Intelligent management method and device for large equipment and medium
By encoding and data collection of large equipment, intelligent management of equipment is realized, solving the problem of insufficient optimization of equipment energy consumption and running time in the existing technology, improving equipment utilization and equalization rate, and reducing costs.
Patent Information
- Application Number
- CN202410973554.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-19
AI Technical Summary
The existing intelligent device management technology is difficult to achieve refined classification management and remote statistical analysis of large-scale equipment, resulting in insufficient optimization of equipment energy consumption and running time and ineffective reduction of costs.
By encoding large equipment, three-phase voltage, current, temperature and operating status data are collected, and the Modbus RTU communication protocol and data acquisition equipment are used for safety monitoring and fault warning, and equipment scheduling prioritization is sorted based on the data to realize the intelligence of the equipment Management in a comprehensive way.
It realizes refined management of large-scale equipment, improves equipment utilization and balance rate, reduces leasing costs and energy consumption, and saves equipment operation costs.
Smart Images

Figure CN118981189A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of equipment management, and more specifically, to a large-scale equipment intelligent management method, device and medium. Background Art
[0002] In the current context of vigorously promoting green development and energy conservation and consumption reduction, reducing costs has become the main goal. Realize remote management and unified management of large-scale machinery and equipment. Online statistics of equipment operation time, energy consumption and other parameters, through analysis and calculation, arrange the distribution of operating time, and take measures to terminate the lease of equipment with short working time and low efficiency, so as to improve operation efficiency, save energy and equipment operation costs through reasonable layout. Adapt to the needs of modern management. The existing intelligent distribution data collection management has realized the intelligent, professional and real-time management effect of the distribution system, but lacks refined analysis and decision-making for parameters such as equipment energy consumption and operating time. There is a lack of refinement in the classification management of equipment with large quantity and high energy consumption, and remote management statistical analysis. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present invention provides a large-scale equipment intelligent management method, device and medium.
[0004] According to one aspect of the present invention, there is provided a large-scale equipment intelligent management method, comprising:
[0005] Encode the large equipment in the management area according to the equipment type and determine the coding information of each equipment;
[0006] The data information of each large equipment during the charging process is collected by the electric energy meter and data acquisition equipment installed in the equipment power distribution system, wherein the data information includes three-phase voltage data, three-phase current data, cable temperature and operation status data;
[0007] Monitor the safety of the equipment based on data information and preset temperature criteria, determine the equipment's fault information, and issue an early warning if the equipment fails;
[0008] Sort the same type of equipment according to the coding information and operating status data, and determine the scheduling priority of the equipment based on the sorting results.
[0009] Optionally, the data information of each large equipment operation process is collected by setting up an electric energy meter and a data acquisition device in the equipment power distribution system, including:
[0010] Using Modbus RTU communication protocol to obtain multiple initial data information within a preset time from the electric energy meter and the data acquisition device;
[0011] After filtering the initial data information, multiple additions are performed to obtain the average value to obtain the data information.
[0012] Optionally, the device is safety monitored based on the data information and preset temperature criteria to determine the fault information of the device and issue an early warning when the device fails, including:
[0013] Determine whether the equipment has a fault based on the three-phase voltage data and the three-phase current data, where the faults include: overvoltage, undervoltage, phase loss, and three-phase current imbalance;
[0014] According to the cable temperature and the preset temperature criteria, determine whether the equipment has a fault of excessive temperature rise or rapid temperature rise;
[0015] In case of equipment failure, early warning or alarm will be issued.
[0016] Optionally, judging whether the device has an over-temperature rise or over-rapid temperature rise fault according to the cable temperature and a preset temperature criterion, including:
[0017] When the cable temperature meets the preset temperature criteria, the device is judged to have a temperature rise failure of too high or too fast. The preset temperature criteria are:
[0018] Tempn≥Tempg
[0019]
[0020] Where Tempn is the n-phase cable temperature, Tempg is the maximum allowable cable temperature, and Tempd is the temperature rise limit rate.
[0021] Optionally, the same type of devices are sorted according to the coding information and the operation status data, and the scheduling priority of the device is determined according to the sorting result, including:
[0022] Determine the operating status data of the same type of equipment based on the coding information;
[0023] Determine the operation time of each device of the same type based on the operation status data of the same type of devices;
[0024] According to the operation duration, the same type of equipment is arranged in ascending order, and the scheduling priority of the same type of equipment is set according to the sorting result, among which the equipment with the shortest operation duration has the highest scheduling priority.
[0025] According to another aspect of the present invention, there is provided a large-scale equipment intelligent management device, comprising:
[0026] The coding module is used to code the large equipment in the management area according to the equipment type and determine the coding information of each equipment;
[0027] The acquisition module is used to collect data information during the charging process of each large device through the electric energy meter and data acquisition equipment set in the equipment power distribution system, wherein the data information includes three-phase voltage data, three-phase current data, cable temperature and operating status data;
[0028] The first determination module is used to perform safety monitoring on the equipment according to the data information and the preset temperature criterion, determine the fault information of the equipment, and issue an early warning when the equipment fails;
[0029] The second determination module is used to sort the devices of the same type according to the coding information and the operation status data, and determine the scheduling priority of the devices according to the sorting results.
[0030] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the storage medium stores a computer program, and the computer program is used to execute the method described in any one of the above aspects of the present invention.
[0031] According to another aspect of the present invention, an electronic device is provided, comprising: a processor; a memory for storing instructions executable by the processor; the processor is configured to read the executable instructions from the memory and execute the instructions to implement the method described in any one of the above aspects of the present invention.
[0032] Therefore, the present invention is based on the equipment intelligent management system to perform data transmission, security, and energy-saving management, and utilizes the hardware data transmission system to collect parameters such as temperature, leakage current, electric energy, temperature, and other switching quantities of various equipment; digitally encodes the on-site equipment according to the equipment type, capacity, and quantity to facilitate computer management, and each device has a unique digital code. Statistics are collected on the operating time and energy consumption of various equipment on the equipment intelligent management and control platform, and scheduling is performed based on historical data. Real-time operating status monitoring and safety monitoring are performed on the equipment, and early warning and alarm processing is performed for unsafe factors. At the same time, energy consumption analysis is performed on the equipment, energy-saving measures are taken, and the energy-saving effect is verified. On the mobile terminal, the operating status of the equipment, energy consumption changes, and alarm processing can be monitored to facilitate remote intelligent management of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:
[0034] Figure 1 It is a flowchart of a large-scale equipment intelligent management method provided by an exemplary embodiment of the present invention;
[0035] Figure 2 is a logic block diagram of data collection provided by an exemplary embodiment of the present invention;
[0036] Figure 3 is a digital coding schematic diagram of a device provided by an exemplary embodiment of the present invention;
[0037] Figure 4 is a schematic diagram of energy consumption management statistics provided by an exemplary embodiment of the present invention;
[0038] Figure 5 is a schematic diagram of energy consumption comparison provided by an exemplary embodiment of the present invention;
[0039] Figure 6 is a schematic diagram of a mobile terminal energy consumption diagram provided by an exemplary embodiment of the present invention;
[0040] Figure 7 It is a schematic diagram of an alarm and processing situation provided by an exemplary embodiment of the present invention;
[0041] Figure 8 It is a structural schematic diagram of a large-scale equipment intelligent management device provided by an exemplary embodiment of the present invention;
[0042] Fig. 9 This is a structure of an electronic device provided by an exemplary embodiment of the present invention. DETAILED DESCRIPTION
[0043] Below, the exemplary embodiments according to the present invention will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments of the present invention, and it should be understood that the present invention is not limited to the exemplary embodiments described here.
[0044] It should be noted that the relative arrangement of components and steps, the numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.
[0045] Those skilled in the art can understand that the terms "first" and "second" in the embodiments of the present invention are only used to distinguish different steps, devices or modules, etc., and neither represent any specific technical meaning nor indicate the necessary logical order between them.
[0046] It should also be understood that, in the embodiments of the present invention, “plurality” may refer to two or more than two, and “at least one” may refer to one, two or more than two.
[0047] It should also be understood that any component, data or structure mentioned in the embodiments of the present invention can generally be understood as one or more, unless explicitly limited or otherwise indicated in the context.
[0048] In addition, the term "and / or" in the present invention is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects before and after are in an "or" relationship.
[0049] It should also be understood that the description of the various embodiments of the present invention focuses on the differences between the various embodiments, and the same or similar aspects thereof can be referenced to each other, and for the sake of brevity, they will not be described one by one.
[0050] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.
[0051] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
[0052] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.
[0053] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.
[0054] Embodiments of the present invention can be applied to electronic devices such as terminal devices, computer systems, servers, etc., which can operate with many other general or special computing system environments or configurations. Examples of well-known terminal devices, computing systems, environments and / or configurations suitable for use with electronic devices such as terminal devices, computer systems, servers, etc. include, but are not limited to: personal computer systems, server computer systems, thin clients, thick clients, handheld or laptop devices, microprocessor-based systems, set-top boxes, programmable consumer electronics, network personal computers, small computer systems, large computer systems, and distributed cloud computing technology environments including any of the above systems, etc.
[0055] Electronic devices such as terminal devices, computer systems, servers, etc. can be described in the general context of computer system executable instructions (such as program modules) executed by computer systems. Generally, program modules can include routines, programs, object programs, components, logic, data structures, etc., which perform specific tasks or implement specific abstract data types. Computer systems / servers can be implemented in a distributed cloud computing environment, where tasks are performed by remote processing devices linked through a communication network. In a distributed cloud computing environment, program modules can be located on local or remote computing system storage media including storage devices.
[0056] Exemplary Methods
[0057] Figure 1 1 is a flow chart of a large-scale equipment intelligent management method provided by an exemplary embodiment of the present invention. This embodiment can be applied to electronic devices, such as Figure 1 As shown, the large-scale equipment intelligent management method 100 includes the following steps:
[0058] Step 101, encode the large equipment in the management area according to the equipment type, and determine the encoding information of each equipment;
[0059] Step 102, collecting data information during the charging process of each large device through an electric energy meter and a data acquisition device installed in the device power distribution system, wherein the data information includes three-phase voltage data, three-phase current data, cable temperature, and operating status data;
[0060] Step 103, perform safety monitoring on the equipment according to the data information and the preset temperature criterion, determine the fault information of the equipment, and issue an early warning if the equipment fails;
[0061] Step 104: sort the devices of the same type according to the coding information and the operation status data, and determine the scheduling priority of the device according to the sorting result.
[0062] Specifically, for the use management and energy consumption management of various equipment, the intelligent management platform is used to collect various parameters of the equipment's operation, calculate the data of parameters such as the equipment's energy consumption, operation time, and operation status, and calculate the operation time and utilization rate of the equipment in the specified area in combination with the actual situation on site, and distribute the equipment's operation volume through reasonable calculation methods. Analyze the reasons for equipment with low operating efficiency, and make rectifications and optimizations. The system collects data through the underlying power meter and data acquisition equipment model, and the data transmission module DTU transmits the data to the local management platform through the local area network or transmits it to the cloud platform through WIFI for remote management. It solves the management of large equipment, improves the utilization rate and balance rate of equipment, and reasonably allocates and leases it, reduces rental costs, and saves costs.
[0063] Furthermore, the system architecture implemented in this application is as follows Figure 2 As shown, specifically including:
[0064] 1. The hardware system of the equipment intelligent management system is connected to the remote acquisition control terminal through the Modbus communication protocol to realize remote data acquisition;
[0065] 2. Realize digital coding of various data, encode on-site equipment according to type and quantity, realize digital management of equipment, and realize digital statistical analysis of equipment operation status on the management and control platform;
[0066] 3. Based on the statistical results, the data are displayed on the platform and provide data basis for the dispatching management of the equipment, so that energy consumption can be further optimized, achieving the effect of energy saving and consumption reduction and balanced equipment use.
[0067] Specific implementation plan: Today, as science and technology continue to make major breakthroughs, China is also vigorously promoting digital transformation and intelligent management. In the field of construction, comprehensive intelligentization is implemented to improve safety and efficiency. For this reason, our company has developed an intelligent equipment management system to provide technical support for intelligent management. Cooperate with the electric energy meter and the remote data acquisition terminal 4GDTU to complete the data acquisition function.
[0068] 1. Hardware system for data acquisition and transmission
[0069] System data collection such as Figure 2 As shown, the power meter is used in the bottom-level equipment to collect the power of the equipment distribution system and monitor the three-phase voltage and current signals. The data acquisition device can have an AD conversion interface to collect the cable temperature of each device, standardize the power consumption of the distribution device, and protect one machine with one switch. By monitoring the cable temperature and leakage, the equipment operation is alarmed and tripped to ensure the safe operation of the equipment. At the same time, the operating status of the equipment can be obtained through the switch quantity, and the operation, shutdown and fault signals are collected through the switch quantity. Other parameters can be directly connected to the remote control terminal through the built-in communication protocol and interface to realize data transmission. The filtering processing of the digital signal is completed in the bottom-level data A / D conversion link, as shown in Formula 1 below, the data of the same interface of N AD conversions are added to obtain the average value. Provide reliable parameter data for equipment management. The temperature data uses the average filtering method to eliminate interference signals. The switch quantity equipment is also deburred to obtain the equipment operation status. When the equipment status changes, the switch quantity 0→1 or 1→0, and after a delay of 10~20ms, the status remains unchanged and then confirmed.
[0070]
[0071] The electric energy meter, output acquisition equipment, and other data transmission are transmitted through the 485 interface, and the Modbus RTU communication protocol is used to communicate with the remote control terminal. The remote control terminal is the master station, and the other devices are slave stations. Each slave station is set with a unique slave address and a unified baud rate to ensure the reliability of data transmission. The slave station address of the system electric energy meter of the present invention is from 10, 11, ... 50; the slave station address of the data acquisition device is from 51, 52, ..., 100; the slave station address of other communication equipment starts from 101 to 255. The protocol address bit is 8, and there can be a maximum of 255 slave station devices. The remote control terminal DTU polls each slave station device in time-sharing, and the access time of each device is 100ms. If there are 50 slave station devices, the polling access cycle is 5s.
[0072] The remote control terminal DTU uploads the collected parameters to the cloud platform or industrial Internet via 4G or WIFI. The remote PC and server obtain data from the cloud platform, perform data statistics and analysis on the management and control platform, and display energy consumption data and equipment operation status at different periods. The operation status of the equipment can be checked at any time on the mobile APP to achieve remote intelligent management.
[0073] 2. Digital code of the device
[0074] There are many types of equipment on site. The equipment intelligent management system of the present invention is mainly aimed at managing large and medium-sized equipment that consumes a lot of energy in industrial production and is frequently used. By improving work efficiency and reducing energy consumption, the purpose of cost saving is achieved. In order to facilitate management and help computers perform statistical analysis, different equipment is first digitally coded.
[0075] like Figure 3 As shown, the codes for various mechanical and electrical equipment are encoded in the form of a combination of letters and numbers, in the form of type + capacity + number. For example, "D" indicates a crane, "H" indicates a welding machine, and "M" indicates an electric motor. This is followed by the capacity of the equipment. A crane is indicated by its maximum lifting capacity, such as 30t, which indicates a crane with a lifting capacity of 30 tons, and 30W indicates a welding machine with a power of 30W. Finally, there is a number. The number of similar equipment is arranged in order from 01, 02, and so on. Figure 2 The table counts the number of each type of equipment. Each device has a unique device code on the computer management and control platform. The device can be queried based on the device code to view the device's operating status.
[0076] The equipment involved in this project includes various cranes, lifts, electric welders, cutting machines, vacuum pumps, winches, rammers, vibratory hammers, air compressors, cranes, etc.
[0077] 3. Design of intelligent equipment management and control platform
[0078] After completing the digital coding and hardware system architecture of each device on site, the parameter information of the on-site equipment can be obtained in real time through the cloud platform and 4G (WIFI) technology. This information includes the equipment's three-phase voltage, current, cable temperature, electric energy, operating status and other parameters.
[0079] First, safety monitoring is performed to detect power supply overvoltage, undervoltage, phase loss, three-phase current imbalance, excessive temperature rise and other faults, and timely warning or alarm is issued. If the temperature of a phase cable exceeds the set value or the temperature rises too fast, and the conditions of formula 2 or formula 3 are met, an alarm message is issued, and the machine is shut down for inspection. Normal operation can be performed after the cause of the fault is eliminated. In the formula, Tempn is the n-phase cable temperature, Tempg is the maximum temperature allowed by the cable, and Tempd is the temperature rise limit speed.
[0080] Tempn≥Tempg----(Formula 2)
[0081]
[0082] Secondly, count the running time of each equipment. For example, count the running time of 5 10t gantry cranes with a period of 7 days or 1 month. The running time of the first gantry crane numbered D10t01 in this time period is TD1, as shown in Formula 4, where TD[i] is the continuous running time of the equipment each time, and the sum is the total running time in the period. Sort the 5 equipment from small to large according to their running time.
[0083]
[0084] After TD1, DT2, TD3, TD4, and TD5 are calculated respectively, the five devices are sorted from small to large according to their operating time. The sorting results are as follows: {TD2, TD5, TD1, TD4, TD3} corresponds to the gantry crane model {D10t02, D10t05, D10t01, D10t04, D10t03}. This sorting result is the priority for the next scheduling. The same model of equipment with short operating time will be called first to achieve relatively balanced operation management and reduce the failure rate. For other equipment, management and scheduling are carried out according to this method to achieve balanced equipment operating time.
[0085] Conduct statistical analysis of equipment energy consumption again. Figure 4 The figure shows the historical data statistics of the total energy consumption of the equipment, which shows the power consumption and changes, represented by curves and bar charts. Figure 5For the energy consumption comparison of similar equipment, if the operating time of similar equipment in the same cycle is close to equilibrium, the power consumption should be close. If the difference is large or too large, the cause needs to be found. If the equipment with excessive energy consumption is caused by aging, it should be scrapped and updated according to the years of use. The energy consumption of the same equipment is compared in different time periods when the operating volume is similar. If the difference is too large, the cause should be found and the fault should be eliminated to reduce unnecessary power loss.
[0086] On mobile devices Figure 6 The figure shows the energy consumption in a cycle (1 month), the month-on-month change of electric energy compared with the previous cycle, and verifies the energy saving effect after taking measures. Check the online status of the equipment and the change curve of energy consumption at any time. Figure 7 Record the fault alarm and alarm processing status, and the timeliness of alarm processing to avoid equipment operation with faults, ensure safety and save resources. Mobile and PC data are shared uniformly, and the operating status of the equipment, power consumption and the effects of various energy-saving measures can be viewed remotely on the mobile terminal at any time. It is convenient to remotely dispatch orders for various fault processing, improve equipment management efficiency, improve equipment utilization, and greatly save the cost of renting equipment.
[0087] Therefore, the present invention is based on the equipment intelligent management system to perform data transmission, security, and energy-saving management, and utilizes the hardware data transmission system to collect parameters such as temperature, leakage current, electric energy, temperature, and other switching quantities of various equipment; digitally encodes the on-site equipment according to the equipment type, capacity, and quantity to facilitate computer management, and each device has a unique digital code. Statistics are collected on the operating time and energy consumption of various equipment on the equipment intelligent management and control platform, and scheduling is performed based on historical data. Real-time operating status monitoring and safety monitoring are performed on the equipment, and early warning and alarm processing is performed for unsafe factors. At the same time, energy consumption analysis is performed on the equipment, energy-saving measures are taken, and the energy-saving effect is verified. On the mobile terminal, the operating status of the equipment, energy consumption changes, and alarm processing can be monitored to facilitate remote intelligent management of the equipment.
[0088] Exemplary Devices
[0089] Figure 8 FIG. 1 is a schematic diagram of the structure of a large-scale equipment intelligent management device provided by an exemplary embodiment of the present invention. Figure 8 As shown, the device 800 includes:
[0090] The encoding module 810 is used to encode the large devices in the management area according to the device type and determine the encoding information of each device;
[0091] The acquisition module 820 is used to collect data information during the charging process of each large device through the electric energy meter and data acquisition equipment set in the device power distribution system, wherein the data information includes three-phase voltage data, three-phase current data, cable temperature and operation status data;
[0092] The first determination module 830 is used to perform safety monitoring on the equipment according to the data information and the preset temperature criterion, determine the fault information of the equipment, and issue an early warning when the equipment fails;
[0093] The second determination module 840 is used to sort the devices of the same type according to the coding information and the operation status data, and determine the scheduling priority of the device according to the sorting result.
[0094] Optionally, the acquisition module 820 includes:
[0095] A first acquisition submodule is used to acquire a plurality of initial data information within a preset acquisition time from the electric energy meter and the data acquisition device using the Modbus RTU communication protocol;
[0096] The second acquisition submodule is used to filter the initial data information, perform multiple additions and take an average value to acquire the data information.
[0097] Optionally, the first determining module 830 includes:
[0098] A first judgment submodule is used to judge whether there is a fault in the device according to the three-phase voltage data and the three-phase current data, wherein the fault includes: overvoltage, undervoltage, phase loss and three-phase current imbalance;
[0099] A second judgment submodule is used to judge whether the device has a temperature rise failure that is too high or too fast according to the cable temperature and the preset temperature criterion;
[0100] The early warning submodule is used to issue an early warning or alarm when a device fails.
[0101] Optionally, the second judgment submodule includes:
[0102] The judgment unit is used to judge whether the device has a temperature rise failure of too high or too fast when the cable temperature meets the preset temperature judgment criterion, wherein the preset temperature judgment criterion is:
[0103] Tempn≥Tempg
[0104]
[0105] Where Tempn is the n-phase cable temperature, Tempg is the maximum allowable cable temperature, and Tempd is the temperature rise limit rate.
[0106] Optionally, the second determining module 840 includes:
[0107] A first determination submodule, used to determine the operating status data of the same type of equipment according to the coding information;
[0108] The second determination submodule is used to determine the operation duration of each device of the same type according to the operation status data of the devices of the same type;
[0109] The submodule is set to sort the same type of equipment in ascending order according to the operation duration, and set the scheduling priority of the same type of equipment according to the sorting result, among which the equipment with the shortest operation duration has the highest scheduling priority.
[0110] Exemplary Electronic Devices
[0111] Fig. 9 This is a structure of an electronic device provided by an exemplary embodiment of the present invention. Fig. 9 As shown, the electronic device 90 includes one or more processors 91 and a memory 92 .
[0112] The processor 91 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device to perform desired functions.
[0113] The memory 92 may include one or more computer program products, which may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 91 may run the program instructions to implement the methods of the software programs of the various embodiments of the present invention described above and / or other desired functions. In one example, the electronic device may also include: an input device 93 and an output device 94, which are interconnected via a bus system and / or other forms of connection mechanisms (not shown).
[0114] In addition, the input device 93 may also include, for example, a keyboard, a mouse, and the like.
[0115] The output device 94 can output various information to the outside, and can include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto.
[0116] Of course, to simplify, Fig. 9 Only some of the components related to the present invention in the electronic device are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, the electronic device may further include any other appropriate components according to specific application conditions.
[0117] Exemplary computer program products and computer-readable storage media
[0118] In addition to the above-mentioned methods and devices, an embodiment of the present invention may also be a computer program product, which includes computer program instructions, which, when executed by a processor, enable the processor to execute the steps of the method according to various embodiments of the present invention described in the above-mentioned "Exemplary Method" section of this specification.
[0119] The computer program product may be written in any combination of one or more programming languages to write program code for performing the operations of the embodiments of the present invention, including object-oriented programming languages such as Java, C++, etc., and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.
[0120] In addition, an embodiment of the present invention may also be a computer-readable storage medium having computer program instructions stored thereon, which, when executed by a processor, enable the processor to execute the steps of the method according to various embodiments of the present invention described in the above “Exemplary Method” section of this specification.
[0121] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, system or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0122] The basic principle of the present invention is described above in conjunction with specific embodiments. However, it should be pointed out that the advantages, strengths, effects, etc. mentioned in the present invention are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. must be possessed by each embodiment of the present invention. In addition, the specific details disclosed above are only for the purpose of illustration and facilitation of understanding, rather than limitation, and the above details do not limit the present invention to being implemented by adopting the above specific details.
[0123] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system embodiment, since it basically corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0124] The block diagrams of the devices, systems, equipment, and systems involved in the present invention are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagram. As will be appreciated by those skilled in the art, these devices, systems, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including", "comprising", "having", etc. are open words, referring to "including but not limited to", and can be used interchangeably with them. The words "or" and "and" used here refer to the words "and / or" and can be used interchangeably with them, unless the context clearly indicates otherwise. The word "such as" used here refers to the phrase "such as but not limited to", and can be used interchangeably with it.
[0125] The method and system of the present invention may be implemented in many ways. For example, the method and system of the present invention may be implemented by software, hardware, firmware or any combination of software, hardware, firmware. The above order of steps for the method is only for illustration, and the steps of the method of the present invention are not limited to the order specifically described above, unless otherwise specifically stated. In addition, in some embodiments, the present invention may also be implemented as a program recorded in a recording medium, which includes machine-readable instructions for implementing the method according to the present invention. Thus, the present invention also covers a recording medium storing a program for executing the method according to the present invention.
[0126] It should also be noted that in the system, device and method of the present invention, each component or each step can be decomposed and / or recombined. These decompositions and / or recombinations should be regarded as equivalent schemes of the present invention. The above description of the disclosed aspects is provided to enable any technician in the field to make or use the present invention. Various modifications to these aspects are very obvious to those skilled in the art, and the general principles defined here can be applied to other aspects without departing from the scope of the present invention. Therefore, the present invention is not intended to be limited to the aspects shown here, but in accordance with the widest range consistent with the principles and novel features disclosed here.
[0127] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present invention to the forms disclosed herein. Although a number of example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.
Claims
1. A method for intelligent management of large equipment, It is characterized in that include: Encode the large equipment in the management area according to the equipment type and determine the coding information of each equipment; The data information of each large-scale equipment during the charging process is collected by the electric energy meter and data acquisition equipment installed in the equipment power distribution system, wherein the data information includes three-phase voltage data, three-phase current data, cable temperature and operation status data; Perform safety monitoring on the equipment according to the data information and preset temperature criteria, determine the fault information of the equipment, and issue an early warning if the equipment fails; The same type of devices are sorted according to the coding information and the operating status data, and the scheduling priority of the device is determined according to the sorting result.
2. The method according to claim 1, It is characterized in that Through the energy meters and data acquisition equipment installed in the equipment power distribution system, data information of each large equipment operation process is collected, including: Using Modbus RTU communication protocol to obtain a plurality of initial data information within a preset time from the electric energy meter and the data acquisition device; The initial data information is filtered and then added multiple times to obtain an average value to obtain the data information.
3. The method according to claim 1, It is characterized in that The equipment is safely monitored based on the data information and the preset temperature criteria, the fault information of the equipment is determined, and an early warning is issued when the equipment fails, including: Determine whether the device has a fault according to the three-phase voltage data and the three-phase current data, wherein the fault includes: overvoltage, undervoltage, phase loss and three-phase current imbalance; According to the cable temperature and the preset temperature criterion, determining whether the device has a fault of excessive temperature rise or excessively rapid temperature rise; In case of equipment failure, early warning or alarm will be issued.
4. The method according to claim 3, It is characterized in that According to the cable temperature and the preset temperature criterion, judging whether the device has a temperature rise failure that is too high or too fast, includes: When the cable temperature meets the preset temperature criterion, it is determined that the device has a temperature rise failure of too high or too fast, wherein the preset temperature criterion is: Tempn≥Tempg Where Tempn is the n-phase cable temperature, Tempg is the maximum temperature allowed by the cable, and Tempd is the temperature rise limit rate.
5. The method according to claim 1, It is characterized in that Sorting the same type of devices according to the coding information and the running status data, and determining the scheduling priority of the devices according to the sorting result, including: Determine the operating status data of the same type of equipment according to the coded information; Determine the operation time of each device of the same type according to the operation status data of the devices of the same type; According to the operation duration, the same type of equipment is sorted in ascending order, and the scheduling priority of the same type of equipment is set according to the sorting result, wherein the equipment with the shortest operation duration has the highest scheduling priority.
6. A large-scale intelligent equipment management device, It is characterized in that include: The coding module is used to code the large equipment in the management area according to the equipment type and determine the coding information of each equipment; The acquisition module is used to collect data information during the charging process of each large-scale equipment through the electric energy meter and data acquisition equipment set in the equipment power distribution system, wherein the data information includes three-phase voltage data, three-phase current data, cable temperature and operating status data; A first determination module is used to perform safety monitoring on the equipment according to the data information and a preset temperature criterion, determine the fault information of the equipment, and issue an early warning when the equipment fails; The second determination module is used to sort the devices of the same type according to the coding information and the operating status data, and determine the scheduling priority of the device according to the sorting result.
7. The device according to claim 6, It is characterized in that Acquisition module, including: A first acquisition submodule is used to acquire a plurality of initial data information within a preset acquisition time from the electric energy meter and the data acquisition device using the Modbus RTU communication protocol; The second acquisition submodule is used to filter the initial data information, perform multiple additions and take an average value to acquire the data information.
8. The device according to claim 6, It is characterized in that The first determination module includes: A first judgment submodule is used to judge whether there is a fault in the device according to the three-phase voltage data and the three-phase current data, wherein the fault includes: overvoltage, undervoltage, phase loss and three-phase current imbalance; A second judgment submodule is used to judge whether the device has a temperature rise failure that is too high or too fast according to the cable temperature and the preset temperature criterion; The early warning submodule is used to issue an early warning or alarm when a device fails.
9. A computer-readable storage medium, It is characterized in that The storage medium stores a computer program, and the computer program is used to execute the method according to any one of claims 1 to 5.
10. An electronic device, It is characterized in that The electronic device comprises: processor; a memory for storing instructions executable by the processor; The processor is used to read the executable instructions from the memory and execute the instructions to implement the method described in any one of claims 1 to 5.
