Power distribution network recovery method based on mobile emergency power supply pre-arrangement and real-time scheduling
By adopting mobile emergency power pre-arrangement and real-time scheduling methods in power grid recovery, the problems of uncertainty in mobile power output and multi-source collaborative operation in power grid recovery are solved, the power access path and scheduling strategy are optimized, and the grid recovery is improved Flexibility and efficiency.
Patent Information
- Application Number
- CN202411049599.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology failed to fully consider the uncertainty of mobile emergency power supply output and the problem of multi-source collaborative operation during the power grid recovery process, and ignored the impact of traffic network status on power grid recovery in disaster scenarios.
Using the method based on mobile emergency power supply pre-arrangement and real-time scheduling, by simulating the fault scenario of the distribution network, the optimal pre-arrangement and real-time scheduling model is established, and the access path and scheduling strategy of the mobile emergency power supply are optimized, combining the transportation network and the distribution network. The spatial coupling method ensures effective utilization of power supply and resource allocation.
It improves the flexibility and overall recovery effect of power grid recovery, prioritizes the recovery of important loads, reduces power outage time and scale, and enhances the independent partitioning capacity of the power grid.
Smart Images

Figure CN118982127A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power distribution network restoration control, and in particular to a power distribution network restoration method based on pre-deployment and real-time scheduling of mobile emergency power supplies. Background Art
[0002] In recent years, with the intensification of global climate change, extreme weather events such as typhoons, rainstorms, ice disasters and extreme high temperatures have occurred frequently, resulting in frequent power outages in power grids, which have had a serious impact on the normal operation of society and economic activities. As an important part of the power system, the resilience of the distribution network, that is, the ability to resist, adapt to and restore power supply to disasters, has become the focus of attention of the power industry and academia. The resilience of the distribution network is not only related to the stability and reliability of the power grid, but also an important indicator to measure the ability of the power grid to respond to emergencies. In order to cope with the dual crises of energy depletion and environmental pollution, and to improve the resilience of the power grid, more and more distributed generation (DG) and electric energy replacement loads are connected to the distribution network. They can not only provide clean energy, but also provide local power supply when the main power grid is damaged, and enhance the self-healing ability and resilience of the power grid. Domestic and foreign scholars have conducted extensive research on the use of these distributed resources for post-disaster recovery and explored a variety of solutions, such as the construction of isolated microgrids, the deployment of emergency generators, and the effective use of mobile resources.
[0003] In the research and implementation of power grid restoration strategies, although mobile power sources are regarded as key resources due to their flexibility and rapid response capabilities, existing methods have some obvious limitations in practical applications. First, since mobile emergency power sources rely on external conditions such as wind and light intensity, these factors are often unstable and unpredictable in disaster situations, making the output of mobile emergency power sources uncertain. However, current research and practice often do not fully consider this uncertainty, resulting in the inability to accurately evaluate and utilize the potential of mobile power sources during the power grid restoration process. Second, existing technologies also have shortcomings in multi-source collaborative operation. During the power grid restoration process, mobile power sources need to be effectively integrated with fixed resources such as distributed power sources and traditional generators to achieve optimal resource configuration and maximize load recovery. However, there is currently no mature solution for how to coordinate these power sources with different sources and characteristics to ensure that they can work together when the power grid is damaged. In addition, existing technologies often ignore the impact of traffic network status on the power grid restoration process and the impact of traffic network status on mobile energy storage scheduling in disaster scenarios.
[0004] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention
[0005] In response to the problems in the related technology, the present invention proposes a distribution network restoration method based on the pre-deployment and real-time scheduling of mobile emergency power supplies, which has the advantages of helping to expand the flexibility of distribution network restoration, giving priority to power supply to important loads, and improving the overall restoration effect, thereby solving the problem that the prior art does not fully consider the uncertainty of power output and the coordinated operation of multiple sources, and ignores the problem that the status of the traffic network in disaster scenarios affects the scheduling of mobile energy storage.
[0006] To this end, the specific technical solution adopted by the present invention is as follows:
[0007] A distribution network restoration method based on pre-arrangement and real-time scheduling of mobile emergency power supplies, the distribution network restoration method based on pre-arrangement and real-time scheduling of mobile emergency power supplies comprises the following steps:
[0008] S1. Based on the spatial coupling mode between the distribution network and the transportation network, simulate the distribution network failure and generate multiple distribution network failure scenarios;
[0009] S2. Based on the generated distribution network fault scenario, with the optimal dispatching path and maximum load recovery after the accident as the goal, and considering the dispatching constraints of the mobile emergency power supply and the operation constraints of the distribution network, the optimal pre-deployment model of the mobile emergency power supply before the accident is established, and the optimal pre-deployment strategy of the mobile emergency power supply is output;
[0010] S3. Based on the optimal pre-deployment strategy of mobile emergency power supply, with the goal of maximizing the restoration of important power loads, and considering the scheduling constraints of mobile emergency power supply and distribution network operation constraints, a real-time scheduling model of mobile emergency power supply after the accident is established, and the real-time scheduling of mobile emergency power supply and distribution network power supply restoration strategy are output.
[0011] Furthermore, based on the spatial coupling mode between the distribution network and the transportation network, simulating the distribution network failure and generating multiple distribution network failure scenarios include the following steps:
[0012] S11. Determine the shortest path for the mobile emergency power supply to access the distribution network using the shortest path algorithm;
[0013] S12. Perform fault simulation analysis based on the shortest path, introduce a fault rate threshold to screen vulnerable lines, and construct a vulnerable line set;
[0014] S13. Based on the vulnerable line set, a single distribution line fault scenario is generated, and random sampling analysis is performed to obtain multiple distribution network fault scenarios.
[0015] Further, using the shortest path algorithm, determining the shortest path for the mobile emergency power supply to access the distribution network includes the following steps:
[0016] S111, determining different paths based on the locations of the pre-deployment points and access points of the mobile emergency power supply;
[0017] S112. Based on the shortest path algorithm, calculate the spatial distance between each mobile emergency power supply pre-deployment point and the distribution network access point through the transportation network;
[0018] S113. Filter the shortest path according to the calculation result of the spatial distance.
[0019] Furthermore, fault simulation analysis is performed based on the shortest path, and a fault rate threshold is introduced to screen vulnerable lines. The construction of the vulnerable line set includes the following steps:
[0020] S121. Obtaining the failure rate of a single distribution tower based on the vulnerability curve of distribution network components;
[0021] S122. Calculate the distribution line failure rate based on the failure rate of a single distribution tower;
[0022] S123. Based on the calculation result of the distribution line failure rate, the fragile lines are screened using the failure rate threshold, and a fragile line set is constructed.
[0023] Furthermore, based on the generated distribution network fault scenario, taking the optimal dispatching path and maximum load recovery after the accident as the goal, and considering the dispatching constraints of the mobile emergency power supply and the operation constraints of the distribution network, the optimal pre-deployment model of the mobile emergency power supply before the accident is established, and the optimal pre-deployment strategy of the mobile emergency power supply is output, including:
[0024] S21. Construct the first-stage objective function based on the optimal dispatching path and the maximum load recovery after the accident;
[0025] S22. According to the mobile emergency power supply dispatch and distribution network operation, the first stage constraint conditions are constructed, wherein the first stage constraint conditions include mobile emergency power supply layout and dispatch constraints, real-time dispatch constraints, pre-deployed node power balance constraints, pre-deployed node active and reactive demand constraints, pre-deployed mobile emergency power supply output constraints and voltage constraints;
[0026] S23. Based on the first-stage objective function and the first-stage constraint conditions, an optimal pre-deployment model of the mobile emergency power supply before an accident is established, and an optimal pre-deployment strategy of the mobile emergency power supply is generated.
[0027] Furthermore, the expression for constructing the objective function of the first stage is:
[0028]
[0029] Where N E , S, S MEG , Z represent the distribution network access point set of mobile emergency power supply, the distribution network damage fault scenario set, the mobile emergency power supply set, and the mobile emergency power supply pre-deployment point set respectively; p srepresents the probability of distribution network damage fault scenario s; w i is the weight of load i, indicating the importance of the load; P i,s represents the load recovery amount at node i under fault scenario s; μ represents the influence coefficient of traffic path on the recovery effect, which can be adjusted appropriately; γ i,s is a 0-1 variable, representing the recovery state variable of load i under scenario s, γ i,s =1 indicates the state has been restored, γ i,s =0 means unrecovered state; is a 0-1 variable, indicating that in fault scenario s, the mobile power supply m is deployed from the pre-deployed point z to the distribution network access node i. Indicates that the mobile emergency power supply m is allocated from the pre-deployed point z to the node i in scenario s. Indicates that the mobile emergency power supply has not been deployed; It represents the road distance between the pre-deployment point z and the distribution network access point i under fault scenario s.
[0030] Furthermore, according to the dispatch of mobile emergency power supply and the operation of distribution network, the first stage constraint conditions are constructed, including the following steps:
[0031] S221. According to the mobile emergency power supply dispatch, establish the mobile emergency power supply layout and dispatch constraints, and introduce real-time dispatch constraints;
[0032] S222. According to the operation of the distribution network, establish pre-arranged node power balance constraints, pre-arranged node active and reactive demand constraints, pre-arranged mobile emergency power supply output constraints and voltage constraints;
[0033] S223. Based on the mobile emergency power supply layout and scheduling constraints and real-time scheduling constraints, and combined with the pre-deployed node power balance constraints, pre-deployed node active and reactive power demand constraints, pre-deployed mobile emergency power supply output constraints and voltage constraints, the first stage constraints are constructed.
[0034] Furthermore, according to the mobile emergency power supply scheduling, establishing the mobile emergency power supply layout and scheduling constraints, and introducing the real-time scheduling constraints include the following steps:
[0035] S2211. According to the pre-deployment point and the deployment status of the mobile emergency power supply, the deployment and scheduling constraints of the mobile emergency power supply are established, wherein the deployment and scheduling constraints of the mobile emergency power supply include the capacity constraints of the pre-deployment point, the quantity constraints of the mobile emergency power supply and the allocation constraints of the mobile emergency power supply;
[0036] S2212. Establish real-time scheduling constraints based on the scheduling path of the mobile emergency power supply.
[0037] Furthermore, according to the pre-deployment point and deployment status of the mobile emergency power supply, establishing the deployment and scheduling constraints of the mobile emergency power supply includes the following steps:
[0038] S22111. Construct the capacity constraint of the pre-deployment point according to the number of mobile emergency power supplies that can be accommodated at the pre-deployment point;
[0039] S22112. Construct a quantity constraint of mobile emergency power supplies according to the quantity of mobile emergency power supplies available for deployment;
[0040] S22113. Based on the deployment status of the mobile emergency power supply, construct the mobile emergency power supply allocation constraints, and combine the pre-deployment point capacity constraints and the mobile emergency power supply quantity constraints to establish the mobile emergency power supply deployment and scheduling constraints.
[0041] Furthermore, according to the operation of the distribution network, establishing the pre-arranged node power balance constraint, the pre-arranged node active and reactive power demand constraint, the pre-arranged mobile emergency power supply output constraint and the voltage constraint includes the following steps:
[0042] S2221. Constructing a pre-arranged node power balance constraint according to power balance and line transmission power;
[0043] S2222. Based on the load amount and the load power factor, construct active and reactive demand constraints of the pre-arranged nodes;
[0044] S2223. Based on the upper limits of active and reactive output, construct output constraints for pre-arranged mobile emergency power supplies;
[0045] S2224. Construct voltage constraints based on the line voltage drop equation and node amplitude.
[0046] Furthermore, according to the optimal pre-deployment strategy of the mobile emergency power supply, with the goal of maximizing the restoration of important power loads, and considering the scheduling constraints of the mobile emergency power supply and the operation constraints of the distribution network, a real-time scheduling model of the mobile emergency power supply after the accident is established, and the real-time scheduling of the mobile emergency power supply and the power supply restoration strategy of the distribution network are output, including the following steps:
[0047] S31, constructing the second stage objective function according to the optimal pre-deployment strategy of the mobile emergency power supply with the goal of maximizing the restoration of important power loads;
[0048] S32. According to the optimal pre-deployment strategy of the mobile emergency power supply, the second-stage constraint conditions are established by considering the dispatch of the mobile emergency power supply and the operation of the distribution network. The second-stage constraint conditions include the dispatch constraint of the mobile emergency power supply, the power balance constraint of the dispatch node, the active and reactive demand constraint of the dispatch node, the output constraint of the dispatch mobile emergency power supply, and the AC power flow constraint of the line.
[0049] S33. Based on the second-stage objective function and the second-stage constraints, a real-time dispatch model for the mobile emergency power supply after an accident is established to generate a real-time dispatch and distribution network power supply restoration strategy for the mobile emergency power supply.
[0050] Furthermore, the expression for constructing the second-stage objective function is:
[0051]
[0052] In the formula, w i represents the load weight of node i, variable P i,t Represents the load recovery amount of node i in time step t.
[0053] Furthermore, according to the optimal pre-deployment strategy of the mobile emergency power supply, considering the dispatch of the mobile emergency power supply and the operation of the distribution network, establishing the second stage constraint conditions includes the following steps:
[0054] S321. Establishing a mobile emergency power supply dispatch constraint according to the path selection and time arrangement of the mobile emergency power supply dispatch;
[0055] S322. According to the operation of the distribution network, establish the power balance constraint of the dispatching node, the active and reactive demand constraint of the dispatching node, the output constraint of the dispatching mobile emergency power supply and the AC power flow constraint of the line;
[0056] S323. Based on the mobile emergency power supply dispatching constraints, and in combination with the dispatching node power balance constraints, the dispatching node active and reactive power demand constraints, the dispatching mobile emergency power supply output constraints and the line AC power flow constraints, the second stage constraints are established.
[0057] Furthermore, according to the path selection and time arrangement of the mobile emergency power dispatch, establishing the mobile emergency power dispatch constraint includes the following steps:
[0058] S3211. Establishing access point connection constraints according to the mobile emergency power supply and the distribution network access point;
[0059] S3212. Establishing access point capacity constraints based on the number of accessible mobile emergency power supplies;
[0060] S3213. Establish time scheduling constraints based on the dispatch time of the mobile emergency power supply on the transportation network, and establish mobile emergency power supply dispatch constraints in combination with access point connection constraints and access point capacity constraints.
[0061] Furthermore, according to the operation of the distribution network, establishing the power balance constraint of the dispatching node, the active and reactive demand constraint of the dispatching node, the output constraint of the dispatching mobile emergency power supply and the AC power flow constraint of the line includes the following steps:
[0062] S3221. Establish a scheduling node power balance constraint according to the node power and line transmission power at the tth time step;
[0063] S3222. Establish active and reactive power demand constraints of the dispatching node according to the node load at the tth time step;
[0064] S3223. Establishing a dispatching mobile emergency power supply output constraint according to the power of each time step of the mobile emergency power supply;
[0065] S3224. Establish line AC power flow constraints according to the node voltage amplitude at the tth time step.
[0066] The beneficial effects of the present invention are:
[0067] (1) The present invention takes into account the access point of the mobile emergency power supply and the real-time scheduling comprehensively, giving full play to the superiority of the mobile emergency power supply as a flexible scheduling resource, so that the key loads of the mobile emergency power supply can be restored first, thereby greatly improving the overall load recovery effect and ensuring the continuity of power supply to important users.
[0068] (2) The present invention takes into account the actual traffic network and dispatching routes, so that the dispatching of mobile emergency power supplies is more in line with the actual operation requirements of the power grid, which can significantly reduce the power outage time and scale of important loads during distribution network failures, and can also more flexibly form multiple independent distribution network partitions. BRIEF DESCRIPTION OF THE DRAWINGS
[0069] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0070] Figure 1 It is a flow chart of a distribution network restoration method based on pre-deployment and real-time scheduling of mobile emergency power supply according to an embodiment of the present invention;
[0071] Figure 2 is a specific implementation diagram of a distribution network restoration method based on pre-deployment and real-time scheduling of mobile emergency power supplies according to an embodiment of the present invention;
[0072] Figure 3 is a spatial coupling diagram of a transportation network and a distribution network according to a distribution network restoration method based on pre-deployment and real-time scheduling of a mobile emergency power supply according to an embodiment of the present invention;
[0073] Figure 4is a schematic diagram of a distribution network-transportation network coupling of a distribution network restoration method based on pre-deployment and real-time scheduling of mobile emergency power supplies according to an embodiment of the present invention;
[0074] Figure 5 is a component vulnerability curve diagram of a distribution network restoration method based on pre-deployment and real-time scheduling of mobile emergency power supplies according to an embodiment of the present invention;
[0075] Figure 6 It is a single-scenario sampling process diagram of a distribution network restoration method based on pre-deployment and real-time scheduling of mobile emergency power supplies according to an embodiment of the present invention. DETAILED DESCRIPTION
[0076] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments and can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementations and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.
[0077] According to an embodiment of the present invention, a distribution network restoration method based on pre-deployment and real-time scheduling of mobile emergency power supplies is provided.
[0078] The present invention is further described with reference to the accompanying drawings and specific embodiments. Figure 1-Figure 2 As shown, according to one embodiment of the present invention, a distribution network restoration method based on pre-arrangement and real-time scheduling of mobile emergency power supplies is provided, and the distribution network restoration method based on pre-arrangement and real-time scheduling of mobile emergency power supplies includes the following steps:
[0079] S1. Based on the spatial coupling mode between the distribution network and the transportation network, simulate the distribution network failure and generate multiple distribution network failure scenarios;
[0080] Specifically, the spatial coupling between the distribution network and the transportation network is as follows: Figure 3-Figure 4 As shown, the distribution network nodes are coupled with the road network nodes through the pre-arranged points and real-time access points of the mobile emergency power supply; the work of the present invention mainly focuses on how to reasonably arrange the mobile emergency power supply to the pre-arranged points, and reasonably dispatch it to the distribution network access points through the pre-arranged points and the transportation network; the key lies in considering the positions of the pre-arranged points and the access points in the distribution network and in the transportation network. There are multiple paths from each pre-arranged point to the intervention point, and the shortest path algorithm needs to be used for screening and comparison, so as to select a shortest path.
[0081] Specifically, since the transportation network and the power distribution network belong to two different public service systems, after an extreme meteorological disaster occurs, there are significant differences in the types of data collected and stored on the transportation side and the power grid side in the emergency power supply and mobile emergency power dispatching links of the distribution network; the real-time data in the transportation network mainly covers the storage of materials, the storage location of mobile emergency power supplies, the circulation speed and efficiency of personnel and materials, possible disasters and interruptions to roads, and restrictions on the direction of road travel; the real-time data of the power distribution network mainly covers the damage location of the line fault point, the type of fault, the demand and quantity of mobile emergency power at the fault point, the type and quantity of power materials in the warehouse, and related information on the mobile emergency power access point.
[0082] S2. Based on the generated distribution network fault scenario, with the optimal dispatching path and maximum load recovery after the accident as the goal, and considering the dispatching constraints of the mobile emergency power supply and the operation constraints of the distribution network, the optimal pre-deployment model of the mobile emergency power supply before the accident is established, and the optimal pre-deployment strategy of the mobile emergency power supply is output;
[0083] S3. Based on the optimal pre-deployment strategy of mobile emergency power supply, with the goal of maximizing the restoration of important power loads, and considering the scheduling constraints of mobile emergency power supply and distribution network operation constraints, a real-time scheduling model of mobile emergency power supply after the accident is established, and the real-time scheduling of mobile emergency power supply and distribution network power supply restoration strategy are output.
[0084] Specifically, in the pre-deployment stage of mobile emergency power supplies, the present invention considers how to connect the shortest path of the mobile emergency power supply to the access point of the distribution network through the transportation network under different fault scenarios, and provide the maximum load recovery amount; and in the real-time scheduling stage of mobile emergency power supplies after the accident, the present invention considers how to use the transportation network to access the corresponding selection points; from a macro perspective, spatial scheduling is actually the path optimization of the mobile emergency power supply in the transportation network and the operation optimization of power supply recovery of the distribution network when the transportation network and the distribution network are coupled with each other; according to the recovery effect of each mobile emergency power supply at each access point, while comprehensively considering the traffic scheduling travel time, etc., the optimal scheduling solution is obtained, that is, the solution that maximizes the objective function is selected.
[0085] In one embodiment, based on the spatial coupling mode between the distribution network and the transportation network, simulating a distribution network failure and generating multiple distribution network failure scenarios include the following steps:
[0086] S11. Determine the shortest path for the mobile emergency power supply to access the distribution network using the shortest path algorithm;
[0087] Specifically, when an extreme disaster occurs, the primary goal of mobile emergency power dispatch is to quickly restore the interrupted load of the distribution network. In order to achieve this goal, the present invention needs to pre-determine the optimal location of the mobile power supply based on the simulated distribution network damage scenario; the pre-layout of the emergency station is the result of the combined influence of multiple disaster factors. However, in actual operation, typhoons are considered to be the most threatening natural disasters. Therefore, in this embodiment, typhoons are specifically selected as the dominant influencing factor for the pre-positioning of emergency stations under distribution network failure scenarios.
[0088] Specifically, although extreme weather has not yet arrived and the distribution network has not experienced any failures, the impact of the upcoming extreme weather on the distribution network must be taken into account, especially the uncertainty and randomness of distribution network component failure scenarios under different extreme weather conditions; therefore, it is necessary to use probabilistic analysis technology to study the impact of extreme weather on grid operation reliability indicators. In this embodiment, based on traditional fault simulation technology, line failures occurring under extreme climate conditions are regarded as independent random events, and random failures that may occur in distribution lines are calculated.
[0089] Specifically, in the above embodiment, typhoon weather is taken as a typical extreme climate condition. Under such weather conditions, the most vulnerable parts of the distribution network are the distribution wires and distribution towers. By analyzing the factors affecting the reliability of transmission lines, it is found that when the meteorological department provides real-time wind speed, the wind model can be used to determine the operating status of the distribution system.
[0090] Specifically, the relationship between the failure rate of lines and towers in the distribution network and the wind speed is called the component vulnerability curve of the distribution network. By analyzing these curves, we can better understand the various factors that affect the safe operation of the distribution network. The component vulnerability curve is as follows: Figure 5 As shown, this is a standard curve of the vulnerability of distribution network components. It belongs to the existing technology and has a specific model, so I will not go into details here.
[0091] S12. Perform fault simulation analysis based on the shortest path, introduce a fault rate threshold to screen vulnerable lines, and construct a vulnerable line set;
[0092] Specifically, assume that the wind speed at time t is v t , the failure rate of a single distribution tower on line (i, j) is P ij,T (v t ), the failure rate of a single line (i, j) is P ij,C (v t ), the specific component failure rate is from Figure 5 It is obtained from the , which represents the relationship between the failure rate of distribution network components and wind speed. It is widely used in various current studies to evaluate the impact of extreme natural disasters such as typhoons on the resilience of power systems.
[0093] Specifically, there are N lines (i, j) between them. ij,T If there are distribution towers, any tower failure will cause the entire line failure, then the failure rate of line (i, j) is P ij,Tower (v t ) and the failure rate of a single tower P ij,T (v t ) is:
[0094]
[0095] Specifically, any fault in the distribution tower or distribution wire will cause the entire line to fail. Therefore, the line failure rate P between nodes i and j is ij,L (v t )for:
[0096]
[0097] Specifically, in order to simplify the calculation of the failure rate and improve the calculation efficiency, the present embodiment introduces a failure rate threshold to screen the vulnerable lines. According to the calculation method of the failure rate of the distribution line, the failure rate P of any line (i, j) can be obtained: ij,L (v t );Set the line failure rate threshold to P step , for any distribution line (i, j):
[0098]
[0099] In the formula, f ij,t = 1 is the set of fragile circuits Ω LF , there are N LF elements, there are N in the distribution line LF A line may be faulty.
[0100] S13. Based on the vulnerable line set, a single distribution line fault scenario is generated, and random sampling analysis is performed to obtain multiple distribution network fault scenarios.
[0101] Specifically, for a scenario s, for the vulnerable line ij∈Ω that has not yet failed Lf , draw a random number τ ij,t,s ∈[0,1], when the random number τ is drawn ij,t,s Less than line failure rate P ij,L (v t ), the line fails and the line fault state is u ij,t,s =1, otherwise u ij,t,s =0, the expression is:
[0102]
[0103] Specifically, for the fragile line ij∈N that has failed at the last moment LF , since the line cannot be repaired during the duration of extreme weather, the fault state of the line remains unchanged, and the expression is:
[0104]
[0105] Specifically, based on the above-mentioned method for simulating faults, the steps of the method for generating a single distribution line fault scenario are as follows: Figure 6 shown.
[0106] Specifically, for the same line, when this type of fault occurs within a certain period of time, it can be determined whether the line has a fault based on the load changes in each period before and after the fault. If it is found through sampling that a line has a fault at a specific time, since the line cannot be repaired under extreme weather conditions, the line will continue to be in a faulty state for the rest of the time, so there is no need to determine the next fault state through sampling. After sampling obtains information on the line when no fault occurs in each special case, the samples are combined into the final data set according to certain rules, thereby realizing a continuous change from a single scenario to multiple scenarios. If, from the sampling results, a line does not have any faults under the entire extreme climate conditions, then the next line should be considered for selection until the fault conditions of all lines at each time node are confirmed, so that the sampling operation in a single scenario can be successfully completed. For multiple scenarios, different sampling methods can be used to ensure the correctness and reliability of the sampling results. In the actual sample extraction process, it is necessary to clarify in advance which scenarios need to be sampled, and repeat the single-scenario sampling process N times. s You can get N times s The sampling results of distribution line fault status in different scenarios.
[0107] In one embodiment, using the shortest path algorithm, determining the shortest path for the mobile emergency power supply to access the power distribution network includes the following steps:
[0108] S111, determining different paths based on the locations of the pre-deployment points and access points of the mobile emergency power supply;
[0109] S112. Based on the shortest path algorithm, calculate the spatial distance between each mobile emergency power supply pre-deployment point and the distribution network access point through the transportation network;
[0110] S113. Filter the shortest path according to the calculation result of the spatial distance.
[0111] Specifically, in this embodiment, the distribution network is coupled with the transportation network, there are pre-deployed points for mobile emergency power supplies in the road network, and there are temporary access points for mobile emergency power supplies in the distribution network. Not all distribution network nodes can temporarily access the mobile emergency power supply.
[0112] Specifically, the layout structure of the transportation network and the traffic conditions of the roads will directly affect the position of the mobile emergency power supply in space. Since the operation mode of the power system has a certain lag, when the distribution network is out of power, it often causes a large number of emergency power materials to be stranded. Traditionally, people only focus on how to improve the reliability of power supply, while ignoring the real-time dispatch of emergency power materials.
[0113] Specifically, the shortest path algorithm is a type of algorithm used to find the shortest path between two vertices in a weighted graph, mainly including the Floyd algorithm and the Dijkstra algorithm; in a transportation network, the shortest transportation path of a vehicle is usually modeled based on traffic path theory. In this embodiment, the Dijkstra algorithm is mainly used to determine the shortest driving distance of a mobile emergency power supply in a transportation network.
[0114] It should be noted that the Dijkstra algorithm is considered to be a classic method for single-source shortest path calculation, and is specifically used to determine the shortest path from a node to all other nodes in an undirected graph; the core feature of the algorithm is to extend outward from the starting point until it reaches the end point. In this embodiment, it is mainly used to calculate the spatial distance from each mobile emergency power pre-deployment point to the distribution network access point through the transportation network, considering the position of the pre-deployment point and the access point in the distribution network and the position in the transportation network. There are multiple paths from each pre-deployment point to the intervention point, and the Dijkstra algorithm needs to be used for screening and comparison to select a shortest path. The algorithm belongs to the prior art and the specific process will not be expanded here.
[0115] In one embodiment, fault simulation analysis is performed based on the shortest path, and a fault rate threshold is introduced to screen vulnerable lines. Constructing a vulnerable line set includes the following steps:
[0116] S121. Obtaining the failure rate of a single distribution tower based on the vulnerability curve of distribution network components;
[0117] S122. Calculate the distribution line failure rate based on the failure rate of a single distribution tower;
[0118] S123. Based on the calculation result of the distribution line failure rate, the fragile lines are screened using the failure rate threshold, and a fragile line set is constructed.
[0119] In one embodiment, based on the generated distribution network fault scenario, taking the optimal dispatching path and the maximum load recovery after the accident as the goal, and considering the dispatching constraints of the mobile emergency power supply and the operation constraints of the distribution network, an optimal pre-deployment model of the mobile emergency power supply before the accident is established, and the optimal pre-deployment strategy of the mobile emergency power supply is output, including:
[0120] S21. Construct the first-stage objective function based on the optimal dispatching path and the maximum load recovery after the accident;
[0121] S22. According to the mobile emergency power supply dispatch and distribution network operation, the first stage constraint conditions are constructed, wherein the first stage constraint conditions include mobile emergency power supply layout and dispatch constraints, real-time dispatch constraints, pre-deployed node power balance constraints, pre-deployed node active and reactive demand constraints, pre-deployed mobile emergency power supply output constraints and voltage constraints;
[0122] S23. Based on the first-stage objective function and the first-stage constraint conditions, an optimal pre-deployment model of the mobile emergency power supply before an accident is established, and an optimal pre-deployment strategy of the mobile emergency power supply is generated.
[0123] Specifically, based on the coupling model of the distribution network and the transportation network and the generated multiple distribution network fault scenarios, the optimal scheduling path and the maximum load recovery amount after the accident are taken as the objective function, and the scheduling constraints of the mobile emergency power supply and the distribution network operation constraints are considered. An optimal pre-deployment model of the mobile emergency power supply before the accident is established, that is, the first stage model of the two-stage power supply restoration strategy of the distribution network considering the pre-deployment and real-time scheduling of the mobile emergency power supply.
[0124] Specifically, after an extreme weather disaster occurs, the mobile emergency power supply quickly moves on the transportation network to reach the node where the charging station is configured and connects to the distribution network for energy exchange; therefore, a suitable pre-deployment location of the mobile emergency power supply can improve the utilization rate of the mobile emergency power supply so that power supply can be quickly restored during a power outage. The optimal pre-deployment location decision of the mobile emergency power supply can be obtained in the pre-accident pre-deployment model.
[0125] In one embodiment, the expression for constructing the first stage objective function is:
[0126]
[0127] Where N E , S, S MEG , Z represent the distribution network access point set of mobile emergency power supply, the distribution network damage fault scenario set, the mobile emergency power supply set, and the mobile emergency power supply pre-deployment point set respectively; p s represents the probability of distribution network damage fault scenario s; w i is the weight of load i, indicating the importance of the load; P i,srepresents the load recovery amount at node i under fault scenario s; μ represents the influence coefficient of traffic path on the recovery effect, which can be adjusted appropriately; γ i,s is a 0-1 variable, representing the recovery state variable of load i under scenario s, γ i,s =1 indicates the state has been restored, γ i,s =0 means unrecovered state; is a 0-1 variable, indicating that in fault scenario s, the mobile power supply m is deployed from the pre-deployed point z to the distribution network access node i. Indicates that the mobile emergency power supply m is allocated from the pre-deployed point z to the node i in scenario s. Indicates that the mobile emergency power supply has not been deployed; It represents the road distance between the pre-deployment point z and the distribution network access point i under fault scenario s.
[0128] Specifically, the present invention focuses on strengthening the system prevention capability before an accident. For the pre-deployment strategy before an accident, the recovery problem in multiple time periods after the accident is not considered first. Only how to pre-deploy the mobile emergency power supply is considered. Considering the damage to the power grid after the accident, how to quickly and optimally deploy the mobile emergency power supply to the distribution network access point through the transportation network; in this embodiment, the goal is to maximize the expected load recovery effect. Considering multiple distribution network line damage scenarios, it is analytically expressed as maximizing the weighted load recovery amount restored under multiple scenarios. At the same time, the shortest moving distance between the pre-deployment point of the mobile emergency power supply on the transportation network and the distribution network access point after the accident is considered, thereby constructing the first-stage objective function. The first-stage objective function focuses on strengthening the system prevention capability before an accident to maximize the expected load recovery effect.
[0129] In one embodiment, according to the mobile emergency power dispatch and the distribution network operation, constructing the first stage constraint conditions includes the following steps:
[0130] S221. According to the mobile emergency power supply dispatch, establish the mobile emergency power supply layout and dispatch constraints, and introduce real-time dispatch constraints;
[0131] Specifically, in the pre-deployment strategy of the mobile emergency power supply, it is necessary to satisfy the capacity of each pre-deployment point (pre-deployment point capacity constraint), the number constraint of the mobile emergency power supply, and the layout state movement of each mobile emergency power supply m (mobile emergency power supply allocation constraint), so as to obtain the emergency power supply layout and scheduling constraints, which are expressed as follows:
[0132]
[0133] Where N z N represents the upper limit of the number of mobile emergency power supplies that can be accommodated at the pre-arranged point z; m Indicates the total number of mobile power supplies; x m,zis a 0-1 variable, indicating the deployment status of mobile power m at the pre-deployment point z, x m,z =1 means that the mobile power source m is allocated to the pre-arranged point z, x m,z =0 means that the power source m is not connected to point z.
[0134] Specifically, formula (7) indicates that the number of mobile emergency power supplies allocated to each pre-deployment point z cannot exceed its capacity upper limit; formula (8) indicates that the number of mobile emergency power supplies available for deployment cannot exceed the upper limit of the number of mobile emergency power supplies in the distribution network; formula (9) indicates that each mobile emergency power supply m can only be allocated to one pre-deployment station z.
[0135] Specifically, the pre-deployment plan of the mobile emergency power supply also involves the problem of scheduling path restriction of the mobile emergency power supply after the accident, that is, the shortest scheduling path. Therefore, the present invention adds a real-time scheduling constraint, and the expression is:
[0136]
[0137] In the formula, It represents the deployment status of mobile emergency power supply m at distribution network access node i under scenario s, omitting the intermediate pre-deployment point link.
[0138] Specifically, formula (10) indicates that the number of mobile emergency power supplies dispatched from the pre-deployment point z to the distribution network access point in any scenario s is less than the number of mobile emergency power supplies remaining at the pre-deployment point z, that is, all mobile emergency power supplies can only be dispatched from the pre-deployment point to the distribution network access point.
[0139] Specifically, formula (11) indicates that in any fault scenario s, each distribution network access point can only be connected to one mobile emergency power supply at most; formula (12) indicates that the mobile emergency power supply connected to node i in any scenario is sent by the pre-deployed point.
[0140] S222. According to the operation of the distribution network, establish pre-arranged node power balance constraints, pre-arranged node active and reactive demand constraints, pre-arranged mobile emergency power supply output constraints and voltage constraints;
[0141] Specifically, considering the pre-deployment of mobile emergency power supplies, the distribution network after the accident also needs to meet various constraints on the operation of the power grid, including pre-deployed node power balance constraints, pre-deployed node active and reactive power demand constraints, pre-deployed mobile emergency power supply output constraints and voltage constraints.
[0142] Specifically, since the key solution variable in this embodiment is the pre-deployment plan of the mobile emergency power supply, for random failures in multiple scenarios, the final result is a multi-scenario probability comprehensive macro result, so the impact of the decision variables in each scenario is not significant. The present invention adopts a distribution network linear power flow model based on Distflow and omits branch impedance loss.
[0143] Specifically, the expression for establishing the power balance constraint of the pre-deployed nodes is:
[0144]
[0145] In the formula, P(i) and C(i) represent the parent node set and child node set of node i respectively; and They represent the active and reactive outputs of the mobile emergency power supply m at the node i in scenario s respectively; They represent the active and reactive power of line (i, j) power transmission under scenario s respectively; Indicates the available status of line (i, j) in scenario s, In scenario s, line (i, j) is normal and can be put into use. Indicates that line (i, j) is damaged and cannot be used; Represents the maximum transmission capacity of line (i, j).
[0146] Specifically, equations (13) and (14) indicate that node i should satisfy active and reactive power balance in any scenario; equation (15) indicates that the transmission power of any complete line (i, j) cannot exceed the line capacity and is limited by the line status.
[0147] Specifically, the expression for establishing the active and reactive power demand constraints of the pre-arranged nodes is:
[0148]
[0149] Where P i , Q i is the active and reactive load at node i; is the power factor at node i.
[0150] Specifically, equations (16) and (17) indicate that the amount of active and reactive power restored at node i under scenario s does not exceed the total active and reactive power demand of the load at node i under normal conditions; equation (18) indicates that the load power factor restored at node i is not higher than the initial power factor.
[0151] Specifically, the expression for establishing the output constraint of the pre-arranged mobile emergency power supply is:
[0152]
[0153] In the formula, Indicates the upper limit of active and reactive output of mobile emergency power supply m.
[0154] Specifically, equations (19) and (20) represent the active and reactive output constraints of the mobile emergency power supply m.
[0155] Specifically, the expression for establishing voltage constraint is:
[0156]
[0157] In the formula, represents the square of the voltage amplitude at node i in scenario s; M represents a sufficiently large positive number; r ij 、x ij represents the resistance and reactance of line (i, j); Indicates the minimum and maximum values of the square of the voltage amplitude at node i.
[0158] Specifically, equations (21) and (22) are line voltage drop equations based on Distflow, in which the quadratic term is ignored and the line voltage constraint is relaxed using the large-M method; equation (23) represents the upper and lower limit constraints of the square of the node amplitude, which constrains the node voltage offset.
[0159] S223. Based on the mobile emergency power supply layout and scheduling constraints and real-time scheduling constraints, and combined with the pre-deployed node power balance constraints, pre-deployed node active and reactive power demand constraints, pre-deployed mobile emergency power supply output constraints and voltage constraints, the first stage constraints are constructed.
[0160] In one embodiment, according to the mobile emergency power supply scheduling, establishing the mobile emergency power supply arrangement and scheduling constraints, and introducing the real-time scheduling constraints include the following steps:
[0161] S2211. According to the pre-deployment point and the deployment status of the mobile emergency power supply, the deployment and scheduling constraints of the mobile emergency power supply are established, wherein the deployment and scheduling constraints of the mobile emergency power supply include the capacity constraints of the pre-deployment point, the quantity constraints of the mobile emergency power supply and the allocation constraints of the mobile emergency power supply;
[0162] S2212. Establish real-time scheduling constraints based on the scheduling path of the mobile emergency power supply.
[0163] In one embodiment, according to the pre-deployment point and deployment status of the mobile emergency power supply, establishing the deployment and scheduling constraints of the mobile emergency power supply includes the following steps:
[0164] S22111. Construct the capacity constraint of the pre-deployment point according to the number of mobile emergency power supplies that can be accommodated at the pre-deployment point;
[0165] S22112. Construct a quantity constraint of mobile emergency power supplies according to the quantity of mobile emergency power supplies available for deployment;
[0166] S22113. Based on the deployment status of the mobile emergency power supply, construct the mobile emergency power supply allocation constraints, and combine the pre-deployment point capacity constraints and the mobile emergency power supply quantity constraints to establish the mobile emergency power supply deployment and scheduling constraints.
[0167] In one embodiment, according to the operation of the distribution network, establishing the pre-arranged node power balance constraint, the pre-arranged node active and reactive demand constraint, the pre-arranged mobile emergency power supply output constraint and the voltage constraint includes the following steps:
[0168] S2221. Constructing a pre-arranged node power balance constraint according to power balance and line transmission power;
[0169] S2222. Construct active and reactive power demand constraints for pre-arranged nodes based on load quantity and load power factor;
[0170] S2223. Based on the upper limits of active and reactive output, construct output constraints for pre-arranged mobile emergency power supplies;
[0171] S2224. Construct voltage constraints based on the line voltage drop equation and the node amplitude.
[0172] In one embodiment, according to the optimal pre-deployment strategy of the mobile emergency power supply, with the goal of maximizing the restoration of important power loads, and considering the scheduling constraints of the mobile emergency power supply and the operation constraints of the distribution network, a real-time scheduling model of the mobile emergency power supply after the accident is established, and the real-time scheduling of the mobile emergency power supply and the power supply restoration strategy of the distribution network are output, including the following steps:
[0173] S31, constructing the second stage objective function according to the optimal pre-deployment strategy of the mobile emergency power supply with the goal of maximizing the restoration of important power loads;
[0174] S32. According to the optimal pre-deployment strategy of the mobile emergency power supply, the second-stage constraint conditions are established by considering the dispatch of the mobile emergency power supply and the operation of the distribution network. The second-stage constraint conditions include the dispatch constraint of the mobile emergency power supply, the power balance constraint of the dispatch node, the active and reactive demand constraint of the dispatch node, the output constraint of the dispatch mobile emergency power supply, and the AC power flow constraint of the line.
[0175] S33. Based on the second-stage objective function and the second-stage constraints, a real-time dispatch model for the mobile emergency power supply after an accident is established to generate a real-time dispatch and distribution network power supply restoration strategy for the mobile emergency power supply.
[0176] Specifically, after the pre-deployment of the mobile emergency power supply is completed, in the face of a specific distribution network damage scenario, it is necessary to carry out real-time scheduling of the mobile emergency power supply, which is the second stage of the present invention; since the mobile emergency power supply is still scarce, it is necessary to match the load priority level and the scheduling route to carry out efficient and reasonable real-time scheduling of the mobile emergency power supply; in order to enhance the post-disaster resilience of the distribution network in a short period of time, an effective multi-period recovery plan is provided, considering the scheduling constraints of the mobile emergency power supply and the operation constraints of the distribution network, and establishing a real-time scheduling of the mobile emergency power supply after the accident and a distribution network power supply recovery strategy.
[0177] Specifically, after the pre-deployment of mobile emergency power supplies, after an extreme accident occurs, the distribution network dispatching center needs to conduct real-time dispatch of mobile emergency power supplies in the face of specific distribution network damage scenarios after evaluating the fault situation; however, mobile emergency power supplies are still scarce, and it is necessary to match load priority levels and dispatching routes to conduct efficient and reasonable real-time dispatch of mobile emergency power supplies.
[0178] Specifically, the mobile emergency power supply needs to be flexibly operated by the transportation network at various access points of the distribution network. The two issues of path selection and distribution network access time are interrelated issues, so the scheduling path of the mobile emergency power supply must be considered.
[0179] In one embodiment, the expression for constructing the second stage objective function is:
[0180]
[0181] In the formula, w i represents the load weight of node i, variable P i,t Represents the load recovery amount of node i in time step t.
[0182] Specifically, the mobile emergency power supply pre-deployment strategy in step S2 is mainly aimed at strengthening the prevention capability of the distribution network system before extreme weather events occur, thereby improving the survival resistance of the power system. After the extreme weather events occur, important loads need to be restored promptly and quickly. In step S3, it is mainly to enhance the post-disaster resilience of the distribution network in a short period of time and provide an effective multi-period recovery plan.
[0183] Specifically, step S3 is mainly to enhance the post-disaster resilience of the distribution network in a short period of time and provide an effective multi-period recovery plan with the goal of maximizing the recovery of important power loads.
[0184] Specifically, within a period of time after an extreme climate event occurs, some fixed distributed power sources still exist in the distribution network, and the mobile emergency power source is used to dynamically dispatch to restore as many important power loads as possible. Since the routing time of the mobile emergency power source on the traffic network must be considered, and the output power of various distributed power sources must go through a ramp-up phase, the actual post-accident recovery problem is modeled as a multi-period problem of the distribution network. In this embodiment, the second-stage objective function is constructed with the goal of maximizing the restoration of important power loads.
[0185] In one embodiment, according to the optimal pre-deployment strategy of the mobile emergency power supply, considering the scheduling of the mobile emergency power supply and the operation of the distribution network, establishing the second stage constraint conditions includes the following steps:
[0186] S321. Establishing a mobile emergency power supply dispatch constraint according to the path selection and time arrangement of the mobile emergency power supply dispatch;
[0187] Specifically, in the process of mobile emergency power dispatch, path selection and time scheduling are two closely related issues; path selection aims to find the most suitable path for the mobile emergency power in the traffic network, while time scheduling is to establish the time schedule for the power to pass through the traffic network and connect with the distribution network nodes. The expression for establishing the mobile emergency power dispatch constraint is:
[0188]
[0189]
[0190] Where, T i,j represents the travel time of the shortest path of the mobile emergency power supply between node i and node j, T i,j =d i,j / v MEG , d i,j is the shortest path length between node i and node j calculated by Dijkstra algorithm. is a 0-1 binary decision variable, It means that the mobile emergency power supply m is connected to the distribution network access point i at the tth time step.
[0191] Specifically, formula (25) indicates that at any time step, the mobile emergency power supply m can only be connected to one distribution network access point; formula (26) indicates that non-distribution network access points cannot access the mobile emergency power supply m; formula (27) indicates that the number of mobile emergency power supplies that can be connected to the distribution network access point i cannot exceed the capacity limit; formula (28) limits the dispatching movement of mobile emergency power supplies on the transportation network. If the mobile emergency power supply m needs to be transferred from node i to node j for connection, if the mobile emergency power supply fails to reach node j in time, that is, τ≤T i,j , then the mobile emergency power supply m is not connected to node j, that is and
[0192] S322. According to the operation of the distribution network, establish the power balance constraint of the dispatching node, the active and reactive demand constraint of the dispatching node, the output constraint of the dispatching mobile emergency power supply and the AC power flow constraint of the line;
[0193] Specifically, the constraints that need to be met during the distribution network power supply restoration process include the dispatching node power balance constraints, the dispatching node active and reactive power demand constraints, the dispatching mobile emergency power supply output constraints and the line AC power flow constraints.
[0194] Specifically, the expression of the scheduling node power balance constraint is:
[0195]
[0196] In the formula, represents the active and reactive output of the mobile emergency power supply m connected to the distribution network node i at the tth time step; P ij,t , Q ij,t represents the active and reactive power of line (i, j) at time step t; P i,t , Q i,t Represents the load recovery amount at node i at the tth time step.
[0197] Specifically, equations (29) and (30) indicate that at the tth time step, node i should satisfy the active and reactive power balance; equation (31) indicates that the transmission power of the complete line (i, j) at the tth time step cannot exceed the line capacity.
[0198] Specifically, the expression of the active and reactive power demand constraint of the dispatching node is:
[0199]
[0200] Where: P i,t , Q i,t represents the active and reactive load at node i at the tth time step; Represents the power factor at node i.
[0201] Specifically, equations (32) and (33) indicate that the active and reactive loads restored at node i at the tth time step do not exceed the total actual active and reactive load demands of the load at node i; equation (34) indicates that the power factor restored at node i at the tth time step is not higher than the initial power factor.
[0202] Specifically, the expression for dispatching the mobile emergency power supply output constraint is:
[0203]
[0204] Where: Indicates the upper limit of active and reactive output of mobile emergency power supply m; It represents the climbing rate of the mobile emergency power supply m; Δt represents the duration of each operation step.
[0205] Specifically, equations (35) and (36) represent the active and reactive output constraints of the mobile emergency power supply m; for the multi-time-step recovery process, equation (37) is added to represent the power change of the mobile emergency power supply at each time step.
[0206] The expression of line AC power flow constraint is:
[0207]
[0208] Where U i,t represents the square of the voltage amplitude at node i at the tth time step; M represents a sufficiently large positive number; r ij 、x ijrepresents the resistance and reactance of line (i, j); Indicates the minimum and maximum values of the square of the voltage at node i.
[0209] Specifically, equations (38) and (39) represent the line voltage drop equation based on Distflow, and the line voltage constraint is relaxed using the large-M method; equation (40) represents the upper and lower limit constraints of the square of the voltage amplitude of node i at the tth time step.
[0210] S323. Based on the mobile emergency power supply dispatching constraints, and in combination with the dispatching node power balance constraints, the dispatching node active and reactive power demand constraints, the dispatching mobile emergency power supply output constraints and the line AC power flow constraints, the second stage constraints are established.
[0211] In one embodiment, according to the path selection and time arrangement of the mobile emergency power scheduling, establishing the mobile emergency power scheduling constraints includes the following steps:
[0212] S3211. Establishing access point connection constraints according to the mobile emergency power supply and the distribution network access point;
[0213] S3212. Establishing access point capacity constraints based on the number of accessible mobile emergency power supplies;
[0214] S3213. Establish time scheduling constraints based on the dispatch time of the mobile emergency power supply on the transportation network, and establish mobile emergency power supply dispatch constraints in combination with access point connection constraints and access point capacity constraints.
[0215] In one embodiment, according to the operation of the distribution network, establishing the power balance constraint of the dispatching node, the active and reactive demand constraint of the dispatching node, the output constraint of the dispatching mobile emergency power supply and the line AC power flow constraint includes the following steps:
[0216] S3221. Establish a scheduling node power balance constraint according to the node power and line transmission power at the tth time step;
[0217] S3222. Establish active and reactive power demand constraints of the dispatching node according to the node load at the tth time step;
[0218] S3223. Establishing a dispatching mobile emergency power supply output constraint according to the power of each time step of the mobile emergency power supply;
[0219] S3224. Establish line AC power flow constraints according to the node voltage amplitude at the tth time step.
[0220] In summary, with the help of the above technical scheme of the present invention, for the problem of power supply restoration in the distribution network, the present invention mainly studies the distribution network power supply restoration model considering the pre-deployment and real-time scheduling of mobile emergency power supplies, and considers the mobile emergency power supplies in the distribution network. An optimization strategy considering the pre-accident pre-deployment and real-time scheduling of mobile emergency power supplies after the accident is proposed; for the distribution network with multiple mobile power supplies, the spatial coupling mode of the distribution network and the transportation network is first analyzed, and a plurality of distribution network failure scenarios are generated using the distribution network failure rate model; then, taking the optimal scheduling path and the maximum load recovery amount after the accident as the objective function, and considering the scheduling constraints of the mobile emergency power supply and the operation constraints of the distribution network, an optimal pre-deployment model of the mobile emergency power supply before the accident is established; then, for the specific faults after the accident, considering the scheduling constraints of the mobile emergency power supply and the operation constraints of the distribution network, a real-time scheduling of the mobile emergency power supply after the accident and a power supply restoration strategy for the distribution network are established.
[0221] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A distribution network restoration method based on pre-deployment and real-time dispatch of mobile emergency power supplies, characterized in that: The distribution network restoration method based on pre-arrangement and real-time dispatch of mobile emergency power supply comprises the following steps: S1. Based on the spatial coupling mode between the distribution network and the transportation network, the distribution network failure is simulated and multiple distribution network failure scenarios are generated; S2. Based on the generated distribution network fault scenario, with the optimal dispatching path and maximum load recovery after the accident as the goal, and considering the dispatching constraints of the mobile emergency power supply and the operation constraints of the distribution network, the optimal pre-deployment model of the mobile emergency power supply before the accident is established, and the optimal pre-deployment strategy of the mobile emergency power supply is output; S3. Based on the optimal pre-deployment strategy of mobile emergency power supply, with the goal of maximizing the restoration of important power loads, and considering the scheduling constraints of mobile emergency power supply and distribution network operation constraints, a real-time scheduling model of mobile emergency power supply after the accident is established, and the real-time scheduling of mobile emergency power supply and distribution network power supply restoration strategy are output.
2. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 1 is characterized in that: The method of simulating distribution network failures based on the spatial coupling mode between the distribution network and the transportation network and generating multiple distribution network failure scenarios includes the following steps: S11. Determine the shortest path for the mobile emergency power supply to access the distribution network using the shortest path algorithm; S12. Perform fault simulation analysis based on the shortest path, introduce a fault rate threshold to screen vulnerable lines, and construct a vulnerable line set; S13. Based on the vulnerable line set, a single distribution line fault scenario is generated, and random sampling analysis is performed to obtain multiple distribution network fault scenarios.
3. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 2 is characterized in that: Determining the shortest path for the mobile emergency power supply to access the power distribution network by using the shortest path algorithm comprises the following steps: S111, determining different paths based on the locations of the pre-deployment points and access points of the mobile emergency power supply; S112. Based on the shortest path algorithm, calculate the spatial distance between each mobile emergency power supply pre-deployment point and the distribution network access point through the transportation network; S113. Filter the shortest path according to the calculation result of the spatial distance.
4. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 2 is characterized in that: The fault simulation analysis is performed based on the shortest path, and the failure rate threshold is introduced to screen the vulnerable lines. The construction of the vulnerable line set includes the following steps: S121. Obtaining the failure rate of a single distribution tower based on the vulnerability curve of distribution network components; S122. Calculate the distribution line failure rate based on the failure rate of a single distribution tower; S123. Based on the calculation result of the distribution line failure rate, the fragile lines are screened using the failure rate threshold, and a fragile line set is constructed.
5. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 1, characterized in that: Based on the generated distribution network fault scenario, taking the optimal dispatching path and the maximum load recovery after the accident as the goal, and considering the dispatching constraints of the mobile emergency power supply and the operation constraints of the distribution network, the optimal pre-deployment model of the mobile emergency power supply before the accident is established, and the optimal pre-deployment strategy of the mobile emergency power supply is output, including: S21. Construct the first-stage objective function based on the optimal dispatching path and the maximum load recovery after the accident; S22. According to the mobile emergency power supply dispatch and distribution network operation, the first stage constraint conditions are constructed, wherein the first stage constraint conditions include mobile emergency power supply layout and dispatch constraints, real-time dispatch constraints, pre-deployed node power balance constraints, pre-deployed node active and reactive demand constraints, pre-deployed mobile emergency power supply output constraints and voltage constraints; S23. Based on the first-stage objective function and the first-stage constraint conditions, an optimal pre-deployment model of the mobile emergency power supply before an accident is established, and an optimal pre-deployment strategy of the mobile emergency power supply is generated.
6. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 5 is characterized in that: The expression for constructing the first stage objective function is: Where N E , S, S MEG , Z represent the distribution network access point set of mobile emergency power supply, the distribution network damage fault scenario set, the mobile emergency power supply set, and the mobile emergency power supply pre-deployment point set respectively; p s represents the probability of distribution network damage fault scenario s; w i is the weight of load i, indicating the importance of the load; P i,s represents the load recovery amount at node i under fault scenario s; μ represents the influence coefficient of the traffic path on the recovery effect, which can be adjusted appropriately; γ i,s is a 0-1 variable, representing the recovery state variable of load i under scenario s, γ i,s =1 indicates the state has been restored, γ i,s =0 means unrecovered state; is a 0-1 variable, indicating that in fault scenario s, the mobile power supply m is deployed from the pre-deployed point z to the distribution network access node i. Indicates that the mobile emergency power supply m is allocated from the pre-deployed point z to the node i in scenario s. Indicates that the mobile emergency power supply has not been deployed; It represents the road distance between the pre-deployment point z and the distribution network access point i under fault scenario s.
7. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 5, characterized in that: According to the mobile emergency power dispatch and distribution network operation, constructing the first stage constraint conditions includes the following steps: S221. According to the mobile emergency power supply scheduling, establish the mobile emergency power supply layout and scheduling constraints, and introduce real-time scheduling constraints; S222. According to the operation of the distribution network, establish pre-arranged node power balance constraints, pre-arranged node active and reactive demand constraints, pre-arranged mobile emergency power supply output constraints and voltage constraints; S223. Based on the mobile emergency power supply layout and scheduling constraints and real-time scheduling constraints, and combined with the pre-deployed node power balance constraints, pre-deployed node active and reactive power demand constraints, pre-deployed mobile emergency power supply output constraints and voltage constraints, the first stage constraints are constructed.
8. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 7, characterized in that: The method of establishing the mobile emergency power supply arrangement and scheduling constraints according to the mobile emergency power supply scheduling and introducing the real-time scheduling constraints includes the following steps: S2211. Establishing mobile emergency power supply layout and scheduling constraints according to the pre-deployment point and layout status of the mobile emergency power supply, wherein the mobile emergency power supply layout and scheduling constraints include pre-deployment point capacity constraints, mobile emergency power supply quantity constraints and mobile emergency power supply allocation constraints; S2212. Establish real-time scheduling constraints based on the scheduling path of the mobile emergency power supply.
9. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 8, characterized in that: The establishment of the mobile emergency power supply arrangement and scheduling constraints according to the pre-arrangement point and arrangement status of the mobile emergency power supply comprises the following steps: S22111. Construct the capacity constraint of the pre-deployment point according to the number of mobile emergency power supplies that can be accommodated at the pre-deployment point; S22112. Construct a quantity constraint of mobile emergency power supplies according to the quantity of mobile emergency power supplies available for deployment; S22113. Based on the deployment status of the mobile emergency power supply, construct the mobile emergency power supply allocation constraints, and combine the pre-deployment point capacity constraints and the mobile emergency power supply quantity constraints to establish the mobile emergency power supply deployment and scheduling constraints.
10. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 7, characterized in that: The establishment of pre-arranged node power balance constraints, pre-arranged node active and reactive power demand constraints, pre-arranged mobile emergency power supply output constraints and voltage constraints according to the operation of the distribution network includes the following steps: S2221. Constructing a pre-arranged node power balance constraint according to power balance and line transmission power; S2222. Based on the load amount and the load power factor, construct active and reactive demand constraints of the pre-arranged nodes; S2223. Based on the upper limits of active and reactive output, construct the output constraints of the pre-arranged mobile emergency power supply; S2224. Construct voltage constraints based on the line voltage drop equation and node amplitude.
11. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 1, characterized in that: The method of establishing a real-time dispatch model of the mobile emergency power supply after an accident based on the optimal pre-deployment strategy of the mobile emergency power supply, taking the restoration of important power loads to the maximum extent possible and considering the dispatch constraints of the mobile emergency power supply and the operation constraints of the distribution network, and outputting the real-time dispatch of the mobile emergency power supply and the power supply restoration strategy of the distribution network includes the following steps: S31, constructing the second stage objective function according to the optimal pre-deployment strategy of the mobile emergency power supply with the goal of maximizing the restoration of important power loads; S32. According to the optimal pre-deployment strategy of the mobile emergency power supply, considering the dispatch of the mobile emergency power supply and the operation of the distribution network, establish the second-stage constraint conditions, wherein the second-stage constraint conditions include the dispatch constraint of the mobile emergency power supply, the power balance constraint of the dispatch node, the active and reactive demand constraint of the dispatch node, the output constraint of the dispatch mobile emergency power supply, and the line AC power flow constraint; S33. Based on the second-stage objective function and the second-stage constraints, a real-time dispatch model for the mobile emergency power supply after an accident is established to generate a real-time dispatch and distribution network power supply restoration strategy for the mobile emergency power supply.
12. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 11, characterized in that: The expression for constructing the second stage objective function is: In the formula, w i represents the load weight of node i, variable P i,t Represents the load recovery amount of node i in time step t.
13. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 11, characterized in that: The method of establishing the second-stage constraint conditions according to the optimal pre-deployment strategy of the mobile emergency power supply and considering the dispatch of the mobile emergency power supply and the operation of the distribution network includes the following steps: S321. Establishing a mobile emergency power supply dispatch constraint according to the path selection and time arrangement of the mobile emergency power supply dispatch; S322. According to the operation of the distribution network, establish the power balance constraint of the dispatching node, the active and reactive demand constraint of the dispatching node, the output constraint of the dispatching mobile emergency power supply and the AC power flow constraint of the line; S323. Based on the mobile emergency power supply dispatching constraints, and in combination with the dispatching node power balance constraints, the dispatching node active and reactive power demand constraints, the dispatching mobile emergency power supply output constraints and the line AC power flow constraints, the second stage constraints are established.
14. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 13, characterized in that: The establishment of the mobile emergency power supply scheduling constraints according to the path selection and time arrangement of the mobile emergency power supply scheduling includes the following steps: S3211. Establishing access point connection constraints according to the mobile emergency power supply and the distribution network access point; S3212. Establishing access point capacity constraints based on the number of accessible mobile emergency power supplies; S3213. Establish time scheduling constraints based on the dispatch time of the mobile emergency power supply on the transportation network, and establish mobile emergency power supply dispatch constraints in combination with access point connection constraints and access point capacity constraints.
15. The method for restoring a distribution network based on pre-deployment and real-time dispatch of mobile emergency power supply according to claim 13, characterized in that: The establishment of the power balance constraint of the dispatching node, the active and reactive demand constraint of the dispatching node, the output constraint of the dispatching mobile emergency power supply and the AC power flow constraint of the line according to the operation of the distribution network includes the following steps: S3221. Establish a scheduling node power balance constraint according to the node power and line transmission power at the tth time step; S3222. Establish active and reactive power demand constraints of the dispatching node according to the node load at the tth time step; S3223. Establishing a dispatching mobile emergency power supply output constraint according to the power of each time step of the mobile emergency power supply; S3224. Establish line AC power flow constraints according to the node voltage amplitude at the tth time step.
Citation Information
Patent Citations
Power distribution network post-disaster repair decision-making method considering information fusion of traffic network and power distribution network
CN112837172A
Extreme weather power distribution network beforehand scheduling method based on line fault consequence analysis
CN113011710A
Distribution network load recovery method and system based on distribution network-traffic network cooperation
CN115459256A
Mobile emergency resource scheduling optimization method considering electric power and traffic coupling network
CN116882552A
Method for making spatio-temporal combined optimal scheduling strategy of mobile energy storage (MES) system
US20220209533A1
Cited By
Emergency control method and system under power distribution network fault
CN119315694A
Power distribution area emergency supply insurance method and system based on vehicle network space-time matching, and medium
CN119382132A
Emergency supply guarantee method, system and medium for distribution station area based on vehicle-grid time-space matching
CN119382132B
Power distribution network fault recovery capability dynamic evaluation method and system
CN122051989A
A power distribution network fault recovery capability dynamic evaluation method and system
CN122051989B