Emergency material warehouse-in and warehouse-out management method and system

By optimizing the storage location of emergency materials and dynamically adjusting the working parameters of inlet and exit, the problems of low efficiency and high cost of emergency materials management in the existing technology are solved, and the effect of rapid response and reduction of operation and maintenance costs is achieved.

CN118982310AInactive Publication Date: 2024-11-19HUANENG INFORMATION TECH CO LTD

Patent Information

Application Number
CN202411471882.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing emergency material management methods mainly rely on manual recording and regular inspections, resulting in inadequate information management, making it difficult to quickly find the required materials in an accident, affecting the rescue timeliness, and the cost of entering and exiting the warehouse is relatively high.

Method used

By optimizing the storage location of emergency materials in the warehouse, setting storage sub-regions according to category and correlation degree, optimizing in-store and outbound working parameters with real-time demand instructions, dynamically adjusting outbound instructions, improving the in-store and outbound efficiency and management of emergency materials efficiency.

Benefits of technology

Improve the response speed of emergency materials, reduce the operation and maintenance costs in and out of warehouses, ensure that the material preparation is completed as quickly as possible in the event of an accident, improve management efficiency, and reduce operation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982310A_ABST
    Figure CN118982310A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of emergency material management, in particular to an emergency material warehouse-in and warehouse-out management method and system. Comprising the steps of traversing emergency material historical parameters to establish an emergency material category sequence, and establishing an emergency material data management library according to the emergency material category sequence; establishing a plurality of storage sub-regions according to warehouse equipment parameters, and setting storage sub-regions of various types of emergency materials; establishing a warehouse-in and warehouse-out working model, and setting warehouse working parameters according to the demand instruction and the warehouse-in and warehouse-out working model; by optimizing the storage positions of various types of emergency materials in the warehouse and setting the corresponding storage sub-areas according to the properties of the various types of emergency materials and the association degrees with other emergency materials, the warehouse-out efficiency when an accident occurs is adapted, the servicing response speed of the emergency materials is increased, and the warehouse-in and warehouse-out efficiency is improved. And warehouse-in and warehouse-out operation and maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of emergency material management, and in particular to a method and system for managing the entry and exit of emergency materials. Background Art

[0002] my country's emergency material management methods are mainly concentrated in manual records, regular inspections, and manual inventory. The existing technical means are still at the traditional manual management stage. Although manual management is direct, the information management of emergency materials is often inadequate. Once an accident occurs, the location of the required emergency materials cannot be accurately found, resulting in the inability to ship out the emergency materials as quickly as possible, which directly affects the rescue timeliness and causes immeasurable losses. Summary of the invention

[0003] The purpose of this application is: to solve the above-mentioned technical problems, this application provides an emergency material warehousing and out-of-warehouse management method and system, aiming to improve the efficiency of emergency material warehousing and out-of-warehouse management, and ensure that the preparation of emergency materials is completed as quickly as possible in the event of an accident.

[0004] In some embodiments of the present application, by optimizing the storage location of each category of emergency supplies in the warehouse, corresponding storage sub-areas are set according to the nature of each category of emergency supplies and the degree of association with other emergency supplies, so as to adapt to the efficiency of outbound delivery when an accident occurs and improve the response speed of emergency supplies. The efficiency of inbound and outbound delivery is improved, and the cost of inbound and outbound operation and maintenance is reduced.

[0005] In some embodiments of the present application, the warehousing work parameters are optimized according to real-time demand instructions to reduce the operation and maintenance costs during the warehousing process. At the same time, the outbound work instructions are dynamically adjusted according to different outbound demands. Under the premise of meeting the timeliness of emergency materials when outbound, the outbound operation and maintenance costs are reduced and the management efficiency of emergency materials is improved.

[0006] In some embodiments of the present application, a method for managing the entry and exit of emergency materials is provided, including: Traverse the historical parameters of emergency materials to establish a series of emergency material categories, and establish an emergency material data management library based on the series of emergency material categories; Establish multiple storage sub-areas based on warehouse equipment parameters, and set storage sub-areas for each category of emergency supplies; Establish a warehouse entry and exit work model, and set warehouse work parameters according to demand instructions and the warehouse entry and exit work model; Among them, when setting up storage sub-areas for each category of emergency supplies, it includes: Establish a series of emergency material categories A, A=(a1,a2…an), where ai is the i-th type of emergency material and n is the number of emergency material categories; Obtain material parameters of each emergency material category according to the emergency material category sequence A; The storage sub-region sequence C, C = (c1, c2…cm), where ci is the i-th storage sub-region and m is the number of storage sub-regions; Generate a storage plan based on the emergency material category sequence A and the storage sub-area sequence C; Set up storage sub-areas for each category of emergency supplies according to the storage plan.

[0007] In some embodiments of the present application, when generating a storage plan, the process includes: Generate multiple first-level storage plans based on all material parameters and the storage sub-area sequence C, and establish a first-level storage plan sequence B, B=(b1, b2…br), where bi is the i-th first-level storage plan and r is the number of first-level storage plans; Generate storage evaluation values ​​for each first-level storage plan according to a preset storage evaluation model; Establish a storage evaluation value sequence J, J = (j1, j2…jr), where ji is the storage evaluation value of the i-th primary storage plan; Set the first-level storage plan corresponding to the maximum value jmax in the storage evaluation value sequence J as the second-level storage plan; Set up storage sub-areas for each category of emergency supplies according to the secondary storage plan.

[0008] In some embodiments of the present application, when generating the storage evaluation value of each primary storage plan, it includes: Establish a material category mapping relationship table based on the preset association model and each emergency material category sequence A; Select the target first-level storage plan in sequence according to the first-level storage plan sequence B; Generate a storage evaluation value j of the target first-level storage plan according to a preset storage evaluation model; j=e1*Q1*( αi*gi)+e2*Q2*U; gi=e3*H 1i +e4*H 2i +e5*H 3i ; Among them, e1 is the preset first weight coefficient; e2 is the preset second weight coefficient; Q1 is the preset first fixed coefficient; Q2 is the preset second fixed coefficient; αi is the influencing factor of the i-th emergency material category; U is the anti-disturbance evaluation value of the target first-level storage plan; Gi is the reference value of the i-th emergency material category in the target first-level storage plan; e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; e5 is the preset fifth weight coefficient; H 1i is the material evaluation value generated according to the storage sub-area of ​​the i-th emergency material category; H2i is the pickup evaluation value generated according to the pickup route of the i-th emergency material category; H 3i It is the association evaluation value between the storage sub-area of ​​the i-th emergency material category and the emergency material category in the adjacent storage sub-area.

[0009] In some embodiments of the present application, when setting the warehouse working parameters, it includes: Get the required instruction category; If the demand instruction is a first-level demand instruction, obtain the parameters of incoming materials according to the first-level demand instruction; Generate multiple first-level storage plans based on storage material parameters and storage and outbound work models; Generate the entry evaluation value of each first-level entry plan and establish the entry evaluation value series D, D=(d1, d2…d r1 ), where d i is the evaluation value of the i-th first-level storage plan; r1 is the number of first-level storage plans; Set the maximum value d in the sequence D of the stored evaluation values max The corresponding first-level storage plan is the second-level storage plan; Set the warehouse's warehousing work parameters according to the secondary warehousing plan.

[0010] In some embodiments of the present application, the generating of multiple primary warehousing plans includes: Extract the categories of emergency materials that need to be stored according to the parameters of the stored materials, and the parameters of each category of emergency materials; According to the storage parameters of the warehouse, set the reserve ratio range for each category of emergency materials that need to be stored; S201: Setting the reserve ratio of each category of emergency materials to be stored; S202: Generate a corresponding sub-warehousing plan for the emergency material category that needs to be stored according to the standby ratio of the emergency material category that needs to be stored and the emergency material parameters; S203: Obtain all sub-warehousing plans, and construct a warehouse entry path according to the warehouse entry and exit work model and all sub-warehousing plans; S204: Generate a single first-level storage plan according to the storage path and all sub-storage plans; S205: Adjust the reserve ratio of each category of emergency supplies that need to be stored, and iterate the above S201-S204 in a loop; S206: Output all first-level warehousing plans.

[0011] In some embodiments of the present application, when setting the warehouse working parameters, it also includes: If the demand instruction is a secondary demand instruction, obtain the parameters of the materials to be shipped out according to the secondary demand instruction; Generate multiple first-level outbound plans based on the parameters of the materials to be outbound and the inbound and outbound work model; Generate the efficiency evaluation value of each first-level outbound plan and establish the efficiency evaluation value series F, F=(f1,f2…f r2 ), where f i is the efficiency evaluation value of the i-th first-level outbound plan; r2 is the number of first-level outbound plans; Set the first-level dispatch plan corresponding to the maximum value fmax in the efficiency evaluation value F as the second-level dispatch plan; Set the warehouse's outbound work parameters according to the secondary outbound plan.

[0012] In some embodiments of the present application, when generating the efficiency evaluation value of each first-level delivery plan, it includes: Select the target first-level outbound delivery plan, and generate the duration evaluation value G1 and the cost evaluation value G2 according to the target first-level outbound delivery plan parameters; Generate the efficiency evaluation value f of the target first-level outbound plan; f=e3*G1+E4*G2; Wherein, e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; Generate efficiency evaluation values ​​for each first-level outbound plan in turn.

[0013] In some embodiments of the present application, an emergency material in-and-out storage management system is provided, including: The central control unit is used to traverse the historical parameters of emergency materials to establish a series of emergency material categories, and to establish an emergency material data management library according to the series of emergency material categories; The storage unit is used to establish multiple storage sub-areas according to the warehouse equipment parameters, and establish a storage sub-area sequence C, C = (c1, c2...cm), where ci is the i-th storage sub-area and m is the number of storage sub-areas; The central control unit sets storage sub-areas for each category of emergency supplies; The in-and-out unit is used to establish an in-and-out work model and set warehouse work parameters according to demand instructions and the in-and-out work model; The central control unit comprises: The first processing module is used to establish an emergency material category sequence A, A=(a1, a2…an), where ai is the i-th type of emergency material and n is the number of emergency material categories; The second processing module obtains material parameters of each emergency material category according to the emergency material category sequence A; the second processing module generates a storage plan according to the emergency material category sequence A and the storage sub-area sequence C; The second processing module is further used to set storage sub-areas for each category of emergency supplies according to the storage plan.

[0014] In some embodiments of the present application, the second processing module is further used to: Generate multiple first-level storage plans based on all material parameters and the storage sub-area sequence C, and establish a first-level storage plan sequence B, B=(b1, b2…br), where bi is the i-th first-level storage plan and r is the number of first-level storage plans; Generate storage evaluation values ​​for each first-level storage plan according to a preset storage evaluation model; Establish a storage evaluation value sequence J, J = (j1, j2…jr), where ji is the storage evaluation value of the i-th primary storage plan; Set the first-level storage plan corresponding to the maximum value jmax in the storage evaluation value sequence J as the second-level storage plan; Set up storage sub-areas for each category of emergency supplies according to the secondary storage plan.

[0015] Compared with the prior art, the method and system for managing the entry and exit of emergency materials in the embodiment of the present application have the following beneficial effects: By optimizing the storage location of each category of emergency supplies in the warehouse, and setting corresponding storage sub-areas according to the nature of each category of emergency supplies and the degree of correlation with other emergency supplies, the efficiency of outbound delivery in the event of an accident can be adapted and the response speed of emergency supplies can be improved. The efficiency of inbound and outbound delivery can be improved, and the cost of inbound and outbound operation and maintenance can be reduced.

[0016] Optimize the warehousing work parameters according to real-time demand instructions to reduce the operation and maintenance costs during the warehousing process. At the same time, dynamically adjust the outbound work instructions according to different outbound demands. Under the premise of meeting the timeliness of emergency materials when outbound, reduce the outbound operation and maintenance costs and improve the management efficiency of emergency materials. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a flow chart of a method for managing the entry and exit of emergency materials in a preferred embodiment of the present application. DETAILED DESCRIPTION

[0018] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0019] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0020] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0021] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0022] like Figure 1 As shown, a method for managing the entry and exit of emergency materials in a preferred embodiment of the present application includes: S101: traverse historical parameters of emergency materials to establish an emergency material category series, and establish an emergency material data management library according to the emergency material category series; S102: Establish multiple storage sub-areas according to warehouse equipment parameters, and set storage sub-areas for each category of emergency supplies; S103: Establishing a warehouse entry and exit work model, and setting warehouse work parameters according to the demand instructions and the warehouse entry and exit work model; Among them, when setting up storage sub-areas for each category of emergency supplies, it includes: Establish a series of emergency material categories A, A=(a1,a2…an), where ai is the i-th type of emergency material and n is the number of emergency material categories; Obtain material parameters of each emergency material category according to the emergency material category sequence A; The storage sub-region sequence C, C = (c1, c2…cm), where ci is the i-th storage sub-region and m is the number of storage sub-regions; Generate a storage plan based on the emergency material category sequence A and the storage sub-area sequence C; Set up storage sub-areas for each category of emergency supplies according to the storage plan.

[0023] Specifically, when generating a storage plan, include: Generate multiple first-level storage plans based on all material parameters and the storage sub-area sequence C, and establish a first-level storage plan sequence B, B=(b1, b2…br), where bi is the i-th first-level storage plan and r is the number of first-level storage plans; Generate storage evaluation values ​​for each first-level storage plan according to a preset storage evaluation model; Establish a storage evaluation value sequence J, J = (jr, jr…jr), where ji is the storage evaluation value of the i-th primary storage plan; Set the first-level storage plan corresponding to the maximum value jmax in the storage evaluation value sequence J as the second-level storage plan; Set up storage sub-areas for each category of emergency supplies according to the secondary storage plan.

[0024] Specifically, the number of storage sub-areas should be greater than the number of emergency material categories, so that a portion of the storage sub-areas can be set as spare areas to meet the demand for a large amount of emergency materials to be warehousing in a short period of time and the demand for storing emergency materials to be scrapped.

[0025] Specifically, a single first-level storage plan includes storage sub-areas and storage quantities corresponding to each category of emergency supplies, and emergency supplies of the same category can be stored in different storage sub-areas.

[0026] Specifically, when generating the storage evaluation value of each primary storage plan, it includes: Establish a material category mapping relationship table based on the preset association model and each emergency material category sequence A; Select the target first-level storage plan in sequence according to the first-level storage plan sequence B; Generate a storage evaluation value j of the target first-level storage plan according to a preset storage evaluation model; j=e1*Q1*( αi*gi)+e2*Q2*U; gi=e3*H 1i +e4*H 2i +e5*H 3i ; Among them, e1 is the preset first weight coefficient; e2 is the preset second weight coefficient; Q1 is the preset first fixed coefficient; Q2 is the preset second fixed coefficient; αi is the influencing factor of the i-th emergency material category; U is the anti-disturbance evaluation value of the target first-level storage plan; Gi is the reference value of the i-th emergency material category in the target first-level storage plan; e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; e5 is the preset fifth weight coefficient; H 1i is the material evaluation value generated according to the storage sub-area of ​​the i-th emergency material category; H 2i is the pickup evaluation value generated according to the pickup route of the i-th emergency material category; H 3i It is the association evaluation value between the storage sub-area of ​​the i-th emergency material category and the emergency material category in the adjacent storage sub-area.

[0027] Specifically, a resource category mapping relationship table is established based on the association relationship between different types of emergency materials. The evaluation index of the association relationship is mainly the probability of different types of emergency materials entering and leaving the warehouse at the same time.

[0028] Specifically, the corresponding impact factor is set according to the importance of each category of emergency supplies.

[0029] Specifically, when generating material evaluation values ​​based on storage sub-areas of emergency material categories, the fewer storage sub-areas corresponding to a single emergency material category, the higher the corresponding material evaluation value; when generating pickup evaluation values ​​based on pickup paths of emergency material categories, the shorter the pickup paths, the higher the corresponding pickup evaluation values, and the stronger the correlation between the emergency materials in the adjacent storage sub-areas and the emergency material categories in the current storage sub-area, the greater the corresponding correlation evaluation value.

[0030] Specifically, the anti-disturbance evaluation value is set based on the vacancy rate of the storage sub-area in the primary storage plan and the degree of interference between mutual paths when picking emergency materials quickly. The higher the anti-disturbance evaluation value, the stronger the current primary storage plan is in coping with the surge in the amount of emergency materials entering the warehouse and the sudden demand for emergency materials to be shipped out.

[0031] Specifically, the higher the storage evaluation value, the higher the feasibility of the corresponding first-level storage plan and the lower the subsequent operation and maintenance cost.

[0032] In the preferred embodiment of the present application, when setting the warehouse working parameters, it includes: Get the required instruction category; If the demand instruction is a first-level demand instruction, obtain the parameters of incoming materials according to the first-level demand instruction; Generate multiple first-level storage plans based on storage material parameters and storage and outbound work models; Generate the entry evaluation value of each first-level entry plan and establish the entry evaluation value series D, D=(d1, d2…d r1 ), where di is the evaluation value of the i-th first-level storage plan; r1 is the number of first-level storage plans; Set the first-level storage plan corresponding to the maximum value dmax in the storage evaluation value sequence D as the second-level storage plan; Set the warehouse's warehousing work parameters according to the secondary warehousing plan.

[0033] Specifically, when generating multiple first-level warehousing plans, it includes: Extract the categories of emergency materials that need to be stored according to the parameters of the stored materials, and the parameters of each category of emergency materials; According to the storage parameters of the warehouse, set the reserve ratio range for each category of emergency materials that need to be stored; S201: Setting the reserve ratio of each category of emergency materials to be stored; S202: Generate a corresponding sub-warehousing plan for the emergency material category that needs to be stored according to the standby ratio of the emergency material category that needs to be stored and the emergency material parameters; S203: Obtain all sub-warehousing plans, and construct a warehouse entry path according to the warehouse entry and exit work model and all sub-warehousing plans; S204: Generate a single first-level storage plan according to the storage path and all sub-storage plans; S205: Adjust the reserve ratio of each category of emergency supplies that need to be stored, and iterate the above S201-S204 in a loop; S206: Output all first-level warehousing plans.

[0034] Specifically, the reserve ratio refers to the proportion of a single type of emergency materials to be stored in the storage sub-area where the same type of emergency materials are located, and the rest to be placed in the vacant reserve storage sub-area. The reserve storage sub-area is close to the storage location of the scrapped emergency materials. Through classified storage, the storage pressure of a single storage sub-area is reduced.

[0035] Specifically, when classifying, emergency materials with shorter expected service life should be placed in the spare storage sub-area first, so as to ensure the quality of the emergency materials when they are prepared and shipped out, avoid the occurrence of unqualified emergency materials, and facilitate the subsequent scrapping process.

[0036] Specifically, the reserve ratio range is set according to the parameters of the emergency materials currently to be stored and the real-time storage parameters of the warehouse.

[0037] Specifically, unless necessary, emergency materials entering the spare storage sub-area will not be instructed to leave the warehouse.

[0038] Specifically, the reference indicators of the warehousing evaluation value include, but are not limited to, the warehousing path cost, the vacancy rate after warehousing, the probability of emergency materials being scrapped in the conventional storage sub-area, the degree of impact on subsequent outbound shipments and other parameters. The larger the warehousing evaluation value, the more feasible the current first-level warehousing plan and the higher the warehousing efficiency.

[0039] In a preferred embodiment of the present application, when setting the warehouse working parameters, it also includes: If the demand instruction is a secondary demand instruction, obtain the parameters of the materials to be shipped out according to the secondary demand instruction; Generate multiple first-level outbound plans based on the parameters of the materials to be outbound and the inbound and outbound work model; Generate the efficiency evaluation value of each first-level outbound plan and establish the efficiency evaluation value series F, F=(f1,f2…f r2 ), where fi is the efficiency evaluation value of the i-th first-level outbound plan; r2 is the number of first-level outbound plans; Set the first-level dispatch plan corresponding to the maximum value fmax in the efficiency evaluation value F as the second-level dispatch plan; Set the warehouse's outbound work parameters according to the secondary outbound plan.

[0040] Specifically, when generating the efficiency evaluation value of each first-level outbound plan, it includes: Select the target first-level outbound delivery plan, and generate the duration evaluation value G1 and the cost evaluation value G2 according to the target first-level outbound delivery plan parameters; Generate the efficiency evaluation value f of the target first-level outbound plan; f=e3*G1+E4*G2; Wherein, e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; Generate efficiency evaluation values ​​for each first-level outbound plan in turn.

[0041] Specifically, the corresponding time evaluation value G1 is set according to the time required for all materials to be shipped out to be prepared. The shorter the time, the greater the corresponding time evaluation value. The cost evaluation value G2 is evaluated based on parameters such as the number of picking times, picking paths, and the number of machines used during the shipping process. The lower the overall cost, the greater the corresponding cost evaluation value.

[0042] Specifically, the duration evaluation value and the cost evaluation value have the same value range, and the first weight coefficient and the second weight coefficient are dynamically adjusted according to the parameters of the materials to be shipped, so as to achieve the optimization processing of different directions of the first-level shipping plan, improve the shipping efficiency and reduce the operation and maintenance cost.

[0043] Based on another preferred embodiment of an emergency material in-and-out storage management method in any of the above preferred embodiments, this preferred embodiment provides an emergency material in-and-out storage management system, including: The central control unit is used to traverse the historical parameters of emergency materials to establish a series of emergency material categories, and to establish an emergency material data management library according to the series of emergency material categories; The storage unit is used to establish multiple storage sub-areas according to the warehouse equipment parameters, and establish a storage sub-area sequence C, C = (c1, c2...cm), where ci is the i-th storage sub-area and m is the number of storage sub-areas; The central control unit sets up storage sub-areas for each category of emergency supplies; The in-and-out unit is used to establish an in-and-out work model and set warehouse work parameters according to demand instructions and the in-and-out work model; The central control unit includes: The first processing module is used to establish an emergency material category sequence A, A=(a1, a2…an), where ai is the i-th type of emergency material and n is the number of emergency material categories; The second processing module obtains material parameters of each emergency material category according to the emergency material category sequence A; the second processing module generates a storage plan according to the emergency material category sequence A and the storage sub-area sequence C; The second processing module is also used to set storage sub-areas for each category of emergency supplies according to the storage plan.

[0044] Specifically, the second processing module is further used for: Generate multiple first-level storage plans based on all material parameters and the storage sub-area sequence C, and establish a first-level storage plan sequence B, B=(b1, b2…br), where bi is the i-th first-level storage plan and r is the number of first-level storage plans; Generate storage evaluation values ​​for each first-level storage plan according to a preset storage evaluation model; Establish a storage evaluation value sequence J, J = (j1, j2…jr), where ji is the storage evaluation value of the i-th primary storage plan; Set the first-level storage plan corresponding to the maximum value jmax in the storage evaluation value sequence J as the second-level storage plan; Set up storage sub-areas for each category of emergency supplies according to the secondary storage plan.

[0045] According to the first concept of this application, by optimizing the storage location of each category of emergency supplies in the warehouse, corresponding storage sub-areas are set according to the nature of each category of emergency supplies and the degree of association with other emergency supplies, so as to adapt to the efficiency of outbound delivery in the event of an accident and improve the response speed of emergency supplies. The efficiency of inbound and outbound delivery is improved, and the cost of inbound and outbound operation and maintenance is reduced.

[0046] According to the second concept of the present application, the warehousing work parameters are optimized according to real-time demand instructions to reduce the operation and maintenance costs during the warehousing process. At the same time, the outbound work instructions are dynamically adjusted according to different outbound demands. On the premise of meeting the timeliness of emergency materials when outbound, the outbound operation and maintenance costs are reduced and the management efficiency of emergency materials is improved.

[0047] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A method for managing the entry and exit of emergency materials, characterized in that: include: Traverse the historical parameters of emergency materials to establish a series of emergency material categories, and establish an emergency material data management library based on the series of emergency material categories; Establish multiple storage sub-areas based on warehouse equipment parameters, and set storage sub-areas for each category of emergency supplies; Establish a warehouse entry and exit work model, and set warehouse work parameters according to demand instructions and the warehouse entry and exit work model; Among them, when setting up storage sub-areas for each category of emergency supplies, it includes: Establish a series of emergency material categories A, A=(a1,a2…an), where ai is the i-th type of emergency material and n is the number of emergency material categories; Obtain material parameters of each emergency material category according to the emergency material category sequence A; The storage sub-region sequence C, C = (c1, c2…cm), where ci is the i-th storage sub-region and m is the number of storage sub-regions; Generate a storage plan based on the emergency material category sequence A and the storage sub-area sequence C; Set up storage sub-areas for each category of emergency supplies according to the storage plan.

2. The method for managing the entry and exit of emergency materials according to claim 1, characterized in that: When you generate a storage plan, include: Generate multiple first-level storage plans based on all material parameters and the storage sub-area sequence C, and establish a first-level storage plan sequence B, B=(b1, b2…br), where bi is the i-th first-level storage plan and r is the number of first-level storage plans; Generate storage evaluation values ​​for each first-level storage plan according to a preset storage evaluation model; Establish a storage evaluation value sequence J, J = (j1, j2…jr), where ji is the storage evaluation value of the i-th primary storage plan; Set the first-level storage plan corresponding to the maximum value jmax in the storage evaluation value sequence J as the second-level storage plan; Set up storage sub-areas for each category of emergency supplies according to the secondary storage plan.

3. The method for managing the entry and exit of emergency materials according to claim 2, characterized in that: When generating the storage evaluation value for each primary storage plan, include: Establish a material category mapping relationship table based on the preset association model and each emergency material category sequence A; Select the target first-level storage plan in sequence according to the first-level storage plan sequence B; Generate a storage evaluation value j of the target first-level storage plan according to a preset storage evaluation model; j=e1*Q1*( αi*gi)+e2*Q2*U; gi=e3*H 1i +e4*H 2i +e5*H 3i ; Among them, e1 is the preset first weight coefficient; e2 is the preset second weight coefficient; Q1 is the preset first fixed coefficient; Q2 is the preset second fixed coefficient; αi is the influencing factor of the i-th emergency material category; U is the anti-disturbance evaluation value of the target first-level storage plan; Gi is the reference value of the i-th emergency material category in the target first-level storage plan; e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; e5 is the preset fifth weight coefficient; H 1i is the material evaluation value generated according to the storage sub-area of ​​the i-th emergency material category; H 2i is the pickup evaluation value generated according to the pickup path of the i-th emergency material category; H 3i It is the association evaluation value between the storage sub-area of ​​the i-th emergency material category and the emergency material category in the adjacent storage sub-area.

4. The method for managing the entry and exit of emergency materials according to claim 3, characterized in that: When setting warehouse working parameters, include: Get the required instruction category; If the demand instruction is a first-level demand instruction, obtain the parameters of incoming materials according to the first-level demand instruction; Generate multiple first-level storage plans based on storage material parameters and storage and outbound work models; Generate the entry evaluation value of each first-level entry plan and establish the entry evaluation value series D, D=(d1, d2…d r1 ), where di is the evaluation value of the i-th first-level storage plan; r1 is the number of first-level storage plans; Set the maximum value d in the sequence D of the stored evaluation values max The corresponding first-level storage plan is the second-level storage plan; Set the warehouse's warehousing work parameters according to the secondary warehousing plan.

5. The method for managing the entry and exit of emergency materials according to claim 4, characterized in that: When generating multiple first-level warehousing plans, it includes: Extract the categories of emergency materials that need to be stored according to the parameters of the stored materials, and the parameters of each category of emergency materials; According to the storage parameters of the warehouse, set the reserve ratio range for each category of emergency materials that need to be stored; S201: Setting the reserve ratio of each category of emergency materials to be stored; S202: Generate a corresponding sub-warehousing plan for the emergency material category that needs to be stored according to the standby ratio of the emergency material category that needs to be stored and the emergency material parameters; S203: Obtain all sub-warehousing plans, and construct a warehouse entry path according to the warehouse entry and exit work model and all sub-warehousing plans; S204: Generate a single first-level storage plan according to the storage path and all sub-storage plans; S205: Adjust the reserve ratio of each category of emergency supplies that need to be stored, and iterate the above S201-S204 in a loop; S206: Output all first-level warehousing plans.

6. The method for managing the entry and exit of emergency materials according to claim 4, characterized in that: When setting warehouse working parameters, it also includes: If the demand instruction is a secondary demand instruction, obtain the parameters of the materials to be shipped out according to the secondary demand instruction; Generate multiple first-level outbound plans based on the parameters of the materials to be outbound and the inbound and outbound work model; Generate the efficiency evaluation value of each first-level outbound plan and establish the efficiency evaluation value series F, F=(f1,f2…f r2 ), where f i is the efficiency evaluation value of the i-th first-level outbound plan; r2 is the number of first-level outbound plans; Set the first-level dispatch plan corresponding to the maximum value fmax in the efficiency evaluation value F as the second-level dispatch plan; Set the warehouse's outbound work parameters according to the secondary outbound plan.

7. The method for managing the entry and exit of emergency materials according to claim 6, characterized in that: When generating the efficiency evaluation value of each first-level outbound plan, it includes: Select the target first-level outbound delivery plan, and generate the duration evaluation value G1 and the cost evaluation value G2 according to the target first-level outbound delivery plan parameters; Generate the efficiency evaluation value f of the target first-level outbound plan; f=e3*G1+E4*G2; Wherein, e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; Generate efficiency evaluation values ​​for each first-level outbound plan in turn.

8. An emergency material in-and-out storage management system, using the emergency material in-and-out storage management method described in any one of claims 1 to 7, characterized in that: include: The central control unit is used to traverse the historical parameters of emergency materials to establish a series of emergency material categories, and to establish an emergency material data management library according to the series of emergency material categories; The storage unit is used to establish multiple storage sub-areas according to the warehouse equipment parameters, and establish a storage sub-area sequence C, C = (c1, c2...cm), where ci is the i-th storage sub-area and m is the number of storage sub-areas; The central control unit sets storage sub-areas for each category of emergency supplies; The in-and-out unit is used to establish an in-and-out work model and set warehouse work parameters according to demand instructions and the in-and-out work model; The central control unit comprises: The first processing module is used to establish an emergency material category sequence A, A=(a1, a2…an), where ai is the i-th type of emergency material and n is the number of emergency material categories; The second processing module obtains material parameters of each emergency material category according to the emergency material category sequence A; the second processing module generates a storage plan according to the emergency material category sequence A and the storage sub-area sequence C; The second processing module is further used to set storage sub-areas for each category of emergency supplies according to the storage plan.

9. The emergency material storage and outgoing management system according to claim 8, characterized in that: The second processing module is also used for: Generate multiple first-level storage plans based on all material parameters and the storage sub-area sequence C, and establish a first-level storage plan sequence B, B=(b1, b2…br), where bi is the i-th first-level storage plan and r is the number of first-level storage plans; Generate storage evaluation values ​​for each first-level storage plan according to a preset storage evaluation model; Establish a storage evaluation value sequence J, J = (j1, j2…jr), where ji is the storage evaluation value of the i-th primary storage plan; Set the first-level storage plan corresponding to the maximum value jmax in the storage evaluation value sequence J as the second-level storage plan; Set up storage sub-areas for each category of emergency supplies according to the secondary storage plan.

Citation Information

Patent Citations

  • NSGA-II-based automatic storage goods allocation optimization method

    CN111178606A

  • Material inventory management method and system and computer storage medium

    CN113362009A

  • Warehouse goods input and output control method and device and warehousing system

    CN115392838A

  • Storage spare part management method and system for supply chain

    CN116308064A

  • Material storage adjustment method, device and equipment and readable storage medium

    CN116681381A

Cited By

  • Fault recording method and system for phase modifier

    CN120103140A

  • Safety data management system and method based on emergency rescue intelligent cabinet

    CN121212599A

  • Safety data management system and method based on emergency rescue intelligent cabinet

    CN121212599B

  • Intelligent level-to-level management system and method for sanitary emergency materials

    CN121660601A