Zone area resource regulation and control method and device of virtual power plant and electronic equipment
By obtaining and predicting the power resource information in each area of the virtual power plant, using neural network models to determine the power demand value, and regulating the resources of the virtual power plant, solving the problem of unstable power grid operation caused by the increase of flexible load, improving the power quality and reliability of power supply sex.
Patent Information
- Application Number
- CN202411095793.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-19
AI Technical Summary
In the new power system, the increase in flexible load has a great impact on the power of the distribution network, resulting in unstable operation of the power grid, and the inability to ensure the quality of the power and the reliability of the power supply. More adjustable resources in virtual power plants need to be discovered to alleviate operating pressure .
By obtaining the calling power resources and environmental information of each station area, using neural network models to predict the power output and consumption values, determine the power demand values, and regulate the power resources of virtual power plants to achieve flexible regulation of distribution network resources.
It improves the power quality and power supply reliability of the distribution network, enhances the adjustable capacity of the virtual power plant, and ensures the stable operation of the power system.
Smart Images

Figure BDA0004987887430000081 
Figure BDA0004987887430000091 
Figure BDA0004987887430000092
Abstract
Description
Technical Field
[0001] The present application relates to the field of electric power, and in particular to a method, device, electronic equipment, storage medium and program product for regulating and controlling substation resources of a virtual power plant. Background Art
[0002] A virtual power plant is an entity that manages and optimizes distributed resources such as distributed power sources, energy storage and adjustable power through advanced digital technology, control technology, Internet of Things technology and information and communication technology. It is also an operating entity that participates in the operation of the power grid and the power market. Virtual power plants aggregate a large amount of flexible and adjustable resources. Mastering the adjustable capabilities of virtual power plants is crucial for power grid regulation. The adjustable capabilities of virtual power plants refer to the ability of users to participate in adjusting loads, including two adjustment directions: increasing loads and reducing loads.
[0003] In some scenarios, with the construction of new power systems, flexible loads such as thermal storage electric boilers, air conditioners, and electric vehicles are increasing year by year. The increase in flexible loads has a significant impact on the power of the distribution network, thereby affecting the safe and stable operation of the distribution network, and failing to guarantee the power quality and power supply reliability of the distribution network. Therefore, how to explore more adjustable resources in the virtual power plant to alleviate the operating pressure of the main grid is a technical problem that technicians in this field need to solve. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a method, device, electronic equipment, storage medium and program product for regulating the substation resources of a virtual power plant, thereby improving the power quality and power supply reliability of the distribution network.
[0005] In order to solve the above technical problems, the embodiments of the present application are implemented as follows:
[0006] In the first aspect, an embodiment of the present application provides a method for regulating and controlling substation resources of a virtual power plant, which method includes: obtaining the power resources currently connected to each substation in the virtual power plant network and environmental information of the current environment of each substation, wherein the power resources to be called include power resources that can be called from the substation or power resources that need to be called into the substation; determining the power output value of each substation according to the environmental information of the current environment of each substation, and determining the power consumption value of each substation using the historical power resource information of each substation; determining the power demand value of each substation according to the power output value and the power consumption value; and regulating the power resources of the virtual power plant according to the power demand value of each substation and the called power resources.
[0007] Optionally, using the historical power resource information of each of the substations to determine the power consumption value of each of the substations includes: inputting the historical power resource information of each of the substations into an energy consumption prediction module of a resource prediction model, and obtaining the power consumption value of each of the substations through the energy consumption prediction module of the resource prediction model, wherein the resource prediction model is a neural network model.
[0008] Optionally, determining the electric energy output value of each substation based on the environmental information of the current environment of each substation includes: inputting the historical environmental information of each substation into a resource prediction model, and obtaining the electric energy output value of each substation through the resource prediction model, wherein the resource prediction model is a neural network model.
[0009] Optionally, before inputting the power demand value of the substation and the called power resources into the resource control model and regulating the power resources of the virtual power plant through the resource control model, the method also includes: obtaining historical environmental information, historical power resource information, historical power output values and historical power consumption values of each substation, wherein the historical environmental information, historical power resource information, historical power output values and historical power consumption values are respectively stored in corresponding data stacks; normalizing the historical environmental information, historical power resource information, historical power output values and historical power consumption values respectively to obtain normalized data; inputting the normalized data of the historical environmental information, historical power resource information, historical power output values and historical power consumption values into the initial resource control model for forward propagation, and transmitting them to the output layer after being processed by the hidden layers of the initial resource control model; if the actual output of the output layer does not match the expected output, then entering the error back propagation stage until the initial resource control model converges.
[0010] Optionally, the normalizing of the historical environmental information, the historical power resource information, the historical electric energy output value and the historical electric energy consumption value respectively includes: unifying the dimensions of the historical environmental information, the historical power resource information, the historical electric energy output value and the historical electric energy consumption value; determining the first maximum value and the first minimum value in the historical environmental information with unified dimensions, the second maximum value and the second minimum value in the historical power resource information with unified dimensions, the third maximum value and the third minimum value in the historical electric energy output value with unified dimensions, and the fourth maximum value and the fourth minimum value in the historical electric energy consumption value; determining the normalized data of the historical environmental information according to the first maximum value and the first minimum value, determining the normalized data of the historical power resource information according to the second maximum value and the second minimum value, determining the normalized data of the historical electric energy output value according to the third maximum value and the third minimum value, and determining the normalized data of the historical electric energy consumption value according to the fourth maximum value and the fourth minimum value.
[0011] Optionally, determining the electric energy output value of each of the substations based on the environmental information of the current environment of each of the substations includes: obtaining the total daily solar radiation in the substation, the component area of the solar power generation equipment in the substation, the component conversion efficiency of the solar power generation equipment, and the comprehensive efficiency coefficient of the solar power generation equipment; determining the electric energy output value of each of the substations based on the total daily solar radiation, the component area of the solar power generation equipment in the substation, the component conversion efficiency of the solar power generation equipment, and the comprehensive efficiency coefficient of the solar power generation equipment.
[0012] Optionally, determining the electric energy output value of each substation based on the environmental information of the current environment of each substation includes: obtaining the standard number of sunshine hours of the current environment, the installed capacity of the solar power generation equipment in the substation, and the comprehensive efficiency coefficient of the solar power generation equipment; determining the electric energy output value of each substation based on the standard number of sunshine hours of the current environment, the installed capacity of the solar power generation equipment in the substation, and the comprehensive efficiency coefficient of the solar power generation equipment.
[0013] In the second aspect, an embodiment of the present application provides a substation resource control device for a virtual power plant, and the substation resource control device for the virtual power plant includes: an acquisition module, which is used to obtain the power resources currently connected to each substation in the virtual power plant network and the environmental information of the current environment of each substation, the power resources being called include power resources that can be called from the substation or power resources that need to be called into the substation; a determination module, which is used to determine the power output value of each substation according to the environmental information of the current environment of each substation, and to determine the power consumption value of each substation using the historical power resource information of each substation; the determination module is also used to determine the power demand value of each substation according to the power output value and the power consumption value; a control module, which is used to control the power resources of the virtual power plant according to the power demand value of each substation and the called power resources.
[0014] In the third aspect, an embodiment of the present application provides an electronic device, including a processor, a communication interface, a memory and a communication bus; wherein the processor, the communication interface and the memory communicate with each other through the communication bus; the memory is used to store computer programs; the processor is used to execute the programs stored in the memory to implement the steps of the method for controlling the substation resources of the virtual power plant as mentioned in the first aspect.
[0015] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method for controlling the substation resources of the virtual power plant as mentioned in the first aspect are implemented.
[0016] In the fifth aspect, an embodiment of the present application provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium, and the computer program includes program instructions. When the program instructions are executed by a computer, the computer executes the steps of the virtual power plant area resource control method mentioned in the first aspect.
[0017] Through the technical solution disclosed in the embodiment of the present application, by obtaining the power resources currently connected to each substation in the virtual power plant network and the environmental information of the current environment of each substation, the power resources called include the power resources that can be called out from the substation or the power resources that need to be called into the substation. The power output value of each substation is determined according to the environmental information of the current environment of each substation, and the power consumption value of each substation is determined using the historical power resource information of each substation. The power demand value of each substation is determined according to the power output value and the power consumption value, and the power resources of the virtual power plant are regulated according to the power demand value of each substation and the power resources called. In this way, the power resources of the virtual power plant can be regulated according to the power demand value of each substation in the virtual power plant and the power resources called, and the resources of the distribution substation can be flexibly regulated, thereby alleviating the operating pressure of the main network. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0019] Figure 1A A schematic diagram of a flow chart of a method for regulating and controlling resources in a virtual power plant provided in an embodiment of the present application;
[0020] Figure 1B A schematic diagram of the structure of a virtual power plant resource control system provided in an embodiment of the present application;
[0021] Figure 2 A schematic diagram of a module composition of a virtual power plant area resource control device provided in an embodiment of the present application;
[0022] Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0023] The purpose of the embodiments of the present application is to provide a method, device, electronic device, storage medium and program product for controlling the substation resources of a virtual power plant, thereby improving the calculation accuracy of the adjustable capacity of the virtual power plant and ensuring the stable and reliable operation of the power system.
[0024] In order to enable those skilled in the art to better understand the technical solutions in this application, the technical solutions in the embodiments of this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are only part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this application.
[0025] Exemplarily, as shown in FIG1 , an embodiment of the present application provides a method for regulating and controlling the substation resources of a virtual power plant. The execution subject of the method may be a server. The method for regulating and controlling the substation resources of the virtual power plant may specifically include the following steps:
[0026] In step S101, the power resources currently connected to each substation in the virtual power plant network and the environmental information of the current environment of each substation are obtained.
[0027] The power resources called include power resources that can be transferred from the substation or power resources that need to be transferred into the substation.
[0028] Specifically, for each substation, it includes information such as distributed production capacity, adjustable load, substation energy storage equipment, etc. Each substation can also be regarded as a small virtual power plant. Each substation can allocate power resources within the substation, and at the same time allocate power resources within the substation according to the power storage, power output and power consumption in the substation, and determine the power resources that can be transferred out or need to be transferred in within the current substation.
[0029] Furthermore, the environmental information of the current environment of the substation can be obtained from the environmental information released by the Meteorological Bureau, which includes time information and weather information. According to the weather information and time information, the power output value of the distributed power generation equipment in the current substation can be determined. The distributed power generation equipment is mainly wind power generation and solar power generation equipment, supplemented by other power generation equipment.
[0030] Furthermore, the environmental information of the current environment includes but is not limited to the total daily solar radiation, wind power, solar radiation intensity, and inclined surface solar radiation.
[0031] In step S102, the power output value of each substation is determined according to the environmental information of the current environment of each substation, and the power consumption value of each substation is determined by using the historical power resource information of each substation.
[0032] Specifically, the electric energy production equipment may be a solar power generation equipment, a wind power generation equipment, etc. In the embodiment of the present application, the solar power generation equipment is taken as an example for description.
[0033] In one possible implementation, determining the electric energy output value of each of the substations based on the environmental information of the current environment of each of the substations includes: obtaining the total daily solar radiation in the substation, the component area of the solar power generation equipment in the substation, the component conversion efficiency of the solar power generation equipment, and the comprehensive efficiency coefficient of the solar power generation equipment; determining the electric energy output value of each of the substations based on the total daily solar radiation, the component area of the solar power generation equipment in the substation, the component conversion efficiency of the solar power generation equipment, and the comprehensive efficiency coefficient of the solar power generation equipment.
[0034] Specifically, the following formula can be used to calculate the power output value:
[0035] E p =HA×S×K1×K2
[0036] In the above formula, HA is the total solar daily radiation, S is the module area, K1 is the module conversion efficiency of the solar power generation equipment, and K2 is the comprehensive efficiency coefficient of the solar power generation equipment. The comprehensive efficiency coefficient takes into account factors such as the type of photovoltaic modules, the inclination angle of the array, the azimuth angle, the system availability, the light utilization rate, and the inverter efficiency.
[0037] In one possible implementation, determining the electric energy output value of each substation based on the environmental information of the current environment of each substation includes: obtaining the standard number of sunshine hours of the current environment, the installed capacity of the solar power generation equipment in the substation, and the comprehensive efficiency coefficient of the solar power generation equipment; determining the electric energy output value of each substation based on the standard number of sunshine hours of the current environment, the installed capacity of the solar power generation equipment in the substation, and the comprehensive efficiency coefficient of the solar power generation equipment.
[0038] Specifically, the following formula can be used to calculate the power output value:
[0039] E p =H×P×K1
[0040] In the above formula, H is the local standard sunshine hours, P is the installed capacity of the solar power generation equipment, and K1 is the comprehensive efficiency coefficient (the value is 75%-85%).
[0041] Further, as an optional embodiment of the present application, determining the electric energy output value of each substation based on the environmental information of the current environment of each substation includes: inputting the historical environmental information of each substation into a resource prediction model, and obtaining the electric energy output value of each substation through the resource prediction model, wherein the resource prediction model is a neural network model.
[0042] Furthermore, as an optional embodiment of the present application, the historical power resource information of each of the substations is input into the energy consumption prediction module of the resource prediction model, and the power consumption value of each of the substations is obtained through the energy consumption prediction module of the resource prediction model, and the resource prediction model is a neural network model.
[0043] Furthermore, as an optional embodiment of the present application, before the power demand value of the substation and the called power resources are input into the resource control model and the power resources of the virtual power plant are controlled by the resource control model, the method also includes: obtaining historical environmental information, historical power resource information, historical power output value and historical power consumption value of each substation, wherein the historical environmental information, historical power resource information, historical power output value and historical power consumption value are respectively stored in corresponding data stacks; normalizing the historical environmental information, historical power resource information, historical power output value and historical power consumption value respectively to obtain normalized data; inputting the normalized data of the historical environmental information, historical power resource information, historical power output value and historical power consumption value into the initial resource control model for forward propagation, and transmitting to the output layer after being processed by each hidden layer of the initial resource control model; if the actual output of the output layer does not match the expected output, then entering the error back propagation stage until the initial resource control model converges.
[0044] Specifically, the historical environmental information, historical power resource information, historical power output value and historical power consumption value of each substation are obtained. Each piece of information is matched according to the time information to generate model training data, and the model training data is stored in a data pile or data stack. The same type of data is stored in the same data stack or data pile. For example, the data of the same time is regarded as the same type of data, and the data of the same weather is regarded as the same type of data. There can be redundancy in the data of different classification data.
[0045] Furthermore, the various data mentioned above are divided into training sets and validation sets. The data in the training set are input from the input layer to the initial resource regulation model for forward propagation. After being processed by the hosts of each hidden layer, they are transmitted to the output layer. If the actual output of the output layer does not match the expected output, the error is transferred to the back propagation stage. The back propagation stage starts from the last output layer. The purpose of training a neural network for classification is often that the output of the last layer can describe the category of the data record. For example, for a binary classification problem, two neural units are often used as the output layer. If the output value of the first neuron in the output layer is larger than that of the second neuron, the data record is considered to belong to the first category, otherwise it belongs to the second category. In the first forward feedback, the weights and biases of the entire network are all random numbers, so the output of the network certainly cannot describe the category of the record. Therefore, it is necessary to adjust the parameters of the network, that is, the weight value and the bias value. The basis for adjustment is the difference between the output value of the output layer of the network and the category. By adjusting the parameters to narrow this difference, this is the optimization goal of the neural network. The optimization goal can be expressed as follows:
[0046] E j =O j (1-O j )(T j -O j )
[0047] In the above formula, E j is the error value of the jth node, O j is the output value of the jth node, T j is the recorded output value of the jth node.
[0048] The middle hidden layer accumulates all node errors of the next layer by weight, and the calculation formula is as follows:
[0049]
[0050] Among them, E k is the error rate of the kth node in the next layer, W jk is the weight value from node j in the current layer to node k in the next layer. After calculating the error rate, the error rate can be used to update the weight and bias. First, the weight update is as follows:
[0051] ΔW ij =λE j O i
[0052] Where, ΔW ij is the weight increment from node i in the current layer to node j in the next layer, O i is the output value of the i-th node, and λ is the learning rate.
[0053] The updated weights are as follows:
[0054] W ij =W ij +ΔW ij
[0055] Among them, W ij is the weight value from node i in the current layer to node j in the next layer.
[0056] After updating the weights, there is one last parameter that needs to be updated, the bias:
[0057] Δθ j =λE j
[0058] Δθ j is the increment of the bias term, E j is the error value of the jth node.
[0059] In the above initial resource control model output and expectation inequality, there is an output error E, which is defined as:
[0060]
[0061] Expanding the error definition to the hidden layer gives:
[0062]
[0063] Further expanding the input layer, we have:
[0064]
[0065] The calculation formula of the output layer of the forward transmission is as follows:
[0066]
[0067] In the above formula, E is the error, d is the expected output, O is the output value of the output layer, x is the output value of the input layer, y is the output value of the hidden layer, and d is the output value of the hidden layer. k is the expected output value of the kth node, o k is the output value of the output layer of the kth node. γ is the number of nodes, f(net k ) is the activation function, ω jk is the weight, y j is the output value of the hidden layer of the jth node, and m is the number of neurons. j is the value of the jth specific layer, θ j is the bias term of the jth node, o j is the output value of the output layer of the jth node. is the exponential value of the value of the j-th specific layer, vij is the state vector from node i in the current layer to node j in the next layer, χ i is the value of node i in the current layer.
[0068] Further, as an optional embodiment of the present application, normalizing the historical environmental information, the historical power resource information, the historical electric energy output value and the historical electric energy consumption value respectively includes: unifying the dimensions of the historical environmental information, the historical power resource information, the historical electric energy output value and the historical electric energy consumption value; determining the first maximum value and the first minimum value in the historical environmental information with unified dimensions, the second maximum value and the second minimum value in the historical power resource information with unified dimensions, the third maximum value and the third minimum value in the historical electric energy output value with unified dimensions, and the fourth maximum value and the fourth minimum value in the historical electric energy consumption value; determining the normalized data of the historical environmental information according to the first maximum value and the first minimum value, determining the normalized data of the historical power resource information according to the second maximum value and the second minimum value, determining the normalized data of the historical electric energy output value according to the third maximum value and the third minimum value, and determining the normalized data of the historical electric energy consumption value according to the fourth maximum value and the fourth minimum value.
[0069] Specifically, the obtained data is normalized, the classified data is normalized, and the data is unified in dimension, and the maximum and minimum values are determined in the unified data. The normalization of data can be calculated using the following formula:
[0070]
[0071] In the above formula, X norm is the normalized data, X is the historical environmental information, historical power resource information, historical power output value and historical power consumption value, X max is the maximum value corresponding to various data, X min is the minimum value corresponding to various data. Then the normalized data is used to form a training sample set, which is divided into a training set and a validation set.
[0072] In step S103, the power demand value of each substation is determined according to the power output value and the power consumption value.
[0073] Specifically, the power output and power consumption values of each substation are summarized to obtain the power demand value of each substation. Since the storage cost of power is high, in order to maximize the use of power, if the excess power output can be transmitted to the substation with power demand, the storage cost of storing power or the waste of power resources can be saved. Therefore, the power demand value of each substation can be constructed, and the power resources of each substation can be regulated.
[0074] In step S104, the power resources of the virtual power plant are regulated according to the power demand value of each substation and the called power resources.
[0075] Specifically, after obtaining the power demand value of each substation and calling the power resources, the power resources of the virtual power plant are adjusted to ensure the stable operation of the resources of the virtual power plant. Figure 1B As shown, when the power resource regulation is needed in the substation, the excess power can be dispatched to the power grid. For example, Figure 1B The electric energy dispatch table of each substation is shown in Table 1.
[0076] Table 1 Electric energy dispatch table of the substation
[0077] Taiwan Area Power demand Power loss value 1 -3.524 0.127 2 +1025 - 3 -7.268 0.290 ... ... ...
[0078] In an embodiment of the present application, by obtaining the power resources currently connected to each substation in the virtual power plant network and the environmental information of the current environment of each substation, the power resources called include the power resources that can be called out from the substation or the power resources that need to be called into the substation. The power output value of each substation is determined based on the environmental information of the current environment of each substation, and the power consumption value of each substation is determined using the historical power resource information of each substation. The power demand value of each substation is determined based on the power output value and the power consumption value, and the power resources of the virtual power plant are regulated based on the power demand value of each substation and the called power resources. In this way, the power resources of the virtual power plant can be regulated according to the power demand value of each substation in the virtual power plant and the called power resources, and the flexible resources of the distribution substation can be regulated, thereby alleviating the operating pressure of the main network.
[0079] Corresponding to the method for controlling the area resources of a virtual power plant provided in the above embodiment, based on the same technical concept, the embodiment of the present application also provides a device for controlling the area resources of a virtual power plant. Figure 2 The module composition diagram of the virtual power plant area resource control device provided in the embodiment of the present application is used to execute the virtual power plant area resource control method described in FIG1 , such as Figure 2As shown, the substation resource control device 200 of the virtual power plant includes: an acquisition module 201, which is used to obtain the power resources currently connected to each substation in the virtual power plant network and the environmental information of the current environment of each substation, the power resources being called include the power resources that can be called out from the substation or the power resources that need to be called into the substation; a determination module 202, which is used to determine the power output value of each substation according to the environmental information of the current environment of each substation, and to determine the power consumption value of each substation using the historical power resource information of each substation; the determination module 202 is also used to determine the power demand value of each substation according to the power output value and the power consumption value; a control module 203, which is used to control the power resources of the virtual power plant according to the power demand value of each substation and the called power resources.
[0080] It can be seen from the technical solution provided by the above embodiments of the present application that by obtaining the power resources currently connected to each substation in the virtual power plant network and the environmental information of the current environment of each substation, the power resources called include the power resources that can be called out from the substation or the power resources that need to be called into the substation. The power output value of each substation is determined according to the environmental information of the current environment of each substation, and the power consumption value of each substation is determined using the historical power resource information of each substation. The power demand value of each substation is determined according to the power output value and the power consumption value, and the power resources of the virtual power plant are regulated according to the power demand value of each substation and the power resources called. In this way, the power resources of the virtual power plant can be regulated according to the power demand value of each substation in the virtual power plant and the power resources called, and the resources of the distribution substation can be flexibly regulated, thereby alleviating the operating pressure of the main network.
[0081] Optionally, the determination module 202 is also used to input the historical power resource information of each of the substations into the energy consumption prediction module of the resource prediction model, and obtain the power consumption value of each of the substations through the energy consumption prediction module of the resource prediction model, and the resource prediction model is a neural network model.
[0082] Optionally, the determination module 202 is further used to input the historical environmental information of each of the substations into a resource prediction model, and obtain the power output value of each of the substations through the resource prediction model, and the resource prediction model is a neural network model.
[0083] Optionally, the acquisition module 201 is also used to obtain the historical environmental information, historical power resource information, historical power output values and historical power consumption values of each of the substations, wherein the historical environmental information, historical power resource information, historical power output values and historical power consumption values are respectively stored in corresponding data stacks; the historical environmental information, the historical power resource information, the historical power output values and the historical power consumption values are respectively normalized to obtain normalized data; the normalized data of the historical environmental information, the historical power resource information, the historical power output values and the historical power consumption values are input into the initial resource regulation model for forward propagation, and are transmitted to the output layer after being processed by the hidden layers of the initial resource regulation model. If the actual output of the output layer does not match the expected output, the error is transferred to the back propagation stage until the initial resource regulation model converges.
[0084] Optionally, the acquisition module 201 is also used to unify the dimensions of the historical environmental information, the historical power resource information, the historical power output value and the historical power consumption value; determine the first maximum value and the first minimum value in the historical environmental information with unified dimensions, the second maximum value and the second minimum value in the historical power resource information with unified dimensions, the third maximum value and the third minimum value in the historical power output value with unified dimensions, and the fourth maximum value and the fourth minimum value in the historical power consumption value; determine the normalized data of the historical environmental information according to the first maximum value and the first minimum value, determine the normalized data of the historical power resource information according to the second maximum value and the second minimum value, determine the normalized data of the historical power output value according to the third maximum value and the third minimum value, and determine the normalized data of the historical power consumption value according to the fourth maximum value and the fourth minimum value.
[0085] Optionally, determining the electric energy output value of each of the substations based on the environmental information of the current environment of each of the substations includes: obtaining the total daily solar radiation in the substation, the component area of the solar power generation equipment in the substation, the component conversion efficiency of the solar power generation equipment, and the comprehensive efficiency coefficient of the solar power generation equipment; determining the electric energy output value of each of the substations based on the total daily solar radiation, the component area of the solar power generation equipment in the substation, the component conversion efficiency of the solar power generation equipment, and the comprehensive efficiency coefficient of the solar power generation equipment.
[0086] Optionally, determining the electric energy output value of each substation based on the environmental information of the current environment of each substation includes: obtaining the standard number of sunshine hours of the current environment, the installed capacity of the solar power generation equipment in the substation, and the comprehensive efficiency coefficient of the solar power generation equipment; determining the electric energy output value of each substation based on the standard number of sunshine hours of the current environment, the installed capacity of the solar power generation equipment in the substation, and the comprehensive efficiency coefficient of the solar power generation equipment.
[0087] The substation resource control device for a virtual power plant provided in the embodiment of the present application can implement each process in the embodiment corresponding to the above-mentioned substation resource control method for a virtual power plant, and has the same or similar beneficial effects. To avoid repetition, it will not be repeated here.
[0088] It should be noted that the substation resource control device for a virtual power plant provided in the embodiment of the present application and the substation resource control method for a virtual power plant provided in the embodiment of the present application are based on the same application concept. Therefore, the specific implementation of this embodiment can refer to the implementation of the aforementioned substation resource control method for a virtual power plant, and has the same or similar beneficial effects, and the repeated parts will not be repeated.
[0089] Corresponding to the virtual power plant area resource control method provided in the above embodiment, based on the same technical concept, the embodiment of the present application also provides an electronic device, which is used to execute the above virtual power plant area resource control method. Figure 3 A schematic diagram of the structure of an electronic device for implementing each embodiment of the present application is shown in FIG. Figure 3 As shown. The electronic device may have relatively large differences due to different configurations or performances, and may include one or more processors 301 and memory 302, and the memory 302 may store one or more storage applications or data. Among them, the memory 302 may be a temporary storage or a permanent storage. The application stored in the memory 302 may include one or more modules (not shown in the figure), and each module may include a series of computer executable instructions in the electronic device.
[0090] Furthermore, the processor 301 can be configured to communicate with the memory 302 to execute a series of computer executable instructions in the memory 302 on the electronic device. The electronic device can also include one or more power supplies 303, one or more wired or wireless network interfaces 304, one or more input and output interfaces 305, and one or more keyboards 306.
[0091] Specifically in this embodiment, the electronic device includes a processor, a communication interface, a memory and a communication bus; wherein the processor, the communication interface and the memory communicate with each other through the bus; the memory is used to store computer programs; the processor is used to execute the programs stored in the memory to achieve the above Figure 1A The various steps in the method embodiment are similar to those in the method embodiment, and have the beneficial effects of the above method embodiments. To avoid repetition, the embodiments of the present application will not be described again here.
[0092] This embodiment also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the above Figure 1A Each step in the method embodiment has the beneficial effects of the above method embodiments. To avoid repetition, the embodiments of the present application will not be described again here.
[0093] The present application provides a computer program product, which includes a computer program stored on a non-transitory computer-readable storage medium. The computer program includes program instructions. When the program instructions are executed by a computer, the computer executes the above Figure 1A Each step in the method embodiment has the beneficial effects of the above method embodiments. To avoid repetition, the embodiments of the present application will not be described again here.
[0094] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, devices, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0095] The present application is described with reference to the flowchart and / or block diagram of the method, device (system) and computer program product according to the embodiment of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, and the combination of the process and / or box in the flowchart and / or block diagram can be realized by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device produce a device for realizing the function specified in one process or multiple processes in the flowchart and / or one box or multiple boxes in the block diagram.
[0096] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to work in a specific manner, so that the instructions stored in the computer-readable memory produce a manufactured product including an instruction device that implements the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.
[0097] These computer program instructions may also be loaded onto a computer or other programmable data processing device so that a series of operational steps are executed on the computer or other programmable device to produce a computer-implemented process, whereby the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.
[0098] In a typical configuration, an electronic device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0099] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0100] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0101] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0102] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, devices or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0103] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A method for regulating and controlling the area resources of a virtual power plant. It is characterized in that The virtual power plant area resource control method includes: Acquire the power resources currently connected to each substation in the virtual power plant network and the environmental information of the current environment of each substation, wherein the power resources to be called include the power resources that can be called out from the substation or the power resources that need to be called into the substation; Determine the power output value of each of the substations according to the environmental information of the current environment of each of the substations, and determine the power consumption value of each of the substations using the historical power resource information of each of the substations; Determine the power demand value of each of the substations according to the power output value and the power consumption value; The power resources of the virtual power plant are regulated according to the power demand value of each of the substations and the called power resources.
2. The method for controlling the resources of a virtual power plant according to claim 1, It is characterized in that The method of using the historical power resource information of each of the substations to determine the power consumption value of each of the substations includes: The historical power resource information of each of the substations is input into the energy consumption prediction module of the resource prediction model, and the power consumption value of each of the substations is obtained through the energy consumption prediction module of the resource prediction model. The resource prediction model is a neural network model.
3. The method for controlling the area resources of a virtual power plant according to claim 1, It is characterized in that Determining the electric energy output value of each of the substations according to the environmental information of the current environment of each of the substations includes: The historical environmental information of each of the substations is input into a resource prediction model, and the power output value of each of the substations is obtained through the resource prediction model, and the resource prediction model is a neural network model.
4. The method for controlling the resources of a virtual power plant according to claim 1, It is characterized in that Before inputting the electric energy demand value of the substation and the called electric power resources into the resource regulation model and regulating the electric power resources of the virtual power plant through the resource regulation model, the method further includes: Acquire historical environmental information, historical power resource information, historical power output value and historical power consumption value of each of the substations, wherein the historical environmental information, historical power resource information, historical power output value and historical power consumption value are respectively stored in corresponding data stacks; Normalizing the historical environmental information, the historical power resource information, the historical power output value, and the historical power consumption value to obtain normalized data; The normalized data of the historical environmental information, the historical power resource information, the historical power output value and the historical power consumption value are input into the initial resource regulation model for forward propagation, and are transmitted to the output layer after being processed by the hidden layers of the initial resource regulation model. If the actual output of the output layer does not match the expected output, the error is transferred to the reverse propagation stage until the initial resource regulation model converges.
5. The method for controlling the resources of a virtual power plant according to claim 4, It is characterized in that The normalizing the historical environment information, the historical power resource information, the historical power output value, and the historical power consumption value respectively comprises: Unifying the dimensions of the historical environmental information, the historical power resource information, the historical power output value, and the historical power consumption value; Determine a first maximum value and a first minimum value in the historical environmental information of a unified dimension, a second maximum value and a second minimum value in the historical electric power resource information of a unified dimension, a third maximum value and a third minimum value in the historical electric energy output values of a unified dimension, and a fourth maximum value and a fourth minimum value in the historical electric energy consumption values; The normalized data of the historical environmental information is determined according to the first maximum value and the first minimum value, the normalized data of the historical power resource information is determined according to the second maximum value and the second minimum value, the normalized data of the historical electric energy output value is determined according to the third maximum value and the third minimum value, and the normalized data of the historical electric energy consumption value is determined according to the fourth maximum value and the fourth minimum value.
6. The method for controlling the resources of a virtual power plant according to claim 1, It is characterized in that Determining the electric energy output value of each of the substations according to the environmental information of the current environment of each of the substations includes: Obtaining the total amount of solar daily radiation in the area, the component area of the solar power generation equipment in the area, the component conversion efficiency of the solar power generation equipment, and the comprehensive efficiency coefficient of the solar power generation equipment; The electric energy output value of each of the substations is determined based on the total daily solar radiation, the component area of the solar power generation equipment in the substation, the component conversion efficiency of the solar power generation equipment and the comprehensive efficiency coefficient of the solar power generation equipment.
7. The method for controlling the area resources of a virtual power plant according to claim 1, It is characterized in that Determining the electric energy output value of each of the substations according to the environmental information of the current environment of each of the substations includes: Obtaining the standard sunshine hours of the current environment, the installed capacity of the solar power generation equipment in the area, and the comprehensive efficiency coefficient of the solar power generation equipment; The electric energy output value of each of the substations is determined according to the standard sunshine hours of the current environment, the installed capacity of the solar power generation equipment in the substation, and the comprehensive efficiency coefficient of the solar power generation equipment.
8. A virtual power plant area resource control device, It is characterized in that include: An acquisition module, used to acquire the power resources currently connected to each substation in the virtual power plant network and the environmental information of the current environment of each substation, wherein the power resources to be called include the power resources that can be called out from the substation or the power resources that need to be called into the substation; A determination module, used to determine the power output value of each of the substations according to the environmental information of the current environment of each of the substations, and to determine the power consumption value of each of the substations using the historical power resource information of each of the substations; The determination module is further used to determine the power demand value of each of the substations according to the power output value and the power consumption value; The control module is used to control the power resources of the virtual power plant according to the power demand value of each of the substations and the called power resources.
9. An electronic device, It is characterized in that It includes a processor, a communication interface, a memory and a communication bus; wherein the processor, the communication interface and the memory communicate with each other through the communication bus; the memory is used to store computer programs; the processor is used to execute the programs stored in the memory to implement the steps of the virtual power plant area resource control method as described in any one of claims 1-7.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by the processor, the steps of the method for regulating the substation resources of a virtual power plant as described in any one of claims 1-7 are implemented.