring cooler according to any one of claims 1 to 7 are implemented.