Polar plate leak detection device and polar plate leak detection method based on polar plate tool

By designing a leak detection device based on electrode plate tooling, and utilizing vacuuming, nitrogen purging, and helium detection technologies, the problem of inaccurately locating leaks in the cooling chamber, hydrogen chamber, and oxygen chamber of hydrogen fuel cell stacks in existing technologies has been solved, achieving efficient and low-cost leak detection.

CN118980465APending Publication Date: 2024-11-19BEIJING NOWOGEN TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411106985.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

Existing technologies are insufficient to accurately detect leaks between the cooling chamber and the hydrogen and oxygen chambers in a hydrogen fuel cell stack, making it impossible to pinpoint the source of the leak. Furthermore, conventional gas detection methods are costly and difficult to implement.

Method used

A plate leak detection device based on a plate tooling was designed, comprising a vacuum pumping mechanism, a nitrogen purging mechanism, a helium delivery mechanism, and a helium detection mechanism. The device is connected to the cavity of the plate tooling via a connecting pipeline assembly to achieve nitrogen purging, vacuum extraction, and helium detection, thereby accurately locating the leakage rate.

Benefits of technology

It enables accurate detection of leakage rates between the cooling chamber and the hydrogen and oxygen chambers in a hydrogen fuel cell stack, simplifying the testing process, reducing costs, and improving testing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980465A_ABST
    Figure CN118980465A_ABST
Patent Text Reader

Abstract

The invention provides a pole plate leak detection device and a pole plate leak detection method based on a pole plate tool. The pole plate leak detection device comprises at least one connecting pipeline assembly, a plurality of connecting pipelines, a plurality of connecting pipelines and a plurality of leakage detection devices, wherein the connecting pipelines are used for being connected with the pole plate tool; the vacuumizing mechanisms are controlled to communicate with the corresponding cavities; the nitrogen purging mechanisms are controlled to communicate with the corresponding cavities; the helium conveying mechanism can be controlled to communicate with the corresponding cavity; and the helium detection mechanism is controlled to communicate with the corresponding cavity. As the vacuumizing mechanism, the nitrogen purging mechanism, the helium conveying mechanism and the helium detection mechanism can be communicated with the corresponding cavities of the polar plate tool through the corresponding connecting pipeline assemblies, the nitrogen purging mechanism can be used for performing nitrogen purging on the cavities before testing so as to reduce interference of other gases; the cavity is vacuumized through a vacuumizing mechanism; helium is supplied into the cavity through a helium conveying mechanism; and the leakage rate of the corresponding cavity can be obtained based on the helium detection mechanism.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of fuel cells, and in particular to a plate leak detection device and a plate leak detection method based on a plate tooling. Background Art

[0002] The hydrogen fuel cell stack is the place where the electrochemical reaction occurs. It is the core component of the hydrogen fuel cell system and maintains the energy output process of the entire fuel cell system. The cathode and anode plates are graphite plates, composite plates or metal plates carved by molding or machining. The bipolar plate assembly is based on the monopolar plate, which is bonded and processed with sealing strips. The stack is composed of multiple single cells stacked in series, with the bipolar plates and membrane electrodes alternately stacked. Sealing elements are embedded between each cell to play a sealing and buffering role, and finally assembled together by compression force.

[0003] Hydrogen fuel cells have high requirements for leakage between cavities, especially for leakage between the cooling cavity (also called the water cavity) and the hydrogen cavity and oxygen cavity. In the actual operation of the stack, the cooling cavity is connected to the coolant, and most coolants contain ethylene glycol. Once ethylene glycol penetrates into the hydrogen and oxygen cavity and contacts the membrane electrode, the performance and life of the stack will be greatly reduced. There is also a situation where the hydrogen and oxygen cavity leaks into the cooling cavity, and the hydrogen sensor of the system water tank alarms, which poses a hidden danger to the safety of vehicles and personnel. Because the leakage process is small and slow, the leakage rate is 1*10-6~1*10-8Pa*m3 / s. It is difficult to detect using conventional gas detection methods, so the introduction of helium detection is the future trend of fuel cell stack air tightness testing.

[0004] CN109708820A provides a fuel cell bipolar plate rapid leak detection device and method. This method only seals the cooling water cavity interface of the bipolar plate, and introduces helium into the external vacuum chamber of the plate. This method can only determine the sum of the hydrogen and oxygen cavity leaking into the cooling cavity, and cannot obtain the amount of hydrogen and oxygen cavity leaking into the cooling cavity respectively, and cannot accurately check which plate leaked from, and requires the construction of a vacuum chamber. CN116046285A provides a fuel bipolar plate helium detection system and method. Although this method attempts to solve the problem of interference with the detection result due to unclean chamber helium exhaust, the helium residual problem cannot be avoided from the embodiment of the invention. The helium in the cavity cannot be effectively exhausted by opening the cavity valve alone, and it involves the gas collection of the external leakage cavity. The product needs to be placed in a vacuum box for processing. Although it is not reflected in the patent, it is essential, and the cost and testing difficulty are greatly increased. The result measured by this method is the sum of cross-leakage and external leakage, and it is impossible to determine how much the product leaks to the outside and how much cross-leakage occurs. Summary of the invention

[0005] In order to solve the above problems, the present invention proposes a plate leakage detection device and a plate leakage detection method based on a plate tooling.

[0006] In the first aspect, the present invention proposes a plate leak detection device based on a plate tooling, wherein the plate tooling has multiple cavities. The plate leak detection device includes: at least one connecting pipeline assembly, which is used to connect to the plate tooling; a vacuum pumping mechanism, which is connected to a corresponding one of the connecting pipeline assemblies and can be controlled to communicate with the corresponding cavity of the plate tooling, so as to vacuum the corresponding cavity of the plate tooling; a nitrogen purge mechanism, which is connected to a corresponding one of the connecting pipeline assemblies and can be controlled to communicate with the corresponding cavity of the plate tooling, so as to purge the corresponding cavity of the plate tooling with nitrogen; a helium delivery mechanism, which is connected to a corresponding one of the connecting pipeline assemblies and can be controlled to communicate with the corresponding cavity of the plate tooling, so as to deliver helium to the corresponding cavity of the plate tooling; and a helium detection mechanism, which is connected to a corresponding one of the connecting pipeline assemblies and can be controlled to communicate with the corresponding cavity of the plate tooling, so as to detect leaks in the corresponding cavity of the plate tooling.

[0007] Furthermore, each of the connecting pipeline assemblies includes: a main connecting pipeline, connected to at least one of the vacuum pumping mechanism, the nitrogen purging mechanism, the helium delivery mechanism, and the helium detection mechanism; at least one branch connecting pipeline, one end of each of the branch connecting pipelines is connected to the main connecting pipeline, and the other end is used to be connected to the plate tooling, and each of the branch connecting pipelines is arranged corresponding to one of the cavities; and a first control valve is arranged on each of the branch connecting pipelines, for controlling the connection or cutoff between the corresponding branch connecting pipeline and the corresponding cavity.

[0008] Furthermore, the vacuum pumping mechanism includes: a vacuum pumping pipeline, which is connected to the main connecting pipeline of the corresponding connecting pipeline assembly and can be controlled to be connected to the corresponding cavity; a vacuum pump, which is arranged in the vacuum pumping pipeline and is used to vacuum the cavity connected to the vacuum pumping pipeline; a second control valve, which is arranged in the vacuum pumping pipeline and is used to control the connection or cutoff between the vacuum pumping pipeline and the main connecting pipeline; and a first pressure detection unit, which is arranged in the vacuum pumping pipeline and is used to detect the gas pressure in the vacuum pumping pipeline.

[0009] Further, the nitrogen purging mechanism includes: a nitrogen delivery pipeline, which is connected to the main connecting pipeline of the corresponding connecting pipeline assembly and can be controlled to communicate with the corresponding cavity; a nitrogen supply unit, which is arranged in the nitrogen delivery pipeline and is used to perform nitrogen purge on the cavity connected to the nitrogen delivery pipeline; a third control valve, which is arranged in the nitrogen delivery pipeline and is used to connect or cut off the nitrogen delivery pipeline with the main connecting pipeline; a second pressure detection unit, which is arranged in the nitrogen delivery pipeline and is used to detect the gas pressure in the nitrogen delivery pipeline; and a first pressure reducing valve, which is arranged in the nitrogen delivery pipeline and is used to control the gas pressure in the nitrogen delivery pipeline.

[0010] Further, the helium delivery mechanism includes: a helium delivery pipeline, which is connected to the main connecting pipeline or the branch connecting pipeline of the corresponding connecting pipeline assembly and can be controlled to be connected to the corresponding cavity; a helium supply unit, which is arranged in the helium delivery pipeline and is used to deliver helium to the cavity connected to the helium delivery pipeline; a fourth control valve, which is arranged in the helium delivery pipeline and is used to control the connection or cutoff between the helium delivery pipeline and the main connecting pipeline or the branch connecting pipeline of the corresponding connecting pipeline assembly; a third pressure detection unit, which is arranged in the helium delivery pipeline and is used to detect the gas pressure in the helium delivery pipeline; and a second pressure reducing valve, which is arranged in the helium delivery pipeline and is used to control the gas pressure in the helium delivery pipeline.

[0011] Further, the helium detection mechanism includes: a helium delivery pipeline, which is connected to the main connection pipeline or the branch connection pipeline of the corresponding connection pipeline assembly and can be controlled to be connected to the corresponding cavity; a helium mass spectrometer, which is arranged on the helium delivery pipeline and is used to perform leakage detection on the cavity connected to the helium delivery pipeline; a fifth control valve, which is arranged on the helium delivery pipeline and is used to control the connection or cutoff between the helium delivery pipeline and the main connection pipeline or the branch connection pipeline of the corresponding connection pipeline assembly; and a filtering unit, which is arranged on the helium delivery pipeline and is used to prevent carbon powder in the helium mass spectrometer from entering the helium delivery pipeline.

[0012] Furthermore, the electrode plate leak detection device also includes an exhaust pipeline assembly, which includes: an exhaust pipeline, which is connected to the main connecting pipeline or the branch connecting pipeline of the corresponding connecting pipeline assembly and can be controlled to be connected to the corresponding cavity; an exhaust valve, which is arranged on the exhaust pipeline and is used to discharge the gas in the cavity connected to the exhaust pipeline; and a second pressure reducing valve, which is arranged on the exhaust pipeline and is used to control the connection or cutoff between the exhaust pipeline and the main connecting pipeline or the branch connecting pipeline of the corresponding connecting pipeline assembly.

[0013] Furthermore, the plate tooling includes a first jig, a bipolar plate and a second jig which are arranged in sequence, and the bipolar plate is sealed and connected to the first jig and the second jig to form three cavities, and the three cavities are respectively defined as a first cavity, a second cavity and a third cavity. The connecting pipeline assembly includes a first connecting pipeline assembly and a second connecting pipeline assembly, and the first connecting pipeline assembly and the second connecting pipeline assembly can be controlled to communicate with the first cavity, the second cavity and the third cavity. The vacuum pumping mechanism, the nitrogen purge mechanism and the helium delivery mechanism are connected to the main connecting pipeline of the first connecting pipeline assembly, and the helium detection mechanism is connected to the main connecting pipeline of the second connecting pipeline assembly.

[0014] Furthermore, the plate fixture includes a third fixture, a first seal, a monopolar plate, a second seal and a fourth fixture which are arranged in sequence. The monopolar plate is sealed and connected to the third fixture through the first seal to enclose a cavity with the third fixture and is defined as a fourth cavity. The monopolar plate is sealed and connected to the fourth fixture through the second seal to enclose another cavity with the fourth fixture and is defined as a fifth cavity. The third fixture is provided with a first detection hole connected to the fourth cavity, and the fourth fixture is provided with an inflation hole and a second detection hole connected to the fifth cavity. There is one connecting pipeline assembly, and there are two branch connecting pipelines in the connecting pipeline assembly. The vacuum pumping mechanism and the nitrogen purge mechanism are connected to the main connecting pipeline of the connecting pipeline assembly, the helium delivery mechanism is connected to one of the two branch connecting pipelines through the inflation hole, and the helium detection mechanism is connected to the other of the two branch connecting pipelines.

[0015] In a second aspect, the present invention further proposes a plate leak detection method, which is applied to the above-mentioned plate leak detection device based on the plate tooling, comprising: using the nitrogen purge mechanism to perform nitrogen purge on the first cavity, the second cavity and the third cavity via the first connecting pipeline assembly; using the vacuum pumping mechanism to simultaneously perform vacuum pumping on the first cavity, the second cavity and the third cavity via the first connecting pipeline assembly; when the vacuum degree in the first cavity, the second cavity and the third cavity reaches a first threshold, controlling the first cavity and the second cavity or the third cavity to be connected with the helium detection mechanism; correspondingly controlling the third cavity or the first cavity and the second cavity to be connected with the helium delivery mechanism and supplying helium; when the pressure in the third cavity or the first cavity and the second cavity reaches a second threshold, based on the helium detection mechanism, obtaining the sum of the vacuum leakage rates from the third cavity to the first cavity and the second cavity or the sum of the vacuum leakage rates from the first cavity and the second cavity to the third cavity.

[0016] In a third aspect, the present invention further proposes a plate leak detection method, which is applied to the above-mentioned plate leak detection device based on the plate tooling, comprising: using the nitrogen purging mechanism to perform nitrogen purging on the first cavity, the second cavity and the third cavity via the first connecting pipeline assembly; using the vacuum pumping mechanism to simultaneously evacuate the first cavity, the second cavity and the third cavity via the first connecting pipeline assembly; when the vacuum degree in the first cavity, the second cavity and the third cavity reaches a first threshold, controlling the first cavity to be connected with the helium detection mechanism; controlling the second cavity to be connected with the helium delivery mechanism and supplying helium; controlling the third cavity not to be connected with the helium delivery mechanism and the helium detection mechanism; when the pressure in the second cavity reaches a second threshold, obtaining the vacuum leakage rate from the second cavity to the first cavity based on the helium detection mechanism.

[0017] In a fourth aspect, the present invention further proposes a plate leak detection method, which is applied to the above-mentioned plate leak detection device based on the plate tooling, comprising: using the nitrogen purging mechanism to perform nitrogen purging on the fourth cavity and the fifth cavity via the connecting pipeline assembly; using the vacuum pumping mechanism to evacuate the fourth cavity via the connecting pipeline assembly; when the vacuum degree in the fourth cavity reaches a first threshold, using the vacuum pumping mechanism to evacuate the fifth cavity via the connecting pipeline assembly; when the vacuum degree in the fifth cavity reaches the first threshold, controlling the fifth cavity to be connected to the helium detection mechanism; controlling the fourth cavity to be connected to the helium delivery mechanism and supplying helium; when the pressure in the fourth cavity reaches a second threshold, obtaining the vacuum leakage rate from the third cavity to the fourth cavity to the fifth cavity based on the helium detection mechanism.

[0018] The beneficial effects of the present invention are as follows:

[0019] In the plate leak detection device based on the plate tooling of the present invention, since the vacuum pumping mechanism, the nitrogen purging mechanism, the helium delivery mechanism and the helium detection mechanism can be connected with the corresponding cavity of the plate tooling through the corresponding connecting pipeline assembly, the nitrogen purging mechanism can be used to purge the cavity to be filled, the cavity to be detected or all the cavities of the plate tooling with nitrogen before the vacuum test to reduce the interference of other gases; then the vacuum pumping mechanism is used to vacuum the cavity to be filled, the cavity to be detected or all the cavities of the plate tooling; then the helium delivery mechanism is used to supply helium to the cavity to be filled; finally, based on the helium detection mechanism connected with the cavity to be detected, the leakage rate of the cavity to be filled to the cavity to be detected can be obtained.

[0020] This Summary is provided to introduce a selection of concepts in a simplified form that are further described below in the Detailed Description. This Summary is not intended to identify key features or essential features of the disclosure, nor is it intended to limit the scope of the disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.

[0022] Figure 1 A schematic diagram of the connection relationship of the electrode plate leakage detection device in one embodiment of the present invention;

[0023] Figure 2 It is a schematic diagram of the connection relationship of the electrode plate leakage detection device of the present invention in another embodiment;

[0024] Figure 3 For Figure 1 Schematic diagram of the corresponding plate tooling;

[0025] Figure 4 For Figure 2 Schematic diagram of the corresponding plate tooling.

[0026] The reference numerals are as follows:

[0027] 100. Plate leak detection device;

[0028] 10. Connecting pipeline assembly; 10A. First connecting pipeline assembly; 10B. Second connecting pipeline assembly; 11. Main connecting pipeline; 12. Branch connecting pipeline; 13. First control valve;

[0029] 20. Vacuum pumping mechanism; 21. Vacuum pumping pipeline; 22. Vacuum pump; 23. Second control valve; 24. First pressure detection unit;

[0030] 30. Nitrogen purge mechanism; 31. Nitrogen delivery pipeline; 32. Nitrogen supply unit; 33. Third control valve; 34. Second pressure detection unit; 35. First pressure reducing valve;

[0031] 40. Helium delivery mechanism; 41. Helium delivery pipeline; 42. Helium supply unit; 43. Fourth control valve; 44. Third pressure detection unit; 45. Second pressure reducing valve;

[0032] 50. Helium detection mechanism; 51. Helium delivery pipeline; 52. Helium mass spectrometer; 53. Fifth control valve; 54. Filter unit;

[0033] 60. Exhaust pipeline assembly; 61. Exhaust pipeline; 62. Exhaust valve; 63. Sixth control valve;

[0034] 70. Auxiliary connecting pipeline; 71. Auxiliary pipeline; 72. Seventh control valve;

[0035] 200, plate tooling; 210, first fixture; 220, bipolar plate; 230, second fixture; 240, third fixture; 241, first detection hole; 250, first sealing member; 260, monopolar plate; 270, second sealing member; 280, fourth fixture; 281, second detection hole; 282, charging hole;

[0036] A1, first cavity; A2, second cavity; A3, third cavity; A4, fourth cavity; A5, fifth cavity. DETAILED DESCRIPTION

[0037] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to make the present disclosure more thorough and complete, and to fully convey the scope of the present disclosure to those skilled in the art.

[0038] As used herein, the term "including" and its variations mean open inclusion, i.e., "including but not limited to". Unless otherwise stated, the term "or" means "and / or". The term "based on" means "based at least in part on". The terms "an example embodiment" and "an embodiment" mean "at least one example embodiment". The term "another embodiment" means "at least one additional embodiment". The terms "first", "second", etc. may refer to different or the same objects. Other explicit and implicit definitions may also be included below.

[0039] The plate leak detection device 100 based on the plate fixture according to the embodiment of the present invention is used to perform vacuum leak detection test on the plate (monopolar plate or bipolar plate) in the plate fixture 200. Wherein, the plate fixture 200 has multiple cavities, and the plate leak detection device 100 can be used to detect the vacuum leakage rate from any cavity (called the cavity to be inflated) to another cavity (called the cavity to be tested), the sum of the leakage rates from any cavity (called the cavity to be inflated) to other multiple cavities (called the cavity to be tested), and the vacuum leakage rate from multiple cavities (called the cavity to be inflated) to a certain cavity (called the cavity to be tested).

[0040] It should be noted that when the electrode plate in the electrode tooling 200 is a bipolar plate, the multiple cavities can be a hydrogen chamber, an oxygen chamber and a cooling chamber (also called a water chamber) respectively; when the electrode plate in the electrode tooling 200 is a monopolar plate, the multiple cavities can be cavities formed by the monopolar plate and the fixture respectively.

[0041] Reference Figures 1 to 4 The electrode plate leak detection device 100 of the embodiment of the present invention includes at least one connecting pipeline assembly 10, a vacuum pumping mechanism 20, a nitrogen purge mechanism 30, a helium delivery mechanism 40 and a helium detection mechanism 50.

[0042] Each connecting pipeline assembly 10 is used to connect with the plate tooling 200, and the vacuum pumping mechanism 20 is connected to a corresponding connecting pipeline assembly 10 and can be controlled to communicate with the corresponding cavity of the plate tooling 200, so as to vacuum the corresponding cavity of the plate tooling 200. The nitrogen purge mechanism 30 is connected to a corresponding connecting pipeline assembly 10 and can be controlled to communicate with the corresponding cavity of the plate tooling 200, so as to purge the corresponding cavity of the plate tooling 200 with nitrogen. The helium delivery mechanism 40 is connected to a corresponding connecting pipeline assembly 10 and can be controlled to communicate with the corresponding cavity of the plate tooling 200, so as to deliver helium to the corresponding cavity of the plate tooling 200. The helium detection mechanism 50 is connected to a corresponding connecting pipeline assembly 10 and can be controlled to communicate with the corresponding cavity of the plate tooling 200, so as to detect leakage in the corresponding cavity of the plate tooling 200.

[0043] In the plate leak detection device 100 of the embodiment of the present invention, since the vacuuming mechanism 20, the nitrogen purging mechanism 30, the helium delivery mechanism 40 and the helium detection mechanism 50 can be connected with the corresponding cavity of the plate tooling 200 through the corresponding connecting pipeline assembly 10, the nitrogen purging mechanism 30 can be used to purge the cavity to be filled, the cavity to be detected or all the cavities of the plate tooling 200 with nitrogen before the vacuum test to reduce the interference of other gases; then the vacuuming mechanism 20 is used to evacuate the cavity to be filled, the cavity to be detected or all the cavities of the plate tooling 200; then the helium delivery mechanism 40 is used to supply helium to the cavity to be filled; finally, based on the helium detection mechanism 50 connected with the cavity to be detected, the leakage rate of the cavity to be filled to the cavity to be detected can be obtained.

[0044] Specifically, the cavity to be detected in this embodiment can be one of the hydrogen cavity, oxygen cavity and cooling cavity in the bipolar plate, and the cavity to be filled with gas can be the other two, so as to determine and measure the sum of the leakage rates from the two cavities to the other cavity; or, the cavity to be detected can be two of the hydrogen cavity, oxygen cavity and cooling cavity in the bipolar plate, and the cavity to be filled with gas can be the other one, so as to determine and measure the sum of the leakage rates from one cavity to the other two cavities; or, the cavity to be detected can be one of the hydrogen cavity, oxygen cavity and cooling cavity in the bipolar plate, and the cavity to be filled with gas can be one of the remaining two, so as to determine and measure the leakage of the three cavities separately.

[0045] The cavity to be detected in this embodiment can be a cavity formed by the monopolar plate and its fixture, and the cavity to be inflated can be another cavity formed by the monopolar plate and its fixture, so as to determine and measure the crosstalk between the two cavities.

[0046] Therefore, in the plate leak detection device 100 of the embodiment of the present invention, based on the connection relationship between the vacuum mechanism 20, the nitrogen purge mechanism 30, the helium delivery mechanism 40 and the helium detection mechanism 50 and different cavities, the interference of other gases can be discharged before detection. During detection, it can not only be used to accurately determine and measure the leakage of the three cavities of the bipolar plate, but also to accurately determine and measure the mutual leakage rate between the cooling cavity and the hydrogen and oxygen cavity, and can also be used for leakage detection of the single polar plate. In addition, the test method of the plate leak detection device 100 is convenient and efficient, can be tested repeatedly, and can be used in mass production.

[0047] Reference Figure 1 and Figure 2 Each connecting pipeline assembly 10 includes a main connecting pipeline 11, at least one branch connecting pipeline 12 and a first control valve 13. The main connecting pipeline 11 of each connecting pipeline assembly 10 is connected to at least one of the vacuum pumping mechanism 20, the nitrogen purge mechanism 30, the helium delivery mechanism 40, and the helium detection mechanism 50. One end of each branch connecting pipeline 12 is connected to the main connecting pipeline 11, and the other end is used to connect to the plate tooling 200, and each branch connecting pipeline 12 is arranged corresponding to one of the cavities. The first control valve 13 is arranged on each branch connecting pipeline 12, and is used to control the connection or cutoff between the corresponding branch connecting pipeline 12 and the corresponding cavity.

[0048] Reference Figure 1 and Figure 2 The vacuum pumping mechanism 20 includes a vacuum pumping pipeline 21 , a vacuum pump 22 , a second control valve 23 and a first pressure detection unit 24 .

[0049] The vacuum line 21 is connected to the main connecting line 11 of the corresponding connecting line assembly 10 and can be controlled to communicate with the corresponding cavity. The vacuum pump 22 is arranged on the vacuum line 21, and is used to vacuum the cavity connected to the vacuum line 21. The second control valve 23 is arranged on the vacuum line 21, and is used to control the connection or cutoff between the vacuum line 21 and the main connecting line 11. The first pressure detection unit 24 is arranged on the vacuum line 21, and is used to detect the gas pressure in the vacuum line 21.

[0050] Reference Figure 1 and Figure 2 The nitrogen purge mechanism 30 includes a nitrogen delivery pipeline 31 , a nitrogen supply unit 32 , a third control valve 33 , a second pressure detection unit 34 and a first pressure reducing valve 35 .

[0051] The nitrogen delivery pipeline 31 is connected to the main connecting pipeline 11 of the corresponding connecting pipeline assembly 10 and can be controlled to communicate with the corresponding cavity. The nitrogen supply unit 32 is arranged on the nitrogen delivery pipeline 31, and is used to purge the cavity connected to the nitrogen delivery pipeline 31 with nitrogen. The third control valve 33 is arranged on the nitrogen delivery pipeline 31, and is used to connect or cut off the nitrogen delivery pipeline 31 with the main connecting pipeline 11. The second pressure detection unit 34 is arranged on the nitrogen delivery pipeline 31, and is used to detect the gas pressure in the nitrogen delivery pipeline 31. The first pressure reducing valve 35 is arranged on the nitrogen delivery pipeline 31, and is used to control the gas pressure in the nitrogen delivery pipeline 21.

[0052] Reference Figure 1 and Figure 2 The helium delivery mechanism 40 includes a helium delivery pipeline 41 , a helium supply unit 42 , a fourth control valve 43 , a third pressure detection unit 44 and a second pressure reducing valve 45 .

[0053] When the plate in the plate fixture 200 is a bipolar plate, Figure 1 As shown, the helium delivery pipeline 41 is connected to the main connection pipeline 11 of the corresponding connection pipeline assembly 10 and can be controlled to communicate with the corresponding cavity through the main connection pipeline 11. The helium supply unit 42 is arranged on the helium delivery pipeline 41, and is used to deliver helium to the cavity connected with the helium delivery pipeline 41. The fourth control valve 43 is arranged on the helium delivery pipeline 41, and is used to control the connection or cutoff between the helium delivery pipeline 41 and the main connection pipeline 11 of the corresponding connection pipeline assembly 10. The third pressure detection unit 44 is arranged on the helium delivery pipeline 41, and is used to detect the gas pressure in the helium delivery pipeline 41. The second pressure reducing valve 45 is arranged on the helium delivery pipeline 41, and is used to control the gas pressure in the helium delivery pipeline 41.

[0054] When the electrode plate in the electrode plate fixture 200 is a monopolar plate, Figure 2 As shown, the helium delivery pipeline 41 is connected to the branch connection pipeline 12 of the corresponding connection pipeline assembly 10 and can be controlled to communicate with the corresponding cavity through the branch connection pipeline 12. The helium supply unit 42 is arranged on the helium delivery pipeline 41, and is used to deliver helium to the cavity connected with the helium delivery pipeline 41. The fourth control valve 43 is arranged on the helium delivery pipeline 41, and is used to control the connection or cutoff between the helium delivery pipeline 41 and the branch connection pipeline 12 of the corresponding connection pipeline assembly 10. The third pressure detection unit 44 is arranged on the helium delivery pipeline 41, and is used to detect the gas pressure in the helium delivery pipeline 41. The second pressure reducing valve 45 is arranged on the helium delivery pipeline 41, and is used to control the gas pressure in the helium delivery pipeline 41.

[0055] Reference Figure 1 and Figure 2The helium detection mechanism 50 includes a helium delivery pipeline 51 , a helium mass spectrometer 52 , a fifth control valve 53 and a filtering unit 54 .

[0056] When the plate in the plate fixture 200 is a bipolar plate, Figure 1 As shown, the helium delivery pipeline 51 is connected to the main connection pipeline 11 of the corresponding connection pipeline assembly 10 and can be controlled to communicate with the corresponding cavity through the main connection pipeline 11. The helium mass spectrometer 52 is arranged on the helium delivery pipeline 51, and is used to perform air leakage detection on the cavity connected to the helium delivery pipeline 51. The fifth control valve 53 is arranged on the helium delivery pipeline 51, and is used to control the communication or cutoff between the helium delivery pipeline 51 and the main connection pipeline 11 of the corresponding connection pipeline assembly 10. The filter unit 54 is arranged on the helium delivery pipeline 51, and is used to prevent the carbon powder in the helium mass spectrometer 42 from entering the helium delivery pipeline 51.

[0057] When the electrode plate in the electrode plate fixture 200 is a monopolar plate, Figure 2 As shown, the helium delivery pipeline 51 is connected to the branch connection pipeline 12 of the corresponding connection pipeline assembly 10 and can be controlled to communicate with the corresponding cavity through the branch connection pipeline 12. The helium mass spectrometer 52 is arranged on the helium delivery pipeline 51, and is used to perform air leakage detection on the cavity connected to the helium delivery pipeline 51. The fifth control valve 53 is arranged on the helium delivery pipeline 51, and is used to control the connection or cutoff between the helium delivery pipeline 51 and the branch connection pipeline 12 of the corresponding connection pipeline assembly 10. The filter unit 54 is arranged on the helium delivery pipeline 51, and is used to prevent the carbon powder in the helium mass spectrometer 42 from entering the helium delivery pipeline 51.

[0058] Reference Figure 1 and Figure 2 The electrode plate leak detection device 100 further includes an exhaust pipeline assembly 60 , and the exhaust pipeline assembly 60 includes an exhaust pipeline 61 , an exhaust valve 62 and a sixth control valve 63 .

[0059] When the plate in the plate fixture 200 is a bipolar plate, Figure 1 As shown, the exhaust pipeline 61 is connected to the main connecting pipeline 11 of the corresponding connecting pipeline assembly 10 and can be controlled to communicate with the corresponding cavity via the main connecting pipeline 11. The exhaust valve 62 is provided on the exhaust pipeline 61, and is used to discharge the gas in the cavity communicated with the exhaust pipeline 61. The sixth control valve 63 is provided on the exhaust pipeline 61, and is used to control the communication or cutoff between the exhaust pipeline 61 and the main connecting pipeline 11 of the corresponding connecting pipeline assembly 10.

[0060] When the electrode plate in the electrode plate fixture 200 is a monopolar plate, Figure 2As shown, the exhaust pipeline 61 is connected to the branch connection pipeline 12 of the corresponding connection pipeline assembly 10 and can be controlled to communicate with the corresponding cavity through the branch connection pipeline 12. The exhaust valve 62 is provided on the exhaust pipeline 61, and is used to discharge the gas in the cavity communicated with the exhaust pipeline 61. The sixth control valve 63 is provided on the exhaust pipeline 61, and is used to control the communication or cutoff between the exhaust pipeline 61 and the branch connection pipeline 12 of the corresponding connection pipeline assembly 10.

[0061] Reference Figure 1 and Figure 3 In one embodiment, the plate fixture 200 includes a first fixture 210, a bipolar plate 220 and a second fixture 230 which are arranged in sequence. The bipolar plate 220 is sealed and connected to the first fixture 210 and the second fixture 230 to form three cavities, and the three cavities are respectively defined as a first cavity A1, a second cavity A2 and a third cavity A3. The first cavity A1, the second cavity A2 and the third cavity A3 can respectively refer to one of a hydrogen cavity, an oxygen cavity and a cooling cavity.

[0062] In this embodiment, the connecting pipeline assembly 10 is divided into two parts, namely, a first connecting pipeline assembly 10A and a second connecting pipeline assembly 10B. The first connecting pipeline assembly 10A and the second connecting pipeline assembly 10B each include a main connecting pipeline 11 and three branch connecting pipelines 12 connected to the main connecting pipeline 11. The first connecting pipeline assembly 10A is respectively connected to the first cavity A1, the second cavity A2 and the third cavity A3 through the three branch connecting pipelines 12 and is in controlled communication. The second connecting pipeline assembly 10B is also respectively connected to the first cavity A1, the second cavity A2 and the third cavity A3 through the three branch connecting pipelines 12 and is in controlled communication. The vacuum pumping line 21 of the vacuum pumping mechanism 20, the nitrogen delivery line 31 of the nitrogen purge mechanism 30, and the helium delivery line 41 of the helium delivery mechanism 40 are all connected to the main connection line 11 of the first connection line assembly 10A, and the helium delivery line 51 of the helium detection mechanism 50 is connected to the main connection line 11 of the second connection line assembly 10B. The exhaust line 61 of the exhaust line assembly 60 is connected to the main connection line 11 of the second connection line assembly 10B.

[0063] Reference Figure 1 and Figure 4 In another embodiment, the plate tooling 200 includes a third fixture 240, a first seal 250, a monopolar plate 260, a second seal 270 and a fourth fixture 280 which are arranged in sequence.

[0064] The monopolar plate 260 is sealed and connected to the third fixture 240 through the first seal 250 to enclose a cavity with the third fixture 240 and defined as the fourth cavity A4. The monopolar plate 260 is sealed and connected to the fourth fixture 280 through the second seal 270 to enclose another cavity with the fourth fixture 280 and defined as the fifth cavity A5. The third fixture 240 is provided with a first detection hole 241 communicating with the fourth cavity A4, and the fourth fixture 280 is provided with a charging hole 282 and a second detection hole 281 communicating with the fifth cavity A5.

[0065] In this embodiment, there is one connecting pipeline assembly 10, and there are two branch connecting pipelines 12 in the connecting pipeline assembly 10, and the two branch connecting pipelines 12 are respectively connected to the fourth cavity A4 and the fifth cavity A5 and are controlled to communicate. Among them, the vacuum pumping pipeline 21 of the vacuum pumping mechanism 20 and the nitrogen delivery pipeline 31 of the nitrogen purge mechanism 30 are connected to the main connecting pipeline 11 of the connecting pipeline assembly 10, the helium delivery pipeline 41 of the helium delivery mechanism 40 is connected to one of the two branch connecting pipelines 12 through the inflation hole 282 (one of the branch connecting pipelines 12 is also connected to the exhaust pipeline 61 of the exhaust pipeline assembly 60), and the helium delivery pipeline 51 of the helium detection mechanism 50 is connected to the other of the two branch connecting pipelines 12.

[0066] Further references Figure 1 and Figure 4 The electrode plate leak detection device 100 further includes an auxiliary connecting pipeline 70. The auxiliary connecting pipeline 70 includes an auxiliary pipeline 71 and a seventh control valve 72. The auxiliary pipeline 71 is used to connect the inflation hole 282 with one of the branch connecting pipelines 12. The seventh control valve 72 is arranged on the auxiliary pipeline 71 to control the connection or cutoff between the inflation hole 282 and one of the branch connecting pipelines 12.

[0067] In order to facilitate the description of the following embodiments, the control valves and the pressure detection units in the electrode plate leakage detection device 100 are numbered as follows: Figure 1 and Figure 2 shown.

[0068] When the plate in the plate fixture 200 is a bipolar plate, in one embodiment, the first cavity A1 and the second cavity A2 refer to one of the hydrogen cavity and the oxygen cavity respectively, the third cavity A3 is a cooling cavity, and the third cavity A3 is used as the cavity to be inflated, the first cavity A1 and the second cavity A2 are used as the cavity to be detected, and refer to Figure 1 The plate leakage detection method of the plate leakage detection device 100 includes steps S310-S350.

[0069] S310, nitrogen is purged into the first cavity A1, the second cavity A2 and the third cavity A3 via the first connecting pipeline assembly 10A using the nitrogen purging mechanism 30. At this time, V2, V4, V5, V6, V7, V8, V9 and V10 are in an open state, and the pressure of P2 is controlled to be 50 Kpa.

[0070] S320, the first cavity A1, the second cavity A2 and the third cavity A3 are simultaneously evacuated via the first connecting pipeline assembly 10A by using the vacuuming mechanism 20. At this time, based on S310, V2 and V10 are closed, and V1 is opened.

[0071] S330, when the vacuum degree in the first cavity A1, the second cavity A2 and the third cavity A3 reaches the first threshold value (such as 20Pa, i.e., the indication of P1), the first cavity A1 and the second cavity A2 are controlled to be connected with the helium detection mechanism 50. At this time, based on S320, V1, V4, V6, V8 are closed, and V11 is opened. However, if the vacuum degree in the first cavity A1, the second cavity A2 and the third cavity A3 still does not reach 20Pa, the test is terminated and it is determined that the product is leaking.

[0072] S340, controlling the third cavity A3 to communicate with the helium delivery mechanism 40 and supplying helium. At this time, based on S330, V3 is opened.

[0073] S350, when the pressure in the third cavity A3 reaches the second threshold value (such as 50Kpa, i.e., the indication of P3), based on the helium detection mechanism 50, the sum of the vacuum leakage rates from the third cavity A3 to the first cavity A1 and the second cavity A2 is obtained, that is, the sum of the vacuum leakage rates from the cooling cavity to the hydrogen cavity and the oxygen cavity.

[0074] After the detection result is obtained in this embodiment, V3 and V11 may be closed, and then V10 is opened first, and then V2, V4, V6, and V8 are opened to perform exhaust.

[0075] When the plate in the plate fixture 200 is a bipolar plate, in another embodiment, the first cavity A1 and the second cavity A2 refer to one of the hydrogen cavity and the oxygen cavity respectively, and the third cavity A3 is a cooling cavity. The first cavity A1 and the second cavity A2 are used as the cavity to be inflated, and the third cavity A3 is used as the cavity to be detected. Figure 1 The plate leakage detection method of the plate leakage detection device 100 includes steps S410-S450.

[0076] S410, nitrogen is purged into the first cavity A1, the second cavity A2 and the third cavity A3 via the first connecting pipeline assembly 10A using the nitrogen purging mechanism 30. At this time, V2, V4, V5, V6, V7, V8, V9 and V10 are in an open state, and the pressure of P2 is controlled to be 50 Kpa.

[0077] S420, the first cavity A1, the second cavity A2 and the third cavity A3 are simultaneously evacuated via the first connecting pipeline assembly 10A by using the vacuuming mechanism 20. At this time, based on S410, V2 and V10 are closed, and V1 is opened.

[0078] S430, when the vacuum degree in the first cavity A1, the second cavity A2 and the third cavity A3 reaches the first threshold value (such as 20Pa, i.e., the indication of P1), the third cavity A3 is controlled to be connected with the helium detection mechanism 50. At this time, based on S420, V1, V5, V7, V9 are closed, and V11 is opened. However, if the vacuum degree in the first cavity A1, the second cavity A2 and the third cavity A3 still does not reach 20Pa, the test is terminated and it is determined that the product is leaking.

[0079] S440, control the first cavity A1 and the second cavity A2 to communicate with the helium delivery mechanism 40 and supply helium. At this time, based on S430, open V3.

[0080] S450, when the pressure in the first cavity A1 and the second cavity A2 reaches a second threshold value (such as 50Kpa, i.e., the indication of P3), based on the helium detection mechanism 50, the sum of the vacuum leakage rates from the first cavity A1 and the second cavity A2 to the third cavity A3 is obtained, that is, the sum of the vacuum leakage rates from the hydrogen cavity and the oxygen cavity to the cooling cavity.

[0081] After the detection result is obtained in this embodiment, V3 and V11 may be closed, and then V10 may be opened first, and then V2, V5, V7, and V9 may be opened to perform exhaust.

[0082] When the electrode plate in the electrode tooling 200 is a bipolar plate, the first cavity A1, the second cavity A2, and the third cavity A3 are respectively a hydrogen cavity, an oxygen cavity, and a cooling cavity. Figure 1 In yet another embodiment, the plate leakage detection method of the plate leakage detection device 100 includes steps S510-S560.

[0083] S510, nitrogen is purged into the first cavity A1, the second cavity A2 and the third cavity A3 via the first connecting pipeline assembly 10A using the nitrogen purging mechanism 30. At this time, V2, V4, V5, V6, V7, V8, V9 and V10 are in an open state, and the pressure of P2 is controlled to be 50 Kpa.

[0084] S520, the first cavity A1, the second cavity A2 and the third cavity A3 are simultaneously evacuated via the first connecting pipeline assembly 10A by using the vacuuming mechanism 20. At this time, based on S510, V2 and V10 are closed, and V1 is opened.

[0085] S530: When the vacuum degree in the first cavity A1, the second cavity A2 and the third cavity A3 reaches a first threshold value (e.g., 20 Pa, i.e., the indication of P1), the first cavity A1 (hydrogen cavity) is controlled to be connected to the helium detection mechanism 50. At this time, based on S520, V1, V4, V6, V8 and V9 are closed, and V11 is opened.

[0086] S540, control the third cavity A3 (cooling cavity) to communicate with the helium delivery mechanism 40 and supply helium. At this time, based on S530, open V3.

[0087] S550 , controlling the second cavity A2 (oxygen cavity) to be disconnected from the helium gas delivery mechanism 40 and the helium detection mechanism 50 .

[0088] S560, when the pressure in the third cavity A3 reaches the second threshold (such as 50KPa, i.e. the indication of P3), based on the helium detection mechanism 50, the vacuum leakage rate from the third cavity A3 to the first cavity A1, i.e. the vacuum leakage rate from the cooling cavity to the hydrogen cavity, is obtained.

[0089] After the detection result is obtained in this embodiment, V3 and V11 may be closed, and then V10 may be opened first, and then V2, V4, V6, V8, and V9 may be opened to perform exhaust.

[0090] When the electrode plate in the electrode tooling 200 is a bipolar plate, the first cavity A1, the second cavity A2, and the third cavity A3 are respectively a hydrogen cavity, an oxygen cavity, and a cooling cavity. Figure 1 In yet another embodiment, the plate leakage detection method of the plate leakage detection device 100 includes steps S610 - S660 .

[0091] S610, nitrogen is purged into the first cavity A1, the second cavity A2 and the third cavity A3 via the first connecting pipeline assembly 10A using the nitrogen purging mechanism 30. At this time, V2, V4, V5, V6, V7, V8, V9 and V10 are in an open state, and the pressure of P2 is controlled to be 50 Kpa.

[0092] S620, the first cavity A1, the second cavity A2 and the third cavity A3 are simultaneously evacuated via the first connecting pipeline assembly 10A by using the vacuuming mechanism 20. At this time, based on S410, V2 and V10 are closed, and V1 is opened.

[0093] S630: When the vacuum degree in the first cavity A1, the second cavity A2 and the third cavity A3 reaches a first threshold value (e.g., 20 Pa, i.e., the indication of P1), the second cavity A2 (oxygen cavity) is controlled to be connected to the helium detection mechanism 50. At this time, based on S620, V1, V4, V6, V7, and V8 are closed, and V11 is opened.

[0094] S640, control the third cavity A3 (cooling cavity) to communicate with the helium delivery mechanism 40 and supply helium. At this time, based on S630, open V3.

[0095] S650 , controlling the first cavity A1 (hydrogen cavity) to be disconnected from the helium gas delivery mechanism 40 and the helium detection mechanism 50 .

[0096] S660, when the pressure in the third cavity A3 reaches the second threshold value (such as 50Kpa, i.e., the indication of P3), based on the helium detection mechanism 50, the vacuum leakage rate from the third cavity A3 to the second cavity A2, i.e., the vacuum leakage rate from the cooling cavity to the oxygen cavity, is obtained.

[0097] After the detection result is obtained in this embodiment, V3 and V11 may be closed, and then V10 is opened first, and then V2, V4, V6, V7, and V8 are opened to perform exhaust.

[0098] When the electrode plate in the electrode tooling 200 is a bipolar plate, the first cavity A1, the second cavity A2, and the third cavity A3 are respectively a hydrogen cavity, an oxygen cavity, and a cooling cavity. Figure 1 In yet another embodiment, the plate leakage detection method of the plate leakage detection device 100 includes steps S710 - S760 .

[0099] S710, nitrogen is purged into the first cavity A1, the second cavity A2 and the third cavity A3 via the first connecting pipeline assembly 10A using the nitrogen purging mechanism 30. At this time, V2, V4, V5, V6, V7, V8, V9 and V10 are in an open state, and the pressure of P2 is controlled to be 50 Kpa.

[0100] S720, the first cavity A1, the second cavity A2 and the third cavity A3 are simultaneously evacuated via the first connecting pipeline assembly 10A by using the vacuuming mechanism 20. At this time, based on S710, V2 and V10 are closed, and V1 is opened.

[0101] S730: When the vacuum levels in the first cavity A1, the second cavity A2 and the third cavity A3 reach the first threshold, the third cavity A3 (cooling cavity) is controlled to be connected to the helium detection mechanism 50. At this time, based on S720, V1, V4, V5, V7 and V9 are closed, and V11 is opened.

[0102] S740, control the second cavity A2 (oxygen cavity) to communicate with the helium delivery mechanism 40 and supply helium. At this time, based on S730, open V3.

[0103] S750 , controlling the first cavity A1 (hydrogen cavity) to be disconnected from the helium gas delivery mechanism 40 and the helium detection mechanism 50 .

[0104] S760, when the pressure in the second cavity A2 reaches the second threshold, based on the helium detection mechanism 50, the vacuum leakage rate from the second cavity A2 to the third cavity A3, that is, the vacuum leakage rate from the oxygen cavity to the cooling cavity is obtained.

[0105] After the detection result is obtained in this embodiment, V3 and V11 may be closed, and then V10 may be opened first, and then V2, V4, V5, V7, and V9 may be opened to perform exhaust.

[0106] When the electrode plate in the electrode tooling 200 is a bipolar plate, the first cavity A1, the second cavity A2, and the third cavity A3 are respectively a hydrogen cavity, an oxygen cavity, and a cooling cavity. Figure 1 In yet another embodiment, the plate leakage detection method of the plate leakage detection device 100 includes steps S810 - S860 .

[0107] S810, nitrogen is purged into the first cavity A1, the second cavity A2 and the third cavity A3 via the first connecting pipeline assembly 10A using the nitrogen purging mechanism 30. At this time, V2, V4, V5, V6, V7, V8, V9 and V10 are in an open state, and the pressure of P2 is controlled to be 50 Kpa.

[0108] S820, the first cavity A1, the second cavity A2 and the third cavity A3 are simultaneously evacuated via the first connecting pipeline assembly 10A by using the vacuuming mechanism 20. At this time, based on S710, V2 and V10 are closed, and V1 is opened.

[0109] S830, when the vacuum degree in the first cavity A1, the second cavity A2 and the third cavity A3 reaches the first threshold value (such as 20 Pa, i.e., the indication of P1), the third cavity A3 (cooling cavity) is controlled to be connected with the helium detection mechanism 50. At this time, based on S820, V1, V5, V6, V7, V9 are closed, and V11 is opened.

[0110] S840, control the first cavity A1 (hydrogen cavity) to communicate with the helium delivery mechanism 40 and supply helium. At this time, based on S8730, open V3.

[0111] S850 , controlling the second cavity A2 (oxygen cavity) to be disconnected from the helium gas delivery mechanism 40 and the helium detection mechanism 50 .

[0112] S860, when the pressure in the first cavity A1 reaches a second threshold value (such as 50 KPa, i.e., the indication of P3), based on the helium detection mechanism 50, the vacuum leakage rate from the first cavity A1 to the third cavity A3, i.e., the vacuum leakage rate from the hydrogen cavity to the cooling cavity, is obtained.

[0113] After the detection result is obtained in this embodiment, V3 and V11 may be closed, and then V10 may be opened first, and then V2, V5, V6, V7, and V9 may be opened to perform exhaust.

[0114] When the electrode plate in the electrode plate fixture 200 is a monopolar plate, refer to Figure 2 In one embodiment, the plate leakage detection method of the plate leakage detection device 100 includes steps S910-S950.

[0115] S910, nitrogen is purged into the fourth cavity A4 and the fifth cavity A5 by using the nitrogen purging mechanism 30 via the connecting pipeline assembly 10. At this time, V2, V3, V4, V5, V7, and V8 are in an open state, and the pressure of P2 is controlled to be 50 Kpa.

[0116] S920, the fourth chamber A4 is evacuated by using the vacuum pumping mechanism 20 via the connecting pipe assembly 10. At this time, based on S910, V2 and V8 are closed first, and then V1 and V4 are opened.

[0117] S930, when the vacuum degree in the fourth cavity A4 reaches the first threshold value (such as 20 Pa, i.e., the indication of P1), the fifth cavity A5 is evacuated by the vacuum pumping mechanism 20 via the connecting pipe assembly 10. At this time, based on S920, V3 is opened.

[0118] S940, when the vacuum degree in the fifth cavity A5 reaches the first threshold value (such as 20 Pa, ie, the indication of P1), the fifth cavity A5 is controlled to be connected with the helium detection mechanism 50. At this time, based on S930, V6 is opened.

[0119] S950, controlling the fourth cavity A4 to communicate with the helium delivery mechanism 40 and supplying helium. At this time, based on S940, V5 is opened.

[0120] S960 , when the pressure in the fourth cavity A4 reaches the second threshold, based on the helium detection mechanism 50 , the vacuum leakage rate of the third cavity A3 to the fourth cavity A4 to the fifth cavity A5 is obtained.

[0121] After the detection result is obtained in this embodiment, V5 and V6 can be closed, and then V2 is opened first, and then V3, V4, V5, V7, and V8 are opened to perform exhaust.

[0122] The embodiments of the present disclosure have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.

Claims

1. A plate leak detection device (100) based on a plate tooling, wherein the plate tooling (200) has a plurality of cavities, characterized in that: include: At least one connecting pipeline assembly (10) used for connecting to the electrode tooling (200); A vacuum pumping mechanism (20) connected to a corresponding one of the connecting pipeline assemblies (10) and capable of being controllably connected to a corresponding cavity of the electrode tooling (200) so as to vacuum the corresponding cavity of the electrode tooling (200); a nitrogen purge mechanism (30), connected to a corresponding one of the connecting pipeline assemblies (10) and capable of being controllably communicated with a corresponding cavity of the electrode tooling (200) so as to purge the corresponding cavity of the electrode tooling (200) with nitrogen; a helium delivery mechanism (40), connected to a corresponding one of the connecting pipeline assemblies (10) and capable of being controllably communicated with a corresponding cavity of the electrode tooling (200) so as to deliver helium to the corresponding cavity of the electrode tooling (200); as well as A helium detection mechanism (50) is connected to a corresponding one of the connection pipeline assemblies (10) and can be controllably communicated with a corresponding cavity of the electrode tooling (200), and is used to perform gas leakage detection on the corresponding cavity of the electrode tooling (200).

2. The plate leak detection device (100) based on the plate tooling according to claim 1, characterized in that: Each of the connecting pipeline components (10) comprises: a main connecting pipeline (11) connected to at least one of the vacuum pumping mechanism (20), the nitrogen purge mechanism (30), the helium delivery mechanism (40), and the helium detection mechanism (50); and at least one branch connection pipeline (12), one end of each branch connection pipeline (12) being connected to the main connection pipeline (11) and the other end being used for connecting to the electrode tooling (200), and each branch connection pipeline (12) being arranged corresponding to one of the cavities; and A first control valve (13) is provided on each branch connecting pipeline (12) and is used to control the connection or cutoff between the corresponding branch connecting pipeline (12) and the corresponding cavity.

3. The plate leak detection device (100) based on the plate tooling according to claim 2, characterized in that: The vacuum pumping mechanism (20) comprises: A vacuum pipeline (21) connected to the main connecting pipeline (11) of the corresponding connecting pipeline assembly (10) and capable of being controlled to communicate with the corresponding cavity; A vacuum pump (22), arranged on the vacuum pumping pipeline (21), and used for vacuuming the cavity connected to the vacuum pumping pipeline (21); a second control valve (23), arranged on the vacuum pumping pipeline (21), and used for controlling the connection or cutoff between the vacuum pumping pipeline (21) and the main connecting pipeline (11); A first pressure detection unit (24) is arranged on the vacuum pipeline (21) and is used to detect the gas pressure in the vacuum pipeline (21).

4. The plate leak detection device (100) based on the plate tooling according to claim 2, characterized in that: The nitrogen purge mechanism (30) comprises: A nitrogen delivery pipeline (31) connected to the main connecting pipeline (11) of the corresponding connecting pipeline assembly (10) and capable of being controlled to communicate with the corresponding cavity; A nitrogen supply unit (32), arranged on the nitrogen delivery pipeline (31), for purging the cavity connected to the nitrogen delivery pipeline (31) with nitrogen; a third control valve (33), arranged on the nitrogen delivery pipeline (31), and used for connecting or shutting off the nitrogen delivery pipeline (31) and the main connecting pipeline (11); A second pressure detection unit (34), arranged in the nitrogen delivery pipeline (31), and used for detecting the gas pressure in the nitrogen delivery pipeline (31); A first pressure reducing valve (35) is provided in the nitrogen delivery pipeline (31) and is used to control the gas pressure in the nitrogen delivery pipeline (21).

5. The plate leak detection device (100) based on the plate tooling according to claim 2, characterized in that: The helium delivery mechanism (40) comprises: A helium gas delivery pipeline (41) connected to the main connecting pipeline (11) or the branch connecting pipeline (12) of the corresponding connecting pipeline assembly (10) and capable of being controllably connected to the corresponding cavity; a helium supply unit (42), arranged on the helium delivery pipeline (41), and used for delivering helium to the cavity connected to the helium delivery pipeline (41); a fourth control valve (43), arranged on the helium delivery pipeline (41), for controlling the connection or cutoff between the helium delivery pipeline (41) and the main connecting pipeline (11) or the branch connecting pipeline (12) of the corresponding connecting pipeline assembly (10); a third pressure detection unit (44), arranged in the helium gas delivery pipeline (41), and used for detecting the gas pressure in the helium gas delivery pipeline (41); A second pressure reducing valve (45) is provided in the helium gas delivery pipeline (41) and is used to control the gas pressure in the helium gas delivery pipeline (41).

6. The plate leak detection device (100) based on the plate tooling according to claim 2, characterized in that: The helium detection mechanism (50) comprises: A helium delivery pipeline (51) connected to the main connection pipeline (11) or the branch connection pipeline (12) of the corresponding connection pipeline assembly (10) and capable of being controllably communicated with the corresponding cavity; a helium mass spectrometer (52), arranged on the helium delivery pipeline (51), and used for performing gas leakage detection on the cavity connected to the helium delivery pipeline (51); a fifth control valve (53), arranged on the helium delivery pipeline (51), for controlling the connection or cutoff between the helium delivery pipeline (51) and the main connection pipeline (11) or the branch connection pipeline (12) of the corresponding connection pipeline assembly (10); A filter unit (54) is arranged on the helium delivery pipeline (51) and is used to prevent carbon powder in the helium mass spectrometer (42) from entering the helium delivery pipeline (51).

7. The electrode plate leak detection device (100) based on the electrode plate tooling according to any one of claims 2 to 6, characterized in that: The electrode plate leak detection device (100) further comprises an exhaust pipeline assembly (60), wherein the exhaust pipeline assembly (60) comprises: An exhaust pipeline (61) connected to the main connecting pipeline (11) or the branch connecting pipeline (12) of the corresponding connecting pipeline assembly (10) and capable of being controllably connected to the corresponding cavity; an exhaust valve (62), arranged on the exhaust pipeline (61), and used for exhausting gas in the cavity connected to the exhaust pipeline (61); The second pressure reducing valve (63) is arranged on the exhaust pipeline (61) and is used to control the connection or cutoff between the exhaust pipeline (61) and the main connecting pipeline (11) or the branch connecting pipeline (12) of the corresponding connecting pipeline assembly (10).

8. The electrode plate leak detection device (100) based on the electrode plate tooling according to claim 7, characterized in that: The electrode tooling (200) comprises a first jig (210), a bipolar plate (220), and a second jig (230) which are arranged in sequence, the bipolar plate (220) being sealedly connected to the first jig (210) and the second jig (230) to form three cavities, and the three cavities are respectively defined as a first cavity (A1), a second cavity (A2), and a third cavity (A3); The connecting pipeline assembly (10) comprises a first connecting pipeline assembly (10A) and a second connecting pipeline assembly (10B), and the first connecting pipeline assembly (10A) and the second connecting pipeline assembly (10B) are both controllably connectable to the first cavity (A1), the second cavity (A2) and the third cavity (A3); The vacuum pumping mechanism (20), the nitrogen purge mechanism (30) and the helium delivery mechanism (40) are connected to the main connecting pipeline (11) of the first connecting pipeline assembly (10A), and the helium detection mechanism (50) is connected to the main connecting pipeline (11) of the second connecting pipeline assembly (10B).

9. The electrode plate leak detection device (100) based on the electrode plate tooling according to claim 7, characterized in that: The polar plate tooling (200) comprises a third fixture (240), a first sealing member (250), a monopolar plate (260), a second sealing member (270), and a fourth fixture (280) which are arranged in sequence; The monopolar plate (260) is sealed and connected to the third fixture (240) through the first sealing member (250), so as to enclose a cavity with the third fixture (240) and define it as a fourth cavity (A4); the monopolar plate (260) is sealed and connected to the fourth fixture (280) through the second sealing member (270), so as to enclose another cavity with the fourth fixture (280) and define it as a fifth cavity (A5); The third fixture (240) is provided with a first detection hole (241) communicating with the fourth cavity (A4), and the fourth fixture (280) is provided with an inflation hole (282) and a second detection hole (281) communicating with the fifth cavity (A5); There is one connecting pipeline assembly (10), there are two branch connecting pipelines (12) in the connecting pipeline assembly (10), the vacuum pumping mechanism (20) and the nitrogen purge mechanism (30) are connected to the main connecting pipeline (11) of the connecting pipeline assembly (10), the helium delivery mechanism (40) is connected to one of the two branch connecting pipelines (12) through the inflation hole (282), and the helium detection mechanism (50) is connected to the other of the two branch connecting pipelines (12).

10. A plate leakage detection method, characterized in that: The plate leak detection device (100) based on the plate tooling as claimed in claim 8 comprises: Utilizing the nitrogen purge mechanism (30) to purge the first cavity (A1), the second cavity (A2), and the third cavity (A3) with nitrogen via the first connecting pipeline assembly (10A); Using the vacuum extraction mechanism (20) to simultaneously evacuate the first cavity (A1), the second cavity (A2) and the third cavity (A3) via the first connecting pipeline assembly (10A); When the vacuum levels in the first cavity (A1), the second cavity (A2) and the third cavity (A3) reach a first threshold, controlling the first cavity (A1) and the second cavity (A2) or the third cavity (A3) to communicate with the helium detection mechanism (50); Correspondingly controlling the third cavity (A3) or the first cavity (A1) and the second cavity (A2) to communicate with the helium delivery mechanism (40) and supply helium; When the pressure in the third cavity (A3) or the first cavity (A1) and the second cavity (A2) reaches a second threshold, based on the helium detection mechanism (50), the sum of the vacuum leakage rates from the third cavity (A3) to the first cavity (A1) and the second cavity (A2) or the sum of the vacuum leakage rates from the first cavity (A1) and the second cavity (A2) to the third cavity (A3) is obtained.

11. A plate leakage detection method, characterized in that: The plate leak detection device (100) based on the plate tooling as claimed in claim 8 comprises: Utilizing the nitrogen purge mechanism (30) to purge the first cavity (A1), the second cavity (A2), and the third cavity (A3) with nitrogen via the first connecting pipeline assembly (10A); Using the vacuum extraction mechanism (20) to simultaneously evacuate the first cavity (A1), the second cavity (A2) and the third cavity (A3) via the first connecting pipeline assembly (10A); When the vacuum levels in the first cavity (A1), the second cavity (A2) and the third cavity (A3) reach a first threshold, controlling the first cavity (A1) to communicate with the helium detection mechanism (50); Controlling the second cavity (A2) to communicate with the helium delivery mechanism (40) and supplying helium; Controlling the third cavity (A3) to be disconnected from the helium delivery mechanism (40) and the helium detection mechanism (50); When the pressure in the second cavity (A2) reaches a second threshold, the vacuum leakage rate from the second cavity (A2) to the first cavity (A1) is obtained based on the helium detection mechanism (50).

12. A plate leakage detection method, characterized in that: The plate leak detection device (100) based on the plate tooling as claimed in claim 9 comprises: Utilizing the nitrogen purge mechanism (30) to purge the fourth cavity (A4) and the fifth cavity (A5) with nitrogen via the connecting pipeline assembly (10); Using the vacuum pumping mechanism (20) to evacuate the fourth cavity (A4) via the connecting pipeline assembly (10); When the vacuum degree in the fourth cavity (A4) reaches a first threshold, the fifth cavity (A5) is evacuated by using the vacuum extraction mechanism (20) via the connecting pipeline assembly (10); When the vacuum degree in the fifth cavity (A5) reaches the first threshold value, controlling the fifth cavity (A5) to communicate with the helium detection mechanism (50); Controlling the fourth cavity (A4) to communicate with the helium delivery mechanism (40) and supplying helium; When the pressure in the fourth cavity (A4) reaches a second threshold, based on the helium detection mechanism (50), the vacuum leakage rate from the third cavity (A3) to the fourth cavity (A4) to the fifth cavity (A5) is obtained.