Method and device for determining power consumption loss of transformer area and electronic equipment

By calculating the power energy data of the station area, accurately determining the total power loss in the station area, the problem of difficulty in accurately determining the power loss in the station area in the prior art is solved, and the operation efficiency and energy utilization rate of the power system are improved.

CN118983776APending Publication Date: 2024-11-19STATE GRID BEIJING ELECTRIC POWER CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411024558.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The prior art is difficult to accurately determine the power loss in the station area, resulting in low power transmission efficiency and energy waste in the power system.

Method used

By obtaining the power energy data of the station area, including wiring diagram, power energy acquisition data, power meter parameters and reactive power compensation equipment parameters, we calculate the structure coefficient of the outlet power grid, line load shape coefficient, average current, low-voltage circuit and other values ​​of the distribution transformer on the low voltage side of the distribution transformer. The resistance and three-phase load imbalance increment coefficients are used to determine the power loss of the bus line, the power loss of the power meter and the power loss of the reactive power compensation equipment, and finally calculate the total power loss of the table area.

Benefits of technology

It realizes accurate determination of power consumption in the station area, considers multiple factors, improves the operating efficiency of the power system, and reduces energy waste and maintenance costs of electricity meters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983776A_ABST
    Figure CN118983776A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of data processing, and particularly relates to a method and device for determining power consumption of a transformer area and electronic equipment. The method comprises the steps that electric energy data of a predetermined transformer area are acquired, and the electric energy data comprise a transformer area wiring diagram, electric energy acquisition data, electric energy meter parameters and reactive compensation equipment parameters in the predetermined transformer area; according to a transformer area wiring diagram and electric energy acquisition data, an outlet power grid structure coefficient, a line head end load shape coefficient, a line head end average current, low-voltage line equivalent resistance, a three-phase load imbalance increment coefficient and line actual operation time of a distribution transformer low-voltage side in a predetermined transformer area are determined, and then total line loss power consumption is determined. The total loss power consumption of the electric energy meter and the loss power consumption of the reactive power compensation equipment are determined according to the preset distribution area total loss power consumption. The technical problem that it is difficult to accurately determine the power consumption of the transformer area in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of data processing, and in particular relates to a method, a device and an electronic device for determining power consumption in a substation. Background Art

[0002] In related technologies, for the convenience of administration, the power range is divided into multiple substations. A substation refers to the power supply range or area of ​​a transformer. The substation plays a vital role in the power system. It is responsible for transmitting electric energy from the transformer to the designated power consumption area, ensuring that power users can "use electricity and use it well."

[0003] However, there are few methods for determining the power loss of a substation in the related technology. The related technology usually determines the loss situation based on the region as the division standard. Therefore, it is difficult to accurately determine the power loss of the substation in the existing technology.

[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0005] The purpose of the present invention is to provide a method, device and electronic equipment for determining power consumption in a substation, so as to at least solve the technical problem in the related art that it is difficult to accurately determine power consumption in a substation.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] In a first aspect, the present invention provides a method for determining power consumption in a substation, comprising:

[0008] Obtain electric energy data of a predetermined substation, wherein the electric energy data includes a substation wiring diagram, electric energy collection data, electric energy meter parameters, and reactive compensation equipment parameters in the predetermined substation; determine the export grid structure coefficient, line head end load shape coefficient, line head end average current, low-voltage line equivalent resistance, three-phase load unbalance increment coefficient, and line actual operation time of the low-voltage side of the distribution transformer in the predetermined substation based on the substation wiring diagram and the electric energy collection data; determine the total line loss power based on the export grid structure coefficient, line head end load shape coefficient, line head end average current, low-voltage line equivalent resistance, three-phase load unbalance increment coefficient, and line actual operation time, and determine the total electric energy meter loss power based on the electric energy meter parameters, and determine the reactive compensation equipment loss power based on the reactive compensation equipment parameters; determine the total substation loss power of the predetermined substation based on the total line loss power, the total electric energy meter loss power, and the reactive compensation equipment loss power.

[0009] Optionally, determining the equivalent resistance of a low-voltage line includes: obtaining a substation wiring diagram of the predetermined substation; determining line segment power grid structure coefficients corresponding to a plurality of lines included in the substation wiring diagram, and determining the meter-read electric power corresponding to the plurality of lines and the resistance corresponding to the plurality of lines based on the electric energy collection data; determining the equivalent resistance of the low-voltage lines corresponding to the plurality of lines based on the line segment power grid structure coefficients corresponding to the plurality of lines, the meter-read electric power corresponding to the plurality of lines, and the resistance corresponding to the plurality of lines; determining the equivalent resistance of the low-voltage lines corresponding to the plurality of lines and the export power grid structure coefficient on the low-voltage side of the distribution transformer.

[0010] Optionally, determining the average current at the head end of the line includes: determining the export active power on the low-voltage side of the distribution transformer, the export reactive power on the low-voltage side of the distribution transformer, the export three-phase average voltage on the low-voltage side of the distribution transformer, and the daily line operation time; determining the average current at the head end of the line based on the export active power, export reactive power, export three-phase average voltage, and daily line operation time.

[0011] Optionally, determining the three-phase load unbalance increment coefficient includes: determining the three-phase load current imbalance degree of the representative day and the imbalance types corresponding to the three-phase load of the representative day based on the electric energy collection data; determining a target unbalance coefficient function based on the imbalance types corresponding to the three-phase load of the representative day; determining the three-phase load unbalance increment coefficient based on the three-phase load current imbalance degree of the representative day and the target unbalance coefficient function.

[0012] Optionally, determining the shape coefficient k of the line head end load includes: determining, based on the electric energy collection data, the minimum current value of all measuring points in the average current selection phase, the maximum current value of all measuring points in the average current selection phase, and the average current value of all measuring points in the average current selection phase; determining a ratio of the maximum current value to the average current value as a standard ratio; determining a shape coefficient function corresponding to the standard ratio; and determining the shape coefficient k of the line head end load based on the shape coefficient function and the target ratio.

[0013] Optionally, determining the line head end load shape coefficient based on the shape coefficient function and the target ratio includes: determining the ratio of the minimum current to the maximum current as a limit ratio; when the standard ratio is greater than or equal to a predetermined threshold, determining the line head end load shape coefficient based on the limit ratio, and / or, when the standard ratio is less than the predetermined threshold, determining the line head end load shape coefficient based on the limit ratio and the standard ratio.

[0014] Optionally, determining the total power loss of the electric energy meter based on the electric energy meter parameters includes: determining multiple electric energy meters in the predetermined area; determining the electric energy meter types corresponding to the multiple electric energy meters; and determining the total power loss of the electric energy meters corresponding to the multiple electric energy meters based on the power losses corresponding to the multiple electric energy meter types.

[0015] According to one aspect of an embodiment of the present invention, a device for determining power loss in a predetermined substation is provided, comprising: an acquisition module, used to acquire power data of the predetermined substation, wherein the power data includes a substation wiring diagram, power collection data, power meter parameters, and reactive compensation equipment parameters in the predetermined substation; a first determination module, used to determine, based on the substation wiring diagram and the power collection data, an export grid structure coefficient on the low-voltage side of a distribution transformer in the predetermined substation, a line head end load shape coefficient, a line head end average current, a low-voltage line equivalent resistance, a three-phase load unbalance increment coefficient, and a line The actual operation time of the line; the second determination module is used to determine the total line loss according to the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual operation time of the line, and determine the total loss of the electric energy meter according to the electric energy meter parameters, and determine the loss of the reactive compensation equipment according to the reactive compensation equipment parameters; the third determination module is used to determine the total loss of the substation area of ​​the predetermined substation according to the total line loss, the total loss of the electric energy meter and the loss of the reactive compensation equipment.

[0016] According to a second aspect of the present invention, an electronic device is provided, comprising: a processor; and a memory for storing instructions executable by the processor; wherein the processor is configured to execute the instructions to implement the method for determining power consumption in a station area as described in any one of the above items.

[0017] According to a third aspect of the present invention, a computer-readable storage medium is provided. When instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device is enabled to execute any of the above-mentioned methods for determining power consumption in a station area.

[0018] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0019] In an embodiment of the present invention, electric energy data of a predetermined substation is obtained, wherein the electric energy data includes a substation wiring diagram, electric energy collection data, electric energy meter parameters, and reactive compensation equipment parameters in the predetermined substation. Based on the substation wiring diagram and the electric energy collection data, the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time of the distribution transformer low-voltage side in the predetermined substation are determined. Based on the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time, the total line loss is determined, and based on the electric energy meter parameters, the total loss of the electric energy meter is determined, and based on the reactive compensation equipment parameters, the loss of the reactive compensation equipment is determined. Based on the total line loss, the total loss of the electric energy meter, and the loss of the reactive compensation equipment, the total loss of the substation in the predetermined substation is determined. It can be seen that through the power collection data and wiring diagram of the predetermined substation, various data are accurately determined, and various types of power loss are determined, so that the determined total power loss of the substation takes into account multiple aspects and is more accurate, avoiding the problem of inaccurate total power loss caused by power loss caused by other aspects, and thus solving the technical problem of accurate determination of power loss in the substation in related technologies. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0021] Figure 1 is a flow chart of a method for determining power consumption in a substation according to an embodiment of the present invention;

[0022] Figure 2 It is a flow chart of a method for determining power consumption in a substation provided in an optional embodiment of the present invention;

[0023] Figure 3 4 is a structural block diagram of a device for determining power consumption in a substation according to an embodiment of the present invention. DETAILED DESCRIPTION

[0024] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0025] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present application belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention.

[0026] First, some nouns or terms that appear in the description of the embodiments of the present application are subject to the following explanations:

[0027] Substation: refers to the power supply range or area of ​​a transformer. It is a term for power economic operation management.

[0028] Low-voltage side of distribution transformer: The low-voltage side is an important port of the transformer, usually referring to the side where the transformer output voltage is lower than the input voltage, also known as the output side of the transformer.

[0029] Low-voltage line: refers to the power line with a rated voltage of 1kV or less. It is an important part of the power system that directly transmits electric energy to low-voltage electrical equipment, and is also an important part of the low-voltage power distribution system.

[0030] Example 1

[0031] According to an embodiment of the present invention, an embodiment of a method for determining power loss in a substation is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0032] Figure 1 FIG. 1 is a flow chart of a method for determining power consumption in a station area according to an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:

[0033] Step S102, obtaining electric energy data of a predetermined area, wherein the electric energy data includes an area wiring diagram, electric energy collection data, electric energy meter parameters, and reactive power compensation equipment parameters in the predetermined area;

[0034] In step S102 provided in the present application, the electric energy data of the predetermined area is obtained, wherein the predetermined area can be a specific transformer, and the power supply range or area of ​​this transformer. In order to accurately determine the loss of the area, and then adjust it more targetedly. As a key link in the power system, the area is responsible for transmitting electric energy to the designated area, and distributing, monitoring and isolating electric energy. Therefore, power regulation based on the area can achieve refined management and control of specific areas. Compared with overall regulation, area regulation can more accurately meet the power needs of different areas (such as urban residential areas, commercial areas, industrial areas and agricultural areas), and improve the pertinence and effectiveness of power supply.

[0035] Among them, the power data of the predetermined substation was obtained, including the substation wiring diagram in the predetermined substation. The substation wiring diagram is a drawing of the connection relationship between various electrical equipment and lines within the substation area of ​​the power system. It shows in detail the connection method and layout of electrical components such as transformers, switchgear, cables, and lines in the substation.

[0036] It also involves power collection data. The power collection data of the substation refers to the data of real-time or regular measurement, recording and analysis of the power usage in a specific substation (an area powered by one or more transformers). The power collection data of the substation refers to the power usage data collected in real time or regularly by the power metering devices (such as smart meters, data acquisition terminals, etc.) installed in the substation. These data include but are not limited to voltage, current, power, electricity, etc., which are used to reflect the power usage and load changes in the substation.

[0037] It also involves the parameters of the electric energy meter, which is a series of parameters used to describe the performance and function of the electric energy meter. It also involves the parameters of the reactive power compensation equipment, which is a series of parameters used to describe the performance and function of the reactive power compensation device.

[0038] Step S104, determining the export grid structure coefficient of the low-voltage side of the distribution transformer in the predetermined area, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time according to the area wiring diagram and the electric energy collection data;

[0039] In step S104 provided in the present application, it is described that a variety of data can be determined based on the substation wiring diagram and the electric energy collection data.

[0040] Among them, the export grid structure coefficient on the low-voltage side of the distribution transformer describes the complexity of the export grid on the low-voltage side of the distribution transformer, including the number of connected lines, the number of branches, the length of the line, etc. The complexity of the grid structure can be determined through the substation wiring diagram, and its impact on grid stability, power quality, and troubleshooting difficulty can be further evaluated, which is conducive to the calculation and analysis of subsequent power data.

[0041] Among them, the load shape factor at the head end of the line is also determined, which reflects the characteristics of the load changing over time, such as peak-to-valley ratio, volatility, etc. Based on the power collection data, the daily, weekly, monthly and annual changes in the load of the substation can be analyzed to determine the load shape factor.

[0042] Among them, the average current at the head end of the line is also determined. The average current is the average current of the line over a period of time (such as one day or one hour). The average current at the head end of the line can be calculated through real-time or historical current data in the power collection data. This parameter is crucial for evaluating the current carrying capacity of the line, predicting the degree of line aging, formulating maintenance plans, and determining the power loss.

[0043] Among them, the equivalent resistance of the low-voltage line is also determined. The equivalent resistance is a parameter that describes the electrical characteristics of the low-voltage line. It takes into account factors such as the length, material, and cross-sectional area of ​​the line. The calculation of the equivalent resistance is usually based on the physical parameters and electrical characteristics of the line. It is crucial for calculating the voltage drop and power loss on the line and performing power grid simulation analysis.

[0044] Among them, the three-phase load unbalance increment coefficient is also determined, which reflects the degree of unbalance of the three-phase load in the substation. Ideally, the three-phase load should be balanced, but in actual operation, due to various reasons (such as user electricity consumption behavior, equipment failure, etc.), the three-phase load is often unbalanced. Through the three-phase current data in the power acquisition data, the imbalance of the three-phase load can be calculated, and then the unbalance increment coefficient can be determined. This coefficient is of great significance for determining losses, evaluating the stability of the power grid, formulating balancing measures, and protecting equipment from damage.

[0045] The actual operation time of the line is also determined. The actual operation time refers to the time that the line is actually powered on and running within a period of time, such as a day. This parameter is crucial for evaluating the utilization rate of the line, formulating maintenance plans, and conducting economic analysis. The actual operation time of the line can be calculated through the switch status data or power metering data in the power collection data.

[0046] Step S106, determining the total line power loss according to the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time, and determining the total power loss of the power meter according to the power meter parameters, and determining the power loss of the reactive compensation equipment according to the reactive compensation equipment parameters;

[0047] In step S106 provided in the present application, the total line loss power, the total power loss of the electric energy meter, and the power loss of the reactive compensation equipment are determined. The corresponding power loss can be determined by the above corresponding methods, wherein the total line loss power is one of the important indicators for measuring the operating efficiency of the power system. By calculating and analyzing the total line loss power, the efficiency of power transmission in the power system can be evaluated, thereby finding potential energy waste points and improvement space. Among them, the total power loss of the electric energy meter is one of the important indicators for evaluating the measurement accuracy of the electric energy meter. By measuring the total power loss of the electric energy meter, it can be determined whether the measurement error of the electric energy meter is within the allowable range to ensure the accuracy of electric energy metering. The total power loss of the electric energy meter can also reflect the performance and quality of the electric energy meter. A lower total power loss means that the electric energy meter has higher efficiency and longer service life, which is conducive to reducing the user's maintenance cost and replacement frequency. Among them, the power loss of the reactive compensation equipment is one of the important indicators for evaluating the performance of the reactive compensation equipment. By measuring and analyzing the power loss of the reactive compensation equipment, it can be determined whether the operating status of the equipment is normal and whether it needs to be repaired or replaced. Understanding the power loss of the reactive compensation equipment helps to optimize the operation of the power system. By rationally configuring reactive power compensation equipment, we can reduce reactive power loss in the system, improve the power factor of the system, reduce line loss, and improve the operating efficiency of the power system.

[0048] Step S108, determining the total power loss of the predetermined substation according to the total line power loss, the total power loss of the electric energy meter and the power loss of the reactive compensation equipment.

[0049] In step S108 provided in the present application, it is explained that the total power loss in the exit area is determined by using the above three types of power loss.

[0050] Through the above steps S102-S108, the electric energy data of the predetermined substation is obtained, wherein the electric energy data includes the substation wiring diagram, electric energy collection data, electric energy meter parameters and reactive compensation equipment parameters in the predetermined substation. According to the substation wiring diagram and the electric energy collection data, the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time of the distribution transformer low-voltage side in the predetermined substation are determined. According to the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time, the total line loss is determined, and according to the electric energy meter parameters, the total loss of the electric energy meter is determined, and according to the reactive compensation equipment parameters, the loss of the reactive compensation equipment is determined. According to the total line loss, the total loss of the electric energy meter and the loss of the reactive compensation equipment, the total loss of the substation in the predetermined substation is determined. It can be seen that through the power collection data and wiring diagram of the predetermined substation, various data are accurately determined, and various types of power loss are determined, so that the determined total power loss of the substation takes into account multiple aspects and is more accurate, avoiding the problem of inaccurate total power loss caused by power loss caused by other aspects, and thus solving the technical problem of accurate determination of power loss in the substation in related technologies.

[0051] As an optional embodiment, determining the equivalent resistance of a low-voltage line includes: obtaining a substation wiring diagram of a predetermined substation; determining the line segment power grid structure coefficients corresponding to the multiple lines included in the substation wiring diagram, and determining the meter readings of the multiple lines corresponding to the multiple lines and the resistances corresponding to the multiple lines based on the electric energy collection data; determining the equivalent resistances of the low-voltage lines corresponding to the multiple lines based on the line segment power grid structure coefficients corresponding to the multiple lines, the meter readings of the multiple lines corresponding to the multiple lines, and the resistances corresponding to the multiple lines; determining the equivalent resistances of the low-voltage lines corresponding to the multiple lines and the export power grid structure coefficient on the low-voltage side of the distribution transformer.

[0052] In this embodiment, the substation wiring diagram is an important drawing describing the structure of the power network in the substation. It shows in detail the connection relationship and layout of the distribution transformers, low-voltage switchgear, lines, loads and other equipment in the substation. Therefore, through the substation wiring diagram, the line segment power grid structure coefficients corresponding to the multiple lines included in the substation wiring diagram can be determined. Since the line segment power grid structure coefficient is a parameter describing the complexity of the power network structure, it takes into account factors such as the length of the line, the number of branches, and the load distribution. Electric energy collection data is important data used to monitor the use of electric energy in the power system. By reading the data of the electric energy meter, the electric energy meter reading corresponding to each line can be determined, that is, the actual power consumption on the line.

[0053] The equivalent resistance of a low-voltage line is a parameter that describes the electrical characteristics of a low-voltage line. It takes into account factors such as the structure, load conditions, and resistance value of the line. By combining the line segment power grid structure coefficient, the amount of electricity read by the electric energy meter, and the resistance value, the equivalent resistance of the low-voltage line corresponding to each line can be calculated. If you want to calculate the equivalent resistance of the entire low-voltage line in the substation, you can weighted sum or calculate in parallel the equivalent resistance of each line according to a certain weight to obtain the equivalent resistance of the low-voltage line in the entire substation. This resistance value can be used to determine the loss in the line later.

[0054] As an optional embodiment, determining the average current at the head end of the line includes: determining the exported active power on the low-voltage side of the distribution transformer, the exported reactive power on the low-voltage side of the distribution transformer, the exported three-phase average voltage on the low-voltage side of the distribution transformer, and the daily line operation time; determining the average current at the head end of the line based on the exported active power, the exported reactive power, the exported three-phase average voltage, and the daily line operation time.

[0055] In this embodiment, the export active power refers to the actual useful electric energy transmitted to the low-voltage power grid through the low-voltage side outlet of the distribution transformer (i.e., the starting point of the feeder), which represents the actual consumption or output of electric energy. It also involves the export reactive power, which refers to the reactive electric energy transmitted to support the inductive load (such as a motor) in the power system. It does not directly work, but is crucial to the stable operation of the power system. It also involves the three-phase average voltage, which refers to the average voltage value of the three-phase line (phase A, phase B, phase C) on the low-voltage side of the distribution transformer. In a three-phase power system, the three-phase voltages are usually not completely equal, so the average value is needed to reflect the overall voltage level. It also involves the daily line operation time, which refers to the actual operation time of the low-voltage side line of the distribution transformer every day, usually in hours. The length of this time depends on the operation plan and load demand of the power system. Through the above data, the average current at the head end of the line can be determined, and the average current at the head end of the line refers to the average current value at the low-voltage side outlet of the distribution transformer (i.e., the starting point of the feeder). Calculating the average current at the head end of a line is an important task in loss analysis, which can help understand the load of the line, evaluate the operating status of the line, and predict the life of the line. The magnitude of the average current at the head end of the line directly affects the line loss, the heating of the equipment, and the stability of the power grid. Therefore, accurately calculating the average current at the head end of the line is of great significance for the operation management and optimization of the power system.

[0056] As an optional embodiment, determining the three-phase load unbalance increment coefficient includes: determining the three-phase load current imbalance degree of the representative day and the imbalance types corresponding to the three-phase load of the representative day based on the electric energy collection data; determining the target imbalance coefficient function based on the imbalance types corresponding to the three-phase load of the representative day; determining the three-phase load unbalance increment coefficient based on the three-phase load current imbalance degree of the representative day and the target imbalance coefficient function.

[0057] In this embodiment, the three-phase load current imbalance is involved, and the three-phase load current imbalance refers to the degree of difference between the three-phase (A phase, B phase, C phase) load currents within a specific time (representative day). This imbalance is usually expressed as a percentage, which is used to quantify the imbalance degree of the three-phase load current. The imbalance type is involved, and the imbalance type refers to the specific cause or type that causes the three-phase load current imbalance. These imbalance types may include load imbalance, voltage imbalance, line impedance imbalance, etc. By analyzing the electric energy collection data, the imbalance types corresponding to the three-phase loads of the representative day can be determined. It also involves a target imbalance coefficient function, which is a mathematical model used to describe and quantify the imbalance state of the three-phase load. This function is usually constructed based on parameters such as imbalance type and imbalance degree, and is used to guide the imbalance management and optimization of the power system. The three-phase load imbalance increment coefficient is an indicator used to quantify the degree of change of the three-phase load imbalance state. It is calculated based on the representative daily three-phase load current imbalance and the target imbalance coefficient function, and is used to reflect the changing trend and degree of the three-phase load imbalance state of the power system over a period of time. In practical applications, the calculation of the three-phase load imbalance increment coefficient can be achieved by comparing the three-phase load current imbalance in different time periods. By calculating the increment coefficient, subsequent losses can be evaluated.

[0058] As an optional embodiment, determining the load shape coefficient of the line head end includes: determining the minimum current value of all measuring points in the average current selection phase, the maximum current value of all measuring points in the average current selection phase, and the average current value of all measuring points in the average current selection phase based on the electric energy collection data; determining the ratio of the maximum current to the average current value as a standard ratio; determining a shape coefficient function corresponding to the standard ratio; and determining the load shape coefficient of the line head end based on the shape coefficient function and the target ratio.

[0059] In this embodiment, the minimum current value is described, which is to find the point with the smallest current value among all the measuring points of the average current selection phase (usually referring to one of the phases A, B or C). The maximum current value is described, which is to find the point with the largest current value among all the measuring points of the same average current selection phase. The average current value is also described, which is the arithmetic average of the current values ​​of all the measuring points in the average current selection phase, and the result is the average current of the phase.

[0060] The ratio of the maximum current to the average current is also determined as a standard ratio. This ratio (usually called the "peak-to-average ratio" or "fluctuation coefficient") is used to quantify the degree of current fluctuation. It reflects the degree of dispersion of the current between the maximum value and the average value, and is an important indicator for evaluating the stability and load characteristics of the power system.

[0061] By determining the shape coefficient function corresponding to the standard ratio, the correct function can be selected, so that the subsequent line head end load shape coefficient can be accurately determined.

[0062] As an optional embodiment, the line head end load shape coefficient is determined based on the shape coefficient function and the target ratio, including: determining the ratio of the minimum current to the maximum current as the limit ratio; when the standard ratio is greater than or equal to a predetermined threshold, determining the line head end load shape coefficient based on the limit ratio, and / or, when the standard ratio is less than the predetermined threshold, determining the line head end load shape coefficient based on the limit ratio and the standard ratio.

[0063] In this embodiment, a limit ratio is involved. The limit ratio (or "peak-to-valley ratio") is the ratio of the minimum current to the maximum current. It reflects the extreme fluctuation of the load between the maximum and minimum values, and is an important indicator for evaluating the degree of load fluctuation. The comparison of the standard ratio (as mentioned above, the ratio of the maximum current to the average current) with the predetermined threshold is used to determine whether the degree of load fluctuation exceeds the set limit. This predetermined threshold is usually set based on the characteristics and operation requirements of the power system. In different cases, the corresponding method for determining the load shape factor at the head end of the line is different. Therefore, it is necessary to determine the head end load shape factor according to the size relationship between the standard ratio and the predetermined threshold. In the case where the standard ratio is greater than or equal to the predetermined threshold: if the load fluctuation is large, the head end load shape factor of the line can be determined only based on the limit ratio. This is because the limit ratio directly reflects the extreme situation of load fluctuation, which is of great significance for evaluating system stability and equipment safety. In the case where the standard ratio is less than the predetermined threshold: if the load fluctuation is within an acceptable range, the head end load shape factor of the line can be determined based on the limit ratio and the standard ratio. Doing so can more comprehensively consider the fluctuation degree and distribution of load, and provide a more accurate reference for subsequent load management and grid optimization.

[0064] As an optional embodiment, the total power loss of the electric energy meter is determined based on the parameters of the electric energy meter, including: determining multiple electric energy meters in a predetermined area; determining the electric energy meter types corresponding to the multiple electric energy meters; and determining the total power loss of the electric energy meters corresponding to the multiple electric energy meters based on the power losses corresponding to the multiple electric energy meter types.

[0065] In this embodiment, multiple electric energy meters in a predetermined area are determined. This step refers to determining all electric energy meters that need to participate in the calculation in a specific area (such as a power supply area of ​​a substation, a residential area, etc.). Determine the types of electric energy meters corresponding to the multiple electric energy meters. Different electric energy meters will have different power losses due to differences in their design, manufacturing process, functions and other factors. Therefore, it is necessary to determine the specific type of each electric energy meter so that the corresponding power loss can be found according to the type later. Based on the power loss corresponding to the multiple types of electric energy meters, the total power loss of the electric energy meters corresponding to the multiple electric energy meters is determined. After knowing the type of each electric energy meter, the corresponding power loss value or the power loss value calculation method can be found in the database or relevant standards according to these types. Then, the power loss of these individual electric energy meters is added to obtain the total power loss of all electric energy meters in the entire area.

[0066] Based on the above embodiments and optional embodiments, an optional implementation is provided, which is described in detail below.

[0067] In an optional implementation manner of the present invention, a method for determining power loss in a substation is provided, which can be determined by an equivalent resistance method and a phase-split equivalent resistance method.

[0068] 1. Equivalent resistance method

[0069] Based on the particularity and complexity of the low-voltage power grid, when the three-phase load is balanced, the equivalent resistance method is used to calculate the power loss of the 0.4kV low-voltage power grid, and it is advisable to carry out the calculation based on the substation as a unit. The loss of the low-voltage substation is divided into three parts: low-voltage network line loss, electric energy meter loss, and reactive compensation equipment loss. The overall line loss theoretical calculation formula is:

[0070]

[0071] The formula is divided into three parts. The first part is the above-mentioned low-voltage network line loss (the same as the above-mentioned total line loss), the second part is the above-mentioned electric energy meter loss (the same as the above-mentioned electric energy meter total loss), and the third part is the above-mentioned reactive compensation equipment loss (the same as the above-mentioned reactive compensation equipment loss).

[0072] ΔA b ——Theoretical line loss of low voltage network when three-phase load is balanced, kWh;

[0073] N——The grid structure coefficient of the low-voltage side outlet of the distribution transformer. For single-phase power supply, it is 2; for three-phase three-wire system, it is 3; for three-phase four-wire system, it is 3.5 (2 wires, 3 wires, 3.5 wires);

[0074] k——Line head load shape factor, which is the equivalent relationship between the root mean square current and the average current;

[0075] I av ——Average current at the beginning of the line, A;

[0076] R eqL ——Equivalent resistance of low voltage line, Ω;

[0077] T——actual operation time of the line, h;

[0078] D – number of calendar days in the month;

[0079] ΔA dbi ——Monthly consumption of the i-th type of energy meter, kWh, which can be divided into single-phase energy meter, three-phase energy meter, and three-phase four-wire energy meter;

[0080] m i ——The number of electric energy meters of category i;

[0081] ΔA c ——Loss of reactive power compensation equipment, kWh.

[0082] (I) Calculation of low voltage network line loss (same as the above method for determining total line loss power)

[0083] The loss of each section of the low-voltage network is:

[0084] ΔA Lj =N(kI av ) 2 R eqLj .T×10 -3 (1-2)

[0085] The total loss of low voltage network line is:

[0086]

[0087] ΔA Lj ——Theoretical line loss of the jth line segment of the low-voltage network when the three-phase load is balanced, kWh;

[0088] R eqLj ——equivalent resistance of the jth line segment, Ω;

[0089] ΔA L ——The overall theoretical line loss of low-voltage network when the three-phase load is balanced, kWh;

[0090] n——total number of low-voltage network line segments;

[0091] ① Calculation I av

[0092]

[0093] or

[0094] I i ——current of any phase;

[0095] Obtain basic data and substitute the data into formula 1-4 to obtain I av .

[0096] ②Calculate k 2

[0097] Convert the load curve of the substation area into a typical load curve.

[0098] Average load factor:

[0099] Minimum load rate:

[0100] I min ——Calculate the minimum value of the current of all measuring points in the average current selection phase (phase A, B, C), A;

[0101] Imax ——Calculate the maximum value of the current of all measuring points in the average current selection phase (phase A, B, C), A.

[0102] If f ≥ 0.5, according to the guidelines, it is converted into a continuous load curve that changes in a straight line, then

[0103]

[0104] If f<0.5, according to the guidelines, it is converted into a two-step continuous load curve.

[0105]

[0106] If the current cannot be obtained, the default k 2 =1.1.

[0107] ③Calculate R eqL

[0108] Assuming that the voltage and power factor are equal at all points in the line, we have:

[0109]

[0110] Right now:

[0111]

[0112] Among them I ∑ , A ∑ They are the distribution transformer outlet current and power respectively.

[0113] Then we have:

[0114]

[0115] Among them, △A is the power loss in the substation.

[0116] That is, the equivalent resistance is:

[0117]

[0118] First calculate the equivalent resistance R of each line segment eqLj :

[0119]

[0120] Then calculate the overall equivalent resistance R of the circuit eqL :

[0121]

[0122] N j ——The power grid structure coefficient of the jth line segment is 2 for single-phase, 3 for three-phase three-wire, and 3.5 for three-phase four-wire;

[0123] A j.∑ ——The sum of the electricity meter readings of the users under the jth line segment, kWh;

[0124] R j ——The resistance of the jth line segment, Ω;

[0125] n——total number of low-voltage network line segments;

[0126] N——The structure coefficient of the power grid at the low-voltage side of the distribution transformer. For single-phase power supply, it is 2; for three-phase three-wire system, it is 3; and for three-phase four-wire system, it is 3.5;

[0127] A i ——The electricity meter reading of the ith user, kWh;

[0128] m——the number of user’s electricity meters.

[0129] N, k 2 ,I av , R eqLj , R eqL Substitute T and T into formulas 1-2 and 1-3 respectively to calculate the low-voltage network segment and line losses.

[0130] (II) Calculation of energy meter loss

[0131]

[0132] ΔA dbi ——Monthly power consumption of various types of electric energy meters. Electric energy meters are divided into three categories: single-phase electric energy meters, three-phase three-wire electric energy meters, and three-phase four-wire electric energy meters. Among them, for electronic electric energy meters, the monthly power consumption of single-phase electric energy meters is 1kWh / meter, the monthly power consumption of three-phase three-wire meters is 2kWh / meter, and the monthly power consumption of three-phase four-wire meters is 3kWh / meter;

[0133] m i ——The number of electric energy meters of category i;

[0134] T——actual operation time of the line, h;

[0135] D – the number of calendar days in the month.

[0136] Substitute the number and monthly loss of all the electric energy meters in the substation into formula 1-11 according to their classification to calculate the loss of the electric energy meters.

[0137] (III) Calculation of reactive power compensation equipment losses

[0138] The reactive power compensation device is a parallel capacitor:

[0139]

[0140] ΔA c- the losses of each parallel capacitor;

[0141] Q ci ——Represents the capacity of the ith shunt capacitor put into operation on the day, kvar, see capacitance parameters;

[0142] tgδ i ——The dielectric loss tangent value of the i-th parallel capacitor, refer to the capacitor factory manual, generally 0.1%;

[0143] T i ——represents the operating time of the i-th parallel capacitor on the day, h;

[0144] n——represents the number of parallel capacitors put into operation daily.

[0145] Count the losses of all reactive power compensation equipment in the substation area, and substitute them into formula 1-12 to calculate the losses of reactive power compensation equipment.

[0146] (IV) Calculation of total losses in low voltage areas

[0147] Substitute the calculated low-voltage network line loss, energy meter loss, and reactive compensation equipment loss into formula 1-1 to calculate the total power loss in the low-voltage area.

[0148] (V) Calculation of electricity supply and sales

[0149] Power supply in the area = power supply of single-phase users + power supply of three-phase users + total power loss in the area;

[0150] The power sales volume of the substation = the power consumption of single-phase users + the power consumption of three-phase users;

[0151] Line segment transmission power = active power at the beginning of the line segment * (power of users connected to the end of the line segment / power of users connected to the end of the previous line segment);

[0152] The power output of a line segment = the power transmitted by the line segment - the power loss of the line segment.

[0153] (VI) Calculation of line loss rate

[0154] Substation line loss rate = (total power consumption in the substation / power supply in the substation) * 100%;

[0155] Line segment loss rate = (line segment power loss / line segment power transmission) * 100%;

[0156] Line loss rate = (line power loss / area power supply) * 100%;

[0157] Electric meter loss rate = (electric meter loss power / power supply in the area) * 100%;

[0158] Reactive power compensation equipment loss rate = (reactive power compensation equipment power loss / station area power supply) * 100%.

[0159] (VII) Calculation of required data

[0160] 1) The structure coefficient of the power grid at the low-voltage side of the distribution transformer is 2 for single-phase, 3 for three-phase three-wire, and 3.5 for three-phase four-wire;

[0161] 2) Current and operating time of the representative day at the low-voltage side outlet of the distribution transformer;

[0162] 3) The power consumption and number of users connected to the low-voltage station area;

[0163] 4) Substation wiring diagram, including: line information (number of line segments, resistance), grid structure coefficient of the line segment;

[0164] 5) Parameters such as the number of electric energy meters in the substation area and monthly loss;

[0165] 6) Parameters such as the number, capacity, dielectric loss angle, etc. of reactive power compensation equipment in the substation area.

[0166] 2. Phase-separated equal resistance method

[0167] When the three-phase load of the low-voltage substation is unbalanced, the phase-separated equal resistance method should be used to calculate the power loss in the substation.

[0168] (I) Calculation steps

[0169] The loss of low-voltage area is divided into three parts: low-voltage network line loss, electric energy meter loss, and reactive power compensation equipment loss. The overall line loss theoretical calculation formula is:

[0170]

[0171] ΔA unb ——Line loss of low voltage area when three-phase load is unbalanced, kWh;

[0172] N——The structure coefficient of the power grid at the low-voltage side of the distribution transformer. For single-phase power supply, it is 2; for three-phase three-wire system, it is 3; and for three-phase four-wire system, it is 3.5;

[0173] k——line head end load shape factor;

[0174] I av ——Average current at the beginning of the line, A;

[0175] R eqL ——Equivalent resistance of low voltage line, Ω;

[0176] K b ——The ratio of the loss when the three-phase load is unbalanced to the loss when the three-phase load is balanced, that is, the three-phase load unbalance increment coefficient;

[0177] T——actual operation time of the line, h;

[0178] D – number of calendar days in the month;

[0179] ΔA dbi ——Monthly consumption of the i-th type of energy meter, kWh, which can be divided into single-phase energy meter, three-phase energy meter, and three-phase four-wire energy meter;

[0180] m i ——The number of electric energy meters of category i;

[0181] ΔA c ——Loss of reactive power compensation equipment, kWh.

[0182] (II) Calculation of low voltage network line losses

[0183] The loss of each section of the low-voltage network is:

[0184] ΔA Lj =N(kI av ) 2 R eqLj .K b .T×10 -3 (2-2)

[0185] The formula for low voltage network line loss is:

[0186]

[0187] ΔA Lj ——Theoretical line loss of the jth line segment of the low-voltage network when the three-phase load is unbalanced, kWh;

[0188] R eqLj ——equivalent resistance of the jth line segment, Ω;

[0189] ΔA L ——The overall theoretical line loss of low-voltage network when the three-phase load is unbalanced, kWh;

[0190] n——Total number of low-voltage network line segments.

[0191] ① Calculation I av

[0192]

[0193] A p ——Represents the daily active power output at the low-voltage side of the distribution transformer, kWh;

[0194] A q ——Represents the reactive power at the low-voltage side outlet of the daily distribution transformer, kWh;

[0195] U——represents the three-phase average line voltage at the low-voltage side outlet of the daily distribution transformer, generally 0.38kV;

[0196] T——represents daily line operation time.

[0197] Obtain basic data and substitute the data into formula 2-4 to obtain I av .

[0198] ②Calculate k 2

[0199]

[0200] I min ——Calculate the average current Select the phase (A, B, C), the minimum value of all measuring points current, A; I max ——Calculate the maximum value of the current of all measuring points in the average current selection phase (phase A, B, C), A.

[0201] If f ≥ 0.5, then

[0202]

[0203] If f<0.5, then

[0204]

[0205] If the current cannot be obtained, the default k 2 =1.1.

[0206] ③Calculate R eqL

[0207] First calculate the equivalent resistance R of each line segment eqLj :

[0208]

[0209] Then calculate the overall equivalent resistance R of the circuit eqL :

[0210]

[0211] N j ——The power grid structure coefficient of the jth line segment is 2 for single-phase, 3 for three-phase three-wire, and 3.5 for three-phase four-wire;

[0212] A j.∑ ——The sum of the electricity meter readings of the users under the jth line segment, kWh;

[0213] R j ——The resistance of the jth line segment, Ω;

[0214] n——total number of low-voltage network line segments;

[0215] N——The structure coefficient of the power grid at the low-voltage side of the distribution transformer. For single-phase power supply, it is 2; for three-phase three-wire system, it is 3; and for three-phase four-wire system, it is 3.5;

[0216] A i ——The electricity meter reading of the ith user, kWh;

[0217] m——the number of user’s electricity meters.

[0218] Substitute the data into formulas 2-9 and 2-10 to calculate the equivalent resistance R of the line segment and line respectively. eqLj , R eqL .

[0219] ④Calculate K b

[0220] 1) First calculate the unbalance degree of three-phase load current ε at each time of the representative day i

[0221]

[0222] I max =max{I Ai , I Bi , I Ci} (2-13)

[0223] ε i ——Represents the unbalance degree of three-phase load current at the outlet of the low-voltage side of the daily distribution transformer at each moment;

[0224] I max ——Represents the maximum value of the three-phase current at the low-voltage side outlet of the daily distribution transformer at each moment, A;

[0225] I avp ——Represents the average value of the three-phase current at the low-voltage side outlet of the daily distribution transformer at each moment, A;

[0226] I Ah ——Represents the A-phase current value at the low-voltage side outlet of the daily distribution transformer at each moment, A;

[0227] I Bh ——Represents the B-phase current value at the low-voltage side outlet of the daily distribution transformer at each moment, A;

[0228] I Ch ——Represents the C-phase current value at the low-voltage side outlet of the daily distribution transformer at each moment, A.

[0229] 2) Determine the type of unbalanced three-phase load at each time of the representative day

[0230]

[0231]

[0232] When G i <0.8, the phase is light, when 0.8≤G i ≤1.2, the phase is average, when 1.2 <G i , this phase is important.

[0233] 3) Calculate the three-phase load unbalance increment coefficient K at each time of the representative day bi

[0234] One heavy, one light, and one average:

[0235]

[0236] One heavy and two light:

[0237] K bi =1+2ε i 2 (2-18)

[0238] Two heavy and one light:

[0239] K bi =1+8ε i 2 (2-19)

[0240] 4) Calculate the three-phase load unbalance increment coefficient K on the representative day b

[0241]

[0242] ⑤Calculate loss

[0243] Put N, I av , k 2 , R eqLj , R eqL , K b Substitute T into formulas 2-2 and 2-3 to calculate the power loss of the low-voltage network line segment and line.

[0244] (III) Calculation of energy meter loss

[0245]

[0246] ΔA dbi ——Monthly power consumption of various types of electric energy meters. Electric energy meters are divided into three categories: single-phase electric energy meters, three-phase three-wire electric energy meters, and three-phase four-wire electric energy meters. Among them, for electronic electric energy meters, the monthly power consumption of single-phase electric energy meters is 0.4kWh / meter, the monthly power consumption of three-phase three-wire meters is 0.8kWh / meter, and the monthly power consumption of three-phase four-wire meters is 1.0kWh / meter;

[0247] m i——The number of electric energy meters of category i;

[0248] T——actual operation time of the line, h;

[0249] D – the number of calendar days in the month.

[0250] Classify all the electric energy meters in the substation and substitute their number and monthly loss into formula 2-21 to calculate the loss of the electric energy meters.

[0251] (IV) Calculation of reactive power compensation equipment losses

[0252] The reactive power compensation device is a parallel capacitor:

[0253]

[0254] ΔA c - the losses of each parallel capacitor;

[0255] Q ci ——Represents the capacity of the ith shunt capacitor put into operation on the day, kvar, see capacitance parameters;

[0256] tgδ i ——The dielectric loss tangent value of the i-th parallel capacitor, refer to the capacitor factory manual, generally minus 0.1%;

[0257] T i ——represents the operating time of the i-th parallel capacitor on the day, h;

[0258] n——represents the number of parallel capacitors put into operation daily.

[0259] Count the losses of all reactive compensation equipment in the substation area, substitute them into formula 2-22, and calculate the losses of reactive compensation equipment.

[0260] (V) Calculation of total losses in low voltage areas

[0261] Substitute the calculated low-voltage network line loss, energy meter loss, and reactive compensation equipment loss into formula 2-1 to calculate the total power loss in the low-voltage area.

[0262] (VI) Calculation of electricity supply and sales

[0263] Power supply in the area = power supply of single-phase users + power supply of three-phase users + total power loss in the area;

[0264] The power sales volume of the substation = the power consumption of single-phase users + the power consumption of three-phase users;

[0265] Line segment transmission power = active power at the beginning of the line * (power of users connected to the end of the line segment / power of users connected to the end of the previous line segment);

[0266] The power output of a line segment = the power transmitted by the line segment - the power loss of the line segment.

[0267] (VII) Calculation of line loss rate

[0268] Substation line loss rate = (total power consumption in the substation / power supply in the substation) * 100%;

[0269] Line segment loss rate = (line segment power loss / line segment power transmission) * 100%;

[0270] Line loss rate = (line power loss / area power supply) * 100%;

[0271] Electric meter loss rate = (electric meter loss power / power supply in the area) * 100%;

[0272] Reactive power compensation equipment loss rate = (reactive power compensation equipment power loss / station area power supply) * 100%.

[0273] (VIII) Calculation of required data

[0274] 1) The structure coefficient of the power grid at the low-voltage side of the distribution transformer is 2 for single-phase, 3 for three-phase three-wire, and 3.5 for three-phase four-wire;

[0275] 2) Current, voltage, active power, reactive power and operating time of the representative day at the low-voltage side outlet of the distribution transformer;

[0276] 3) Representative daily three-phase load curve of the low-voltage side outlet of the distribution transformer;

[0277] 4) The power consumption and number of users connected to the low-voltage station area;

[0278] 5) Substation wiring diagram, including: line information (number of line segments, resistance), grid structure coefficient of the line segment;

[0279] 6) Parameters such as the number of electric energy meters in the substation area and monthly loss;

[0280] 7) The number, capacity, dielectric loss angle and other parameters of reactive power compensation equipment in the substation area.

[0281] That is, the above formula is the same as the above method for obtaining the electric energy data of the predetermined area, wherein the electric energy data includes the area wiring diagram, electric energy collection data, electric energy meter parameters and reactive power compensation equipment parameters in the predetermined area;

[0282] According to the area wiring diagram and power collection data, determine the export grid structure coefficient N of the low-voltage side of the distribution transformer in the predetermined area, the line head load shape coefficient k, and the line head average current I av , low voltage line equivalent resistance R eqL , three-phase load unbalance increment coefficient K b , the actual operation time of the line is T;

[0283] Based on the export grid structure factor N, the line head load shape factor k, and the line head average current I av , low voltage line equivalent resistance R eqL , three-phase load unbalance increment coefficient K b , the actual operation time of the line T, determine the total line power loss, and determine the total power loss of the power meter based on the power meter parameters, and determine the power loss of the reactive compensation equipment based on the reactive compensation equipment parameters;

[0284] Determine the equivalent resistance R of the low voltage line eqL When including:

[0285] Get the area wiring diagram of the reserved area;

[0286] Determine the line segment power grid structure coefficient N corresponding to each of the multiple lines included in the substation wiring diagram j , and according to the electric energy collection data, determine the electric energy meter readings A corresponding to the multiple lines i , the multiple circuits correspond to the corresponding resistance R j ;

[0287] According to the line segment power grid structure coefficient N corresponding to multiple lines j , the electric energy meters corresponding to multiple lines read the power A i , and the corresponding resistances R of the multiple circuits j , determine the low-voltage line equivalent resistance R corresponding to multiple lines eqLj ;

[0288] According to the low voltage line equivalent resistance R corresponding to multiple lines eqLj And the export grid structure coefficient N on the low-voltage side of the distribution transformer, determine the low-voltage line equivalent resistance R eqL .

[0289] Determine the average current I at the beginning of the line av When including:

[0290] Determine the active power A at the outlet of the low voltage side of the distribution transformer p , the reactive power output A of the low voltage side of the distribution transformer q , the three-phase average line voltage U at the outlet of the low-voltage side of the distribution transformer, and the daily line operation time T;

[0291] Based on the export active power A p , export reactive power A q , the average three-phase line voltage U at the outlet, and the daily line operation time T, determine the average current I at the head end of the line av .

[0292] It should be noted that, for the above-mentioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should know that the present invention is not limited by the described action sequence, because according to the present invention, certain steps can be performed in other sequences or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present invention.

[0293] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods of various embodiments of the present invention.

[0294] Example 2

[0295] According to an embodiment of the present invention, a device for implementing the above-mentioned method for determining power consumption in a substation is also provided. Figure 3 is a structural block diagram of a device for determining power consumption in a substation according to an embodiment of the present invention. Figure 3 As shown, the device includes: an acquisition module 302, a first determination module 304, a second determination module 306 and a third determination module 308. The device is described in detail below.

[0296] The acquisition module 302 is used to acquire the electric energy data of the predetermined area, wherein the electric energy data includes the area wiring diagram, electric energy collection data, electric energy meter parameters and reactive power compensation equipment parameters in the predetermined area;

[0297] The first determination module 304 is connected to the acquisition module 302 and is used to determine the export grid structure coefficient of the low-voltage side of the distribution transformer in the predetermined area, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time according to the area wiring diagram and the electric energy collection data;

[0298] The second determination module 306 is connected to the first determination module 304, and is used to determine the total line loss power according to the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time, and determine the total power loss of the electric energy meter according to the electric energy meter parameters, and determine the power loss of the reactive compensation equipment according to the reactive compensation equipment parameters;

[0299] The third determination module 308 is connected to the second determination module 306, and is used to determine the total power loss of the predetermined substation according to the total line power loss, the total power loss of the electric energy meter and the power loss of the reactive compensation equipment.

[0300] It should be noted here that the above-mentioned acquisition module 302, the first determination module 304, the second determination module 306 and the third determination module 308 correspond to steps S102 to S108 in the method for determining the power loss in the substation, and the instances and application scenarios implemented by the multiple modules and the corresponding steps are the same, but are not limited to the contents disclosed in the above-mentioned embodiment 1.

[0301] Example 3

[0302] According to another aspect of an embodiment of the present invention, there is also provided an electronic device, comprising: a processor; and a memory for storing instructions executable by the processor, wherein the processor is configured to execute instructions to implement any of the above methods for determining power consumption in a station area.

[0303] Example 4

[0304] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided. When instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device can execute any of the above-mentioned methods for determining power consumption in a station area.

[0305] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0306] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0307] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0308] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0309] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0310] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0311] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for determining power consumption in a substation, characterized in that: include: Acquiring electric energy data of a predetermined area, wherein the electric energy data includes an area wiring diagram, electric energy collection data, electric energy meter parameters, and reactive power compensation equipment parameters in the predetermined area; According to the substation wiring diagram and the electric energy collection data, determine the export grid structure coefficient of the low-voltage side of the distribution transformer in the predetermined substation, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time; Determine the total line power loss according to the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time, and determine the total power loss of the power meter according to the power meter parameters, and determine the power loss of the reactive compensation equipment according to the reactive compensation equipment parameters; The total power loss of the predetermined substation is determined based on the total line power loss, the total power loss of the electric energy meter and the power loss of the reactive compensation equipment.

2. The method according to claim 1, characterized in that: Determine the equivalent resistance of low voltage lines, including: Obtaining a substation wiring diagram of the predetermined substation; Determine the line segment power grid structure coefficients corresponding to the multiple lines included in the substation wiring diagram, and determine the electric energy meter readings corresponding to the multiple lines and the resistances corresponding to the multiple lines based on the electric energy collection data; Determine the equivalent resistance of the low-voltage lines corresponding to the multiple lines respectively according to the line segment power grid structure coefficients corresponding to the multiple lines respectively, the electric energy meters corresponding to the multiple lines respectively, and the resistances corresponding to the multiple lines respectively; The low-voltage line equivalent resistance is determined according to the low-voltage line equivalent resistances respectively corresponding to the multiple lines and the export power grid structure coefficient on the low-voltage side of the distribution transformer.

3. The method according to claim 1, characterized in that Determine the average current at the beginning of the line, including: Determine the active power output at the low voltage side of the distribution transformer, the reactive power output at the low voltage side of the distribution transformer, the average three-phase voltage at the low voltage side of the distribution transformer, and the daily line operation time; The average current at the head end of the line is determined based on the exported active power, exported reactive power, exported three-phase average voltage, and daily line operation time T.

4. The method according to claim 1, characterized in that: Determine the three-phase load unbalance increment coefficient K b ,include: Determine, based on the electric energy collection data, the unbalance degree of the three-phase load current of the representative day and the unbalance type corresponding to the three-phase load of the representative day; Determining a target unbalance coefficient function according to the unbalance types respectively corresponding to the three-phase loads of the representative day; The three-phase load unbalance increment coefficient is determined according to the representative daily three-phase load current unbalance degree and the target unbalance coefficient function.

5. The method according to claim 1, characterized in that Determining the line head end load shape factor k comprises: Determine the minimum current value of all measuring points in the average current selected phase, the maximum current value of all measuring points in the average current selected phase, and the average current value of all measuring points in the average current selected phase according to the electric energy collection data; Determining a ratio of the maximum current to the average current as a standard ratio; determining a shape coefficient function corresponding to the standard ratio; The line head end load shape coefficient k is determined based on the shape coefficient function and the target ratio.

6. The method according to claim 5, characterized in that Determining the line head end load shape coefficient according to the shape coefficient function and the target ratio includes: Determining a ratio of the minimum current value to the maximum current value as a limit ratio; When the standard ratio is greater than or equal to a predetermined threshold, the line head end load shape coefficient is determined based on the limit ratio, and / or, when the standard ratio is less than the predetermined threshold, the line head end load shape coefficient is determined based on the limit ratio and the standard ratio.

7. The method according to any one of claims 1 to 6, characterized in that: Determining the total power consumption of the electric energy meter according to the electric energy meter parameters includes: Determining a plurality of electric energy meters in the predetermined area; Determine the electric energy meter types corresponding to the multiple electric energy meters respectively; According to the power losses respectively corresponding to the multiple power meter types, the total power losses of the power meters corresponding to the multiple power meters are determined.

8. A device for determining power consumption in a predetermined area, characterized in that: include: An acquisition module, used to acquire electric energy data of a predetermined area, wherein the electric energy data includes an area wiring diagram, electric energy collection data, electric energy meter parameters, and reactive power compensation equipment parameters in the predetermined area; The first determination module is used to determine the export grid structure coefficient of the low-voltage side of the distribution transformer in the predetermined substation, the line head end load shape coefficient, the line head end average current, the low-voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time according to the substation wiring diagram and the electric energy collection data; The second determination module is used to determine the total line loss power according to the export grid structure coefficient, the line head end load shape coefficient, the line head end average current, the low voltage line equivalent resistance, the three-phase load unbalance increment coefficient, and the actual line operation time, and determine the total power loss of the electric energy meter according to the electric energy meter parameters, and determine the power loss of the reactive compensation equipment according to the reactive compensation equipment parameters; The third determination module is used to determine the total power loss of the predetermined substation according to the total line power loss, the total power loss of the electric energy meter and the power loss of the reactive compensation equipment.

9. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; The processor is configured to execute the instructions to implement the method for determining power consumption in a metro station according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: When the instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device is enabled to execute the method for determining power consumption in a station area according to any one of claims 1 to 7.