Integrated energy system scheduling method and device, electronic equipment and storage medium

By obtaining and predicting the historical scheduling data of the micronet, screening non-isolated data and dividing it into first-level systems, and performing hierarchical scheduling, the problems of large communication volume and poor timeliness in the existing technology are solved, and the scheduling efficiency of the comprehensive energy system is improved. and timeliness.

CN118982178APending Publication Date: 2024-11-19GUANGDONG ELECTRIC POWER SCI RES INST ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410998072.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

There are problems of huge communication volume, poor timeliness and low efficiency in the existing comprehensive energy system optimization scheduling methods.

Method used

By obtaining the historical scheduling data of each micronet, making isolated points judgments, filtering out non-isolated data, predicting future scheduling, and dividing the micronet into first-level systems to perform hierarchical scheduling, reducing data traffic, and improving efficiency and Timeliness.

Benefits of technology

The hierarchical optimization scheduling of the integrated energy system is realized, which reduces data traffic and improves the efficiency and timeliness of scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982178A_ABST
    Figure CN118982178A_ABST
Patent Text Reader

Abstract

The invention discloses an integrated energy system scheduling method and device, electronic equipment and a storage medium, which are used for solving the problems of huge communication traffic, poor timeliness and low efficiency in the existing integrated energy system optimal scheduling method. The method comprises the following steps: acquiring historical scheduling data of each micro-grid in the integrated energy system; for each micro-grid, performing isolated point judgment on the historical scheduling data to obtain non-isolated data, and predicting a future scheduling amount of the micro-grid in a future time period based on the non-isolated data; the plurality of microgrids are divided into a plurality of primary systems in combination with the future scheduling amount of the plurality of microgrids, and one microgrid only exists in one primary system; performing primary scheduling on each primary system according to the sum of the micro-grid scheduling quantity of each primary system in the future time period; and performing secondary scheduling on each microgrid according to the future scheduling amount of each microgrid in the primary system in the future time period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing technology, and in particular to a comprehensive energy system scheduling method, device, electronic equipment and storage medium. Background Art

[0002] The rapid development of modern industry has led to serious problems such as energy shortage and environmental degradation. Therefore, reasonable means are urgently needed to improve the utilization rate of various energy sources, reduce carbon emissions, and reduce environmental pressure. The widespread application of integrated energy systems that couple the four energy sources of cold, heat, electricity, and gas in the power industry has become one of the important methods to solve the above problems. An integrated energy system usually contains multiple microgrids. The power mutual assistance between different microgrids can effectively solve the problem of supply and demand balance and reduce costs. Therefore, how to optimize the scheduling of integrated energy systems has gradually become a hot research issue.

[0003] At present, the centralized optimization scheduling method is mainly used to optimize the scheduling of integrated energy systems. Although the centralized optimization algorithm is simple and fast, it requires all kinds of data from all microgrids in the system to be transmitted to the control center for unified scheduling, which results in huge communication volume, poor timeliness and low efficiency. Summary of the invention

[0004] The present invention provides a comprehensive energy system scheduling method, device, electronic device and storage medium, which are used to solve or partially solve the problems of huge communication volume, poor timeliness and low efficiency existing in the existing comprehensive energy system optimization scheduling method.

[0005] The present invention provides a method for scheduling an integrated energy system, wherein the integrated energy system includes a plurality of microgrids, and the method includes:

[0006] Obtaining historical dispatch data of each of the microgrids;

[0007] For each of the microgrids, performing isolated point judgment on the historical dispatching data to obtain non-isolated data, and predicting the future dispatching amount of the microgrid in a future time period based on the non-isolated data;

[0008] In combination with the future dispatching amount of the multiple microgrids, the multiple microgrids are divided into a plurality of primary systems, wherein one microgrid exists in only one primary system;

[0009] Performing first-level scheduling on each of the first-level systems according to the sum of the microgrid scheduling amounts of each of the first-level systems in a future time period;

[0010] According to the future dispatching amount of each microgrid in the primary system in a future time period, the respective microgrids are subjected to secondary dispatching.

[0011] Optionally, the historical scheduling data includes a plurality of historical scheduling quantities, and the performing isolated point judgment on the historical scheduling data to obtain non-isolated data includes:

[0012] Obtaining historical dates corresponding to a plurality of the historical scheduling quantities;

[0013] Establishing a historical scheduling coordinate system with historical dates as the horizontal coordinate and historical scheduling quantities as the vertical coordinate, and marking multiple sample points corresponding to the multiple historical scheduling quantities in the historical scheduling coordinate system;

[0014] Judging the plurality of sample points based on a preset isolated point detection algorithm to obtain a plurality of non-isolated points among the plurality of sample points;

[0015] The multiple target historical dispatch quantities corresponding to the multiple non-isolated points are used as the non-isolated data of the microgrid among the multiple historical dispatch quantities.

[0016] Optionally, predicting a future dispatching amount of the microgrid in a future time period based on the non-isolated data includes:

[0017] Determine the maximum value and the minimum value in the non-isolated data, and calculate the predicted floating range according to the maximum value and the minimum value;

[0018] The mean of the non-isolated data is calculated, and the future dispatching amount of the microgrid in a future time period is calculated by combining the mean and the predicted floating range.

[0019] Optionally, performing primary scheduling on each of the primary systems according to the sum of microgrid scheduling amounts of each of the primary systems in a future time period includes:

[0020] For each of the primary systems, a plurality of target microgrids existing in the primary system are selected from the plurality of microgrids, and a target future scheduling amount corresponding to each of the target microgrids in a future time period;

[0021] The first-level system is scheduled at the first level by using the sum of the target future scheduling quantities.

[0022] Optionally, performing secondary scheduling on each microgrid according to a future scheduling amount of each microgrid in the primary system in a future time period includes:

[0023] For each of the target microgrids, the target future scheduling amount is used to perform secondary scheduling on the target microgrid.

[0024] Optionally, the acquiring historical scheduling data of each microgrid includes:

[0025] Acquire original data of multiple historical dispatch quantities of each microgrid in the integrated energy system;

[0026] For each of the microgrids, duplicate data are removed, erroneous data are corrected, and normalization is performed on the original data of the multiple historical scheduling quantities to obtain multiple historical scheduling quantities of the microgrid, and the multiple historical scheduling quantities are integrated into the historical scheduling data of the microgrid.

[0027] Optionally, the maximum number of microgrids in the primary system is the maximum number of microgrids that can be accommodated by the primary system when the scheduling data processing efficiency is greater than a preset processing efficiency.

[0028] The present invention also provides a comprehensive energy system scheduling device, wherein the comprehensive energy system includes a plurality of microgrids, and the device includes:

[0029] A historical dispatch data acquisition module, used to acquire the historical dispatch data of each microgrid;

[0030] A future dispatching amount prediction module is used to perform isolated point judgment on the historical dispatching data for each microgrid to obtain non-isolated data, and predict the future dispatching amount of the microgrid in a future time period based on the non-isolated data;

[0031] A primary system division module, used to divide the multiple microgrids into a plurality of primary systems in combination with the future dispatching quantities of the multiple microgrids, wherein one microgrid exists in only one primary system;

[0032] A primary dispatching module, used for performing primary dispatching on each of the primary systems according to the sum of the microgrid dispatching quantities of each of the primary systems in a future time period;

[0033] The secondary scheduling module is used to perform secondary scheduling on each microgrid according to the future scheduling amount of each microgrid in the primary system in a future time period.

[0034] The present invention also provides an electronic device, the device comprising a processor and a memory:

[0035] The memory is used to store program code and transmit the program code to the processor;

[0036] The processor is used to execute the integrated energy system scheduling method as described in any one of the above items according to the instructions in the program code.

[0037] The present invention also provides a computer-readable storage medium, wherein the computer-readable storage medium is used to store program code, and the program code is used to execute the integrated energy system scheduling method as described in any one of the above items.

[0038] It can be seen from the above technical solutions that the present invention has the following advantages:

[0039] A method for optimizing the dispatch of an integrated energy system is proposed. First, based on historical dispatch data, non-isolated data is screened out, and non-isolated data is further used to predict the relatively accurate dispatch amount of each microgrid in the future time period; then, combined with the predicted dispatch amount of each microgrid, each microgrid is divided into multiple first-level systems. When dispatching, the first-level system is first taken as a whole, and the integrated energy system performs first-level dispatch on multiple first-level systems. Then, the first-level system performs second-level dispatch on the microgrids in the first-level system according to the amount dispatched by the integrated energy system. Therefore, in the process of optimizing the dispatch of the integrated energy system, each microgrid is indirectly dispatched by setting up the first-level system, and hierarchical optimization dispatch is realized through hierarchical processing, which reduces the communication volume of the integrated energy system data and can improve the efficiency and timeliness of dispatch. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0041] Figure 1 A flowchart of the steps of a method for scheduling an integrated energy system;

[0042] Figure 2 It is a structural block diagram of a comprehensive energy system dispatching device;

[0043] Figure 3 The figure is a schematic diagram of the structure of a terminal device. DETAILED DESCRIPTION

[0044] The embodiments of the present invention provide a comprehensive energy system scheduling method, device, electronic device and storage medium, which are used to solve or partially solve the problems of huge communication volume, poor timeliness and low efficiency existing in the existing comprehensive energy system optimization scheduling method.

[0045] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] As an example, with the rapid development of modern industry, the problems such as energy shortage and environmental degradation cannot be ignored. The widespread application of integrated energy systems that couple the four energy sources of cold, heat, electricity and gas in the power industry has become one of the important methods to solve the above problems. An integrated energy system usually contains multiple microgrids. The power mutual assistance between different microgrids can effectively solve the problem of supply and demand balance and reduce costs. Therefore, how to optimize the scheduling of integrated energy systems has gradually become a hot research issue.

[0047] At present, the centralized optimization scheduling method is mainly used to optimize the scheduling of integrated energy systems. Although the centralized optimization algorithm is simple and fast, it requires all kinds of data from all microgrids in the system to be transmitted to the control center for unified scheduling, which results in huge communication volume, poor timeliness and low efficiency.

[0048] Therefore, one of the core invention points of the embodiment of the present invention is: in view of the shortcomings of the prior art, a method for optimizing and scheduling an integrated energy system is proposed. First, the isolation forest algorithm and historical scheduling data are combined to screen out non-isolated data, and the non-isolated data is further used to predict the relatively accurate scheduling amount of each microgrid in the future time period; then, combined with the predicted scheduling amount of each microgrid, each microgrid is divided into multiple first-level systems. When scheduling, the first-level system is first taken as a whole, and the integrated energy system performs first-level scheduling on multiple first-level systems, and then the first-level system performs second-level scheduling on the microgrids in the first-level system according to the amount scheduled by the integrated energy system. Therefore, in the process of optimizing and scheduling the integrated energy system, each microgrid is indirectly scheduled by setting up a first-level system. The integrated energy system only needs to receive data from multiple first-level systems, and the first-level system receives data from each microgrid it manages, thereby realizing hierarchical optimization scheduling through hierarchical processing, reducing the communication volume of integrated energy system data, and improving the efficiency and timeliness of scheduling.

[0049] Reference Figure 1 , shows a flowchart of a method for scheduling an integrated energy system provided by an embodiment of the present invention, which may specifically include the following steps:

[0050] Step 101, obtaining historical dispatch data of each microgrid;

[0051] Dispatching data mainly refers to the real-time monitoring data, planning data, control command data and other related information required by the power dispatching organization in the process of power system operation management and control. In actual situations, the historical raw data collected by the power dispatching collection system may have problems such as data duplication, missing data, and errors. Therefore, in order to ensure data quality and improve calculation accuracy, the collected raw data needs to be preprocessed before actual dispatching.

[0052] In combination with the foregoing content, it can be seen that the integrated energy system may include multiple microgrids. In a specific implementation, the historical scheduling data of each microgrid can be obtained by: first obtaining the original data of multiple historical scheduling quantities of each microgrid in the integrated energy system; for each microgrid, removing duplicate data, correcting erroneous data, and normalizing the original data of multiple historical scheduling quantities to obtain multiple historical scheduling quantities of the microgrid, and integrating the multiple historical scheduling quantities into the historical scheduling data of the microgrid.

[0053] Among them, removing duplicate data is an important part of the data cleaning process. Its purpose is to ensure data quality, avoid deviations in analysis results caused by duplicate information, save storage space and improve query efficiency.

[0054] Step 102, for each of the microgrids, performing isolated point judgment on the historical dispatching data to obtain non-isolated data, and predicting the future dispatching amount of the microgrid in a future time period based on the non-isolated data;

[0055] In the embodiment of the present invention, an isolation forest algorithm (iForest) is used as an outlier detection algorithm to process historical scheduling data to remove part of the data in multiple historical scheduling quantities. The isolation forest algorithm is an anomaly detection algorithm used to mine abnormal data or outliers. Its principle is to find data that does not conform to the rules of other data in a large amount of data.

[0056] In addition to the isolation forest algorithm, the outlier detection algorithm for detecting outliers may also adopt a statistical outlier detection method, a neighbor-based outlier detection method, a clustering-based outlier detection method, a classification-based outlier detection method, etc. It is understood that the present invention is not limited to this.

[0057] In a specific implementation, isolated point judgment is performed on historical dispatch data to obtain non-isolated data. The method can be as follows: first, historical dates corresponding to multiple historical dispatch quantities are obtained; then, a historical dispatch coordinate system is established with the historical date as the horizontal coordinate and the historical dispatch quantity as the vertical coordinate, and multiple sample points corresponding to multiple historical dispatch quantities are marked in the historical dispatch coordinate system; multiple sample points are judged based on a preset isolated point detection algorithm, such as an isolated forest algorithm, to obtain multiple non-isolated points among the multiple sample points; and then multiple target historical dispatch quantities corresponding to the multiple non-isolated points are used as non-isolated data of the microgrid among the multiple historical dispatch quantities.

[0058] The isolation forest algorithm can not only reduce the amount of data, improve the calculation rate and scheduling efficiency, but also ensure that there is basically no abnormal data in the data used for subsequent predictions, thereby improving the accuracy of the prediction results and ensuring the accuracy of scheduling.

[0059] Furthermore, based on the non-isolated data, predicting the future dispatching amount of the microgrid in the future time period may specifically include:

[0060] First, determine the maximum and minimum values ​​in the non-isolated data, and calculate the predicted floating range based on the maximum and minimum values ​​using the following formula:

[0061] A=Amax-Amin

[0062] Among them, A represents the predicted floating range, A max Represents the maximum value among non-isolated data, A min Represents the minimum value among non-isolated data.

[0063] Then calculate the mean of the non-isolated data, combine the mean and the predicted floating range, and calculate the future dispatching amount of the microgrid in the future time period (which can be expressed as a 24-hour time period in the future day) through the following formula:

[0064]

[0065] Among them, C1 represents the maximum value of the future dispatching amount of the microgrid in the future time period, C2 represents the minimum value of the future dispatching amount of the microgrid in the future time period, and Z represents the mean value of non-isolated data.

[0066] It can be seen from the above formula that the maximum and minimum values ​​of the microgrid dispatching amount are obtained through prediction, and its purpose is to ensure that the microgrid has sufficient dispatching amount in the future time period.

[0067] Step 103, combining the future dispatching amounts of the multiple microgrids, dividing the multiple microgrids into a plurality of primary systems, wherein one microgrid exists in only one primary system;

[0068] Then, the multiple microgrids can be divided into several primary systems in combination with the future dispatching amount of multiple microgrids in the integrated energy system, wherein the maximum number of microgrids in each primary system is the maximum number of microgrids that can be accommodated by the primary system when the dispatching data processing efficiency is greater than the preset processing efficiency. That is, when dividing the microgrids, the number of primary systems and the number of microgrids in each primary system are determined based on the future dispatching amount of each microgrid, so as to ensure that the dispatching data processing efficiency of each primary system meets a certain processing efficiency (such as a processing efficiency greater than 85%) as much as possible.

[0069] Generally speaking, for each microgrid, its future dispatching amount can be any value in the range of [C2, C1], and the value of each microgrid dispatching amount is also related to the microgrid division of the primary system in this step.

[0070] In a primary system, if the number of microgrids is large, the efficiency of data processing will be reduced. Therefore, in order to make the processing efficiency of each primary system as high as possible, avoid reducing the scheduling efficiency due to excessive data, and make the microgrid division more reasonable, a maximum number of microgrids can be set for each primary system in combination with the future scheduling volume of each microgrid. The maximum number of microgrids is limited by the processing efficiency of the processor (primary system) and depends on the amount of data of each microgrid in the primary system. Assuming that the amount of data of each microgrid allocated to a primary system is large, the maximum number of microgrids in the primary system may be 3 or even 2; assuming that the amount of data of each microgrid allocated to a primary system is small, the maximum number of microgrids in the primary system may be 5, or even 6 or 7.

[0071] In actual division, the number of microgrids can be rounded to the integer between [1 and the maximum number of microgrids]. In general, in order to improve resource utilization efficiency, the maximum value is usually taken as the number of microgrids in the primary system.

[0072] For example, suppose that the time it takes for a processor (the first primary system) to process the data of two microgrids is the same as the time it takes for the processor to process the data of three microgrids. In this case, the maximum number of microgrids is 3. However, as the number increases, the processor will always reach the upper limit of parallel processing. In this case, instead of continuing to increase the number of microgrids in the first primary system, it is better to transfer the newly added microgrid data to another processor (the second primary system) for processing. At this time, compared with using only one primary system, the efficiency of processing microgrid scheduling data will be higher. When dividing microgrids, random division can be used, but in principle, adjacent microgrids will be divided into the same primary system in order to better manage microgrids. Assuming that the microgrids in the primary system are adjacent, when the scheduling amount of one microgrid is insufficient, the surplus amount can be scheduled in the adjacent microgrid.

[0073] For example, assuming that there are 5 microgrids in the integrated energy system, the ratio of the future scheduling volume (i.e., the amount of data to be processed) of each microgrid is 3:1:1:2:1. When the scheduling data processing efficiency is set to be greater than 85%, assuming that a processor (first-level system) can process about 4 times the amount of data, in order to ensure the processing efficiency as much as possible and improve resource utilization efficiency, the 5 microgrids can be divided into 2 first-level systems. The first first-level system has 2 microgrids (the ratio of microgrid scheduling volume is 3:1), and the second first-level system has 3 microgrids (the ratio of microgrid scheduling volume is 1:2:1).

[0074] Step 104, performing first-level scheduling on each of the first-level systems according to the sum of the microgrid scheduling amounts of each of the first-level systems in a future time period;

[0075] For the integrated energy system, each primary system can be firstly dispatched according to the sum of the microgrid dispatching quantities of each primary system in the future time period. The specific process can be as follows: for each primary system, several target microgrids existing in the primary system are selected from multiple microgrids, and the target future dispatching quantity corresponding to each target microgrid in the future time period; the sum of each target future dispatching quantity is used to perform primary dispatching on the primary system.

[0076] For example, suppose there are 10 microgrids in an integrated energy system. After the dispatch amount prediction calculation and the first-level system division in the above steps, it is divided into three first-level systems, namely, first-level system X (including microgrid 1 with a future dispatch amount of A, microgrid 2 with a future dispatch amount of B, and microgrid 3 with a future dispatch amount of C), first-level system Y (including microgrid 4 with a future dispatch amount of D, microgrid 5 with a future dispatch amount of E, and microgrid 6 with a future dispatch amount of F), first-level system Z (including microgrid 7 with a future dispatch amount of G, microgrid 8 with a future dispatch amount of H, and microgrid 9 with a future dispatch amount of C). For example, for a microgrid 9 with a metric of I and a microgrid 10 with a future dispatching amount of J, when performing dispatching, the integrated energy system first performs a first-level dispatch on the first-level system X according to the total dispatching amount of the microgrid A+B+C (i.e., the dispatching amount sent to the first-level system X is A+B+C), and performs a first-level dispatch on the first-level system Y according to the total dispatching amount of the microgrid D+E+F (i.e., the dispatching amount sent to the first-level system Y is D+E+F), and performs a first-level dispatch on the first-level system Z according to the total dispatching amount of the microgrid G+H+I+J (i.e., the dispatching amount sent to the first-level system Z is G+H+I+J).

[0077] Step 105 , performing secondary scheduling on each microgrid according to the future scheduling amount of each microgrid in the primary system in a future time period.

[0078] Then, the microgrids in the primary system can be secondarily scheduled according to the future scheduling amount of each microgrid in the primary system in the future time period. On the basis of using the sum of the target future scheduling amounts corresponding to each target microgrid to perform the primary scheduling of the primary system, the process can be specifically as follows: for each target microgrid, the target microgrid is secondarily scheduled using the target future scheduling amount.

[0079] Still continuing with the above example, taking the first-level system Z as an example, after the integrated energy system sends the total dispatching amount G+H+I+J to the first-level system Z, the first-level system Z performs second-level dispatching according to the future dispatching amount of each microgrid in the system to obtain the microgrid dispatching data. That is, the first-level system Z performs second-level dispatching on microgrid 7 according to the dispatching amount G, performs second-level dispatching on microgrid 8 according to the dispatching amount G, performs second-level dispatching on microgrid 9 according to the dispatching amount H, and performs second-level dispatching on microgrid 10 according to the dispatching amount I. When the dispatching is completed, the dispatching data of each microgrid can be transmitted back to the corresponding first-level system, and indirectly transmitted back to the integrated energy system through each first-level system, thereby realizing hierarchical optimization dispatching through hierarchical processing, reducing the communication volume of integrated energy system data, and improving dispatching efficiency and timeliness.

[0080] In an embodiment of the present invention, a method for optimizing and dispatching an integrated energy system is proposed. First, the isolation forest algorithm and historical dispatching data are combined to screen out non-isolated data, and the non-isolated data is further used to predict the relatively accurate dispatching amount of each microgrid in the future time period; then, combined with the predicted dispatching amount of each microgrid, each microgrid is divided into multiple first-level systems. When dispatching, the first-level system is first taken as a whole, and the integrated energy system performs first-level dispatching on multiple first-level systems, and then the first-level system performs second-level dispatching on the microgrids in the first-level system according to the amount dispatched by the integrated energy system. Therefore, in the process of optimizing and dispatching the integrated energy system, each microgrid is indirectly dispatched by setting up a first-level system. The integrated energy system only needs to receive data from multiple first-level systems, and the first-level system receives data from each microgrid it manages, thereby realizing hierarchical optimization and dispatching through hierarchical processing, reducing the communication volume of integrated energy system data, and improving the efficiency and timeliness of dispatching.

[0081] Reference Figure 2 , shows a structural block diagram of a comprehensive energy system scheduling device provided by an embodiment of the present invention, which may specifically include:

[0082] A historical dispatch data acquisition module 201 is used to acquire historical dispatch data of each microgrid;

[0083] A future dispatch amount prediction module 202 is used to perform isolated point judgment on the historical dispatch data for each microgrid, obtain non-isolated data, and predict the future dispatch amount of the microgrid in a future time period based on the non-isolated data;

[0084] A primary system division module 203 is used to divide the multiple microgrids into a plurality of primary systems in combination with the future scheduling quantities of the multiple microgrids, wherein one microgrid exists in only one primary system;

[0085] A primary scheduling module 204 is used to perform primary scheduling on each of the primary systems according to the sum of the microgrid scheduling amounts of each of the primary systems in a future time period;

[0086] The secondary scheduling module 205 is used to perform secondary scheduling on each microgrid according to the future scheduling amount of each microgrid in the primary system in a future time period.

[0087] In an optional embodiment, the historical scheduling data includes a plurality of historical scheduling quantities, and the future scheduling quantity prediction module 202 includes:

[0088] A historical date acquisition module, used to acquire historical dates corresponding to a plurality of the historical scheduling quantities;

[0089] A sample point marking module, used to establish a historical scheduling coordinate system with historical dates as horizontal coordinates and historical scheduling quantities as vertical coordinates, and mark multiple sample points corresponding to the multiple historical scheduling quantities in the historical scheduling coordinate system;

[0090] A non-isolated point judgment module, used to judge the multiple sample points based on a preset isolated point detection algorithm to obtain multiple non-isolated points from the multiple sample points;

[0091] The non-isolated data determination module is used to use the multiple target historical dispatch quantities corresponding to the multiple non-isolated points as the non-isolated data of the microgrid among the multiple historical dispatch quantities.

[0092] In an optional embodiment, the future scheduling amount prediction module 202 further includes:

[0093] A predicted floating range calculation module, used to determine the maximum value and the minimum value in the non-isolated data, and calculate the predicted floating range according to the maximum value and the minimum value;

[0094] The future dispatching amount calculation module is used to calculate the mean of the non-isolated data, and calculate the future dispatching amount of the microgrid in a future time period by combining the mean and the predicted floating range.

[0095] In an optional embodiment, the first-level scheduling module 204 is specifically used to:

[0096] For each of the primary systems, a plurality of target microgrids existing in the primary system are selected from the plurality of microgrids, and a target future scheduling amount corresponding to each of the target microgrids in a future time period;

[0097] The first-level system is scheduled at the first level by using the sum of the target future scheduling quantities.

[0098] In an optional embodiment, the secondary scheduling module 205 is specifically used for:

[0099] For each of the target microgrids, the target future scheduling amount is used to perform secondary scheduling on the target microgrid.

[0100] In an optional embodiment, the historical scheduling data acquisition module 201 includes:

[0101] A historical dispatch quantity raw data acquisition module is used to acquire the raw data of multiple historical dispatch quantities of each microgrid in the integrated energy system;

[0102] The historical data preprocessing module is used to remove duplicate data, correct erroneous data and normalize the original data of the multiple historical scheduling quantities for each of the microgrids, obtain multiple historical scheduling quantities of the microgrid, and integrate the multiple historical scheduling quantities into the historical scheduling data of the microgrid.

[0103] In an optional embodiment, the maximum number of microgrids in the primary system is the maximum number of microgrids that can be accommodated by the primary system when the scheduling data processing efficiency is greater than a preset processing efficiency.

[0104] As for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the aforementioned method embodiment.

[0105] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0106] The embodiment of the present invention also provides a terminal device, see Figure 3 The terminal device 300 may include: at least one processor 310 and a memory 320, wherein the memory 320 is used to store a computer program 321, and the processor 310 is used to call and run the computer program 321 stored in the memory 320 to implement the steps in any of the above-mentioned method embodiments, for example Figure 1Steps 101 to 105 in the illustrated embodiment. Alternatively, when the processor 310 executes the computer program, the functions of each module / unit in the above-mentioned device embodiments are implemented, for example Figure 2 The functions of each module are shown.

[0107] Exemplarily, the computer program 321 may be divided into one or more modules / units, one or more modules / units are stored in the memory 320, and are executed by the processor 310 to complete the present invention. The one or more modules / units may be a series of computer program segments that can complete specific functions, and the program segments are used to describe the execution process of the computer program in the terminal device 300.

[0108] Those skilled in the art will understand that Figure 3 It is only an example of a terminal device and does not constitute a limitation on the terminal device. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components, such as input and output devices, network access devices, buses, etc.

[0109] The processor 310 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc.

[0110] The memory 320 may be an internal storage unit of the terminal device, or an external storage device of the terminal device, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. The memory 320 is used to store the computer program and other programs and data required by the terminal device. The memory 320 may also be used to temporarily store data that has been output or is to be output.

[0111] The bus may be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, the bus in the drawings of the present invention is not limited to only one bus or one type of bus.

[0112] The integrated energy system scheduling method provided in the embodiment of the present invention can be applied to terminal devices such as computers, wearable devices, vehicle-mounted devices, tablet computers, laptops, netbooks, etc. The embodiment of the present invention does not impose any restrictions on the specific type of terminal devices.

[0113] An embodiment of the present invention further provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, it can implement the steps in each embodiment of the above-mentioned integrated energy system scheduling method.

[0114] An embodiment of the present invention provides a computer program product. When the computer program product runs on a mobile terminal, the mobile terminal implements the steps in each embodiment of the above-mentioned integrated energy system scheduling method when executing the computer program product.

[0115] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned various method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the camera / terminal device, a recording medium, a computer memory, a read-only memory (ROM), a random access memory (RAM), an electrical carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.

[0116] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0117] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0118] In the embodiments provided by the present invention, it should be understood that the disclosed devices / network equipment and methods can be implemented in other ways. For example, the device / network equipment embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0119] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0120] It can be understood that the above-described embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A method for scheduling an integrated energy system, characterized in that: The integrated energy system includes a plurality of microgrids, and the method includes: Obtaining historical dispatch data of each of the microgrids; For each of the microgrids, performing isolated point judgment on the historical dispatching data to obtain non-isolated data, and predicting the future dispatching amount of the microgrid in a future time period based on the non-isolated data; In combination with the future dispatching amount of the multiple microgrids, the multiple microgrids are divided into a plurality of primary systems, wherein one microgrid exists in only one primary system; Performing first-level scheduling on each of the first-level systems according to the sum of the microgrid scheduling amounts of each of the first-level systems in a future time period; According to the future dispatching amount of each microgrid in the primary system in a future time period, the respective microgrids are subjected to secondary dispatching.

2. The integrated energy system scheduling method according to claim 1, characterized in that: The historical scheduling data includes a plurality of historical scheduling quantities, and performing isolated point judgment on the historical scheduling data to obtain non-isolated data includes: Obtaining historical dates corresponding to a plurality of the historical scheduling quantities; Establishing a historical scheduling coordinate system with historical dates as the horizontal coordinate and historical scheduling quantities as the vertical coordinate, and marking multiple sample points corresponding to the multiple historical scheduling quantities in the historical scheduling coordinate system; Judging the plurality of sample points based on a preset isolated point detection algorithm to obtain a plurality of non-isolated points among the plurality of sample points; The multiple target historical dispatch quantities corresponding to the multiple non-isolated points are used as the non-isolated data of the microgrid among the multiple historical dispatch quantities.

3. The integrated energy system scheduling method according to claim 1, characterized in that: The predicting, based on the non-isolated data, the future dispatching amount of the microgrid in a future time period includes: Determine the maximum value and the minimum value in the non-isolated data, and calculate the predicted floating range according to the maximum value and the minimum value; The mean of the non-isolated data is calculated, and the future dispatching amount of the microgrid in a future time period is calculated by combining the mean and the predicted floating range.

4. The integrated energy system scheduling method according to claim 1, characterized in that: The first-level scheduling of each of the first-level systems is performed according to the sum of the microgrid scheduling amounts of each of the first-level systems in the future time period, including: For each of the primary systems, a plurality of target microgrids existing in the primary system are selected from the plurality of microgrids, and a target future scheduling amount corresponding to each of the target microgrids in a future time period; The first-level system is scheduled at the first level by using the sum of the target future scheduling quantities.

5. The integrated energy system scheduling method according to claim 4, characterized in that: The performing secondary scheduling on each microgrid according to the future scheduling amount of each microgrid in the primary system in a future time period includes: For each of the target microgrids, the target future scheduling amount is used to perform secondary scheduling on the target microgrid.

6. The integrated energy system scheduling method according to claim 1, characterized in that: The acquiring of the historical dispatch data of each microgrid comprises: Acquire original data of multiple historical dispatch quantities of each microgrid in the integrated energy system; For each of the microgrids, duplicate data are removed, erroneous data are corrected, and normalization is performed on the original data of the multiple historical scheduling quantities to obtain multiple historical scheduling quantities of the microgrid, and the multiple historical scheduling quantities are integrated into the historical scheduling data of the microgrid.

7. The integrated energy system scheduling method according to any one of claims 1 to 6, characterized in that: The maximum value of the number of microgrids in the primary system is the maximum number of microgrids that can be accommodated by the primary system when the scheduling data processing efficiency is greater than the preset processing efficiency.

8. A comprehensive energy system scheduling device, characterized in that: The integrated energy system includes a plurality of microgrids, and the device includes: A historical dispatch data acquisition module, used to acquire the historical dispatch data of each microgrid; A future dispatching amount prediction module is used to perform isolated point judgment on the historical dispatching data for each microgrid to obtain non-isolated data, and predict the future dispatching amount of the microgrid in a future time period based on the non-isolated data; A primary system division module, used to divide the multiple microgrids into a plurality of primary systems in combination with the future dispatching quantities of the multiple microgrids, wherein one microgrid exists in only one primary system; A primary dispatching module, used for performing primary dispatching on each of the primary systems according to the sum of the microgrid dispatching quantities of each of the primary systems in a future time period; The secondary scheduling module is used to perform secondary scheduling on each microgrid according to the future scheduling amount of each microgrid in the primary system in a future time period.

9. An electronic device, characterized in that: The device comprises a processor and a memory: The memory is used to store program code and transmit the program code to the processor; The processor is used to execute the integrated energy system scheduling method described in any one of claims 1-7 according to the instructions in the program code.